Grid and Transmission · Source-checked

ERCOT wind and solar curtailment, congestion costs and transmission limits

IMM charts show congestion curtailed about 9.8 TWh of ERCOT wind and solar output in 2025, up from about 8.3 TWh in 2024 (approximate Power Hopper readings), while the IMM reports real-time congestion costs rose 32%.

Download CSVDownload JSON Read the article

about 9.8 TWh

ERCOT wind and solar curtailed by congestion in 2025 (approximate Power Hopper reading of IMM charts)

2021-2025 (IMM figures); generation 2021-2025 and Jan-Oct 2026

Takeaway

  • IMM charts show congestion curtailed about 9.8 TWh of ERCOT wind and solar output in 2025, up from about 8.3 TWh in 2024 (approximate Power Hopper readings), while the IMM reports real-time congestion costs rose 32%.

Article: Grid congestion held back nearly 10 TWh of wind and solar power on the ERCOT grid in 2025

Data

Generation, congestion curtailment and real-time congestion cost (curtailment and cost are approximate Power Hopper readings of IMM charts)
YearPeriodWind (TWh)Solar (TWh)Wind + solar share (%)Wind curtailed, approx. (TWh)Solar curtailed, approx. (TWh)Total curtailed, approx. (TWh)RT congestion cost, approx. ($B)
2021Full year95.415.7128.45.21.46.62.0
2022Full year107.2624.1930.75.32.37.62.8
2023Full year107.9932.431.64.81.96.72.4
2024Full year111.7448.2234.65.33.08.32.0
2025Full year114.9267.8137.45.74.19.82.6
2026Jan-Oct (preliminary for latest months)101.4472.539.9
ERCOT 2025 RTP stability interface planning limits (9,999 = no limit needed in that study)
InterfaceGTC codeLimit type2027 limit (MW)2030 limit (MW)Note
PanhandlePNHNDLStatic44404440Limit from most recent ERCOT MIS GTC methodology documents
West Texas ExportWESTEXStatic12240162002027 from Long-Term West Texas Export Study; 2030 from 2024 RTP 345-kV vs 765-kV STEP comparison
North to HoustonN_TO_HHourly profile55955595Base rating from voltage stability study; hourly multipliers applied
McCameyMCCAMYStatic999999999,999 = no limit needed; due to Bearkat-North McCamey-Sand Lake 345-kV line (22RPG010, in service 2026)
Wharton CountyWHARTNStatic12851285MIS GTC methodology
Zapata-StarrZAPSTRStatic230230MIS GTC methodology
Hamilton CountyHMLTNStatic7070MIS GTC methodology
Nelson Sharpe-Rio HondoNELRIOStatic99999999LRGV project included in case
North Edinburg-LoboNE_LOBStatic99999999LRGV project included in case
Valley ExportVALEXPStatic99999999LRGV project included in case
Valley ImportVALIMPHourly profile99999999LRGV project included in case
ERCOT top real-time constraints by congestion rent, two 12-month windows
PeriodRankMonitored elementCongestion rent ($M)ERCOT note
Oct 2024-Sep 20251Koch Tap - Vealmoor 138kV211
Oct 2024-Sep 20252Hargrove - Twin Buttes 138kV176
Oct 2024-Sep 20253Odessa EHV Switch - Yarbrough Sub 138kV151Planned and forced outages
Oct 2024-Sep 20254West Texas Export Interface127
Oct 2024-Sep 20255Longshore Switch - Consavvy Switch 345kV102
Oct 2024-Sep 20256Laredo VFT North - Las Cruces 138kV64
Oct 2024-Sep 20257Bell County - Salado Switch 138kV64
Oct 2024-Sep 20258Knapp - Scurry Chevron 138kV57
Oct 2024-Sep 20259Haine Drive - La Palma 138kV54Planned and forced outages
Oct 2024-Sep 202510Polecat Creek Switch - Wrage Ranch Pod 138kV52
Oct 2023-Nov 2024 (per 2024 report)1Tonkawa Switch - Morgan Creek SES 345kV156
Oct 2023-Nov 2024 (per 2024 report)2West Texas Export Interface148
Oct 2023-Nov 2024 (per 2024 report)3Morgan Creek SES - Navigation Sub 138kV79
Oct 2023-Nov 2024 (per 2024 report)4Odessa EHV Switch - Yarbrough Sub 138kV57
Oct 2023-Nov 2024 (per 2024 report)5Hargrove - Twin Buttes 138kV55
Oct 2023-Nov 2024 (per 2024 report)6Panhandle Interface49
Oct 2023-Nov 2024 (per 2024 report)7Bell County - Salado Switch 138kV48
Oct 2023-Nov 2024 (per 2024 report)8Lamesa - Jim Payne POI 138kV46
Oct 2023-Nov 2024 (per 2024 report)9North Edinburg to Lobo interface45
Oct 2023-Nov 2024 (per 2024 report)10Burns Sub - Rio Hondo 138kV33

