{"source":{"label":"Texas Comptroller of Public Accounts, Chapter 313 agreements and applications","url":"https://comptroller.texas.gov/economy/development/prop-tax/ch313/agreement-docs.php","license":"Public state records"},"notes":["Chapter 313 let school districts limit the taxable value of large new projects (it closed to new applications at the end of 2022). Every row here reached a signed agreement.","County, MW and planned start come from the company's application and may have changed later. An agreement does not prove the project was built."],"tally":{"energy_agreements":421,"with_text":419,"county":241,"county_from_description":86,"mw":311,"cod":256,"county_from_isd":16,"not_power":8,"county_from_name":6,"eia_match":116,"eia_ambiguous":8,"projects":367},"projects":[{"app":"1364","applicant":"Sun Valley Solar, LLC","isd":"Abbott ISD","app_date":"04/24/2019","first_tax_year":"2022","tech":"solar","county":null,"mw":250.0,"mw_text":"Sun Valley Solar, LLC is a 250 MW-AC solar electric generating facility, that when established will provide two full-time salaried positions","cod":"July2021","doc":"https://assets.comptroller.texas.gov/ch313/1364/abbott-1364-sunvalley-app.pdf","project_key":"SUN VALLEY||solar|250.0","first_of_project":true},{"app":"1921","applicant":"Antelope Solar LLC","isd":"Abernathy ISD","app_date":"05/19/2022","first_tax_year":"2028","tech":"solar","county":"Hale","mw":250.0,"mw_text":"com U Ro ckw al l, TX 75087 Tab 4: Detailed Description of the Project Antelope Solar, LLC is a 250 MW/AC solar electric generation facility that will be located in Hale County within Abernathy Independent School District","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1921/1921-abernathy-antelope-app.pdf","counties":["Hale"],"county_how":"application form","project_key":"ANTELOPE||solar|250.0","first_of_project":true},{"app":"1539","applicant":"Chillingham Solar LLC f/k/a 250LB 8me LLC","isd":"Academy ISD","app_date":"11/03/2020","first_tax_year":"2024","tech":"solar","county":null,"mw":300.0,"mw_text":"The Applicant proposes to construct a 300 MW/AC solar electric generation facility in eastern Bell County","cod":"December31,2022","doc":"https://assets.comptroller.texas.gov/ch313/1539/1539-academy-250lb8mellc-app-post-11032020.pdf","project_key":"CHILLINGHAM||solar|300.0","first_of_project":true},{"app":"313","applicant":"Spinning Spur Wind Three, LLC","isd":"Adrian ISD","app_date":"07/11/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/313/Adrian-ISD-No-313-Spinning-Spur-Wind-Three-LLC-Application-7-11-2013.pdf","project_key":"SPINNING SPUR THREE||wind|None","first_of_project":true},{"app":"255","applicant":"Spinning Spur Wind Two, LLC","isd":"Adrian ISD","app_date":"12/10/2012","first_tax_year":"2014","tech":"wind","county":"Oldham","mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/255/adrian-0255-spinning-app.pdf","counties":["Oldham"],"county_how":"application description","project_key":"SPINNING SPUR TWO||wind|None","first_of_project":true},{"app":"1411","applicant":"2W Permian Solar, LLC","isd":"Andrews ISD","app_date":"08/16/2019","first_tax_year":"2022","tech":"solar","county":"Andrews","mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1411/1411-andrewsisd-2w-app.pdf","counties":["Andrews"],"county_how":"school district name","eia":{"id":63255,"n":"2W Permian Solar Project Hybrid","st":"operating"},"project_key":"PERMIAN||solar|None","first_of_project":true},{"app":"1301","applicant":"Jumbo Hill Wind Project, LLC","isd":"Andrews ISD","app_date":"10/16/2018","first_tax_year":"2021","tech":"wind","county":"Andrews","mw":160.0,"mw_text":", LLC Chapter 313 Application to Andrews ISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment Jumbo Hill Wind Project, LLC plans to construct a 160 MW wind farm in Andrews County","cod":"December2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1301/1301-andrews-jumbo-app.pdf","counties":["Andrews"],"county_how":"school district name","eia":{"id":62630,"n":"Jumbo Hill Wind Project","st":"operating"},"project_key":"JUMBO HILL||wind|160.0","first_of_project":true},{"app":"1293","applicant":"Lapetus Energy Project, LLC","isd":"Andrews ISD","app_date":"09/17/2018","first_tax_year":"2020","tech":"solar","county":"Andrews","mw":100.0,"mw_text":"stment Lapetus Energy Project, LLC, anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 100 MW ac","cod":"12/2019","doc":"https://assets.comptroller.texas.gov/ch313/1293/andrews-1293-lapetus-app.pdf","counties":["Andrews"],"county_how":"application description","eia":{"id":62448,"n":"Lapetus","st":"operating"},"project_key":"LAPETUS||solar|100.0","first_of_project":true},{"app":"1281","applicant":"Prospero Energy Project, LLC","isd":"Andrews ISD","app_date":"08/15/2018","first_tax_year":"2021","tech":"solar","county":"Andrews","mw":250.0,"mw_text":"tment Prospero Energy Project, LLC, anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 250 MW ac","cod":"12/2020","doc":"https://assets.comptroller.texas.gov/ch313/1281/andrews-1281-prospero-app.pdf","counties":["Andrews"],"county_how":"application description","eia_candidates":[{"id":62755,"n":"Prospero Solar","st":"operating"},{"id":64325,"n":"Prospero Solar II","st":"operating"}],"project_key":"PROSPERO||solar|250.0","first_of_project":true},{"app":"1463","applicant":"Prospero Solar II, LLC","isd":"Andrews ISD","app_date":"01/17/2020","first_tax_year":"2022","tech":"solar","county":"Andrews","mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1463/1463-andrewsisd-prospero-app.pdf","counties":["Andrews"],"county_how":"school district name","eia":{"id":64325,"n":"Prospero Solar II","st":"operating"},"project_key":"PROSPERO|2|solar|None","first_of_project":true},{"app":"1803","applicant":"Brazoria Solar I, LLC","isd":"Angleton ISD","app_date":"04/22/2022","first_tax_year":"2027","tech":"solar","county":"Brazoria","mw":250.0,"mw_text":"ocumentation of combined group membership, received by CPA Tab 4 Detailed Description of the Project The Brazoria Solar I, LLC project will be an approximately 250 MWac photovoltaic solar power generation facility, that would be built on approximately 1,902 acres of privately owned land in Brazoria ","cod":"December2025","doc":"https://assets.comptroller.texas.gov/ch313/1803/1803-angleton-brazoria-app.pdf","counties":["Brazoria"],"county_how":"application form","project_key":"BRAZORIA|1|solar|250.0","first_of_project":true},{"app":"1766","applicant":"Cascade Solar Energy LLC","isd":"Angleton ISD","app_date":"04/08/2022","first_tax_year":"2026","tech":"solar","county":"Brazoria","mw":20.0,"mw_text":"Tab 7: Description of Qualified Investment Cascade Solar , LLC is a 20 MW/AC solar electric generation facility up to an Z Dt Z that Z be located in north- centra Brazoria County in western Angleton Independent School District","cod":"May1,2024","doc":"https://assets.comptroller.texas.gov/ch313/1766/1766-angleton-cadcade-app.pdf","counties":["Brazoria"],"county_how":"application form","project_key":"CASCADE||solar|20.0","first_of_project":true},{"app":"1594","applicant":"Cottonwood Bayou Solar, LLC","isd":"Angleton ISD","app_date":"04/26/2021","first_tax_year":"2024","tech":"solar","county":"Brazoria","mw":null,"mw_text":null,"cod":"December31,2023","doc":"https://assets.comptroller.texas.gov/ch313/1594/1594-angleton-cottonwood-app.pdf","counties":["Brazoria"],"county_how":"application form","eia":{"id":66915,"n":"Cottonwood Bayou Solar","st":"planned"},"project_key":"COTTONWOOD BAYOU||solar|None","first_of_project":true},{"app":"1624","applicant":"Myrtle Solar, LLC","isd":"Angleton ISD","app_date":"07/23/2021","first_tax_year":"2023","tech":"solar","county":"Brazoria","mw":92.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 92 MW located in Angleton ISD","cod":"December2022","doc":"https://assets.comptroller.texas.gov/ch313/1624/1624-angleton-myrtle-app.pdf","counties":["Brazoria"],"county_how":"application form","eia":{"id":66910,"n":"Myrtle Solar, LLC","st":"planned"},"project_key":"MYRTLE||solar|92.0","first_of_project":true},{"app":"1666","applicant":"Anson Solar Center 2, LLC","isd":"Anson ISD","app_date":"11/11/2021","first_tax_year":"2026","tech":"solar","county":"Jones","mw":200.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 200 MW located in Anson ISD","cod":"Q42025","doc":"https://assets.comptroller.texas.gov/ch313/1666/1666-anson-anson-app.pdf","counties":["Jones"],"county_how":"application form","eia":{"id":69149,"n":"Anson 2 Solar","st":"planned"},"project_key":"ANSON|2|solar|200.0","first_of_project":true},{"app":"1256","applicant":"Anson Solar Center, LLC","isd":"Anson ISD","app_date":"05/10/2018","first_tax_year":"2021","tech":"solar","county":null,"mw":200.0,"mw_text":"The propose d Project is anticipated to have a capacity of approximately 200 MW located in Anson ISD","cod":"December 2020","doc":"https://assets.comptroller.texas.gov/ch313/1256/anson-1256-anson-app.pdf","project_key":"ANSON||solar|200.0","first_of_project":true},{"app":"212","applicant":"Bobcat Wind Project, LLC f/k/a Briar Creek, LLC","isd":"Archer City ISD","app_date":"01/23/2012","first_tax_year":"2013","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/212/212-Archer-City-ISD-Briar-Creek-LLC-2013-Application.pdf","project_key":"BOBCAT||wind|None","first_of_project":true},{"app":"188","applicant":"Windthorst-II, LLC","isd":"Archer City ISD","app_date":"07/15/2011","first_tax_year":"2013","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/188/188_Archer_City_Windthorst_2012_Application.pdf","project_key":"WINDTHORST|2|wind|None","first_of_project":true},{"app":"1558","applicant":"AP Solar 4, LLC","isd":"Austwell-Tivoli ISD","app_date":"02/26/2021","first_tax_year":"2024","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1558/1558-austwell-ap-app.pdf","project_key":"AP Solar 4, LLC|4|solar|None","first_of_project":true},{"app":"1454","applicant":"Hubbard Wind, LLC","isd":"Axtell ISD","app_date":"12/18/2019","first_tax_year":"2022","tech":"wind","county":null,"mw":302.7,"mw_text":"Hubbard Wind, LLC is a 302.7 MW/AC electric generating wind facility","cod":"January1,2022","doc":"https://assets.comptroller.texas.gov/ch313/1454/1454-axtell-hubbard-app.pdf","project_key":"HUBBARD||wind|302.7","first_of_project":true},{"app":"1688","applicant":"PP Jaguar Solar LLC and PP Jaguar Bess LLC f/k/a SP-Jaguar Solar LLC","isd":"Axtell ISD","app_date":"01/04/2022","first_tax_year":"2025","tech":"solar","county":"McLennan","mw":275.0,"mw_text":"Jaguar Solar seeks to develop and interconnect 275 megawatts (\"MW\") photovoltaic solar and battery energy storage project into the ERCOT market; 157 MWac solar and 25MWac battery energy storage will be located in Axtell ISD","cod":"QTR32024","doc":"https://assets.comptroller.texas.gov/ch313/1688/1688-axtell-spjaguar-app.pdf","counties":["McLennan"],"county_how":"application form","project_key":"JAGUAR JAGUAR||solar|275.0","first_of_project":true},{"app":"1645","applicant":"Century Oak Wind Project, LLC","isd":"Baird ISD","app_date":"09/14/2021","first_tax_year":"2024","tech":"wind","county":"Callahan","mw":150.0,"mw_text":"The Applicant, Century Oak Wind Project, LLC plans to construct a 150 MW wind farm in Callahan County","cod":"December2023","doc":"https://assets.comptroller.texas.gov/ch313/1645/1645-baird-century-app.pdf","counties":["Callahan"],"county_how":"application form","project_key":"CENTURY OAK||wind|150.0","first_of_project":true},{"app":"1752","applicant":"Enbridge Solar (Sequoia I), LLC f/k/a Enbridge Solar (Endorado), LLC f/k/a Eldorado Solar Project, LLC","isd":"Baird ISD","app_date":"03/29/2022","first_tax_year":"2026","tech":"solar","county":"Callahan","mw":406.0,"mw_text":"The Applicant proposes to construct and operate a 406 MW-AC renewable energy generating solar facility that will be located in Baird Independent School District","cod":"May31, 2025","doc":"https://assets.comptroller.texas.gov/ch313/1752/1752-baird-eldorado-app.pdf","counties":["Callahan"],"county_how":"application form","project_key":"ENBRIDGE SEQUOIA|1|solar|406.0","first_of_project":true},{"app":"1522","applicant":"Ranchland Wind Project II, LLC","isd":"Baird ISD","app_date":"08/31/2020","first_tax_year":"2022","tech":"wind","county":null,"mw":98.61,"mw_text":"The Applicant, Ranchland Wind Project Two, LLC is a 98.61 MW wind energy facility that will feature 26 wind turbines","cod":"December31,2021","doc":"https://assets.comptroller.texas.gov/ch313/1522/1522-baird-ranchland-app.pdf","project_key":"RANCHLAND|2|wind|98.61","first_of_project":true},{"app":"1307","applicant":"Peyton Creek Wind Farm, LLC","isd":"Bay City ISD","app_date":"10/23/2018","first_tax_year":"2020","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1307/1307-baycity-peyton-app.pdf","project_key":"PEYTON CREEK||wind|None","first_of_project":true},{"app":"1557","applicant":"Blackjack Creek Wind Farm, LLC","isd":"Beeville ISD","app_date":"01/28/2021","first_tax_year":"2022","tech":"wind","county":null,"mw":134.4,"mw_text":"8-MW turbines TOTAL: TOTAL: TOTAL: TOTAL: 28 turbines 14 turbines 8 turbines 50 turbines 134.4 MW 67","cod":"December31,2021","doc":"https://assets.comptroller.texas.gov/ch313/1557/1557-beeville-blackjack-app.pdf","project_key":"BLACKJACK CREEK||wind|134.4","first_of_project":true},{"app":"1244","applicant":"Torrecillas Wind Energy, LLC","isd":"Benavides ISD","app_date":"03/26/2018","first_tax_year":"2019","tech":"wind","county":null,"mw":202.0,"mw_text":"The propose d Project is anticipated to have a capacity of approximately 202 MW located in Benavides ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1244/1244-benavides-torrecillas-app.pdf","project_key":"TORRECILLAS||wind|202.0","first_of_project":true},{"app":"1302","applicant":"El Campo Wind, LLC","isd":"Benjamin ISD","app_date":"10/16/2018","first_tax_year":"2021","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1302/benjamin-1302-el-app.pdf","project_key":"CAMPO||wind|None","first_of_project":true},{"app":"1353","applicant":"Griffin Trail Wind, LLC","isd":"Benjamin ISD","app_date":"03/15/2019","first_tax_year":"2022","tech":"wind","county":"Knox","mw":225.6,"mw_text":"The proposed Project is anticipated to have a total capacity of 225.6 MW, with approximately 98","cod":"Q4 2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1353/1353-benjamin-griffin-app.pdf","counties":["Knox"],"county_how":"application description","eia":{"id":62411,"n":"Griffin Trail Wind","st":"operating"},"project_key":"GRIFFIN TRAIL||wind|225.6","first_of_project":true},{"app":"1274","applicant":"TG East Wind Project, LLC","isd":"Benjamin ISD","app_date":"07/09/2018","first_tax_year":"2020","tech":"wind","county":"Knox","mw":278.0,"mw_text":"As such, the development resources necessary to advance the subject planned 278 MW TG East Wind Project, LLC could be redeployed to other renewable energy development projects in other power markets in the United States","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1274/benjamin-1274-tg-app.pdf","counties":["Knox"],"county_how":"application description","eia":{"id":64639,"n":"TG East","st":"operating"},"project_key":"EAST||wind|278.0","first_of_project":true},{"app":"1017","applicant":"Gunsight Mountain Wind Energy, LLC","isd":"Big Spring ISD","app_date":"07/14/2014","first_tax_year":"2016","tech":"wind","county":null,"mw":120.0,"mw_text":"n of Project Gunsight Mountain Wind Energy LLC anticipates constructing a wind-powered electric generating facility with an operating capacity of approximately 120 megawatts","cod":"4thQtr2015","doc":"https://assets.comptroller.texas.gov/dat/ch313/1017/1017-bigspring-gunsight-app.pdf","project_key":"GUNSIGHT MOUNTAIN||wind|120.0","first_of_project":true},{"app":"334","applicant":"Logan's Gap Wind I, LLC","isd":"Blanket ISD","app_date":"08/01/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/334/334-Blanket-ISD-Logans-Gap-Wind-2014-Application.pdf","project_key":"LOGAN GAP|1|wind|None","first_of_project":true},{"app":"1279","applicant":"Briar Creek Solar 1, LLC f/k/a Clean Vision Solar, LLC","isd":"Blooming Grove ISD","app_date":"08/08/2018","first_tax_year":"2022","tech":"solar","county":null,"mw":150.0,"mw_text":"Clean Vision Solar, LLC is a 150 MW solar electric generating facility, that when established will provide 5, full-time salary competitive jobs","cod":"December2020","doc":"https://assets.comptroller.texas.gov/ch313/1279/blooming-1279-clean-app.pdf","project_key":"BRIAR CREEK|1|solar|150.0","first_of_project":true},{"app":"1802","applicant":"Iguala Solar LLC","isd":"Bloomington ISD","app_date":"04/22/2022","first_tax_year":"2028","tech":"solar","county":"Victoria","mw":250.0,"mw_text":"Iguala Solar LLC a 250 MW/AC hybrid solar and battery storage project","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1802/1802-bloomington-iguala-app.pdf","counties":["Victoria"],"county_how":"application form","project_key":"IGUALA||solar|250.0","first_of_project":true},{"app":"2075","applicant":"Prairie Energy Partners LLC","isd":"Bloomington ISD","app_date":"06/03/2022","first_tax_year":"2026","tech":"solar","county":"Victoria","mw":150.0,"mw_text":"ewable electricity (solar, wind, waste heat, and geothermal) would be sourced and distributed through the ERCOT grid as well as generated onsite supported by a 150 MW/h hydrogen/oxygen peaking plant, with reciprocating engines for advantageous start/stop operation, to be utilized during supply inter","cod":"Q12025","doc":"https://assets.comptroller.texas.gov/ch313/2075/2075-bloomington-prairie-app.pdf","counties":["Victoria"],"county_how":"application form","project_key":"PRAIRIE PARTNERS||solar|150.0","first_of_project":true},{"app":"1949","applicant":"Midpoint Solar, LLC","isd":"Blum ISD","app_date":"05/23/2022","first_tax_year":"2026","tech":"solar","county":"Hill","mw":150.0,"mw_text":"The Applicant, Midpoint Solar, LLC anticipates developing a utility scale single axis tracker photovoltaic facility designed to use solar power to generate 150 MWac electricity in Hill County","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/1949/1949-blum-midpoint-app.pdf","counties":["Hill"],"county_how":"application form","eia":{"id":66897,"n":"Midpoint Solar, LLC","st":"operating"},"project_key":"MIDPOINT||solar|150.0","first_of_project":true},{"app":"1363","applicant":"B.T. Coniglio Solar, LLC","isd":"Bonham ISD","app_date":"04/24/2019","first_tax_year":"2021","tech":"solar","county":null,"mw":94.5,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 94.5 MW located in Bonham ISD","cod":"December2020","doc":"https://assets.comptroller.texas.gov/ch313/1363/bohnam-1363-coniglio-app.pdf","project_key":"CONIGLIO||solar|94.5","first_of_project":true},{"app":"1215","applicant":"Engie Long Draw Solar LLC f/k/a BNB Long Draw Solar, LLC","isd":"Borden County ISD","app_date":"09/07/2017","first_tax_year":"2020","tech":"solar","county":"Borden","mw":150.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 150 MW located in Borden County ISD","cod":"3Q2019","doc":"https://assets.comptroller.texas.gov/ch313/1215/borden-1215-bnb-app.pdf","counties":["Borden"],"county_how":"application description","eia":{"id":62845,"n":"ENGIE Long Draw Solar LLC","st":"operating"},"project_key":"ENGIE LONG DRAW||solar|150.0","first_of_project":true},{"app":"1175","applicant":"Fluvanna Wind Energy 2, LLC","isd":"Borden County ISD","app_date":"02/14/2017","first_tax_year":"2020","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1175/borden-1175-fluvanna-app.pdf","project_key":"FLUVANNA|2|wind|None","first_of_project":true},{"app":"366","applicant":"Stephens Ranch Wind Energy, LLC","isd":"Borden County ISD","app_date":"11/19/2013","first_tax_year":"2015","tech":"wind","county":"Borden","mw":377.0,"mw_text":"ns Ranch Wind Energy, LLC Chapter 313 Application to Borden County ISD Cummings Westlake, LLC ATTACHMENT 4 Stephens Ranch Wind Energy, LLC plans to construct a 377 MW wind farm in Borden and Lynn Counties","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/366/Borden-County-Stephens-Ranch-2015-Application-11-21-13.pdf","counties":["Borden"],"county_how":"application description","project_key":"STEPHENS||wind|377.0","first_of_project":true},{"app":"302","applicant":"OCI Alamo 4 LLC f/k/a Solar Prime LLC","isd":"Brackett ISD","app_date":"06/10/2013","first_tax_year":"2014","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/302/302_Brackett_ISD_Solar_Prime_2014_Application.pdf","project_key":"OCI ALAMO|4|solar|None","first_of_project":true},{"app":"1335","applicant":"Zier Solar, LLC","isd":"Brackett ISD","app_date":"01/23/2019","first_tax_year":"2024","tech":"solar","county":"Kinney","mw":160.0,"mw_text":"n for 313 Appraised Value Limitation by Zier Solar, LLC to Brackett ISD Tab 8 Description of Qualified Property Zier Solar, LLC plans to construct an estimated 160 MW-AC photovoltaic solar energy facility in Kinney County, located entirely within Brackett ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1335/brackett-1335-zier-app.pdf","counties":["Kinney"],"county_how":"application description","eia":{"id":66137,"n":"Zier Solar","st":"operating"},"project_key":"ZIER||solar|160.0","first_of_project":true},{"app":"1101","applicant":"Rattlesnake Power, LLC","isd":"Brady ISD","app_date":"08/27/2015","first_tax_year":"2018","tech":"other","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1101/1101-brady-rattlesnake-app.pdf","project_key":"RATTLESNAKE||other|124.0","first_of_project":false},{"app":"1679","applicant":"TAI Norton Solar, LLC f/k/a 231RC 8me LLC","isd":"Bronte ISD","app_date":"12/09/2021","first_tax_year":"2024","tech":"solar","county":"Runnels","mw":125.0,"mw_text":"231RC 8me LLC is a 125 MW/AC solar energy generation project","cod":"June1,2023","doc":"https://assets.comptroller.texas.gov/ch313/1679/1679-bronte-231RC-app.pdf","counties":["Runnels"],"county_how":"application form","project_key":"TAI NORTON||solar|125.0","first_of_project":true},{"app":"1719","applicant":"Hecate Energy Longhorn Solar LLC","isd":"Bryson ISD","app_date":"03/01/2022","first_tax_year":"2026","tech":"solar","county":"Jack","mw":666.0,"mw_text":"Energy Longhorn Solar LLC Chapter 313 Application Bryson ISD TAB 7 Description of Qualified Investment Hecate Energy Longhorn Solar LLC proposes to construct a 666 MW ac (net capacity) Photovoltaic solar facility and Battery Energy Storage System (BESS) that would be sited in Jack County","cod":"Q42027","doc":"https://assets.comptroller.texas.gov/ch313/1719/1719-bryson-hecate-app.pdf","counties":["Jack"],"county_how":"application form","eia":{"id":68839,"n":"Hecate Energy Longhorn Solar LLC","st":"operating"},"project_key":"HECATE LONGHORN||solar|666.0","first_of_project":true},{"app":"171","applicant":"Senate Wind, LLC 2011","isd":"Bryson ISD","app_date":"05/17/2010","first_tax_year":"2011","tech":"wind","county":null,"mw":126.0,"mw_text":"The wind farm will have an estimated initial capacity of 126 megawatts","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/171/BrysonSenateWindApplication2011-4-30-2010.pdf","project_key":"SENATE||wind|126.0","first_of_project":true},{"app":"1521","applicant":"Ben Milam Solar 3 LLC","isd":"Buckholts ISD","app_date":"08/25/2020","first_tax_year":"2024","tech":"solar","county":null,"mw":250.0,"mw_text":"A 250 MW solar PV generating facility may include a qualified investment consisting of the following improvements: \ufffd Photovoltaic modules; \ufffd DC-to-AC inverters; \ufffd Medium and high-voltage electric cabling; \ufffd Single axis racking s","cod":"September 1,2022","doc":"https://assets.comptroller.texas.gov/ch313/1521/1521-buckholts-benmilan3-app.pdf","project_key":"BEN MILAM|3|solar|250.0","first_of_project":true},{"app":"1934","applicant":"Sypert Branch Solar LLC","isd":"Buckholts ISD","app_date":"05/20/2022","first_tax_year":"2026","tech":"solar","county":"Milam","mw":150.0,"mw_text":"LTS ISD SYPERT BRANCH SOLAR LLC Chapter 313 Application Buckholts ISD TAB 7 Description of Qualified Investment Sypert Branch Solar LLC proposes to construct a 150 MW (AC) Photovoltaic solar that would be sited on approximately 1,000 acres of land approximately 5 miles Northwest of the city of Buckh","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1934/1934-buckholts-sypert-app.pdf","counties":["Milam"],"county_how":"application description","eia":{"id":69150,"n":"Sypert Branch Solar","st":"planned"},"project_key":"SYPERT BRANCH||solar|150.0","first_of_project":true},{"app":"174","applicant":"Sherbino II Wind Farm","isd":"Buena Vista ISD","app_date":"08/10/2010","first_tax_year":"2011","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/174/Buena Vista_Sherbino II Wind Farm_2011_Application.pdf","project_key":"SHERBINO|2|wind|None","first_of_project":true},{"app":"1811","applicant":"OCI Hillsboro Solar LLC f/k/a OCI San Antonio Hillsboro Solar LLC","isd":"Bynum ISD","app_date":"04/26/2022","first_tax_year":"2028","tech":"solar","county":"Hill","mw":250.0,"mw_text":"The full project would have approximately 520,000 panels and associated inverters located in Hill County with a total capacity of 250 MW (ac) of Solar","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1811/1811-bynum-oci-app.pdf","counties":["Hill"],"county_how":"application description","eia":{"id":66401,"n":"OCI Hillsboro","st":"planned"},"project_key":"OCI HILLSBORO||solar|250.0","first_of_project":true},{"app":"1925","applicant":"HyFuels Green Lake Solar LLC","isd":"Calhoun County ISD","app_date":"05/20/2022","first_tax_year":"2028","tech":"solar","county":"Calhoun","mw":400.0,"mw_text":"GREEN LAKE SOLAR LLC Chapter 313 Application CALHOUN COUNTY ISD TAB 7 Description of Qualified Investment Hyfuels Green Lake Solar LLC proposes to construct a 400MW ac (net capacity) Photovoltaic solar facility with attached battery storage that would be sited on land approximately 10 miles northwes","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1925/1925-calhoun-hyfuels-app.pdf","counties":["Calhoun"],"county_how":"application description","project_key":"HYFUELS GREEN LAKE||solar|400.0","first_of_project":true},{"app":"1927","applicant":"HyFuels Green Lake Wind LLC","isd":"Calhoun County ISD","app_date":"05/20/2022","first_tax_year":"2028","tech":"wind","county":"Calhoun","mw":400.0,"mw_text":"LS GREEN LAKE WIND LLC Chapter 313 Application CALHOUN COUNTY ISD TAB 7 Description of Qualified Investment Hyfuels Green Lake Wind LLC proposes to construct a 400MW ac (net capacity) wind generating facility with attached battery storage that would be sited on land approximately 10 miles northwest ","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1927/1927-calhoun-hyfuels-app.pdf","counties":["Calhoun"],"county_how":"application description","project_key":"HYFUELS GREEN LAKE||wind|400.0","first_of_project":true},{"app":"1479","applicant":"Tres Bahias Solar Power, LLC","isd":"Calhoun County