{
  "title": "ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026",
  "slug": "ercot-wind-solar-curtailment-congestion",
  "version": "1.0",
  "published": "2026-11-10",
  "last_verified": "2026-11-10",
  "period": "2021-2025 (IMM figures); generation 2021-2025 and Jan-Oct 2026",
  "publisher": "Power Hopper Team, powerhopper.energy",
  "license": "CC BY 4.0 for Power Hopper-created compilation and analysis. Underlying data: ERCOT and Potomac Economics (ERCOT Independent Market Monitor), credited to the source.",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "citation": "Power Hopper Team. \"ERCOT wind and solar curtailment, congestion costs and transmission interface limits, 2021-2026.\" Power Hopper Media Data Room, November 2026. https://powerhopper.energy/media/data/ercot-wind-solar-curtailment-congestion. Data: ERCOT; Potomac Economics (ERCOT IMM). CC BY 4.0.",
  "methodology_url": "https://powerhopper.energy/media/methodology#ercot-wind-solar-curtailment-congestion",
  "data_basis": null,
  "underlying_data": "ERCOT and Potomac Economics (ERCOT Independent Market Monitor)",
  "fields": [
    {
      "name": "year",
      "description": "Calendar year"
    },
    {
      "name": "period",
      "description": "Full year, or the months covered (2026: January-October)"
    },
    {
      "name": "ercot_wind_generation_twh",
      "description": "ERCOT wind generation, TWh (Fuel Mix Report)"
    },
    {
      "name": "ercot_solar_generation_twh",
      "description": "ERCOT solar generation, TWh (Fuel Mix Report)"
    },
    {
      "name": "ercot_total_generation_twh",
      "description": "ERCOT total generation, TWh (Fuel Mix Report)"
    },
    {
      "name": "wind_share_pct",
      "description": "Wind share of ERCOT generation, %"
    },
    {
      "name": "solar_share_pct",
      "description": "Solar share of ERCOT generation, %"
    },
    {
      "name": "wind_plus_solar_share_pct",
      "description": "Wind plus solar share, %"
    },
    {
      "name": "imm_wind_curtailed_due_to_congestion_twh_approx",
      "description": "Wind curtailed due to congestion, TWh (approximate Power Hopper reading of IMM Figs. 13-14)"
    },
    {
      "name": "imm_solar_curtailed_due_to_congestion_twh_approx",
      "description": "Solar curtailed due to congestion, TWh (approximate reading)"
    },
    {
      "name": "imm_total_curtailed_due_to_congestion_twh_approx",
      "description": "Wind plus solar curtailed due to congestion, TWh (approximate reading)"
    },
    {
      "name": "imm_real_time_congestion_cost_busd_approx",
      "description": "Real-time congestion cost, $ billion (approximate reading of IMM Fig. 37)"
    }
  ],
  "rows": [
    {
      "year": 2021,
      "period": "Full year",
      "ercot_wind_generation_twh": 95.4,
      "ercot_solar_generation_twh": 15.71,
      "ercot_total_generation_twh": 391.58,
      "wind_share_pct": 24.4,
      "solar_share_pct": 4.0,
      "wind_plus_solar_share_pct": 28.4,
      "imm_wind_curtailed_due_to_congestion_twh_approx": 5.2,
      "imm_solar_curtailed_due_to_congestion_twh_approx": 1.4,
      "imm_total_curtailed_due_to_congestion_twh_approx": 6.6,
      "imm_real_time_congestion_cost_busd_approx": 2.0
    },
    {
      "year": 2022,
      "period": "Full year",
      "ercot_wind_generation_twh": 107.26,
      "ercot_solar_generation_twh": 24.19,
      "ercot_total_generation_twh": 428.48,
      "wind_share_pct": 25.0,
      "solar_share_pct": 5.6,
      "wind_plus_solar_share_pct": 30.7,
      "imm_wind_curtailed_due_to_congestion_twh_approx": 5.3,
      "imm_solar_curtailed_due_to_congestion_twh_approx": 2.3,
      "imm_total_curtailed_due_to_congestion_twh_approx": 7.6,
      "imm_real_time_congestion_cost_busd_approx": 2.8
    },
    {
      "year": 2023,
      "period": "Full year",
      "ercot_wind_generation_twh": 107.99,
      "ercot_solar_generation_twh": 32.4,
      "ercot_total_generation_twh": 443.83,
      "wind_share_pct": 24.3,
      "solar_share_pct": 7.3,
      "wind_plus_solar_share_pct": 31.6,
      "imm_wind_curtailed_due_to_congestion_twh_approx": 4.8,
      "imm_solar_curtailed_due_to_congestion_twh_approx": 1.9,
      "imm_total_curtailed_due_to_congestion_twh_approx": 6.7,
      "imm_real_time_congestion_cost_busd_approx": 2.4
    },
    {
      "year": 2024,
      "period": "Full year",
      "ercot_wind_generation_twh": 111.74,
      "ercot_solar_generation_twh": 48.22,
      "ercot_total_generation_twh": 461.67,
      "wind_share_pct": 24.2,
      "solar_share_pct": 10.4,
      "wind_plus_solar_share_pct": 34.6,
      "imm_wind_curtailed_due_to_congestion_twh_approx": 5.3,
      "imm_solar_curtailed_due_to_congestion_twh_approx": 3.0,
      "imm_total_curtailed_due_to_congestion_twh_approx": 8.3,
      "imm_real_time_congestion_cost_busd_approx": 2.0
    },
    {
      "year": 2025,
      "period": "Full year",
      "ercot_wind_generation_twh": 114.92,
      "ercot_solar_generation_twh": 67.81,
      "ercot_total_generation_twh": 488.07,
      "wind_share_pct": 23.5,
      "solar_share_pct": 13.9,
      "wind_plus_solar_share_pct": 37.4,
      "imm_wind_curtailed_due_to_congestion_twh_approx": 5.7,
      "imm_solar_curtailed_due_to_congestion_twh_approx": 4.1,
      "imm_total_curtailed_due_to_congestion_twh_approx": 9.8,
      "imm_real_time_congestion_cost_busd_approx": 2.6
    },
    {
      "year": 2026,
      "period": "Jan-Oct (preliminary for latest months)",
      "ercot_wind_generation_twh": 101.44,
      "ercot_solar_generation_twh": 72.5,
      "ercot_total_generation_twh": 435.54,
      "wind_share_pct": 23.3,
      "solar_share_pct": 16.6,
      "wind_plus_solar_share_pct": 39.9,
      "imm_wind_curtailed_due_to_congestion_twh_approx": "",
      "imm_solar_curtailed_due_to_congestion_twh_approx": "",
      "imm_total_curtailed_due_to_congestion_twh_approx": "",
      "imm_real_time_congestion_cost_busd_approx": ""
    }
  ]
}