Grid congestion held back nearly 10 TWh of wind and solar power on the ERCOT grid in 2025

By Power Hopper Team

Published November 10, 2026 · Reviewed by Brent Ward on November 10, 2026.

The short version. Texas wind and solar farms on the ERCOT grid could have produced about 9.8 terawatt-hours (TWh) more electricity in 2025, but grid congestion limited how much could be delivered, according to our reading of charts published by the Independent Market Monitor for ERCOT (Potomac Economics, the IMM). That is the most in the five years the IMM charts, and up from about 8.3 TWh in 2024. Over the same year, the IMM reports, the cost of congestion in ERCOT's real-time market rose 32% from $1.9 billion in 2024.

Stacked bar chart of wind and solar energy curtailed because of transmission congestion in ERCOT: 2021 6.6 TWh, 2022 7.6, 2023 6.7, 2024 8.3, 2025 9.8 TWh (wind 5.7, solar 4.1).
Source: Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report, Figures 13 and 14 (p. 18). Values are approximate Power Hopper readings of the published charts, rounded to 0.1 TWh; they are not figures the IMM reports.

What "curtailed because of congestion" means

When a transmission line or a group of lines reaches its safe limit, ERCOT's dispatch software tells some power plants on the crowded side to produce less, and calls on other plants elsewhere to make up the difference. Wind and solar farms in remote, resource-rich areas are often the ones told to back down.

In a section on curtailment caused by congestion, the IMM reports that roughly 4.7% of wind generation and roughly 6% of solar generation were curtailed in 2025. Its report shows the amounts only as bar charts. Our reading of those bars is about 5.7 TWh of wind and 4.1 TWh of solar. As a cross-check, the IMM's percentages applied to ERCOT's own 2025 generation totals (114.9 TWh of wind and 67.8 TWh of solar) give about 9.5 to 10.0 TWh, depending on whether the shares are taken of actual or of available output.

These figures cover congestion only. Wind and solar are also cut back at times when the whole grid has more power than it needs, and the IMM's numbers leave those hours out.

Wind and solar are a growing share of ERCOT's power

ERCOT's fuel-mix report shows wind and solar together produced 182.7 TWh in 2025, or 37.4% of the grid's electricity. Solar is growing fastest: from January through October 2026, solar farms produced 72.5 TWh (September and October figures are initial, not final, settlement), already more than in all of 2025 (67.8 TWh).

On March 18, 2026, at 10:33 a.m., wind and solar met 86.77% of ERCOT's load, a new record, with 43,399 MW of renewable output, according to an ERCOT operations report to its board.

Where the grid gets crowded

ERCOT's planning reports point to a few interfaces, groups of lines that carry power between regions, that limit flows most often:

Three cards showing ERCOT's assumed 2027 stability limits in its 2025 Regional Transmission Plan study: Panhandle export interface 4,440 megawatts; West Texas export interface 12,240 megawatts, rising to 16,200 in 2030; North-to-Houston import interface 5,595 megawatts base rating.
Source: ERCOT 2025 Regional Transmission Plan stability interface limits (Aug. 5, 2025). Planning assumptions; real-time limits vary.

One zone, two different problems

In ERCOT's competitive areas, power for customers is settled at load-zone wholesale prices. A zone's wholesale price does not show what any retail plan costs. The West load zone takes in both the Panhandle, which often has more wind and solar power than its lines can export, and the Permian Basin, where oilfield and cryptocurrency-mining demand is growing faster than power can be brought in. The IMM says average load in the West zone rose 12.3% in 2025.

That mix gave the West zone the highest average wholesale energy price in ERCOT for the second year in a row: $41.59 per megawatt-hour in 2025, against an ERCOT average of $36.94 (IMM figures excluding price adders), about 13% higher. The same zone also had the most intervals with negative prices. The IMM notes that ERCOT's load zones have not been updated since 2003 and recommends redrawing them to match today's grid.