Charts

Grid and Transmission · 2021 to 2025

Grid congestion curtailed about 9.8 TWh of ERCOT wind and solar power in 2025, the most in five years

Estimated wind and solar energy ERCOT dispatch held back because of transmission congestion. 2025: wind about 5.7 TWh, solar about 4.1 TWh (Power Hopper readings). The IMM reports roughly 4.7% of wind generation and 6% of solar generation were curtailed.

  • Wind
  • Solar
2021
5.2 TWh1.4 TWhTotal 6.6 TWh
2022
5.3 TWh2.3 TWhTotal 7.6 TWh
2023
4.8 TWh1.9 TWhTotal 6.7 TWh
2024
5.3 TWh3.0 TWhTotal 8.3 TWh
2025
5.7 TWh4.1 TWhTotal 9.8 TWh

Terawatt-hours (TWh)

Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report for the ERCOT Electricity Markets (June 2026). Figures 13-14 (p. 18). Values are approximate Power Hopper readings of the IMM's published bar charts (Figures 13-14, p. 18; measured from the PDF's vector graphics, rounded to 0.1 TWh); they are not figures the IMM reports. The IMM text gives the roughly 4.7% and 6% shares. Excludes curtailment for system-wide oversupply that is not tied to congestion.

Chart: ERCOT wind and solar output curtailed because of transmission congestion, 2021-2025 · Methodology for ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "ERCOT wind and solar output curtailed because of transmission congestion, 2021-2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/charts#chart-ercot-wind-solar-curtailment-due-to-congestion-2021-2025. Accessed [date accessed].

Data table
ERCOT wind and solar output curtailed because of transmission congestion, 2021-2025 (Terawatt-hours (TWh))
YearWindSolar
20215.2 TWh1.4 TWh
20225.3 TWh2.3 TWh
20234.8 TWh1.9 TWh
20245.3 TWh3.0 TWh
20255.7 TWh4.1 TWh

Grid and Transmission · 2021 to 2025

ERCOT's real-time congestion cost rose 32% in 2025, its first increase since 2022

Value of real-time congestion across ERCOT, all zones, billions of dollars.

2021
2022
2023
2024
2025

Billions of dollars

Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report for the ERCOT Electricity Markets (June 2026). Figure 37 (p. 62) and text. Values are approximate Power Hopper readings of the IMM's annual bars (Figure 37, p. 62), rounded to $0.1B; they are not figures the IMM reports. The IMM's text reports $1.9 billion for 2024 and a 32% increase in 2025.

Chart: ERCOT real-time transmission congestion cost by year, 2021-2025 · Methodology for ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "ERCOT real-time transmission congestion cost by year, 2021-2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/charts#chart-ercot-real-time-congestion-cost-2021-2025. Accessed [date accessed].

Data table
ERCOT real-time transmission congestion cost by year, 2021-2025 (Billions of dollars)
YearReal-time congestion
2021$2.0B
2022$2.8B
2023$2.4B
2024$2.0B
2025$2.6B

Grid and Transmission · 2027 study case

Three grid interfaces limit how much power can move between Texas regions

Assumed stability limits ERCOT uses in its 2025 Regional Transmission Plan study for 2027, in megawatts (MW). Schematic, not a map.

