{"source":{"title":"ERCOT Transmission Project and Information Tracking (October 2026, no-cost public edition)","url":"https://www.ercot.com/files/docs/2022/03/02/ERCOT-October-TPIT-No-Cost-100126.xlsx","page":"https://www.ercot.com/gridinfo/planning","sha256":"4b1ba7546fae0f8f729855148a6882effd1c460466a25851a6c6dad197aaac69","retrieved_at":"2026-11-17"},"counts":{"future":1513,"planned":277,"completed":319,"cancelled":99},"cost_summary":{"sheet":"ImprovementCostSummary10232026","rows":[["2025 Completed","0","1338595000","1713556500","0","322517000","3374668500"],["2026 Completed","0","763293000","486329000","0","133966000.00000001","1383588000"],["2026 Planned","0","3005025000","1745012778","0","580261000","5330298778"],["2027","0","5202494202","3667097686","15000000","403294000","9287885888"],["2028","1632100000","5003012539","5374677101","0","641707000","12651496640"],["2029","2040500000","4443705002","2799260003","0","337907000","9671372005"],["2030","9159690000","1569308003","1454582432","0","171663000","12355243435"],["2031","2800268000","2273175002","664980000","0","104953000","5843376002"],["2032","4604330000","1856810000","234075000","0","21900000","6717115000"],["2033","0","1533190000","203180000","0","5000000","1741370000"],["2026 Completed","0","763293000","486329000","0","133966000.00000001","1383588000"],["2026 Planned","0","2354311000","1411288778","0","292418000","4058017778"],["2025-2033","20236888000","26988607748","18342750500","15000000","2723168000","68356414248"],["2025-2026","0","5106913000","3944898278","0","1036744000","10088555278"],["2027-2033","20236888000","21881694748","14397852222","15000000","1686424000","58267858970"]],"note":"ERCOT aggregate project cost by in-service year and voltage (USD), as published in the TPIT workbook; not per project."},"link_rules":"see scripts/grid-atlas/link-projects.mjs","tally":{"tpit":2208,"tpit_line_projects":915,"terminals_both":176,"direct":68,"path":38,"ambiguous_path":3,"endpoints_only":36,"mcpr_cross":14,"rpg_cross":54,"bus_bridge":24,"length_mismatch":31,"mcpr_possible":6},"projects":[{"id":"ercot-tpit:70550","ercot_project":"70550","title":"Create_GP_Solar_POI_Bus","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Glen Pine","to":"Explorer","county_from":"Van Zandt","county_to":"Van Zandt","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Created GP Solar POI bus."},{"id":"ercot-tpit:105622A","ercot_project":"105622A","title":"Adds type A load records at King","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"King","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:61406","ercot_project":"61406","title":"Kendall - Welfare Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-29","actual_isd":null,"cm_new":0,"cm_rebuilt":10.2,"from":"Kendall","to":"Welfare","county_from":"Kendall","county_to":"Kendall","tier":"Tier 3","rpg":"22RPG005","rpg_completed":"2022-09-09","bod_reviewed":null,"comments":null,"description":"This project will Increase the reliability of transmission facilities on the T584 Kendall to Welfare 138-kV and T656 Bergheim to Kendall 345-kV 10.2-mile double-circuit transmission line by replacing the aging conductor.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/146741265","name":"Kendall Substation","coordinates":[-98.8867,29.98492]},{"osm_id":"osm:way/146741284","name":"Welfare Substation","coordinates":[-98.76065,29.88682]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:73025","ercot_project":"73025","title":"New Shaula 345kV Substation","owner":"CPS/NO","owner_project":"S-0970","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-29","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5380","to":"5133, 5915","county_from":"DeWitt","county_to":"DeWitt","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New Shaula 345kV Substation will be looped into the existing Elm Creek to STP circuit 1 transmission line."},{"id":"ercot-tpit:99000D","ercot_project":"99000D","title":"Install (2) 14.4 MVAR distribution cap banks at Twinwood substation. Install (2) 14.4 MVAR distribution cap banks at Fulshear substation. Install (2) 40 MVAR transmission cap bank at Peters substation.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Twinwood","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (2) 14.4 MVAR distribution cap banks at Twinwood substation."},{"id":"ercot-tpit:100305","ercot_project":"100305","title":"Cross Expansion: Modify existing 345 kV Station","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Hall","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand Cross station to connect a large load"},{"id":"ercot-tpit:69902B","ercot_project":"69902B","title":"New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar.","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"TH Wharton","to":"Zenith","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.71C TH Wharton to Zenith in order to increase thermal limits"},{"id":"ercot-tpit:98593","ercot_project":"98593","title":"Quanah: Rebuild 69 kV Station","owner":"AEP TNC","owner_project":"TA2018027","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Quanah","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Dollars Update","description":"Rehab Quanah 69 kV station"},{"id":"ercot-tpit:75255F","ercot_project":"75255F","title":"San Antonio South Reliability RPG Project","owner":"CPS/NO","owner_project":null,"kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.89,"from":"5260","to":"5385","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"22RPG048","rpg_completed":null,"bod_reviewed":"2023-08-31","comments":null,"description":"Rebuild approximately 3 circuit miles of 138KV Transmission from Leon Creek to South San to meet current CPS Energy and industry standards. The new line will require a rating of 478MVA.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:90065","ercot_project":"90065","title":"Abilene Northwest to Mulberry Creek: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":"TP2023881","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.58,"from":"Abilene Northwest","to":"Mulberry Creek","county_from":"Taylor","county_to":"Jones","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rebuild the Abilene Northwest to Mulberry Creek 138 kV line","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:86796","ercot_project":"86796","title":"Buccaneer: Construct New 69 kV Station","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Buccaneer","to":null,"county_from":"McCulloch","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect the Oncor Regency station to the new Buccaneer 69 kV station on the Eden to North Brady 69 kV line between Melvin and North Brady"},{"id":"ercot-tpit:86800","ercot_project":"86800","title":"Pendulo: Construct New 345 kV Terminal","owner":"ETT/AEP TNC/ETT","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pendulo","to":null,"county_from":"Haskell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Rubicon Alpha Wind to the Pendulo 345 kV station"},{"id":"ercot-tpit:67422F","ercot_project":"67422F","title":"Greens Bayou to Clinton 138kV Conversion","owner":"CNP","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clinton","to":"Greens Bayou","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove Wallisville substation from Ckt.10A service… Resulting in Ckt.10A Clinton to Greens Bayou"},{"id":"ercot-tpit:65837","ercot_project":"65837","title":"New Cachena 345kV Switchyard","owner":"CPS/NO","owner_project":"S-0966","kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5068","to":"5133, 5323","county_from":"Wilson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"The New 345kV Cachena switchyard will be looped into the future 345 kV Elm Creek to New Hickory ckt 1 transmission line . This loop should be rated to match or exceed the existing line rating."},{"id":"ercot-tpit:99000A","ercot_project":"99000A","title":"Install (2) 14.4 MVAR distribution cap banks at Twinwood substation. Install (2) 14.4 MVAR distribution cap banks at Fulshear substation. Install (2) 40 MVAR transmission cap bank at Peters substation.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fulshear","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (2) 14.4 MVAR distribution cap banks at Fulshear substation."},{"id":"ercot-tpit:67329","ercot_project":"67329","title":"San Miguel to Cruce 345 kV lines","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":231.12,"cm_rebuilt":0,"from":"San Miguel","to":"Cruce","county_from":"Atascosa","county_to":"Duval","tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-12-23","bod_reviewed":null,"comments":null,"description":"New San Miguel to Cruce 345 kV double circuit lines","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:73496","ercot_project":"73496","title":"Nelson Sharpe: Construct New 345 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Nelson Sharpe","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Noria Hondo Solar and BESS to the Nelson Sharpe 345 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:109924","ercot_project":"109924","title":"Install a new 138kV switchyard to connect new El Patrimonio Solar PV Generation. The switchyard will be looped into the existing 138 kV Leon Creek to Trumbo transmission line.","owner":"CPS/NO","owner_project":"T-0374","kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5333","to":"5260, 5429","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:90059","ercot_project":"90059","title":"Cascabel: Construct New 345 kV Station","owner":"ETT","owner_project":"TP2024121","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cascabel","to":null,"county_from":"Jones","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Moccasin Solar to the new Cascabel 345 kV station on the Clear Crossing to Figaro 345 kV line between Clear Crossing and Kirchoff"},{"id":"ercot-tpit:75255C","ercot_project":"75255C","title":"San Antonio South Reliability RPG Project","owner":"CPS/NO","owner_project":null,"kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":4.87,"from":"5230","to":"5260","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"22RPG048","rpg_completed":null,"bod_reviewed":"2023-08-31","comments":null,"description":"The Leon Creek to Howard Rd circuit should be upgraded to 698 MVA, minimum.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:67422G","ercot_project":"67422G","title":"Greens Bayou to Clinton 138kV Conversion","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":2.17,"cm_rebuilt":0,"from":"Greens Bayou","to":"Clinton","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert Wallisville substation from Ckt.10A service to 138kV loop service on 138kV TEXWAL to Clinton Ckt.13 to create new Ckt.13 Greens Bayou to TEXWAL to Wallisville to Clinton.","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:78461B","ercot_project":"78461B","title":"West Columbia to Damon and Needville to Big Creek Ckt.89A Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":5.46,"from":"Needville","to":"Big Creek","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":"23RPG021","rpg_completed":"2023-08-31","bod_reviewed":"2023-08-31","comments":null,"description":"Rebuild/reconductor Needville to Big Creek Ckt.89 as a Hardening upgrade.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:20TPIT0000","ercot_project":"20TPIT0000","title":"Parkway Substation T1 Replacement","owner":"GVEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-02-04","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Parkway","to":null,"county_from":"Guadalupe","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace T1, 20 MVA with a 40 MVA 138-13.09 kV transformer"},{"id":"ercot-tpit:99138","ercot_project":"99138","title":"Establish Herndon 345 kV Switch","owner":"ONCOR","owner_project":"R6407","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-02-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Herndon","to":"Herndon","county_from":"Milam","county_to":"Milam","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Herndon 345 kV Switch"},{"id":"ercot-tpit:65719","ercot_project":"65719","title":"Rebuild/reconductor portions of Ckt.05A Missouri City to Sienna as a Hardening upgrade(24RPG030).","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":3.8,"from":"Missouri City","to":"Sienna","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 4","rpg":"24RPG030","rpg_completed":"2024-10-10","bod_reviewed":"2024-10-10","comments":null,"description":"Rebuild and reconductor portion of Missouri City to Sienna Ckt.05A as a Hardening upgrade","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/129126589","name":"Missouri City Substation","coordinates":[-95.53006,29.61265]},{"osm_id":"osm:way/293342157","name":"Sienna Substation","coordinates":[-95.56131,29.53812]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:76242","ercot_project":"76242","title":"Lytle: Construct New 138 kV Terminal","owner":"ETT/AEP TCC/ETT","owner_project":"TP2022155","kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-02-28","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Lytle","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Status, Transmission Owner and In-Service Date Update","description":"Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:64499","ercot_project":"64499","title":"Hyde Park to Downtown Ckt.32A Upgrades","owner":"CNP","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":1.2,"from":"Downtown","to":"Hyde Park","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Hyde Park to Downtown Ckt.32A","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/54370017","name":"Downtown Substation","coordinates":[-95.37379,29.75512]},{"osm_id":"osm:way/336565806","name":"Hyde Park Substation","coordinates":[-95.38442,29.7479]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:73063","ercot_project":"73063","title":"Big Foot to Lytle: Convert to 138 kV","owner":"AEP TCC","owner_project":"TP2022155","kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":12,"from":"Big Foot","to":"Lytle","county_from":"Medina","county_to":"Frio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Status, In-Service Date and Reactive Capability Added Update","description":"Convert the Big Foot to Lytle 69 kV line to 138 kV and interconnect Rowan Digital to the Lytle 138 kV station","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:90232B","ercot_project":"90232B","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"PH Robinson","to":"Meadow","county_from":"Galveston","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:81229","ercot_project":"81229","title":"Upgrade Oaks Auto","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Oaks","to":"Oaks","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Oaks Auto to 150MVA"},{"id":"ercot-tpit:76816","ercot_project":"76816","title":"Upgrade Loyola Auto","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Loyola","to":"Loyola","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Loyola Auto"},{"id":"ercot-tpit:90476","ercot_project":"90476","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-01","actual_isd":null,"cm_new":1.5,"cm_rebuilt":0,"from":"Sivells Bend Tap","to":"Sivells Bend","county_from":"Cooke","county_to":"Cooke","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:89961","ercot_project":"89961","title":"RCEC_Horton_Load","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Added Horton bus, along with load and branches"},{"id":"ercot-tpit:99391B","ercot_project":"99391B","title":"Stanton East - Midland Basin - Spraberry 69 kV Line Conversion to 138 kV","owner":"ONCOR","owner_project":"PB_L18_A","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Spraberry","to":"Stanton East","county_from":"Midland","county_to":"Midland","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add part of Permian Basin Reliability Plan Upgrade ID L18. Decommissions Midland Basin, Midland Gulf, Spraberry, Martin, and Stanton East 69 kV Stations."},{"id":"ercot-tpit:104551","ercot_project":"104551","title":"Models ALUVIUM","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:112691","ercot_project":"112691","title":"WETT Buck Canyon 345 kV Station for Synchronous Condensers","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-03-10","actual_isd":null,"cm_new":0.64,"cm_rebuilt":0,"from":"Long Draw","to":"Buck Canyon","county_from":"Borden","county_to":"Borden","tier":"Tier 3","rpg":"24RPG041","rpg_completed":"2025-01-28","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:107120","ercot_project":"107120","title":"Pastor Substation Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pastor","to":null,"county_from":"Concho","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will install the transmission interconnection facilities including constructing a new 345-kV substation (\"Pastor\")."},{"id":"ercot-tpit:72568","ercot_project":"72568","title":"Friendship to Rutherford Storm Hardening","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-15","actual_isd":null,"cm_new":0,"cm_rebuilt":4.5,"from":"Friendship","to":"Rutherford","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild single circuit section of Friendship to Rutherford and reconductor with bundled 795 ACSR Conductor, 440 MVA. Replaces Project ID 61270.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:87697","ercot_project":"87697","title":"Bell County - Poage - Seaton 69 kV Line Conversion to 138 kV","owner":"ONCOR","owner_project":"R6367","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-15","actual_isd":null,"cm_new":0,"cm_rebuilt":17.8,"from":"Bell County","to":"Seaton","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Bell County - Poage - Seaton 69 kV Line Conversion to 138 kV","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174019719","name":"Bell County Switching Station","coordinates":[-97.39354,31.01004]},{"osm_id":"osm:way/340206120","name":"Seaton Substation","coordinates":[-97.28245,31.08098]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:89952","ercot_project":"89952","title":"RCEC_AllenNorthLoad","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-15","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Collin","county_to":"Collin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding Allen North Load Bus, Load and Branch from Allen NLoad to RIDGVIEW_8","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:80336","ercot_project":"80336","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-15","actual_isd":null,"cm_new":0,"cm_rebuilt":2.23,"from":"WESTLOOP","to":"BROCK","county_from":"Parker","county_to":"Parker","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:78179","ercot_project":"78179","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ding Dong","to":"Ding Dong","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:91570","ercot_project":"91570","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-19","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gustine","to":"Pottsville","county_from":"Hamilton","county_to":"Hamilton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:89922","ercot_project":"89922","title":"Whaley 345kV Substation Expansion for ROSE/Rock Rose Energy BESS (26INR0201)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-19","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Waterhole","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand Whaley 345kV Substation for ROSE / Rock Rose Energy BESS (26INR0201). Connect generator through one new generator lead."},{"id":"ercot-tpit:102536","ercot_project":"102536","title":"Rebuild/reconductor portions of Ckt.94B King to CHAMON as a Hardening upgrade","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-30","actual_isd":null,"cm_new":0,"cm_rebuilt":3.45,"from":"King","to":"CHAMON","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:44399","ercot_project":"44399","title":"South Padre Island: Rebuild as GIS station","owner":"AEP TCC","owner_project":"3712","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"South Padre Island","to":"-","county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":"24RPG036","rpg_completed":"2024-12-27","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rebuild South Padre Island as a GIS"},{"id":"ercot-tpit:86771","ercot_project":"86771","title":"Scissortail: Construct New 138 kV Station","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Scissortail","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Dollars Update","description":"Interconnect the TNMP Flycatcher station to the new Scissortail 138 kV station on the Saragosa to Solstice 138 kV line between Hoef's Road and Verhalen"},{"id":"ercot-tpit:80852","ercot_project":"80852","title":"Lolita: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lolita","to":null,"county_from":"Jackson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Third Coast BESS to the Lolita 138 kV station"},{"id":"ercot-tpit:80502","ercot_project":"80502","title":"Lon Hill: Construct New 345 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-31","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Lon Hill","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect the Tom Cruise load to the Lon Hill 345 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:76914","ercot_project":"76914","title":"Ocelot: Construct New 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-03-31","actual_isd":null,"cm_new":0.189,"cm_rebuilt":0,"from":"Ocelot","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact, In-Service Date and Dollars Update","description":"Interconnect the Ocelot load to the new Ocelot 138 kV station on the Military Highway to Palo Alto 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:99917","ercot_project":"99917","title":"Fayetteville AT2 Autotransformer Restoration","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will install, test, and commission a replacement 672 MVA Auto Transformer (AT2) to replace the existing failed unit. SMIT will manufacture and design the replacement 672MVA AT2 which is covered under warranty. The new unit will be iden"},{"id":"ercot-tpit:105602","ercot_project":"105602","title":"MODELS FLYCATCHER","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Reeves","county_to":"Reeves","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:100478","ercot_project":"100478","title":"Establish Woodfin 138 kV Switch","owner":"ONCOR","owner_project":"M3341","kv":345,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2027-03-31","actual_isd":"2025-05-15","cm_new":0,"cm_rebuilt":0,"from":"Woodfin 345 kV Switch","to":null,"county_from":"Lamar","county_to":"Lamar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Woodfin 138 kV Switch"},{"id":"ercot-tpit:109599","ercot_project":"109599","title":"Expand Katy Substation Ckt.09H for 4th Distribution Transformer.