Texas power grid map: what the Grid Atlas shows
The Grid Atlas maps the Texas power grid's physical backbone: about 55,888 miles of mapped power lines, 6,257 substations and 986 power plants, as drawn by volunteers in OpenStreetMap and colored by voltage. High-voltage lines (230 kV and above, mostly 345 kV in ERCOT) move bulk power between regions; 138 kV and 69 kV lines feed local substations.
Line lengths are the length of each mapped OpenStreetMap way: route geometry, not circuit-miles. Operators and voltages appear only where a mapper recorded them; anything missing reads "unavailable". OSM does not say whether a line is energized and an OSM edit date is not a construction date, so ages, owners, conductors and official line names come only from public records: FERC Form 1, ERCOT's transmission project tracker, PUCT monthly construction reports and PUCT dockets. Anything without a record reads "Not publicly documented" and is never estimated.
Click a substation to see its transformers and capacity from FERC Form 1, the distribution feeders its utility reported to the PUCT (where the utility's substation name could be matched to the map, about 4 in 10 reported feeders), when it was connected as a new substation (PUCT construction reports), the ERCOT generating units connected there and every mapped line that ends there. Click a power plant for its ERCOT installed capacity, its EIA nameplate capacity, in-service years, planned generators and planned retirements, and a line for its name, ends, age, last rebuild, conductor, owner, PUCT docket and congestion history.
Key figures
- 53,948 mi of mapped lines at 60 kV and above
- 19,302 mapped line corridors at 60 kV and above (768 with an official or record name)
- 1,032 substations with FERC transformer records
- 207 GW nameplate capacity at 1,109 Texas power plants on EIA's operating list (September 2026; includes 3.7 GW on standby or out of service)
- 99 GW of ERCOT generating capacity matched to 414 mapped plants
- 481 transmission elements binding in ERCOT, 2026-10-22 to 2026-11-21
Most congested Texas transmission elements
Ranked by hours binding in ERCOT's day-ahead market, 2026-10-22 to 2026-11-21 (ERCOT NP4-191-CD). Binding means the element was at its limit in the market solution; it is not an outage.
| Element | kV | Day-ahead hours binding | ERCOT limit (median) |
|---|---|---|---|
| MATHIS – ARGENTAline · ERCOT LN:ARGENTA:MATHIS:69 | 69 | 704 | 69 MW |
| PSA – BCVline · ERCOT LN:BCV:PSA:138 | 138 | 661 | 478 MW |
| Blessing Substation – Blessing Substationtransformer · ERCOT XF:BLESSING:345/138 | 345 | 637 | 428 MW |
| Putnam Switching Station – LENSWline · ERCOT LN:LENSW:PUTN:138 | 138 | 560 | 87 MW |
| Scurry Chevron Substation – Knapp Substationline · ERCOT LN:KNAPP:SCRCV:138 | 138 | 544 | 222 MW |
| Solstice Substation – Fort Stockton Plant Substationline · ERCOT LN:FTST:SOLSTICE:138 | 138 | 540 | 231 MW |
| Grant Substation – Plaza Substationline · ERCOT LN:GN:PZ:138 | 138 | 501 | 387 MW |
| Blessing Substation – PAVLOVline · ERCOT LN:BLESSING:PAVLOV:138 | 138 | 490 | 157 MW |
| Asherton Substation – CATARINAline · ERCOT LN:ASHERTON:CATARINA:138 | 138 | 457 | 152 MW |
| transformer · ERCOT XF::0/0 | 0 | 429 | 1,000 MW |
Largest power plants on the map by ERCOT capacity
Installed capacity from ERCOT's Monthly Outlook for Resource Adequacy unit list, matched to mapped plants (the map lists the ERCOT units behind each figure).
| Plant | Fuel (as mapped) | Installed MW | In service |
|---|---|---|---|
| W. A. Parish Electric Generating Station9 ERCOT units | coal;gas | 4,009 | 1958–1982 |
| Martin Lake Power Plant3 ERCOT units | coal | 2,679 | 1977–1979 |
| Comanche Peak Nuclear Power Plant2 ERCOT units | nuclear | 2,538 | 1990–1993 |
| Forney Energy Center8 ERCOT units | gas | 2,024 | 2003 |
| Limestone Electric Generating Station2 ERCOT units | coal | 1,850 | 1985–1986 |
| Oak Grove Power Plant2 ERCOT units | coal | 1,834 | 2010–2011 |
| Midlothian Energy Facility6 ERCOT units | gas | 1,581 | 2001–2002 |
| J K Spruce Power Plant2 ERCOT units | coal | 1,482 | 1992–2010 |
| T. H. Wharton Power Plant17 ERCOT units | gas | 1,296 | 1967–1975 |
| Handley Power Plant3 ERCOT units | gas | 1,265 | 1963–1977 |
| Lamar Power Project6 ERCOT units | gas | 1,176 | 2000 |
| Guadalupe Power Partners Generating Station6 ERCOT units | gas | 1,132 | 2000 |
| Freestone Energy Center6 ERCOT units | gas | 1,099 | 2002 |
| Sandy Creek Energy Station1 ERCOT unit | coal | 1,008 | 2013 |
| Hays Energy Project4 ERCOT units | gas | 988 | 2002 |
Texas generating capacity by fuel
Nameplate capacity of every generator of 1 MW or more on EIA's operating list for Texas, from the U.S. Energy Information Administration's monthly generator inventory (Form EIA-860M) as of September 2026. The list includes 3,674 MW on standby or out of service. Nameplate is a generator's rated size, not what it produces; wind and solar produce well below nameplate most hours. 183,431 MW of the total is in ERCOT; the rest is in the Southwest Power Pool (13,708 MW), MISO (7,663 MW), El Paso Electric (1,928 MW) and balancing authority code DOPD as published by EIA (500 MW).
| Fuel | Nameplate MW | Share |
|---|---|---|
| Natural gas and oil | 85,163 | 41.1% |
| Wind | 44,526 | 21.5% |
| Solar | 34,979 | 16.9% |
| Battery storage | 19,400 | 9.4% |
| Coal and lignite | 16,582 | 8.0% |
| Nuclear | 5,139 | 2.5% |
| Hydro | 735 | 0.4% |
| Other (biomass, waste heat, landfill gas and others) | 708 | 0.3% |
| Total | 207,230 | 100% |
Planned power plant retirements in Texas
Generators whose owners had told EIA they plan to retire them, as of EIA's September 2026 inventory (8,412 MW in all). A planned retirement can be delayed or cancelled, and a date that has already passed may since have happened or moved; it is the owner's plan as reported, not a forecast.