  1. 4,440MW: Panhandle export interface (PNHNDL)Same limit assumed for 2030. The IMM's 2024 report said the Panhandle often sees negative prices due to frequent curtailment of abundant wind generation, and its 2025 report describes the area as export-constrained.
  2. 12,240MW: West Texas export interface (WESTEX)Rises to 16,200 MW in ERCOT's 2030 case, which includes the 765-kV plan. ERCOT projects $130M of congestion rent on it in 2027 and $147M in 2030 (base case).
  3. 5,595MW: North-to-Houston import interface (N_TO_H)Base rating; ERCOT applies hourly multipliers. Limits imports into the Houston area.

Source: ERCOT, 2025 Regional Transmission Plan Economic Study: Stability Interface Limits (RPG meeting July 29, 2025; posted Aug 5, 2025); ERCOT 2025 Report on Existing and Potential Electric System Constraints and Needs (Dec 23, 2025). Planning-study limits with no prior outages; real-time operating limits change with grid conditions and are published only to certified market participants.

Chart: ERCOT planning limits on three transmission interfaces that bind often · Methodology for ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "ERCOT planning limits on three transmission interfaces that bind often." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/charts#chart-ercot-transmission-interface-planning-limits-2027. Accessed [date accessed].

Data table
ERCOT planning limits on three transmission interfaces that bind often
StepCountNote
MW: Panhandle export interface (PNHNDL)4,440Same limit assumed for 2030. The IMM's 2024 report said the Panhandle often sees negative prices due to frequent curtailment of abundant wind generation, and its 2025 report describes the area as export-constrained.
MW: West Texas export interface (WESTEX)12,240Rises to 16,200 MW in ERCOT's 2030 case, which includes the 765-kV plan. ERCOT projects $130M of congestion rent on it in 2027 and $147M in 2030 (base case).
MW: North-to-Houston import interface (N_TO_H)5,595Base rating; ERCOT applies hourly multipliers. Limits imports into the Houston area.

More charts and share cards

Grid and Transmission · Additional charts

ERCOT solar generation rose from 15.7 TWh in 2021 to 67.8 TWh in 2025; wind rose from 95.4 to 114.9 TWh

Source: ERCOT Fuel Mix Report (IntGenbyFuel2021-2026.xlsx), annual totals; Power Hopper calculation.

Chart: ERCOT solar generation rose from 15.7 TWh in 2021 to 67.8 TWh in 2025; wind rose from 95.4 to 114.9 TWh · Methodology for ERCOT solar generation rose from 15.7 TWh in 2021 to 67.8 TWh in 2025; wind rose from 95.4 to 114.9 TWh · CC BY 4.0

Cite this chart

Power Hopper Team. "ERCOT solar generation rose from 15.7 TWh in 2021 to 67.8 TWh in 2025; wind rose from 95.4 to 114.9 TWh." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-wind-and-solar-generation-twh-2021-2025. Accessed [date accessed].

Grid and Transmission · Additional charts

Wind and solar made up 37.4% of ERCOT generation in 2025, up from 28.4% in 2021

Source: ERCOT Fuel Mix Report (IntGenbyFuel2021-2026.xlsx), annual totals; Power Hopper calculation.

Chart: Wind and solar made up 37.4% of ERCOT generation in 2025, up from 28.4% in 2021 · Methodology for Wind and solar made up 37.4% of ERCOT generation in 2025, up from 28.4% in 2021 · CC BY 4.0

Cite this chart

Power Hopper Team. "Wind and solar made up 37.4% of ERCOT generation in 2025, up from 28.4% in 2021." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-wind-and-solar-share-of-generation-2021-2025. Accessed [date accessed].

Grid and Transmission · Additional charts

ERCOT solar generation in January-October 2026 (72.5 TWh) already exceeded all of 2025 (67.8 TWh)

Source: ERCOT Fuel Mix Report (IntGenbyFuel2021-2026.xlsx), annual totals; Power Hopper calculation.

Chart: ERCOT solar generation in January-October 2026 (72.5 TWh) already exceeded all of 2025 (67.8 TWh) · Methodology for ERCOT solar generation in January-October 2026 (72.5 TWh) already exceeded all of 2025 (67.8 TWh) · CC BY 4.0

Cite this chart

Power Hopper Team. "ERCOT solar generation in January-October 2026 (72.5 TWh) already exceeded all of 2025 (67.8 TWh)." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-solar-generation-jan-oct-2026-vs-full-year-2025. Accessed [date accessed].