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Katy","to":null,"county_from":"Waller","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110102","ercot_project":"110102","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Elmaton","to":"Elmaton","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Co-located with battery storage Project. Interconnect into existing Elmaton substation located between South Texas Project and W.A. Parish"},{"id":"ercot-tpit:76293","ercot_project":"76293","title":"Upgraded Cedvale-MiDiva138KV","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0.15,"from":"Cerdarvale","to":"Midiva","county_from":"Ward","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:86782","ercot_project":"86782","title":"Add Dansk load serving substation","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":"2024-02-01","bod_reviewed":null,"comments":null,"description":"Cuts in new Dansk load serving station on existing Red Bluff to Danevang transmission line"},{"id":"ercot-tpit:80404","ercot_project":"80404","owner":"BRYN","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-01","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"BRYN EAST","to":"RAYBURN","county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reroute East to Rodgers 69kV line to create East to Rayburn 69kV line to accommodate the TXDOT SH6 project.","terminal_match":{"from":"not_in_osm","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/1389561562","name":"Rodgers Substation","coordinates":[-96.34677,30.66878]},{"osm_id":"osm:way/100103259","name":"East Substation","coordinates":[-96.29895,30.65945]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:92890","ercot_project":"92890","title":"Add Fresa load serving substation","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Atascosa","county_to":"Atascosa","tier":"Tier 4","rpg":null,"rpg_completed":"2024-02-01","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:91457B","ercot_project":"91457B","title":"Establish Drane 345 kV Switch","owner":"ONCOR","owner_project":"R6410","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-01","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Drane 345 kV Switch","to":"Tormes Solar","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Drane 345 kV Switch Gen Tie","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:73663","ercot_project":"73663","title":"New transformer (T1) at BPUB Waterport Substation","owner":"BPUB/BROWNSVILLE PUB","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-02","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Waterport Substation (59450)","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"BPUB new load T1 at bus 59450"},{"id":"ercot-tpit:112656","ercot_project":"112656","title":"Hagansport 138 kV Switch","owner":"ONCOR","owner_project":"M3333","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-04","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hagansport Switch","to":null,"county_from":"Franklin","county_to":"Franklin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Hagansport 138 kV Switch"},{"id":"ercot-tpit:104567","ercot_project":"104567","title":"BBEC Sandy Hill T2","owner":"BBEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sandy Hill","to":null,"county_from":"Washington","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Second Transformer at Sandy Hill"},{"id":"ercot-tpit:80295","ercot_project":"80295","title":"Add 2nd transformer at Ponder","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ponder","to":"Ponder","county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add 2nd transformer at Ponder"},{"id":"ercot-tpit:82840","ercot_project":"82840","owner":"BEPC","owner_project":null,"kv":115,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-16","actual_isd":null,"cm_new":3,"cm_rebuilt":0,"from":"HYDRA","to":"Hydroponic","county_from":"Lubbock","county_to":"Lubbock","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105135","ercot_project":"105135","title":"Missouri City Low Profile Conversion","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Missouri City","to":"Blueridge / DEWALT","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert Missouri City distribution substation to low-profile. Install Missouri City TR4 at Ckt.02A Blueridge to Missouri City to DEWALT."},{"id":"ercot-tpit:103299","ercot_project":"103299","title":"Bluff Creek: Upgrade Relaying and Communication","owner":"AEP TNC","owner_project":"TP2025822","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bluff Creek","to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":"2026-02-11","bod_reviewed":"2026-02-11","comments":null,"description":"Upgrade the relaying and communication at the Bluff Creek 138 kV station to support the Buffalo Gap Wind Repower"},{"id":"ercot-tpit:99798","ercot_project":"99798","title":"Citrus City: Install 138 kV circuit breakers","owner":"AEP TCC","owner_project":"TP2023324","kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Citrus City","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Status and In-Service Date Update","description":"Install breakers at the Citrus City 138 kV station"},{"id":"ercot-tpit:90051","ercot_project":"90051","title":"Riley: Construct New 345 kV Terminal","owner":"AEP TNC/ETT","owner_project":"TP2024133","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Riley","to":null,"county_from":"Wilbarger","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect the Sabey Data Center load to the existing Riley 345 kV station"},{"id":"ercot-tpit:98601","ercot_project":"98601","title":"Riley: Expand 345 kV Station","owner":"ETT/AEP TNC","owner_project":"TP2025169","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0.25,"cm_rebuilt":0,"from":"Riley","to":null,"county_from":"Wilbarger","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Interconnect Dundee Wind and Felix Solar to the existing Riley 345 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:84900","ercot_project":"84900","title":"23RPG032: San Antonio South Reliability II: Rebuild Pawnee to Tango into a double circuit","owner":"CPS/CPS, STEC, AEP","owner_project":"T-0401","kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-04-30","actual_isd":null,"cm_new":12.2,"cm_rebuilt":12.2,"from":"5725","to":"8689","county_from":"Karnes","county_to":"Bee","tier":"Tier 1","rpg":"23RPG032","rpg_completed":null,"bod_reviewed":"2024-04-23","comments":null,"description":"Rebuild approximately 12 miles of existing horizontal single circuit 345kV transmission infrastructure into new vertical double circuit 345kV transmission infrastructure.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:84902","ercot_project":"84902","title":"23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit","owner":"CPS/CPS, STEC","owner_project":"T-0400","kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-04-30","actual_isd":null,"cm_new":45.83,"cm_rebuilt":45.83,"from":"5400","to":"5725","county_from":"Bexar","county_to":"Karnes","tier":"Tier 1","rpg":"23RPG032","rpg_completed":null,"bod_reviewed":"2024-04-23","comments":null,"description":"The final upgrades on the STEC side will be completed and the ultimate ratings of the double circuit will be realized.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:90049","ercot_project":"90049","title":"Yellowjacket: Construct New 138 kV Terminal","owner":"ETT","owner_project":"TP2024115","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"Yellowjacket","to":null,"county_from":"Menard","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Dollars Update","description":"Interconnect Black and Gold Energy Storage to the Yellowjacket 138 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:86802","ercot_project":"86802","title":"Saragosa: Construct New 138 kV Terminal","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Saragosa","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Cantaloupe Solar to the Saragosa 138 kV station"},{"id":"ercot-tpit:87019","ercot_project":"87019","title":"Rincon: Upgrade 138 kV Bus","owner":"AEP TCC","owner_project":"TP2024029","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rincon","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Upgrade the Rincon 138 kV bus"},{"id":"ercot-tpit:87027","ercot_project":"87027","title":"Black Bayou: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":"TP2024060","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Black Bayou","to":null,"county_from":"Victoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Two Brothers BESS to the Black Bayou 138 kV station"},{"id":"ercot-tpit:51005","ercot_project":"51005","title":"Rocksprings to Friess Ranch: Rebuild 69 kV line","owner":"AEP TCC/AEP TNC, ETT","owner_project":"2792","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":22.6,"from":"Rocksprings","to":"Friess Ranch","county_from":"Edwards","county_to":"Sutton","tier":"Tier 3","rpg":"19RPG018","rpg_completed":"2019-11-18","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rehab Rocksprings to Sonora 69 kV line","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:86022","ercot_project":"86022","title":"Jordan 138kV Substation Expansion for Coneflower Storage (23INR0425)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jordan","to":"Coneflower","county_from":"Chambers","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand 138kV Jordan substation for Coneflower Storage generator interconnection (23INR0425)"},{"id":"ercot-tpit:76580","ercot_project":"76580","title":"Poblano: Build new 138 kV station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Poblano","to":null,"county_from":"Uvalde","county_to":null,"tier":"Tier 3","rpg":"23RPG007","rpg_completed":"2023-05-19","bod_reviewed":null,"comments":"In-Service Date Update","description":"Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station"},{"id":"ercot-tpit:75255D","ercot_project":"75255D","title":"San Antonio South Reliability RPG Project","owner":"CPS/NO","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":14.36,"from":"5231","to":"5056","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"22RPG048","rpg_completed":null,"bod_reviewed":"2023-08-31","comments":null,"description":"Rebuild/Upgrade 14.9 mile Cagnon to Howard 345kV double circuit transmission line with a minimum rating of 1746 MVA.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:87508","ercot_project":"87508","title":"RCEC_BranchChanges_Kaufman_Update2","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":4.51,"from":null,"to":null,"county_from":"Kaufman","county_to":"Kaufman","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Modifying branch impedance between ROSHILRC and TALTY_RC","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:87497","ercot_project":"87497","title":"RCEC_BranchChanges_Kaufman__Update1","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.65,"from":null,"to":null,"county_from":"Kaufman","county_to":"Kaufman","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Modifying branch impedance between Boze and Scury_RC","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:91463","ercot_project":"91463","title":"New Station tapping Oak Grove to Rand 138kV line.","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New Station tapping Oak Grove to Rand 138kV line."},{"id":"ercot-tpit:88041","ercot_project":"88041","title":"24RPG004: Omicron Reliability Project: Rebuild Leon Creek to Pearsal","owner":"CPS/NO","owner_project":"T-0396","kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":1.67,"from":"5260","to":"5335","county_from":"Bexar","county_to":"Bexar","tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":"Rebuild ~1.6 miles of double-ckt from Leon Creek to Pearsall transmission line with normal and emergency ratings of at least 478MVA","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:75255E","ercot_project":"75255E","title":"San Antonio South Reliability RPG Project","owner":"CPS/NO","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":14.36,"from":"5231","to":"5056","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"22RPG048","rpg_completed":null,"bod_reviewed":"2023-08-31","comments":null,"description":"Rebuild/Upgrade 14.9 mile Cagnon to Howard 345kV double circuit transmission line with a minimum rating of 1746 MVA.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:99266","ercot_project":"99266","title":"Big Spring - Steer 138 kV Line Rebuild","owner":"ONCOR","owner_project":"PB_L21_B","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":5.8,"from":"Big Spring","to":"Steer","county_from":"Howard","county_to":"Howard","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L21B. Upgrade the existing Big Spring - Steer 138-kV line.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99341","ercot_project":"99341","title":"Horntoad 345 kV Switch","owner":"ONCOR","owner_project":"R8911","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-06","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Horntoad","to":"Horntaod","county_from":"Ward","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Horntoad 345 kV Switch to connect a generator"},{"id":"ercot-tpit:82826","ercot_project":"82826","title":"Sunflower 138 kV Switch","owner":"ONCOR","owner_project":"R6322","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-06","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sunflower Switch","to":"Sunflower Switch","county_from":"McLennan","county_to":"McLennan","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Sunflower 138 kV Switch"},{"id":"ercot-tpit:103506","ercot_project":"103506","title":"Add Spadefoot 345 kV Switch","owner":"ONCOR","owner_project":"R8925","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-13","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Spadefoot","to":"Spadefoot","county_from":"Ward","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Spadefoot 345 kV Switch"},{"id":"ercot-tpit:89912","ercot_project":"89912","title":"Olmos to Wilson T297 Transmission Line Rebuild","owner":"GVEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-14","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Olmos","to":"Wilson","county_from":"Guadalupe","county_to":"Wilson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild 7.18 miles of 138 kV from 477 conductor wood pole line to 795 drake conductor concrete/steel transmission line"},{"id":"ercot-tpit:100257","ercot_project":"100257","title":"Hill Country Auto #4 will be replaced Summer 2027 to a 10% impedance auto.","owner":"CPS/NO","owner_project":"S-0959","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-14","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5211","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109898","ercot_project":"109898","title":"Construct New Alamo City 138kV Substation","owner":"CPS","owner_project":"T-0416","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-14","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5008","to":"5110, 5294","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:107130","ercot_project":"107130","title":"LCRATSC Highline Substation Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-14","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Highline Substation","to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will install the transmission interconnection facilities including constructing a new 345-kV substation (\"Highline\")."},{"id":"ercot-tpit:107128","ercot_project":"107128","title":"Concho River Substation Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-14","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Concho River","to":null,"county_from":"Concho","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will install the transmission interconnection facilities including constructing a new 345-kV substation (Concho River Substation)."},{"id":"ercot-tpit:92625","ercot_project":"92625","title":"Chelsea 138 kV Switch","owner":"ONCOR","owner_project":"M5019","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-14","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Chelsea Switch","to":null,"county_from":"Collin","county_to":"Collin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Chelsea 138 kV Switch"},{"id":"ercot-tpit:111798","ercot_project":"111798","title":"Establish Wingate 345 kV Switch","owner":"ONCOR","owner_project":"R6464","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Wingate 345 kV Switch","to":"Wingate 345 kV Switch","county_from":"Nacogdoches","county_to":"Nacogdoches","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Wingate 345 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:112695","ercot_project":"112695","title":"WETT Pitchfork 345 kV Station for Synchronous Condensers","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0.21,"from":"Cottonwood","to":"Pitchfork","county_from":"Dickens","county_to":"Dickens","tier":"Tier 3","rpg":"25RPG005","rpg_completed":"2025-03-10","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/453589317","name":"Cottonwood Substation","coordinates":[-100.87665,33.77829]},{"osm_id":"osm:way/1490401522","name":"Pitchfork Switchyard","coordinates":[-100.87854,33.77494]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 3.3 mi but ERCOT reports 0.21 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:110174","ercot_project":"110174","title":"Lytton Springs - Mendoza Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0.6,"from":"Lytton Springs","to":"Mendoza","county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the 0.6-mile Lytton Springs - Mendoza 138-kV circuit to achieve a minimum 724 MVA emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/173981611","name":"Lytton Springs Substation","coordinates":[-97.67431,30.00537]},{"osm_id":"osm:way/173981661","name":"Mendoza Substation","coordinates":[-97.66761,30.00353]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 1.3 mi but ERCOT reports 0.6 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:104623","ercot_project":"104623","title":"Establish Triple Seven 345 kV Switch","owner":"ONCOR","owner_project":"R6405","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Triple Seven","to":"Triple Seven","county_from":"Lampasas","county_to":"Lampasas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Triple Seven 345 kV Switch for Thomas Cameron BESS"},{"id":"ercot-tpit:104625","ercot_project":"104625","title":"Establish Rumor 345 kV Switch","owner":"ONCOR","owner_project":"R6406","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rumor","to":"Rumor","county_from":"Mills","county_to":"Mills","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Rumor 345 kV Switch for Chisme Solar and Storage"},{"id":"ercot-tpit:104652","ercot_project":"104652","title":"Establish Bell Springs 138 kV Switch","owner":"ONCOR","owner_project":"R6472","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Bell Springs 138 kV Switch","to":"Bell Springs 138 kV Switch","county_from":"Hill","county_to":"Hill","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Bell Springs 138 kV Switch for Vial BESS","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104655","ercot_project":"104655","title":"Establish Gamblin 138 kV Switch","owner":"ONCOR","owner_project":"R6456","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gamblin 138 kV Switch","to":"Gamblin 138 kV Switch","county_from":"Rains","county_to":"Rains","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Gamblin 138 kV Switch for Willis Storage"},{"id":"ercot-tpit:104660","ercot_project":"104660","title":"Establish Peach Tree 138 kV Switch","owner":"ONCOR","owner_project":"R6470","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Peach Tree 138 kV Switch","to":"Peach Tree 138 kV Switch","county_from":"Freestone","county_to":"Freestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Peach Tree 138 kV Switch for Fairway Storage"},{"id":"ercot-tpit:105008","ercot_project":"105008","title":"Wingjet_Switch_138kV","owner":"ONCOR","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Base Camp Switch","to":"Hicks Switch","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Wingjet 138 kV Switch"},{"id":"ercot-tpit:105060","ercot_project":"105060","title":"Union - Deep Creek 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8744","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9.8,"from":"Union","to":"Deep Creek","county_from":"Scurry","county_to":"Scurry","tier":"Tier 3","rpg":"26RPG014","rpg_completed":"2026-04-10","bod_reviewed":"2026-05-04","comments":null,"description":"Rebuild existing 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105063","ercot_project":"105063","title":"Union - Dermott 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8839","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.4,"from":"Union","to":"Dermott","county_from":"Scurry","county_to":"Scurry","tier":"Tier 3","rpg":"26RPG014","rpg_completed":"2026-05-04","bod_reviewed":null,"comments":null,"description":"Rebuild existing 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:105316","ercot_project":"105316","title":"Ennis West Switch – Sterrett Switch 138kV Line Upgrade","owner":"ONCOR","owner_project":"M4200","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":21,"from":"Ennis West Switch","to":"Sterrett Switch","county_from":"Ellis","county_to":"Ellis","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Ennis West Switch – Sterrett Switch 138kV Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105472","ercot_project":"105472","title":"Silverleaf 345kV BUS from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Ward","county_to":"Ward","tier":"Tier 1","rpg":"23RPG013","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:91881B","ercot_project":"91881B","title":"Medallion 138 kV Switch","owner":"ONCOR","owner_project":"R8821","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Midland","to":"Midland","county_from":"Midland","county_to":"Midland","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reterminates South Curtis 138 kV POD into a new terminal at Medallion 138 kV Switch"},{"id":"ercot-tpit:91847C","ercot_project":"91847C","title":"Hornsby Load Power Transformer Addition","owner":"LCRATSC","owner_project":"PLC-8186","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:72011B","ercot_project":"72011B","title":"Tonkawa - Ranger Camp 345 kV Line Rebuild","owner":"ONCOR","owner_project":"R3025","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":21.3,"from":"Tonkawa","to":"Ranger Camp","county_from":"Mitchell","county_to":"Scurry","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Tonkawa - Ranger Camp 345 kV Line Rebuild","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:100184","ercot_project":"100184","title":"LyttonSprings_Mendoza_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lytton Springs","to":"Mendoza","county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T534 Lytton Springs - Mendoza 138-kV transmission line to obtain a higher operational rating."