| Plant | Technology | MW | Planned retirement |
|---|---|---|---|
| SabineOrange County · 3 generators · Entergy Texas Inc. | Natural Gas Steam Turbine | 1,304 | Oct 2026 |
| O W SommersBexar County · 1 generator · City of San Antonio - (TX) | Natural Gas Steam Turbine | 446 | Mar 2027 |
| Plant XLamb County · 1 generator · Southwestern Public Service Co | Natural Gas Steam Turbine | 190 | Dec 2027 |
| NicholsPotter County · 1 generator · Southwestern Public Service Co | Natural Gas Steam Turbine | 114 | Dec 2027 |
| NewmanEl Paso County · 1 generator · El Paso Electric Co | Natural Gas Steam Turbine | 82 | Dec 2027 |
| Hal C Weaver Power PlantTravis County · 2 generators · University of Texas at Austin | Natural Gas Fired Combined Cycle | 14 | Jan 2028 |
| TolkLamb County · 2 generators · Southwestern Public Service Co | Conventional Steam Coal | 1,136 | Dec 2028 |
| J K SpruceBexar County · 1 generator · City of San Antonio - (TX) | Conventional Steam Coal | 566 | Dec 2028 |
| NicholsPotter County · 1 generator · Southwestern Public Service Co | Natural Gas Steam Turbine | 114 | Dec 2028 |
| NewmanEl Paso County · 1 generator · El Paso Electric Co | Natural Gas Steam Turbine | 82 | Dec 2028 |
| O W SommersBexar County · 1 generator · City of San Antonio - (TX) | Natural Gas Steam Turbine | 446 | Mar 2029 |
| Works 4Wichita County · 1 generator · Vitro Architectural Glass | Petroleum Liquids | 2 | Nov 2029 |
| NicholsPotter County · 1 generator · Southwestern Public Service Co | Natural Gas Steam Turbine | 248 | Dec 2030 |
| CopperEl Paso County · 1 generator · El Paso Electric Co | Natural Gas Fired Combustion Turbine | 87 | Dec 2030 |
| JonesLubbock County · 1 generator · Southwestern Public Service Co | Natural Gas Steam Turbine | 248 | Dec 2031 |
| NewmanEl Paso County · 4 generators · El Paso Electric Co | Natural Gas Steam Turbine; Natural Gas Fired Combined Cycle | 412 | Dec 2031 |
| Flower Valley IReeves County · 1 generator · Flower Valley | Batteries | 10 | Aug 2032 |
| Lewis CreekMontgomery County · 2 generators · Entergy Texas Inc. | Natural Gas Steam Turbine | 543 | Jun 2034 |
| JonesLubbock County · 1 generator · Southwestern Public Service Co | Natural Gas Steam Turbine | 248 | Dec 2034 |
| HarringtonPotter County · 1 generator · Southwestern Public Service Co | Natural Gas Steam Turbine | 360 | Dec 2036 |
| HarringtonPotter County · 1 generator · Southwestern Public Service Co | Natural Gas Steam Turbine | 360 | Dec 2038 |
| HarringtonPotter County · 1 generator · Southwestern Public Service Co | Natural Gas Steam Turbine | 360 | Dec 2040 |
| Madero GridHidalgo County · 1 generator · Madero Grid, LLC | Batteries | 100 | Jun 2042 |
| Ignacio Grid Energy Storage SystemHidalgo County · 1 generator · Ignacio Grid, LLC | Batteries | 100 | Jun 2042 |
| Hale Community Wind FarmHale County · 1 generator · Southwestern Public Service Co | Onshore Wind Turbine | 478 | Dec 2044 |
| JonesLubbock County · 1 generator · Southwestern Public Service Co | Natural Gas Fired Combustion Turbine | 183 | Dec 2056 |
| JonesLubbock County · 1 generator · Southwestern Public Service Co | Natural Gas Fired Combustion Turbine | 183 | Dec 2058 |
Data centers and other large loads, by region
Large loads are data centers, crypto mining and other sites that would use 75 MW or more. In September 2026 ERCOT conditionally classified the loads in its first large-load study round ("Batch Zero") for 2032: 66.4 GW as base load (204 projects: already energized, or qualifying through ERCOT's other base-load categories: committed, advancing, the Permian reliability plan, earlier studies, or net metering) and 125.4 GW as studied load (158 projects ERCOT will study separately; some were moved there from the base-load path). It excluded another 302.2 GW (373 projects). About 22 GW of the base load is already energized; the rest are plans that may change, and ERCOT's final verification is due in December 2026. ERCOT does not publish individual projects or locations.
| ERCOT weather zone | Base load 2032 (MW) | Studied load 2032 (MW) | Total (MW) |
|---|---|---|---|
| North Central | 14,559 | 25,807 | 40,366 |
| North | 14,222 | 24,309 | 38,531 |
| South | 4,266 | 20,447 | 24,713 |
| West | 5,986 | 16,395 | 22,381 |
| South Central | 6,747 | 14,772 | 21,519 |
| Far West | 8,493 | 10,539 | 19,032 |
| Coast | 10,976 | 6,497 | 17,473 |
| East | 1,110 | 6,625 | 7,735 |
Counties ERCOT named: the most base load is in Dallas (5,713 MW), Harris (5,672 MW), Haskell (2,689 MW), Brazoria (2,357 MW), Ellis (2,330 MW); the most base plus studied load is in Cameron (12,235 MW), Dallas (7,637 MW), Jones (7,000 MW), Harris (6,899 MW), Childress (6,750 MW). In ERCOT's November 2026 data-center survey (preliminary), 433 of 465 loads responded; the 429 responses ERCOT reviewed request 177.4 GW in all; by load zone: West 73 GW, South 49 GW, North 45 GW, Houston 10 GW.
The largest Texas power outages since 2014
Statewide customers without power at the worst 15-minute moment of each event, from Oak Ridge National Laboratory's EAGLE-I records, which read utility outage maps every 15 minutes. An event is a run of consecutive days when at least 100,000 Texas customers were out at some moment. EAGLE-I's coverage grew over the years, so its counts are lower bounds; it does not record causes.
| Dates (UTC) | Peak customers out | Customer-hours out |
|---|---|---|
| 2021-02-15 to 2021-02-20 | 4,257,873 | 222,415,752 |
| 2024-07-08 to 2024-07-16 | 2,762,057 | 208,323,881 |
| 2024-05-16 to 2024-05-23 | 1,047,793 | 56,049,494 |
| 2024-05-28 to 2024-06-01 | 1,045,160 | 31,201,237 |
| 2021-09-14 to 2021-09-15 | 523,960 | 8,815,014 |
| 2023-06-22 | 447,357 | 5,643,511 |
| 2023-02-01 to 2023-02-05 | 444,493 | 24,471,529 |
| 2025-03-04 to 2025-03-05 | 416,145 | 7,383,842 |
| 2019-06-09 to 2019-06-11 | 384,428 | 11,215,244 |
| 2023-03-03 | 345,638 | 3,150,291 |
The map's outage-history layer shows each county's customer-hours without power per 1,000 residents per year, 2018 to 2025. EAGLE-I sometimes assigns a utility's outages to the wrong county, so county figures are approximate and are not ranked here; 43 county-years with more customers out than a county plausibly has are left out.
Emergency incidents reported to the U.S. Department of Energy
Utilities and ERCOT must report major outages, load shedding, public appeals to save power, suspicious activity and physical or cyber attacks on grid equipment to the U.S. Department of Energy within hours (Form OE-417). Rows naming Texas or the Texas RE region are counted; some cover several states. Texas reports by year: 2014: 20, 2015: 21, 2016: 14, 2017: 14, 2018: 15, 2019: 39, 2020: 48, 2021: 91, 2022: 52, 2023: 59, 2024: 76, 2025: 32. By kind: severe weather 186, vandalism, physical or cyber attack 92, system operations (control-centre events) 49, suspicious activity (no attack reported) 49, other 44, load shed or loss of service 33, fuel or generation shortfall 13, public appeal to save power 11, transmission or equipment 4. One incident can be reported more than once, and many reports give customers as unknown.
| Began | Area (as reported) | Type | Customers affected (as reported) |
|---|---|---|---|
| 2021-02-10 | Texas: | Severe Weather | 2,000,000 |
| 2021-02-15 | Texas: Harris County; | Severe Weather | 1,390,000 |
| 2017-08-27 | Texas: Harris County; | Severe Weather | 1,076,868 |
| 2017-08-26 | Texas: | Severe Weather | 1,076,868 |
| 2021-02-16 | Texas: | Severe Weather | 840,000 |
| 2024-05-16 | Harris County, Texas | Weather or natural disaster | 807,584 |
| 2021-09-14 | Texas: Harris County; | Severe Weather | 705,415 |
| 2024-05-28 | McLennan County, Texas; Dallas County, Texas; Hill County, Texas; Bell County, Texas; Kaufman County, Texas; Brown Count | Weather or natural disaster | 650,000 |
| 2020-08-27 | Texas: Louisiana: | Severe Weather | 615,992 |
| 2019-06-09 | Texas: Collin County, Dallas County, Denton County, Palo Pinto County, Tarrant County, Ellis County, Williamson County; | Severe Weather | 558,000 |
How reliable are Texas utilities?