Horizontal bar chart of ERCOT real-time congestion cost: 2021 about $2.0 billion, 2022 about $2.8 billion, 2023 about $2.4 billion, 2024 about $2.0 billion, 2025 about $2.6 billion. 2025 is highlighted, up 32% from 2024.
Source: IMM 2025 State of the Market Report, Figure 37 (p. 62) and text. Bar values are approximate Power Hopper readings of the chart, rounded to $0.1 billion; the IMM's text reports $1.9 billion for 2024 and a 32% increase in 2025.

What is being built

ERCOT reports about $55.5 billion of transmission projects in engineering, routing, licensing or construction as of July 17, 2026. That total covers all project types, not only lines that serve wind and solar. Key pieces include:

What it means for a household bill

The data supports three plain points, and no more:

  1. Congestion raises the cost of serving load. When lines are full, the IMM explains, the market "shifts generation to higher-cost units," so lower-cost generators cannot serve everyone. Those costs are part of wholesale energy prices. The data does not show how they affect any particular retail plan.
  2. Some congestion money flows back. Congestion rent funds financial rights traded in ERCOT's markets. In 2025, surplus payments to load-serving entities totaled $293 million, up 22%, according to the IMM. The data does not show whether any of this reaches customers' bills.
  3. Transmission is paid for through regulated delivery charges. In areas with retail choice, the PUCT sets the rates that transmission and distribution utilities charge to deliver power, including a charge that recovers transmission costs, and retail electric providers include these delivery charges in what customers pay. Customers of city-owned utilities and electric cooperatives pay rates set by their own utility. ERCOT reports that transmission cost of service per megawatt-hour, adjusted for inflation, has declined slightly over the last 10 years, because electricity use has grown along with the investment.

The data does not show how much any one household's bill changed because of curtailment or congestion.

How we did this

We used ERCOT's fuel-mix workbooks for generation, ERCOT planning reports for interface limits and constraint rankings, and the IMM's 2024 and 2025 State of the Market reports for curtailment and congestion. The IMM publishes its yearly curtailment and congestion totals as bar charts, not tables. We read the bar lengths from the vector graphics in the PDF and scaled them to the axis labels. This reproduces ERCOT's 2021 and 2025 wind totals to within 0.1 TWh. The full method, data and sources are on our data page.

Sources.

  1. Potomac Economics (ERCOT Independent Market Monitor), 2025 State of the Market Report for the ERCOT Electricity Markets.
  2. Potomac Economics, 2024 State of the Market Report (revised July 2025).
  3. ERCOT, Fuel Mix Report.
  4. ERCOT, 2025 Regional Transmission Plan Economic Study: Stability Interface Limits (Aug. 5, 2025).
  5. ERCOT, 2025 Report on Existing and Potential Electric System Constraints and Needs.
  6. ERCOT, 2024 Report on Existing and Potential Electric System Constraints and Needs.
  7. ERCOT, 345-kV plan and Texas 765-kV strategic transmission expansion comparison (Jan. 27, 2025).
  8. ERCOT, Monthly Operational Overview, September 2026.
  9. ERCOT, System Operations Update (Apr. 13, 2026).

Customers of most city-owned utilities and electric cooperatives in Texas cannot choose a different electricity provider. If you live where retail choice is available, you can compare plans with Power Hopper. Power Hopper is a PUCT-registered broker, BR260201; electricity providers may pay us a commission if you sign up through us. BJW Ventures LLC is paid by the retail electric provider, or by an enrollment platform that is paid by that provider, if you enroll through a path that pays us a commission; you are not charged a broker fee by us.

Power Hopper is not affiliated with or endorsed by ERCOT, the PUCT, Potomac Economics (the Independent Market Monitor for ERCOT), Grid Strategies, or any transmission utility, company or project named in this article.

Power Hopper (BJW Ventures LLC d/b/a Power Hopper) is a PUCT-registered electricity broker, BR260201; registration is not a PUCT endorsement. Electricity providers may pay us a commission if you sign up through us. Power Hopper is not a retail electric provider, utility or transmission and distribution utility, and is not affiliated with or endorsed by the PUCT, ERCOT or any utility, supplier or data provider named above. This brief was prepared with AI assistance.