},{"id":"ercot-tpit:100698","ercot_project":"100698","title":"Install a 35.72MVAr Capacitor Bank at Potranco Substation","owner":"CPS/NO","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5346","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102788","ercot_project":"102788","title":"Overland_Substation_Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Pecos","county_to":"Pecos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 345-kV Overland substation and cut-in the double circuit Bakersfield Substation to Solstice Substation 345-kV transmission line (T718 and T683) to provide two (2) Points of Interconnection"},{"id":"ercot-tpit:102846","ercot_project":"102846","title":"Longshore 345 kV Switch Rebuild","owner":"ONCOR","owner_project":"R8719","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cattleman","to":"Longshore","county_from":"Mitchell","county_to":"Howard","tier":"Tier 1","rpg":"23RPG034","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Longshore 345 kV Switch Rebuild: Cattleman 345 kV Line Re-terminations"},{"id":"ercot-tpit:99353","ercot_project":"99353","title":"Oak Spring (fka Roscoe, Plowboy) 345/138 kV Switch","owner":"ONCOR","owner_project":"R8613","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Nolan","county_to":"Nolan","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L25A and L25B. Establish a new Roscoe 345/138-kV substation near the Sweetwater Tap (1341) and install two new 345/138-kV transformers. Loop the existing Sweetwater East - Champion Creek/Bitter ","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:91626","ercot_project":"91626","title":"Upgrading Buda to Manchaca","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrading Buda to Manchaca branch to minimum of 379 MVA."},{"id":"ercot-tpit:92347","ercot_project":"92347","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"New station Walston","to":"Butler","county_from":"Freestone","county_to":"Freestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:92622","ercot_project":"92622","title":"Elroy_Wolf_Lane_Transmission_Line_Overhaul","owner":"LCRATSC","owner_project":"PLC-6950","kv":138,"list":"future","status_reported":"In-Service","status":"In service","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bastrop","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee"},{"id":"ercot-tpit:92627","ercot_project":"92627","title":"Colton_Mendoza_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":"PLC-7994","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Caldwell","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee"},{"id":"ercot-tpit:92778","ercot_project":"92778","title":"Dunham 345-138 kV Switch and Dunham - Burger Lake 138 kV Line Section","owner":"ONCOR","owner_project":"M5007","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Dunham","to":"Dunham","county_from":"Denton","county_to":"Denton","tier":"Tier 3","rpg":"25RPG023","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Dunham 345/138 kV Switch and Dunham - Burger Lake 138 kV Line Section"},{"id":"ercot-tpit:93191","ercot_project":"93191","title":"Bent Tree 138 kV Substation","owner":"ONCOR","owner_project":"R6388","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bent Tree Substation","to":"Bent Tree Substation","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Bent Tree 138 kV Substation with 55.2 MVAR capacitor bank using 3-18.4 MVAR stages"},{"id":"ercot-tpit:98873","ercot_project":"98873","title":"Prong Moss 345-138 kV auto-transformers and 138 kV Switch","owner":"ONCOR","owner_project":"R8661","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Prong Moss","to":"Prong Moss","county_from":"Howard","county_to":"Howard","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L20A, L20B and L20D Establish a new Prong Moss 345/138-kV substation and install two new 345/138-kV transformers. Loop the existing Elbow - Bulldog 138-kV line into Prong Moss. Loop the existing"},{"id":"ercot-tpit:98875","ercot_project":"98875","title":"Redberry (fka Elbow) - Prong Moss 138 kV Line Rebuild","owner":"ONCOR","owner_project":"PB_L20_C","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":5.782,"from":"Elbow","to":"Prong Moss","county_from":"Howard","county_to":"Howard","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L20C Upgrade the existing Redberry (fka Elbow) - Prong Moss 138-kV line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99064","ercot_project":"99064","title":"Clarksville 69 kV Capacitor Bank","owner":"ONCOR","owner_project":"M5350","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clarksville","to":null,"county_from":"Red River","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Clarksville 69 kV Capacitor Bank"},{"id":"ercot-tpit:99321","ercot_project":"99321","title":"Austin Ranch 138kV Capacitor Bank","owner":"ONCOR","owner_project":"M3222","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Austin Ranch","to":"Austin Ranch","county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Austin Ranch 138kV Capacitor Bank"},{"id":"ercot-tpit:99367","ercot_project":"99367","title":"China Grove - 900126 (towards Barber Lake) 138 kV Line Section Rebuild","owner":"ONCOR","owner_project":"PB_L22_F","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0.1,"from":"China Grove","to":"Barber Lake","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L22F. Upgrade the existing China Grove - 900126 138-kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/458556059","name":"China Grove Switching Station","coordinates":[-100.87368,32.5235]},{"osm_id":"osm:way/456417965","name":"Barber Lake Substation","coordinates":[-100.91546,32.39984]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 18.1 mi but ERCOT reports 0.1 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:99542","ercot_project":"99542","title":"Establish Axtell 345 kV Switch","owner":"ONCOR","owner_project":"R6469","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Axtell 345 kV Switch","to":"Axtell 345 kV Switch","county_from":"McLennan","county_to":"McLennan","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Axtell 345 kV Switch for Pepper Solar"},{"id":"ercot-tpit:99610","ercot_project":"99610","title":"Upgrade Jacksonville Switch 138/69 kV Auto","owner":"ONCOR","owner_project":"R6399","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jacksonville 69 kV Switch","to":"Jacksonville 69 kV Switch","county_from":"Cherokee","county_to":"Cherokee","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Jacksonville Switch 138/69 kV Auto"},{"id":"ercot-tpit:99624","ercot_project":"99624","title":"Upgrade Redland Switch - Herty Tap 138 kV Line Section","owner":"ONCOR","owner_project":"R6291","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.9,"from":"Redland 138 kV Switch","to":"Herty Tap","county_from":"Angelina","county_to":"Angelina","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Redland Switch - Herty Tap 138 kV Line Section","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99685","ercot_project":"99685","title":"Nimbus 345 kV Switch","owner":"ONCOR","owner_project":"M4475","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Nimbus Switch","to":null,"county_from":"Ellis","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Nimbus 345 kV Switch"},{"id":"ercot-tpit:99687","ercot_project":"99687","title":"Paradise Lake 345 kV Switch","owner":"ONCOR","owner_project":"M3340","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Franklin","to":"Franklin","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Paradise Lake 345 kV Switch"},{"id":"ercot-tpit:99833","ercot_project":"99833","title":"LCRATSC_Kempner-Lampasas_Transmission_Line_Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":5.62,"from":"7061 Copperas Cove","to":"7260 Kempner","county_from":"Lampasas","county_to":"Lampasas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 7.7 mile T154 Kempner - Lampasas 138-kV transmission line.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/504849103","name":"Copperas Cove Substation","coordinates":[-97.96091,31.10978]},{"osm_id":"osm:way/504849106","name":"Kempner Substation","coordinates":[-98.05398,31.09134]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/504849104","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":5.7,"straight_mi":null},{"id":"ercot-tpit:99941","ercot_project":"99941","title":"Kirkland 138 kV Capacitor Bank","owner":"ONCOR","owner_project":"M4022","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kirkland","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Kirkland 138 kV Capacitor Bank"},{"id":"ercot-tpit:80546C","ercot_project":"80546C","title":"Upgrade the Hutto & Round Rock - Salado 138 kV Line","owner":"ONCOR","owner_project":"R6203, R6202","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":12.9,"cm_rebuilt":12.9,"from":"Georgetown East","to":"Sonterra","county_from":"Williamson","county_to":"Williamson","tier":"Tier 3","rpg":"24RPG018, 25RPG006","rpg_completed":"2025-03-17","bod_reviewed":null,"comments":null,"description":"Rebuild and double-circuit the Georgetown East - Sonterra 138 kV Line Section","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/240078927","name":"Georgetown East Substation","coordinates":[-97.64491,30.62372]},{"osm_id":"osm:way/213201551","name":"Sonterra Substation","coordinates":[-97.60762,30.80229]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/509602507","layer":"lines-138"},{"osm_id":"osm:way/339937470","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":12.5,"straight_mi":12.5},{"id":"ercot-tpit:80546D","ercot_project":"80546D","title":"Upgrade the Hutto & Round Rock - Salado 138 kV Line","owner":"ONCOR","owner_project":"R6203, R6202","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sonterra","to":"Salado Switch","county_from":"Williamson","county_to":"Williamson","tier":"Tier 3","rpg":"24RPG018, 25RPG006","rpg_completed":"2025-03-17","bod_reviewed":null,"comments":null,"description":"Rebuild and double-circuit the Sonterra - Salado 138 kV Line Section. Establish Salado 138 kV Switch and the Salado Switch - Round Rock Switch 138 kV Line"},{"id":"ercot-tpit:87673","ercot_project":"87673","title":"Rebuild the Salado - Bell County 138 kV Line","owner":"ONCOR","owner_project":"R6280","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":7.8,"cm_rebuilt":0,"from":"Salado","to":"Bell County","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Salado - Bell County 138 kV Line on new structures","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:87675","ercot_project":"87675","title":"Rebuild the Bell County - Fryers Creek 138 kV Line","owner":"ONCOR","owner_project":"R6336","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":3.2,"cm_rebuilt":0,"from":"Bell County","to":"Fryers Creek","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Bell County - Fryers Creek 138 kV Line on new structures","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:87707","ercot_project":"87707","title":"Salado 345/138 kV Autotransformer #1 and #2","owner":"ONCOR","owner_project":"R6354, R6202","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Salado","to":"Salado","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Salado 345/138 kV Autotransformer #1 and #2"},{"id":"ercot-tpit:87792","ercot_project":"87792","title":"Establish the Bynum 345 kV Switch","owner":"ONCOR","owner_project":"R6369","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bynum Switch","to":"Bynum Switch","county_from":"Hill","county_to":"Hill","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish the Bynum 345 kV Switch"},{"id":"ercot-tpit:85977B","ercot_project":"85977B","title":"Cedar Hill - Swiftex Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":"24RPG014","rpg_completed":"2024-05-23","bod_reviewed":null,"comments":null,"description":"Corrects topology for Elgin Tap and its associated branches"},{"id":"ercot-tpit:91312","ercot_project":"91312","title":"LCRATSC Austrop - Garfield Transmission Line Upgrade","owner":"LCRATSC","owner_project":"PLC-8063, PLC-8139, PLC-8140","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":16.8,"from":"7040","to":"7048","county_from":"Travis","county_to":"Bastrop","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade the Austrop - Zorn 345-kV double-circuit transmission line to achieve a higher operational rating. Coordinating PMCRs include 91312, 104635, and 104639.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:91382","ercot_project":"91382","title":"Henne_Kohlenberg_Transmission_Line_Addition","owner":"LCRATSC","owner_project":"PLC-6682","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Comal","county_to":"Comal","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New Braunfels Utilities will be building a new substation to serve new customer load near Kohlenberg Rd. LCRA TSC will build a new transmission line from Henne Substation to the new Kohlenberg substation and provide transmission service via"},{"id":"ercot-tpit:91397","ercot_project":"91397","title":"Wolf_Lane_Wyldwood_Transmission_Line_Overhaul","owner":"LCRATSC","owner_project":"PLC-6945","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Wyldwood","to":"Wolf Lane","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee"},{"id":"ercot-tpit:91404","ercot_project":"91404","title":"Howard Lane_Wells Branch_TL_Upgrade","owner":"LCRATSC","owner_project":"PLC-7655","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T387 Howard Lane - Wells Branch 138-kV transmission line to achieve a higher operational rating."},{"id":"ercot-tpit:76728","ercot_project":"76728","title":"Skyview 345/138 kV Switch","owner":"ONCOR","owner_project":"M4350","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Skyview","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Skyview 345/138 kV Switch"},{"id":"ercot-tpit:78046","ercot_project":"78046","title":"Blue Goose (fka Toyah Creek) 345 kV Switch","owner":"ONCOR","owner_project":"R8715","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sand Lake","to":"Solstice","county_from":"Ward","county_to":"Pecos","tier":"Tier 1","rpg":"23RPG013","rpg_completed":"2023-06-09","bod_reviewed":null,"comments":null,"description":"Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013)"},{"id":"ercot-tpit:5526","ercot_project":"5526","title":"Three Creek 345/138 kV Switch (fka Forney)","owner":"ONCOR","owner_project":"M4114","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Forney","to":null,"county_from":"Kaufman","county_to":null,"tier":"Tier 1","rpg":"24RPG021","rpg_completed":"2024-07-29","bod_reviewed":null,"comments":null,"description":"Rebuild existing 345/138 kV switching"},{"id":"ercot-tpit:78369","ercot_project":"78369","title":"Rebuild Sam Switch - Venus Switch 345 kV DCKT","owner":"ONCOR","owner_project":"R6293","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":76,"from":"Venus","to":"Sam","county_from":"Ellis","county_to":"Hill","tier":"Tier 1","rpg":"24RPG017","rpg_completed":"2024-07-02","bod_reviewed":null,"comments":null,"description":"Rebuild Sam Switch - Venus Switch 345 kV DCKT","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/147127242","name":"Venus Substation","coordinates":[-97.07272,32.44401]},{"osm_id":"osm:way/386799112","name":"Sam Switching Station","coordinates":[-97.01809,31.8977]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/1462376317","layer":"lines-345plus"},{"osm_id":"osm:way/1462839671","layer":"lines-345plus"},{"osm_id":"osm:way/172111112","layer":"lines-345plus"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":37.5,"straight_mi":37.9},{"id":"ercot-tpit:80870","ercot_project":"80870","title":"Bakersfield Dynamic Reactive Substation Upgrade","owner":"LCRATSC","owner_project":"1030378","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bakersfield (BAKESW)","to":"Bakersfield (BAKESW)","county_from":"Pecos","county_to":"Pecos","tier":"Tier 1","rpg":"23RPG027","rpg_completed":"2023-09-28","bod_reviewed":null,"comments":null,"description":"Add a 350 MVAR synchronous condenser at Bakersfield substation based on ERCOT recommendation."},{"id":"ercot-tpit:85977A","ercot_project":"85977A","title":"Cedar Hill - Swiftex Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":"24RPG014","rpg_completed":"2024-05-23","bod_reviewed":null,"comments":null,"description":"Upgrade the existing T367 Cedar Hill - Swiftex 138-kV transmission line from Cedar Hill to Str 181 (Elgin Tap)"},{"id":"ercot-tpit:85979","ercot_project":"85979","title":"Elgin - Elgin Tap Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2027-05-15","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":"24RPG014","rpg_completed":"2024-05-23","bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 2.2 mile T728 Elgin (structure #17/7) - Elgin Tap 138-kV transmission line."},{"id":"ercot-tpit:71156","ercot_project":"71156","title":"Ennis West Switch-Waxahachie Switch 138 kV Line Rebuild","owner":"ONCOR","owner_project":"M4200","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ennis West","to":"Waxahachie","county_from":"Ellis","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Ennis West-Waxahachie 138 kV Line"},{"id":"ercot-tpit:71912A","ercot_project":"71912A","title":"Killeen Fort Hood - Killeen Taft 138 kV Line","owner":"ONCOR","owner_project":"R6245","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3.95,"from":"Killeen Fort Hood","to":"Killeen Park Street Tap","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Killeen Fort Hood - Killeen Park Street Tap 138 kV Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/462426808","name":"Killeen Fort Hood Substation","coordinates":[-97.76652,31.13251]},{"osm_id":"osm:way/315411906","name":"Killeen Park Street Substation","coordinates":[-97.72946,31.12569]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/462426809","layer":"lines-138"},{"osm_id":"osm:way/315411904","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":2.9,"straight_mi":2.2},{"id":"ercot-tpit:71912B","ercot_project":"71912B","title":"Killeen Fort Hood - Killeen Taft 138 kV Line","owner":"ONCOR","owner_project":"R6245","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3.95,"from":"Killeen Park Street Tap","to":"Killeen Taft","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Killeen Park Street Tap - Killeen Taft 138 kV Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99136","ercot_project":"99136","title":"Wilke 138 kV Capacitors","owner":"ONCOR","owner_project":"R6457","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Wilke","to":"Wilke","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 110.4 MVAR capacitor bank at Wilke 138 kV Substation"},{"id":"ercot-tpit:89889","ercot_project":"89889","title":"Three Creek 138 kV Capacitor Bank","owner":"ONCOR","owner_project":"M4114","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Three Creek","to":null,"county_from":"Kaufman","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Three Creek 138 kV Capacitor Bank"},{"id":"ercot-tpit:87701","ercot_project":"87701","title":"Establish the Roberts 138 kV Switch","owner":"ONCOR","owner_project":"R6353","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Watercrest","to":"Watercrest","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish the Roberts 138 kV Switch"},{"id":"ercot-tpit:87695","ercot_project":"87695","title":"Hartrick 138 kV Switch","owner":"ONCOR","owner_project":"R6363","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bell County","to":"Bell County","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Hartrick 138 kV Switch"},{"id":"ercot-tpit:91461B","ercot_project":"91461B","title":"Establish Tarantula 345 kV Switch","owner":"ONCOR","owner_project":"R6412","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-19","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Tarantula 345 kV Switch","to":"Tehuacana Creek Solar","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Tarantula 345 kV Switch Gen Tie","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:86912","ercot_project":"86912","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-21","actual_isd":null,"cm_new":0,"cm_rebuilt":12.6,"from":"Gabriel","to":"Schwertner","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:70800","ercot_project":"70800","title":"Triada: Build New 345 kV Station","owner":"ETT/AEP TCC/ETT","owner_project":"TP2022749","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-25","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Triada","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Siete Wind to the new Triada 345 kV station on the Avanzada to Lobo 345 kV line"},{"id":"ercot-tpit:75835C","ercot_project":"75835C","title":"Upgrade Ckt.66B Stone Lake to Tomball to increase thermal limits. Install 40 MVAR cap bank at Hockley substation and tapped on Ckt.66B Hockley to Stone Lake.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-27","actual_isd":null,"cm_new":0,"cm_rebuilt":2.45,"from":"Stone Lake","to":"Tomball","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG012","rpg_completed":"2023-05-26","bod_reviewed":"2023-05-26","comments":null,"description":"Upgrade Ckt.66B Stone Lake to Tomball to increase thermal limits. Phase Three of overall approved upgrades.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:78173","ercot_project":"78173","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Trimmier","to":"Trimmier","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102777","ercot_project":"102777","title":"Prairieland 138/35kV Distribution Substation","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Prairieland","to":"Hockley/Stone Lake","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Prairieland (PRL) 138/35kV Distribution Substation. Loop on Ckt.66B Hockley to Stone Lake to create new Ckt.66B Hockley to Prairieland to Stone Lake."