Average minutes without power per customer in 2025, as each utility reported to the U.S. Energy Information Administration (Form EIA-861) for its Texas customers. "All events" counts every day; "without major event days" removes the rare worst days (usually big storms), picked by the statistical threshold the IEEE 1366 standard defines. Utilities marked "own standard" measure differently, so their figures are not directly comparable. These official figures differ from the outage-map estimates above.
| Utility | Texas customers | Minutes out, all events | Minutes out, without major event days | Interruptions per customer |
|---|---|---|---|---|
| Oncor Electric Delivery Company LLCutility's own standard | 4,084,817 | 232 | 67 | 1.55 |
| CenterPoint Energy | 2,898,292 | 193 | 151 | 1.954 |
| City of San Antonio - (TX) | 940,662 | 111 | 75 | 1.54 |
| AEP Texas Central Company | 921,564 | 205 | 155 | 1.761 |
| Austin Energy | 575,518 | 182 | 77 | 1.29 |
| Entergy Texas Inc. | 539,043 | 403 | 305 | 2.579 |
| Pedernales Electric Coop, Inc | 441,007 | 90 | 78 | 1.156 |
| El Paso Electric Co | 363,341 | 55 | 55 | 0.858 |
| Denton County Elec Coop, Inc | 333,690 | 49 | 37 | 0.399 |
| Texas-New Mexico Power Coutility's own standard | 274,282 | 165 | 119 | 1.501 |
| Southwestern Public Service Co | 270,149 | 441 | 151 | 1.71 |
| AEP Texas North Company | 200,476 | 133 | 106 | 1.407 |
| Southwestern Electric Power Co | 192,887 | 467 | 312 | 2.979 |
| Magic Valley Electric Coop Inc | 149,858 | 288 | 231 | not reported |
| Tri-County Electric Coop, Inc (TX) | 144,322 | 203 | 132 | 1.67 |
Rooftop solar and other small generators, by utility
Each year Texas utilities report to the PUCT every small generator connected to their distribution lines. These totals come from the 2025 reports.
| Utility | Systems at the end of 2025 | Solar MW (incl. with batteries) | Battery-only MW | Gas and diesel MW | Systems added in 2025 |
|---|---|---|---|---|---|
| Oncor | 122,767 | 1,323 | 211 | 779 | not reported separately |
| CenterPoint Energy Houston Electric | 63,057 | 586 | 209 | 451 | 9,602 |
| AEP Texas | 28,280 | 302 | 472 | 107 | 1,593 |
| El Paso Electric | 27,646 | 153 | 0 | 15 | 1,200 |
| TNMP | 7,142 | 230 | 0 | 26 | 835 |
Distributed generation = small generators connected to the local distribution system: mostly rooftop solar, plus batteries and some gas and diesel units. Capacity is the nameplate each utility reported, summed by fuel. End of 2025 = systems in service before 2025 plus those added in 2025 (Oncor reports one list through December 31, 2025). Rows marked superseded, cancelled or withdrawn are left out; TNMP's 2025 count includes some capacity additions to existing systems. TNMP's 'Other' capacity columns are left out because they appear to mix kW and kWh. Categories follow each utility's own sheets (in service, added in 2025, pending, removed); utilities organise their reports differently, so compare utilities with care. Not included (reports filed as PDF only): Entergy Texas (PDF only), SWEPCO (PDF only), SPS (PDF only).
Substations in FEMA flood zones
We checked the FEMA flood zone at the centre of each of the 6,257 mapped substations. 304 sit in a 1% annual chance flood area (the "100-year floodplain"), including 27 in a floodway and 3 in a coastal high-hazard zone, and 180 more in a 0.2% annual chance area. Another 69 are behind levees that FEMA credits with reducing the risk. 1,692 are in places with no digital FEMA flood map, so their risk is unknown, not low. Click a substation to see its zone.
FEMA maps show flood risk for insurance and planning; they do not show past flooding, and many floods happen outside mapped zones.
Transmission projects from utilities' own (archived) web pages
Utilities post pages for transmission projects while they are planned and built, then often take them down. We read 78 such pages from the Internet Archive (CPS Energy 44, CenterPoint Energy 3, Oncor 30, TNMP 1). Rows with a stated date or PUCT docket are listed; dates are what the utility said at the time.
| Project | Utility | kV | Stated date | PUCT docket | Archived page |
|---|---|---|---|---|---|
| blossom substation | CPS Energy | 138 | June 2017 | 2021-10-19 | |
| buckeye la heights transmission line rebuild | CPS Energy | 138 | May 2021 | 2020-11-30 | |
| coliseum to kirby transmission line | CPS Energy | 138 | June 2017 | 2021-10-19 | |
| five points to westside transmission project | CPS Energy | 138 | June 2017 | 2021-10-19 | |
| howard solstice transmission | CPS Energy | 765 | 59336 | 2026-03-05 | |
| howard to san miguel transmission | CPS Energy | 57115 | 2026-07-11 | ||
| hunt lane to pinn road transmission line rebuild project | CPS Energy | 138 | June 2017 | 2021-10-19 | |
| hunt lane to pinn road transmission rebuild | CPS Energy | 138 | 2022 | 2021-12-02 | |
| merida to westside trans line rebuild project | CPS Energy | 138 | May 2019 | 2021-10-19 | |
| omicron | CPS Energy | 138 | 58276 | 2026-07-11 | |
| padua transmission line project | CPS Energy | 138 | 54308 | 2024-10-04 | |
| pawnee to tango | CPS Energy | 345 | 58253 | 2026-07-11 | |
| potranco substation | CPS Energy | 138 | summer 2018 | 2019-07-22 | |
| rafter phase two transmission line | CPS Energy | 138 | April 2020 | 2020-03-30 | |
| rafter substation | CPS Energy | 138 | June 2018 | 2019-08-24 | |
| ranchtown to talley road | CPS Energy | 138 | 57206 | 2026-07-11 | |
| sat15 substation transmission line | CPS Energy | 55728 | 2026-07-11 | ||
| scenic loop project | CPS Energy | 138 | 51023 | 2024-10-09 | |
| spruce to pawnee transmission line | CPS Energy | 345 | 57849 | 2026-07-11 | |
| tezel substation | CPS Energy | end of 2024 | 2024-10-09 | ||
| oyster creek transmission project | CenterPoint Energy | 138 | 41749 | 2017-02-05 | |
| bell county east big hill 765 | Oncor | 345, 765 | summer 2030 | 2026-04-21 | |
| border switch to clearfork switch | Oncor | 345 | 2029 | 2026-02-14 | |
| double creek to prime | Oncor | 138 | Summer 2028 | 2026-04-17 | |
| plowboy to oak spring 138kv | Oncor | 138 | 2028 | 2026-04-17 | |
| porterville to shifting sands 138kv | Oncor | 138 | end of 2028 | 2026-04-17 | |
| quarry field to kyle ranch 138 kv | Oncor | 138 | 49302 | 2022-07-13 |
Dates and voltages are as the utility stated them on the date the page was captured; a planned date is a plan, not a fact. Archived copies can be incomplete. Each row links to the archived page so the wording can be checked.