ISD","app_date":"03/19/2020","first_tax_year":"2024","tech":"solar","county":"Calhoun","mw":195.0,"mw_text":"TRES BAHIAS SOLAR POWER, LLC Chapter 313 Application Calhoun County ISD TAB 7 Description of Qualified Investment Tres Bahias Solar LLC proposes to construct a 195 MW ac (net capacity) Photovoltaic solar facility that would be sited on land west of the town of Port Comfort, TX and south of Weedhaven","cod":"June2021","doc":"https://assets.comptroller.texas.gov/ch313/1479/1479-calhoun-tres-app.pdf","counties":["Calhoun"],"county_how":"application description","eia":{"id":65947,"n":"Tres Bahias","st":"operating"},"project_key":"TRES BAHIAS||solar|195.0","first_of_project":true},{"app":"1518","applicant":"Ben Milam Solar 2 LLC","isd":"Cameron ISD","app_date":"08/25/2020","first_tax_year":"2024","tech":"solar","county":"Cameron","mw":250.0,"mw_text":"d Investment Ben Milam Solar 2 LLC, anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 250MW","cod":"September 1,2022","doc":"https://assets.comptroller.texas.gov/ch313/1518/1518-cameron-ben2-app.pdf","counties":["Cameron"],"county_how":"school district name","project_key":"BEN MILAM|2|solar|250.0","first_of_project":true},{"app":"330","applicant":"Miami Wind I, LLC","isd":"Canadian ISD","app_date":"08/06/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/330/Canadian-ISD-No330-Miami-Wind-I-LLC-Revised-ScheduleC-supplemental-material-to-app.pdf","project_key":"MIAMI|1|wind|None","first_of_project":true},{"app":"1040","applicant":"Astra Wind LLC f/k/a Happy Whiteface Wind, LLC","isd":"Canyon ISD","app_date":"11/15/2014","first_tax_year":"2016","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1040/1040-canyon-happy-annual-2015.pdf","project_key":"ASTRA||wind|None","first_of_project":true},{"app":"1297","applicant":"Shakes Solar, LLC","isd":"Carrizo Springs Cisd","app_date":"09/26/2018","first_tax_year":"2021","tech":"solar","county":"Dimmit","mw":200.0,"mw_text":"ttachment to Application for 313 Appraised Value Limitation by Shakes Solar, LLC to Carrizo Springs CISD development resources necessary to advance the planned 200 MW Shakes could be redeployed to other renewable energy development projects in other power markets in the United States","cod":"QTR12020","doc":"https://assets.comptroller.texas.gov/ch313/1297/carrizo-1297-shakes-app.pdf","counties":["Dimmit"],"county_how":"application description","eia":{"id":65333,"n":"Shakes Solar","st":"operating"},"project_key":"SHAKES||solar|200.0","first_of_project":true},{"app":"1963","applicant":"Skull Creek Solar, LLC","isd":"Cayuga ISD","app_date":"07/21/2022","first_tax_year":"2027","tech":"solar","county":"Anderson","mw":133.0,"mw_text":"The project will encompass approximately 850+ acres and will consist of approximately 133 MW of solar generation capacity","cod":"2024","doc":"https://assets.comptroller.texas.gov/ch313/1963/1963-cayuga-skull-app.pdf","counties":["Anderson"],"county_how":"application form","project_key":"SKULL CREEK||solar|133.0","first_of_project":true},{"app":"1582","applicant":"Azalea Springs Solar Park LLC","isd":"Central ISD","app_date":"04/16/2021","first_tax_year":"2025","tech":"solar","county":"Angelina","mw":180.0,"mw_text":"The installed capacity of the proposed project is expected to be approximately 180 megawatts (MW)","cod":"Q22023","doc":"https://assets.comptroller.texas.gov/ch313/1582/1582-central-azalea-app.pdf","counties":["Angelina"],"county_how":"application form","eia":{"id":68470,"n":"Azalea Springs Solar Park","st":"operating"},"project_key":"AZALEA SPRINGS||solar|180.0","first_of_project":true},{"app":"1197","applicant":"Childress Solar Park, LLC","isd":"Childress ISD","app_date":"06/16/2017","first_tax_year":"2020","tech":"solar","county":"Childress","mw":240.0,"mw_text":"The proposed project will include (but is not limited to): \ufffd Nameplate capacity of approximately 240 MW-AC in size; \ufffd 654520 PV modules from GCL System Integration Technology Co","cod":"December2018","doc":"https://assets.comptroller.texas.gov/ch313/1197/childress-1197-childress-app.pdf","counties":["Childress"],"county_how":"school district name","project_key":"CHILDRESS||solar|240.0","first_of_project":true},{"app":"1613","applicant":"Excel Advantage Services, LLC and Greenalia Solar Power Misae III, LLC","isd":"Childress ISD","app_date":"06/01/2021","first_tax_year":"2025","tech":"solar","county":"Childress","mw":517.35,"mw_text":"The proposed project will include (but is not limited to): x Nameplate capacity of approximately 517.35 megawatts (MW) alternating current (AC) in size; x 1,760,640 solar photovoltaic (PV) modules from Jinko Solar (Model JKM 395 Watt, Monocrystalline module, 72-H-V); x 620 DC-to-AC inverters from TM","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1613/1613-childress-excel-app.pdf","counties":["Childress"],"county_how":"school district name","project_key":"EXCEL ADVANTAGE SERVICES||solar|517.35","first_of_project":true},{"app":"1246","applicant":"Blue Summit II Wind, LLC","isd":"Chillicothe ISD","app_date":"03/27/2018","first_tax_year":"2019","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":"December 2018","doc":"https://assets.comptroller.texas.gov/dat/ch313/1246/1246-chillicothe-blue-app.pdf","project_key":"BLUE SUMMIT|2|wind|None","first_of_project":true},{"app":"1322","applicant":"Blue Summit III Wind, LLC","isd":"Chillicothe ISD","app_date":"12/05/2018","first_tax_year":"2020","tech":"wind","county":null,"mw":115.0,"mw_text":"The Applicant proposes to construct 115 MW wind farm in Hardeman County","cod":"December2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1322/1322-chillicothe-blue-app.pdf","project_key":"BLUE SUMMIT|3|wind|115.0","first_of_project":true},{"app":"228","applicant":"Blue Summit Wind, LLC","isd":"Chillicothe ISD","app_date":"05/16/2012","first_tax_year":"2013","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/228/228_Chilicothe_ISD_Blue_Summit_Wind_2013_Application.pdf","project_key":"BLUE SUMMIT||wind|None","first_of_project":true},{"app":"1419","applicant":"BPL Crown Solar, LLC f/k/a OCI Corona, LLC","isd":"Chilton ISD","app_date":"08/27/2019","first_tax_year":"2023","tech":"solar","county":"Falls","mw":100.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 100 MW ac, all of which will be located in Chilton ISD","cod":"June2021","doc":"https://assets.comptroller.texas.gov/ch313/1419/1419-chilton-oci-app.pdf","counties":["Falls"],"county_how":"application description","eia":{"id":64259,"n":"BPL Crown Solar LLC","st":"operating"},"project_key":"BPL CROWN||solar|100.0","first_of_project":true},{"app":"1448","applicant":"BPL Sol Solar LLC f/k/a OCI SOL, LLC","isd":"Chilton ISD","app_date":"11/26/2019","first_tax_year":"2023","tech":"solar","county":"Falls","mw":100.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 100 MW ac, all of which will be located in Chilton ISD","cod":"January2022","doc":"https://assets.comptroller.texas.gov/dat/ch313/1448/1448-chiltonisd-oci-app.pdf","counties":["Falls"],"county_how":"application description","eia":{"id":64260,"n":"BPL Sol Solar LLC","st":"operating"},"project_key":"BPL SOL||solar|100.0","first_of_project":true},{"app":"1659","applicant":"Markum Solar Farm, LLC","isd":"China Spring ISD","app_date":"10/27/2021","first_tax_year":"2025","tech":"solar","county":null,"mw":80.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 80 MW located in China Spring ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1659/1659-china-markum-app.pdf","project_key":"MARKUM||solar|80.0","first_of_project":true},{"app":"1711","applicant":"Mockingbird Solar Center, LLC","isd":"Chisum ISD","app_date":"02/23/2022","first_tax_year":"2025","tech":"solar","county":"Lamar","mw":162.0,"mw_text":"4% 162 MWac Tab Item 7 Description of Qualified Investment Mockingbird Solar Center, LLC plans to construct a solar project that has an installed capacity of 338 MWac in Chisum ISD","cod":"Q42023","doc":"https://assets.comptroller.texas.gov/ch313/1711/1711-chisum-mockingbird-app.pdf","counties":["Lamar"],"county_how":"application form","eia":{"id":64347,"n":"Mockingbird Solar Center","st":"operating"},"project_key":"MOCKINGBIRD||solar|162.0","first_of_project":true},{"app":"1951","applicant":"MRG Goody Solar Project, LLC","isd":"Chisum ISD","app_date":"05/23/2022","first_tax_year":"2026","tech":"solar","county":"Lamar","mw":139.0,"mw_text":"MRG Goody Solar Project, LLC is a 139 MW AC (Megawatts AC) hybrid solar energy generation and 40 MW AC battery storage project","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1951/1951-chisum-mrg-app.pdf","counties":["Lamar"],"county_how":"application form","eia":{"id":66390,"n":"MRG Goody Solar Project Hybrid","st":"planned"},"project_key":"MRG GOODY||solar|139.0","first_of_project":true},{"app":"386","applicant":"Salt Fork Wind, LLC","isd":"Clarendon ISD","app_date":"11/22/2013","first_tax_year":"2015","tech":"wind","county":null,"mw":161.0,"mw_text":"Property (per Application pg 8) Salt Fork Wind Project will consist of a wind-powered electric generating facility with an operating capacity of approximately 161 megawatts","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/386/386-clarendonisd-salt-app.pdf","project_key":"SALT FORK||wind|161.0","first_of_project":true},{"app":"344","applicant":"Route 66 Wind Power, LLC","isd":"Claude ISD","app_date":"08/29/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/344/App-344-Claude-ISD-Route-66-Amendment-No-01-to-Agreement.pdf","project_key":"ROUTE|66|wind|None","first_of_project":true},{"app":"1544","applicant":"BT Hickerson Solar LLC","isd":"Clifton ISD","app_date":"12/07/2020","first_tax_year":"2023","tech":"solar","county":"Bosque","mw":310.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 310 MW located in Clifton ISD","cod":"December2022","doc":"https://assets.comptroller.texas.gov/ch313/1544/1544-clifton-bthickersonsolar-app.pdf","counties":["Bosque"],"county_how":"application form","eia":{"id":66903,"n":"BT Hickerson Solar, LLC","st":"operating"},"project_key":"HICKERSON||solar|310.0","first_of_project":true},{"app":"1542","applicant":"Elawan Dileo Solar, LLC f/k/a BT Dileo Solar, LLC","isd":"Clifton ISD","app_date":"12/07/2020","first_tax_year":"2024","tech":"solar","county":"Bosque","mw":72.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 72 MW located in Clifton ISD","cod":"May2023","doc":"https://assets.comptroller.texas.gov/ch313/1542/1542-clifton-btdielosolar-app.pdf","counties":["Bosque"],"county_how":"application form","project_key":"ELAWAN DILEO||solar|72.0","first_of_project":true},{"app":"1485","applicant":"Brazoria County Solar Project, LLC","isd":"Columbia-Brazoria ISD","app_date":"04/08/2020","first_tax_year":"2023","tech":"solar","county":"Brazoria","mw":null,"mw_text":null,"cod":"Q42022","doc":"https://assets.comptroller.texas.gov/ch313/1485/1485-columbia-brazoria-app.pdf","counties":["Brazoria"],"county_how":"applicant name","eia":{"id":66046,"n":"Brazoria County Solar Project (Danciger)","st":"operating"},"project_key":"BRAZORIA COUNTY||solar|None","first_of_project":true},{"app":"1399","applicant":"Brazoria West Solar Project, LLC","isd":"Columbia-Brazoria ISD","app_date":"07/19/2019","first_tax_year":"2023","tech":"solar","county":null,"mw":200.0,"mw_text":"ed project provides for the design and construction of a solar energy facility, and associated infrastructure, with an approximate total generation capacity of 200 megawatts AC located within a proposed, contiguous reinvestment zone","cod":"Q42021","doc":"https://assets.comptroller.texas.gov/ch313/1399/1399-columbia-brazoria-app.pdf","project_key":"BRAZORIA WEST||solar|200.0","first_of_project":true},{"app":"1429","applicant":"TX Gulf Solar I, LLC","isd":"Columbia-Brazoria ISD","app_date":"09/20/2019","first_tax_year":"2025","tech":"solar","county":"Brazoria","mw":100.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 100 MWac located in Brazoria County","cod":"December2022","doc":"https://assets.comptroller.texas.gov/ch313/1429/1429-columbia-txgulf-app.pdf","counties":["Brazoria"],"county_how":"application description","project_key":"GULF|1|solar|100.0","first_of_project":true},{"app":"335","applicant":"Logan's Gap Wind I, LLC","isd":"Comanche ISD","app_date":"08/01/2013","first_tax_year":"2014","tech":"wind","county":"Comanche","mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/335/335-Comanche-ISD-Logans-Gap-Wind-2014-Application.pdf","counties":["Comanche"],"county_how":"school district name","project_key":"LOGAN GAP|1|wind|None","first_of_project":false},{"app":"1686","applicant":"Pine Forest Solar I, LLC","isd":"Como-Pickton Cisd","app_date":"01/12/2022","first_tax_year":"2025","tech":"solar","county":"Hopkins","mw":284.29,"mw_text":"Pine Forest Solar I, LLC is a 284.29 MW/AC solar energy generation project","cod":"May1,2024","doc":"https://assets.comptroller.texas.gov/ch313/1686/1686-como-pine-app.pdf","counties":["Hopkins"],"county_how":"application form","eia":{"id":68906,"n":"Pine Forest Solar I","st":"operating"},"project_key":"PINE FOREST|1|solar|284.29","first_of_project":true},{"app":"1455","applicant":"Hubbard Wind, LLC","isd":"Coolidge ISD","app_date":"12/18/2019","first_tax_year":"2022","tech":"wind","county":null,"mw":302.7,"mw_text":"Hubbard Wind, LLC is a 302.7 MW/AC electric generating wind facility","cod":"January1,2022","doc":"https://assets.comptroller.texas.gov/ch313/1455/1455-coolidge-hubbard-app.pdf","project_key":"HUBBARD||wind|302.7","first_of_project":false},{"app":"1589","applicant":"Limestone Wind Project, LLC","isd":"Coolidge ISD","app_date":"04/22/2021","first_tax_year":"2023","tech":"wind","county":"Limestone","mw":125.0,"mw_text":"ISD Limestone Wind Project, LLC Chapter 313 Application Coolidge ISD TAB 7 Description of Qualified Investment Limestone Wind Project, LLC plans to construct a 125 MW wind farm in Limestone County","cod":"December2022","doc":"https://assets.comptroller.texas.gov/ch313/1589/1589-coolidge-limestone-app.pdf","counties":["Limestone"],"county_how":"application form","project_key":"LIMESTONE||wind|125.0","first_of_project":true},{"app":"1603","applicant":"Waco Solar, LLC","isd":"Coolidge ISD","app_date":"05/14/2021","first_tax_year":"2024","tech":"solar","county":"Limestone","mw":272.0,"mw_text":"NextEra Energy Resources Development, LLC is developing \"Waco Solar\", a 272 MW/AC solar energy generation project","cod":"December31,2022","doc":"https://assets.comptroller.texas.gov/ch313/1603/1603-coolidge-waco-app.pdf","counties":["Limestone"],"county_how":"application form","eia_candidates":[{"id":65762,"n":"Waco Solar","st":"operating"},{"id":67354,"n":"Waco Solar II","st":"planned"}],"project_key":"WACO||solar|272.0","first_of_project":true},{"app":"1936","applicant":"Eagle Springs Solar, LLC","isd":"Cooper ISD","app_date":"05/20/2022","first_tax_year":"2026","tech":"solar","county":"Delta","mw":150.0,"mw_text":"The project will be capable of generating approximately 150 MWac and will cover a surface area approximately 880 acres","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/1936/1936-cooper-eagle-app.pdf","counties":["Delta"],"county_how":"application form","eia":{"id":66341,"n":"Eagle Springs Hybrid","st":"planned"},"project_key":"EAGLE SPRINGS||solar|150.0","first_of_project":true},{"app":"1520","applicant":"Enel Green Power Estonian Solar Project, LLC f/k/a 249RD 8me LLC","isd":"Cooper ISD","app_date":"08/28/2020","first_tax_year":"2024","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":"December1, 2022","doc":"https://assets.comptroller.texas.gov/ch313/1520/1520-cooper-249rd8me-app.pdf","project_key":"ENEL GREEN ESTONIAN||solar|None","first_of_project":true},{"app":"1498","applicant":"Pisgah Ridge Solar, LLC","isd":"Corsicana ISD","app_date":"06/09/2020","first_tax_year":"2023","tech":"solar","county":null,"mw":200.0,"mw_text":"The Project will be capable of generating approximately 200 MWac and will cover a surface area approximately 2,000 acres","cod":"12/31/2022","doc":"https://assets.comptroller.texas.gov/dat/ch313/1498/1498-corsicanaisd-pisgah-app.pdf","project_key":"PISGAH RIDGE||solar|200.0","first_of_project":true},{"app":"1800","applicant":"Tehuacana Creek Solar, LLC","isd":"Corsicana ISD","app_date":"04/22/2022","first_tax_year":"2028","tech":"solar","county":"Freestone","mw":650.0,"mw_text":"Tehuacana Creek Solar, LLC is a 650 MW AC (Megawatts AC) hybrid solar energy generation and battery storage project","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1800/1800-corsicana-tehuacana-app.pdf","counties":["Freestone","Navarro"],"county_how":"application form","eia":{"id":65855,"n":"Tehuacana Creek Solar","st":"planned"},"project_key":"TEHUACANA CREEK||solar|650.0","first_of_project":true},{"app":"1977","applicant":"High Noon Solar Project, LLC","isd":"Covington ISD","app_date":"05/25/2022","first_tax_year":"2027","tech":"solar","county":"Hill","mw":175.0,"mw_text":"GTON, ISD High Noon Solar Project, LLC CHAPTER 313 APPLICATION COVINGTON ISD Tab 7 Description of Qualified Investment High Noon Solar LLC plans to construct a 175 MW solar farm with 90 MW of BESS in Hill County, spanning both Covington ISD and Blum ISD","cod":"12/31/2026","doc":"https://assets.comptroller.texas.gov/ch313/1977/1977-covington-high-app.pdf","counties":["Hill"],"county_how":"application form","project_key":"HIGH NOON||solar|175.0","first_of_project":true},{"app":"1879","applicant":"Midpoint Solar, LLC","isd":"Covington ISD","app_date":"05/16/2022","first_tax_year":"2026","tech":"solar","county":"Hill","mw":150.0,"mw_text":"The Applicant, Midpoint Solar, LLC anticipates constructing a solar photovoltaic electric generating facility with an operating capacity of approximately 150 MWac and will cover a surface area of approximately 600 acres","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/1879/1879-covington-midpoint-app.pdf","counties":["Hill"],"county_how":"application form","eia":{"id":66897,"n":"Midpoint Solar, LLC","st":"operating"},"project_key":"MIDPOINT||solar|150.0","first_of_project":false},{"app":"1796","applicant":"Crane I Solar Electric LLC","isd":"Crane ISD","app_date":"04/22/2022","first_tax_year":"2028","tech":"solar","county":"Crane","mw":205.0,"mw_text":"The project will be capable of generating approximately 205 MWac and will cover a surface area of approximately 1,500 acres","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/1796/1796-crane-crane-app.pdf","counties":["Crane"],"county_how":"application form","project_key":"CRANE|1|solar|205.0","first_of_project":true},{"app":"1797","applicant":"Crane II Solar Electric LLC","isd":"Crane ISD","app_date":"04/22/2022","first_tax_year":"2028","tech":"solar","county":"Crane","mw":205.0,"mw_text":"The project will be capable of generating approximately 205 MWac and will cover a surface area of approximately 1,500 acres","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/1797/1797-crane-crane-app.pdf","counties":["Crane"],"county_how":"application form","project_key":"CRANE|2|solar|205.0","first_of_project":true},{"app":"1182","applicant":"Crane Solar Project, LLC f/k/a CED Crane Solar, LLC","isd":"Crane ISD","app_date":"03/28/2017","first_tax_year":"2020","tech":"solar","county":"Crane","mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1182/crane-1182-sp-app.pdf","counties":["Crane"],"county_how":"school district name","project_key":"CRANE||solar|None","first_of_project":true},{"app":"1519","applicant":"Emerald Grove Solar, LLC","isd":"Crane ISD","app_date":"08/26/2020","first_tax_year":"2023","tech":"solar","county":"Crane","mw":108.0,"mw_text":"The Applicant proposes to construct a solar power generating facility with a total operating capacity of 108 megawatts, on approximately 1,000 acres all of which will be within Crane Independent School District territory","cod":"Q22022","doc":"https://assets.comptroller.texas.gov/ch313/1519/1519-crane-emerald-app.pdf","counties":["Crane"],"county_how":"school district name","project_key":"EMERALD GROVE||solar|108.0","first_of_project":true},{"app":"1795","applicant":"Hecate Energy Point Mountain Facility, LLC","isd":"Crane ISD","app_date":"04/21/2022","first_tax_year":"2028","tech":"solar","county":"Crane","mw":430.0,"mw_text":"acility LLC Chapter 313 Application Crane ISD TAB 7 Description of Qualified Investment Hecate Energy Point Mountain Solar Facility LLC proposes to construct a 430 MW ac (net capacity) Photovoltaic solar facility and Battery Energy Storage System (BESS) that would be sited in Crane County","cod":"Q42027","doc":"https://assets.comptroller.texas.gov/ch313/1795/1795-crane-hecate-app.pdf","counties":["Crane"],"county_how":"application form","project_key":"HECATE POINT MOUNTAIN FACILITY||solar|430.0","first_of_project":true},{"app":"1822","applicant":"Big Sampson Wind Project, LLC","isd":"Crockett County Consolidated Csd","app_date":"04/28/2022","first_tax_year":"2026","tech":"wind","county":"Crockett","mw":400.0,"mw_text":"The Applicant, Big Sampson Wind Project, LLC, seeks to construct a 400 MWac within the Big Sampson Wind Project Reinvestment Zone created by Crockett County on April 11, 2022","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1822/1822-crockettco-big-app.pdf","counties":["Crockett"],"county_how":"application form","eia":{"id":68873,"n":"Big Sampson Wind","st":"planned"},"project_key":"BIG SAMPSON||wind|400.0","first_of_project":true},{"app":"1239","applicant":"High Lonesome Wind Power, LLC","isd":"Crockett County Consolidated Csd","app_date":"02/26/2018","first_tax_year":"2020","tech":"wind","county":"Crockett","mw":120.0,"mw_text":"ication to Crockett County Consolidated CSD Cummings Westlake, LLC TAB 7 Description of Qualified Investment High Lonesome Wind Power, LLC plans to construct a 120 MW up to 142 MW wind farm in Crockett County","cod":"December2019","doc":"https://assets.comptroller.texas.gov/ch313/1239/crockett-1239-high-app.pdf","counties":["Crockett"],"county_how":"application description","project_key":"HIGH LONESOME||wind|120.0","first_of_project":true},{"app":"1229","applicant":"Ranchero Wind Farm, LLC","isd":"Crockett County Consolidated Csd","app_date":"11/13/2017","first_tax_year":"2020","tech":"wind","county":"Crockett","mw":250.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 250 MW located in Crockett County CSD","cod":"December2019","doc":"https://assets.comptroller.texas.gov/ch313/1229/crockett-1229-ranchero-app.pdf","counties":["Crockett"],"county_how":"application description","eia":{"id":62259,"n":"Ranchero Wind Farm LLC","st":"operating"},"project_key":"RANCHERO||wind|250.0","first_of_project":true},{"app":"1695","applicant":"Shamrock Wind, LLC","isd":"Crockett County Consolidated Csd","app_date":"02/02/2022","first_tax_year":"2024","tech":"wind","county":"Crockett","mw":223.9,"mw_text":"Tab 4: Detailed Description of the Project Shamrock Wind, LLC is a 223.9 MW wind energy generation facility that will be located in northern Crockett County in Crockett County Consolidated Common School District","cod":"December31,2023","doc":"https://assets.comptroller.texas.gov/ch313/1695/1695-crockett-shamrock-app.pdf","counties":["Crockett"],"county_how":"application form","eia":{"id":66540,"n":"Shamrock Wind","st":"operating"},"project_key":"SHAMROCK||wind|223.9","first_of_project":true},{"app":"1284","applicant":"White Mesa Wind, LLC","isd":"Crockett County Consolidated Csd","app_date":"08/22/2018","first_tax_year":"2022","tech":"wind","county":"Crockett","mw":500.0,"mw_text":"The overall Project is anticipated to have a capacity of 500 MW consisting of 200 GE 2","cod":"Q42019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1284/1284-crockett-white-app.pdf","counties":["Crockett"],"county_how":"application description","eia":{"id":64710,"n":"White Mesa Wind","st":"operating"},"project_key":"WHITE MESA||wind|500.0","first_of_project":true},{"app":"308","applicant":"Wake Wind Energy, LLP","isd":"Crosbyton Cisd","app_date":"07/02/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/308/crosbyton-0308-wake-app.pdf","project_key":"WAKE||wind|None","first_of_project":true},{"app":"1231","applicant":"Foard City Wind, LLC","isd":"Crowell ISD","app_date":"12/14/2017","first_tax_year":"2020","tech":"wind","county":null,"mw":350.