The short version. Texas wind and solar farms on the ERCOT grid could have produced about 9.8 terawatt-hours (TWh) more electricity in 2025, but grid congestion limited how much could be delivered, according to our reading of charts published by the Independent Market Monitor for ERCOT (Potomac Economics, the IMM). That is the most in the five years the IMM charts, and up from about 8.3 TWh in 2024. Over the same year, the IMM reports, the cost of congestion in ERCOT's real-time market rose 32% from $1.9 billion in 2024.

What "curtailed because of congestion" means
When a transmission line or a group of lines reaches its safe limit, ERCOT's dispatch software tells some power plants on the crowded side to produce less, and calls on other plants elsewhere to make up the difference. Wind and solar farms in remote, resource-rich areas are often the ones told to back down.
In a section on curtailment caused by congestion, the IMM reports that roughly 4.7% of wind generation and roughly 6% of solar generation were curtailed in 2025. Its report shows the amounts only as bar charts. Our reading of those bars is about 5.7 TWh of wind and 4.1 TWh of solar. As a cross-check, the IMM's percentages applied to ERCOT's own 2025 generation totals (114.9 TWh of wind and 67.8 TWh of solar) give about 9.5 to 10.0 TWh, depending on whether the shares are taken of actual or of available output.
These figures cover congestion only. Wind and solar are also cut back at times when the whole grid has more power than it needs, and the IMM's numbers leave those hours out.
Wind and solar are a growing share of ERCOT's power
ERCOT's fuel-mix report shows wind and solar together produced 182.7 TWh in 2025, or 37.4% of the grid's electricity. Solar is growing fastest: from January through October 2026, solar farms produced 72.5 TWh (September and October figures are initial, not final, settlement), already more than in all of 2025 (67.8 TWh).
On March 18, 2026, at 10:33 a.m., wind and solar met 86.77% of ERCOT's load, a new record, with 43,399 MW of renewable output, according to an ERCOT operations report to its board.
Where the grid gets crowded
ERCOT's planning reports point to a few interfaces, groups of lines that carry power between regions, that limit flows most often:

- The Panhandle. ERCOT's 2027 and 2030 planning studies cap power leaving the Panhandle at 4,440 megawatts (MW). The IMM's 2024 report said the Panhandle "often sees negative prices due to frequent curtailment of abundant wind generation," and its 2025 report describes the area as export-constrained.
- West Texas exports. The West Texas export interface is capped at 12,240 MW in ERCOT's 2027 study case. It ranked fourth among ERCOT's real-time constraints from October 2024 to September 2025, with $127 million in congestion rent.
- Local lines in West Texas. The three most expensive constraints in that period were all 138-kilovolt lines in West Texas: Koch Tap to Vealmoor ($211 million), Hargrove to Twin Buttes ($176 million) and Odessa EHV to Yarbrough ($151 million), according to ERCOT.
One zone, two different problems
In ERCOT's competitive areas, power for customers is settled at load-zone wholesale prices. A zone's wholesale price does not show what any retail plan costs. The West load zone takes in both the Panhandle, which often has more wind and solar power than its lines can export, and the Permian Basin, where oilfield and cryptocurrency-mining demand is growing faster than power can be brought in. The IMM says average load in the West zone rose 12.3% in 2025.
That mix gave the West zone the highest average wholesale energy price in ERCOT for the second year in a row: $41.59 per megawatt-hour in 2025, against an ERCOT average of $36.94 (IMM figures excluding price adders), about 13% higher. The same zone also had the most intervals with negative prices. The IMM notes that ERCOT's load zones have not been updated since 2003 and recommends redrawing them to match today's grid.