What Texas fossil plants actually produced, hour by hour
The U.S. Environmental Protection Agency measures the output of every large fossil-fuel unit in Texas each hour, for its air-pollution programs. Click a gas or coal plant on the map to see its yearly output, its busiest hour, how often it started up, and its output through Winter Storm Uri. These are gross figures measured at the generator; the plant's own use is included, so they run a little above EIA's net generation.
Winter Storm Uri: fossil output, February 10-20, 2021
Fossil plants in EPA's data reached 64,641 MW at Feb 14, 18:00 (local standard time). During February 15-18, when ERCOT ordered rotating outages, their output fell as low as 40,396 MW (Feb 16, 13:00). Wind, solar, nuclear and small units are not in EPA's data, so this is not total Texas generation.
Daily table
| Day | Highest hour, MW | Lowest hour, MW |
|---|---|---|
| Feb 10 | 53,342 | 38,416 |
| Feb 11 | 59,253 | 45,388 |
| Feb 12 | 63,228 | 47,491 |
| Feb 13 | 63,080 | 53,505 |
| Feb 14 | 64,641 | 50,557 |
| Feb 15 | 61,966 | 42,645 |
| Feb 16 | 46,342 | 40,396 |
| Feb 17 | 48,658 | 41,245 |
| Feb 18 | 50,898 | 40,895 |
| Feb 19 | 54,583 | 29,879 |
| Feb 20 | 44,377 | 21,134 |
Largest fossil plants by measured output, 2025
| Plant | Gross GWh | Busiest hour, MW | Starts | CO₂, million tons |
|---|---|---|---|---|
| W A Parish | 16,751 | 3,608 | 180 | 15.6 |
| Oak Grove | 12,055 | 1,838 | 40 | 12.5 |
| Forney Power Plant | 10,259 | 2,005 | 984 | 4.4 |
| Martin Lake | 9,357 | 1,749 | 44 | 9.6 |
| Sam Seymour | 9,077 | 1,704 | 12 | 10.2 |
| Limestone | 8,272 | 1,781 | 20 | 9.1 |
| Odessa Ector Generating Station | 8,245 | 1,220 | 248 | 3.4 |
| Channelview Cogeneration Facility | 8,209 | 1,268 | 25 | 3.4 |
| Deer Park Energy Center | 8,046 | 1,340 | 129 | 4.6 |
| Temple Power Station | 7,907 | 1,556 | 48 | 3.7 |
| Montgomery County Power Station | 7,153 | 1,076 | 19 | 2.9 |
| Midlothian Energy | 7,092 | 1,761 | 928 | 3.2 |
Starts count unit start-ups across all of a plant's units. CO₂ as EPA reports it, in short tons.
New gas plants backed by the Texas Energy Fund
Texas voters created the Texas Energy Fund in 2023 to finance new dispatchable power plants. As of 2026-11-20, the PUCT lists 9 executed loans for 5,446 MW and 5 completion bonus grants for 1,438 MW. Click a plant on the EIA layer to see its loan or grant.
| Project | Place | MW | Operations | Amount |
|---|---|---|---|---|
| Rock Island Generation ProjectKerrville Public Utility Board | Colorado County, about 10 miles south of Columbus | 122 | Summer 2027 | $105 million |
| T H Wharton expansion (northwest Houston)NRG Energy, Inc. | Harris County | 456 | May 26, 2026 | $216 million |
| New unit at the Cedar Bayou Generating StationNRG Energy, Inc. | Chambers County (near Baytown) | 721 | Summer 2028 | $562 million |
| Pin Oak Creek Energy CenterConstellation Energy Generation, LLC (Calpine) | Freestone County | 460 | April 29, 2026 | $278 million |
| CPV Basin RanchCompetitive Power Ventures | Ward County | 1,350 | 2029 | $1.12 billion |
| Expansion at the Greens Bayou Generating StationNRG Energy, Inc. | Harris County | 455 | 2028 | $370 million |
| Rayburn Energy Station IIRayburn Country Electric Cooperative, Inc. | Sherman (Grayson County) | 570 | 2028 | $411 million |
| Two new units at the Permian Basin Power PlantVistra Corp. | Ward County | 860 | 2028 | $583.3 million |
| Pecos Power PlantMercuria Investments U.S., Inc. and Continental Resources, Inc. (Pecos Power Plant LLC) | Reeves County | 452 | 2027 | $459 million |
| Project | Place | MW | Operations | Amount |
|---|---|---|---|---|
| Timmerman Power Plant (first unit)Lower Colorado River Authority | Caldwell County | 188 | August 14, 2025 | $22,560,000 over 10 years |
| Timmerman Unit 2Lower Colorado River Authority | Caldwell County | 188 | April 16, 2026 | $22,560,000 over 10 years |
| Pin Oak Creek Energy CenterCalpine (Constellation) | Freestone County | 460 | April 29, 2026 | $55,200,000 over 10 years |
| T H Wharton expansionNRG Energy, Inc. | Harris County | 456 | May 26, 2026 | $54,720,000 over 10 years |
| Friendswood Energy Center expansionTejas Power Generation, LLC (Shell Energy North America) | Harris County | 146 | May 21, 2026 | $17,520,000 over 10 years |
Loans and grants the PUCT has executed. Sizes and operating dates are as the PUCT lists them; a planned date can slip. Each EIA plant link is to a plant the release names. Rayburn Energy Station II and the Pecos Power Plant are not yet in EIA's inventory. Some projects received both a loan and a completion bonus grant (T H Wharton, Pin Oak Creek); do not add the two tables together.
Energy projects with Texas school-tax agreements (Chapter 313)
Until it closed to new applications at the end of 2022, Chapter 313 of the Texas Tax Code let school districts cap the taxable value of large new projects. 367 solar, wind, storage and power projects reached signed agreements (421 agreements: a project crossing several school districts signs one with each). The Comptroller posts each company's application, which states the project's county, size and planned start. We read those applications and checked each project against the U.S. EIA plant list.
| Technology | Projects | Agreements | MW stated in applications (each project once) | EIA lists as operating | EIA lists as planned |
|---|---|---|---|---|---|
| Solar | 212 | 224 | 44,122188 of 212 state a size | 48 | 19 |
| Wind | 151 | 192 | 22,66299 of 151 state a size | 35 | 3 |
| Other or unclear | 4 | 5 | 6942 of 4 state a size | 2 | 0 |
County, MW and planned start come from the company's application and may have changed later. An agreement does not prove the project was built. A project with no EIA match may have been renamed, combined with another phase, cancelled or not yet reported. Open a county on the outage layer to see its projects.
Reliability needs in ERCOT's transmission plans
Each year ERCOT's Regional Transmission Plan lists the transmission projects its studies find are needed to keep the grid reliable over the next six years. Many are placeholders that utilities later turn into tracked projects; a listing is not an approval or a schedule. The 2024 list is ERCOT's 345-kV plan appendix. Listings by plan year: 2015: 62, 2016: 40, 2017: 62, 2018: 40, 2019: 58, 2020: 51, 2021: 67, 2022: 89, 2023: 173, 2024: 237, 2025: 192. Counties named most often in the 2021 to 2025 plans (a project listed in several years counts each time): Dallas (90), Travis (34), Ellis (31), Pecos (31), Bell (30), Howard (30), Reeves (28), Midland (26), Mitchell (23), Tarrant (21).