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 350 MW located in Crowell ISD","cod":"Q4 2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1231/1231-crowell-foard-app.pdf","project_key":"FOARD CITY||wind|350.0","first_of_project":true},{"app":"1778","applicant":"Montgomery Ranch Wind Farm, LLC","isd":"Crowell ISD","app_date":"04/15/2022","first_tax_year":"2024","tech":"wind","county":"Foard","mw":200.6,"mw_text":"Montgomery Ranch Wind Farm, LLC is a 200.6 MW wind energy generation project","cod":"December31,2023","doc":"https://assets.comptroller.texas.gov/ch313/1778/1778-crowell-montgomery-app.pdf","counties":["Foard"],"county_how":"application form","project_key":"MONTGOMERY||wind|200.6","first_of_project":true},{"app":"1392","applicant":"Brazoria West Solar Project, LLC","isd":"Damon ISD","app_date":"07/09/2019","first_tax_year":"2023","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1392/damon-1392-brazoria-app.pdf","project_key":"BRAZORIA WEST||solar|200.0","first_of_project":false},{"app":"1898","applicant":"Long Point Solar, LLC","isd":"Damon ISD","app_date":"05/17/2022","first_tax_year":"2028","tech":"solar","county":"Brazoria","mw":100.0,"mw_text":"al Towers & Equipment x Mounting & Tracker Equipment x Battery Energy Storage System (BESS) Tab 8: Description of Qualified Property Long Point Solar, LLC is a 100 MW/AC solar electric generation facility, with an additional 100 MW battery energy storage system","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/dat/ch313/1898/1898-damon-longpoint-app.pdf","counties":["Brazoria"],"county_how":"application form","eia":{"id":68998,"n":"Long Point Solar","st":"operating"},"project_key":"LONG POINT||solar|100.0","first_of_project":true},{"app":"1243","applicant":"Wagyu Solar, LLC","isd":"Damon ISD","app_date":"03/28/2018","first_tax_year":"2020","tech":"solar","county":null,"mw":120.0,"mw_text":"osed project provides for the design and construcMon of a solar energy facility, and associated infrastructure, with an approximate total generaMon capacity of 120 MW AC located within Damon ISD Reinvestment Zone No","cod":"Q42019","doc":"https://assets.comptroller.texas.gov/ch313/1243/damon-1243-wagyu-app.pdf","project_key":"WAGYU||solar|120.0","first_of_project":true},{"app":"1287","applicant":"Myrtle Solar, LLC","isd":"Danbury ISD","app_date":"08/28/2018","first_tax_year":"2023","tech":"solar","county":null,"mw":200.0,"mw_text":"The Project is anticipated to have a capacity of approximately 200MW located in Danbury and Angleton ISDs","cod":"December 2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1287/1287-danbury-myrtle-app.pdf","project_key":"MYRTLE||solar|200.0","first_of_project":true},{"app":"1584","applicant":"Limestone Wind Project, LLC","isd":"Dawson ISD","app_date":"04/16/2021","first_tax_year":"2023","tech":"wind","county":"Navarro","mw":176.0,"mw_text":"N ISD Limestone Wind Project, LLC Chapter 313 Application Dawson ISD TAB 7 Description of Qualified Investment Limestone Wind Project, LLC plans to construct a 176 MW wind farm in Navarro County","cod":"December2022","doc":"https://assets.comptroller.texas.gov/ch313/1584/1584-dawson-limestone-app.pdf","counties":["Navarro"],"county_how":"application form","project_key":"LIMESTONE||wind|176.0","first_of_project":true},{"app":"1734","applicant":"Liberty County Solar Project, LLC","isd":"Dayton ISD","app_date":"03/21/2022","first_tax_year":"2025","tech":"solar","county":"Liberty","mw":100.0,"mw_text":"able Liberty County Solar Project, LLC Chapter 313 Application to Dayton ISD Tab 7 Description of Qualified Investment Recurrent proposes the construction of a 100 MW (ac) PV power generation facility on approximately 1,050 acres of land in Liberty County, to be located generally west of the interse","cod":"Q42024","doc":"https://assets.comptroller.texas.gov/ch313/1734/1734-dayton-liberty-app.pdf","counties":["Liberty"],"county_how":"application form","eia":{"id":67159,"n":"Liberty County Solar Project","st":"operating"},"project_key":"LIBERTY COUNTY||solar|100.0","first_of_project":true},{"app":"1085","applicant":"Bethel Wind Farm LLC f/k/a Orion Wind Resources, LLC","isd":"Dimmitt ISD","app_date":"06/25/2015","first_tax_year":"2017","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1085/dimmitt-1085-orion-app.pdf","project_key":"BETHEL||wind|None","first_of_project":true},{"app":"315","applicant":"TX Hereford Wind II, LLC","isd":"Dimmitt ISD","app_date":"07/15/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":200.1,"mw_text":"m will be constructed as a second phase of Hereford Wind I (Deaf Smith County), with a total of up to 87 wind turbine generators, for a total capacity of up to 200.1 megawatts (MW) for Phase II","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/315/App-315-Dimmitt-ISD-TX-Hereford-Wind-II-LLC-Findings-of-Fact-with-Attachments.pdf","project_key":"HEREFORD|2|wind|200.1","first_of_project":true},{"app":"1540","applicant":"Bernard Creek Solar LLC f/k/a CG Wharton County LLC","isd":"East Bernard ISD","app_date":"11/13/2020","first_tax_year":"2022","tech":"solar","county":"Wharton","mw":80.0,"mw_text":"t the Sandy Branch Solar Project Expansion, a solar electricity generating facility in northeastern Wharton County with a total rated capacity of approximately 80 megawatts on an approximately 500-acre parcel located entirely within East Bernard ISD","cod":"Q12022","doc":"https://assets.comptroller.texas.gov/ch313/1540/1540-east-cg-app.pdf","counties":["Wharton"],"county_how":"applicant name","eia":{"id":65034,"n":"Bernard Creek Solar","st":"operating"},"project_key":"BERNARD CREEK||solar|80.0","first_of_project":true},{"app":"1420","applicant":"Bernard Creek Solar LLC f/k/a CG Wharton County, LLC","isd":"East Bernard ISD","app_date":"08/28/2019","first_tax_year":"2022","tech":"solar","county":"Wharton","mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1420/1420-east-cg-app.pdf","counties":["Wharton"],"county_how":"applicant name","eia":{"id":65034,"n":"Bernard Creek Solar","st":"operating"},"project_key":"BERNARD CREEK||solar|80.0","first_of_project":false},{"app":"1276","applicant":"Oberon Solar IA, LLC f/k/a Oberson Solar, LLC","isd":"Ector County ISD","app_date":"07/30/2018","first_tax_year":"2020","tech":"solar","county":null,"mw":50.0,"mw_text":"The project is estimated to be of 50megawatt (MW) minimum and potentially larger as feasibility is improved via economic development incentives","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1276/ector-1276-oberon-app.pdf","project_key":"OBERON||solar|50.0","first_of_project":true},{"app":"1816","applicant":"Ophelia Solar, LLC","isd":"Ector County ISD","app_date":"04/26/2022","first_tax_year":"2026","tech":"solar","county":"Ector","mw":110.0,"mw_text":"ial operations of the Project, all of which will be located within the project boundary, Enterprise Zone, Ector ISD and Ector County, Texas: \ufffd Minimum, nominal 110 MW-AC in size; \ufffd Hanwha bifacial modules; \ufffd DC-to-AC inverters; \ufffd Medium and high-voltage electric cabling; \ufffd Single axis tracking syste","cod":"12/1/2025","doc":"https://assets.comptroller.texas.gov/ch313/1816/1816-ector-ophelia-app.pdf","counties":["Ector"],"county_how":"application form","project_key":"OPHELIA||solar|110.0","first_of_project":true},{"app":"1277","applicant":"Maverick Creek Wind, LLC","isd":"Eden Cisd","app_date":"07/31/2018","first_tax_year":"2021","tech":"wind","county":"Concho","mw":504.0,"mw_text":"The full Project is anticipated to consist of approximately 130 wind turbines which when operational will be capable of generating up to 504 MW, depending on final turbine technology selection","cod":"December 2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1277/1277-eden-maverick-app.pdf","counties":["Concho"],"county_how":"application description","eia":{"id":62853,"n":"Maverick Creek Wind","st":"operating"},"project_key":"MAVERICK CREEK||wind|504.0","first_of_project":true},{"app":"1136","applicant":"SP Cactus Flats Wind Energy, LLC f/k/a RES Cactus Flats Wind Energy, LP","isd":"Eden Cisd","app_date":"04/26/2016","first_tax_year":"2019","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1136/1136-eden-res-app.pdf","project_key":"CACTUS FLATS||wind|None","first_of_project":true},{"app":"1003","applicant":"Hidalgo Wind Farm, LLC","isd":"Edinburg Cisd","app_date":"04/15/2017","first_tax_year":"2016","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1003/1003-Edinburg-ISD-Hidalgo-Wind-Farm-LLC-2015-Application.pdf","project_key":"HIDALGO||wind|None","first_of_project":true},{"app":"1460","applicant":"New Hickory Solar LLC f/k/a Old Hickory Solar LLC","isd":"Edna ISD","app_date":"01/06/2020","first_tax_year":"2026","tech":"solar","county":"Jackson","mw":206.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 206 MWac located in Jackson County","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1460/1460-edna-oldhickory-app.pdf","counties":["Jackson"],"county_how":"application description","eia":{"id":69507,"n":"New Hickory Solar","st":"planned"},"project_key":"NEW HICKORY||solar|206.0","first_of_project":true},{"app":"1837","applicant":"Wichita Solar I, LLC","isd":"Electra ISD","app_date":"05/04/2022","first_tax_year":"2028","tech":"solar","county":"Wichita","mw":625.0,"mw_text":"documentation of combined group membership, received by CPA Tab #4 - Detailed Description of Project The Wichita Solar I, LLC project will be an approximately 625 MWac photovoltaic solar power generation facility, that would be built on part of approximately 5,400 acres of privately owned land in Wi","cod":"December2028","doc":"https://assets.comptroller.texas.gov/ch313/1837/1837-electra-wichita-app.pdf","counties":["Wichita"],"county_how":"application form","project_key":"WICHITA|1|solar|625.0","first_of_project":true},{"app":"1242","applicant":"East Blackland Solar Project 1","isd":"Elgin ISD","app_date":"12/03/2018","first_tax_year":"2021","tech":"solar","county":null,"mw":120.0,"mw_text":"East Blackland Solar Project 1 LLC anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 120 MW","cod":"FourthQuarter2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1242/1242-elgin-east-app.pdf","project_key":"EAST BLACKLAND|1|solar|120.0","first_of_project":true},{"app":"1446","applicant":"7V Solar Ranch, LLC","isd":"Flatonia ISD","app_date":"11/18/2019","first_tax_year":"2023","tech":"solar","county":"Fayette","mw":240.0,"mw_text":"The Project will be capable of generating approximately 240 MWac and will cover a surface lease of approximately 1700 acres","cod":"Q32022","doc":"https://assets.comptroller.texas.gov/dat/ch313/1446/1446-flatoniaisd-7v-app.pdf","counties":["Fayette"],"county_how":"application description","project_key":"7V Solar Ranch, LLC||solar|240.0","first_of_project":true},{"app":"1045","applicant":"Cotton Plains Wind I, LLC","isd":"Floydada ISD","app_date":"12/03/2014","first_tax_year":"2017","tech":"wind","county":"Floyd","mw":400.0,"mw_text":"Overall, the proposed Cotton Plains Project is sized to achieve up to 400 MW in total capacity","cod":"Q32016","doc":"https://assets.comptroller.texas.gov/ch313/1045/floydada-1045-cotton-app.pdf","counties":["Floyd"],"county_how":"application description","project_key":"COTTON PLAINS|1|wind|400.0","first_of_project":true},{"app":"294","applicant":"Longhorn Wind Project, LLC","isd":"Floydada ISD","app_date":"05/29/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/294/App-294-Floydada-ISD-Longhorn-Wind-Attachment-21-Amended-Map-of-Reinvestment-Zone-Amendment-No-001.pdf","project_key":"LONGHORN||wind|None","first_of_project":true},{"app":"1124","applicant":"Old Settler Wind, LLC","isd":"Floydada ISD","app_date":"02/16/2016","first_tax_year":"2017","tech":"wind","county":"Floyd","mw":150.0,"mw_text":"The Project is anticipated to have a capacity of 150 MW located in Floydada ISD","cod":"Q32016","doc":"https://assets.comptroller.texas.gov/ch313/1124/floydada-1124-oldsettler-app.pdf","counties":["Floyd"],"county_how":"application description","eia":{"id":60366,"n":"Old Settler Wind","st":"operating"},"project_key":"OLD SETTLER||wind|150.0","first_of_project":true},{"app":"1004","applicant":"South Plains Wind Energy, LLC & South Plains Wind Energy II, LLC","isd":"Floydada ISD","app_date":"04/15/2014","first_tax_year":"2015","tech":"wind","county":null,"mw":120.0,"mw_text":"WHEREAS, the Applicant has requested to increase the size of the Project in the District from approximately 120 megawatts to 192","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1004/App-1004-Floydada-ISD-Amendment-No1.pdf","project_key":"SOUTH PLAINS||wind|120.0","first_of_project":true},{"app":"307","applicant":"Wake Wind Energy, LLC","isd":"Floydada ISD","app_date":"07/02/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/307/floydada-0307-wake-app.pdf","project_key":"WAKE||wind|None","first_of_project":false},{"app":"325","applicant":"Miami Wind I, LLC","isd":"Fort Elliott Cisd","app_date":"07/31/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/325/Fort-Elliott-CISD-No325-Miami-Wind-I-LLC-Revised-Schedule-C-supplemental-material-to-app.pdf","project_key":"MIAMI|1|wind|None","first_of_project":false},{"app":"326","applicant":"Barilla Solar, LLC","isd":"Fort Stockton ISD","app_date":"07/22/2013","first_tax_year":"2014","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/326/326-Fort-Stockton-ISD-Barilla-Solar-2014-Application.pdf","project_key":"BARILLA||solar|None","first_of_project":true},{"app":"1960","applicant":"DHI Power, LLC","isd":"Fort Stockton ISD","app_date":"05/24/2022","first_tax_year":"2028","tech":"solar","county":"Pecos","mw":202.8,"mw_text":"DHI Power, LLC is developing Mitchell Plant Road Solar + Storage, a 202.8 MW/AC solar energy generation project with an additional 205","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1960/1960-fort-dhi-app.pdf","counties":["Pecos"],"county_how":"application form","project_key":"DHI||solar|202.8","first_of_project":true},{"app":"1306","applicant":"Taygete Energy Project, LLC","isd":"Fort Stockton ISD","app_date":"10/19/2018","first_tax_year":"2021","tech":"solar","county":"Pecos","mw":250.0,"mw_text":"stment Taygete Energy Project, LLC, anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 250 MW ac","cod":"2/2021","doc":"https://assets.comptroller.texas.gov/ch313/1306/fort-1306-taygete-app.pdf","counties":["Pecos"],"county_how":"application description","eia_candidates":[{"id":62483,"n":"Taygete Energy Project LLC","st":"operating"},{"id":64075,"n":"Taygete II Energy Project","st":"operating"}],"project_key":"TAYGETE||solar|250.0","first_of_project":true},{"app":"1377","applicant":"West Texas Solar Project II, LLC f/k/a Taygete Energy Project II, LLC","isd":"Fort Stockton ISD","app_date":"05/23/2019","first_tax_year":"2023","tech":"solar","county":"Pecos","mw":255.0,"mw_text":"The proposed project will include, but is not limited to, the following: \ufffd Planned 255 MW-AC in size; \ufffd PV modules; \ufffd DC-to-AC inverters; \ufffd Medium and high-voltage electric cabling; \ufffd Single axis tracker racking system (mounting structures); \ufffd Project substation which will include a high-voltage tra","cod":"6/2021","doc":"https://assets.comptroller.texas.gov/ch313/1377/fortstockton-1377-taygete-II-app.pdf","counties":["Pecos"],"county_how":"application description","project_key":"WEST|2|solar|255.0","first_of_project":true},{"app":"1780","applicant":"Buffalo Meadow Solar Project, LLC","isd":"Franklin ISD","app_date":"04/18/2022","first_tax_year":"2028","tech":"solar","county":"Robertson","mw":275.0,"mw_text":"Buffalo Meadow Solar Project, LLC is a 275 MW/AC solar energy generation project, with an additional 150 MW battery energy storage system","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1780/1780-franklin-buffalo-app.pdf","counties":["Robertson"],"county_how":"application form","project_key":"BUFFALO MEADOW||solar|275.0","first_of_project":true},{"app":"1148","applicant":"Bearkat Wind Energy I, LLC","isd":"Glasscock County ISD","app_date":"08/08/2016","first_tax_year":"2018","tech":"wind","county":"Glasscock","mw":240.0,"mw_text":"The wind farm will have an estimated capacity of between 200 and 240 megawatts (\"MW\")","cod":"November2017","doc":"https://assets.comptroller.texas.gov/ch313/1148/glasscock-1148-bearkat-app.pdf","counties":["Glasscock"],"county_how":"application description","project_key":"BEARKAT|1|wind|240.0","first_of_project":true},{"app":"303","applicant":"CPV Rattlesnake Den Renewable Energy Company, LLC","isd":"Glasscock County ISD","app_date":"06/17/2013","first_tax_year":"2014","tech":"other","county":"Glasscock","mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/303/glasscock-0303-cpv-app.pdf","counties":["Glasscock"],"county_how":"application description","project_key":"CPV RATTLESNAKE DEN COMPANY||other|None","first_of_project":true},{"app":"1604","applicant":"Lacy Creek Wind, LLC f/k/a Edmondson Ranch Wind, LLC","isd":"Glasscock County ISD","app_date":"05/18/2021","first_tax_year":"2023","tech":"wind","county":"Glasscock","mw":205.0,"mw_text":"Edmondson Ranch Wind, LLC is a 205 MW wind energy generation project","cod":"12/31/2022","doc":"https://assets.comptroller.texas.gov/ch313/1604/1604-glasscock-edmondson-app.pdf","counties":["Glasscock"],"county_how":"application form","project_key":"LACY CREEK||wind|205.0","first_of_project":true},{"app":"1210","applicant":"McCrae Wind Energy II, LLC f/k/a Bearkat Wind Energy II, LLC","isd":"Glasscock County ISD","app_date":"08/04/2017","first_tax_year":"2020","tech":"wind","county":"Glasscock","mw":162.15,"mw_text":"The wind farm will have an estimated capacity of 162.15 megawatts (\"MW\")","cod":"December2018","doc":"https://assets.comptroller.texas.gov/ch313/1210/glasscock-1210-bearkatii-app.pdf","counties":["Glasscock"],"county_how":"application description","eia":{"id":63342,"n":"McCrae Wind Energy II","st":"planned"},"project_key":"MCCRAE|2|wind|162.15","first_of_project":true},{"app":"1511","applicant":"Bluebonnet Wind Power, LLC","isd":"Goldthwaite ISD","app_date":"08/06/2020","first_tax_year":"2023","tech":"wind","county":"Mills","mw":103.5,"mw_text":"BLUEBONNET WIND POWER, LLC Chapter 313 Application Goldthwaite ISD TAB 7 Description of Qualified Investment Bluebonnet Wind Power, LLC proposes to construct a 103.5 MW ac (net capacity) wind powered electric generating facility that would be sited on land southeast of the town of Goldthwaite, TX Mi","cod":"December2021","doc":"https://assets.comptroller.texas.gov/ch313/1511/1511-goldthwaite-bluebonnet-app.pdf","counties":["Mills"],"county_how":"application description","project_key":"BLUEBONNET||wind|103.5","first_of_project":true},{"app":"218","applicant":"Goldthwaite Wind Energy LLC","isd":"Goldthwaite ISD","app_date":"01/11/2012","first_tax_year":"2013","tech":"wind","county":null,"mw":95.0,"mw_text":"ription of Project Goldthwaite Wind Energy LLC anticipates constructing a wind-powered electric generating facility with an operating capacity of approximately 95 megawatts (the \"Goldthwaite Project\") and a may install up to 152 megawatts","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/218/goldthwaite-0218-goldthwaite-app.pdf","project_key":"GOLDTHWAITE||wind|95.0","first_of_project":true},{"app":"1502","applicant":"Priddy Wind Project, LLC","isd":"Goldthwaite ISD","app_date":"07/22/2020","first_tax_year":"2022","tech":"wind","county":"Mills","mw":300.0,"mw_text":"ISD PRIDDY WIND PROJECT, LLC Chapter 313 Application Goldthwaite ISD TAB 7 Description of Qualified Investment Priddy Wind Project, LLC proposes to construct a 300MW ac (net capacity) Wind turbine facility that would be sited on approximately 35,240 acres of land between the towns of Goldthwaite, TX","cod":"December31,2021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1502/1502-goldthwaiteisd-priddy-app.pdf","counties":["Mills"],"county_how":"application description","eia":{"id":64165,"n":"Priddy Wind Project","st":"operating"},"project_key":"PRIDDY||wind|300.0","first_of_project":true},{"app":"1532","applicant":"CED Peregrine Solar, LLC f/k/a SP-Peregrine Solar LLC","isd":"Goliad ISD","app_date":"09/29/2020","first_tax_year":"2024","tech":"solar","county":"Goliad","mw":300.0,"mw_text":"The Applicant plans to construct an estimated 300 MW solar farm in Goliad County, One Hundred percent of which will be qualified investment located in Goliad ISD","cod":"QTR22023","doc":"https://assets.comptroller.texas.gov/ch313/1532/1532-goliad-sp-app.pdf","counties":["Goliad"],"county_how":"application description","project_key":"CED PEREGRINE||solar|300.0","first_of_project":true},{"app":"1731","applicant":"Keys Hollow Solar, LLC","isd":"Goliad ISD","app_date":"03/14/2022","first_tax_year":"2028","tech":"solar","county":"Goliad","mw":400.0,"mw_text":"IAD ISD KEYS HOLLOW SOLAR, LLC, LLC Chapter 313 Application Goliad ISD TAB 7 Description of Qualified Investment Keys Hollow Solar, LLC proposes to construct a 400MW ac (net capacity) Photovoltaic solar facility with attached battery storage that would be sited on land approximately 8","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1731/1731-goliad-keys-app.pdf","counties":["Goliad"],"county_how":"school district name","project_key":"KEYS HOLLOW||solar|400.0","first_of_project":true},{"app":"1839","applicant":"Ray Ranch Solar LLC f/k/a Tulsita Solar, LLC","isd":"Goliad ISD","app_date":"05/04/2022","first_tax_year":"2025","tech":"solar","county":"Goliad","mw":274.0,"mw_text":"The Applicant proposes to construct a solar photovoltaic electric generating facility with an operating capacity of approximately 274 MWac and will cover a surface area of approximately 2,000 acres","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/1839/1839-goliad-tulsita-app.pdf","counties":["Goliad"],"county_how":"application form","eia":{"id":67837,"n":"Ray Ranch Solar","st":"planned"},"project_key":"RAY||solar|274.0","first_of_project":true},{"app":"1727","applicant":"Pinnington Solar LLC f/k/a Hecate Energy Longhorn Solar LLC","isd":"Graford ISD","app_date":"03/14/2022","first_tax_year":"2026","tech":"solar","county":"Palo Pinto","mw":218.0,"mw_text":"The full project would have approximately 587,670 panels and associated inverters located in Jack and Palo Pinto Counties with a total capacity of 218 MW (ac)","cod":"Q42027","doc":"https://assets.comptroller.texas.gov/ch313/1727/1727-graford-hecate-app.pdf","counties":["Palo Pinto"],"county_how":"application form","project_key":"PINNINGTON||solar|218.0","first_of_project":true},{"app":"1728","applicant":"PK Solar, LLC f/k/a Novis Renewables, LLC","isd":"Graford ISD","app_date":"03/14/2022","first_tax_year":"2028","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1728/1728-graford-novis-app.pdf","project_key":"PK Solar, LLC f/k/a Novis Renewables, LLC||solar|None","first_of_project":true},{"app":"170","applicant":"Senate Wind, LLC 2011","isd":"Graham ISD","app_date":"05/17/2010","first_tax_year":"2011","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/170/GrahamISDno170_SenateWindLLCApplication.pdf","project_key":"SENATE||wind|126.0","first_of_project":false},{"app":"1632","applicant":"Young Wind, LLC","isd":"Graham ISD","app_date":"08/25/2021","first_tax_year":"2023","tech":"wind","county":"Young","mw":null,"mw_text":null,"cod":"Q4, 2022","doc":"https://assets.comptroller.texas.gov/ch313/1632/1632-graham-young-app.pdf","counties":["Young"],"county_how":"application form","project_key":"YOUNG||wind|356.0","first_of_project":false},{"app":"1010","applicant":"Colbeck's Corner, LLC f/k/a Grandview Wind Farm II, LLC","isd":"Grandview-Hopkins ISD","app_date":"05/22/2014","first_tax_year":"2016","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":"December31,2015","doc":"https://assets.comptroller.texas.gov/dat/ch313/1010/1010-grandview-grandview-app.pdf","project_key":"COLBECK CORNER||wind|None","first_of_project":true},{"app":"1764","applicant":"Angelo Solar LLC","isd":"Grape Creek ISD","app_date":"04/07/2022","first_tax_year":"2024","tech":"solar","county":"Tom Green","mw":195.0,"mw_text":"Apex Clean Energy, Angelo Solar LLC Chapter 313 Application to Grape Creek ISD TAB 7 Description of Qualified Investment Angelo Solar, LLC plans to construct a 195MW solar farm, including battery storage for the power generated on site, in Tom Green County","cod":"November2023","doc":"https://assets.comptroller.texas.gov/ch313/1764/1764-grape-angelo-app.pdf","counties":["Tom Green"],"county_how":"application form","eia":{"id":68145,"n":"Angelo Solar","st":"operating"},"project_key":"ANGELO||solar|195.0","first_of_project":true},{"app":"1091","applicant":"Midway Wind, LLC f/k/a Apex Midway Wind, LLC","isd":"Gregory-Portland ISD","app_date":"07/28/2015","first_tax_year":"2017","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":"Fourthquarter2016","doc":"https://assets.comptroller.texas.gov/dat/ch313/1091/1091-gregory-apex-app.pdf","project_key":"MIDWAY||wind|160.125","first_of_project":false},{"app":"1757","applicant":"Padre Solar, LLC","isd":"Gregory-Portland ISD","app_date":"03/30/2022","first_tax_year":"2028","tech":"solar","county":"San Patricio","mw":408.0,"mw_text":"Padre Solar, LLC Chapter 313 Application to Gregory-Portland ISD TAB 7 Description of Qualified Investment Padre Solar, LLC plans to construct an approximately 408 MWac solar powered electric generating facility in San Patricio County","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/1757/1757-gregory-padre-app.pdf","counties":["San Patricio"],"county_how":"application form","project_key":"PADRE||solar|408.0","first_of_project":true},{"app":"1830","applicant":"BT Fewell Solar, LLC","isd":"Groesbeck ISD","app_date":"05/03/2022","first_tax_year":"2028","tech":"solar","county":"Limestone","mw":240.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 240 MW located in Groesbeck ISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1830/1830-groesbeck-bt-app.pdf","counties":["Limestone"],"county_how":"application form","project_key":"FEWELL||solar|240.0","first_of_project":true},{"app":"1900","applicant":"Diver Solar, LLC f/k/a Stetson Renewables Holdings, LLC","isd":"Groesbeck ISD","app_date":"05/18/2022","first_tax_year":"2026","tech":"solar","county":"Limestone","mw":250.0,"mw_text":"Stetson Renewables Holdings, LLC a 250 MW/AC solar energy generation project","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1900/1900-groesbeck-stetson-app.pdf","counties":["Limestone"],"county_how":"application form","eia":{"id":68483,"n":"Diver Solar, LLC","st":"operating"},"project_key":"DIVER||solar|250.0","first_of_project":true},{"app":"356","applicant":"Grandview Wind Farm II, LLC","isd":"Groom ISD","app_date":"01/15/2013","first_tax_year":"2015","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/356/App-356-Groom-ISD-Grandview-Wind-Farm-II-LLC-Carson-County-Reinvestment-Zone-Guidelines-Item-24-Amendment-No-001.pdf","project_key":"GRANDVIEW|2|wind|None","first_of_project":true},{"app":"312","applicant":"Grandview Wind Farm, LLC","isd":"Groom ISD","app_date":"07/09/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/312/App-12-Groom-ISD-Grandview-Wind-Attachment-24-Reinvestment-Zone-Guidelines-Amendment-No-003.pdf","project_key":"GRANDVIEW||wind|None","first_of_project":true},{"app":"387","applicant":"Salt Fork Wind, LLC","isd":"Groom ISD","app_date":"11/22/2013","first_tax_year":"2015","tech":"wind","county":null,"mw":161.0,"mw_text":"Property (per Application pg 8) Salt Fork Wind Project will consist of a wind-powered electric generating facility with an operating capacity of approximately 161 megawatts","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/387/0387-groom-salt-app.pdf","project_key":"SALT FORK||wind|161.0","first_of_project":false},{"app":"1541","applicant":"Great Prairie Wind, LLC f/k/a Firewheel Wind Energy, LLC","isd":"Gruver ISD","app_date":"11/23/2020","first_tax_year":"2023","tech":"wind","county":"Hansford","mw":359.