Grid and Transmission · Additional charts

Congestion curtailed 4.7% of ERCOT wind generation and about 6% of solar generation in 2025

Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report (June 2026).

Chart: Congestion curtailed 4.7% of ERCOT wind generation and about 6% of solar generation in 2025 · Methodology for Congestion curtailed 4.7% of ERCOT wind generation and about 6% of solar generation in 2025 · CC BY 4.0

Cite this chart

Power Hopper Team. "Congestion curtailed 4.7% of ERCOT wind generation and about 6% of solar generation in 2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-wind-solar-curtailment-rate-due-to-congestion-2025. Accessed [date accessed].

Grid and Transmission · Additional charts

Wind and solar curtailed by congestion rose from about 8.3 TWh in 2024 to about 9.8 TWh in 2025

Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report, Figs. 13–14, p. 18 (June 2026); digitized by Power Hopper.

Chart: Wind and solar curtailed by congestion rose from about 8.3 TWh in 2024 to about 9.8 TWh in 2025 · Methodology for Wind and solar curtailed by congestion rose from about 8.3 TWh in 2024 to about 9.8 TWh in 2025 · CC BY 4.0

Cite this chart

Power Hopper Team. "Wind and solar curtailed by congestion rose from about 8.3 TWh in 2024 to about 9.8 TWh in 2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-wind-solar-curtailed-by-congestion-twh-2024-vs-2025. Accessed [date accessed].

Grid and Transmission · Additional charts

Three West Texas 138-kV lines topped ERCOT's congestion list for October 2024 to September 2025

Source: ERCOT 2025 Constraints and Needs Report (Dec. 23, 2025), top real-time constraints by congestion rent.

Chart: Three West Texas 138-kV lines topped ERCOT's congestion list for October 2024 to September 2025 · Methodology for Three West Texas 138-kV lines topped ERCOT's congestion list for October 2024 to September 2025 · CC BY 4.0

Cite this chart

Power Hopper Team. "Three West Texas 138-kV lines topped ERCOT's congestion list for October 2024 to September 2025." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-top-10-transmission-constraints-congestion-rent-oct-2024-sep-2025. Accessed [date accessed].

Grid and Transmission · Additional charts

In ERCOT's 2024 report, the West Texas Export interface ranked No. 2 for congestion rent ($148M)

Source: ERCOT 2024 Constraints and Needs Report (Dec. 20, 2024), top real-time constraints by congestion rent.

Chart: In ERCOT's 2024 report, the West Texas Export interface ranked No. 2 for congestion rent ($148M) · Methodology for In ERCOT's 2024 report, the West Texas Export interface ranked No. 2 for congestion rent ($148M) · CC BY 4.0

Cite this chart

Power Hopper Team. "In ERCOT's 2024 report, the West Texas Export interface ranked No. 2 for congestion rent ($148M)." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-top-10-transmission-constraints-congestion-rent-2024-report. Accessed [date accessed].

Grid and Transmission · Additional charts

Only the West Texas Export limit rises between ERCOT's 2027 and 2030 planning cases: 12,240 MW to 16,200 MW

Source: ERCOT 2025 Regional Transmission Plan, stability interface planning limits (Aug. 5, 2025).

Chart: Only the West Texas Export limit rises between ERCOT's 2027 and 2030 planning cases: 12,240 MW to 16,200 MW · Methodology for Only the West Texas Export limit rises between ERCOT's 2027 and 2030 planning cases: 12,240 MW to 16,200 MW · CC BY 4.0

Cite this chart

Power Hopper Team. "Only the West Texas Export limit rises between ERCOT's 2027 and 2030 planning cases: 12,240 MW to 16,200 MW." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-interface-stability-limits-2027-vs-2030-planning-cases. Accessed [date accessed].

Grid and Transmission · Additional charts

ERCOT's 2027 planning cases no longer model limits on McCamey and four Rio Grande Valley interfaces

Source: ERCOT 2025 Regional Transmission Plan, stability interface planning limits (Aug. 5, 2025). Project estimates: ERCOT RPG/Board documents.