Texas substations with the most transformer capacity
In-service transformer capacity reported by investor-owned utilities on FERC Form 1 page 426, for substations matched one-to-one to the map. Co-op and city substations do not file FERC Form 1 and are not ranked.
| Substation | Utility (filing year) | MVA in service | Transformers | Voltages (kV) |
|---|---|---|---|---|
| Sheffield Substation | AEP Texas Inc. (2025) | 10,012 | 12 | 69 / 7.56 |
| Bellaire Substation | CenterPoint Energy Houston Electric, LLC (2025) | 3,340 | 9 | 345 / 138 / 35 / 23 / 12 |
| Lon Hill Substation | AEP Texas Inc. (2025) | 2,830 | 11 | 345 / 138 / 70.5 / 69 / 13.8 / 12.47 / 12 / 7.62 |
| Jones Creek Substation | CenterPoint Energy Houston Electric, LLC (2025) | 2,500 | 5 | 345 / 138 / 23 / 12 |
| Mulberry Creek Substation | AEP Texas Inc. (2025) | 2,160 | 16 | 345 / 138 / 34.5 / 13.8 |
| Cypress Substation | Entergy Texas, Inc. (2025) | 2,100 | 4 | 500 / 230 / 13.8 |
| North Belt Substation | CenterPoint Energy Houston Electric, LLC (2025) | 2,000 | 5 | 345 / 138 / 35 / 23 |
| White Oak Substation | CenterPoint Energy Houston Electric, LLC (2025) | 1,797 | 8 | 345 / 138 / 69 / 23 / 12 |
| Jeanetta Substation | CenterPoint Energy Houston Electric, LLC (2025) | 1,747 | 5 | 345 / 138 / 23 / 12 |
| Addicks Substation | CenterPoint Energy Houston Electric, LLC (2025) | 1,700 | 5 | 345 / 138 / 35 / 23 |
| Rothwood Substation | CenterPoint Energy Houston Electric, LLC (2025) | 1,600 | 2 | 345 / 138 / 23 |
| Hartburg Substation | Entergy Texas, Inc. (2025) | 1,585 | 2 | 500 / 230 / 13.8 |
| Grimes Substation | Entergy Texas, Inc. (2025) | 1,576 | 4 | 345 / 230 / 34.5 / 13.8 |
| Odessa EHV Substation | Oncor Electric Delivery Company LLC (2025) | 1,496 | 3 | 345 / 138 / 14 / 12 |
| Stewart Road Substation | AEP Texas Inc. (2025) | 1,383 | 3 | 345 / 138 / 69 / 34.5 / 13.8 / 12 |
Frequently asked questions
What does the Texas Grid Atlas show?
A map of the Texas power grid: high-voltage transmission lines colored by voltage, substations and power plants as mapped in OpenStreetMap, with line names, owners and ages from public records, substation transformer capacity from FERC Form 1, ERCOT generating-unit capacity, every Texas power plant from the EIA generator inventory, ERCOT wholesale prices and binding transmission constraints, and source-linked PUCT transmission project costs.
How old are Texas transmission lines?
Only lines with a public record get an age on the map: an in-service year from FERC Form 1, ERCOT's transmission project tracker or a PUCT construction report. Many Texas lines were built decades before electronic records begin in 1994, so most mapped miles are still marked not documented rather than estimated.
Does the map show power outages?
No. ERCOT's detailed transmission outage schedules are restricted to market participants, and a congested line or a dark area in the nighttime imagery is not evidence of an outage. For outages at your home, check your local utility's outage map.
What does transmission congestion mean in ERCOT?
A transmission constraint binds when ERCOT's dispatch has to keep flow on a line or transformer at its limit, so cheaper power cannot reach where it is needed and prices separate across the grid. The map flags elements that bound in ERCOT's day-ahead market over the last 31 days and in real-time dispatch over the last 7 days, together with ERCOT's enforced limit in MW.
Where does the data come from?
OpenStreetMap for the mapped lines, substations and plants; FERC Form 1 for line and substation records of investor-owned utilities; the Public Utility Commission of Texas for monthly construction reports, CCN dockets and project costs; and ERCOT for prices, constraints, the transmission project tracker, the interconnection queue and the generating-unit list; and the U.S. Energy Information Administration (Form EIA-860M) for every Texas generator's capacity, in-service year and planned retirement. Every value in the map names its source.
Can I download the data?
Yes. Every layer and record set is available as GeoJSON, JSON or CSV from the Download menu, with a manifest of file hashes. Map data derived from OpenStreetMap is under the Open Database License.
Wholesale prices on the map
The price layer reads ERCOT's public market reports directly: real-time locational marginal prices from each security-constrained economic dispatch (SCED) run, real-time 15-minute settlement point prices, and hourly day-ahead settlement point prices. Each is labeled with its price type, interval, age and source. These are the latest public postings, delayed by ERCOT's publication schedule, not a live feed.
ERCOT does not publish coordinates for its price nodes. Power Hopper places a price only where ERCOT's public bus mapping names a substation that matches exactly one OpenStreetMap substation with an agreeing voltage (about 580 substations); every other node is counted but not drawn, and nothing is interpolated between points. Compare with ERCOT's official LMP contour map.
Congestion
The congestion layer lists ERCOT's latest binding transmission constraints (report NP6-86-CD). A binding constraint means a line or transformer limit was binding in a dispatch run. It is not evidence of an outage or equipment failure. ERCOT's detailed transmission outage schedules are restricted to market participants and are not used here, so asset panels say "No asset-specific outage verified from accessible public records" rather than "no outages".
Transmission projects
The projects layer draws ERCOT's Transmission Project and Information Tracking list (2,208 projects, 2026-11-17), colored by status. A project is drawn on a mapped line only when both of its terminal substations match OpenStreetMap by name, voltage and county, and either one mapped line joins them or exactly one mapped corridor of reasonable length does; otherwise only its terminals, or nothing, is shown. ERCOT's public edition of this list has no per-project cost; costs come from the PUCT and ERCOT documents below.
Transmission project costs
Utilities that build Texas transmission file a monthly construction progress report with the Public Utility Commission of Texas under 16 TAC §25.83. For each project that needed a certificate of convenience and necessity (CCN), the report gives the cost estimate in the CCN application, the final estimate when construction started and, about six months after completion, the final actual cost, split into line and substation facilities. Power Hopper reads those filed workbooks (382 filings from 2020-01-15 to 2025-06-16), keeps every figure tied to its filing, sheet and cell, checks that the components add up, has an independent reviewer re-read a sample of the source files, and publishes only figures that pass. Estimates and final actual costs are never mixed, and a cost per mile is shown only when the cost and the miles describe the same facilities.