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 359 MW located in Gruver ISD","cod":"Q42022","doc":"https://assets.comptroller.texas.gov/ch313/1541/1541-gruver-firewheel-app.pdf","counties":["Hansford"],"county_how":"application form","eia":{"id":64665,"n":"Great Prairie Wind","st":"operating"},"project_key":"GREAT PRAIRIE||wind|359.0","first_of_project":true},{"app":"1574","applicant":"Great Prairie Wind, LLC f/k/a Great Prairie Wind II","isd":"Gruver ISD","app_date":"04/16/2021","first_tax_year":"2023","tech":"wind","county":null,"mw":149.0,"mw_text":"3 Application to Gruver ISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment Great Prairie Wind II, LLC plans to construct a wind farm of which 149MW will be in Gruver ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1574/1574-gruver-greatprairieii-app.pdf","project_key":"GREAT PRAIRIE||wind|149.0","first_of_project":true},{"app":"1587","applicant":"Great Prairie Wind, LLC f/k/a Great Prairie Wind III","isd":"Gruver ISD","app_date":"04/21/2021","first_tax_year":"2023","tech":"wind","county":null,"mw":301.0,"mw_text":"II, LLC Chapter 313 Application to Gruver ISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment Great Prairie Wind III, LLC plans to construct a 301 MW wind farm in Hansford County and 301 MW will be in Gruver ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1587/1587-gruver-greatprairieiii-app.pdf","project_key":"GREAT PRAIRIE||wind|301.0","first_of_project":true},{"app":"1785","applicant":"Comanche Solar, LLC","isd":"Hamilton ISD","app_date":"05/09/2022","first_tax_year":"2027","tech":"solar","county":"Comanche","mw":100.0,"mw_text":"documentation of combined group membership, received by CPA Tab 4 Detailed Description of the Project The Comanche Solar, LLC project will be an approximately 100 MWac photovoltaic solar power generation facility, that would be built on approximately 1,000 acres of privately owned land in Comanche C","cod":"December2028","doc":"https://assets.comptroller.texas.gov/ch313/1785/1785-hamilton-comanche-app.pdf","counties":["Comanche"],"county_how":"application form","project_key":"COMANCHE||solar|100.0","first_of_project":true},{"app":"1530","applicant":"Grizzly Ridge Solar, LLC","isd":"Hamilton ISD","app_date":"09/23/2020","first_tax_year":"2022","tech":"solar","county":"Hamilton","mw":100.0,"mw_text":"The Project will be approximately 100 MWac and will be located on up to 3,274 acres in the Hamilton Independent School District","cod":"March2022","doc":"https://assets.comptroller.texas.gov/ch313/1530/1530-hamilton-grizzly-app.pdf","counties":["Hamilton"],"county_how":"application description","eia":{"id":66410,"n":"Grizzly Ridge Solar","st":"operating"},"project_key":"GRIZZLY RIDGE||solar|100.0","first_of_project":true},{"app":"1911","applicant":"Neches Valley Power LLC f/k/a Recurrent Energy Development Holdings, LLC","isd":"Hardin-Jefferson ISD","app_date":"05/19/2022","first_tax_year":"2028","tech":"solar","county":"Jefferson","mw":200.0,"mw_text":"Project Prime is anticipated to have an installed capacity of approximately 200 MW (ac)","cod":"Q42027","doc":"https://assets.comptroller.texas.gov/ch313/1911/1911-hardin-recurrent-app.pdf","counties":["Jefferson"],"county_how":"application form","project_key":"NECHES VALLEY||solar|200.0","first_of_project":true},{"app":"1872","applicant":"Adams Creek Solar Project, LLC","isd":"Harrold ISD","app_date":"05/13/2022","first_tax_year":"2028","tech":"solar","county":"Wilbarger","mw":250.0,"mw_text":"Adams Creek Solar Project, LLC is a 250 MW/AC solar energy generation project that will be located within a proposed reinvestment zone in Wilbarger County and Harrold Independent School District","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1872/1872-harrold-adams-app.pdf","counties":["Wilbarger"],"county_how":"application form","eia":{"id":70300,"n":"Adams Creek Solar Project","st":"planned"},"project_key":"ADAMS CREEK||solar|250.0","first_of_project":true},{"app":"1606","applicant":"Eastern Trail Solar Center, LLC","isd":"Harrold ISD","app_date":"05/19/2021","first_tax_year":"2027","tech":"solar","county":"Wilbarger","mw":400.0,"mw_text":"School District Percentage of Anticipated Number Harrold ISD Project of MWac 100% 400 MWac INTERNAL Tab Item 7 Description of Qualified Investment Eastern Trail Solar Center, LLC plans to construct a solar project that has an installed capacity of approximately 400 MWac in Harrold ISD","cod":"12/31/2022","doc":"https://assets.comptroller.texas.gov/ch313/1606/1606-harrold-eastern-app.pdf","counties":["Wilbarger"],"county_how":"application form","project_key":"EASTERN TRAIL||solar|400.0","first_of_project":true},{"app":"1069","applicant":"Electra Wind, LLC","isd":"Harrold ISD","app_date":"04/20/2015","first_tax_year":"2017","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1069/1069-harrold-electra-app.pdf","project_key":"ELECTRA||wind|200.0","first_of_project":false},{"app":"1435","applicant":"Western Trail Wind, LLC","isd":"Harrold ISD","app_date":"10/01/2019","first_tax_year":"2022","tech":"wind","county":null,"mw":252.0,"mw_text":"The installed capacity of the proposed project is expected to be approximately 252 megawatts (MW)","cod":"Q42021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1435/1435-harroldisd-western-app.pdf","project_key":"WESTERN TRAIL||wind|252.0","first_of_project":true},{"app":"1833","applicant":"New Hart Solar, LLC","isd":"Hart ISD","app_date":"05/04/2022","first_tax_year":"2028","tech":"solar","county":null,"mw":300.0,"mw_text":"The project will be capable of generating approximately 300 MWac and will cover a surface area approximately 3,000 acres","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1833/1833-hart-new-app.pdf","project_key":"NEW HART||solar|300.0","first_of_project":true},{"app":"1676","applicant":"Briggs Solar, LLC","isd":"Haskell Cisd","app_date":"12/03/2021","first_tax_year":"2028","tech":"solar","county":"Haskell","mw":305.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 305 MW located in Haskell CISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1676/1676-haskell-briggs-app.pdf","counties":["Haskell"],"county_how":"application form","eia":{"id":66691,"n":"Briggs Solar, LLC","st":"planned"},"project_key":"BRIGGS||solar|305.0","first_of_project":true},{"app":"1616","applicant":"Grasshopper Solar, LLC","isd":"Haskell Cisd","app_date":"06/25/2021","first_tax_year":"2027","tech":"solar","county":"Haskell","mw":310.0,"mw_text":"Tab Item 7 Description of Qualified Investment Grasshopper Solar, LLC plans to construct a 310 MW solar farm (the \"Project\") in Haskell County","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1616/1616-haskell-grasshopper-app.pdf","counties":["Haskell"],"county_how":"application form","project_key":"GRASSHOPPER||solar|310.0","first_of_project":true},{"app":"1065","applicant":"Horse Creek Wind, LLC","isd":"Haskell Cisd","app_date":"04/10/2015","first_tax_year":"2017","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1065/1065-haskell-horse-app.pdf","project_key":"HORSE CREEK||wind|None","first_of_project":true},{"app":"1638","applicant":"Inertia Wind Project, LLC","isd":"Haskell Cisd","app_date":"09/01/2021","first_tax_year":"2023","tech":"wind","county":"Haskell","mw":298.6,"mw_text":"Inertia Wind Project, LLC is a 298.6 MW wind energy generation project","cod":"December31,2022","doc":"https://assets.comptroller.texas.gov/ch313/1638/1638-haskell-inertia-app.pdf","counties":["Haskell"],"county_how":"application form","eia":{"id":65546,"n":"Inertia Wind Project","st":"operating"},"project_key":"INERTIA||wind|298.6","first_of_project":true},{"app":"1612","applicant":"Millers Branch Solar, LLC","isd":"Haskell Cisd","app_date":"06/10/2021","first_tax_year":"2026","tech":"solar","county":"Haskell","mw":200.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 200 MW located in Haskell CISD","cod":"December2024","doc":"https://assets.comptroller.texas.gov/ch313/1612/1612-haskell-millers-app.pdf","counties":["Haskell"],"county_how":"application form","eia":{"id":69101,"n":"Millers Branch Solar","st":"operating"},"project_key":"MILLERS BRANCH||solar|200.0","first_of_project":true},{"app":"1906","applicant":"Millers Branch Solar, LLC f/k/a Brazos Fork Solar, LLC","isd":"Haskell Cisd","app_date":"05/18/2022","first_tax_year":"2028","tech":"solar","county":"Haskell","mw":300.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 300 MW located in Haskell CISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1906/1906-haskell-brazos-app.pdf","counties":["Haskell"],"county_how":"application form","eia":{"id":69101,"n":"Millers Branch Solar","st":"operating"},"project_key":"MILLERS BRANCH||solar|300.0","first_of_project":true},{"app":"1905","applicant":"Throckmorton Wind, LLC f/k/a Stetson Renewables Holdings, LLC","isd":"Haskell Cisd","app_date":"05/18/2022","first_tax_year":"2027","tech":"wind","county":"Haskell","mw":82.0,"mw_text":"Stetson Renewables Holdings, LLC a 82 MW/AC wind energy generation project","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1905/1905-haskell-stetson-app.pdf","counties":["Haskell"],"county_how":"application form","project_key":"THROCKMORTON||wind|82.0","first_of_project":true},{"app":"1132","applicant":"Willow Springs Windfarm, LLC","isd":"Haskell Cisd","app_date":"04/06/2016","first_tax_year":"2018","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1132/haskell-1132-willow-app.pdf","project_key":"WILLOW SPRINGS WINDFARM||wind|None","first_of_project":true},{"app":"268","applicant":"TX Hereford Wind, LLC","isd":"Hereford ISD","app_date":"02/11/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":400.2,"mw_text":"farm will potentially be constructed as one phase or possibly multiple phases, with a total of up to 174 wind turbine generators, for a total capacity of up to 400.2 megawatts (MW), spanning the Hereford and Dimmitt school districts in southeast Deaf Smith and eastern Castro Counties, Texas","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/268/App-268-TX-Hereford-Wind-Hereford-ISD-Findings-of-Fact.pdf","project_key":"HEREFORD||wind|400.2","first_of_project":true},{"app":"1331","applicant":"Maryneal Windpower, LLC","isd":"Highland ISD","app_date":"01/19/2019","first_tax_year":"2021","tech":"wind","county":null,"mw":180.0,"mw_text":"d Description ofProject Maryneal Windpower, LLC anticipates constructing a wind-powered electric generating facility with an operating capacity ofapproximately 180 megawatts","cod":"Q4 2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1331/1331-highland-maryneal-app.pdf","project_key":"MARYNEAL WINDPOWER||wind|180.0","first_of_project":true},{"app":"1838","applicant":"Three W Solar LLC","isd":"Hillsboro ISD","app_date":"05/04/2022","first_tax_year":"2026","tech":"solar","county":"Hill","mw":110.0,"mw_text":"The Applicant, Three W Solar LLC, seeks to construct a 110 MW ac, all of which will be located in Hillsboro ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1838/1838-hillsboro-three-app.pdf","counties":["Hill"],"county_how":"application description","eia":{"id":69283,"n":"Three W Solar","st":"operating"},"project_key":"THREE||solar|110.0","first_of_project":true},{"app":"1456","applicant":"Hubbard Wind, LLC","isd":"Hubbard ISD","app_date":"12/18/2019","first_tax_year":"2022","tech":"wind","county":null,"mw":302.7,"mw_text":"Hubbard Wind, LLC is a 302.7 MW/AC electric generating wind facility","cod":"January1,2022","doc":"https://assets.comptroller.texas.gov/ch313/1456/1456-hubbard-hubbard-app.pdf","project_key":"HUBBARD||wind|302.7","first_of_project":false},{"app":"1126","applicant":"Buckthorn Wind Project, LLC","isd":"Huckabay ISD","app_date":"03/10/2016","first_tax_year":"2018","tech":"wind","county":"Erath","mw":96.0,"mw_text":", LLC Chapter 313 Application to Huckabay ISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment Buckthorn Wind Project, LLC plans to construct a 96 MW wind farm in Erath County","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1126/1126-huckabay-buckthorn-app.pdf","counties":["Erath"],"county_how":"application description","eia":{"id":60983,"n":"Buckthorn Wind","st":"operating"},"project_key":"BUCKTHORN||wind|96.0","first_of_project":true},{"app":"1490","applicant":"Blue Jay Solar I, LLC","isd":"Iola ISD","app_date":"05/19/2020","first_tax_year":"2023","tech":"solar","county":"Grimes","mw":210.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 210 MWac located in Grimes County","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1490/1490-iola-blue-app.pdf","counties":["Grimes"],"county_how":"application description","eia":{"id":64672,"n":"Blue Jay Solar I, LLC","st":"operating"},"project_key":"BLUE JAY|1|solar|210.0","first_of_project":true},{"app":"1650","applicant":"Grimes County Solar Project, LLC","isd":"Iola ISD","app_date":"09/24/2021","first_tax_year":"2025","tech":"solar","county":"Grimes","mw":210.0,"mw_text":"The project will be capable of generating approximately 210 MWac and will cover a surface area approximately 2,000 acres","cod":"12/31/2023","doc":"https://assets.comptroller.texas.gov/ch313/1650/1650-iola-grimes-app.pdf","counties":["Grimes"],"county_how":"application form","eia":{"id":67046,"n":"Grimes County Solar","st":"operating"},"project_key":"GRIMES COUNTY||solar|210.0","first_of_project":true},{"app":"1524","applicant":"Canyon Wind Farm, LLC","isd":"Ira ISD","app_date":"09/04/2020","first_tax_year":"2024","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1524/1524-ira-canyon-app.pdf","project_key":"CANYON||wind|360.0","first_of_project":false},{"app":"1020","applicant":"BHE Pearl Solar, LLC & BHES Alamo 6, LLC f/k/a West Texas Solar 1 LLC","isd":"Iraan-Sheffield ISD","app_date":"08/07/2014","first_tax_year":"2018","tech":"solar","county":null,"mw":110.0,"mw_text":"The anticipated generation capacity of the Project is 110 MW","cod":"Q12016","doc":"https://assets.comptroller.texas.gov/dat/ch313/1020/1020-iraan-west-app.pdf","project_key":"BHE PEARL||solar|110.0","first_of_project":true},{"app":"1059","applicant":"East Pecos Solar, LLC","isd":"Iraan-Sheffield ISD","app_date":"02/19/2015","first_tax_year":"2016","tech":"solar","county":"Pecos","mw":103.0,"mw_text":"d Investment East Pecos Solar, LLC, anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 103 MW","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1059/iraan-1059-east-app.pdf","counties":["Pecos"],"county_how":"application description","eia":{"id":60436,"n":"East Pecos Solar","st":"operating"},"project_key":"EAST PECOS||solar|103.0","first_of_project":true},{"app":"1170","applicant":"Midway Solar LLC","isd":"Iraan-Sheffield ISD","app_date":"01/13/2017","first_tax_year":"2019","tech":"solar","county":"Pecos","mw":182.0,"mw_text":"ified Investment Midway Solar, LLC, anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 182 MW","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1170/iraan-1170-midway-app.pdf","counties":["Pecos"],"county_how":"application description","eia":{"id":61368,"n":"Midway Solar - TX","st":"operating"},"project_key":"MIDWAY||solar|182.0","first_of_project":true},{"app":"1152","applicant":"Santa Rita East Wind, LLC","isd":"Irion County ISD","app_date":"09/02/2016","first_tax_year":"2020","tech":"wind","county":null,"mw":200.0,"mw_text":"ion of Project Santa Rita East Wind Energy LLC anticipates constructing a wind-powered electric generating facility with an operating capacity of approximately 200 megawatts","cod":"Q32019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1152/1152-irion-santarita-app.pdf","project_key":"SANTA RITA EAST||wind|200.0","first_of_project":true},{"app":"1896","applicant":"Oystercatcher Solar, LLC","isd":"Italy ISD","app_date":"05/17/2022","first_tax_year":"2027","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1896/1896-italy-oystercatcher-app.pdf","project_key":"OYSTERCATCHER||solar|None","first_of_project":true},{"app":"1465","applicant":"BPL Files Solar, LLC f/k/a BT Files Solar, LLC","isd":"Itasca ISD","app_date":"02/13/2020","first_tax_year":"2023","tech":"solar","county":null,"mw":150.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 150 MW located in Itasca ISD","cod":"December2021","doc":"https://assets.comptroller.texas.gov/ch313/1465/1465-itasca-bt-app.pdf","project_key":"BPL FILES||solar|150.0","first_of_project":true},{"app":"1787","applicant":"Hill Solar 2, LLC","isd":"Itasca ISD","app_date":"04/20/2022","first_tax_year":"2027","tech":"solar","county":"Hill","mw":200.0,"mw_text":"Tab 8 Description of Qualified Property Hill Solar 2, LLC project will be an approximately 200 MWac photovoltaic solar power generation facility that would be built on approximately 1,187 acres of privately owned land in Hill County, Texas","cod":"December2028","doc":"https://assets.comptroller.texas.gov/ch313/1787/1787-itasca-hill2-app.pdf","counties":["Hill"],"county_how":"application form","project_key":"HILL|2|solar|200.0","first_of_project":true},{"app":"1729","applicant":"Hill Solar I, LLC","isd":"Itasca ISD","app_date":"03/14/2022","first_tax_year":"2025","tech":"solar","county":"Hill","mw":400.0,"mw_text":"Affiliate List received by the Comptroller of Public Accounts Tab 4 Detailed Description of the Project The Hill Solar I, LLC project will be an approximately 400 MWac photovoltaic solar power generation facility, that would be built on approximately 3,554 acres of privately owned land in Hill Count","cod":"December2024","doc":"https://assets.comptroller.texas.gov/ch313/1729/1729-itasca-hill-app.pdf","counties":["Hill"],"county_how":"application form","project_key":"HILL|1|solar|400.0","first_of_project":true},{"app":"301","applicant":"Keechi Wind, LLC","isd":"Jacksboro ISD","app_date":"06/12/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/301/301-Jacksboro-ISD-Keechi-Wind-2014-Application.pdf","project_key":"KEECHI||wind|None","first_of_project":true},{"app":"1403","applicant":"Texas Solar Nova 1, LLC","isd":"Jayton-Girard ISD","app_date":"07/29/2019","first_tax_year":"2024","tech":"solar","county":"Kent","mw":252.0,"mw_text":"Tab 4 Detailed Description of Project The Texas Solar Nova 1 (aka Kent 3 Solar, TX Kent 3, TX Kent 3 Solar, Kent3 Solar Site) project will be an approximately 252 MW AC photovoltaic solar power generation facility that would be built on approximately 1,701 acres out of the reinvestment zone (Tab 16)","cod":"Q42021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1403/1403-jaytongirard-texassolar1-app.pdf","counties":["Kent"],"county_how":"application description","eia":{"id":65654,"n":"Texas Solar Nova 1","st":"operating"},"project_key":"NOVA|1|solar|252.0","first_of_project":true},{"app":"1404","applicant":"Texas Solar Nova 2, LLC","isd":"Jayton-Girard ISD","app_date":"07/31/2019","first_tax_year":"2024","tech":"solar","county":"Kent","mw":200.0,"mw_text":"Tab 4 Detailed Description of Project The Texas Solar Nova 2 (aka Kent 3 Solar, TX Kent 3, TX Kent 3 Solar, Kent3 Solar Site) project will be an approximately 200 MW AC photovoltaic solar power generation facility that would be built on approximately 1,883 acres out of the reinvestment zone (Tab16) ","cod":"Q2202 2","doc":"https://assets.comptroller.texas.gov/dat/ch313/1404/1404-jaytongirard-texassolar2-app.pdf","counties":["Kent"],"county_how":"application description","eia":{"id":65660,"n":"Texas Solar Nova 2","st":"operating"},"project_key":"NOVA|2|solar|200.0","first_of_project":true},{"app":"327","applicant":"Sendero Wind Energy, LLC","isd":"Jim Hogg County ISD","app_date":"07/17/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/327/327-Jim-Hogg-County-ISD-Sendero-Wind-2014-Application.pdf","project_key":"SENDERO||wind|None","first_of_project":true},{"app":"1176","applicant":"Stella Wind Farm, LLC","isd":"Kenedy County Wide Csd","app_date":"03/27/2017","first_tax_year":"2019","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1176/1176-kenedy-stella-app.pdf","project_key":"STELLA||wind|None","first_of_project":true},{"app":"1566","applicant":"Fence Post Solar Project, LLC","isd":"Kerens ISD","app_date":"02/25/2021","first_tax_year":"2024","tech":"solar","county":"Navarro","mw":240.0,"mw_text":"As such, the development resources necessary to advance the planned 240 MWac Fence Post Solar could be redeployed to other renewable energy development projects in other power markets in the United States","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1566/1566-kerens-fence-app.pdf","counties":["Navarro"],"county_how":"application description","eia":{"id":66801,"n":"Fence Post Solar Hybrid Project, LLC","st":"operating"},"project_key":"FENCE POST||solar|240.0","first_of_project":true},{"app":"1694","applicant":"Goodalta Power Center LLC","isd":"Kerens ISD","app_date":"01/28/2022","first_tax_year":"2026","tech":"solar","county":"Navarro","mw":180.0,"mw_text":"The Applicant proposes to construct a solar photovoltaic electric generating facility with an operating capacity of approximately 180 MWac within Kerens ISD and Navarro County","cod":"12/31/2024","doc":"https://assets.comptroller.texas.gov/ch313/1694/1694-kerens-goodalta-app.pdf","counties":["Navarro"],"county_how":"application form","project_key":"GOODALTA||solar|180.0","first_of_project":true},{"app":"1973","applicant":"Orca Falls Solar, LLC f/k/a Elm Flats Solar, LLC","isd":"Kerens ISD","app_date":"05/25/2022","first_tax_year":"2028","tech":"solar","county":"Navarro","mw":125.0,"mw_text":"The project will be capable of generating approximately 125 MWac and will cover a surface area approximately 1,500 acres","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/1973/1973-kerens-elm-app.pdf","counties":["Navarro"],"county_how":"application form","project_key":"ORCA FALLS||solar|125.0","first_of_project":true},{"app":"351","applicant":"OCI Solar Power, LLC","isd":"Knippa ISD","app_date":"10/25/2013","first_tax_year":"2014","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/351/App-351-Knippa-ISD-OCI-Solar-Power-LLC-Combined-Application-11-8-13.pdf","project_key":"OCI||solar|None","first_of_project":true},{"app":"1860","applicant":"Lumberton PV I, LLC","isd":"Kountze ISD","app_date":"05/12/2022","first_tax_year":"2029","tech":"solar","county":"Hardin","mw":200.0,"mw_text":"Tab 4: Detailed Description of the Project Lumberton PV I, LLC is a 200 MW/AC solar electric generation facility, with an additional 50 MW battery energy storage system","cod":"December31,2025","doc":"https://assets.comptroller.texas.gov/ch313/1860/1860-kountze-lumberton-app.pdf","counties":["Hardin"],"county_how":"application form","eia":{"id":66904,"n":"Lumberton PV I, LLC","st":"planned"},"project_key":"LUMBERTON|1|solar|200.0","first_of_project":true},{"app":"1514","applicant":"Hecate Energy Frye Solar LLC","isd":"Kress ISD","app_date":"08/14/2020","first_tax_year":"2024","tech":"solar","county":"Swisher","mw":500.0,"mw_text":"D HECATE ENERGY FRYE SOLAR LLC Chapter 313 Application Kress ISD TAB 7 Description of Qualified Investment Hecate Energy Frye Solar LLC proposes to construct a 500 MW ac (net capacity) Photovoltaic solar facility that would be sited on approximately 7,680 acres of land approximately 13 miles southea","cod":"D ec emb er 31 , 2022","doc":"https://assets.comptroller.texas.gov/ch313/1514/1514-kress-hecate-app.pdf","counties":["Swisher"],"county_how":"application description","eia":{"id":64233,"n":"Hecate Energy Frye Solar LLC","st":"operating"},"project_key":"HECATE FRYE||solar|500.0","first_of_project":true},{"app":"1033","applicant":"BNB Lamesa Solar LLC","isd":"Lamesa ISD","app_date":"10/28/2014","first_tax_year":"2017","tech":"solar","county":"Dawson","mw":150.0,"mw_text":"a solar powered electric generating Findings of Fact \ufffd Lamesa ISD / Lamesa BNB Solar LLC Page 6 J9XMZCLN0D1MNX facility with an operating capacity of at least 150 MW, which would require two (2) full time positions","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1033/App-1033-Lamesa-ISD- BNB-Solar-LLC-Findings-of-Fact.pdf","counties":["Dawson"],"county_how":"application description","project_key":"BNB LAMESA||solar|150.0","first_of_project":true},{"app":"316","applicant":"Mesquite Creek Wind, LLC","isd":"Lamesa ISD","app_date":"07/17/2013","first_tax_year":"2014","tech":"wind","county":"Borden","mw":200.6,"mw_text":"The proposed Project is anticipated to have a total capacity of 200.6 MW, with approximately 187 MW located in Lamesa ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/316/App-316-Lamesa-ISD-Mesquite-Creek-Wind-Findings-of-Fact-with-Attachments.pdf","counties":["Borden"],"county_how":"application description","project_key":"MESQUITE CREEK||wind|200.6","first_of_project":true},{"app":"1601","applicant":"Public Service Company of Oklahoma f/k/a Lazbuddie Wind Energy LLC","isd":"Lazbuddie ISD","app_date":"05/13/2021","first_tax_year":"2026","tech":"wind","county":null,"mw":235.0,"mw_text":"fied Property To Lazbuddie ISD Tab #4 Detailed Description of Project Lazbuddie Wind Energy LLC proposes constructing a wind power farm with an output of up to 235MW on up to 32,000 acres of privately-owned land in Parmer County","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1601/1601-lazbuddie-lazbuddie-app.pdf","project_key":"PUBLIC SERVICE COMPANY OKLAHOMA||wind|235.0","first_of_project":true},{"app":"1933","applicant":"Schoolhouse Solar, LLC","isd":"Lexington ISD","app_date":"05/20/2022","first_tax_year":"2028","tech":"solar","county":"Lee","mw":150.0,"mw_text":"Schoolhouse Solar, LLC is a 150 MW/AC solar energy generation project, with an additional 100 MW/AC battery storage system, that will be located within a proposed reinvestment zone in Lee County and Lexington Independent School District","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1933/1933-lexington-schoolhouse-app.pdf","counties":["Lee"],"county_how":"application form","project_key":"SCHOOLHOUSE||solar|150.0","first_of_project":true},{"app":"1569","applicant":"Lone Spur Solar Energy LLC","isd":"Livingston ISD","app_date":"03/02/2021","first_tax_year":"2027","tech":"solar","county":"Polk","mw":105.0,"mw_text":"The Project will be capable of generating approximately 105 MWac and will cover a surface area up to 1,200 acres","cod":"12/31/2023","doc":"https://assets.comptroller.texas.gov/ch313/1569/1569-livingston-lone-app.pdf","counties":["Polk"],"county_how":"application form","project_key":"LONE SPUR||solar|105.0","first_of_project":true},{"app":"1538","applicant":"Umbriel Solar, LLC","isd":"Livingston ISD","app_date":"10/23/2020","first_tax_year":"2024","tech":"solar","county":null,"mw":150.0,"mw_text":"l Solar, LLC Chapter 313 Application to Livingston ISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment Umbriel Solar, LLC plans to construct a 150 MW solar farm in Polk County and all 150 MW will be in Livingston ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1538/1538-livingston-umbrielsolar-publicapp-11092020.pdf","project_key":"UMBRIEL||solar|150.0","first_of_project":true},{"app":"1888","applicant":"Hill Country Wind Power Rock Creek, LLC","isd":"Lockney ISD","app_date":"05/17/2022","first_tax_year":"2028","tech":"wind","county":"Floyd","mw":600.0,"mw_text":"Hill Country Wind Power Rock Creek, LLC is proposing to construct a 600 MW wind powered electric generation facility that will span Briscoe, Floyd, and Swisher Counties","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1888/1888-lockney-hill-app.pdf","counties":["Floyd"],"county_how":"application form","project_key":"HILL COUNTRY ROCK CREEK||wind|600.0","first_of_project":true},{"app":"295","applicant":"Longhorn Wind Project, LLC","isd":"Lockney ISD","app_date":"05/28/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/295/App-295-Lockney-ISD-Longhorn-Wind-Attachment-21-Amended-Map-of-Reinvestment-Zone-Amendment-No-001.pdf","project_key":"LONGHORN||wind|None","first_of_project":false},{"app":"280","applicant":"South Plains Wind Energy, LLC","isd":"Lockney ISD","app_date":"04/15/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/280/App280-Lockney-ISD-South-Plains-Wind-Energy-LLC-Economic-Impact-and-Recommendation-Package.pdf","project_key":"SOUTH PLAINS||wind|120.0","first_of_project":false},{"app":"1129","applicant":"Heart of Texas Wind, LLC","isd":"Lohn ISD","app_date":"03/31/2016","first_tax_year":"2020","tech":"wind","county":"McCulloch","mw":150.0,"mw_text":"The project is anticipated to generate 150MW","cod":"4Q2017","doc":"https://assets.comptroller.texas.gov/dat/ch313/1129/1129-lohn-heart-app.pdf","counties":["McCulloch"],"county_how":"application description","eia":{"id":61032,"n":"Heart of Texas Wind Project","st":"operating"},"project_key":"HEART||wind|150.0","first_of_project":true},{"app":"1096","applicant":"Rattlesnake Power, LLC","isd":"Lohn ISD","app_date":"08/10/2015","first_tax_year":"2018","tech":"other","county":"McCulloch","mw":124.0,"mw_text":"The Project is anticipated to consist of 53 to 62 wind turbines which when operational will be capable of generating between 124 MW and 159 MW depending on final turbine technology selection","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1096/1096-lohn-rattlesnake-app.pdf","counties":["McCulloch"],"county_how":"application description","eia":{"id":60743,"n":"Rattlesnake Power, LLC","st":"operating"},"project_key":"RATTLESNAKE||other|124.0","first_of_project":true},{"app":"209","applicant":"Crosby County Wind Farm LLC","isd":"Lorenzo ISD","app_date":"03/27/2012","first_tax_year":"2013","tech":"wind","county":"Crosby","mw":20.0,"mw_text":"The wind farm will have a capacity of up to 20 megawatts","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/209/Lorenzo-ISD-No209-Crosby-County-Wind-Farm-LLC-Application-4-16-12.pdf","counties":["Crosby"],"county_how":"applicant name","project_key":"CROSBY COUNTY||wind|20.0","first_of_project":true},{"app":"1142","applicant":"Lorenzo Wind, LLC f/k/a Fiber Winds Holding, LLC","isd":"Lorenzo ISD","app_date":"06/28/2016","first_tax_year":"2019","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":"December2017","doc":"https://assets.comptroller.texas.gov/ch313/1142/lorenzo-1142-fiber-app.pdf","project_key":"LORENZO||wind|None","first_of_project":true},{"app":"342","applicant":"Cameron Wind I, LLC","isd":"Los Fresnos Cisd","app_date":"07/08/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/342/Application-to-the-Los-Fresnos-CISD-from-APEX-Wind-Energy-8-19-2013.pdf","project_key":"CAMERON|1|wind|None","first_of_project":true},{"app":"1255","applicant":"Palmas Wind, LLC","isd":"Los Fresnos Cisd","app_date":"04/25/2018","first_tax_year":"2020","tech":"wind","county":null,"mw":144.9,"mw_text":"r Community Qualified Investment and Qualified Property Map Palmas Altas Wind Project Willacy Qualified Investment and Property Map (! (! Palmas Altas Layout - 144.9 MW !