Chart: ERCOT's 2027 planning cases no longer model limits on McCamey and four Rio Grande Valley interfaces · Methodology for ERCOT's 2027 planning cases no longer model limits on McCamey and four Rio Grande Valley interfaces · CC BY 4.0

Cite this chart

Power Hopper Team. "ERCOT's 2027 planning cases no longer model limits on McCamey and four Rio Grande Valley interfaces." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-interfaces-no-limit-needed-in-2027-planning-cases. Accessed [date accessed].

Grid and Transmission · Additional charts

ERCOT's study puts the West Texas Export stability limit at 16.2 GW with the 765-kV plan, up from 12.7 GW

Source: ERCOT, 2024 RTP 345-kV vs Texas 765-kV STEP comparison (Jan. 27, 2025).

Chart: ERCOT's study puts the West Texas Export stability limit at 16.2 GW with the 765-kV plan, up from 12.7 GW · Methodology for ERCOT's study puts the West Texas Export stability limit at 16.2 GW with the 765-kV plan, up from 12.7 GW · CC BY 4.0

Cite this chart

Power Hopper Team. "ERCOT's study puts the West Texas Export stability limit at 16.2 GW with the 765-kV plan, up from 12.7 GW." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-west-texas-export-stability-limit-by-transmission-plan. Accessed [date accessed].

Grid and Transmission · Additional charts

The West load zone had ERCOT's highest average price in 2025: $41.59/MWh, about 13% above the ERCOT average

Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report (June 2026).

Chart: The West load zone had ERCOT's highest average price in 2025: $41.59/MWh, about 13% above the ERCOT average · Methodology for The West load zone had ERCOT's highest average price in 2025: $41.59/MWh, about 13% above the ERCOT average · CC BY 4.0

Cite this chart

Power Hopper Team. "The West load zone had ERCOT's highest average price in 2025: $41.59/MWh, about 13% above the ERCOT average." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-west-load-zone-vs-ercot-average-price-2025. Accessed [date accessed].

Grid and Transmission · Additional charts

ERCOT's full 765-kV plan was estimated at $32.99 billion in January 2025, including $13.77 billion for the Permian portion

Sources: ERCOT 2024 RTP 345-kV vs 765-kV STEP comparison (Jan. 27, 2025); ERCOT Board (Dec. 2021); ERCOT EIR (June 2022).

Chart: ERCOT's full 765-kV plan was estimated at $32.99 billion in January 2025, including $13.77 billion for the Permian portion · Methodology for ERCOT's full 765-kV plan was estimated at $32.99 billion in January 2025, including $13.77 billion for the Permian portion · CC BY 4.0

Cite this chart

Power Hopper Team. "ERCOT's full 765-kV plan was estimated at $32.99 billion in January 2025, including $13.77 billion for the Permian portion." Chart. ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026 dataset. Power Hopper Media Data Room, published November 10, 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion#cv2-ercot-transmission-plan-cost-estimates-765-kv-permian-lrgv-bearkat. Accessed [date accessed].

Share cards

Stat card: ~9.8 TWh. of ERCOT wind and solar output curtailed by congestion in 2025. Up from about 8.3 TWh in 2024: about 5.7 TWh of wind and 4.1 TWh of solar.

Key-number card · 1200 × 675 px

~9.8 TWh: of ERCOT wind and solar output curtailed by congestion in 2025

Source: Potomac Economics (ERCOT IMM) 2025 State of the Market Report; ERCOT Fuel Mix Report. TWh values are approximate Power Hopper readings of the IMM's Figs. 13–14 (p. 18), rounded to 0.1 TWh.

Download PNG of ~9.8 TWh: of ERCOT wind and solar output curtailed by congestion in 2025 WebP of ~9.8 TWh: of ERCOT wind and solar output curtailed by congestion in 2025 JPG of ~9.8 TWh: of ERCOT wind and solar output curtailed by congestion in 2025

Stat card: ~9.8 TWh. of ERCOT wind and solar output curtailed by congestion in 2025. Up from about 8.3 TWh in 2024: about 5.7 TWh of wind and 4.1 TWh of solar.