What is being built
ERCOT reports about $55.5 billion of transmission projects in engineering, routing, licensing or construction as of July 17, 2026. That total covers all project types, not only lines that serve wind and solar. Key pieces include:
- The 765-kV plan. In April 2025 the Public Utility Commission of Texas (PUCT) approved three 765-kilovolt import paths into the Permian Basin, the first facilities at that voltage in ERCOT. ERCOT lists them for service in 2031. ERCOT's January 2025 estimate for the full 765-kV plan was $32.99 billion, including $13.77 billion for the Permian Basin plan. ERCOT's study found the plan would raise the West Texas export limit in its 2030 study case from about 12.7 GW to 16.2 GW. (The 12,240 MW figure above is ERCOT's assumption for 2027, before the plan.)
- Nearer-term lines. ERCOT's December 2025 constraints report listed the Bearkat-North McCamey-Sand Lake 345-kV line (estimated at $477.6 million) for service in 2026 and the Lower Rio Grande Valley project (estimated at $1.28 billion) for 2027. Because of these projects, ERCOT's 2025 planning cases assume no limit is needed on the McCamey interface and four Rio Grande Valley interfaces, an expectation ERCOT says could change.
What it means for a household bill
The data supports three plain points, and no more:
- Congestion raises the cost of serving load. When lines are full, the IMM explains, the market "shifts generation to higher-cost units," so lower-cost generators cannot serve everyone. Those costs are part of wholesale energy prices. The data does not show how they affect any particular retail plan.
- Some congestion money flows back. Congestion rent funds financial rights traded in ERCOT's markets. In 2025, surplus payments to load-serving entities totaled $293 million, up 22%, according to the IMM. The data does not show whether any of this reaches customers' bills.
- Transmission is paid for through regulated delivery charges. In areas with retail choice, the PUCT sets the rates that transmission and distribution utilities charge to deliver power, including a charge that recovers transmission costs, and retail electric providers include these delivery charges in what customers pay. Customers of city-owned utilities and electric cooperatives pay rates set by their own utility. ERCOT reports that transmission cost of service per megawatt-hour, adjusted for inflation, has declined slightly over the last 10 years, because electricity use has grown along with the investment.
The data does not show how much any one household's bill changed because of curtailment or congestion.
How we did this
We used ERCOT's fuel-mix workbooks for generation, ERCOT planning reports for interface limits and constraint rankings, and the IMM's 2024 and 2025 State of the Market reports for curtailment and congestion. The IMM publishes its yearly curtailment and congestion totals as bar charts, not tables. We read the bar lengths from the vector graphics in the PDF and scaled them to the axis labels. This reproduces ERCOT's 2021 and 2025 wind totals to within 0.1 TWh. The full method, data and sources are on our data page.
Sources.
- Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report for the ERCOT Electricity Markets.
- Potomac Economics, 2024 State of the Market Report (revised July 2025).
- ERCOT, Fuel Mix Report.
- ERCOT, 2025 Regional Transmission Plan Economic Study: Stability Interface Limits (Aug. 5, 2025).
- ERCOT, 2025 Report on Existing and Potential Electric System Constraints and Needs.
- ERCOT, 2024 Report on Existing and Potential Electric System Constraints and Needs.
- ERCOT, 345-kV plan and Texas 765-kV strategic transmission expansion comparison (Jan. 27, 2025).
- ERCOT, Monthly Operational Overview, September 2026.
- ERCOT, System Operations Update (Apr. 13, 2026).
Customers of most city-owned utilities and electric cooperatives in Texas cannot choose a different electricity provider. If you live where retail choice is available, you can compare plans with Power Hopper. Power Hopper is a PUCT-registered broker, BR260201; electricity providers may pay us a commission if you sign up through us. BJW Ventures LLC is paid by the retail electric provider, or by an enrollment platform that is paid by that provider, if you enroll through a path that pays us a commission; you are not charged a broker fee by us.
Power Hopper is not affiliated with or endorsed by ERCOT, the PUCT, Potomac Economics (the Independent Market Monitor for ERCOT), Grid Strategies, or any transmission utility, company or project named in this article.
Power Hopper (BJW Ventures LLC d/b/a Power Hopper) is a PUCT-registered electricity broker, BR260201; registration is not a PUCT endorsement. Electricity providers may pay us a commission if you sign up through us. Power Hopper is not a retail electric provider, utility or transmission and distribution utility, and is not affiliated with or endorsed by the PUCT, ERCOT or any utility, supplier or data provider named above. This brief was prepared with AI assistance.