( (! (!(! (! Palmas Altas - Project Boundary !((!!(!(!(!(!(!(!((!(!!((!(!(!!((!!((!!(!(!(!(!((!(!!((!(! Cameron County ISDs County","cod":"December2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1255/1255-losfresnos-palmas-app.pdf","project_key":"PALMAS||wind|144.9","first_of_project":true},{"app":"1051","applicant":"San Roman Wind I, LLC","isd":"Los Fresnos Cisd","app_date":"12/29/2014","first_tax_year":"2017","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1051/1051-los-san-amendapp1.pdf","project_key":"SAN ROMAN|1|wind|None","first_of_project":true},{"app":"1355","applicant":"Hecate Energy Ramsey, LLC","isd":"Louise ISD","app_date":"03/26/2019","first_tax_year":"2022","tech":"solar","county":"Wharton","mw":500.0,"mw_text":"UISE ISD HECATE ENERGY RAMSEY LLC Chapter 313 Application Louise ISD TAB 7 Description of Qualified Investment Hecate Energy Ramsey LLC proposes to construct a 500 MW ac (net capacity) Photovoltaic solar facility that would be sited on approximately 4,300 acres of land south of El Campo, TX in Whart","cod":"December2020","doc":"https://assets.comptroller.texas.gov/ch313/1355/louise-1355-hecate-app.pdf","counties":["Wharton"],"county_how":"application description","project_key":"HECATE RAMSEY||solar|500.0","first_of_project":true},{"app":"201","applicant":"DEGS Wind I, LLC","isd":"Lyford Cisd","app_date":"08/03/2011","first_tax_year":"2012","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/201/201_Lyford_DEGS_Wind_I_2012_Application.pdf","project_key":"DEGS|1|wind|None","first_of_project":true},{"app":"1555","applicant":"El Sauz Ranch Wind, LLC","isd":"Lyford Cisd","app_date":"01/15/2021","first_tax_year":"2024","tech":"wind","county":"Willacy","mw":300.0,"mw_text":"The wind farm will have an estimated capacity of 300 megawatts (\"MW\")","cod":"QTR 4 2023","doc":"https://assets.comptroller.texas.gov/ch313/1555/1555-lyford-elsauz-app.pdf","counties":["Willacy"],"county_how":"application form","eia":{"id":65760,"n":"El Sauz Ranch Wind, LLC","st":"operating"},"project_key":"SAUZ||wind|300.0","first_of_project":true},{"app":"1150","applicant":"Las Majadas Wind Farm, LLC","isd":"Lyford Cisd","app_date":"09/01/2016","first_tax_year":"2019","tech":"wind","county":"Willacy","mw":202.0,"mw_text":"y Las Majadas Wind Energy Project, LLC to Lyford CISD Attachment 8 Description of Qualified Property Las Majadas Wind Farm, LLC plans to construct an estimated 202 MW wind farm in Willacy County, located entirely within Lyford CISD","cod":"December2018","doc":"https://assets.comptroller.texas.gov/ch313/1150/lyford-1150-lasmajadas-app.pdf","counties":["Willacy"],"county_how":"application description","eia":{"id":63739,"n":"Las Majadas Wind Farm","st":"operating"},"project_key":"LAS MAJADAS||wind|202.0","first_of_project":true},{"app":"189","applicant":"Magic Valley Wind Farm I, LLC","isd":"Lyford Cisd","app_date":"08/08/2011","first_tax_year":"2012","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/189/189_Lyford_Magic_Valley_2012_Application.pdf","project_key":"MAGIC VALLEY|1|wind|None","first_of_project":true},{"app":"1475","applicant":"West Raymond Wind Farm, LLC","isd":"Lyford Cisd","app_date":"03/05/2020","first_tax_year":"2021","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":"December 31, 2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1475/1475-lyfordcisd-westraymond-app.pdf","project_key":"WEST RAYMOND||wind|None","first_of_project":true},{"app":"1894","applicant":"BdPU Solar Maratua, LLC f/k/a BdPU Texas Solar Project II, LLC","isd":"Madisonville Cisd","app_date":"05/17/2022","first_tax_year":"2028","tech":"solar","county":"Grimes","mw":194.0,"mw_text":"The proposed Project is expected to have an installed capacity of approximately 194 MW (AC), with an estimated 476,000 PV modules, 45 inverters, and all other Project improvements located entirely in Madisonville CISD","cod":"Q42027","doc":"https://assets.comptroller.texas.gov/ch313/1894/1894-madisonville-bdpu-app.pdf","counties":["Grimes"],"county_how":"application form","project_key":"BDPU MARATUA||solar|194.0","first_of_project":true},{"app":"1732","applicant":"Hollow Branch Creek Solar, LLC","isd":"Madisonville Cisd","app_date":"03/17/2022","first_tax_year":"2028","tech":"solar","county":null,"mw":700.0,"mw_text":"com U Rockwall , TX 75087 Tab 4: Detailed Description of the Project Hollow Branch Creek Solar, LLC is a 700 MW AC hybrid solar energy generation and battery storage project","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1732/1732-madisonville-hollow-app.pdf","project_key":"HOLLOW BRANCH CREEK||solar|700.0","first_of_project":true},{"app":"1639","applicant":"Copperhead Solar, LLC","isd":"Marlin ISD","app_date":"09/08/2021","first_tax_year":"2024","tech":"solar","county":"Falls","mw":135.0,"mw_text":"Shaded Purple COPPERHEAD SOLAR, LLC Chapter 313 Application Marlin ISD TAB 7 Description of Qualified Investment Copperhead Solar, LLC proposes to construct a 135 MW ac (net capacity) Photovoltaic solar facility with associated battery storage that would be sited on land approximately 4 miles east n","cod":"December2023","doc":"https://assets.comptroller.texas.gov/ch313/1639/1639-marlin-copperhead-app.pdf","counties":["Falls"],"county_how":"application form","project_key":"COPPERHEAD||solar|135.0","first_of_project":true},{"app":"1430","applicant":"Enel Green Power Roseland Solar, LLC f/k/a Hecate Energy Roseland Solar, LLC","isd":"Mart ISD","app_date":"09/26/2019","first_tax_year":"2023","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1430/1430-mart-hecate-app.pdf","project_key":"ENEL GREEN ROSELAND||solar|None","first_of_project":true},{"app":"1964","applicant":"Gransolar Texas Fifteen LLC","isd":"Mart ISD","app_date":"05/24/2022","first_tax_year":"2028","tech":"solar","county":"Limestone","mw":180.55,"mw_text":"Gransolar Texas Fifteen LLC is a 180.55 MW/AC solar energy generation project that will be located within a proposed reinvestment zone in Limestone County and Mart Independent School District","cod":"November30,2027","doc":"https://assets.comptroller.texas.gov/ch313/1964/1964-mart-gransolar-app.pdf","counties":["Limestone"],"county_how":"application form","project_key":"GRANSOLAR FIFTEEN||solar|180.55","first_of_project":true},{"app":"1958","applicant":"Lavender Solar LLC","isd":"Mart ISD","app_date":"05/24/2022","first_tax_year":"2027","tech":"solar","county":"Limestone","mw":180.0,"mw_text":"KB ENERGY LLC TO MART ISD Lavender Solar LLC CHAPTER 313 APPLICATION MART ISD Tab 7 Description of Qualified Investment Lavender Solar LLC plans to construct a 180 MW solar farm with 100 MW of BESS which will be interconnected to Brazos Electric Cooperative in Limestone County in Mart ISD","cod":"4Q2026","doc":"https://assets.comptroller.texas.gov/ch313/1958/1958-mart-lavender-app.pdf","counties":["Limestone"],"county_how":"application form","project_key":"LAVENDER||solar|180.0","first_of_project":true},{"app":"1312","applicant":"Prairie Hill Wind Project, LLC","isd":"Mart ISD","app_date":"11/16/2018","first_tax_year":"2021","tech":"wind","county":"Limestone","mw":300.0,"mw_text":"Prairie Hill Wind Project, LLC anticipates that the project will have a capacity of approximately 300 megawatts (MW), comprised of 110 wind turbines with a nameplate generating capacity rating of 2","cod":"December2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1312/1312-mart-prairie-app.pdf","counties":["Limestone","McLennan"],"county_how":"application description","eia":{"id":63100,"n":"Prairie Hill Wind Project","st":"operating"},"project_key":"PRAIRIE HILL||wind|300.0","first_of_project":true},{"app":"1736","applicant":"True North Solar, LLC","isd":"Mart ISD","app_date":"03/24/2022","first_tax_year":"2025","tech":"solar","county":"Falls","mw":240.0,"mw_text":"The Applicant proposes to construct a 240 MW solar farm to be located in the reinvestment zone and project boundary within Mart ISD and Falls County","cod":"Q42024","doc":"https://assets.comptroller.texas.gov/ch313/1736/1736-mart-true-app.pdf","counties":["Falls"],"county_how":"application form","eia":{"id":65998,"n":"True North Solar, LLC","st":"operating"},"project_key":"TRUE NORTH||solar|240.0","first_of_project":true},{"app":"1992","applicant":"Charter Oak Solar, LLC","isd":"Mathis ISD","app_date":"05/25/2022","first_tax_year":"2028","tech":"solar","county":"Live Oak","mw":320.0,"mw_text":"The proposed Project is anticipated to have a total power generation capacity of 320 MW ac and 160 MW of one-hour battery storage, all of which will be located in Mathis ISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1992/1992-mathis-charter-app.pdf","counties":["Live Oak"],"county_how":"application form","project_key":"CHARTER OAK||solar|320.0","first_of_project":true},{"app":"1492","applicant":"El Algodon Alto Wind Farm, LLC","isd":"Mathis ISD","app_date":"05/19/2020","first_tax_year":"2022","tech":"wind","county":null,"mw":200.0,"mw_text":"El Algodon Alto Wind Farm, LLC is a 200 MW/AC wind energy generation facility that will feature in total approximately 91 wind turbines","cod":"December31,2021","doc":"https://assets.comptroller.texas.gov/ch313/1492/1492-mathis-el-app.pdf","project_key":"ALGODON ALTO||wind|200.0","first_of_project":true},{"app":"1178","applicant":"Karankawa Wind, LLC f/k/a Pacific Wind Development, LLC","isd":"Mathis ISD","app_date":"03/01/2017","first_tax_year":"2020","tech":"wind","county":null,"mw":200.0,"mw_text":"escription of Scope of Proposed Project Applicant proposes to construct an wind-powered electric generation facility with a nameplate capacity of approximately 200 megawatts","cod":"4Q2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1178/1178-mathis-pacific-app.pdf","project_key":"KARANKAWA||wind|200.0","first_of_project":true},{"app":"1082","applicant":"CED Upton County Solar, LLC","isd":"Mccamey ISD","app_date":"07/02/2015","first_tax_year":"2017","tech":"solar","county":"Upton","mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1082/mccamey-1082-pv-app.pdf","counties":["Upton"],"county_how":"applicant name","project_key":"CED UPTON COUNTY||solar|None","first_of_project":true},{"app":"1300","applicant":"Roadrunner Solar Project, LLC, and Enel Green Power Roadrunner Solar Project II","isd":"Mccamey ISD","app_date":"10/05/2018","first_tax_year":"2020","tech":"solar","county":null,"mw":400.0,"mw_text":"Roadrunner Solar Project, LLC is a two-phased solar project that upon completion will be a 400 MW AC generating facility","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1300/mccamey-1300-roadrunner-app.pdf","project_key":"ROADRUNNER||solar|400.0","first_of_project":true},{"app":"1073","applicant":"Upton County Solar 2, LLC f/k/a SPD-SolarTexas2 LLC","isd":"Mccamey ISD","app_date":"12/29/2014","first_tax_year":"2017","tech":"solar","county":"Upton","mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1073/mccamey-1073-spd-app.pdf","counties":["Upton"],"county_how":"applicant name","project_key":"UPTON COUNTY|2|solar|None","first_of_project":true},{"app":"1700","applicant":"Caprock Solar, LLC","isd":"Meadow ISD","app_date":"02/11/2022","first_tax_year":"2028","tech":"solar","county":"Terry","mw":100.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 100MW located in Meadow ISD","cod":"D ec emb er 2027","doc":"https://assets.comptroller.texas.gov/ch313/1700/1700-meadow-caprock-app.pdf","counties":["Terry"],"county_how":"application form","project_key":"CAPROCK||solar|100.0","first_of_project":true},{"app":"1699","applicant":"Sundown Wind, LLC","isd":"Meadow ISD","app_date":"02/11/2022","first_tax_year":"2028","tech":"wind","county":null,"mw":100.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 100 MW located in Meadow ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1699/1699-meadow-sundown-app.pdf","project_key":"SUNDOWN||wind|100.0","first_of_project":true},{"app":"331","applicant":"Miami Wind I, LLC","isd":"Miami ISD","app_date":"08/06/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/331/Miami-ISD-No331-Miami-Wind-I-LLC-Revised-SceduleC-supplemental-material-to-app.pdf","project_key":"MIAMI|1|wind|None","first_of_project":false},{"app":"1718","applicant":"Pioneer Hutt Wind Energy LLC","isd":"Midland ISD","app_date":"02/28/2022","first_tax_year":"2024","tech":"wind","county":"Midland","mw":141.0,"mw_text":"com U Ro ckw al l, TX 75087 Tab 4: Detailed Description of the Project Pioneer Hutt Wind Energy LLC is a 141 MW wind electric generation facility that will be located in southeastern Midland County in Midland Independent School District","cod":"December31,2023","doc":"https://assets.comptroller.texas.gov/ch313/1718/1718-midland-pioneer-app.pdf","counties":["Midland"],"county_how":"application form","eia":{"id":66531,"n":"Pioneer Hutt Wind Energy","st":"operating"},"project_key":"PIONEER HUTT||wind|141.0","first_of_project":true},{"app":"320","applicant":"Shannon Wind, LLC f/k/a Horn Wind, LLC and its Affiliates South Clay Wind Farm, LLC and Shannon-1 Wind Farm, LLC","isd":"Midway ISD","app_date":"07/25/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/320/320-Midway-ISD-Horn-Wind-LLC-2015-Application.pdf","project_key":"SHANNON||wind|None","first_of_project":true},{"app":"1635","applicant":"Milano Solar, LLC","isd":"Milano ISD","app_date":"08/27/2021","first_tax_year":"2028","tech":"solar","county":"Milam","mw":200.0,"mw_text":"Milano Solar LLC was formed by Electerra to develop the existing project assets for the Milano Solar Project and to fund the development of at least a 200 MW name plate capacity utility-scale solar project","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1635/1635-milano-milano-app.pdf","counties":["Milam"],"county_how":"application description","project_key":"MILANO||solar|200.0","first_of_project":true},{"app":"1735","applicant":"Armadillo Solar Center, LLC","isd":"Mildred ISD","app_date":"03/22/2022","first_tax_year":"2025","tech":"solar","county":"Navarro","mw":200.0,"mw_text":"Tab Item 7 Description of Qualified Investment Armadillo Solar Center, LLC plans to construct a 200 MW solar farm (the \"Project\") in Navarro County","cod":"Q42024","doc":"https://assets.comptroller.texas.gov/dat/ch313/1735/1735-mildred-armadillo-app.pdf","counties":["Navarro"],"county_how":"application form","eia":{"id":64349,"n":"Armadillo Solar Center","st":"planned"},"project_key":"ARMADILLO||solar|200.0","first_of_project":true},{"app":"1486","applicant":"Roadrunner Crossing Wind Farm, LLC","isd":"Moran ISD","app_date":"04/13/2020","first_tax_year":"2025","tech":"wind","county":"Callahan","mw":null,"mw_text":null,"cod":"December 31, 2021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1486/1486-moranisd-roadrunner-app.pdf","counties":["Callahan"],"county_how":"application description","project_key":"ROADRUNNER CROSSING||wind|None","first_of_project":true},{"app":"1892","applicant":"Roaring Springs Solar LLC f/k/a Stetson Renewables Holdings, LLC","isd":"Motley County ISD","app_date":"05/17/2022","first_tax_year":"2026","tech":"solar","county":"Motley","mw":250.0,"mw_text":"Stetson Renewables Holdings, LLC a 250 MW/AC solar energy generation project","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1892/1892-motley-stetson-app.pdf","counties":["Motley"],"county_how":"application form","eia":{"id":68458,"n":"Roaring Springs, LLC","st":"operating"},"project_key":"ROARING SPRINGS||solar|250.0","first_of_project":true},{"app":"1457","applicant":"Hubbard Wind, LLC","isd":"Mount Calm ISD","app_date":"12/18/2019","first_tax_year":"2022","tech":"wind","county":null,"mw":302.7,"mw_text":"Hubbard Wind, LLC is a 302.7 MW/AC electric generating wind facility","cod":"January1,2022","doc":"https://assets.comptroller.texas.gov/ch313/1457/1457-mount-hubbard-app.pdf","project_key":"HUBBARD||wind|302.7","first_of_project":false},{"app":"1596","applicant":"Waco Solar, LLC","isd":"Mount Calm ISD","app_date":"04/28/2021","first_tax_year":"2024","tech":"solar","county":"Limestone","mw":128.0,"mw_text":"Waco Solar, LLC is a 128 MW/AC solar energy generation project","cod":"December31,2022","doc":"https://assets.comptroller.texas.gov/ch313/1596/1596-mount-waco-app.pdf","counties":["Limestone"],"county_how":"application form","eia_candidates":[{"id":65762,"n":"Waco Solar","st":"operating"},{"id":67354,"n":"Waco Solar II","st":"planned"}],"project_key":"WACO||solar|128.0","first_of_project":true},{"app":"374","applicant":"Muenster Wind Farm, LLC","isd":"Muenster ISD","app_date":"11/25/2013","first_tax_year":"2015","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/374/374-Muenster-ISD-Muenster-Wind-Farm-2014-Application.pdf","project_key":"MUENSTER||wind|None","first_of_project":true},{"app":"1394","applicant":"Wildcat Creek Wind Farm, LLC","isd":"Muenster ISD","app_date":"07/10/2019","first_tax_year":"2022","tech":"wind","county":"Cooke","mw":118.0,"mw_text":"RM LLC TO MUENSTER ISD Wildcat Creek Wind Farm LLC Chapter 313 Application to Muenster ISD TAB#6 Other School District Information The Applicant estimates that 118 megawatts of the estimated 180 megawatts of the project will be located in Era ISD","cod":"Q4 2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1394/1394-muenster-wildcat-app.pdf","counties":["Cooke"],"county_how":"application description","eia":{"id":62715,"n":"Wildcat Creek Wind Farm LLC","st":"operating"},"project_key":"WILDCAT CREEK||wind|118.0","first_of_project":true},{"app":"1608","applicant":"Sunbuddie Solar Energy LLC","isd":"Muleshoe ISD","app_date":"05/26/2021","first_tax_year":"2025","tech":"solar","county":null,"mw":100.0,"mw_text":"praised Value Limitation on Qualified Property To Muleshoe ISD Tab #4 Detailed Description of Project Sunbuddie Solar Energy LLC proposes constructing an up to 100MW solar electric generation facility on up to 1,500 acres of privately-owned land in Lamb and Bailey Counties","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1608/1608-muleshoe-sunbuddie-app.pdf","project_key":"SUNBUDDIE||solar|100.0","first_of_project":true},{"app":"337","applicant":"Logan's Gap Wind I, LLC","isd":"Mullin ISD","app_date":"08/12/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/337/337-Mullin-ISD-Logans-Gap-Wind-2014-Application.pdf","project_key":"LOGAN GAP|1|wind|None","first_of_project":false},{"app":"1064","applicant":"Horse Creek Wind, LLC","isd":"Munday Cisd","app_date":"04/10/2015","first_tax_year":"2017","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1064/1064-munday-horse-app.pdf","project_key":"HORSE CREEK||wind|None","first_of_project":false},{"app":"1784","applicant":"Castro Solar One, LLC","isd":"Nazareth ISD","app_date":"04/19/2022","first_tax_year":"2025","tech":"solar","county":"Castro","mw":223.0,"mw_text":"Tab 5 Documentation to Assist in Determining if Limitation is a Determining Factor Summary Castro Solar one LLC is a planned approximately 223 MW ac solar photovoltaic power plant to be located in the Southern region of the Texas Panhandle near Nazareth in Castro County, Texas","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1784/1784-nazareth-castro-app.pdf","counties":["Castro"],"county_how":"application form","project_key":"CASTRO ONE||solar|223.0","first_of_project":true},{"app":"1393","applicant":"AP Solar 2, LLC","isd":"Needville ISD","app_date":"07/08/2019","first_tax_year":"2023","tech":"solar","county":"Fort Bend","mw":350.0,"mw_text":"The Applicant proposes to construct approximately 350MWac utility-scale solar (photovoltaic) field to be located on up to 2,642 acres in Fort Bend County","cod":"QTR22021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1393/1393-needville-apsolar2-app.pdf","counties":["Fort Bend"],"county_how":"application description","project_key":"AP Solar 2, LLC|2|solar|350.0","first_of_project":true},{"app":"1468","applicant":"Old 300 Solar Center, LLC","isd":"Needville ISD","app_date":"02/25/2020","first_tax_year":"2022","tech":"solar","county":null,"mw":400.0,"mw_text":"Tab Item 7 Description of Qualified Investment Old 300 Solar Center, LLC plans to construct a 400 MW solar farm (the \"Project\") in Fort Bend County","cod":"Q12022","doc":"https://assets.comptroller.texas.gov/ch313/1468/1468-needville-old-app.pdf","project_key":"OLD||solar|400.0","first_of_project":true},{"app":"2014","applicant":"Red River Bend Solar, LLC","isd":"New Boston ISD","app_date":"05/27/2022","first_tax_year":"2028","tech":"solar","county":"Bowie","mw":150.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 150MW located in New Boston ISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/2014/2014-new-red-app.pdf","counties":["Bowie"],"county_how":"application form","project_key":"RED RIVER BEND||solar|150.0","first_of_project":true},{"app":"1633","applicant":"Young Wind, LLC","isd":"Newcastle ISD","app_date":"08/25/2021","first_tax_year":"2023","tech":"wind","county":"Young","mw":356.0,"mw_text":"Three Hundred Fifty Six (356 MW) will be in Newcastle ISD","cod":"Q4, 2022","doc":"https://assets.comptroller.texas.gov/ch313/1633/1633-newcastle-young-app.pdf","counties":["Young"],"county_how":"application form","project_key":"YOUNG||wind|356.0","first_of_project":true},{"app":"1618","applicant":"Hoke Solar Project, LLC f/k/a Brush Country Solar Project, LLC","isd":"Nixon-Smiley Cisd","app_date":"06/30/2021","first_tax_year":"2024","tech":"solar","county":"Gonzales","mw":100.0,"mw_text":"The Applicant, Brush Country Solar Project, LLC, plans to construct an estimated 100 MWac photovoltaic solar energy facility with an additional 30 MWac battery storage facility within Gonzales County, located within Nixon-Smiley Consolidated Independent School District territory","cod":"Q42023","doc":"https://assets.comptroller.texas.gov/ch313/1618/1618-nixon-brush-app.pdf","counties":["Gonzales"],"county_how":"application form","project_key":"HOKE||solar|100.0","first_of_project":true},{"app":"1746","applicant":"Hollow Branch Creek Solar, LLC","isd":"Normangee ISD","app_date":"03/29/2022","first_tax_year":"2028","tech":"solar","county":null,"mw":700.0,"mw_text":"Tab 4: Detailed Description of the Project In its entirety, Hollow Branch Creek Solar LLC is a 700 MW AC hybrid solar energy generation and battery storage project","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1746/1746-normangee-hollow-app.pdf","project_key":"HOLLOW BRANCH CREEK||solar|700.0","first_of_project":false},{"app":"2008","applicant":"Savannah Oaks Solar Project, LLC","isd":"Normangee ISD","app_date":"05/27/2022","first_tax_year":"2029","tech":"solar","county":"Madison","mw":200.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 200MW all of which will be located in Normangee ISD","cod":"December2028","doc":"https://assets.comptroller.texas.gov/ch313/2008/2008-normangee-savannah-app.pdf","counties":["Madison"],"county_how":"application form","project_key":"SAVANNAH OAKS||solar|200.0","first_of_project":true},{"app":"1712","applicant":"Mockingbird Solar Center, LLC","isd":"North Lamar ISD","app_date":"02/23/2022","first_tax_year":"2025","tech":"solar","county":"Lamar","mw":162.0,"mw_text":"4% 162 MWac Tab Item 7 Description of Qualified Investment Mockingbird Solar Center, LLC plans to construct a solar project that has an installed capacity of 162 MWac in North Lamar ISD","cod":"Q42023","doc":"https://assets.comptroller.texas.gov/ch313/1712/1712-north-mockingbird-app.pdf","counties":["Lamar"],"county_how":"application form","eia":{"id":64347,"n":"Mockingbird Solar Center","st":"operating"},"project_key":"MOCKINGBIRD||solar|162.0","first_of_project":false},{"app":"1733","applicant":"Savannah Oaks Solar Project, LLC","isd":"North Zulch ISD","app_date":"03/18/2022","first_tax_year":"2029","tech":"solar","county":"Madison","mw":230.