},{"id":"ercot-tpit:104643B","ercot_project":"104643B","title":"Ckt.66B Stone Lake to Hockley Hardening and Waller Cap Bank","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-29","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Waller","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 20 MVAr transmission cap bank at Waller tapped on Ckt.77B to Hockley. Install 14.4 MVAr cap bank at Waller substation connected to TR3."},{"id":"ercot-tpit:104643A","ercot_project":"104643A","title":"Ckt.66B Stone Lake to Hockley Hardening and Waller Cap Bank","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-29","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Stone Lake","to":"Hockley","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.66B Hockley to (Prairieland) to Stone Lake to increase thermal limits (Hockley equipment upgrade)"},{"id":"ercot-tpit:72213","ercot_project":"72213","title":"Cedar Hill: Upgrade Relays","owner":"AEP TNC","owner_project":"TP2022739","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Hill","to":null,"county_from":"Lee","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Upgrade relays for the Sterling City terminal and Miles terminal at the Cedar Hill 138 kV station"},{"id":"ercot-tpit:73061","ercot_project":"73061","title":"Falfurrias to King Ranch: 138 kV Line Rebuild","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":20.5,"from":"Falfurrias","to":"King Ranch","county_from":"Brooks","county_to":"Kleberg","tier":"Tier 4","rpg":null,"rpg_completed":"2023-02-24","bod_reviewed":null,"comments":"In-Service Date and Dollars Update","description":"Rehab the Falfurrias to King Ranch 138 kV line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:68254","ercot_project":"68254","title":"Friend Ranch: Build new 138 kV Terminal","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Friend Ranch","to":null,"county_from":"Crockett","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Blue Sky Solar to the Friend Ranch 138 kV Station"},{"id":"ercot-tpit:90255B","ercot_project":"90255B","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Bayou","to":"Cedar Bayou Distribution","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":"24RPG026","rpg_completed":"2024-09-12","bod_reviewed":"2024-09-12","comments":null,"description":"Upgrade Ckt.84D Cedar Bayou to CD/HOPSON to increase thermal limits."},{"id":"ercot-tpit:90255E","ercot_project":"90255E","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"EAGLE","to":"WINFRE/Mont Belvieu","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":"24RPG026","rpg_completed":"2024-09-12","bod_reviewed":"2024-09-12","comments":null,"description":"Apply 110% Emergency rating for the EAGLE customer substation 2000A equipment to increase thermal limits on Ckts 52B / 52C. Upgrade existing 515 / 515 MVA Mont Belvieu relay system limits on Ckt.52C line position."},{"id":"ercot-tpit:90255C","ercot_project":"90255C","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Bayou","to":"CHEVRON","county_from":"Chambers","county_to":"Harris","tier":"Tier 3","rpg":"24RPG026","rpg_completed":"2024-09-12","bod_reviewed":"2024-09-12","comments":null,"description":"Upgrade Ckt.86A Cedar Bayou to CHEVRON to increase thermal limits."},{"id":"ercot-tpit:99728","ercot_project":"99728","title":"Kilby: Expand 345 kV Station","owner":"ETT/AEP TNC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kilby","to":null,"county_from":"Haskell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Owner Update","description":"Interconnect Briggs Solar and BESS to the existing Kilby 345 kV station"},{"id":"ercot-tpit:104643C","ercot_project":"104643C","title":"Ckt.66B Stone Lake to Hockley Hardening and Waller Cap Bank","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":5.75,"from":"Stone Lake","to":"Hockley","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild and reconductor Ckt.66B Hockley to (Prairieland) to Stone Lake as a Hardening upgrade.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:90008","ercot_project":"90008","title":"Tango to Pawnee: Rebuild 345 kV Line","owner":"AEP TCC/CPS,STEC","owner_project":"TP2024118","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-30","actual_isd":null,"cm_new":1.2,"cm_rebuilt":1.2,"from":"Tango","to":"Pawnee","county_from":"Bee","county_to":"Karnes","tier":"Tier 1","rpg":"22RPG048","rpg_completed":"2024-04-10","bod_reviewed":"2024-04-23","comments":"In-Service Date Update","description":"Rebuild the Tango to Pawnee 345 kV line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:76569","ercot_project":"76569","title":"Asherton: Rebuild 138 kV station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Asherton","to":null,"county_from":"Dimmit","county_to":null,"tier":"Tier 3","rpg":"23RPG007","rpg_completed":"2023-05-19","bod_reviewed":null,"comments":"In-Service Date Update","description":"Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station"},{"id":"ercot-tpit:90047","ercot_project":"90047","title":"Big Hill to Rockefeller Storage: Construct New 345 kV Line","owner":"AEP TNC","owner_project":"TP2024144","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"Big Hill","to":"Rockefeller Storage","county_from":"Schleicher","county_to":"Schleicher","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Interconnect Rockefeller Storage to the existing Big Hill 345 kV station","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:99134","ercot_project":"99134","title":"Install generator lead at existing GBY Substation for new interconnection to NRG customer substation. Previously known as GBY-6","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Greens Bayou","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:90255A","ercot_project":"90255A","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mont Belvieu","to":"WARVUE","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":"24RPG026","rpg_completed":"2024-09-12","bod_reviewed":"2024-09-12","comments":null,"description":"Install 120 MVAr cap bank at Mont Belvieu Ckt.84E to WARVUE."},{"id":"ercot-tpit:110068A","ercot_project":"110068A","title":"This models the new CEHE Raider Substation and upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Raider","to":"Cedar Creek/Bailey","county_from":"Wharton","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 345kV CEHE Raider substation. Loop 345 kV Ckt. 72 Bailey-Cedar Creek line into the new 345 kV Raider substation. Upgrade line relaying on Ckt 72 Cedar Creek-Raider-Bailey. Remove temporary 138 kV service."},{"id":"ercot-tpit:112585A","ercot_project":"112585A","title":"Removal of 140MVAr SVC and facilities from Bellaire and Crosby 138kV substations.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove the 140MVAr SVC and facilities from Bellaire 138kV substation"},{"id":"ercot-tpit:112585B","ercot_project":"112585B","title":"Removal of 140MVAr SVC and facilities from Bellaire and Crosby 138kV substations.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Crosby","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove the 140MVAr SVC and facilities from Crosby 138kV substation"},{"id":"ercot-tpit:82851B","ercot_project":"82851B","title":"Adds TNMP White Oak Substation","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2027-05-31","actual_isd":"2027-05-31","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"In-service Whiteoak bus and loads, and match CNP ISD date to interconnect together."},{"id":"ercot-tpit:85987A","ercot_project":"85987A","title":"Upgrade Ckt.26 STRATT to SINTEK to increase thermal limits. Upgrade Ckt.26F Velasco to CAMDEN to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":5.26,"from":"Clute","to":"SINTEK","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"24RPG012","rpg_completed":"2024-05-02","bod_reviewed":"2024-05-02","comments":null,"description":"Upgrade Ckt.26D Clute to SINTEK to increase thermal limits. (Expect a full 2-959ACSS reconductor Ckt.26 Clute to SINTEK and a 1-795AAC conductor limitation Ckt.26 STRATT to Clute)","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:73098","ercot_project":"73098","title":"Castroville Cut-in 138 kV","owner":"ETT/AEP TCC/ETT","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2027-05-31","actual_isd":"2023-05-25","cm_new":0.4,"cm_rebuilt":0,"from":"Quihi","to":"Castroville (CPS)","county_from":"Medina","county_to":null,"tier":"Tier 2","rpg":"22RPG022","rpg_completed":"2023-11-22","bod_reviewed":null,"comments":"In-Service Date Update","description":"Cut the AEP line from Quihi to CPS Castroville into the newly converted to 138 kV STEC Castroville station.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99453E","ercot_project":"99453E","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"King","to":"North Belt","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.97B King to North Belt to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:63635","ercot_project":"63635","title":"Tribute: Build 138 kV Station","owner":"AEP TNC","owner_project":"1877","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tribute","to":null,"county_from":"Tom Green","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Build new 138 kV Station on the San Angelo Power to Red Creek 138 kV line"},{"id":"ercot-tpit:102786","ercot_project":"102786","title":"Fairbanks Substation 4th Transformer","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"In-Service","status":"In service","projected_isd":"2027-05-31","actual_isd":"2026-05-04","cm_new":0,"cm_rebuilt":0,"from":"Fairbanks","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add 4th Transformer at Fairbanks Substation"},{"id":"ercot-tpit:102542","ercot_project":"102542","title":"Expand Peters 138kV Substation from ring bus to Breaker-and-Half configuration. Connect two circuits from Peters to TRENCH (TRE) customer owned substation","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Peters","to":"TRENCK","county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104643D","ercot_project":"104643D","title":"Ckt.66B Stone Lake to Hockley Hardening and Waller Cap Bank","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":1.83,"from":"Stone Lake","to":"Hockley","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild and reconductor Ckt.66B Hockley to (Prairieland) to Stone Lake as a Hardening upgrade.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109652A","ercot_project":"109652A","title":"Flewellen 4th Distribution Transformer Addition and associated upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Flewellen","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install fourth Flewellen distribution transformer TR4. Tap transformer at the Flewellen breaker position on Ckt.09H Flewellen to Katy."},{"id":"ercot-tpit:109652B","ercot_project":"109652B","title":"Flewellen 4th Distribution Transformer Addition and associated upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Flewellen","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Flewellen equipment at the Ckt.73D breaker position to Obrien to increase thermal limits Ckt.73D Obrien to Flewellen."},{"id":"ercot-tpit:109652C","ercot_project":"109652C","title":"Flewellen 4th Distribution Transformer Addition and associated upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Flewellen","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.09G Brazos Valley to Fort Bend to increase thermal limits."},{"id":"ercot-tpit:109652D","ercot_project":"109652D","title":"Flewellen 4th Distribution Transformer Addition and associated upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Crabb River Road","to":"Reading","county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Crabb River Road substation equipment to increase thermal limits on Ckt.09F Reading to Crabb River Road."},{"id":"ercot-tpit:91713","ercot_project":"91713","title":"Install (1) 40 MVAr switchable cap bank at Hockley substation.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hockley","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99950","ercot_project":"99950","title":"Expansion of Stillman to accomodate interconnection of Resaca Oasis Storage BESS","owner":"SLU","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0.02,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW - IA Signed","description":"Interconnection of GINR #27INR0399 Resaca Oasis Storage to Sharyland's Stillman Station. Planned COD is 09/20/2027","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:75776A","ercot_project":"75776A","title":"Samaritan 138kV Switching Station","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Samaritan","to":"Angleton/STRATT","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconfigure Ckt.26C Angleton to STRATT and loop into new CEHE-owned 138kV Samaritan switching station to create new Ckt.26 Angleton to Samaritan to STRATT. No line upgrades Ckt.26 Angleton to Samaritan to STRATT."},{"id":"ercot-tpit:99453U","ercot_project":"99453U","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Zenith","to":"TH Wharton","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.98I Zenith to TH Wharton to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:69892","ercot_project":"69892","title":"Deer Park Tap to NOBEL Ckt.21C Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":1.06,"from":"Deer Park","to":"NOBEL","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade portions of Deer Park Tap to Underwood tap to NOBEL Ckt.21C as a Hardening upgrade","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99453Z","ercot_project":"99453Z","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Singleton","to":"Gibbons Creek","county_from":"Grimes","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.99 Singleton to Gibbons Creek to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453S","ercot_project":"99453S","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Addicks","to":"Obrien","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.39B Addicks to Obrien to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453N","ercot_project":"99453N","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"DOW","to":"Jones Creek","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.18D DOW to Jones Creek to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453Y","ercot_project":"99453Y","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Singleton","to":"Gibbons Creek","county_from":"Grimes","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.75 Singleton to Gibbons Creek to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:90242A","ercot_project":"90242A","title":"Clute to Velasco Ckt.82 Upgrades RPG","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0.62,"from":"SINTEK","to":"CAMDEN","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":"24RPG012","rpg_completed":"2024-05-02","bod_reviewed":"2024-05-02","comments":null,"description":"Upgrade Ckt.26E SINTEK to CAMDEN to increase thermal limits.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/522624196","name":"Sintek Substation","coordinates":[-95.35739,28.99229]},{"osm_id":"osm:way/521377903","name":"Camden Substation","coordinates":[-95.35739,28.98813]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 4 mi but ERCOT reports 0.62 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:90242B","ercot_project":"90242B","title":"Clute to Velasco Ckt.82 Upgrades RPG","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0.31,"from":"CAVERN","to":"Clute/BIPORT","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":"24RPG012","rpg_completed":"2024-05-02","bod_reviewed":"2024-05-02","comments":null,"description":"Upgrade Ckt.82F RIWOOD to CAVERN to BIPORT to increase thermal limits. (Expect partial reconductor to Ckt.86F RIWOOD to CAVERN with 1-795ACSR limiting conductor and full 2-959ACSS reconductor to Ckt.86F CAVERN to BIPORT)","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:90242C","ercot_project":"90242C","title":"Clute to Velasco Ckt.82 Upgrades RPG","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0.21,"from":"BIPORT","to":"OYSTER CREEK","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":"24RPG012","rpg_completed":"2024-05-02","bod_reviewed":"2024-05-02","comments":null,"description":"Upgrade Ckt.82G BIPORT to OYSTER CREEK to increase thermal limits.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:90242D","ercot_project":"90242D","title":"Clute to Velasco Ckt.82 Upgrades RPG","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":1.06,"from":"GLOBAL","to":"Velasco","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":"24RPG012","rpg_completed":"2024-05-02","bod_reviewed":"2024-05-02","comments":null,"description":"Upgrade Ckt.82D GLOBAL to Velasco to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:103423","ercot_project":"103423","title":"Bellaire to Ulrich Hardening","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":1.14,"from":"Bellaire","to":"Ulrich","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild/reconductor portions of Ckt.35 Bellaire to Ulrich as a Hardening upgrade.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/8286448","name":"Bellaire Substation","coordinates":[-95.4512,29.72463]},{"osm_id":"osm:way/339227608","name":"Ulrich Substation","coordinates":[-95.48381,29.73588]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 2.4 mi but ERCOT reports 1.14 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:100503A","ercot_project":"100503A","title":"Webster Distribution Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Polaris","to":"PH Robinson","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove existing Webster TR3 tap from Ckt.35A Polaris to PH Robinson. Reconfigure tap section and reconnect to another circuit."},{"id":"ercot-tpit:100503D","ercot_project":"100503D","title":"Webster Distribution Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Webster","to":"Polaris /Kemah","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand Webster with new TR4 distribution transformer and connect to Ckt.95F Polaris to Webster TR4 to Kemah."},{"id":"ercot-tpit:100503C","ercot_project":"100503C","title":"Webster Distribution Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Webster","to":"PH Robinson /Webster","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Disconnect Webster TR2 from Ckt.92A service and reconnect as Ckt.93A PH Robinson to Webster TR1/TR2 to Webster main bus."},{"id":"ercot-tpit:100503B","ercot_project":"100503B","title":"Webster Distribution Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Webster","to":"El Dorado /Kemah","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Disconnect Webster TR2 from Ckt.92A service and reconnect at other circuit location (see other entry for TR2). Reconnect Webster TR3 as Ckt.92A El Dorado to WEB-TR3 to Kemah."},{"id":"ercot-tpit:76369","ercot_project":"76369","title":"BRINE Substation Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BRINE","to":"DALTON/Mont Belvieu","county_from":"Chambers","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade substation equipment at BRINE on Ckt.86H DALTON to BRINE to Mont Belvieu."},{"id":"ercot-tpit:89924","ercot_project":"89924","title":"Weinbrenner 138kV Substation Expansion for SWITCH (SWG)/Elio BESS (25INR0103)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Weinbrenner","to":null,"county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand 138kV Weinbrenner substation for SWITCH (SWG)/Elio BESS (25INR0103). Install one new generator lead from Weinbrenner to SWITCH/Elio BESS"},{"id":"ercot-tpit:90063","ercot_project":"90063","title":"Elm Creek to Mulberry Creek: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":"TP2023600","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":5.7,"from":"Elm Creek","to":"Mulberry Creek","county_from":"Taylor","county_to":"Jones","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Dollars Update","description":"Rebuild the Elm Creek to Mulberry Creek 138 kV line","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:81215","ercot_project":"81215","title":"Oklaunion: Reconfigure 138 kV Station","owner":"AEP TNC/ETT","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Oklaunion","to":null,"county_from":"Wilbarger","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Reconfigure the Oklaunion 138 kV station from a straight bus to a ring bus"},{"id":"ercot-tpit:82851A","ercot_project":"82851A","title":"Adds TNMP White Oak Substation","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New TNMP White Oak substation."},{"id":"ercot-tpit:84892","ercot_project":"84892","title":"23RPG028: STEC Rio Medina Project: New transmission line between Tally and Ranchtown","owner":"CPS/NO","owner_project":"T-0393","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":12,"cm_rebuilt":0,"from":"5422","to":"5358","county_from":"Medina","county_to":"Bexar","tier":"Tier 2","rpg":"23RPG028","rpg_completed":"2024-02-16","bod_reviewed":null,"comments":null,"description":"Install new 138kV single circuit transmission line from Ranchtown to Talley Road (~12 miles) with normal and emergency ratings of at least 469 MVA. This new transmission line requires a single route CCN.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:87423","ercot_project":"87423","title":"Reconfigure TNMP Pyote 138kV Substation.","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0.92,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Ward","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:6072","ercot_project":"6072","title":"Eldorado to Ft. McKavitt: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"2677","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":19.41,"from":"Eldorado Tap","to":"Ft. McKavitt","county_from":"Schleicher","county_to":"Schleicher","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rehab Eldorado to Ft. McKavitt 69 kV line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:75776B","ercot_project":"75776B","title":"Samaritan 138kV Switching Station","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Samaritan","to":"Angleton/Clute","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Connect Samaritan CEHE substation with two leads to TNMP_White Oak distribution substation."},{"id":"ercot-tpit:85987B","ercot_project":"85987B","title":"Upgrade Ckt.26 STRATT to SINTEK to increase thermal limits. Upgrade Ckt.26F Velasco to CAMDEN to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0.28,"from":"CAMDEN","to":"Velasco","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"24RPG012","rpg_completed":"2024-05-02","bod_reviewed":"2024-05-02","comments":null,"description":"Upgrade Ckt.26F CAMDEN to Velasco to increase thermal limits.