| Project | Headline cost | Per mile | Status | Evidence |
|---|---|---|---|---|
| Texas 765-kV STEP Eastern Backbone ProjectAEP Texas; CPS Energy; Oncor Electric Delivery; CenterPoint Energy Houston Electric · 765 kV · PUCT n/a | $9.384 billionERCOT planning estimate; line plus substation | $8,463,203per circuit-mile | ERCOT staff recommended Board endorsement (Board meeting Dec 8-9, 2025). The Board vote itself and the PUCT CCN filings were not verified in this pilot. | Source, page 17Verified estimate |
| Oncor Southern DFW Load Interconnection and General Grid Strengthening Project (Option 3)Oncor Electric Delivery · 345 kV · PUCT n/a | $2.886 billionERCOT planning estimate; whole project as reported | unavailable | ERCOT staff recommended Board endorsement (Board meeting April 20-21, 2026). The Board vote itself was not verified in this pilot. | Source, page 1Verified estimate |
| Howard to Solstice 765-kV transmission lineAEP Texas Inc.; City of San Antonio, acting by and through the City Public Service Board (CPS Energy) · 765 kV · PUCT 59336 | $2.153 billionPUCT-approved route estimate; line facilities only | $5,843,387per circuit-mile | PUCT order approving route 4 mod 1 filed 2026-09-18. The docket's filing list shows an 'Order extending time to act on motions for rehearing' filed 2026-11-05 (item 2800), so rehearing was still pending at that date. The rehearing order itself was not reviewed in this pilot. | Source, page 22Verified estimate |
| Euclid 765-kV Substation and Transmission Line AdditionLCRA Transmission Services Corporation; CenterPoint Energy Houston Electric · 765 kV · PUCT n/a | $1.831 billionERCOT planning estimate; line plus substation | $13,934,551per circuit-mile | ERCOT staff recommended Board endorsement (Board meeting June 2026). The Board vote itself and any PUCT CCN filing were not verified in this pilot. | Source, page 14Verified estimate |
| Drill Hole to Sand Lake to Solstice 765-kV Line ProjectOncor Electric Delivery; American Electric Power Service Corporation (AEPSC) · 765 kV · PUCT n/a | $742.2 millionERCOT planning estimate; line plus substation | $7,109,195per circuit-mile | ERCOT staff recommended Board endorsement (Board meeting Dec 8-9, 2025). The Board vote itself and any PUCT CCN filing were not verified in this pilot. | Source, page 12Verified estimate |
| Ramhorn Hill - Dunham 345 kV Transmission LineOncor Electric Delivery · 345 kV · PUCT 55067 | $264.7 millionFinal estimate (construction start); line facilities only | $6,347,709per circuit-mile | Construction underway (7% complete, 2025-06-13)Not publicly verified | PUCT filing, cell I1385Verified estimate |
| Odessa EHV - Riverton and Moss - Riverton 345 kV LineOncor Electric Delivery · 345 kV · PUCT 48095 | $248.6 millionFinal estimate (construction start); line facilities only | $1,147,074per circuit-mile | Completed 2020-12-202020-12-20 | PUCT filing, cell I1188Verified estimate |
| North McCamey - Sand Lake 345 kV LineOncor Electric Delivery · 345 kV · PUCT 55121 | $167.3 millionFinal estimate (construction start); line facilities only | $950,388per circuit-mile | Construction underway (5% complete, 2025-06-13)Not publicly verified | PUCT filing, cell I1383Verified estimate |
| Cruce - Reforzar 345-kV Double-Circuit T-LineAEP Texas · 345 kV · PUCT 55397 | $150.3 millionCCN application estimate; whole project as reported | unavailable | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H144Verified estimate |
| Del Sol - Frontera 345-kV T-LineAEP Texas · 345 kV · PUCT 55001 | $127.2 millionFinal estimate (construction start); whole project as reported | unavailable | Construction underway (20% complete, 2025-06-13)Not publicly verified | PUCT filing, cell I103Verified estimate |
| Cruce - Del Sol 345-kV Double-Circuit T-LineElectric Transmission Texas · 345 kV · PUCT 55151 | $112.5 millionCCN application estimate; whole project as reported | unavailable | Construction underway (5% complete, 2025-06-13)Not publicly verified | PUCT filing, cell H13Verified estimate |
| Leander - Round Rock TL Addition (CCN)LCRA Transmission Services Corporation · 138 kV · PUCT 45866 | $111.9 millionFinal actual cost; whole project as reported | unavailable | Completed 2020-06-042020-06-04 | PUCT filing, cell J3Verified final actual |
| Cruce - Del Sol 345-kV Double-Circuit T-LineAEP Texas · 345 kV · PUCT 55151 | $107.2 millionCCN application estimate; whole project as reported | unavailable | Construction underway (5% complete, 2025-06-13)Not publicly verified | PUCT filing, cell H136Verified estimate |
| Cenizo - Cruce 345-kV Double-Circuit T-LineAEP Texas · 345 kV · PUCT 55296 | $100.7 millionCCN application estimate; whole project as reported | unavailable | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H209Verified estimate |
| Drill Hole Switch - El Capitan Switch 345 kV Transmission LineOncor Electric Delivery · 345 kV · PUCT 57828 | $97.5 millionCCN application estimate; line facilities only | $2,298,774per circuit-mile | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H1400Verified estimate |
| Drill Hole Switch - Riverton Switch 345 kV Transmission LineOncor Electric Delivery · 345 kV · PUCT 58007 | $88.0 millionCCN application estimate; line facilities only | $1,929,781per circuit-mile | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H1403Verified estimate |
| Ogallala - Abernathy 345 kV LineOncor Electric Delivery · 345 kV · PUCT 48625 | $76.7 millionFinal actual cost; line facilities only | $1,324,567per circuit-mile | Completed 2021-06-212021-06-21 | PUCT filing, cell J1245Verified final actual |
| Mountain Home TL Addition (CCN)LCRA Transmission Services Corporation · 138 kV · PUCT 49523 | $76.5 millionFinal actual cost; whole project as reported | unavailable | Completed 2022-12-27Not publicly verified | PUCT filing, cell J2Verified final actual |
| Del Sol - Frontera 345-kV T-LineElectric Transmission Texas · 345 kV · PUCT 55001 | $75.1 millionFinal estimate (construction start); whole project as reported | unavailable | Construction underway (20% complete, 2025-06-13)Not publicly verified | PUCT filing, cell I10Verified estimate |
| Angstrom - Naismith 345-kV T-LineAEP Texas · 345 kV · PUCT 52656 | $72.5 millionFinal estimate (construction start); whole project as reported | unavailable | Construction underway (99% complete, 2025-06-13)2025-12-14 (estimated) | PUCT filing, cell I61Verified estimate |
| Riverton Switch - Sand Lake Switch 138 kV Transmission LineOncor Electric Delivery · 138 kV · PUCT 57633 | $70.9 millionCCN application estimate; line facilities only | $1,771,375per circuit-mile | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H1397Verified estimate |
| Sand Lake - Solstice 345 kV LineOncor Electric Delivery · 345 kV · PUCT 48785 | $68.9 millionFinal estimate (construction start); line facilities only | unavailable | Completed 2020-12-282020-12-28 | PUCT filing, cell I1189Verified estimate |
| Brackettville - Escondido 138-kV T-LineAEP Texas · 138 kV · PUCT 50545 | $68.6 millionFinal actual cost; whole project as reported | unavailable | Completed 2024-02-232023-12-21 | PUCT filing, cell J23Verified final actual |
| Far West Texas Project: Solstice to Bakersfield 345-kV T-LineAEP Texas · 345 kV · PUCT 48787 | $66.2 millionFinal actual cost; whole project as reported | unavailable | Completed 2020-11-202020-12-20 | PUCT filing, cell J32Verified final actual |
| Riverton - Sand Lake 345 kV Line (Operating at 138 kV)Oncor Electric Delivery · 138 kV · PUCT 47368 | $64.7 millionFinal estimate (construction start); line facilities only | $1,630,187per circuit-mile | Completed 2019-12-302019-12-30 | PUCT filing, cell I685Verified estimate |
| Watermill Switch - Wilmer Switch 345 kV Transmission LineOncor Electric Delivery · 345 kV · PUCT 57918 | $63.3 millionCCN application estimate; line facilities only | $7,193,182per circuit-mile | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H1402Verified estimate |
| Frontera 345-kV StationAEP Texas · 345 kV · PUCT 55001 | $63.0 millionFinal estimate (construction start); whole project as reported | unavailable | Construction underway (15% complete, 2025-06-13)Not publicly verified | PUCT filing, cell I104Verified estimate |
| Angstrom-Grissom 345-kV T-LineAEP Texas · 345 kV · PUCT 51912 | $62.8 millionFinal estimate (construction start); whole project as reported | unavailable | Construction underway (85% complete, 2025-06-13)Not publicly verified | PUCT filing, cell I13Verified estimate |
| Ajo - Reforzar 345-kV Double-Circuit T-LineAEP Texas · 345 kV · PUCT 55573 | $61.8 millionCCN application estimate; whole project as reported | unavailable | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H225Verified estimate |