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 230MW all of which will be located in North Zulch ISD","cod":"December2028","doc":"https://assets.comptroller.texas.gov/ch313/1733/1733-north-savannah-app.pdf","counties":["Madison"],"county_how":"application form","project_key":"SAVANNAH OAKS||solar|230.0","first_of_project":true},{"app":"229","applicant":"Blue Summit Wind, LLC","isd":"Northside ISD","app_date":"05/17/2012","first_tax_year":"2013","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/229/229_Northside_ISD_Blue_Summit_Wind_2013_Application.pdf","project_key":"BLUE SUMMIT||wind|None","first_of_project":false},{"app":"196","applicant":"Wind Tex Energy - Stephens, LLC","isd":"O'Donnell ISD","app_date":"08/16/2011","first_tax_year":"2012","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/196/196-ODonnell-ISD-WindTex-Amended-313-Application-Submitted-5-25-12.pdf","project_key":"TEX STEPHENS||wind|None","first_of_project":true},{"app":"1674","applicant":"Bar C Solar, LLC","isd":"Oakwood ISD","app_date":"12/01/2021","first_tax_year":"2024","tech":"solar","county":"Freestone","mw":200.0,"mw_text":"The project will be capable of generating approximately 200 MWac and will cover a surface area approximately 1,500 acres","cod":"12/31/2023","doc":"https://assets.comptroller.texas.gov/ch313/1674/1674-oakwood-barc-app.pdf","counties":["Freestone"],"county_how":"application form","project_key":"BAR||solar|200.0","first_of_project":true},{"app":"1870","applicant":"Misae Solar IV LLC","isd":"Oakwood ISD","app_date":"05/13/2022","first_tax_year":"2026","tech":"solar","county":"Leon","mw":218.4,"mw_text":"The proposed project will have a total estimated nameplate capacity of 218.4 megawatts (MW) alternating current (AC), all of which will be located within Oakwood ISD","cod":"Q42025","doc":"https://assets.comptroller.texas.gov/dat/ch313/1870/1870-oakwoodisd-misae-app.pdf","counties":["Leon"],"county_how":"application form","eia":{"id":70052,"n":"Misae Solar IV LLC","st":"operating"},"project_key":"MISAE|4|solar|218.4","first_of_project":true},{"app":"1506","applicant":"El Algodon Alto Wind Farm, LLC","isd":"Odem-Edroy ISD","app_date":"05/22/2020","first_tax_year":"2022","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":"December31,2021","doc":"https://assets.comptroller.texas.gov/ch313/1506/1506-odem-elalgodon-app.pdf","project_key":"ALGODON ALTO||wind|200.0","first_of_project":false},{"app":"173","applicant":"Trinity Hills Wind Farm f/k/a BP Wind Energy NA Inc.","isd":"Olney ISD","app_date":"07/26/2010","first_tax_year":"2011","tech":"wind","county":null,"mw":225.0,"mw_text":"The wind farm will have a capacity of 225 megawatts","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/173/OlneyISDno173_BP_Wind_Application.pdf","project_key":"TRINITY HILLS||wind|225.0","first_of_project":true},{"app":"1607","applicant":"Enbridge Solar (Orange Grove), LLC f/k/a Talitha Energy Project, LLC","isd":"Orange Grove ISD","app_date":"05/26/2021","first_tax_year":"2025","tech":"solar","county":"Jim Wells","mw":130.0,"mw_text":"he full project is expected to have approximately 337,000 panels, 41 inverters, and 17 containers for BESS located in Jim Wells County with a total capacity of 130 MW (ac) along with 40MW of BESS","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1607/1607-orange-talitha-app.pdf","counties":["Jim Wells"],"county_how":"application description","project_key":"ENBRIDGE ORANGE GROVE||solar|130.0","first_of_project":true},{"app":"1813","applicant":"Thalia Solar, LLC","isd":"Paducah ISD","app_date":"04/26/2022","first_tax_year":"2028","tech":"solar","county":"Cottle","mw":252.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 252MW located in Paducah ISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1813/1813-paducah-thalia-app.pdf","counties":["Cottle"],"county_how":"application form","project_key":"THALIA||solar|252.0","first_of_project":true},{"app":"1481","applicant":"Azure Sky Solar Project, LLC","isd":"Paint Creek ISD","app_date":"03/26/2020","first_tax_year":"2022","tech":"solar","county":null,"mw":225.0,"mw_text":"Azure Sky Solar Project, LLC is a 225 MW/AC solar energy generation facility that will feature an additional 77 MW of battery storage","cod":"June1,2021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1481/1481-paintcreek-azure-app.pdf","project_key":"AZURE SKY||solar|225.0","first_of_project":true},{"app":"304","applicant":"Pattern Panhandle Wind 2 LLC","isd":"Panhandle ISD","app_date":"06/05/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/304/App-304-Panhandle-ISD-Pattern-Panhandle-Wind-2-LLC-Findings-of-Fact-Attachments.pdf","project_key":"PATTERN PANHANDLE|2|wind|None","first_of_project":true},{"app":"260","applicant":"Pattern Panhandle Wind, LLC","isd":"Panhandle ISD","app_date":"12/05/2012","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/260/AppISDno260-Panhandle-PatternPanhandleWindProject-Map-and-Schedules-Application-Material-Previously-Marked-Confidential.pdf","project_key":"PATTERN PANHANDLE||wind|None","first_of_project":true},{"app":"269","applicant":"Route 66 Wind Power, LLC","isd":"Panhandle ISD","app_date":"02/20/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/269/App 269-Panhandle-ISD-Route-66-Wind-Amendment-No-1-to-Agreement.pdf","project_key":"ROUTE|66|wind|None","first_of_project":false},{"app":"1698","applicant":"Hanson Solar, LLC","isd":"Panther Creek Cisd","app_date":"02/07/2022","first_tax_year":"2028","tech":"solar","county":null,"mw":396.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 396 MW located in Panther Creek CISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1698/1698-panther-hanson-app.pdf","project_key":"HANSON||solar|396.0","first_of_project":true},{"app":"1849","applicant":"Greenalia Solar Power Donegal, LLC f/k/a HE-Cottonwood Solar LLC","isd":"Patton Springs ISD","app_date":"05/09/2022","first_tax_year":"2026","tech":"solar","county":"Dickens","mw":204.2,"mw_text":"com U Ro ckw al l, TX 75087 Tab 4: Detailed Description of the Project HE-Cottonwood Solar, LLC is a 204.2 MW/AC solar electric generation facility that will be located in Dickens County within Patton Springs Independent School District","cod":"December, 2025","doc":"https://assets.comptroller.texas.gov/ch313/1849/1849-patton-he-app.pdf","counties":["Dickens"],"county_how":"application form","project_key":"GREENALIA DONEGAL||solar|204.2","first_of_project":true},{"app":"1462","applicant":"Helena Wind, LLC","isd":"Pawnee ISD","app_date":"01/15/2020","first_tax_year":"2023","tech":"wind","county":"Bee","mw":252.0,"mw_text":"The installed capacity ofthe proposed project is expected to be approximately 252 megawatts (MW)","cod":"Q2 2022","doc":"https://assets.comptroller.texas.gov/ch313/1462/1462-pawnee-helena-app.pdf","counties":["Bee"],"county_how":"application description","eia":{"id":63738,"n":"Helena Wind","st":"operating"},"project_key":"HELENA||wind|252.0","first_of_project":true},{"app":"1525","applicant":"Sparta Solar, LLC","isd":"Pawnee ISD","app_date":"09/09/2020","first_tax_year":"2024","tech":"solar","county":null,"mw":250.0,"mw_text":"Tab Item 7 Description of Qualified Investment Sparta Solar, LLC plans to construct a 250 MW solar farm (the \"Project\") in Bee County","cod":"07/01/2022","doc":"https://assets.comptroller.texas.gov/ch313/1525/1525-pawnee-sparta-app.pdf","project_key":"SPARTA||solar|250.0","first_of_project":true},{"app":"1389","applicant":"Elara Energy Project, LLC","isd":"Pearsall ISD","app_date":"07/01/2019","first_tax_year":"2022","tech":"other","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1389/pearsall-1389-elara-app.pdf","project_key":"ELARA||other|None","first_of_project":true},{"app":"1388","applicant":"Horizon Solar, LLC","isd":"Pearsall ISD","app_date":"07/01/2019","first_tax_year":"2023","tech":"solar","county":null,"mw":200.0,"mw_text":"The proposed Project will include, but is not limited to, the following: \ufffd Planned up to 200 MW-AC in size; \ufffd Photovoltaic (PV) modules; \ufffd DC-to-AC inverters; \ufffd Medium and high-voltage electric cabling; \ufffd Tracker racking system (mounting structures); \ufffd Project substation which will include a high-vo","cod":"Q42022","doc":"https://assets.comptroller.texas.gov/dat/ch313/1388/1388-pearsall-horizon-app.pdf","project_key":"HORIZON||solar|200.0","first_of_project":true},{"app":"1716","applicant":"Morrow Lake Solar, LLC","isd":"Pearsall ISD","app_date":"02/25/2022","first_tax_year":"2025","tech":"solar","county":"Frio","mw":200.0,"mw_text":"Morrow Lake Solar, LLC is a 200 MW/AC solar energy generation project with an additional 200 MW battery energy storage system","cod":"September30,2024","doc":"https://assets.comptroller.texas.gov/ch313/1716/1716-pearsall-morrow-app.pdf","counties":["Frio"],"county_how":"application form","eia":{"id":66775,"n":"Morrow Lake Solar","st":"operating"},"project_key":"MORROW LAKE||solar|200.0","first_of_project":true},{"app":"1824","applicant":"DBR Solar, LLC","isd":"Pecos-Barstow-Toyah ISD","app_date":"04/29/2022","first_tax_year":"2028","tech":"solar","county":"Reeves","mw":250.0,"mw_text":"DBR Solar, LLC is a 250 MW/AC solar energy generation project that will be located within a proposed reinvestment zone in Reeves County and Pecos-Barstow-Toyah Independent School District","cod":"January1, 2027","doc":"https://assets.comptroller.texas.gov/ch313/1824/1824-pecos-dbr-app.pdf","counties":["Reeves"],"county_how":"application form","project_key":"DBR||solar|250.0","first_of_project":true},{"app":"1189","applicant":"West of the Pecos Solar, LLC","isd":"Pecos-Barstow-Toyah ISD","app_date":"05/10/2017","first_tax_year":"2020","tech":"solar","county":"Reeves","mw":100.0,"mw_text":"d Investment West of the Pecos, LLC anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 100 MW","cod":"October2018","doc":"https://assets.comptroller.texas.gov/dat/ch313/1189/1189-pecos-west-app.pdf","counties":["Reeves"],"county_how":"application description","eia":{"id":62415,"n":"West of the Pecos Solar","st":"operating"},"project_key":"WEST PECOS||solar|100.0","first_of_project":true},{"app":"1843","applicant":"Ash Creek Solar LLC","isd":"Penelope ISD","app_date":"05/05/2022","first_tax_year":"2026","tech":"solar","county":"Hill","mw":478.84,"mw_text":"The Applicant, Ash Creek Solar LLC is a 478.84 MW/AC solar electric generation facility with a 306 MW/AC battery storage system","cod":"December1,2025","doc":"https://assets.comptroller.texas.gov/ch313/1843/1843-penelope-ash-app.pdf","counties":["Hill"],"county_how":"application form","eia":{"id":66774,"n":"Ash Creek Solar","st":"operating"},"project_key":"ASH CREEK||solar|478.84","first_of_project":true},{"app":"293","applicant":"Keechi Wind, LLC","isd":"Perrin-Whitt Cisd","app_date":"06/04/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/293/App-293-Perrin-Whitt-CISD-Keechi-Wind-LLC-Economic-Impact-and-Recommendation-Package.pdf","project_key":"KEECHI||wind|None","first_of_project":false},{"app":"321","applicant":"Palo Duro Wind Energy, LLC","isd":"Perryton ISD","app_date":"07/29/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/321/App-321-Palo-Duro-Wind-Perryton-ISD-Attach-20-Revised-Schedule-D-9-26-13.pdf","project_key":"PALO DURO||wind|None","first_of_project":true},{"app":"1134","applicant":"Southwestern Public Service Company f/k/a Hale Petersburg Wind, LLC f/k/a Hale Wind Energy, LLC","isd":"Petersburg ISD","app_date":"04/15/2016","first_tax_year":"2019","tech":"wind","county":"Hale","mw":478.0,"mw_text":"Once operational, this project will be capable of generating up to 478MW","cod":"Q42017","doc":"https://assets.comptroller.texas.gov/dat/ch313/1134/1134-petersburg-hale-app.pdf","counties":["Hale"],"county_how":"application description","project_key":"SOUTHWESTERN PUBLIC SERVICE COMPANY||wind|478.0","first_of_project":true},{"app":"1707","applicant":"Hecate Energy Hazel LLC","isd":"Petrolia Cisd","app_date":"02/21/2022","first_tax_year":"2028","tech":"solar","county":"Clay","mw":614.0,"mw_text":"IA CISD Hecate Energy Hazel LLC Chapter 313 Application Petrolia CISD TAB 7 Description of Qualified Investment Hecate Energy Hazel LLC proposes to construct a 614 MW ac (net capacity) Photovoltaic solar facility and Battery Energy Storage System (BESS) that would be sited in Clay County","cod":"Q42027","doc":"https://assets.comptroller.texas.gov/ch313/1707/1707-petrolia-hecate-app.pdf","counties":["Clay"],"county_how":"application form","project_key":"HECATE HAZEL||solar|614.0","first_of_project":true},{"app":"1453","applicant":"Delilah Solar Energy, LLC","isd":"Prairiland ISD","app_date":"12/17/2019","first_tax_year":"2024","tech":"solar","county":"Lamar","mw":250.0,"mw_text":"Energy LLC Chapter 313 Application to Prairiland ISD CHECKLIST ITEM #4 Detailed Description of Project Delilah Solar Energy LLC proposes constructing an up to 250 MW solar electric generation facility on up to 7,305 acres of privately-owned land in Red River County and Lamar County","cod":"Q42022","doc":"https://assets.comptroller.texas.gov/ch313/1453/1453-pairiland-delilah-app.pdf","counties":["Lamar"],"county_how":"application description","project_key":"DELILAH||solar|250.0","first_of_project":true},{"app":"1288","applicant":"Impact Solar 1, LLC f/k/a G.S.E. Twelve, LLC","isd":"Prairiland ISD","app_date":"08/28/2018","first_tax_year":"2020","tech":"solar","county":null,"mw":250.0,"mw_text":"Impact Solar, LLC is a 250 MW solar electric generating facility, that when established will provide 10, full-time salary competitive jobs","cod":"January2021","doc":"https://assets.comptroller.texas.gov/ch313/1288/prairiland-1288-impact-app.pdf","project_key":"IMPACT|1|solar|250.0","first_of_project":true},{"app":"1474","applicant":"Paris Farm Solar, LLC","isd":"Prairiland ISD","app_date":"03/05/2020","first_tax_year":"2024","tech":"solar","county":null,"mw":200.0,"mw_text":"The Project will be capable of generating approximately 200 MWac and will cover a surface lease of approximately 1,600 acres","cod":"Q42022","doc":"https://assets.comptroller.texas.gov/ch313/1474/1474-prairiland-paris-app.pdf","project_key":"PARIS||solar|200.0","first_of_project":true},{"app":"1371","applicant":"Samson Solar Energy II, LLC","isd":"Prairiland ISD","app_date":"05/14/2019","first_tax_year":"2026","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1371/prairiland-1371-samson-app.pdf","project_key":"SAMSON|2|solar|None","first_of_project":true},{"app":"1370","applicant":"Samson Solar Energy III, LLC","isd":"Prairiland ISD","app_date":"05/14/2019","first_tax_year":"2022","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1370/prairiland-1370-samson-app.pdf","project_key":"SAMSON|3|solar|None","first_of_project":true},{"app":"1328","applicant":"Samson Solar Energy, LLC","isd":"Prairiland ISD","app_date":"01/15/2019","first_tax_year":"2022","tech":"solar","county":null,"mw":500.0,"mw_text":"tation on Qualified Property to Prairiland ISD CHECKLIST ITEM #4 Detailed Description of Project Samson Solar Energy LLC proposes constructing an approximately 500 MW solar electric generation facility on privately-owned land in Lamar County","cod":"Q42022","doc":"https://assets.comptroller.texas.gov/dat/ch313/1328/1328-prairiland-samson-app.pdf","project_key":"SAMSON||solar|500.0","first_of_project":true},{"app":"1954","applicant":"SGT Hoskins Solar Project, LLC","isd":"Prairiland ISD","app_date":"05/23/2022","first_tax_year":"2028","tech":"solar","county":null,"mw":200.0,"mw_text":"The Applicant, SGT Hoskins Solar Project, LLC is a 200 MW AC (Megawatts AC) hybrid solar energy generation and 100 MW battery storage project","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1954/1954-prairilandisd-sgt-app.pdf","project_key":"SGT HOSKINS||solar|200.0","first_of_project":true},{"app":"1140","applicant":"Flat Top Wind I, LLC","isd":"Priddy ISD","app_date":"06/21/2016","first_tax_year":"2019","tech":"wind","county":"Mills","mw":200.0,"mw_text":"Flat Top Wind I, LLC anticipates that the Project will have a capacity of between 150 and 200 megawatts (MW), comprised of 50 to 100 wind turbines with a nameplate generating capacity rating of 2","cod":"Q42017","doc":"https://assets.comptroller.texas.gov/ch313/1140/priddy-1140-flattop-app.pdf","counties":["Mills"],"county_how":"application description","eia":{"id":61212,"n":"Flat Top Wind I","st":"operating"},"project_key":"FLAT TOP|1|wind|200.0","first_of_project":true},{"app":"1505","applicant":"Priddy Wind Project, LLC","isd":"Priddy ISD","app_date":"07/23/2020","first_tax_year":"2022","tech":"wind","county":"Mills","mw":300.0,"mw_text":"IDDY ISD PRIDDY WIND PROJECT, LLC Chapter 313 Application Priddy ISD TAB 7 Description of Qualified Investment Priddy Wind Project, LLC proposes to construct a 300MW ac (net capacity) Wind turbine facility that would be sited on approximately 35,240 acres of land between the towns of Goldthwaite, TX","cod":"December31,2021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1505/1505-priddyisd-priddy-app.pdf","counties":["Mills"],"county_how":"application description","eia":{"id":64165,"n":"Priddy Wind Project","st":"operating"},"project_key":"PRIDDY||wind|300.0","first_of_project":false},{"app":"1245","applicant":"Blue Summit III Wind, LLC","isd":"Quanah ISD","app_date":"04/02/2018","first_tax_year":"2020","tech":"wind","county":null,"mw":55.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 55 MW located in Quanah ISD","cod":"December2018","doc":"https://assets.comptroller.texas.gov/dat/ch313/1245/1245-quanah-blue-app.pdf","project_key":"BLUE SUMMIT|3|wind|55.0","first_of_project":true},{"app":"1810","applicant":"Taabe Solar, LLC","isd":"Quanah ISD","app_date":"04/26/2022","first_tax_year":"2028","tech":"solar","county":"Hardeman","mw":800.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 800MW located in Quanah ISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1810/1810-quanah-taabe-app2.pdf","counties":["Hardeman"],"county_how":"application form","project_key":"TAABE||solar|800.0","first_of_project":true},{"app":"1445","applicant":"Appaloosa Run Wind, LLC f/k/a Appaloosa Run Renewable Energy Project, LLC","isd":"Rankin ISD","app_date":"11/12/2019","first_tax_year":"2023","tech":"wind","county":"Upton","mw":175.0,"mw_text":"nstruct the wind farm, Tri Global will install wind turbines, collection lines, and transmission lines all within Rankin ISD that will have a rated capacity of 175 MW (the \"Appaloosa Run Project\")","cod":"October2021","doc":"https://assets.comptroller.texas.gov/ch313/1445/1445-rankin-appaloosa-app.pdf","counties":["Upton"],"county_how":"application description","eia":{"id":65335,"n":"Appaloosa Run Wind","st":"operating"},"project_key":"APPALOOSA RUN||wind|175.0","first_of_project":true},{"app":"1237","applicant":"High Lonesome Wind Power, LLC","isd":"Rankin ISD","app_date":"02/15/2018","first_tax_year":"2020","tech":"wind","county":"Crockett","mw":155.0,"mw_text":", LLC Chapter 313 Application to Rankin ISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment High Lonesome Wind Power, LLC plans to construct a 155 MW up to 183 MW wind farm in Upton County","cod":"December2019","doc":"https://assets.comptroller.texas.gov/ch313/1237/rankin-1237-high-app.pdf","counties":["Crockett"],"county_how":"application description","project_key":"HIGH LONESOME||wind|155.0","first_of_project":true},{"app":"206","applicant":"Magic Valley Wind Farm I, LLC","isd":"Raymondville ISD","app_date":"10/11/2011","first_tax_year":"2012","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/206/206_Raymondville_Magic_Valley_Farm_I_2012_Application.pdf","project_key":"MAGIC VALLEY|1|wind|None","first_of_project":false},{"app":"1103","applicant":"Santa Rita Wind Energy, LLC","isd":"Reagan County ISD","app_date":"09/17/2015","first_tax_year":"2018","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1103/1103-reagan-santarita-app.pdf","project_key":"SANTA RITA||wind|None","first_of_project":true},{"app":"1697","applicant":"Opuntia Solar, LLC","isd":"Refugio ISD","app_date":"02/02/2022","first_tax_year":"2028","tech":"solar","county":"Refugio","mw":100.0,"mw_text":"LLC TO REFUGIO ISD OPUNTIA SOLAR, LLC Chapter 313 Application Refugio ISD TAB 7 Description of Qualified Investment Opuntia Solar, LLC proposes to construct a 100MW ac (net capacity) Photovoltaic solar facility with attached battery storage that would be sited on land approximately 20 miles northeas","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1697/1697-refugio-opuntia-app.pdf","counties":["Refugio"],"county_how":"school district name","project_key":"OPUNTIA||solar|100.0","first_of_project":true},{"app":"1426","applicant":"Enel Green Power Roseland Solar, LLC f/k/a Hecate Energy Roseland Solar, LLC","isd":"Riesel ISD","app_date":"09/18/2019","first_tax_year":"2023","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1426/1426-reisel-ecate-app.pdf","project_key":"ENEL GREEN ROSELAND||solar|None","first_of_project":false},{"app":"373","applicant":"Duke Energy Renewables Wind, LLC","isd":"Rio Grande City Cisd","app_date":"11/21/2013","first_tax_year":"2015","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/373/App-373-Rio-Grande-City-CISD-Duke-Energy-Renewables-Wind-LLC-Economic-Evaluation-and-Recommendation-Packet.pdf","project_key":"DUKE||wind|480.0","first_of_project":false},{"app":"395","applicant":"Hidalgo Wind Farm, LLC","isd":"Rio Grande City Cisd","app_date":"12/17/2013","first_tax_year":"2015","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/395/395-Rio-Grande-City-Hildalgo-Wind-2015-Application.pdf","project_key":"HIDALGO||wind|None","first_of_project":false},{"app":"1271","applicant":"Mesteno Windpower, LLC","isd":"Rio Grande City Cisd","app_date":"06/29/2018","first_tax_year":"2020","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1271/1271-rio-mesteno-app.pdf","project_key":"MESTENO WINDPOWER||wind|None","first_of_project":true},{"app":"202","applicant":"DEGS Wind I, LLC","isd":"Rio Hondo ISD","app_date":"08/03/2011","first_tax_year":"2012","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/202/202_Rio_Hondo_DEGS_Wind_I_2012_Application.pdf","project_key":"DEGS|1|wind|None","first_of_project":false},{"app":"1386","applicant":"Delilah Solar Energy II, LLC","isd":"Rivercrest ISD","app_date":"06/26/2019","first_tax_year":"2026","tech":"solar","county":null,"mw":200.0,"mw_text":"ised Value Limitation on Qualified Property To Rivercrest ISD Tab #4 Detailed Description of Project Delilah Solar Energy II LLC proposes constructing an up to 200 MW solar electric generation facility on up to 9,763 acres of privately-owned land in Red River County","cod":"Q42022","doc":"https://assets.comptroller.texas.gov/ch313/1386/rivercrest-1386-delilah-app.pdf","project_key":"DELILAH|2|solar|200.0","first_of_project":true},{"app":"1385","applicant":"Delilah Solar Energy, LLC","isd":"Rivercrest ISD","app_date":"06/26/2019","first_tax_year":"2024","tech":"solar","county":null,"mw":200.0,"mw_text":"praised Value Limitation on Qualified Property To Rivercrest ISD Tab #4 Detailed Description of Project Delilah Solar Energy LLC proposes constructing an up to 200 MW solar electric generation facility on up to 7,305 acres of privately-owned land in Red River County","cod":"Q42022","doc":"https://assets.comptroller.texas.gov/ch313/1385/rivercrest-1385-delilah-app.pdf","project_key":"DELILAH||solar|200.0","first_of_project":true},{"app":"1640","applicant":"Noria Hondo Solar, LLC","isd":"Riviera ISD","app_date":"09/08/2021","first_tax_year":"2027","tech":"solar","county":"Kleberg","mw":145.0,"mw_text":"O RIVIERA ISD NORIA HONDO SOLAR LLC Chapter 313 Application Riviera ISD TAB 7 Description of Qualified Investment Noria Hondo Solar LLC proposes to construct a 145 MW (AC) Photovoltaic solar facility and 75MW Battery Energy Storage System (BESS) that would be sited on approximately 2000 acres of lan","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1640/1640-riviera-noria-app.pdf","counties":["Kleberg"],"county_how":"application description","eia":{"id":65344,"n":"Noria Hondo Solar (Hybrid)","st":"planned"},"project_key":"NORIA HONDO||solar|145.0","first_of_project":true},{"app":"1296","applicant":"Aviator Wind, LLC f/k/a Grape Creek Wind, LLC","isd":"Robert Lee ISD","app_date":"09/25/2018","first_tax_year":"2021","tech":"wind","county":"Coke","mw":300.0,"mw_text":"In December 2012, Apex completed development and construction of the 300 MW Canadian Hills Wind project outside Oklahoma City, and in the past two years, Apex completed construction of five wind facilities and started construction on additional projects in Illinois, Texas, and Oklahoma","cod":"Q4 2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1296/1296-robert-grape-app.pdf","counties":["Coke"],"county_how":"application description","eia":{"id":63209,"n":"Aviator Wind","st":"operating"},"project_key":"AVIATOR||wind|300.0","first_of_project":true},{"app":"1910","applicant":"Hill Country Wind Power Mesquite Star Phase II, LLC","isd":"Roby Cisd","app_date":"05/19/2022","first_tax_year":"2028","tech":"wind","county":"Fisher","mw":650.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 650MW, 57% of which will be located in Roby CISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1910/1910-roby-hill-app.pdf","counties":["Fisher"],"county_how":"application form","project_key":"HILL COUNTRY MESQUITE STAR PHASE|2|wind|650.0","first_of_project":true},{"app":"1617","applicant":"Sandow Lakes Ranch Solar I, LLC","isd":"Rockdale ISD","app_date":"06/24/2021","first_tax_year":"2025","tech":"solar","county":"Milam","mw":385.0,"mw_text":"The Applicant, Sandow Lakes Ranch Solar I, LLC, plans to construct an estimated 385 MW ac (net capacity) Photovoltaic solar facility, approximately 934,173 PV panels and 110 solar inverters, within Milam County, located within Rockdale Independent School District territory","cod":"June2024","doc":"https://assets.comptroller.texas.gov/ch313/1617/1617-rockdale-sandowi-app.pdf","counties":["Milam"],"county_how":"application form","project_key":"SANDOW LAKES|1|solar|385.0","first_of_project":true},{"app":"1836","applicant":"Sandow Lakes Ranch Solar II, LLC","isd":"Rockdale ISD","app_date":"05/04/2022","first_tax_year":"2028","tech":"solar","county":"Milam","mw":214.0,"mw_text":"The Applicant, Sandow Lakes Ranch Solar II, LLC, seeks to construct a 214 MW ac, all of which will be located in Rockdale ISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1836/1836-rockdale-sandow-app.pdf","counties":["Milam"],"county_how":"application form","project_key":"SANDOW LAKES|2|solar|214.0","first_of_project":true},{"app":"1630","applicant":"Five Wells Solar Center LLC","isd":"Rogers ISD","app_date":"08/19/2021","first_tax_year":"2024","tech":"solar","county":"Bell","mw":342.0,"mw_text":"The Applicant, FIVE WELLS SOLAR CENTER LLC, seeks to construct a 342 MW (AC) Photovoltaic solar that would be sited on approximately 3,000 acres of land approximately 4 miles West of the city of Rogers in Bell County","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1630/1630-rogers-fivewells-app.pdf","counties":["Bell"],"county_how":"application description","eia":{"id":66420,"n":"Five Wells Solar Center - Hybrid","st":"operating"},"project_key":"FIVE WELLS||solar|342.0","first_of_project":true},{"app":"391","applicant":"Duke Energy Renewables Wind, LLC","isd":"Roma ISD","app_date":"12/03/2013","first_tax_year":"2015","tech":"wind","county":"Starr","mw":480.0,"mw_text":"y (per Application pg 8) Los Vientos III, IV, V Project will consist of a wind-powered electric generating facility with an operating capacity of approximately 480 megawatts","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/391/391-roma-duke-app.pdf","counties":["Starr"],"county_how":"application description","project_key":"DUKE||wind|480.0","first_of_project":true},{"app":"1212","applicant":"Rio Bravo Windpower, LLC","isd":"Roma ISD","app_date":"08/25/2017","first_tax_year":"2020","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1212/1212-roma-rio-app.pdf","project_key":"RIO BRAVO WINDPOWER||wind|None","first_of_project":true},{"app":"1704","applicant":"Caprock Solar, LLC","isd":"Ropes ISD","app_date":"02/17/2022","first_tax_year":"2028","tech":"solar","county":"Hockley","mw":300.