Grid and Transmission · Source-checked
ERCOT wind and solar curtailment, congestion costs and transmission limits
IMM charts show congestion curtailed about 9.8 TWh of ERCOT wind and solar output in 2025, up from about 8.3 TWh in 2024 (approximate Power Hopper readings), while the IMM reports real-time congestion costs rose 32%.
about 9.8 TWh
ERCOT wind and solar curtailed by congestion in 2025 (approximate Power Hopper reading of IMM charts)
Takeaway
- IMM charts show congestion curtailed about 9.8 TWh of ERCOT wind and solar output in 2025, up from about 8.3 TWh in 2024 (approximate Power Hopper readings), while the IMM reports real-time congestion costs rose 32%.
Article: Grid congestion held back nearly 10 TWh of wind and solar power on the ERCOT grid in 2025
Data
| Year | Period | Wind (TWh) | Solar (TWh) | Wind + solar share (%) | Wind curtailed, approx. (TWh) | Solar curtailed, approx. (TWh) | Total curtailed, approx. (TWh) | RT congestion cost, approx. ($B) |
|---|---|---|---|---|---|---|---|---|
| 2021 | Full year | 95.4 | 15.71 | 28.4 | 5.2 | 1.4 | 6.6 | 2.0 |
| 2022 | Full year | 107.26 | 24.19 | 30.7 | 5.3 | 2.3 | 7.6 | 2.8 |
| 2023 | Full year | 107.99 | 32.4 | 31.6 | 4.8 | 1.9 | 6.7 | 2.4 |
| 2024 | Full year | 111.74 | 48.22 | 34.6 | 5.3 | 3.0 | 8.3 | 2.0 |
| 2025 | Full year | 114.92 | 67.81 | 37.4 | 5.7 | 4.1 | 9.8 | 2.6 |
| 2026 | Jan-Oct (preliminary for latest months) | 101.44 | 72.5 | 39.9 |
| Interface | GTC code | Limit type | 2027 limit (MW) | 2030 limit (MW) | Note |
|---|---|---|---|---|---|
| Panhandle | PNHNDL | Static | 4440 | 4440 | Limit from most recent ERCOT MIS GTC methodology documents |
| West Texas Export | WESTEX | Static | 12240 | 16200 | 2027 from Long-Term West Texas Export Study; 2030 from 2024 RTP 345-kV vs 765-kV STEP comparison |
| North to Houston | N_TO_H | Hourly profile | 5595 | 5595 | Base rating from voltage stability study; hourly multipliers applied |
| McCamey | MCCAMY | Static | 9999 | 9999 | 9,999 = no limit needed; due to Bearkat-North McCamey-Sand Lake 345-kV line (22RPG010, in service 2026) |
| Wharton County | WHARTN | Static | 1285 | 1285 | MIS GTC methodology |
| Zapata-Starr | ZAPSTR | Static | 230 | 230 | MIS GTC methodology |
| Hamilton County | HMLTN | Static | 70 | 70 | MIS GTC methodology |
| Nelson Sharpe-Rio Hondo | NELRIO | Static | 9999 | 9999 | LRGV project included in case |
| North Edinburg-Lobo | NE_LOB | Static | 9999 | 9999 | LRGV project included in case |
| Valley Export | VALEXP | Static | 9999 | 9999 | LRGV project included in case |
| Valley Import | VALIMP | Hourly profile | 9999 | 9999 | LRGV project included in case |
| Period | Rank | Monitored element | Congestion rent ($M) | ERCOT note |
|---|---|---|---|---|
| Oct 2024-Sep 2025 | 1 | Koch Tap - Vealmoor 138kV | 211 | |
| Oct 2024-Sep 2025 | 2 | Hargrove - Twin Buttes 138kV | 176 | |
| Oct 2024-Sep 2025 | 3 | Odessa EHV Switch - Yarbrough Sub 138kV | 151 | Planned and forced outages |
| Oct 2024-Sep 2025 | 4 | West Texas Export Interface | 127 | |
| Oct 2024-Sep 2025 | 5 | Longshore Switch - Consavvy Switch 345kV | 102 | |
| Oct 2024-Sep 2025 | 6 | Laredo VFT North - Las Cruces 138kV | 64 | |
| Oct 2024-Sep 2025 | 7 | Bell County - Salado Switch 138kV | 64 | |
| Oct 2024-Sep 2025 | 8 | Knapp - Scurry Chevron 138kV | 57 | |
| Oct 2024-Sep 2025 | 9 | Haine Drive - La Palma 138kV | 54 | Planned and forced outages |
| Oct 2024-Sep 2025 | 10 | Polecat Creek Switch - Wrage Ranch Pod 138kV | 52 | |
| Oct 2023-Nov 2024 (per 2024 report) | 1 | Tonkawa Switch - Morgan Creek SES 345kV | 156 | |
| Oct 2023-Nov 2024 (per 2024 report) | 2 | West Texas Export Interface | 148 | |
| Oct 2023-Nov 2024 (per 2024 report) | 3 | Morgan Creek SES - Navigation Sub 138kV | 79 | |
| Oct 2023-Nov 2024 (per 2024 report) | 4 | Odessa EHV Switch - Yarbrough Sub 138kV | 57 | |
| Oct 2023-Nov 2024 (per 2024 report) | 5 | Hargrove - Twin Buttes 138kV | 55 | |
| Oct 2023-Nov 2024 (per 2024 report) | 6 | Panhandle Interface | 49 | |
| Oct 2023-Nov 2024 (per 2024 report) | 7 | Bell County - Salado Switch 138kV | 48 | |
| Oct 2023-Nov 2024 (per 2024 report) | 8 | Lamesa - Jim Payne POI 138kV | 46 | |
| Oct 2023-Nov 2024 (per 2024 report) | 9 | North Edinburg to Lobo interface | 45 | |
| Oct 2023-Nov 2024 (per 2024 report) | 10 | Burns Sub - Rio Hondo 138kV | 33 |
Charts
Grid and Transmission · 2021 to 2025
Grid congestion curtailed about 9.8 TWh of ERCOT wind and solar power in 2025, the most in five years
Estimated wind and solar energy ERCOT dispatch held back because of transmission congestion. 2025: wind about 5.7 TWh, solar about 4.1 TWh (Power Hopper readings). The IMM reports roughly 4.7% of wind generation and 6% of solar generation were curtailed.
- Wind
- Solar
Terawatt-hours (TWh)