| Poesta - Tuleta 138-kV T-LineAEP Texas · 138 kV · PUCT 49347 | $60.4 millionFinal estimate (construction start); whole project as reported | unavailable | Energized 2024-08-292024-08-29 | PUCT filing, cell I12Verified estimate |
| Bearkat Switching Station to Oncor Switching Station Transmission Line ProjectWind Energy Transmission Texas · 345 kV · PUCT 50410 | $51.8 millionFinal estimate (construction start); line facilities only | unavailable | Approved; construction not started as of 2022-07-14Not publicly verified | PUCT filing, cell I6Verified estimate |
| Zorn - Marion TL Addition (CCN)LCRA Transmission Services Corporation · 345 kV · PUCT 45601 | $48.6 millionFinal actual cost; whole project as reported | unavailable | Completed 2019-05-302019-05-30 | PUCT filing, cell J3Verified final actual |
| Solstice Expansion for 345-kV StationAEP Texas · 345 kV · PUCT 48787 | $48.4 millionFinal actual cost; whole project as reported | unavailable | Completed 2020-12-312020-12-20 | PUCT filing, cell J31Verified final actual |
| Cooks Point TL Addition (CCN)LCRA Transmission Services Corporation · 138 kV · PUCT 48358 | $47.0 millionFinal actual cost; whole project as reported | unavailable | Completed 2021-06-302021-06-30 | PUCT filing, cell J2Verified final actual |
| Far West Texas Project: Solstice to Sand Lake 345-kV T-LineAEP Texas · 345 kV · PUCT 48785 | $45.8 millionFinal actual cost; whole project as reported | unavailable | Completed 2020-11-202020-12-16 | PUCT filing, cell J33Verified final actual |
| Tuleta to Coleto Creek 138-kV Dbl Ckt LineAEP Texas · 138 kV · PUCT 44837 | $45.7 millionFinal actual cost; whole project as reported | unavailable | Energized 2019-09-272019-09-27 | PUCT filing, cell J9Verified final actual |
| Poesta - Three Rivers 138-kV T-LineAEP Texas · 138/69 kV · PUCT 49347 | $45.0 millionFinal estimate (construction start); whole project as reported | unavailable | Construction underway (50% complete, 2023-11-20)Not publicly verified | PUCT filing, cell I126Verified estimate |
| Horseshoe Springs - Owl Hills 138 kV LineOncor Electric Delivery · 138 kV · PUCT 48544 | $40.3 millionFinal estimate (construction start); line facilities only | $1,348,250per circuit-mile | Completed 2020-02-112020-02-11 | PUCT filing, cell I687Verified estimate |
| Border Switch - Quarry Field Switch 345 kV Transmission LineOncor Electric Delivery · 345 kV · PUCT 57837 | $36.1 millionCCN application estimate; line facilities only | $1,770,049per circuit-mile | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H1401Verified estimate |
| Stewart Rd. 345-kV Station: ExpansionAEP Texas · 345 kV · PUCT 47603 | $35.7 millionFinal actual cost; whole project as reported | unavailable | Completed 2021-10-312021-10-18 | PUCT filing, cell J3Verified final actual |
| Bearkat - Longshore 345 kV LineOncor Electric Delivery · 345 kV · PUCT 50410 | $34.8 millionFinal estimate (construction start); line facilities only | unavailable | Completed 2023-12-012023-12-01 | PUCT filing, cell I1190Verified estimate |
| Lufkin Switch - Redland Switch 345 kV LineOncor Electric Delivery · 345 kV · PUCT 55172 | $34.5 millionFinal estimate (construction start); line facilities only | $4,356,272per circuit-mile | Construction underway (2% complete, 2025-06-13)Not publicly verified | PUCT filing, cell I1384Verified estimate |
| Exchange Switch - Roanoke Switch 138/345 kV Transmission Line RebuildOncor Electric Delivery · 345/138 kV · PUCT 55575 | $34.4 millionCCN application estimate; line facilities only | unavailable | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H1387Verified estimate |
| Bernoulli Switching station and 345kV Transmission line to Lacy Creek Collector stationWind Energy Transmission Texas · 345 kV · PUCT 52977 | $33.8 millionCCN application estimate; line facilities only | $2,467,445per circuit-mile | Construction underway (55% complete, 2022-07-14)Not publicly verified | PUCT filing, cell H7Verified estimate |
| Ranger Camp Switch - Cattleman Switch 345 kV Transmission LineOncor Electric Delivery · 345 kV · PUCT 57519 | $33.5 millionFinal estimate (construction start); line facilities only | $3,982,794per circuit-mile | Approved; construction not started as of 2025-06-13Not publicly verified | PUCT filing, cell I1393Verified estimate |
| Glaze Lake Switch 138 kV Loop Transmission LineOncor Electric Delivery · 138 kV · PUCT 57723 | $32.2 millionCCN application estimate; line facilities only | $1,608,400per circuit-mile | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H1398Verified estimate |
| Del Sol 345-kV StationElectric Transmission Texas · 345 kV · PUCT 55001 | $30.3 millionFinal estimate (construction start); whole project as reported | unavailable | Construction underway (30% complete, 2025-06-13)Not publicly verified | PUCT filing, cell I11Verified estimate |
| Flat Iron Substation – Barr Ranch Switch – Quickriver Tap 138 kV LineOncor Electric Delivery · 138 kV · PUCT 53491 | $29.8 millionFinal actual cost; line facilities only | $1,568,317per circuit-mile | Completed 2023-05-302023-05-30 | PUCT filing, cell J1229Verified final actual |
| Owl Hills - Tunstill POD 138 kV LineOncor Electric Delivery · 138 kV · PUCT 48582 | $27.2 millionFinal estimate (construction start); line facilities only | $1,456,922per circuit-mile | Completed 2020-12-102020-12-10 | PUCT filing, cell I964Verified estimate |
| Blumenthal TL Addition (CCN)LCRA Transmission Services Corporation · 138 kV · PUCT 43599 | $26.8 millionFinal actual cost; whole project as reported | unavailable | Completed 2018-05-182018-05-18 | PUCT filing, cell J2Verified final actual |
| New Bethel 345 kV Loop LineOncor Electric Delivery · 345 kV · PUCT 44672 | $26.5 millionCCN application estimate; line facilities only | $981,444per circuit-mile | Proposed (CCN docket open as of 2024-05-07)Not publicly verified | PUCT filing, cell H1091Verified estimate |
| Stewart Rd. 345-kV HairpinElectric Transmission Texas · 345 kV · PUCT 47973 | $25.5 millionFinal actual cost; whole project as reported | unavailable | Completed 2021-05-192021-05-19 | PUCT filing, cell J2Verified final actual |
| Hartring Substation - Upland Substation 138 kV Transmission LineOncor Electric Delivery · 138 kV · PUCT 57263 | $22.7 millionFinal estimate (construction start); line facilities only | $1,291,558per circuit-mile | Approved; construction not started as of 2025-06-13Not publicly verified | PUCT filing, cell I1395Verified estimate |
| Nacogdoches Southeast Switch - Redland Switch 345 kV LineOncor Electric Delivery · 345 kV · PUCT 54524 | $22.2 millionFinal estimate (construction start); line facilities only | $1,655,115per circuit-mile | Completed 2024-12-262024-12-26 | PUCT filing, cell I1381Verified estimate |
| Resnik - Naismith 138-kV Double Circuit Transmission LineAEP Texas · 138 kV · PUCT 53987 | $19.4 millionFinal estimate (construction start); whole project as reported | unavailable | Construction underway (98% complete, 2025-06-13)Not publicly verified | PUCT filing, cell I108Verified estimate |
| Heartland-Yellowjacket ETTElectric Transmission Texas · 138 kV · PUCT 46234 | $19.2 millionFinal actual cost; whole project as reported | unavailable | Completed 2019-10-212020-06-03 | PUCT filing, cell J3Verified final actual |
| Kyle Ranch - Quarry Field 138 kV LineOncor Electric Delivery · 138 kV · PUCT 49302 | $19.0 millionFinal estimate (construction start); substation facilities only | unavailable | Completed 2020-12-102020-12-10 | PUCT filing, cell I725Verified estimate |
| Riverton - Kyle Ranch 138 kV LineOncor Electric Delivery · 138 kV · PUCT 49304 | $18.9 millionFinal actual cost; line facilities only | $1,244,768per circuit-mile | Completed 2020-12-102020-12-10 | PUCT filing, cell J1225Verified final actual |
| Cogdell - Clairemont 138 kV LineOncor Electric Delivery · 138 kV · PUCT 47808 | $18.6 millionFinal estimate (construction start); line facilities only | unavailable | Completed 2020-12-302020-12-30 | PUCT filing, cell I720Verified estimate |
| Reiter Switch - Tesoro Switch 345 kV Transmission LineOncor Electric Delivery · 345 kV · PUCT 56799 | $18.1 millionCCN application estimate; line facilities only | $2,058,523per circuit-mile | Proposed (CCN docket open as of 2025-06-13)Not publicly verified | PUCT filing, cell H1392Verified estimate |
Imagery and terrain
Nighttime Lights uses NASA Black Marble imagery served by NASA GIBS: a 2016 annual composite and the most recent single-night NOAA-20 pass. Neither is real time, and a dark area is not evidence of an outage. Terrain uses the public Terrain Tiles dataset on AWS Open Data. Satellite view uses USGS The National Map imagery (public domain). Each loads only when you turn it on.