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 300MW located in Ropes ISD","cod":"D ec emb er2027","doc":"https://assets.comptroller.texas.gov/ch313/1704/1704-ropes-caprock-app.pdf","counties":["Hockley"],"county_how":"application form","project_key":"CAPROCK||solar|300.0","first_of_project":true},{"app":"1705","applicant":"Sundown Wind, LLC","isd":"Ropes ISD","app_date":"02/17/2022","first_tax_year":"2028","tech":"wind","county":null,"mw":300.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 300 MW located in Ropes ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1705/1705-ropes-sundown-app.pdf","project_key":"SUNDOWN||wind|300.0","first_of_project":true},{"app":"1517","applicant":"Ben Milam Solar 1 LLC","isd":"Rosebud-Lott ISD","app_date":"08/25/2020","first_tax_year":"2024","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":"September 1,2022","doc":"https://assets.comptroller.texas.gov/ch313/1517/1517-rosebud-ben1-app.pdf","project_key":"BEN MILAM|1|solar|None","first_of_project":true},{"app":"1516","applicant":"Ben Milam Solar 2 LLC","isd":"Rosebud-Lott ISD","app_date":"08/25/2020","first_tax_year":"2024","tech":"solar","county":null,"mw":250.0,"mw_text":"d Investment Ben Milam Solar 2 LLC, anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 250 MW","cod":"September 1,2022","doc":"https://assets.comptroller.texas.gov/ch313/1516/1516-rosebud-ben2-app.pdf","project_key":"BEN MILAM|2|solar|250.0","first_of_project":false},{"app":"1754","applicant":"Cattlemen Solar Park II LLC","isd":"Rosebud-Lott ISD","app_date":"03/29/2022","first_tax_year":"2025","tech":"solar","county":"Milam","mw":180.0,"mw_text":"As explained in more detail in Tab 4, the proposed 150-180 Megawatt solar photovoltaic facility (the \"Project\") is expected to be fully operational by the end of 2027","cod":"Q42027","doc":"https://assets.comptroller.texas.gov/ch313/1754/1754-rosebud-cattlemenii-app.pdf","counties":["Milam"],"county_how":"application form","eia":{"id":67976,"n":"Cattlemen Solar II","st":"planned"},"project_key":"CATTLEMEN|2|solar|180.0","first_of_project":true},{"app":"1573","applicant":"Cattlemen Solar Park LLC","isd":"Rosebud-Lott ISD","app_date":"03/23/2021","first_tax_year":"2024","tech":"solar","county":"Milam","mw":240.0,"mw_text":"The installed solar photovoltaic capacity of the proposed Project is expected to be approximately 240 Megawatts","cod":"Q32023","doc":"https://assets.comptroller.texas.gov/ch313/1573/1573-rosebudlott-cattlemen-app.pdf","counties":["Milam"],"county_how":"application form","eia_candidates":[{"id":66168,"n":"Cattlemen Solar Park","st":"planned"},{"id":67976,"n":"Cattlemen Solar II","st":"planned"}],"project_key":"CATTLEMEN||solar|240.0","first_of_project":true},{"app":"1753","applicant":"Yaupon Solar, LLC and Yaupon Solar Energy Storage, LLC","isd":"Rosebud-Lott ISD","app_date":"03/29/2022","first_tax_year":"2027","tech":"solar","county":"Milam","mw":200.0,"mw_text":"C Chapter 313 Application Rosebud-Lott ISD TAB 7 Description of Qualified Investment The proposed Project is anticipated to have a total generation capacity of 200 MW ac with 100 MW battery storage all of which will be in Rosebud-Lott ISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1753/1753-rosebud-yaupon-app.pdf","counties":["Milam"],"county_how":"application form","eia":{"id":66216,"n":"Yaupon Solar Project (Hybrid)","st":"operating"},"project_key":"YAUPON||solar|200.0","first_of_project":true},{"app":"1410","applicant":"Amadeus Wind, LLC","isd":"Rotan ISD","app_date":"08/14/2019","first_tax_year":"2021","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":"Q42020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1410/1410-rotanisd-amadeus-app.pdf","project_key":"AMADEUS||wind|None","first_of_project":true},{"app":"1662","applicant":"CH Solterra LLC f/k/a BT Solterra Solar, LLC","isd":"Saltillo ISD","app_date":"10/29/2021","first_tax_year":"2028","tech":"solar","county":"Hopkins","mw":143.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 143 MW located in Saltillo ISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1662/1662-saltillo-bt-app.pdf","counties":["Hopkins"],"county_how":"application form","project_key":"SOLTERRA||solar|143.0","first_of_project":true},{"app":"1562","applicant":"Stampede Solar Project, LLC","isd":"Saltillo ISD","app_date":"02/05/2021","first_tax_year":"2023","tech":"solar","county":"Hopkins","mw":250.0,"mw_text":"plication for 313 Appraised Value Limitation by Stampede Solar Project, LLC to Saltillo ISD As such, the development resources necessary to advance the planned 250 MWac Stampede Solar could be redeployed to other renewable energy development projects in other power markets in the United States","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1562/1562-saltillo-stampede-app.pdf","counties":["Hopkins"],"county_how":"application description","eia":{"id":67762,"n":"Stampede Solar Hybrid","st":"operating"},"project_key":"STAMPEDE||solar|250.0","first_of_project":true},{"app":"1123","applicant":"Bruenning's Breeze Wind Farm, LLC f/k/a Magic Valley Wind Farm II, LLC","isd":"San Perlita ISD","app_date":"02/04/2016","first_tax_year":"2018","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1123/1123-sanperlita-magic-app.pdf","project_key":"BRUENNING BREEZE||wind|None","first_of_project":true},{"app":"1556","applicant":"El Sauz Ranch Wind, LLC","isd":"San Perlita ISD","app_date":"01/21/2021","first_tax_year":"2024","tech":"wind","county":"Willacy","mw":300.0,"mw_text":"The wind farm will have a total estimated capacity of 300 megawatts (\"MW\")","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1556/1556-sanperlita-elsauz-app.pdf","counties":["Willacy"],"county_how":"application description","eia":{"id":65760,"n":"El Sauz Ranch Wind, LLC","st":"operating"},"project_key":"SAUZ||wind|300.0","first_of_project":false},{"app":"203","applicant":"Magic Valley Wind Farm I, LLC","isd":"San Perlita ISD","app_date":"08/30/2011","first_tax_year":"2012","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/203/San_Perlita_ISD_Magic_Valley_Wind_Farm_Application_9-22-2011.pdf","project_key":"MAGIC VALLEY|1|wind|None","first_of_project":false},{"app":"2035","applicant":"Accalia Point Solar, LLC","isd":"Santa Maria ISD","app_date":"05/29/2022","first_tax_year":"2028","tech":"solar","county":"Cameron","mw":190.0,"mw_text":"The project will be capable of generating approximately 190 MWac and will cover a surface area approximately 1,100 acres","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/2035/2035-santa-accalia-app.pdf","counties":["Cameron"],"county_how":"application form","eia":{"id":66673,"n":"Accalia Point Solar, LLC","st":"planned"},"project_key":"ACCALIA POINT||solar|190.0","first_of_project":true},{"app":"1252","applicant":"Rayos Del Sol Solar Project, LLC","isd":"Santa Maria ISD","app_date":"04/23/2018","first_tax_year":"2023","tech":"solar","county":"Cameron","mw":150.0,"mw_text":"As such, the development resources necessary to advance the planned 150 MW Rayos Del Sol could be redeployed to other renewable energy development projects in other power markets in the United States","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1252/santa-1252-rayos-app.pdf","counties":["Cameron"],"county_how":"application description","project_key":"RAYOS DEL SOL||solar|150.0","first_of_project":true},{"app":"1946","applicant":"Cold Creek Solar LLC","isd":"Schleicher ISD","app_date":"05/20/2022","first_tax_year":"2029","tech":"solar","county":"Schleicher","mw":430.0,"mw_text":"The project will encompass approximately 3,000+ acres and will consist of approximately 430 MW of solar generation capacity and 170 MW battery energy storage system (BESS)","cod":"4thQtr2028","doc":"https://assets.comptroller.texas.gov/ch313/1946/1946-schleicher-cold-app.pdf","counties":["Schleicher"],"county_how":"application form","project_key":"COLD CREEK||solar|430.0","first_of_project":true},{"app":"1167","applicant":"Live Oak Wind Project, LLC","isd":"Schleicher ISD","app_date":"01/11/2017","first_tax_year":"2019","tech":"wind","county":"Schleicher","mw":200.0,"mw_text":"___________________________________________ Tab 4 Detailed Description of Project The proposed Project is anticipated to have a total capacity of approximately 200 megawatts (\"MW\"), all of which will be located in Schleicher County Independent School District","cod":"January2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1167/1167-schleicher-liveoak-app.pdf","counties":["Schleicher"],"county_how":"application description","eia":{"id":61782,"n":"Live Oak Wind Project","st":"operating"},"project_key":"LIVE OAK||wind|200.0","first_of_project":true},{"app":"1773","applicant":"Mittel Rockefeller Solar, LLC","isd":"Schleicher ISD","app_date":"04/13/2022","first_tax_year":"2026","tech":"solar","county":"Schleicher","mw":null,"mw_text":null,"cod":"December31,2025","doc":"https://assets.comptroller.texas.gov/ch313/1773/1773-schleicher-rockefeller-app.pdf","counties":["Schleicher"],"county_how":"application form","project_key":"MITTEL ROCKEFELLER||solar|None","first_of_project":true},{"app":"1427","applicant":"Lily Solar, LLC","isd":"Scurry-Rosser ISD","app_date":"09/18/2019","first_tax_year":"2022","tech":"solar","county":null,"mw":146.0,"mw_text":"Lily Solar, LLC is a 146 MW/AC solar electric generating facility with an additional 50 MW of battery storage, that when established will provide two (2) full-time salary competitive jobs","cod":"January 1, 2022","doc":"https://assets.comptroller.texas.gov/dat/ch313/1427/1427-scurryrosser-lily-app.pdf","project_key":"LILY||solar|146.0","first_of_project":true},{"app":"328","applicant":"Green Pastures Wind I, LLC","isd":"Seymour ISD","app_date":"08/01/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/328/328-Seymour-ISD-Green-Pastures-2014-Application.pdf","project_key":"GREEN PASTURES|1|wind|None","first_of_project":true},{"app":"1357","applicant":"Griffin Trail Wind, LLC","isd":"Seymour ISD","app_date":"04/09/2019","first_tax_year":"2022","tech":"wind","county":"Knox","mw":225.6,"mw_text":"The proposed Project is anticipated to have a total capacity of 225.6 MW, with approximately 126","cod":"Q42020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1357/1357-seymour-griffin-app.pdf","counties":["Knox"],"county_how":"application description","eia":{"id":62411,"n":"Griffin Trail Wind","st":"operating"},"project_key":"GRIFFIN TRAIL||wind|225.6","first_of_project":false},{"app":"1820","applicant":"Rolling Plains Solar, LLC","isd":"Seymour ISD","app_date":"04/27/2022","first_tax_year":"2027","tech":"solar","county":"Baylor","mw":500.0,"mw_text":"ocumentation of combined group membership, received by CPA Tab 4 Detailed Description of the Project Rolling Plains Solar, LLC project will be an approximately 500 MWac photovoltaic solar power generation facility that would be built within the requested Reinvestment Zone, currently approximately 12","cod":"October2027","doc":"https://assets.comptroller.texas.gov/ch313/1820/1820-seymour-rolling-app.pdf","counties":["Baylor"],"county_how":"application form","project_key":"ROLLING PLAINS||solar|500.0","first_of_project":true},{"app":"1202","applicant":"Seymour Hills Wind Project, LLC","isd":"Seymour ISD","app_date":"07/11/2017","first_tax_year":"2019","tech":"wind","county":null,"mw":100.0,"mw_text":"pter 313 Application to Seymour ISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment Seymour Hills Wind Project, LLC plans to construct up to a 100 MW wind farm in Baylor County","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1202/seymour-1202-seymourhills-app.pdf","project_key":"SEYMOUR HILLS||wind|100.0","first_of_project":true},{"app":"1523","applicant":"Southwestern Electric Power Company f/k/a Diversion Wind Energy LLC","isd":"Seymour ISD","app_date":"09/01/2020","first_tax_year":"2025","tech":"wind","county":null,"mw":300.0,"mw_text":"scription of Project Diversion Wind Energy LLC anticipates constructing a wind-powered electric generating facility with an operating capacity of approximately 300 megawatts","cod":"12/31/2021","doc":"https://assets.comptroller.texas.gov/ch313/1523/1523-seymour-diversion-app.pdf","project_key":"SOUTHWESTERN COMPANY||wind|300.0","first_of_project":true},{"app":"1489","applicant":"Western Trail Wind, LLC","isd":"Seymour ISD","app_date":"04/29/2020","first_tax_year":"2022","tech":"wind","county":"Baylor","mw":300.0,"mw_text":"Western Trail Wind anticipates constructing a wind-powered electric generating facility with an operating capacity of approximately 300 megawatts","cod":"Q42021","doc":"https://assets.comptroller.texas.gov/ch313/1489/1489-seymour-western-app.pdf","counties":["Baylor"],"county_how":"application description","project_key":"WESTERN TRAIL||wind|300.0","first_of_project":true},{"app":"353","applicant":"Briscoe Wind Farm, LLC","isd":"Silverton ISD","app_date":"11/12/2013","first_tax_year":"2015","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/353/App-353-Silverton-ISD-Briscoe-Wind-Farm-LLC-Amendment-001-to-Application.pdf","project_key":"BRISCOE||wind|None","first_of_project":true},{"app":"1889","applicant":"Hill Country Wind Power Rock Creek, LLC","isd":"Silverton ISD","app_date":"05/17/2022","first_tax_year":"2028","tech":"wind","county":"Briscoe","mw":600.0,"mw_text":"Hill Country Wind Power Rock Creek, LLC is proposing to construct a 600 MW wind powered electric generation facility that will span Briscoe, Floyd and Swisher Counties","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1889/1889-silverton-hill-app.pdf","counties":["Briscoe"],"county_how":"application form","project_key":"HILL COUNTRY ROCK CREEK||wind|600.0","first_of_project":false},{"app":"292","applicant":"Longhorn Wind Project, LLC","isd":"Silverton ISD","app_date":"05/28/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/292/App-292-Silverton-ISD-Longhorn-Wind-Attachment-22-Reinvestment-Zone-Order-Supplement-001.pdf","project_key":"LONGHORN||wind|None","first_of_project":false},{"app":"1495","applicant":"El Algodon Alto Wind Farm, LLC","isd":"Sinton ISD","app_date":"05/20/2020","first_tax_year":"2022","tech":"wind","county":null,"mw":200.0,"mw_text":"El Algodon Alto Wind Farm, LLC is a 200 MW/AC wind energy generation facility that will feature in total approximately 91 wind turbines","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1495/1495-sinton-el-app.pdf","project_key":"ALGODON ALTO||wind|200.0","first_of_project":false},{"app":"1497","applicant":"Blackjack Creek Wind Farm, LLC","isd":"Skidmore-Tynan ISD","app_date":"06/02/2020","first_tax_year":"2022","tech":"wind","county":null,"mw":240.0,"mw_text":"This mixture of wind turbine generators will provide an approximate total Project capacity of 240 MW","cod":"December31,2021","doc":"https://assets.comptroller.texas.gov/ch313/1497/1497-skidmore-blackjack-app.pdf","project_key":"BLACKJACK CREEK||wind|240.0","first_of_project":true},{"app":"1682","applicant":"Honeycomb Solar, LLC f/k/a Tynan Solar 1 LLC","isd":"Skidmore-Tynan ISD","app_date":"12/20/2021","first_tax_year":"2026","tech":"solar","county":"Bee","mw":61.1,"mw_text":"The Applicant proposes constructing a 61.1 MW/AC solar electric generation facility, with an additional 61","cod":"December31,2022","doc":"https://assets.comptroller.texas.gov/ch313/1682/1682-skidmore-tynan-app.pdf","counties":["Bee"],"county_how":"application form","eia":{"id":69351,"n":"Honeycomb Solar and Storage","st":"planned"},"project_key":"HONEYCOMB||solar|61.1","first_of_project":true},{"app":"1177","applicant":"Karankawa Wind, LLC f/k/a Pacific Wind Development, LLC","isd":"Skidmore-Tynan ISD","app_date":"02/17/2017","first_tax_year":"2020","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1177/1177-skidmore-pacific-app.pdf","project_key":"KARANKAWA||wind|200.0","first_of_project":false},{"app":"1567","applicant":"Porter Solar, LLC","isd":"Slidell ISD","app_date":"02/15/2021","first_tax_year":"2024","tech":"solar","county":"Denton","mw":174.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 174 MW located in Slidell ISD","cod":"December2023","doc":"https://assets.comptroller.texas.gov/ch313/1567/1567-slidell-porter-app.pdf","counties":["Denton","Wise"],"county_how":"application form","eia":{"id":65937,"n":"Porter Solar, LLC (TX)","st":"operating"},"project_key":"PORTER||solar|174.0","first_of_project":true},{"app":"1531","applicant":"Big Star Solar, LLC","isd":"Smithville ISD","app_date":"09/24/2020","first_tax_year":"2022","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1531/1531-smithville-big-app.pdf","project_key":"BIG STAR||solar|None","first_of_project":true},{"app":"1442","applicant":"Canyon Wind Farm, LLC","isd":"Snyder ISD","app_date":"11/01/2019","first_tax_year":"2024","tech":"wind","county":"Scurry","mw":360.0,"mw_text":"Attachment to Application for Chapter 313 Appraised Value Limitation by Canyon Wind Farm, LLC to Snyder ISD resources necessary to advance the subject planned 360 MW Canyon Wind Farm, LLC could be redeployed to other renewable energy development projects in other power markets in the United States","cod":"April1,2021","doc":"https://assets.comptroller.texas.gov/ch313/1442/1442-snyder-canyon-app.pdf","counties":["Scurry"],"county_how":"application description","eia":{"id":60271,"n":"Canyon Wind Project, LLC","st":"operating"},"project_key":"CANYON||wind|360.0","first_of_project":true},{"app":"1204","applicant":"Coyote Wind","isd":"Snyder ISD","app_date":"07/18/2017","first_tax_year":"2021","tech":"wind","county":null,"mw":242.0,"mw_text":"The installed capacity of the proposed project is expected to be approximately 242 megawatts (MW)","cod":"Q42018","doc":"https://assets.comptroller.texas.gov/dat/ch313/1204/1204-snyder-coyote-app.pdf","project_key":"COYOTE||wind|242.0","first_of_project":true},{"app":"1128","applicant":"Dermott Wind, LLC","isd":"Snyder ISD","app_date":"03/24/2016","first_tax_year":"2018","tech":"wind","county":null,"mw":230.0,"mw_text":"The installed capacity of the proposed project is expected to be approximately 230 megawatts (MW)","cod":"Q42017","doc":"https://assets.comptroller.texas.gov/ch313/1128/snyder-1128-dermott-app.pdf","project_key":"DERMOTT||wind|230.0","first_of_project":true},{"app":"1116","applicant":"Fluvanna Wind Energy, LLC","isd":"Snyder ISD","app_date":"12/17/2015","first_tax_year":"2018","tech":"wind","county":"Scurry","mw":150.0,"mw_text":"As such, the development resources necessary to advance the subject planned 150MW Fluvanna Wind Energy, LLC could be redeployed to other renewable energy development projects in other power markets in the United States","cod":"June2017","doc":"https://assets.comptroller.texas.gov/ch313/1116/snyder-1116-fluvanna-public-app-12-17-15.pdf","counties":["Scurry"],"county_how":"application description","eia":{"id":59245,"n":"Fluvanna","st":"operating"},"project_key":"FLUVANNA||wind|150.0","first_of_project":true},{"app":"1249","applicant":"Sage Draw Wind, LLC","isd":"Southland ISD","app_date":"04/16/2018","first_tax_year":"2020","tech":"wind","county":"Lynn","mw":300.0,"mw_text":"The installed capacity of the proposed project is expected to be approximately 300 megawatts (MW)","cod":"Q4 2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1249/1249-southland-sage-app.pdf","counties":["Lynn"],"county_how":"application description","eia":{"id":62620,"n":"Sage Draw Wind","st":"operating"},"project_key":"SAGE DRAW||wind|300.0","first_of_project":true},{"app":"319","applicant":"Palo Duro Wind Energy, LLC","isd":"Spearman ISD","app_date":"07/29/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":null,"project_key":"PALO DURO||wind|None","first_of_project":false},{"app":"1609","applicant":"Sunbuddie Solar Energy LLC","isd":"Springlake-Earth ISD","app_date":"05/26/2021","first_tax_year":"2025","tech":"solar","county":null,"mw":100.0,"mw_text":"Value Limitation on Qualified Property To Springlake-Earth ISD Tab #4 Detailed Description of Project Sunbuddie Solar Energy LLC proposes constructing an up to 100MW solar electric generation facility on up to 1,500 acres of privately-owned land in Lamb County","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1609/1609-springlake-sunbuddie-app.pdf","project_key":"SUNBUDDIE||solar|100.0","first_of_project":false},{"app":"1345","applicant":"BlueBell Solar II, LLC","isd":"Sterling City ISD","app_date":"02/19/2019","first_tax_year":"2021","tech":"solar","county":null,"mw":100.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 100 MW located in Sterling City ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1345/1345-sterling-bluebell-app.pdf","project_key":"BLUEBELL|2|solar|100.0","first_of_project":true},{"app":"1115","applicant":"Bluebell Solar, LLC","isd":"Sterling City ISD","app_date":"12/17/2015","first_tax_year":"2019","tech":"solar","county":"Sterling","mw":173.0,"mw_text":"C Chapter 313 Application to Sterling City ISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment Bluebell Solar, LLC plans to construct an up to 173 MW solar electric generating project in Sterling County","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1115/1115-sterling-bluebell-app.pdf","counties":["Sterling"],"county_how":"application description","eia_candidates":[{"id":60789,"n":"Bluebell Solar","st":"operating"},{"id":63351,"n":"Bluebell Solar II","st":"operating"}],"project_key":"BLUEBELL||solar|173.0","first_of_project":true},{"app":"1578","applicant":"Lacy Creek Wind, LLC f/k/a Edmondson Ranch Wind, LLC","isd":"Sterling City ISD","app_date":"04/07/2021","first_tax_year":"2023","tech":"wind","county":"Sterling","mw":90.0,"mw_text":"Edmondson Ranch Wind, LLC is a 90 MW wind energy generation project","cod":"12/31/2022","doc":"https://assets.comptroller.texas.gov/ch313/1578/1578-sterling-edmondson-app.pdf","counties":["Sterling"],"county_how":"application form","eia":{"id":65162,"n":"Lacy Creek Wind Energy Center","st":"operating"},"project_key":"LACY CREEK||wind|90.0","first_of_project":true},{"app":"1740","applicant":"Huisache Solar LLC f/k/a Novis Renewables, LLC","isd":"Stockdale ISD","app_date":"03/28/2022","first_tax_year":"2028","tech":"solar","county":"Wilson","mw":195.0,"mw_text":"on of Qualified Investment The Applicant anticipates constructing a solar photovoltaic electric generating facility with an operating capacity of approximately 195 MWac and will cover a surface area of approximately 1,500 acres","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/1740/1740-stockdale-novis-app.pdf","counties":["Wilson"],"county_how":"application form","project_key":"HUISACHE||solar|195.0","first_of_project":true},{"app":"1149","applicant":"Blue Cloud Wind Energy, LLC","isd":"Sudan ISD","app_date":"08/25/2016","first_tax_year":"2019","tech":"wind","county":"Bailey","mw":150.0,"mw_text":"The wind farm will have an estimated capacity of 150 megawatts (\"MW\")","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1149/sudan-1149-blue-app.pdf","counties":["Bailey","Lamb"],"county_how":"application description","eia":{"id":60270,"n":"Blue Cloud Wind Energy LLC","st":"operating"},"project_key":"BLUE CLOUD||wind|150.0","first_of_project":true},{"app":"1383","applicant":"Hopkins Energy, LLC","isd":"Sulphur Bluff ISD","app_date":"06/26/2019","first_tax_year":"2024","tech":"solar","county":null,"mw":320.0,"mw_text":"Hopkins Energy LLC is a 320 MW-AC solar electric generating facility, that when established will provide 2, full-time salary competitive jobs","cod":"December1,2021","doc":"https://assets.comptroller.texas.gov/ch313/1383/sulphurbluff-1383-hopkins-app.pdf","project_key":"HOPKINS||solar|320.0","first_of_project":true},{"app":"1528","applicant":"Bright Arrow Solar, LLC","isd":"Sulphur Springs ISD","app_date":"09/21/2020","first_tax_year":"2022","tech":"solar","county":null,"mw":300.0,"mw_text":"Bright Arrow Solar, LLC is a 300 MW/AC solar energy generation project","cod":"December31,2022","doc":"https://assets.comptroller.texas.gov/ch313/1528/1528-sulphur-bright-app.pdf","project_key":"BRIGHT ARROW||solar|300.0","first_of_project":true},{"app":"1384","applicant":"Hopkins Energy, LLC","isd":"Sulphur Springs ISD","app_date":"06/26/2019","first_tax_year":"2024","tech":"solar","county":null,"mw":320.0,"mw_text":"Hopkins Energy LLC is a 320 MW-AC solar electric generating facility, that when established will provide 1, full-time salary competitive jobs","cod":"December1,2021","doc":"https://assets.comptroller.texas.gov/ch313/1384/sulphursprings-1384-hopkins-app.pdf","project_key":"HOPKINS||solar|320.0","first_of_project":false},{"app":"1893","applicant":"Hill Country Wind Power Mesquite Star Phase II, LLC","isd":"Sweetwater ISD","app_date":"05/17/2022","first_tax_year":"2028","tech":"wind","county":"Fisher","mw":650.