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/521377903","name":"Camden Substation","coordinates":[-95.35739,28.98813]},{"osm_id":"osm:way/215254772","name":"Velasco Substation","coordinates":[-95.36265,28.98023]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 5.6 mi but ERCOT reports 0.28 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:65906","ercot_project":"65906","title":"To add Jordan Station for GINR 21INR0031","owner":"LST","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Fisher","county_to":"Fisher","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:71319","ercot_project":"71319","title":"Upgrade Pearsall Station","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pearsall","to":"Pearsall","county_from":"Frio","county_to":"Frio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Pearsall Station equipment for full auto xfmr ratings. (Upgrade station to breaker and a half is complete)"},{"id":"ercot-tpit:80422","ercot_project":"80422","title":"Add_Triangle_Park_Load","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Triangle Park","to":null,"county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding second distribution transformer at Triangle Park"},{"id":"ercot-tpit:61090","ercot_project":"61090","title":"Timbercreek 138kV substation","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Onion Creek","to":"Pilot Knob","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Change name to Establish 138kV Timbercreek substation with (2) 40MVA transformers and will cut into existing Ckt 948 (Onion Creek to Pilot Knob)"},{"id":"ercot-tpit:93685","ercot_project":"93685","title":"New Transformer will be added at Titan Substation.","owner":"BPUB","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Titan","to":"Titan","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99369","ercot_project":"99369","title":"Union (fka Sun) - Golden Switch - Dermott 138 kV line Rebuild","owner":"ONCOR","owner_project":"PB_L22_C","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":13.6,"from":"Union","to":"Dermott","county_from":"Scurry","county_to":"Scurry","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L22C. Upgrade the existing Union (fka Sun) - Golden Switch - Dermott 138-kV line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:103793","ercot_project":"103793","title":"BRYN_GreensPrairie_Rebuild","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BTU Greens Prairie","to":null,"county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Greens Prairie 138-kV Substation to add a second distribution transformer"},{"id":"ercot-tpit:111357","ercot_project":"111357","title":"LST_OpenSky_Second_Ckt_Loopin","owner":"LST","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Phantom Hill","to":"Claytonville","county_from":"Jones","county_to":"Jones","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop 2nd 345 kV circuit into Open Sky Station to support 25INR0473 project"},{"id":"ercot-tpit:81299","ercot_project":"81299","title":"Ranger Camp – Prong Moss 345 kV Line Rebuild","owner":"ONCOR","owner_project":"R3025","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":61.4,"from":"Ranger Camp","to":"Prong Moss","county_from":"Mitchell","county_to":"Howard","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 345 kV line and add a second circuit to the new line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110451","ercot_project":"110451","title":"STEC Hammer Load Project Phase 1","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"George West","to":null,"county_from":"Live Oak","county_to":"Live Oak","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-Construct new transmission line from STEC George West to load site","terminal_match":{"from":"ambiguous","to":"multi_or_missing"}},{"id":"ercot-tpit:102484","ercot_project":"102484","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-04","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Silver City","to":"Branchville","county_from":"Milam","county_to":"Milam","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:112234","ercot_project":"112234","title":"Model Cowpen 138kV Substation","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:91062","ercot_project":"91062","title":"Add Boles Station which taps the Quinlan North to Magness line","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding Boles Bus and updating the line information"},{"id":"ercot-tpit:75255B","ercot_project":"75255B","title":"San Antonio South Reliability RPG Project","owner":"CPS/NO","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5231","to":"5230","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"22RPG048","rpg_completed":null,"bod_reviewed":"2023-08-31","comments":null,"description":"Install a 3rd 600MVA 345/138kV autotransformer at Howard."},{"id":"ercot-tpit:6572","ercot_project":"6572","title":"Ballinger to Eden 69 kV line: Rebuild taps","owner":"AEP TNC","owner_project":"2814","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":2.8,"from":"Ballinger","to":"Eden","county_from":"Runnels","county_to":"Concho","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Rebuild Taps on the Ballinger to Eden 69 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/119137383","name":"Ballinger Substation","coordinates":[-99.94456,31.74117]},{"osm_id":"osm:way/493048288","name":"Eden Substation","coordinates":[-99.83623,31.21574]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:81227","ercot_project":"81227","title":"Cattleman – Gascondades 345 kV Reroute","owner":"ONCOR","owner_project":"R8647","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":2.5,"from":"Cattleman","to":"Gascondades","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Terminate Morgan Creek – Gascondades 345 kV Line into Cattleman 345 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:80970","ercot_project":"80970","title":"Joule: Construct New 345 kV Station","owner":"ETT/AEP TNC/ETT","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Joule","to":null,"county_from":"Knox","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Zeissel Solar and Storage to the new Joule 345 kV station on the Clear Crossing to Coulomb 345 kV line"},{"id":"ercot-tpit:73661","ercot_project":"73661","title":"New transformer (T2) at BPUB Palo Alto Substation","owner":"BPUB/BROWNSVILLE PUB","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BPUB Palo Alto 5965","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding load (T2) on bus 5965 Palo Alto."},{"id":"ercot-tpit:76576","ercot_project":"76576","title":"Asherton to Uvalde: Convert to 138 kV","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":59.74,"from":"Asherton","to":"Uvalde","county_from":"Dimmit","county_to":"Uvalde","tier":"Tier 3","rpg":"23RPG007","rpg_completed":"2023-05-19","bod_reviewed":null,"comments":"In-Service Date Update","description":"Convert Asherton to Uvalde 69 kV to 138 kV, rebuild Asherton 138 kV station, build new Poblano 138 kV station","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/6697271","name":"Asherton Substation","coordinates":[-99.75572,28.44234]},{"osm_id":"osm:way/343141488","name":"Uvalde Substation","coordinates":[-99.79859,29.21294]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/15384794","layer":"lines-138"},{"osm_id":"osm:way/15383747","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":56.9,"straight_mi":53.3},{"id":"ercot-tpit:90173C","ercot_project":"90173C","title":"Cedar Bayou 5 Generator Interconnection (23INR0029)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"HOPSON","to":"WARVUE","county_from":"Chambers","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits."},{"id":"ercot-tpit:90173B","ercot_project":"90173B","title":"Cedar Bayou 5 Generator Interconnection (23INR0029)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Bayou","to":"Chambers","county_from":"Chambers","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.97E Cedar Bayou to Chambers to increase thermal limits."},{"id":"ercot-tpit:90055","ercot_project":"90055","title":"Ursidae: Construct New 138 kV Station","owner":"AEP TCC","owner_project":"TP2024151","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ursidae","to":null,"county_from":"Wharton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Northington Solar to the new Ursidae 138 kV station on the El Campo to Victoria 138 kV line between Corichi and El Campo"},{"id":"ercot-tpit:90033","ercot_project":"90033","title":"Reveille to Navitas: Construct New 138 kV Line","owner":"AEP TCC","owner_project":"TP2024157","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0.15,"cm_rebuilt":0,"from":"Reveille","to":"Navitas","county_from":"La Salle","county_to":"La Salle","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Dollars Update","description":"Interconnect the new Navitas load station to the existing Reveille 138 kV station","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:98612","ercot_project":"98612","title":"Plover: Rebuild 69 kV Station","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Plover","to":null,"county_from":"Schleicher","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Rebuild Eldorado Cities Service Co. Tap and rename to Plover"},{"id":"ercot-tpit:93117","ercot_project":"93117","title":"Gibson: Construct New Distribution Station","owner":"AEP TNC","owner_project":"DR24N0009","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gibson","to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct new distribution station on the Abilene South to Putnam 138 kV line between Abilene South and Vinson"},{"id":"ercot-tpit:98616","ercot_project":"98616","title":"Dotterel: Rebuild 69 kV Station","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Dotterel","to":null,"county_from":"Schleicher","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Rebuild Middle Valley REA Tap and rename to Dotterel"},{"id":"ercot-tpit:90173A","ercot_project":"90173A","title":"Cedar Bayou 5 Generator Interconnection (23INR0029)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Bayou","to":null,"county_from":"Chambers","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Connect new generation facility to Cedar Bayou 345kV substation with 721 MW combined cycle natural gas-fired units."},{"id":"ercot-tpit:109847A","ercot_project":"109847A","title":"DRILCO Area improvements in support of proposed load addition.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"DRILCO","to":"North Belt","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Substation equipment at DRILCO and North Belt to increase rating of ckt 67"},{"id":"ercot-tpit:72884","ercot_project":"72884","title":"Gonzales: Build 69 kV STATCOM","owner":"ETT/AEP TNC/ETT","owner_project":"TP2022130","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gonzales","to":null,"county_from":"Presidio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Build new 69 kV STATCOM at the Gonzales 69 kV station"},{"id":"ercot-tpit:48818","ercot_project":"48818","title":"Ballinger: Rebuild 138 kV Station","owner":"AEP TNC","owner_project":"2777","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ballinger","to":null,"county_from":"Runnels","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Rehab the 138/69 kV autotransformer at Ballinger"},{"id":"ercot-tpit:5458","ercot_project":"5458","title":"Load serving","owner":"DME","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2027-07-01","actual_isd":"2027-07-01","cm_new":0,"cm_rebuilt":0,"from":"Underwood","to":null,"county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:90903","ercot_project":"90903","title":"ALUVIUM gen tie station","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:76291","ercot_project":"76291","title":"Upgraded Cedarvale–BoneSpringsTap–Fishhook","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":12.59,"from":"Cedarvale to Bone Springs Tap","to":"Bone Springs Tap to Fishhook","county_from":"Ward","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104871","ercot_project":"104871","title":"Oncor_ME_104871_Healey_345kV_Switch","owner":"ONCOR","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tricorner","to":"Elkton","county_from":"Kaufman","county_to":"Kaufman","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Healey 345 kV Switch interconnection to Erika Solar"},{"id":"ercot-tpit:105622B","ercot_project":"105622B","title":"Adds type A load records at King","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"King","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:85008","ercot_project":"85008","title":"Add Rio Medina - Legend Falls Tline","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-01","actual_isd":null,"cm_new":5.6,"cm_rebuilt":0,"from":"Rio Medina","to":null,"county_from":"Medina","county_to":"Medina","tier":"Tier 2","rpg":null,"rpg_completed":"2024-02-01","bod_reviewed":null,"comments":null,"description":"Add Rio Medina - Legend Falls Tline as part of the Rio Medina RPG Project","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:91708","ercot_project":"91708","title":"New San Geronimo Substation","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rio Medina","to":"Legend Falls","county_from":"Medina","county_to":"Medina","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"adds new San Geronimo station on STEC Rio Medina - CPS Legend Falls line"},{"id":"ercot-tpit:100684","ercot_project":"100684","title":"Install a 50MVAr Capacitor Bank at Grissom Substation","owner":"CPS/NO","owner_project":"S-1044","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5185","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:112684","ercot_project":"112684","title":"WETT Binturong 345 kV Station for Synchronous Condensers","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-07-15","actual_isd":null,"cm_new":0.52,"cm_rebuilt":0,"from":"Bearkat","to":"Binturong","county_from":"Glasscock","county_to":"Glasscock","tier":"Tier 3","rpg":"24RPG041","rpg_completed":"2025-01-28","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:73436B","ercot_project":"73436B","title":"Rockhound - Connell 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R8718, R8807","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-24","actual_isd":null,"cm_new":10,"cm_rebuilt":0,"from":"Rockhound","to":"Connell","county_from":"Martin","county_to":"Midland","tier":"Tier 1","rpg":"24RPG020","rpg_completed":"2025-11-19","bod_reviewed":null,"comments":null,"description":"Rockhound - Connell 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:87633","ercot_project":"87633","title":"WETT Buck Canyon Synchronous Condenser","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-07-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Buck Canyon","to":"Buck Canyon","county_from":"Borden","county_to":"Borden","tier":"Tier 1","rpg":"23RPG026","rpg_completed":"2023-09-28","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:72032","ercot_project":"72032","title":"Stewart to West Bay Ckts 48A & 59A Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":21.7,"from":"Stewart","to":"West Bay","county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor Ckts. 48A & 59A Stewart to West Bay as a Hardening upgrade.","terminal_match":{"from":"matched","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/337244621","name":"Stewart Substation","coordinates":[-94.91068,29.22779]},{"osm_id":"osm:way/337244616","name":"Westbay Substation","coordinates":[-95.09062,29.11268]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","osm_matches":[{"osm_id":"osm:way/337244611","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":13.9,"straight_mi":null},{"id":"ercot-tpit:90057","ercot_project":"90057","title":"Volar: Construct New 138 kV Station","owner":"AEP TCC","owner_project":"TP2024145","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-31","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Volar","to":"XE Flying Kite Solar","county_from":"Zavala","county_to":"Zavala","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Interconnect XE Flying Kite Solar to the new Volar 138 kV station on the Crystal City to Poblano 138 kV line between La Pryor and Poblano","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:100030","ercot_project":"100030","title":"Beeville: Replace 69 kV Cap Banks","owner":"AEP TCC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Beeville","to":null,"county_from":"Bee","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact, In-Service Date and Reactive Capability Update","description":"Replace the failed 69 kV capacitor banks at the existing Beeville 69 kV station"},{"id":"ercot-tpit:110481","ercot_project":"110481","title":"Ad Hoc TPIT: 150 MVAR Reactive Compensation at Load Site (Nova Prime 138 kV)","owner":"WETT","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-08-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Nova Prime 138 kV","to":"Nova Prime 138 kV","county_from":"Kent","county_to":"Kent","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102879","ercot_project":"102879","title":"Add Zella Station for GINR on San Miguel to Fowlerton","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:81373","ercot_project":"81373","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-13","actual_isd":null,"cm_new":0,"cm_rebuilt":1.5,"from":"Longstreet","to":"Buckholts","county_from":"Milam","county_to":"Milam","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:91108","ercot_project":"91108","title":"Fisk 345 kV Switch","owner":"ONCOR","owner_project":"R6328","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Brown Switch","to":"Central Bluff","county_from":"Coleman","county_to":"Coleman","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 345 kV Switch."},{"id":"ercot-tpit:81415","ercot_project":"81415","title":"Hermleigh Synchronous Condenser","owner":"ONCOR","owner_project":"D20232","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-18","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tonkawa","to":"Tonkawa","county_from":"Scurry","county_to":"Scurry","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Hermleigh Syncrhonous Condenser"},{"id":"ercot-tpit:75856A","ercot_project":"75856A","title":"Rebuild and reconductor portions of Ckt.28A to prepare for ETHYL 138kV conversion. Loop into Ckt.96G to create new Ckt.96G PHILIP to ETHYL 138kV to BEARLE. Retire ETHYL 69kV substation and remaining portions of 69kV Ckt.16D and Ckt.28A.","owner":"CNP","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":1.33,"from":"ETHYL","to":"South Channel","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild and reconductor portions of Ckt.28A to prepare for ETHYL 138kV conversion.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:75856B","ercot_project":"75856B","title":"Rebuild and reconductor portions of Ckt.28A to prepare for ETHYL 138kV conversion. Loop into Ckt.96G to create new Ckt.96G PHILIP to ETHYL 138kV to BEARLE. Retire ETHYL 69kV substation and remaining portions of 69kV Ckt.16D and Ckt.28A.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"ETHYL","to":"PHILIP / BEARLE","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert ETHYL customer 69kV substation to 138kV. Loop into Ckt.96G to create new Ckt.96G PHILIP to ETHYL 138kV to BEARLE. Retire ETHYL 69kV substation and remaining portions of 69kV Ckt.16D and Ckt.28A."},{"id":"ercot-tpit:69471","ercot_project":"69471","title":"Villa Cavazos: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-31","actual_isd":null,"cm_new":0.35,"cm_rebuilt":0,"from":"Villa Cavazos","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Eval BESS to the Villa Cavazos 138 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:110465","ercot_project":"110465","title":"Add 200 MVar cap bank at Ghost Town","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ghost Town","to":null,"county_from":"Gray","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:80858","ercot_project":"80858","title":"Sterling City: Upgrade 69 kV Relays","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sterling City","to":null,"county_from":"Sterling","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Upgrade relays at the Sterling City 69 kV station on the Angora 69 kV terminal"},{"id":"ercot-tpit:110463","ercot_project":"110463","title":"Add 80 MVar of cap banks at Miami Wind","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Gray","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:73059","ercot_project":"73059","title":"Barrera: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Barrera","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct new distribution station on the North Laredo Switch to Reveille 138 kV line"},{"id":"ercot-tpit:111270","ercot_project":"111270","title":"Fort Stockton Switch: Construct New 138 kV Terminal","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-08-31","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Fort Stockton Switch","to":null,"county_from":"Pecos","county_to":null,"tier":"Tier 1","rpg":"23RPG023","rpg_completed":"2024-01-18","bod_reviewed":"2024-01-24","comments":null,"description":"Construct a new 138 kV terminal at Fort Stockton Switch for the new TNMP line to Woodhouse","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:110517","ercot_project":"110517","title":"Ad Hoc TPIT: 350 MVAR Reactive Compensation at Mhos 345 kV","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mhos 345 kV","to":"Mhos 345 kV","county_from":"Scurry","county_to":"Scurry","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:90111","ercot_project":"90111","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-01","actual_isd":null,"cm_new":1.2,"cm_rebuilt":0,"from":"Gainesville","to":"Red River","county_from":"Cooke","county_to":"Cooke","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:91611","ercot_project":"91611","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":11.4,"from":"Spring","to":"Rector","county_from":"Cooke","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102665","ercot_project":"102665","title":"BEPC_TPIT102665_Greyfox","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-03","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Parker","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102765","ercot_project":"102765","title":"BEPC_TPIT102765_Mahogany","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-06","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Nolan","to":"Tenaska","county_from":"Johnson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:113288","ercot_project":"113288","title":"Oncor_MW_113288_Halsell_Switch","owner":"ONCOR","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Halsell 345 kV Switch (POI for Possum Kingdom Solar and Storage)"},{"id":"ercot-tpit:66202C","ercot_project":"66202C","title":"Upgrade Palestine-Crockett 69 kV Line","owner":"ONCOR","owner_project":"R6182","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-15","actual_isd":null,"cm_new":0,"cm_rebuilt":8.5,"from":"Grapeland","to":"Crockett","county_from":"Houston","county_to":"Houston","tier":"Tier 3","rpg":"22RPG035","rpg_completed":"2022-11-15","bod_reviewed":null,"comments":null,"description":"Rebuild the Grapeland - Crockett 69 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:81440","ercot_project":"81440","title":"Yarbrough - Pecos Trail 138 kV Line Section Rebuild","owner":"ONCOR","owner_project":"R8527","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9.4,"from":"Wolf","to":"Yarbrough","county_from":"Ward","county_to":"Ector","tier":"Tier 3","rpg":"25RPG008","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 138 kV line section from Yarbrough - Pecos Trail POD 138 kV.