Chart image 2,400 × 1,622 px, with headline, source and credit
Download PNG of ERCOT wind and solar output curtailed because of transmission congestion, 2021-2025 WebP of ERCOT wind and solar output curtailed because of transmission congestion, 2021-2025 SVG of ERCOT wind and solar output curtailed because of transmission congestion, 2021-2025
Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report for the ERCOT Electricity Markets (June 2026). Figures 13-14 (p. 18). Values are approximate Power Hopper readings of the IMM's published bar charts (Figures 13-14, p. 18; measured from the PDF's vector graphics, rounded to 0.1 TWh); they are not figures the IMM reports. The IMM text gives the roughly 4.7% and 6% shares. Excludes curtailment for system-wide oversupply that is not tied to congestion.
Cite this chart
Power Hopper Team. "ERCOT wind and solar output curtailed because of transmission congestion, 2021-2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/charts#chart-ercot-wind-solar-curtailment-due-to-congestion-2021-2025. Accessed [date accessed].
Data table
| Year | Wind | Solar |
|---|---|---|
| 2021 | 5.2 TWh | 1.4 TWh |
| 2022 | 5.3 TWh | 2.3 TWh |
| 2023 | 4.8 TWh | 1.9 TWh |
| 2024 | 5.3 TWh | 3.0 TWh |
| 2025 | 5.7 TWh | 4.1 TWh |
Grid and Transmission · 2021 to 2025
ERCOT's real-time congestion cost rose 32% in 2025, its first increase since 2022
Value of real-time congestion across ERCOT, all zones, billions of dollars.
Billions of dollars