Social square · 1080 × 1080 px

~9.8 TWh: of ERCOT wind and solar output curtailed by congestion in 2025

Source: Potomac Economics (ERCOT IMM) 2025 State of the Market Report; ERCOT Fuel Mix Report. TWh values are approximate Power Hopper readings of the IMM's Figs. 13–14 (p. 18), rounded to 0.1 TWh.

Download PNG of ~9.8 TWh: of ERCOT wind and solar output curtailed by congestion in 2025 WebP of ~9.8 TWh: of ERCOT wind and solar output curtailed by congestion in 2025 JPG of ~9.8 TWh: of ERCOT wind and solar output curtailed by congestion in 2025

Stat card: +32%. rise in ERCOT real-time congestion cost in 2025. The Independent Market Monitor reports a 32% rise in real-time congestion cost in 2025, from $1.9 billion in 2024.

Key-number card · 1200 × 675 px

+32%: rise in ERCOT real-time congestion cost in 2025

Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report (June 2026).

Download PNG of +32%: rise in ERCOT real-time congestion cost in 2025 WebP of +32%: rise in ERCOT real-time congestion cost in 2025 JPG of +32%: rise in ERCOT real-time congestion cost in 2025

Stat card: +32%. rise in ERCOT real-time congestion cost in 2025. The Independent Market Monitor reports a 32% rise in real-time congestion cost in 2025, from $1.9 billion in 2024.

Social square · 1080 × 1080 px

+32%: rise in ERCOT real-time congestion cost in 2025

Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report (June 2026).

Download PNG of +32%: rise in ERCOT real-time congestion cost in 2025 WebP of +32%: rise in ERCOT real-time congestion cost in 2025 JPG of +32%: rise in ERCOT real-time congestion cost in 2025

Stat card: 37.4%. of ERCOT generation came from wind and solar in 2025. 182.7 TWh of 488.1 TWh. Wind 23.5%, solar 13.9%.

Key-number card · 1200 × 675 px

37.4%: of ERCOT generation came from wind and solar in 2025

Source: ERCOT Fuel Mix Report (IntGenbyFuel2021-2026.xlsx), annual totals; Power Hopper calculation.

Download PNG of 37.4%: of ERCOT generation came from wind and solar in 2025 WebP of 37.4%: of ERCOT generation came from wind and solar in 2025 JPG of 37.4%: of ERCOT generation came from wind and solar in 2025

Stat card: 37.4%. of ERCOT generation came from wind and solar in 2025. 182.7 TWh of 488.1 TWh. Wind 23.5%, solar 13.9%.

Social square · 1080 × 1080 px

37.4%: of ERCOT generation came from wind and solar in 2025

Source: ERCOT Fuel Mix Report (IntGenbyFuel2021-2026.xlsx), annual totals; Power Hopper calculation.

Download PNG of 37.4%: of ERCOT generation came from wind and solar in 2025 WebP of 37.4%: of ERCOT generation came from wind and solar in 2025 JPG of 37.4%: of ERCOT generation came from wind and solar in 2025

Stat card: 86.77%. ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m. 43,399 MW of renewable generation at the time of the record.

Key-number card · 1200 × 675 px

86.77%: ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m.

Source: ERCOT System Operations Update to the Board (Apr. 13, 2026).

Download PNG of 86.77%: ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m. WebP of 86.77%: ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m. JPG of 86.77%: ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m.

Stat card: 86.77%. ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m. 43,399 MW of renewable generation at the time of the record.

Social square · 1080 × 1080 px

86.77%: ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m.

Source: ERCOT System Operations Update to the Board (Apr. 13, 2026).

Download PNG of 86.77%: ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m. WebP of 86.77%: ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m. JPG of 86.77%: ERCOT renewable penetration record, March 18, 2026 at 10:33 a.m.

Stat card: $55.5B. in ERCOT transmission projects in engineering, routing, licensing or construction. As of July 17, 2026. All projects and purposes, not a renewables-only buildout.

Key-number card · 1200 × 675 px

$55.5B: in ERCOT transmission projects in engineering, routing, licensing or construction

Source: ERCOT Monthly Operational Overview, August and September 2026.