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:66492C","ercot_project":"66492C","title":"Chico West - Grindstone Switch 69 kV Line rebuild","owner":"ONCOR","owner_project":"M3006","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-15","actual_isd":null,"cm_new":0,"cm_rebuilt":7.3,"from":"Jacksboro Amoco","to":"Chico City Services","county_from":"Jack","county_to":"Wise","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Jacksboro Amoco - Chico City Services 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:66206B","ercot_project":"66206B","title":"Upgrade Temple - Minerva 69 kV Line","owner":"ONCOR","owner_project":"R6186","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-15","actual_isd":null,"cm_new":13.1,"cm_rebuilt":0,"from":"Marak","to":"Minerva","county_from":"Milam","county_to":"Milam","tier":"Tier 3","rpg":"22RPG034","rpg_completed":"2022-11-01","bod_reviewed":null,"comments":null,"description":"Upgrade Marak - Minerva 69 kV Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/462426858","name":"Marak Substation","coordinates":[-97.04909,30.89337]},{"osm_id":"osm:way/127245540","name":"Minerva Substation","coordinates":[-96.95443,30.74579]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/15351533","layer":"lines-69"},{"osm_id":"osm:way/15355219","layer":"lines-69"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":13.2,"straight_mi":11.6},{"id":"ercot-tpit:91496","ercot_project":"91496","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-09-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Perry","to":"Ben Hur","county_from":"Limestone","county_to":"Limestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:73448","ercot_project":"73448","title":"Roma: Build new 138 kV terminal","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Roma","to":null,"county_from":"Starr","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Bordertown BESS interconnection to Roma Station on Roma Switch to Rio Grande City"},{"id":"ercot-tpit:87635","ercot_project":"87635","title":"WETT Pitchfork Synchronous Condenser","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pitchfork","to":"Pitchfork","county_from":"Dickens","county_to":"Dickens","tier":"Tier 1","rpg":"23RPG026","rpg_completed":"2023-09-28","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:79988","ercot_project":"79988","title":"Lucero: Construct New 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-30","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"Lucero","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date and Dollars should be Update","description":"Interconnect SanPat Solar I and SanPat Solar II to the new Lucero 345 kV station on the Angstrom to Naismith 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:80327","ercot_project":"80327","title":"RTP projects included the addition of 18.4 MVAR capacitor at Whitesboro SW","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Whitesboro SW","to":"Whitesboro SW","county_from":"Grayson","county_to":"Grayson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"RTP projects included the addition of 18.4 MVAR capacitor at Whitesboro SW"},{"id":"ercot-tpit:90040","ercot_project":"90040","title":"Del Sol: Construct New 345 kV Terminal","owner":"ETT","owner_project":"TP2024116","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Del Sol","to":null,"county_from":"Starr","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Diamondback Solar to the Del Sol 345 kV station"},{"id":"ercot-tpit:104617","ercot_project":"104617","title":"Refugio 138/69 kV:Install Capacitor Bank","owner":"AEP TCC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Refugio","to":null,"county_from":"Refugio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Install 17.2 Mvar cap bank at the Refugio 69 kV station"},{"id":"ercot-tpit:76232","ercot_project":"76232","title":"Reconductor Mivida-Coachwhip-Fishhook 2045 ACCC","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":14.39,"from":"Mivida PSSE Bus# 38152","to":"Fishhook PSSE Bus# 38180","county_from":"Ward","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110084A","ercot_project":"110084A","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CEHE_Newsub","to":"WAParish/Whaley","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 345kV substation. Loop WAP-Whaley Ckt 72."},{"id":"ercot-tpit:77805","ercot_project":"77805","title":"TNMP Pecos County RPG: Leon Creek to Coyanosa 138kV Double Ckt","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-01","actual_isd":null,"cm_new":31.2,"cm_rebuilt":0.6,"from":"Leon Creek (bus # 38355)","to":"Coyanosa (bus # 38380)","county_from":"Pecos","county_to":"Reeves","tier":"Tier 1","rpg":"23RPG023","rpg_completed":"2024-02-08","bod_reviewed":"2024-03-06","comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:91481","ercot_project":"91481","title":"RCEC_Kemp_RC_station","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New TVEC substation by tapping Oncor's line Kemp to Seven Points 138kV."},{"id":"ercot-tpit:110090A","ercot_project":"110090A","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NEWSUB","to":"Jordan/King","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 345 kV substation. Loop 345 kV Circuit 97 Jordan – King into the new 345 kV substation."},{"id":"ercot-tpit:105600","ercot_project":"105600","title":"MODELS HALITE","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Pecos","county_to":"Pecos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:103867","ercot_project":"103867","title":"BRYN_ShadyLane_Rebuild","owner":"BRYN","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BTU Shady Lane","to":null,"county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Shady Lane into a ring bus configuration. MAY NEED TO DELETE THIS LATER IF IT CONFLICTS WITH A FUTURE NOMCR OR NMMS TOPOLOGY."},{"id":"ercot-tpit:110079A","ercot_project":"110079A","title":"This models upgrades required for a proposed load addition near King Substation","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CEHE_NewSub","to":"King/Greens Bayou","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 345 kV CEHE_NewSub on ckt 75 King to Greens Bayou to create ckt.75 King to CEHE_NewSub to Greens Bayou. Upgrade substation equipment at King and Greens Bayou substations."},{"id":"ercot-tpit:87677","ercot_project":"87677","title":"Rebuild the Fryers Creek - Temple 138 kV Line","owner":"ONCOR","owner_project":"R6335","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-15","actual_isd":null,"cm_new":4.5,"cm_rebuilt":0,"from":"Fryers Creek","to":"Temple","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Fryers Creek - Temple 138 kV Line on new structures","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:43434","ercot_project":"43434","title":"This is the POI for High Noon Solar and Storage","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-21","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Boot Hill","to":"Boot Hill","county_from":"Hill","county_to":"Hill","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102632","ercot_project":"102632","title":"BEPC_TPIT102632_BLACKTHORN","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-22","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Ellis","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:100537","ercot_project":"100537","title":"Add new Iron Horse station for 25INR0230","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-23","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Limestone","to":"Gibbons Creek","county_from":"Leon","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99910","ercot_project":"99910","title":"County Line Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-24","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Elroy","to":"Wolf Lane","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Provide transformation service to a BBEC-member load in close proximity of existing Wolf Lane Substation. The 138-kV County Line Substation will be cut-in on T582 Elroy-Wolf Lane transmission line."},{"id":"ercot-tpit:87328","ercot_project":"87328","title":"Sunstone: Construct New 138 kV Station","owner":"AEP TCC/ETT","owner_project":"TP2022754","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sunstone","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect the Inner Harbor Desalination Plant load to the new Sunstone 138 kV station on the Morris Street to Nueces Bay 138 kV line"},{"id":"ercot-tpit:90053","ercot_project":"90053","title":"Dokmai: Construct New 138 kV Station","owner":"AEP TCC","owner_project":"TP2024120","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Dokmai","to":null,"county_from":"Calhoun","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Interconnect Hyfuels Western Farmland Wind to the new Dokmai 138 kV station on the Cangrejo to Dacosta 138 kV line between Beecher and Cangrejo"},{"id":"ercot-tpit:91259A","ercot_project":"91259A","title":"Phelps (PHE) CEHE Station for SKIPJA (SKP) / Skipjack Energy Storage (26INR0189)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Phelps","to":"WA Parish /Nash","county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new Phelps (PHE) 138kV Substation for generator interconnection to SKIPJA (SKP) - Skipjack Energy Storage (26INR0189). Loop into existing Ckt.02B WA Parish to Nash to create new Ckt.02 WA Parish to Phelps to Nash."},{"id":"ercot-tpit:81152","ercot_project":"81152","title":"Buford (fka China Grove) to Tributary 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8656","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":23.7,"from":"Rebuild Buford (fka China Grove)","to":"Tributary Switch","county_from":"Mitchell","county_to":"Howard","tier":"Tier 3","rpg":"26RPG010","rpg_completed":"2026-03-30","bod_reviewed":null,"comments":null,"description":"Rebuild Buford (fka China Grove) to Tributary 138 kV Line Rebuild","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:90031","ercot_project":"90031","title":"LLaves: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2024167","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Llaves","to":null,"county_from":"Goliad","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Keys Hollow Solar & Storage to the new Llaves 345 kV station on the Coleto Creek to Raptor 345 kV line"},{"id":"ercot-tpit:90014","ercot_project":"90014","title":"Palafox: Construct New 138 kV Station","owner":"AEP TCC","owner_project":"TP2024132","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Palafox","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Construct new STEC distribution station on the North Laredo Switch to Reveille 138 kV line between Barrera and North Laredo Switch"},{"id":"ercot-tpit:90134A","ercot_project":"90134A","title":"Elvis (EVS) 138kV CEHE Substation for ROCK N ROLL Storage (24INR0234)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Elvis","to":"WINMIL/Rosharon","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new Elvis (EVS) 138kV CEHE Substation for generator interconnection to Rock N Roll Storage. Connect to Ckt.26B WINMIL to Rosharon to create new Ckt.26 WINMIL to Elvis to Rosharon."},{"id":"ercot-tpit:89939A","ercot_project":"89939A","title":"Install new Skains (SKA) 345kV Substation for generator interconnection to Hollow Branch Creek Solar (24INR0422)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Skains","to":"Singleton/Jewett","county_from":"Grimes","county_to":"Leon","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new Skains (SKA) 345kV Substation for generator interconnection to Hollow Branch Creek Solar (24INR0422). Loop into existing Ckt.74 Singleton to Jewett (ONCOR) to create new Ckt.74 Singleton to Skains to Jewett."},{"id":"ercot-tpit:110166","ercot_project":"110166","title":"County Line Dynamic Reactive Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"County Line","to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install reactive support at the County Line 138-kV Substation. This is an LCP Upgrade project to support Batch Zero Base Load"},{"id":"ercot-tpit:100333","ercot_project":"100333","title":"Ghost Town: Add new 345 kV Station","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":14.3,"cm_rebuilt":0,"from":"Gray","to":"Ghost Town","county_from":"Gray","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add new substation to serve 25INR0080 & 26INR0113","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:98610","ercot_project":"98610","title":"Riley: Expand 345 kV Station","owner":"ETT/AEP TNC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":6,"cm_rebuilt":0,"from":"Riley","to":null,"county_from":"Wilbarger","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Interconnect the OPS load to the existing Riley 345 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:98802","ercot_project":"98802","title":"Claror: Construct New 345 kV Station","owner":"ETT","owner_project":"TP2025175","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Claror","to":null,"county_from":"King","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Bigway Solar I and II to the new Claror 345 kV station on the Edith Clarke to Cottonwood 345 kV line"},{"id":"ercot-tpit:55421","ercot_project":"55421","title":"Ballinger to Concho: Rebuild 69 kV line","owner":"AEP TNC","owner_project":"1861","kv":69,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":20.45,"from":"Ballinger","to":"San Angelo Concho","county_from":"Runnels","county_to":"Tom Green","tier":"Tier 3","rpg":"20RPG004","rpg_completed":"2020-04-30","bod_reviewed":"2020-05-08","comments":"Transmission Status Update","description":"Rebuild Ballinger to Concho 69 kV line, install POP switch for Rowena, install CB at Miles, install POP switch for Harriett REA","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/119137383","name":"Ballinger Substation","coordinates":[-99.94456,31.74117]},{"osm_id":"osm:way/192617531","name":"San Angelo Concho Substation","coordinates":[-100.42709,31.45007]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 36.5 mi but ERCOT reports 20.45 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:80576","ercot_project":"80576","title":"Chalmers: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Chalmers","to":null,"county_from":"Matagorda","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct new distribution station on the Lane City to Magill 138 kV line"},{"id":"ercot-tpit:79451A","ercot_project":"79451A","title":"Loop new Ancla CEHE 138kV substation into Ckt.04E Angleton to West Columbia to create new Ckt.04 Angleton to Ancla to West Columbia. Install one generator lead from Ancla CEHE 138kV substation to ROYAL / Royal River BESS.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ancla","to":"Angleton /West Columbia","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new Ancla CEHE 138kV substation into Ckt.04E Angleton to West Columbia to create new Ckt.04 Angleton to Ancla to West Columbia."},{"id":"ercot-tpit:73332","ercot_project":"73332","title":"Install Hermann (HER) Distribution Substation","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hermann","to":"Plaza/Grant","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Hermann (HER) Distribution Substation. Loop on Ckt.08I to create new Ckt.08 Plaza to Hermann to Grant."},{"id":"ercot-tpit:90134B","ercot_project":"90134B","title":"Elvis (EVS) 138kV CEHE Substation for ROCK N ROLL Storage (24INR0234)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"ROCK_N","to":null,"county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from Elvis (EVS) 138kV CEHE Substation to customer-owned ROCK_N (RNR) for ROCK N ROLL Storage (24INR0234) customer substation."},{"id":"ercot-tpit:91259B","ercot_project":"91259B","title":"Phelps (PHE) CEHE Station for SKIPJA (SKP) / Skipjack Energy Storage (26INR0189)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Phelps","to":"SKIPJA","county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from Phelps (PHE) 138kV Substation to SKIPJA (SKP) / Skipjack Energy Storage (26INR0189)"},{"id":"ercot-tpit:89939B","ercot_project":"89939B","title":"Install new Skains (SKA) 345kV Substation for generator interconnection to Hollow Branch Creek Solar (24INR0422)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Skains","to":"HOLLOW","county_from":"Grimes","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from Skains (SKA) 345kV CEHE Substation to HOLLOW (HLW) / Hollow Branch Solar (24INR0422)"},{"id":"ercot-tpit:89955","ercot_project":"89955","title":"RCEC_Peerless_Load","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-01","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Hopkins","county_to":"Hopkins","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding Pearless Bus, Load and Branch from Pearless to PRLS_RC","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:91135","ercot_project":"91135","title":"Add the Frankston station which taps the Coffee to Blackburn line","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding the Frankston station, tapping Rayburn's Coffee and Oncor's Blackburn stations."},{"id":"ercot-tpit:102559","ercot_project":"102559","title":"BEPC_TPIT_KosseSW_Kosse","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-05","actual_isd":null,"cm_new":0,"cm_rebuilt":5.5,"from":"85","to":"89","county_from":"Limestone","county_to":"Limestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:91986","ercot_project":"91986","title":"Establish the Wofford/Berryville POI","owner":"ONCOR","owner_project":"R6332","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-06","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Frankston","to":"Berryville","county_from":"Anderson","county_to":"Anderson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish the Wofford/Berryville POI","puct_project":"mcpr:oncor-electric-delivery:0pt54686","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110156","ercot_project":"110156","title":"CTT Red Rock station/Cross Expansion","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-11-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Hall","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Will replace CTT Cross Expansion PMCR. Adds total of 225 MVar cap banks, removes series capacitors."},{"id":"ercot-tpit:109706","ercot_project":"109706","title":"Angstrom: Expand 345 kV Station","owner":"AEP TCC","owner_project":"TP2023019","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-15","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Ansgtrom","to":"N/A","county_from":"San Patricio","county_to":"San Patricio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Alila Solar to the Angstrom 345 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:75524","ercot_project":"75524","title":"This converts Bell County to Gabriel to 138 KV","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-18","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bell County","to":"Gabriel","county_from":"Bell","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:111353","ercot_project":"111353","title":"Oncor_FW_Ward - Barnsley 69 kV Line Conversion to 138 kV","owner":"ONCOR","owner_project":"R8923","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-20","actual_isd":null,"cm_new":0,"cm_rebuilt":7.5,"from":"Ward","to":"Barnsley Sub","county_from":"Ward","county_to":"Crane","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert Ward - Barnsley 69 kV Line to 138 kV","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:80340","ercot_project":"80340","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-26","actual_isd":null,"cm_new":0,"cm_rebuilt":6.1,"from":"Keith Switch","to":"Iola","county_from":"Grimes","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:73067","ercot_project":"73067","title":"Marina: Construct New Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Marina","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct new network station on the Highway 9 to Morris St and Nueces Bay 138 kV lines"},{"id":"ercot-tpit:73423","ercot_project":"73423","title":"Buddy Owens: Build new 138 kV Substation","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Buddy Owens","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Build new 138 kV substation on Key Switch to North McAllen 138 kV line"},{"id":"ercot-tpit:75255A","ercot_project":"75255A","title":"San Antonio South Reliability RPG Project","owner":"CPS/CPS, STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":50,"cm_rebuilt":0,"from":"5231","to":"5901","county_from":"Bexar","county_to":"Atascosa","tier":"Tier 1","rpg":"22RPG048","rpg_completed":null,"bod_reviewed":"2023-08-31","comments":null,"description":"Construct a new, 50-mile Howard Rd to San Miguel 345kV double circuit transmission line with a normal and emergency rating of at least 1982 MVA per circuit; this transmission line will require approximately 50 mile of new Right of Way (ROW)","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:73032","ercot_project":"73032","title":"Mulberry Creek: Rebuild 138 kV Station","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mulberry Creek","to":null,"county_from":"Jones","county_to":null,"tier":"Tier 4","rpg":"25RPG034","rpg_completed":"2025-10-16","bod_reviewed":null,"comments":"In-Service Date and Tier Update","description":"Rebuild Mulberry Creek 138 kV station"},{"id":"ercot-tpit:71002","ercot_project":"71002","title":"Tidehaven: Construct New Distribution Station","owner":"AEP TCC","owner_project":"3767 DP21X0007","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tidehaven","to":null,"county_from":"Matagorda","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct new distribution station on the Blessing to Palacios 69 kV line"},{"id":"ercot-tpit:70710","ercot_project":"70710","title":"Eden to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"TA2021119","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":19.5,"cm_rebuilt":0,"from":"Eden","to":"Yellowjacket","county_from":"Concho","county_to":"Menard","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rehab the Eden to Yellowjacket 69 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/493048288","name":"Eden Substation","coordinates":[-99.83623,31.21574]},{"osm_id":"osm:way/192667620","name":"Yellowjacket Substation","coordinates":[-99.78479,30.93165]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/346417354","layer":"lines-69"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":19.5,"straight_mi":null},{"id":"ercot-tpit:45397","ercot_project":"45397","title":"Lion: 138 kV Station & Transmission Line","owner":"AEP TCC","owner_project":"3672 TP2018218","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":2.71,"cm_rebuilt":0,"from":"Lion","to":"Stewart Road","county_from":"Hidalgo","county_to":"Hidalgo","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Lion: 138 kV Station with new line to Stewart Road","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:104463","ercot_project":"104463","title":"Wren: Construct New 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Wren","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect the Eolic load to the new Wren 345 kV station via (2) new single circuits from Rio Hondo 345 kV station."