Chart image 2,400 × 1,426 px, with headline, source and credit
Download PNG of ERCOT real-time transmission congestion cost by year, 2021-2025 WebP of ERCOT real-time transmission congestion cost by year, 2021-2025 SVG of ERCOT real-time transmission congestion cost by year, 2021-2025
Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report for the ERCOT Electricity Markets (June 2026). Figure 37 (p. 62) and text. Values are approximate Power Hopper readings of the IMM's annual bars (Figure 37, p. 62), rounded to $0.1B; they are not figures the IMM reports. The IMM's text reports $1.9 billion for 2024 and a 32% increase in 2025.
Cite this chart
Power Hopper Team. "ERCOT real-time transmission congestion cost by year, 2021-2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/charts#chart-ercot-real-time-congestion-cost-2021-2025. Accessed [date accessed].
Data table
| Year | Real-time congestion |
|---|---|
| 2021 | $2.0B |
| 2022 | $2.8B |
| 2023 | $2.4B |
| 2024 | $2.0B |
| 2025 | $2.6B |
Grid and Transmission · 2027 study case
Three grid interfaces limit how much power can move between Texas regions
Assumed stability limits ERCOT uses in its 2025 Regional Transmission Plan study for 2027, in megawatts (MW). Schematic, not a map.
- 4,440MW: Panhandle export interface (PNHNDL)Same limit assumed for 2030. The IMM's 2024 report said the Panhandle often sees negative prices due to frequent curtailment of abundant wind generation, and its 2025 report describes the area as export-constrained.
- 12,240MW: West Texas export interface (WESTEX)Rises to 16,200 MW in ERCOT's 2030 case, which includes the 765-kV plan. ERCOT projects $130M of congestion rent on it in 2027 and $147M in 2030 (base case).
- 5,595MW: North-to-Houston import interface (N_TO_H)Base rating; ERCOT applies hourly multipliers. Limits imports into the Houston area.

Chart image 2,400 × 1,446 px, with headline, source and credit
Download PNG of ERCOT planning limits on three transmission interfaces that bind often WebP of ERCOT planning limits on three transmission interfaces that bind often SVG of ERCOT planning limits on three transmission interfaces that bind often
Source: ERCOT, 2025 Regional Transmission Plan Economic Study: Stability Interface Limits (RPG meeting July 29, 2025; posted Aug 5, 2025); ERCOT 2025 Report on Existing and Potential Electric System Constraints and Needs (Dec 23, 2025). Planning-study limits with no prior outages; real-time operating limits change with grid conditions and are published only to certified market participants.
Cite this chart
Power Hopper Team. "ERCOT planning limits on three transmission interfaces that bind often." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/charts#chart-ercot-transmission-interface-planning-limits-2027. Accessed [date accessed].
Data table
| Step | Count | Note |
|---|---|---|
| MW: Panhandle export interface (PNHNDL) | 4,440 | Same limit assumed for 2030. The IMM's 2024 report said the Panhandle often sees negative prices due to frequent curtailment of abundant wind generation, and its 2025 report describes the area as export-constrained. |
| MW: West Texas export interface (WESTEX) | 12,240 | Rises to 16,200 MW in ERCOT's 2030 case, which includes the 765-kV plan. ERCOT projects $130M of congestion rent on it in 2027 and $147M in 2030 (base case). |
| MW: North-to-Houston import interface (N_TO_H) | 5,595 | Base rating; ERCOT applies hourly multipliers. Limits imports into the Houston area. |
More charts and share cards
Grid and Transmission · Additional charts
ERCOT solar generation rose from 15.7 TWh in 2021 to 67.8 TWh in 2025; wind rose from 95.4 to 114.9 TWh

Download PNG of ERCOT solar generation rose from 15.7 TWh in 2021 to 67.8 TWh in 2025; wind rose from 95.4 to 114.9 TWh WebP of ERCOT solar generation rose from 15.7 TWh in 2021 to 67.8 TWh in 2025; wind rose from 95.4 to 114.9 TWh SVG of ERCOT solar generation rose from 15.7 TWh in 2021 to 67.8 TWh in 2025; wind rose from 95.4 to 114.9 TWh
Source: ERCOT Fuel Mix Report (IntGenbyFuel2021-2026.xlsx), annual totals; Power Hopper calculation.
Cite this chart
Power Hopper Team. "ERCOT solar generation rose from 15.7 TWh in 2021 to 67.8 TWh in 2025; wind rose from 95.4 to 114.9 TWh." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-wind-and-solar-generation-twh-2021-2025. Accessed [date accessed].
Grid and Transmission · Additional charts
Wind and solar made up 37.4% of ERCOT generation in 2025, up from 28.4% in 2021