Download PNG of $55.5B: in ERCOT transmission projects in engineering, routing, licensing or construction WebP of $55.5B: in ERCOT transmission projects in engineering, routing, licensing or construction JPG of $55.5B: in ERCOT transmission projects in engineering, routing, licensing or construction

Stat card: $55.5B. in ERCOT transmission projects in engineering, routing, licensing or construction. As of July 17, 2026. All projects and purposes, not a renewables-only buildout.

Social square · 1080 × 1080 px

$55.5B: in ERCOT transmission projects in engineering, routing, licensing or construction

Source: ERCOT Monthly Operational Overview, August and September 2026.

Download PNG of $55.5B: in ERCOT transmission projects in engineering, routing, licensing or construction WebP of $55.5B: in ERCOT transmission projects in engineering, routing, licensing or construction JPG of $55.5B: in ERCOT transmission projects in engineering, routing, licensing or construction

Methodology

  1. Generation: ERCOT Fuel Mix Report workbooks (IntGenbyFuel2021-2026.xlsx), annual "Total" column, GWh/1,000. 2021-2025 final settlement; 2026 is January-October and the latest months are preliminary.
  2. Curtailment due to congestion: The IMM publishes these totals only as bar charts. We read bar lengths from the PDF's vector graphics and scaled them to the axis labels (about ±0.1 TWh). Our readings reproduce ERCOT's 2021 and 2025 wind totals within 0.1 TWh and are consistent with the IMM's stated shares of roughly 4.7% (wind) and 6% (solar).
  3. Real-time congestion cost: read the same way from IMM Figure 37 (about ±$0.05B; published rounded to $0.1B); the ratio 2025/2024 equals the IMM's stated +32%.
  4. Interface limits: copied from ERCOT's 2025 RTP stability-limit table; 9,999 means "no limit needed" in that study.
  5. Constraint rankings: copied from ERCOT's annual constraints reports (12-month windows, congestion rent).

Full methodology

Limitations

  • Curtailment and congestion-cost values are readings of published charts, not IMM-tabulated numbers.
  • Curtailment covers congestion only; curtailment for system-wide oversupply is excluded.
  • Interface limits are planning assumptions; real-time limits vary and are published only to certified market participants (ECEII).
  • Congestion rent is not the same as consumer cost; it measures price differences times flows.
  • No geographic layer: ERCOT does not publish GIS for interfaces or lines.

Data dictionary

FieldDescription
yearCalendar year
periodFull year, or the months covered (2026: January-October)
ercot_wind_generation_twhERCOT wind generation, TWh (Fuel Mix Report)
ercot_solar_generation_twhERCOT solar generation, TWh (Fuel Mix Report)
ercot_total_generation_twhERCOT total generation, TWh (Fuel Mix Report)
wind_share_pctWind share of ERCOT generation, %
solar_share_pctSolar share of ERCOT generation, %
wind_plus_solar_share_pctWind plus solar share, %
imm_wind_curtailed_due_to_congestion_twh_approxWind curtailed due to congestion, TWh (approximate Power Hopper reading of IMM Figs. 13-14)
imm_solar_curtailed_due_to_congestion_twh_approxSolar curtailed due to congestion, TWh (approximate reading)
imm_total_curtailed_due_to_congestion_twh_approxWind plus solar curtailed due to congestion, TWh (approximate reading)
imm_real_time_congestion_cost_busd_approxReal-time congestion cost, $ billion (approximate reading of IMM Fig. 37)

Power Hopper is not affiliated with or endorsed by ERCOT, the PUCT, Potomac Economics (the Independent Market Monitor for ERCOT), Grid Strategies or any company or project named on this page.

Power Hopper (BJW Ventures LLC d/b/a Power Hopper) is a PUCT-registered electricity broker, BR260201; registration is not a PUCT endorsement. Electricity providers may pay us a commission if you sign up through us. Power Hopper is not a retail electric provider, utility or transmission and distribution utility, and is not affiliated with or endorsed by the PUCT, ERCOT or any utility, supplier or data provider named above. This brief was prepared with AI assistance.