Not on the map yet
- Generator output: plants show ERCOT installed capacity and EIA nameplate capacity, not what they generate. ERCOT units whose plant or switchyard is not identifiable on the map are counted in generation-units.json but not drawn.
- Transmission outages and line thermal ratings: ERCOT's outage schedules and network model are restricted (market participants, CEII). The map shows ERCOT's enforced limit only when a constraint binds.
- Distribution feeders: we found no Texas utility that publishes a feeder or hosting-capacity map (the U.S. DOE hosting-capacity atlas lists none for Texas). The distribution layer shows only the lines OpenStreetMap volunteers have mapped, a small share of the total.
- Battery storage capacity at a substation: no public source states it. The battery screen shows price spreads, batteries already nearby, transformers and congestion; being near a substation does not mean capacity is available.
- Individual large-load and data-center projects: ERCOT publishes them only as totals by weather zone and its top counties, not by site. The map shows those totals and data centers mapped in OpenStreetMap.
- Filed route geometry for planned lines: drawn only as schematic dashed links between endpoint substations until a filed route file is digitized.
- Monthly construction reports filed after July 15, 2025 are in the PUCT Compliance Reporting Portal, which requires a login; they are not used.
Sources and licensing
- Power lines, substations and plants: © OpenStreetMap contributors, Open Database License 1.0; GeoJSON downloads are derived databases under the same license. Open Infrastructure Map's hosted tiles are not used.
- Basemap: OpenFreeMap vector tiles, © OpenMapTiles, data from OpenStreetMap.
- Boundaries and search points: U.S. Census Bureau 2024 cartographic boundaries and Gazetteer (public domain). A ZIP point helps you find a place; it does not identify your utility.
- Prices and constraints: ERCOT public reports NP6-787-CD, NP6-905-CD, NP4-190-CD, NP6-86-CD, NP4-191-CD and the NP4-160-SG bus mapping; Potomac Economics (ERCOT market monitor) annual constraint rankings.
- Distribution feeders: PUCT Service Quality Reports for 2024 (16 TAC §25.52, §25.81), Project No. 57478, from AEP Texas, CenterPoint, El Paso Electric, Entergy Texas, Oncor, SPS, SWEPCO and TNMP.
- Utility service areas: HIFLD Open (2025) Electric Retail Service Territories via a third-party public copy, built from EIA-861 and Census boundaries (approximate).
- Line owners and voltages where OpenStreetMap is silent: Homeland Infrastructure Foundation-Level Data (HIFLD) Electric Power Transmission Lines, public use, via a third-party public copy last edited in January 2020; labelled with HIFLD's inferred flag and source date.
- Electricity generated by plant: U.S. EIA Form EIA-923 (public domain). Plant interconnection, gas supply and water source: U.S. EIA Form EIA-860 annual (public domain).
- Wind turbines and solar footprints: U.S. Geological Survey U.S. Wind Turbine Database and U.S. Large-Scale Solar Photovoltaic Database (public domain).
- Utility reliability: U.S. EIA Form EIA-861 (public domain).
- Measured fossil-plant output: U.S. EPA Clean Air Markets Program Data, hourly (public domain).
- Gas pipelines: Railroad Commission of Texas, Digital Map Information (public records; the RRC makes no claim as to accuracy). Not for locating pipelines before digging: call 811.
- Planned turbines and towers: FAA Obstruction Evaluation case archives (public).
- Data-center permit records: U.S. EPA ECHO (public domain).
- Qualifying facilities: FERC Form 556 certifications (data.ferc.gov, public).
- Storm reports: NOAA NCEI Storm Events Database (public domain).
- Flood zones: FEMA National Flood Hazard Layer (public domain).
- Tax agreements: Texas Comptroller, Chapter 313 agreements and applications (public records).
- Texas Energy Fund and distributed-generation reports: Public Utility Commission of Texas (public records).
- Archived utility project pages: Oncor, CPS Energy, CenterPoint Energy and TNMP websites as captured by the Internet Archive Wayback Machine.
- ERCOT Independent Reviews: ERCOT Regional Planning Group documents.
- Emergency incidents: U.S. Department of Energy Form OE-417 annual summaries, Texas and Texas RE rows.
- Transmission plans: ERCOT Regional Transmission Plan reports 2015-2025, reliability project appendices (public versions).
- Outage history: Oak Ridge National Laboratory EAGLE-I recorded outages (figshare doi 10.6084/m9.figshare.24237376), CC BY 4.0; county population: U.S. Census Bureau 2024 estimates.
- Large loads and data centers: ERCOT Board, Item 14 Batch Zero Update (September 2026); ERCOT Data Center State and Community Impact RFI preliminary summary (PUC open meeting, November 5, 2026); data-center buildings from OpenStreetMap.
- Power plants and generators: U.S. Energy Information Administration, Form EIA-860M monthly generator inventory (public domain).
- Generating units: ERCOT Monthly Outlook for Resource Adequacy unit list; interconnection queue: ERCOT Generation Interconnection Status reports; projects: ERCOT Transmission Project and Information Tracking (TPIT).
- Line and substation records: FERC Form 1 pages 422, 424 and 426 (via Catalyst Cooperative PUDL, CC-BY-4.0).
- Construction and cost records: PUCT Interchange monthly construction reports under 16 TAC §25.83 (every yearly project, 1999 to mid-2025), PUCT CCN and exempt-activity dockets, PUCT transmission cost of service filings, PUCT Docket 59336, and ERCOT Board items for 25RPG022, 25RPG025 and 26RPG001.
- Imagery: NASA GIBS / NASA Black Marble; USGS The National Map; Terrain Tiles on AWS (Tilezen/Mapzen, USGS 3DEP, SRTM and others).
- Map rendering: MapLibre GL JS (BSD-3-Clause).
Beta. Grid snapshot 2026-11-16T21:22:36Z; layers built 2026-11-17T22:52:53Z; project records generated 2026-11-18T03:48:50.886Z.