Download PNG of Wind and solar made up 37.4% of ERCOT generation in 2025, up from 28.4% in 2021 WebP of Wind and solar made up 37.4% of ERCOT generation in 2025, up from 28.4% in 2021 SVG of Wind and solar made up 37.4% of ERCOT generation in 2025, up from 28.4% in 2021
Source: ERCOT Fuel Mix Report (IntGenbyFuel2021-2026.xlsx), annual totals; Power Hopper calculation.
Cite this chart
Grid and Transmission · Additional charts
ERCOT solar generation in January-October 2026 (72.5 TWh) already exceeded all of 2025 (67.8 TWh)

Download PNG of ERCOT solar generation in January-October 2026 (72.5 TWh) already exceeded all of 2025 (67.8 TWh) WebP of ERCOT solar generation in January-October 2026 (72.5 TWh) already exceeded all of 2025 (67.8 TWh) SVG of ERCOT solar generation in January-October 2026 (72.5 TWh) already exceeded all of 2025 (67.8 TWh)
Source: ERCOT Fuel Mix Report (IntGenbyFuel2021-2026.xlsx), annual totals; Power Hopper calculation.
Cite this chart
Power Hopper Team. "ERCOT solar generation in January-October 2026 (72.5 TWh) already exceeded all of 2025 (67.8 TWh)." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-solar-generation-jan-oct-2026-vs-full-year-2025. Accessed [date accessed].
Grid and Transmission · Additional charts
Congestion curtailed 4.7% of ERCOT wind generation and about 6% of solar generation in 2025

Download PNG of Congestion curtailed 4.7% of ERCOT wind generation and about 6% of solar generation in 2025 WebP of Congestion curtailed 4.7% of ERCOT wind generation and about 6% of solar generation in 2025 SVG of Congestion curtailed 4.7% of ERCOT wind generation and about 6% of solar generation in 2025
Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report (June 2026).
Cite this chart
Power Hopper Team. "Congestion curtailed 4.7% of ERCOT wind generation and about 6% of solar generation in 2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-wind-solar-curtailment-rate-due-to-congestion-2025. Accessed [date accessed].
Grid and Transmission · Additional charts
Wind and solar curtailed by congestion rose from about 8.3 TWh in 2024 to about 9.8 TWh in 2025

Download PNG of Wind and solar curtailed by congestion rose from about 8.3 TWh in 2024 to about 9.8 TWh in 2025 WebP of Wind and solar curtailed by congestion rose from about 8.3 TWh in 2024 to about 9.8 TWh in 2025 SVG of Wind and solar curtailed by congestion rose from about 8.3 TWh in 2024 to about 9.8 TWh in 2025
Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report, Figs. 13–14, p. 18 (June 2026); digitized by Power Hopper.
Cite this chart
Power Hopper Team. "Wind and solar curtailed by congestion rose from about 8.3 TWh in 2024 to about 9.8 TWh in 2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-wind-solar-curtailed-by-congestion-twh-2024-vs-2025. Accessed [date accessed].
Grid and Transmission · Additional charts
Three West Texas 138-kV lines topped ERCOT's congestion list for October 2024 to September 2025

Download PNG of Three West Texas 138-kV lines topped ERCOT's congestion list for October 2024 to September 2025 WebP of Three West Texas 138-kV lines topped ERCOT's congestion list for October 2024 to September 2025 SVG of Three West Texas 138-kV lines topped ERCOT's congestion list for October 2024 to September 2025
Source: ERCOT 2025 Constraints and Needs Report (Dec. 23, 2025), top real-time constraints by congestion rent.
Cite this chart
Power Hopper Team. "Three West Texas 138-kV lines topped ERCOT's congestion list for October 2024 to September 2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-top-10-transmission-constraints-congestion-rent-oct-2024-sep-2025. Accessed [date accessed].
Grid and Transmission · Additional charts
In ERCOT's 2024 report, the West Texas Export interface ranked No. 2 for congestion rent ($148M)