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 650MW 39% of which will be located in Sweetwater ISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1893/1893-sweetwater-hill-app.pdf","counties":["Fisher"],"county_how":"application form","project_key":"HILL COUNTRY MESQUITE STAR PHASE|2|wind|650.0","first_of_project":false},{"app":"1201","applicant":"Midway Wind, LLC f/k/a Apex Midway Wind, LLC","isd":"Taft ISD","app_date":"07/07/2017","first_tax_year":"2020","tech":"wind","county":"San Patricio","mw":160.125,"mw_text":"The proposed Project is anticipated to have a total capacity of 160.125 MW, with approximately 60","cod":"1stquarter2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1201/1201-taft-apex-app.pdf","counties":["San Patricio"],"county_how":"application description","eia":{"id":61776,"n":"Midway Wind, LLC","st":"operating"},"project_key":"MIDWAY||wind|160.125","first_of_project":true},{"app":"1883","applicant":"Padre Solar LLC","isd":"Taft ISD","app_date":"05/16/2022","first_tax_year":"2028","tech":"solar","county":null,"mw":408.0,"mw_text":"The installed capacity of the proposed project in Taft ISD is expected to be approximately 408 megawatts (MWac)","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1883/1883-taft-padre-app.pdf","project_key":"PADRE||solar|408.0","first_of_project":false},{"app":"1181","applicant":"Tahoka Wind, LLC","isd":"Tahoka ISD","app_date":"03/14/2017","first_tax_year":"2019","tech":"wind","county":"Lynn","mw":300.0,"mw_text":"Item 6 100% of the Project is anticipated to be located within Tahoka ISO Tab Item 7 Description of Qualified Investment Tahoka Wind, LLC plans to construct a 300 MW wind farm in Lynn County within the boundaries of Tahoka ISD consisting of 120 turbines","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1181/1181-tahoka-tahoka-app.pdf","counties":["Lynn"],"county_how":"application description","eia":{"id":61921,"n":"Tahoka Wind","st":"operating"},"project_key":"TAHOKA||wind|300.0","first_of_project":true},{"app":"1819","applicant":"Piedra Soalr, LLC f/k/a Core Solar Land Holdings I, LLC","isd":"Teague ISD","app_date":"04/27/2022","first_tax_year":"2027","tech":"solar","county":"Freestone","mw":300.0,"mw_text":"on of combined group membership, received by CPA Tab 4 Detailed Description of the Project The Core Solar Land Holdings I, LLC project will be an approximately 300 MWac photovoltaic solar power generation facility that would be built on selected areas of approximately 3,195 acres of privately owned ","cod":"December2028","doc":"https://assets.comptroller.texas.gov/ch313/1819/1819-teague-core-app.pdf","counties":["Freestone"],"county_how":"application form","project_key":"PIEDRA SOALR||solar|300.0","first_of_project":true},{"app":"1657","applicant":"Stoneridge Solar, LLC f/k/a Ben Milam Solar 5 LLC","isd":"Thorndale ISD","app_date":"10/21/2021","first_tax_year":"2025","tech":"solar","county":null,"mw":20.0,"mw_text":"A 20 MW solar PV generating facility may include a qualified investment consisting of the following improvements: \ufffd Photovoltaic modules; \ufffd DC-to-AC inverters; \ufffd Medium and high-voltage electric cabling; \ufffd Single axis racking s","cod":"December31,2024","doc":"https://assets.comptroller.texas.gov/ch313/1657/1657-thondale-ben-app.pdf","project_key":"STONERIDGE||solar|20.0","first_of_project":true},{"app":"1487","applicant":"Azure Sky Wind Project, LLC","isd":"Throckmorton ISD","app_date":"04/07/2020","first_tax_year":"2022","tech":"wind","county":"Throckmorton","mw":348.0,"mw_text":"ind Project, LLC Chapter 313 Application Throckmorton Collegiate ISD TAB 7 Description of Qualified Investment Azure Sky Wind Project, LLC plans to construct a 348 MW wind farm in Throckmorton County","cod":"December2021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1487/1487-throckmorton-azuresky-app.pdf","counties":["Throckmorton"],"county_how":"school district name","eia":{"id":64164,"n":"Azure Sky Wind Project, LLC Hybrid","st":"operating"},"project_key":"AZURE SKY||wind|348.0","first_of_project":true},{"app":"1634","applicant":"Inertia Wind Project, LLC","isd":"Throckmorton ISD","app_date":"08/26/2021","first_tax_year":"2023","tech":"wind","county":"Throckmorton","mw":298.6,"mw_text":"Inertia Wind Project, LLC is a 298.6 MW wind energy generation project","cod":"December31,2022","doc":"https://assets.comptroller.texas.gov/ch313/1634/1634-throckmorton-inertia-app.pdf","counties":["Throckmorton"],"county_how":"application form","project_key":"INERTIA||wind|298.6","first_of_project":false},{"app":"1472","applicant":"King Creek Wind Farm 1 LLC f/k/a King Creek Wind Farm, LLC","isd":"Throckmorton ISD","app_date":"03/05/2020","first_tax_year":"2022","tech":"wind","county":"Throckmorton","mw":200.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 200 MW located in Throckmorton Collegiate ISD","cod":"December2021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1472/1472-throckmorton-kingcreek-app.pdf","counties":["Throckmorton"],"county_how":"school district name","project_key":"KING CREEK|1|wind|200.0","first_of_project":true},{"app":"1471","applicant":"King Creek Wind Farm 2 LLC f/k/a King Creek Wind Farm II, LLC","isd":"Throckmorton ISD","app_date":"03/05/2020","first_tax_year":"2022","tech":"wind","county":"Throckmorton","mw":275.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 275 MW located in Throckmorton Collegiate ISD","cod":"December2022","doc":"https://assets.comptroller.texas.gov/dat/ch313/1471/1471-throckmorton-kingcreekii-app.pdf","counties":["Throckmorton"],"county_how":"school district name","eia":{"id":66323,"n":"King Creek Wind Farm 2, LLC","st":"operating"},"project_key":"KING CREEK|2|wind|275.0","first_of_project":true},{"app":"1807","applicant":"Monarch Creek Wind LLC f/k/a King Creek Wind Farm 3 LLC","isd":"Throckmorton ISD","app_date":"04/25/2022","first_tax_year":"2027","tech":"wind","county":"Throckmorton","mw":350.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 350 MW located in Throckmorton CISD","cod":"December2027","doc":"https://assets.comptroller.texas.gov/ch313/1807/1807-throckmorton-king-app.pdf","counties":["Throckmorton"],"county_how":"application form","eia":{"id":69606,"n":"Monarch Creek Wind, LLC","st":"planned"},"project_key":"MONARCH CREEK||wind|350.0","first_of_project":true},{"app":"1943","applicant":"Throckmorton Wind, LLC f/k/a Stetson Renewables Holdings, LLC","isd":"Throckmorton ISD","app_date":"05/20/2022","first_tax_year":"2027","tech":"wind","county":"Throckmorton","mw":154.0,"mw_text":"Stetson Renewables Holdings, LLC a 154 MW/AC wind energy generation project","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1943/1943-throck-stetson-app.pdf","counties":["Throckmorton"],"county_how":"application form","project_key":"THROCKMORTON||wind|154.0","first_of_project":true},{"app":"1470","applicant":"Danish Fields Solar, LLC","isd":"Tidehaven ISD","app_date":"03/05/2020","first_tax_year":"2023","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":"December1,2022","doc":"https://assets.comptroller.texas.gov/dat/ch313/1470/1470-tidehavenisd-danish-app.pdf","project_key":"DANISH FIELDS||solar|None","first_of_project":true},{"app":"1677","applicant":"Hecate Energy Harley Hand Solar LLC","isd":"Trent ISD","app_date":"12/08/2021","first_tax_year":"2028","tech":"solar","county":"Nolan","mw":514.0,"mw_text":"Y HARLEY HAND SOLAR LLC Chapter 313 Application Trent ISD TAB 7 Description of Qualified Investment Hecate Energy Harley Hand Solar LLC proposes to construct a 514 MW ac (net capacity) Photovoltaic solar facility and Battery Energy Storage System (BESS) that would be sited on approximately 4,224 acr","cod":"Q42027","doc":"https://assets.comptroller.texas.gov/ch313/1677/1677-trentisd-hecate-app.pdf","counties":["Nolan"],"county_how":"application form","eia":{"id":64234,"n":"Hecate Energy Harley Hand Solar LLC","st":"planned"},"project_key":"HECATE HARLEY HAND||solar|514.0","first_of_project":true},{"app":"1592","applicant":"Hornet Solar LLC f/k/a Hornet Solar II, LLC f/k/a TX Nazareth Solar, LLC","isd":"Tulia ISD","app_date":"04/26/2021","first_tax_year":"2025","tech":"solar","county":"Swisher","mw":200.0,"mw_text":"The Project will be capable of generating approximately 200 MWac and will cover a surface area approximately 2,000 acres","cod":"12/31/2023","doc":"https://assets.comptroller.texas.gov/ch313/1592/1592-tulia-txnazareth-app.pdf","counties":["Swisher"],"county_how":"application form","eia_candidates":[{"id":65463,"n":"Hornet Solar (TX)","st":"operating"},{"id":67985,"n":"Hornet Solar II (TX) (Hybrid)","st":"planned"}],"project_key":"HORNET||solar|200.0","first_of_project":true},{"app":"1593","applicant":"Hornet Solar, LLC","isd":"Tulia ISD","app_date":"04/26/2021","first_tax_year":"2025","tech":"solar","county":"Swisher","mw":310.0,"mw_text":"The Project will be capable of generating approximately 310 MWac and will cover a surface area approximately 2,000 acres","cod":"12/31/2023","doc":"https://assets.comptroller.texas.gov/ch313/1593/1593-tulia-hornet-app.pdf","counties":["Swisher"],"county_how":"application form","eia_candidates":[{"id":65463,"n":"Hornet Solar (TX)","st":"operating"},{"id":67985,"n":"Hornet Solar II (TX) (Hybrid)","st":"planned"}],"project_key":"HORNET||solar|310.0","first_of_project":true},{"app":"1441","applicant":"Corazon Energy, LLC","isd":"United ISD","app_date":"10/23/2019","first_tax_year":"2022","tech":"solar","county":null,"mw":400.0,"mw_text":"The proposed Project is anticipated to have a total capacity of 400 MW all of which will be located in United ISD","cod":"May2021","doc":"https://assets.comptroller.texas.gov/ch313/1441/1441-united-corazon-app.pdf","project_key":"CORAZON||solar|400.0","first_of_project":true},{"app":"1744","applicant":"Gransolar Texas Three LLC","isd":"United ISD","app_date":"03/28/2022","first_tax_year":"2028","tech":"solar","county":"Webb","mw":169.0,"mw_text":"com U Ro ckw al l, TX 75087 Tab 4: Detailed Description of the Project Gransolar Texas Three LLC is a 169 MW/AC solar electric generation facility that will be located in southern Webb County within southern United Independent School District","cod":"March3, 2027","doc":"https://assets.comptroller.texas.gov/ch313/1744/1744-united-gransolar3-app.pdf","counties":["Webb"],"county_how":"application form","project_key":"GRANSOLAR THREE||solar|169.0","first_of_project":true},{"app":"1745","applicant":"Gransolar Texas Two LLC","isd":"United ISD","app_date":"03/28/2022","first_tax_year":"2028","tech":"solar","county":"Webb","mw":300.0,"mw_text":"com U Rockwall , TX 75087 Tab 4: Detailed Description of the Project Gransolar Texas Two LLC is a 300 MW/AC solar electric generation facility that will be located in central Webb County within eastern United Independent School District","cod":"November21,2027","doc":"https://assets.comptroller.texas.gov/ch313/1745/1745-united-gransolar2-app.pdf","counties":["Webb"],"county_how":"application form","project_key":"GRANSOLAR TWO||solar|300.0","first_of_project":true},{"app":"1673","applicant":"Hecate Energy Outpost Solar LLC","isd":"United ISD","app_date":"11/23/2021","first_tax_year":"2025","tech":"solar","county":"Webb","mw":514.0,"mw_text":"OLAR LLC Chapter 313 Application United ISD CUMMINGS WESTLAKE TAB 7 Description of Qualified Investment Hecate Energy Outpost Solar LLC proposes to construct a 514 MW ac (net capacity) Photovoltaic solar facility and Battery Energy Storage System (BESS) that would be sited on approximately 18,500 ac","cod":"D ec emb er 2027","doc":"https://assets.comptroller.texas.gov/ch313/1673/1673-united-hecate-app.pdf","counties":["Webb"],"county_how":"application form","eia":{"id":68838,"n":"Hecate Energy Outpost Solar LLC","st":"operating"},"project_key":"HECATE OUTPOST||solar|514.0","first_of_project":true},{"app":"350","applicant":"OCI Solar Power, LLC","isd":"Uvalde Cisd","app_date":"10/25/2013","first_tax_year":"2014","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/350/App-350-Uvalde-CISD-OCI-Solar-Power-LLC-Combined-Application-11-8-13.pdf","project_key":"OCI||solar|None","first_of_project":false},{"app":"1664","applicant":"Markum Solar Farm, LLC","isd":"Valley Mills ISD","app_date":"11/08/2021","first_tax_year":"2025","tech":"solar","county":null,"mw":81.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 81 MW located in Valley Mills ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1664/1664-valley-markum-app.pdf","project_key":"MARKUM||solar|81.0","first_of_project":true},{"app":"168","applicant":"Spinning Spur Wind LLC","isd":"Vega ISD","app_date":"02/12/2010","first_tax_year":"2011","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/168/AppISDno168-Vega-SpinningSpurWind-Map-Application-Material-Previously-Marked-Confidential.pdf","project_key":"SPINNING SPUR||wind|None","first_of_project":true},{"app":"256","applicant":"Spinning Spur Wind Two, LLC","isd":"Vega ISD","app_date":"12/13/2012","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/256/AppISDno256-Vega-SpinningSpurTwo-Tax-Abatement-All-Improvement-Application-Material-Previously-Marked-Confidential.pdf","project_key":"SPINNING SPUR TWO||wind|None","first_of_project":false},{"app":"1678","applicant":"Alamosa Solar West, LLC","isd":"Vernon ISD","app_date":"12/15/2021","first_tax_year":"2026","tech":"solar","county":"Wilbarger","mw":200.0,"mw_text":"The project will be capable of generating approximately 200 MWac and will cover a surface area approximately 2,000 acres","cod":"1/1/2025","doc":"https://assets.comptroller.texas.gov/ch313/1678/1678-vernon-alamosa-app.pdf","counties":["Wilbarger"],"county_how":"application form","project_key":"ALAMOSA WEST||solar|200.0","first_of_project":true},{"app":"1066","applicant":"Electra Wind, LLC","isd":"Vernon ISD","app_date":"03/30/2015","first_tax_year":"2017","tech":"wind","county":null,"mw":200.0,"mw_text":"The proposed Project will include a total of up to 100 wind turbine generators, for a total capacity of up to 200 megawatts (MW), spanning the Vernon and Harrold school districts in eastern Wilbarger County, Texas","cod":"Q42016","doc":"https://assets.comptroller.texas.gov/dat/ch313/1066/1066-vernon-electra-app.pdf","project_key":"ELECTRA||wind|200.0","first_of_project":true},{"app":"1248","applicant":"Lockett Wind Farm, LLC","isd":"Vernon ISD","app_date":"04/09/2018","first_tax_year":"2020","tech":"wind","county":null,"mw":184.0,"mw_text":"The installed capacity ofthe proposed project is expected to be approximately 184 megawatts (MW)","cod":"Q4 2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1248/1248-vernon-lockett-app.pdf","project_key":"LOCKETT||wind|184.0","first_of_project":true},{"app":"1424","applicant":"Western Trail Wind, LLC","isd":"Vernon ISD","app_date":"08/30/2019","first_tax_year":"2022","tech":"wind","county":null,"mw":252.0,"mw_text":"The installed capacity of the proposed project is expected to be approximately 252 megawatts (MW)","cod":"Q42021","doc":"https://assets.comptroller.texas.gov/dat/ch313/1424/1424-vernonisd-western-app.pdf","project_key":"WESTERN TRAIL||wind|252.0","first_of_project":false},{"app":"1717","applicant":"Oriana Solar LLC","isd":"Victoria ISD","app_date":"03/03/2022","first_tax_year":"2026","tech":"solar","county":"Victoria","mw":200.0,"mw_text":"Oriana Solar LLC Chapter 313 Application to Victoria ISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment Oriana Solar LLC plans to construct a 200 MWac solar electric generating facility with attached BESS in Victoria ISD","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1717/1717-victoria-oriana-app.pdf","counties":["Victoria"],"county_how":"school district name","eia":{"id":65849,"n":"Oriana Solar LLC","st":"operating"},"project_key":"ORIANA||solar|200.0","first_of_project":true},{"app":"1105","applicant":"Broadview Energy JN LLC","isd":"Walcott ISD","app_date":"10/09/2015","first_tax_year":"2017","tech":"wind","county":null,"mw":82.8,"mw_text":"LLC Chapter 313 Application to Walcott ISD Cummings Westlake, LLC Description of Qualified Investment TAB 7 Broadview Energy JN LLC plans to construct up to an 82.8 MW wind farm in Deaf Smith County","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1105/1105-walcott-broadview-app.pdf","project_key":"BROADVIEW||wind|82.8","first_of_project":true},{"app":"1451","applicant":"Concho Valley Solar, LLC","isd":"Wall ISD","app_date":"12/04/2019","first_tax_year":"2023","tech":"solar","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1451/1451-wallisd-concho-app.pdf","project_key":"CONCHO VALLEY||solar|None","first_of_project":true},{"app":"1808","applicant":"Parliament Solar, LLC f/k/a AP Solar 8, LLC","isd":"Waller ISD","app_date":"04/25/2022","first_tax_year":"2025","tech":"solar","county":"Waller","mw":null,"mw_text":null,"cod":"QTR42024","doc":"https://assets.comptroller.texas.gov/ch313/1808/1808-waller-ap-app.pdf","counties":["Waller"],"county_how":"application form","eia":{"id":69320,"n":"Parliament Solar","st":"operating"},"project_key":"PARLIAMENT||solar|None","first_of_project":true},{"app":"1290","applicant":"Aviator Wind, LLC f/k/a Grape Creek Wind, LLC","isd":"Water Valley ISD","app_date":"09/07/2018","first_tax_year":"2021","tech":"wind","county":"Coke","mw":300.0,"mw_text":"In December 2012, Apex completed development and construction of the 300 MW Canadian Hills Wind project outside Oklahoma City, and in the past two years, Apex completed construction of five wind facilities and started construction on additional projects in Illinois, Texas, and Oklahoma","cod":"Q4 2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1290/1290-water-grape-app.pdf","counties":["Coke"],"county_how":"application description","eia":{"id":63209,"n":"Aviator Wind","st":"operating"},"project_key":"AVIATOR||wind|300.0","first_of_project":false},{"app":"1667","applicant":"Water Valley Wind Energy, LLC","isd":"Water Valley ISD","app_date":"11/16/2021","first_tax_year":"2028","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1667/1667-water-water-app.pdf","project_key":"WATER VALLEY||wind|None","first_of_project":true},{"app":"2069","applicant":"El Molino Solar, LLC","isd":"Webb Cisd","app_date":"06/01/2022","first_tax_year":"2028","tech":"solar","county":"Webb","mw":250.0,"mw_text":"The project will be capable of generating approximately 250 MWac and will cover a surface area approximately 3,000 acres","cod":"12/31/2027","doc":"https://assets.comptroller.texas.gov/ch313/2069/2069-webb-el-app.pdf","counties":["Webb"],"county_how":"application form","project_key":"MOLINO||solar|250.0","first_of_project":true},{"app":"1125","applicant":"Javelina Wind Energy II, LLC f/k/a Albercas Wind Energy II, LLC","isd":"Webb Cisd","app_date":"02/16/2016","first_tax_year":"2017","tech":"wind","county":null,"mw":200.0,"mw_text":"The proposed Project is anticipated to have a capacity of 200 MW located in Webb CISD","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1125/1125-webb-albercas-app.pdf","project_key":"JAVELINA|2|wind|200.0","first_of_project":true},{"app":"322","applicant":"Javelina Wind Energy, LLC","isd":"Webb Cisd","app_date":"07/30/2013","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/322/322-Webb-CISD-Javelina-Wind-Energy-2014-Application.pdf","project_key":"JAVELINA||wind|None","first_of_project":true},{"app":"2074","applicant":"Siete Wind, LLC","isd":"Webb Cisd","app_date":"06/01/2022","first_tax_year":"2028","tech":"wind","county":"Webb","mw":92.0,"mw_text":"School District County Percentage of Anticipated Anticipated MW United ISD Project Number of 92 MW Webb CISD Webb County, Turbines 408 MW Texas 18% 27 Webb County, 82% Texas 120 Attachment to Application for 313 Appraised Value Limitation by Siete Wind, LLC to Webb CISD Tab 7 Description of Qualifie","cod":"QTR42025","doc":"https://assets.comptroller.texas.gov/ch313/2074/2074-webb-siete-app.pdf","counties":["Webb"],"county_how":"application form","project_key":"SIETE||wind|92.0","first_of_project":true},{"app":"1305","applicant":"Torrecillas Wind Energy, LLC","isd":"Webb Cisd","app_date":"10/18/2018","first_tax_year":"2019","tech":"wind","county":null,"mw":170.0,"mw_text":"The proposed Project is anticipated to have a capacity of approximately 170.0 MW located in Webb CISD","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1305/1305-webb-torrecillas-app.pdf","project_key":"TORRECILLAS||wind|170.0","first_of_project":true},{"app":"232","applicant":"Whitetail Wind Energy, LLC","isd":"Webb Cisd","app_date":"05/14/2012","first_tax_year":"2013","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/232/232-Webb-CISD-Whitetail-Wind-Energy-Application.pdf","project_key":"WHITETAIL||wind|None","first_of_project":true},{"app":"1580","applicant":"Algodon Solar Energy LLC","isd":"Wellman-Union Cisd","app_date":"04/14/2021","first_tax_year":"2027","tech":"solar","county":"Terry","mw":200.0,"mw_text":"e Limitation on Qualified Property To Wellman-Union CISD Tab #4 Detailed Description of Project Algodon Solar Energy LLC proposes constructing an approximately 200MW solar electric generation facility on 3,680 acres of privately-owned land in Terry County","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1580/1580-wellmanunion-algodon-app.pdf","counties":["Terry"],"county_how":"application description","project_key":"ALGODON||solar|200.0","first_of_project":true},{"app":"1588","applicant":"Gulfstar Power LLC","isd":"Wharton ISD","app_date":"04/22/2021","first_tax_year":"2024","tech":"other","county":"Wharton","mw":570.0,"mw_text":"LLC TO WHARTON ISD GULFSTAR POWER LLC Chapter 313 Application Wharton ISD TAB 7 Description of Qualified Investment GulfStar Power, LLC proposes to construct a 570MW ac (net capacity) Photovoltaic solar facility that would be sited on approximately 3,200 acres of land approximately 3 miles east sout","cod":"October2023","doc":"https://assets.comptroller.texas.gov/ch313/1588/1588-wharton-gulfstar-app.pdf","counties":["Wharton"],"county_how":"application form","eia":{"id":66871,"n":"GulfStar Power, LLC","st":"operating"},"project_key":"GULFSTAR||other|570.0","first_of_project":true},{"app":"1848","applicant":"Lane City Wind, LLC","isd":"Wharton ISD","app_date":"05/09/2022","first_tax_year":"2025","tech":"wind","county":"Wharton","mw":201.6,"mw_text":"umentation from the Office of the Governor (if applicable) Not Applicable TAB 7 Description of Qualified Investment Lane City Wind, LLC proposes to construct a 201.6 MWac (net capacity) Wind Energy project that would be sited on approximately 14,000 acres of land","cod":"December31,2024","doc":"https://assets.comptroller.texas.gov/ch313/1848/1848-wharton-lane-app.pdf","counties":["Wharton"],"county_how":"application form","eia":{"id":67443,"n":"Lane City Wind","st":"operating"},"project_key":"LANE CITY||wind|201.6","first_of_project":true},{"app":"1390","applicant":"Red Tailed Hawk Solar, LLC f/k/a AP Solar 6, LLC","isd":"Wharton ISD","app_date":"07/01/2019","first_tax_year":"2023","tech":"solar","county":"Wharton","mw":null,"mw_text":null,"cod":null,"doc":null,"counties":["Wharton"],"county_how":"school district name","eia":{"id":66157,"n":"Red Tailed Hawk Solar LLC","st":"operating"},"project_key":"RED TAILED HAWK||solar|None","first_of_project":true},{"app":"261","applicant":"Pattern Panhandle Wind, LLC","isd":"White Deer ISD","app_date":"12/17/2012","first_tax_year":"2014","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/261/whitedeer-0261-pattern-app.pdf","project_key":"PATTERN PANHANDLE||wind|None","first_of_project":false},{"app":"1186","applicant":"Wildcat Ranch Wind Project, LLC","isd":"Whiteface Cisd","app_date":"04/25/2017","first_tax_year":"2019","tech":"wind","county":null,"mw":150.0,"mw_text":"Chapter 313 Application to Whiteface CISD Cummings Westlake, LLC TAB 7 Description of Qualified Investment Wildcat Ranch Wind Project, LLC plans to construct a 150 MW wind farm in Cochran County","cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1186/1186-whiteface-wildcat-app.pdf","project_key":"WILDCAT||wind|150.0","first_of_project":true},{"app":"1250","applicant":"Sage Draw Wind, LLC","isd":"Wilson ISD","app_date":"04/16/2018","first_tax_year":"2020","tech":"wind","county":"Lynn","mw":300.0,"mw_text":"The installed capacity of the proposed project is expected to be approximately 300 megawatts (MW)","cod":"Q4 2019","doc":"https://assets.comptroller.texas.gov/dat/ch313/1250/1250-wilson-sage-app.pdf","counties":["Lynn"],"county_how":"application description","eia":{"id":62620,"n":"Sage Draw Wind","st":"operating"},"project_key":"SAGE DRAW||wind|300.0","first_of_project":false},{"app":"1217","applicant":"Phoebe Energy Project, LLC","isd":"Wink-Loving ISD","app_date":"09/19/2017","first_tax_year":"2020","tech":"solar","county":"Winkler","mw":250.0,"mw_text":"estment Phoebe Energy Project, LLC, anticipates constructing a solar photovoltaic (PV) electric generating facility with an operating capacity of approximately 250 MW ac","cod":"12/2019","doc":"https://assets.comptroller.texas.gov/ch313/1217/wink-1217-phoebe-app.pdf","counties":["Winkler"],"county_how":"application description","eia":{"id":61906,"n":"Phoebe Solar","st":"operating"},"project_key":"PHOEBE||solar|250.0","first_of_project":true},{"app":"1326","applicant":"Cranell Wind Farm, LLC","isd":"Woodsboro ISD","app_date":"12/21/2018","first_tax_year":"2020","tech":"wind","county":null,"mw":null,"mw_text":null,"cod":null,"doc":"https://assets.comptroller.texas.gov/dat/ch313/1326/1326-woodsboro-cranell-app.pdf","project_key":"CRANELL||wind|None","first_of_project":true},{"app":"1786","applicant":"Tehuacana Creek Solar, LLC","isd":"Wortham ISD","app_date":"04/20/2022","first_tax_year":"2028","tech":"solar","county":"Freestone","mw":650.0,"mw_text":"The Applicant, Tehuacana Creek Solar LLC, seeks to construct a 650 MW AC hybrid solar energy generation and battery storage project","cod":"December31,2027","doc":"https://assets.comptroller.texas.gov/ch313/1786/1786-wortham-tehuacana-app.pdf","counties":["Freestone","Navarro"],"county_how":"application form","eia":{"id":65855,"n":"Tehuacana Creek Solar","st":"planned"},"project_key":"TEHUACANA CREEK||solar|650.0","first_of_project":false},{"app":"1722","applicant":"Desert Vine Solar LLC","isd":"Zapata County ISD","app_date":"03/04/2022","first_tax_year":"2025","tech":"solar","county":"Zapata","mw":120.0,"mw_text":"Desert Vine Solar LLC plans to construct an estimated 120 MWac photovoltaic solar energy facility in Zapata County, located within Zapata County ISD","cod":"Q42024","doc":"https://assets.comptroller.texas.gov/ch313/1722/1722-zapata-desert-app.pdf","counties":["Zapata"],"county_how":"application form","project_key":"DESERT VINE||solar|120.0","first_of_project":true},{"app":"1358","applicant":"Las Lomas Wind Energy, LLC","isd":"Zapata County ISD","app_date":"04/09/2019","first_tax_year":"2021","tech":"wind","county":"Zapata","mw":200.0,"mw_text":"Las Lomas Wind Energy, LLC anticipates that the project will have a capacity of approximately 200 megawatts (MW), comprised of between 44 and 80 wind turbines with a nameplate generating capacity rating of between 2","cod":null,"doc":"https://assets.comptroller.texas.gov/ch313/1358/zapata-1358-laslomas-app.pdf","counties":["Zapata"],"county_how":"application description","eia":{"id":63101,"n":"Las Lomas Wind Project","st":"operating"},"project_key":"LAS LOMAS||wind|200.0","first_of_project":true},{"app":"1832","applicant":"Redonda Solar LLC","isd":"Zapata County ISD","app_date":"05/03/2022","first_tax_year":"2025","tech":"solar","county":"Zapata","mw":250.0,"mw_text":"Redonda Solar LLC plans to construct an estimated 250 MWac photovoltaic solar energy facility in Zapata County, located within Zapata County ISD","cod":"Q42024","doc":"https://assets.comptroller.texas.gov/ch313/1832/1832-zapata-redonda-app.pdf","counties":["Zapata"],"county_how":"application form","project_key":"REDONDA||solar|250.0","first_of_project":true},{"app":"1259","applicant":"Reloj del Sol Wind Farm, LLC","isd":"Zapata County ISD","app_date":"05/25/2018","first_tax_year":"2021","tech":"wind","county":"Zapata","mw":202.0,"mw_text":"for which the Applicant is requesting an appraised value limitation will be a wind-powered electric generating facility with an estimated operating capacity of 202 megawatts of power","cod":"Q 4 2020","doc":"https://assets.comptroller.texas.gov/dat/ch313/1259/1259-zapata-reloj-app.pdf","counties":["Zapata"],"county_how":"application description","eia":{"id":62207,"n":"Reloj del Sol Wind Farm","st":"operating"},"project_key":"RELOJ DEL SOL||wind|202.0","first_of_project":true}]}