},{"id":"ercot-tpit:103952","ercot_project":"103952","title":"LCRATSC_Shoreline_Substation_Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Travis","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will construct the new 138-kV Shoreline Substation. Shoreline Substation will provide 138-kV POI to serve Oncor's Rattan Substation load."},{"id":"ercot-tpit:90340B","ercot_project":"90340B","title":"South Lane City substation expansion for BRP Diran BESS (23INR0137)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"South Lane City","to":"Dyann","county_from":"Wharton","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Relocate existing Ckt.60D South Lane City to Dyann with expansion of South Lane City to BAAH configuration."},{"id":"ercot-tpit:90340A","ercot_project":"90340A","title":"South Lane City substation expansion for BRP Diran BESS (23INR0137)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"South Lane City","to":"BRP Diran BESS","county_from":"Wharton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand South Lane City substation for generator interconnection to BRP Diran BESS. Convert South Lane City to BAAH configuration."},{"id":"ercot-tpit:87629","ercot_project":"87629","title":"WETT Binturong Synchronous Condenser","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Binturong","to":"Binturong","county_from":"Glasscock","county_to":"Glasscock","tier":"Tier 1","rpg":"23RPG026","rpg_completed":"2023-09-28","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99808","ercot_project":"99808","title":"Cesium: Construct New 345 kV Station","owner":"ETT/AEP TNC/ETT","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cesium","to":null,"county_from":"Fisher","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Owner Update","description":"Interconnect the Castle load to the new Cesium 345 kV station on the Clear Crossing to Figaro 345 kV line between Figaro and Kirchoff"},{"id":"ercot-tpit:93048","ercot_project":"93048","title":"Add Liendo load serving substation","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Waller","county_to":"Waller","tier":"Tier 4","rpg":null,"rpg_completed":"2024-02-01","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102867","ercot_project":"102867","title":"Upgrade Sargent to Franklins Camp 2025 RTP","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99280","ercot_project":"99280","title":"Natural Dam - Beals Creek 138 kV Line","owner":"ONCOR","owner_project":"PB_L21_A","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":7.4,"from":"Natural Dam","to":"Bealscreek","county_from":"Howard","county_to":"Howard","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L21A. Upgrade the existing Natural Dam - Beals Creek 138-kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99391C","ercot_project":"99391C","title":"Stanton East - Midland Basin - Spraberry 69 kV Line Conversion to 138 kV","owner":"ONCOR","owner_project":"PB_L18_A","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":26.8,"from":"Consavvy","to":"Stanton East","county_from":"Midland","county_to":"Midland","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add part of Permian Basin Reliability Plan Upgrade ID L18. Convert the existing Stanton East - Midland Basin - Spraberry 69-kV line to 138-kV and cut into Rockhound and Stanton East 138 kV Switches to establish the Consavvy - Rockhound - St","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:89991","ercot_project":"89991","title":"Upgrade Sargent - Bay City","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":18.5,"from":"Sargent","to":"Bay City","county_from":"Matagorda","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Sargent - Bay City line to 795ACSR. 2024 RTP; 2025 RTP","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/520652091","name":"Sargent Substation","coordinates":[-95.66776,28.87214]},{"osm_id":"osm:way/515869180","name":"Bay City Substation","coordinates":[-95.90376,28.97827]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/515910303","layer":"lines-69"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":18.5,"straight_mi":null},{"id":"ercot-tpit:91553","ercot_project":"91553","title":"RCEC_Union_Valley","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":5.14,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Hunt","county_to":"Hunt","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"180MW load connecting to a new load serving station from RCEC's Union Valley Station to Blackland RC. This includes an installation of 100 MVAR Capacitor Bank at Union Valley Load Station (6981)","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:78044","ercot_project":"78044","title":"Hays Hill (fka Rock Draw) 345 kV Switch","owner":"ONCOR","owner_project":"R8716","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sand Lake","to":"North McCamey","county_from":"Ward","county_to":"Upton","tier":"Tier 1","rpg":"23RPG013","rpg_completed":"2023-06-09","bod_reviewed":null,"comments":null,"description":"Adding Oncor's portion of TNMP Silverleaf and Cowpen 345/138-kV Stations Project (23RPG013)"},{"id":"ercot-tpit:80824","ercot_project":"80824","title":"Zenaida: Construct New 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Zenaida","to":null,"county_from":"Duval","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Dove Run Solar to the new Zenaida 138 kV station on the Crestonio to Falfurrias 138 kV line"},{"id":"ercot-tpit:80830","ercot_project":"80830","title":"Zenaida: Construct New 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Zenaida","to":null,"county_from":"Duval","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Sun Cactus Solar to the new Zenaida 138 kV station on the Crestonio to Falfurrias 138 kV line"},{"id":"ercot-tpit:15TPIT0044","ercot_project":"15TPIT0044","title":"Fowlerton Capacitor","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fowlerton","to":null,"county_from":"La Salle","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add 19.2 MVAR capacitor"},{"id":"ercot-tpit:110733","ercot_project":"110733","title":"Related_WylieSW_LCP_Upgrades_Walnut_Newman_Line","owner":"GPL","owner_project":"0","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0.56,"from":"Walnut","to":"Newman","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Related_WylieSW_LCP_Upgrades_Walnut_Newman_Line","duplicate_listing":true,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/346508815","name":"Walnut Substation","coordinates":[-96.63184,32.91645]},{"osm_id":"osm:way/346508731","name":"Newman Switching Station","coordinates":[-96.62452,32.91371]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 0.1 mi but ERCOT reports 0.56 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:110733","ercot_project":"110733","title":"Related_WylieSW_LCP_Upgrades_Walnut_Newman_Line","owner":"GPL","owner_project":"0","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0.56,"from":"Walnut","to":"Newman","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Related_WylieSW_LCP_Upgrades_Walnut_Newman_Line","duplicate_listing":true,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/346508815","name":"Walnut Substation","coordinates":[-96.63184,32.91645]},{"osm_id":"osm:way/346508731","name":"Newman Switching Station","coordinates":[-96.62452,32.91371]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 0.1 mi but ERCOT reports 0.56 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:110749","ercot_project":"110749","title":"Related_WylieSW_LCP_Upgrades_Walnut_Naaman_Line","owner":"GPL","owner_project":"0","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":2.82,"from":"Walnut","to":"Naaman","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Related_WylieSW_LCP_Upgrades_Walnut_Naaman_Line","duplicate_listing":true,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/346508815","name":"Walnut Substation","coordinates":[-96.63184,32.91645]},{"osm_id":"osm:way/346508813","name":"Naaman Substation","coordinates":[-96.61135,32.9369]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:110749","ercot_project":"110749","title":"Related_WylieSW_LCP_Upgrades_Walnut_Naaman_Line","owner":"GPL","owner_project":"0","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":2.82,"from":"Walnut","to":"Naaman","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Related_WylieSW_LCP_Upgrades_Walnut_Naaman_Line","duplicate_listing":true,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/346508815","name":"Walnut Substation","coordinates":[-96.63184,32.91645]},{"osm_id":"osm:way/346508813","name":"Naaman Substation","coordinates":[-96.61135,32.9369]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:99006","ercot_project":"99006","title":"Establish El Capitan 345/138 kV Switch","owner":"ONCOR","owner_project":"PB_L5_A","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"El Capitan","to":"El Capitan","county_from":"Culberson","county_to":"Culberson","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L5A Establish a new Culberson 345/138-kV substation at the existing Culberson Switch and install two new 345/138-kV transformers"},{"id":"ercot-tpit:93088A","ercot_project":"93088A","title":"Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV Double-Circuit Line Rebuild 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","owner_project":"PB_L24_A","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":83.22,"from":"Cattleman","to":"Longshore","county_from":"Nolan","county_to":"Mitchell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L24A. LCRA and Oncor joint project to add L24A Upgrade the existing Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV double-circuit line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110063","ercot_project":"110063","title":"This models upgrades required for a proposed load addition.","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Seabreeze","to":"Seabreeze","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Connect customer load at Seabreeze or TANGLEWOOD substations"},{"id":"ercot-tpit:108819","ercot_project":"108819","title":"Upgrades conductor rating","owner":"TNMP","owner_project":"PBRP Upgrade L13","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:100680","ercot_project":"100680","title":"Install a 50MVAr Capacitor Bank at Grandview Substation","owner":"CPS/NO","owner_project":"S-1047","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5175","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102865","ercot_project":"102865","title":"Add Moursund load serving station","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99016","ercot_project":"99016","title":"Drill Hole - El Capitan (fka Culberson) 345 kV double-circuit line","owner":"ONCOR","owner_project":"PB_L5_D","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-01","actual_isd":null,"cm_new":36.2,"cm_rebuilt":0,"from":"Drill Hole","to":"El Capitan","county_from":"Culberson","county_to":"Culberson","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L5D Add a new Drill Hole - El Capitan (fka Culberson) 345-kV double-circuit line","puct_project_possible":"mcpr:oncor-electric-delivery:0pt56246","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104619","ercot_project":"104619","title":"Addition of Blue Moon substation","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-06","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Addition of Blue Moon substation on 138 kV line connecting Bertram to Burnet."},{"id":"ercot-tpit:110819","ercot_project":"110819","title":"Add Quantum 345 kV Switch","owner":"ONCOR","owner_project":null,"kv":345,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2027-12-09","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Connect Quantum 345 kV Switch to the existing Longshore - Cattleman Switch 345 kV line, approximately 13 miles Southwest of Colorado City, TX off of CR 365."},{"id":"ercot-tpit:100076","ercot_project":"100076","title":"Establish Maxdale 138 kV Switch","owner":"ONCOR","owner_project":"R6468","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-09","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Maxdale","to":"Maxdale","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Maxdale 138 kV Switch for Cosper Solar"},{"id":"ercot-tpit:111417","ercot_project":"111417","title":"Littlestar 138 kV Switch","owner":"ONCOR","owner_project":"R8978","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-09","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Little Star","to":"Little Star","county_from":"Ward","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish new 138 kV Switch"},{"id":"ercot-tpit:103919","ercot_project":"103919","title":"Potterson Lake 138 kV Switch","owner":"ONCOR","owner_project":"R8908","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-09","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Catclaw","to":"Mudstone","county_from":"Glasscock","county_to":"Glasscock","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish new 138 kV Switch"},{"id":"ercot-tpit:70012A","ercot_project":"70012A","title":"BEPC_NOTPIT_ClarkLakeVoltConv1","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Parker","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:6777","ercot_project":"6777","title":"Establish Division Sub Cedar Hill - Liggett 138 kV Line","owner":"ONCOR","owner_project":"M5280","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-14","actual_isd":null,"cm_new":6,"cm_rebuilt":0,"from":"Grand Prairie West","to":"Mayfield Tap","county_from":"Dallas","county_to":"Tarrant","tier":"Tier 2","rpg":"23RPG018","rpg_completed":null,"bod_reviewed":null,"comments":"Project Deferral","description":"Establish Division Sub and Loop Cedar Hill - Liggett 138 kV line in to Great Southwest / General Motors","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:103265","ercot_project":"103265","title":"Hunt Area System Restoration","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hunt","to":null,"county_from":"Kerr","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will restore and replace flood damaged transmission facilities at the Hunt substation and damaged structures on 138-kV Hunt to Turtle Creek transmission line (T240)."},{"id":"ercot-tpit:100695","ercot_project":"100695","title":"Install a 50MVAr Capacitor Bank at Omicron Substation","owner":"CPS/NO","owner_project":"S-1048","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5326","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:91945","ercot_project":"91945","title":"Establish Alder 138 kV Switch","owner":"ONCOR","owner_project":"R6329","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Alder","to":"Alder","county_from":"Van Zandt","county_to":"Van Zandt","tier":"Tier 2","rpg":"24RPG007","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Alder 138 kV Switch"},{"id":"ercot-tpit:92274","ercot_project":"92274","title":"Whitebaker 345kV - Part of Upgrade L13 2024 Permian Basin Study","owner":"TNMP","owner_project":"PBRP Upgrade L13","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":22,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:92852A","ercot_project":"92852A","title":"Monticello_Paris_Line_Upgrade","owner":"ONCOR","owner_project":"R986","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":33.3,"from":"Monticello","to":"Woodard","county_from":"Titus","county_to":"Lamar","tier":"Tier 1","rpg":"25RPG026","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Monticello - Woodard 345 kV Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:93466","ercot_project":"93466","title":"Rebuild Odessa EHV - Reiter 138 kV Double Circuit Line","owner":"ONCOR","owner_project":"PB L17","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Odessa EHV","to":"Reiter","county_from":"Ector","county_to":"Ector","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L17 Upgrade Odessa - Reiter 138kV double-circuit line"},{"id":"ercot-tpit:98878","ercot_project":"98878","title":"Chalk 69 kV Substation Conversion to 138 kV","owner":"ONCOR","owner_project":"PB_L20_G","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Prong Moss","to":"McDonald Road","county_from":"Howard","county_to":"Glasscock","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L20G. Construct a new Chalk 138-kV substation at the existing Chalk 69-kV substation and loop the existing McDonald Road – Navigation 138-kV line into Chalk","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99271","ercot_project":"99271","title":"Upgrade Hutto 138 kV terminal equipment","owner":"ONCOR","owner_project":"R6205","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hutto","to":"Hutto","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Hutto 138 kV terminal equipment for the Hutto - Teal 138 kV Line"},{"id":"ercot-tpit:99284","ercot_project":"99284","title":"Ranger Camp Switch - Barber Lake Switch 138 kV Line (East Circuit, 2nd Circuit)","owner":"ONCOR","owner_project":"PB_L22_A","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":3.68,"cm_rebuilt":0,"from":"Ranger Camp","to":"Barber Lake","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L22A. Install a new 3.68-mile, 138 kV second conductor on existing double-circuit structures from Ranger Camp to Barber Lake (via Frontier)","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99407","ercot_project":"99407","title":"Sun - Sacroc - Union 138 kV Line Rebuild","owner":"ONCOR","owner_project":"PB_L22_D","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":1.3,"from":"Sun","to":"Union","county_from":"Scurry","county_to":"Scurry","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L22D. Upgrade the existing Sun - Sacroc - Union 138 kV Line Rebuild.