Download PNG of In ERCOT's 2024 report, the West Texas Export interface ranked No. 2 for congestion rent ($148M) WebP of In ERCOT's 2024 report, the West Texas Export interface ranked No. 2 for congestion rent ($148M) SVG of In ERCOT's 2024 report, the West Texas Export interface ranked No. 2 for congestion rent ($148M)
Source: ERCOT 2024 Constraints and Needs Report (Dec. 20, 2024), top real-time constraints by congestion rent.
Cite this chart
Power Hopper Team. "In ERCOT's 2024 report, the West Texas Export interface ranked No. 2 for congestion rent ($148M)." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-top-10-transmission-constraints-congestion-rent-2024-report. Accessed [date accessed].
Grid and Transmission · Additional charts
Only the West Texas Export limit rises between ERCOT's 2027 and 2030 planning cases: 12,240 MW to 16,200 MW

Download PNG of Only the West Texas Export limit rises between ERCOT's 2027 and 2030 planning cases: 12,240 MW to 16,200 MW WebP of Only the West Texas Export limit rises between ERCOT's 2027 and 2030 planning cases: 12,240 MW to 16,200 MW SVG of Only the West Texas Export limit rises between ERCOT's 2027 and 2030 planning cases: 12,240 MW to 16,200 MW
Source: ERCOT 2025 Regional Transmission Plan, stability interface planning limits (Aug. 5, 2025).
Cite this chart
Power Hopper Team. "Only the West Texas Export limit rises between ERCOT's 2027 and 2030 planning cases: 12,240 MW to 16,200 MW." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-interface-stability-limits-2027-vs-2030-planning-cases. Accessed [date accessed].
Grid and Transmission · Additional charts
ERCOT's 2027 planning cases no longer model limits on McCamey and four Rio Grande Valley interfaces

Download PNG of ERCOT's 2027 planning cases no longer model limits on McCamey and four Rio Grande Valley interfaces WebP of ERCOT's 2027 planning cases no longer model limits on McCamey and four Rio Grande Valley interfaces SVG of ERCOT's 2027 planning cases no longer model limits on McCamey and four Rio Grande Valley interfaces
Source: ERCOT 2025 Regional Transmission Plan, stability interface planning limits (Aug. 5, 2025). Project estimates: ERCOT RPG/Board documents.
Cite this chart
Power Hopper Team. "ERCOT's 2027 planning cases no longer model limits on McCamey and four Rio Grande Valley interfaces." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-interfaces-no-limit-needed-in-2027-planning-cases. Accessed [date accessed].
Grid and Transmission · Additional charts
ERCOT's study puts the West Texas Export stability limit at 16.2 GW with the 765-kV plan, up from 12.7 GW

Download PNG of ERCOT's study puts the West Texas Export stability limit at 16.2 GW with the 765-kV plan, up from 12.7 GW WebP of ERCOT's study puts the West Texas Export stability limit at 16.2 GW with the 765-kV plan, up from 12.7 GW SVG of ERCOT's study puts the West Texas Export stability limit at 16.2 GW with the 765-kV plan, up from 12.7 GW
Source: ERCOT, 2024 RTP 345-kV vs Texas 765-kV STEP comparison (Jan. 27, 2025).
Cite this chart
Power Hopper Team. "ERCOT's study puts the West Texas Export stability limit at 16.2 GW with the 765-kV plan, up from 12.7 GW." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-west-texas-export-stability-limit-by-transmission-plan. Accessed [date accessed].
Grid and Transmission · Additional charts
The West load zone had ERCOT's highest average price in 2025: $41.59/MWh, about 13% above the ERCOT average

Download PNG of The West load zone had ERCOT's highest average price in 2025: $41.59/MWh, about 13% above the ERCOT average WebP of The West load zone had ERCOT's highest average price in 2025: $41.59/MWh, about 13% above the ERCOT average SVG of The West load zone had ERCOT's highest average price in 2025: $41.59/MWh, about 13% above the ERCOT average
Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report (June 2026).
Cite this chart
Power Hopper Team. "The West load zone had ERCOT's highest average price in 2025: $41.59/MWh, about 13% above the ERCOT average." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-west-load-zone-vs-ercot-average-price-2025. Accessed [date accessed].
Grid and Transmission · Additional charts
ERCOT's full 765-kV plan was estimated at $32.99 billion in January 2025, including $13.77 billion for the Permian portion

Download PNG of ERCOT's full 765-kV plan was estimated at $32.99 billion in January 2025, including $13.77 billion for the Permian portion WebP of ERCOT's full 765-kV plan was estimated at $32.99 billion in January 2025, including $13.77 billion for the Permian portion SVG of ERCOT's full 765-kV plan was estimated at $32.99 billion in January 2025, including $13.77 billion for the Permian portion
Sources: ERCOT 2024 RTP 345-kV vs 765-kV STEP comparison (Jan. 27, 2025); ERCOT Board (Dec. 2021); ERCOT EIR (June 2022).
Cite this chart
Power Hopper Team. "ERCOT's full 765-kV plan was estimated at $32.99 billion in January 2025, including $13.77 billion for the Permian portion." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-transmission-plan-cost-estimates-765-kv-permian-lrgv-bearkat. Accessed [date accessed].
Share cards
Methodology
- Generation: ERCOT Fuel Mix Report workbooks (
IntGenbyFuel2021-2026.xlsx), annual "Total" column, GWh/1,000. 2021-2025 final settlement; 2026 is January-October and the latest months are preliminary. - Curtailment due to congestion: The IMM publishes these totals only as bar charts. We read bar lengths from the PDF's vector graphics and scaled them to the axis labels (about ±0.1 TWh). Our readings reproduce ERCOT's 2021 and 2025 wind totals within 0.1 TWh and are consistent with the IMM's stated shares of roughly 4.7% (wind) and 6% (solar).
- Real-time congestion cost: read the same way from IMM Figure 37 (about ±$0.05B; published rounded to $0.1B); the ratio 2025/2024 equals the IMM's stated +32%.
- Interface limits: copied from ERCOT's 2025 RTP stability-limit table; 9,999 means "no limit needed" in that study.
- Constraint rankings: copied from ERCOT's annual constraints reports (12-month windows, congestion rent).
Limitations
- Curtailment and congestion-cost values are readings of published charts, not IMM-tabulated numbers.
- Curtailment covers congestion only; curtailment for system-wide oversupply is excluded.
- Interface limits are planning assumptions; real-time limits vary and are published only to certified market participants (ECEII).
- Congestion rent is not the same as consumer cost; it measures price differences times flows.
- No geographic layer: ERCOT does not publish GIS for interfaces or lines.
Data dictionary
| Field | Description |
|---|---|
year | Calendar year |
period | Full year, or the months covered (2026: January-October) |
ercot_wind_generation_twh | ERCOT wind generation, TWh (Fuel Mix Report) |
ercot_solar_generation_twh | ERCOT solar generation, TWh (Fuel Mix Report) |
ercot_total_generation_twh | ERCOT total generation, TWh (Fuel Mix Report) |
wind_share_pct | Wind share of ERCOT generation, % |
solar_share_pct | Solar share of ERCOT generation, % |
wind_plus_solar_share_pct | Wind plus solar share, % |
imm_wind_curtailed_due_to_congestion_twh_approx | Wind curtailed due to congestion, TWh (approximate Power Hopper reading of IMM Figs. 13-14) |
imm_solar_curtailed_due_to_congestion_twh_approx | Solar curtailed due to congestion, TWh (approximate reading) |
imm_total_curtailed_due_to_congestion_twh_approx | Wind plus solar curtailed due to congestion, TWh (approximate reading) |
imm_real_time_congestion_cost_busd_approx | Real-time congestion cost, $ billion (approximate reading of IMM Fig. 37) |
Power Hopper is not affiliated with or endorsed by ERCOT, the PUCT, Potomac Economics (the Independent Market Monitor for ERCOT), Grid Strategies or any company or project named on this page.
Power Hopper (BJW Ventures LLC d/b/a Power Hopper) is a PUCT-registered electricity broker, BR260201; registration is not a PUCT endorsement. Electricity providers may pay us a commission if you sign up through us. Power Hopper is not a retail electric provider, utility or transmission and distribution utility, and is not affiliated with or endorsed by the PUCT, ERCOT or any utility, supplier or data provider named above. This brief was prepared with AI assistance.