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99479B","ercot_project":"99479B","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","owner_project":"PB_L23","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":12.8,"from":"China Grove","to":"Bluff Creek","county_from":"Scurry","county_to":"Scurry","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds part of Permian Basin Reliability Plan Upgrade ID L23. Convert the existing Snyder - Scurry - China Grove and Snyder - Amoco Tap - China Grove 69-kV lines to 138-kV. This converts the Snyder - Ira - China Grove 69 kV Line into 138 kV a","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99622","ercot_project":"99622","title":"Establish Pin Oak 345 kV Switch","owner":"ONCOR","owner_project":"R6331","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pin Oak 345 kV Switch","to":"Pin Oak 345 kV Switch","county_from":"Freestone","county_to":"Freestone","tier":"Tier 1","rpg":"25RPG004","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Pin Oak 345 kV Switch","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:87705","ercot_project":"87705","title":"Pepper Creek - Temple Elm Creek 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R6198","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.2,"from":"Pepper Creek","to":"Temple Elm Creek","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor the Pepper Creek - Temple Elm Creek 138 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:87709","ercot_project":"87709","title":"Belton - Temple 138 kV Line","owner":"ONCOR","owner_project":"R6199","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9.6,"from":"Belton","to":"Temple","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Belton - Temple 138 kV Line","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:91459","ercot_project":"91459","title":"Establish Mosher 345 kV Switch","owner":"ONCOR","owner_project":"R6321","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mosher 345 kV Switch","to":"Mosher 345 kV Switch","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Mosher 345 kV Switch for Glasgow Solar"},{"id":"ercot-tpit:71910B","ercot_project":"71910B","title":"Rebuild the Hillsboro - Elm Mott 69 kV Line","owner":"ONCOR","owner_project":"R6221","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.3,"from":"West 69 kV Substation","to":"Abbott 69 kV Substation","county_from":"McLennan","county_to":"Hill","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the West - Abbott 69 kV Line Section","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:81067","ercot_project":"81067","title":"Balch Springs Tap – Balch Springs 138 kV Line Section","owner":"ONCOR","owner_project":"M4194","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3.6,"from":"Balch Springs Tap","to":"Balch Springs","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Balch Springs Tap – Balch Springs 138 kV Line Section","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:81225","ercot_project":"81225","title":"Cattleman - Range Rider 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R8722","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.6,"from":"Cattleman","to":"Range Rider","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 138 kV double-circuit line from Cattleman to Range Rider Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:81232","ercot_project":"81232","title":"Cattleman – Bitter Creek/Champion Creek 345 kV Reroute","owner":"ONCOR","owner_project":"R8647","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":5,"from":"Cattleman","to":"Bitter Creek and Champion Creek","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Terminate Morgan Creek – Bitter Creek/Champion Creek Double-Circuit 345 kV Line into Cattleman 345 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:66190","ercot_project":"66190","title":"East Levee - Industrial Blvd 138 kV DCKT Line","owner":"ONCOR","owner_project":"M4213","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"East Levee","to":"Industrial","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild East Levee - Industrial Blvd 138 kV DCKT Line"},{"id":"ercot-tpit:68681","ercot_project":"68681","title":"Lamar Blossom Switch - Clarksville 69 kV Line Rebuild","owner":"ONCOR","owner_project":"M5325","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lamar","to":"River Crest","county_from":"Lamar","county_to":"Red River","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 69 kV Line"},{"id":"ercot-tpit:68706","ercot_project":"68706","title":"Edgewood Switch – Royse Switch 138 kV Line","owner":"ONCOR","owner_project":"M3227","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Edgewood","to":"Able Springs","county_from":"Van Zandt","county_to":"Kaufman","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild and convert the Edgewood-Iron Bridge 69 kV to 138 kV operation"},{"id":"ercot-tpit:72940","ercot_project":"72940","title":"FireHall_138kV_Switch","owner":"ONCOR","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":3.4,"cm_rebuilt":0,"from":"Roanoke Switch","to":"Kingsridge Switch","county_from":"Tarrant","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Fire Hall 138 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:76654","ercot_project":"76654","title":"Establish Voss Lake 345/138 kV Switch","owner":"ONCOR","owner_project":"R6278","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":5.6,"from":"Voss Lake","to":"Voss Lake","county_from":"Milam","county_to":"Milam","tier":"Tier 1","rpg":"25RPG009","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Voss Lake 345/138 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:111207","ercot_project":"111207","title":"Stainback 345 kV Capacitor Bank","owner":"ONCOR","owner_project":"M5017","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Stainback 345 kV Switch","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:87010","ercot_project":"87010","title":"Establish Drill Hole 345/138 kV Switch","owner":"ONCOR","owner_project":"R8725","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":2.32,"cm_rebuilt":0,"from":"Drill Hole Switch","to":"Drill Hole Switch","county_from":"Culberson","county_to":"Culberson","tier":"Tier 1","rpg":"24RPG010","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Drill Hole 345/138 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:111794","ercot_project":"111794","title":"Establish Iron Crest 138 kV Switch","owner":"ONCOR","owner_project":"R6440","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Iron Crest 138 kV Switch","to":"Iron Crest 138 kV Switch","county_from":"Anderson","county_to":"Anderson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Iron Crest 138 kV Switch"},{"id":"ercot-tpit:111870","ercot_project":"111870","title":"Establish Caroline Creek 138 kV Switch","owner":"ONCOR","owner_project":"R6543","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Caroline Creek 138 kV Switch","to":"Caroline Creek 138 kV Switch","county_from":"Freestone","county_to":"Freestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Caroline Creek 138 kV Switch"},{"id":"ercot-tpit:111952","ercot_project":"111952","title":"Binkley 138 kV Switch","owner":"ONCOR","owner_project":"M3367","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Binkley Switch","to":null,"county_from":"Grayson","county_to":"Grayson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Binkley 138 kV Switch"},{"id":"ercot-tpit:110583","ercot_project":"110583","title":"Fire Hall 138 kV Capacitor Bank","owner":"ONCOR","owner_project":"M5352","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fire Hall","to":null,"county_from":"Tarrant","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Fire Hall 138 kV Capacitor Bank"},{"id":"ercot-tpit:104821","ercot_project":"104821","title":"Wycliff 138 kV POD","owner":"ONCOR","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2027-12-15","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":0,"from":"Dallas","to":"Dallas","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Wycliff 138 kV POD"},{"id":"ercot-tpit:104824","ercot_project":"104824","title":"Wilson 138 kV Switch","owner":"ONCOR","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2027-12-15","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":0,"from":"Dallas","to":"Dallas","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":"25RPG004","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Wilson 138 kV Switch","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:104898","ercot_project":"104898","title":"Deaf Smith - Theory 345 kV Double-Circuit and Wallaby - AJ Swope 345 kV Line Cut-In","owner":"ONCOR","owner_project":"R8899","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":60,"cm_rebuilt":0,"from":"Deaf Smith","to":"Theory","county_from":"Deaf Smith","county_to":"Deaf Smith","tier":"Tier 3","rpg":"26RPG013","rpg_completed":"2026-04-16","bod_reviewed":null,"comments":null,"description":"Construct Deaf Smith - Theory 345 kV Double-Circuit Line and Cut-In Wallaby - AJ Swope 345 kV Line into Deaf Smith 345 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102849B","ercot_project":"102849B","title":"Union 138 kV Switch","owner":"ONCOR","owner_project":"R8608","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":13.6,"from":"Union","to":"Union","county_from":"Scurry","county_to":"Scurry","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Cut-in the Deep Creek - Sacroc 138 kV Line Section into Union 138 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105330","ercot_project":"105330","title":"Sterrett Switch – MidlothianTXI 138kV_Line_Upgrade","owner":"ONCOR","owner_project":"M4349","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sterrett Switch","to":"Midlothian TXI","county_from":"Ellis","county_to":"Ellis","tier":"Tier 1","rpg":null,"rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Sterrett Switch – MidlothianTXI 138kV Line Upgrade"},{"id":"ercot-tpit:105332","ercot_project":"105332","title":"Watermill Switch – Stainback Switch 345kV Double-Circuit Line Upgrade","owner":"ONCOR","owner_project":"M4432","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3,"from":"Watermill Switch","to":"Stainback Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Watermill Switch – Stainback Switch 345kV Double-Circuit Line Upgrade","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:105320","ercot_project":"105320","title":"Pebble Creek 138 kV Capacitor","owner":"ONCOR","owner_project":"M4434","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pebble Creek 138 kV Switch","to":null,"county_from":"Ellis","county_to":null,"tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Pebble Creek 138 kV Capacitor","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:104506","ercot_project":"104506","title":"Establish Kilough 138 kV POD","owner":"ONCOR","owner_project":"R6511","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kilough 138 kV POD","to":"Kilough 138 kV POD","county_from":"Cherokee","county_to":"Cherokee","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Kilough 138 kV POD"},{"id":"ercot-tpit:87021","ercot_project":"87021","title":"Construct Drill Hole – Riverton 345 kV Double-Circuit","owner":"ONCOR","owner_project":"R8748","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-16","actual_isd":null,"cm_new":36,"cm_rebuilt":0,"from":"Drill Hole Switch","to":"Riverton Switch","county_from":"Culberson","county_to":"Reeves","tier":"Tier 1","rpg":"24RPG010","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct Drill Hole – Riverton 345 kV Double-Circuit","puct_project":"mcpr:oncor-electric-delivery:0pt54657","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:105334","ercot_project":"105334","title":"Watermill Switch – Wilson Switch 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4363","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-16","actual_isd":null,"cm_new":0,"cm_rebuilt":1.25,"from":"Watermill Switch","to":"Wilson Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Watermill Switch – Wilson Switch 138 kV Double-Circuit Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:105324","ercot_project":"105324","title":"Mesquite Switch – Seagoville Switch 138kV Line","owner":"ONCOR","owner_project":"M4435","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-16","actual_isd":null,"cm_new":0,"cm_rebuilt":8.3,"from":"Mesquite Switch","to":"Seagoville Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Mesquite Switch – Seagoville Switch 138kV Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:105314","ercot_project":"105314","title":"Cedar Crest Switch – Wilson Switch 138kV Line","owner":"ONCOR","owner_project":"M4406","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-16","actual_isd":null,"cm_new":0,"cm_rebuilt":5.3,"from":"Cedar Crest Switch","to":"Wilson Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Cedar Crest Switch – Wilson Switch 138kV Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:90061","ercot_project":"90061","title":"Poisson: Construct New 345 kV Station","owner":"AEP TNC","owner_project":"TP2024154","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Poisson","to":null,"county_from":"Wichita","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Short Creek Solar to the new Poisson 345 kV station on the Riley to Fisher Road 345 kV line"},{"id":"ercot-tpit:102661","ercot_project":"102661","title":"BEPC_TPIT102661_Pursley","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-17","actual_isd":null,"cm_new":0.13,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Navarro","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:61449","ercot_project":"61449","title":"Clark Church/Birdhouse (Ottine New) Substation","owner":"GVEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ottine","to":"Ottine","county_from":"Gonzales","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Build New 138 Substation adjacent to LCRA Birdhouse station; replaces existing Ottine station, add 20MVA"},{"id":"ercot-tpit:80850","ercot_project":"80850","title":"Lon Hill to Sinton: Bypass Waterworks 69 kV station","owner":"AEP TCC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-21","actual_isd":null,"cm_new":0,"cm_rebuilt":0.45,"from":"Odem","to":"Stevens Tap","county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Relocate portion of 69 kV line between Odem and Stevens Tap to bypass Waterworks 69 kV station","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:104595","ercot_project":"104595","title":"BBEC Max Zuehlke substation high side upgrade","owner":"BBEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-26","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Max Zuehlke","to":null,"county_from":"Washington","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace 336 (Linnet) conductor, jumpers, and connectors with 959 (Suwannee) conductor, jumpers, and connectors.(MLSE)"},{"id":"ercot-tpit:104605","ercot_project":"104605","title":"BBEC Lexington to Lyle Wolz Transmission Line Upgrade","owner":"BBEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-26","actual_isd":null,"cm_new":0,"cm_rebuilt":12.4,"from":"Lexington","to":"Lyle Wolz","county_from":"Lee","county_to":"Burleson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace 336 (Linnet) conductor with 959 (Suwannee) and replace a limited number of structures to accommodate the new conductor.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:104601","ercot_project":"104601","title":"BBEC Lyle Wolz to Lyons Transmission Line Upgrade","owner":"BBEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-26","actual_isd":null,"cm_new":0,"cm_rebuilt":14,"from":"Lyle Wolz","to":"Lyons","county_from":"Burleson","county_to":"Burleson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace 336 (Linnet) conductor with 959 (Suwannee) and replace a limited number of structures to accommodate the new conductor.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:105470","ercot_project":"105470","title":"Cowpen 345kV Bus from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-27","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Reeves","county_to":"Reeves","tier":"Tier 1","rpg":"23RPG013","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104599","ercot_project":"104599","title":"BBEC Gay Hill substation high side upgrade","owner":"BBEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gay Hill","to":null,"county_from":"Washington","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace 336 (Linnet) conductor, jumpers, and connectors with 959 (Suwannee) conductor, jumpers, and connectors. (MLSE)"},{"id":"ercot-tpit:99821","ercot_project":"99821","title":"LCRATSC_Copperas_Cove-Kempner_Transmission_Line_Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-29","actual_isd":null,"cm_new":0,"cm_rebuilt":5.62,"from":"7323","to":"7330","county_from":"Lampasas","county_to":"Lampasas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 5.6 mile T721 Kempner - Copperas Cove 138-kV transmission line.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:85965","ercot_project":"85965","title":"RGEC_Altuda 69-kV In-line_Breaker_Installation","owner":"RGEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Alpr2A (6665)","to":"PrsmnGap2A (6669)","county_from":"Brewster","county_to":"Brewster","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Working on engineering design with consultant.","description":"Install 69-kV breaker between Alpine Switch and Persimmon Gap substation at Altuda substation."},{"id":"ercot-tpit:61232","ercot_project":"61232","title":"RGEC Persimmon Gap Substation 69-kV Transmission Line Extension and Substation Expansion","owner":"RGEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Persimmon Gap","to":"Persimmon Gap","county_from":"Brewster","county_to":"Brewster","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Scheduled RUS Construction Work Plan Project","description":"Extend Alpine-Persimmon Gap 69-kV Transmission Line at Switch# 6669 and Install Circuit Switcher to accommodate new substation power transformer and distribution bays. New power transformer capacity will be 12/16/20 MVA."},{"id":"ercot-tpit:100674","ercot_project":"100674","title":"Install a 50MVAr Capacitor Bank at Crossroads Substation","owner":"CPS/NO","owner_project":"S-1050","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5102","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109610B","ercot_project":"109610B","title":"Missouri City to HO Clarke - Hardening Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":1.06,"from":"HO Clarke","to":"Missouri City","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild/reconductor portions of Ckt.05A HO Clarke to Blue Ridge as a Hardening upgrade.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:100672","ercot_project":"100672","title":"Install a 50MVAr Capacitor Bank at Castroville Substation","owner":"CPS/NO","owner_project":"S-1045","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5083","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:107134","ercot_project":"107134","title":"LCRATSC Laurel Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Laurel Substation","to":null,"county_from":"Lampasas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will install the transmission interconnection facilities (TIF) including constructing a new 138-kV substation (\"Laurel Substation Addition\")."},{"id":"ercot-tpit:102996","ercot_project":"102996","title":"Install new 138kV AERIE (AER) customer substation. Loop on Ckt.02B to create new Ckt.02 Nash to AERIE to Burke.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"AERIE","to":"Nash / Burke","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 138kV AERIE (AER) customer substation. Loop on Ckt.02B to create new Ckt.02 Nash to AERIE to Burke."},{"id":"ercot-tpit:103878","ercot_project":"103878","title":"Fairbanks Substation 4th Transformer","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":4.15,"from":"Deihl","to":"White Oak","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/129161388","name":"Deihl Substation","coordinates":[-95.47609,29.8547]},{"osm_id":"osm:way/128672826","name":"White Oak Substation","coordinates":[-95.43481,29.81518]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/587103621","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":4.1,"straight_mi":null},{"id":"ercot-tpit:104559B","ercot_project":"104559B","title":"Hockley Distribution Transformer Addition with Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Flewellen","to":"Katy","county_from":"Fort Bend","county_to":"Waller","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.66A Flewellen to Katy tap to increase thermal limits"},{"id":"ercot-tpit:90035","ercot_project":"90035","title":"Edith Clarke: Expand 345 kV Station","owner":"AEP TNC","owner_project":"TP2024193","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0.3,"cm_rebuilt":0,"from":"Edith Clarke","to":null,"county_from":"Foard","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Title, Terminal \"to\" Location, TSP/Company Contact, In-Service Date and County Location for ending point Update","description":"Interconnect Seine BESS to the existing Edith Clarke 345 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:92280","ercot_project":"92280","title":"Alamo St - Bottlebrush 138kV - Upgrade L12 2024 Permian Basin Study","owner":"TNMP","owner_project":"PBRP Upgrade L12","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":31.75,"cm_rebuilt":28.7,"from":null,"to":null,"county_from":"Pecos","county_to":"Pecos","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Alamo St - Bottlebrush 138kV - Upgrade L12 2024 Permian Basin Study","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:78404","ercot_project":"78404","title":"LCRATSC Bastrop Colony Substation Addition (formerly Bastrop Village)","owner":"LCRATSC","owner_project":"PLC-8067","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bastrop Colony","to":null,"county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:98994B","ercot_project":"98994B","title":"Replace Harrisburg with new Manchester Subsation","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Manchester","to":"GOODYEAR/Magnolia Park","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade existing Ckt.70B GOODYEAR to Magnolia Park to increase thermal limits. Loop new Manchester distribution substation on existing Ckt.70B to create new Ckt.70B GOODYEAR to Manchester to Magnolia Park. No Transmission Breakers expected"},{"id":"ercot-tpit:99796","ercot_project":"99796","title":"Ganado: Expand 138 kV Station","owner":"AEP TCC","owner_project":"TP2025221","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Ganado","to":null,"county_from":"Jackson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Interconnect Dios BESS to the existing Ganado 138 kV station","terminal_match":{"from":"ambiguous","to":"multi_or_missing"}},{"id":"ercot-tpit:99919","ercot_project":"99919","title":"Georgetown Power Transformer Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the Georgetown 138-kV transmission bus to a four circuit breaker improved bus with Gas Insulated Switchgear (GIS). The new switchgear and all 138-kV series equipment should be rated at 4000 continuous amps. Upgrade Georgetown T1 and"},{"id":"ercot-tpit:99924","ercot_project":"99924","title":"Pine Path Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 138-kV substation to cut-in on T670 to serve new customer load in the BBEC service territory."},{"id":"ercot-tpit:67427B","ercot_project":"67427B","title":"MINING 138kV Conversion and BENTON customer substation removal(24RPG033).","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"MINING-138","to":"College /Jefferson","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":"24RPG033","rpg_completed":"2024-12-02","bod_reviewed":"2024-12-02","comments":null,"description":"Install new customer-owned MINING 138kV substation. Loop substation on existing Ckt.06G to create new Ckt.06 Pasadena to College tap to MINING to Jefferson."},{"id":"ercot-tpit:67427A","ercot_project":"67427A","title":"MINING 138kV Conversion and BENTON customer substation removal(24RPG033).","owner":"CNP","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Deepwater","to":"South Channel","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":"24RPG033","rpg_completed":"2024-12-02","bod_reviewed":"2024-12-02","comments":null,"description":"Rebuild/Repurpose existing 69kV Ckt.16C MINING Switchrack to MINING tap section. Retire MINING Switchrack from Ckt.16C to create new Ckt.16C Deepwater to South Channel. Remove customer-owned BENTON substation from CEHE service. Retire MININ"},{"id":"ercot-tpit:91394","ercot_project":"91394","title":"Mendoza_Substation_Upgrade","owner":"LCRATSC","owner_project":"PLC-8202","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Increase the transformation capacity at Mendoza Substation by installing an additional power transformer and upgrade the existing bus configuration to an improved bus arrangement."},{"id":"ercot-tpit:91545","ercot_project":"91545","title":"Birdhouse Substation Upgrade","owner":"LCRATSC","owner_project":"PLC-6656","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Gonzales","county_to":"Gonzales","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Birdhouse substation to provide a new POI for GVEC PWT."},{"id":"ercot-tpit:78495","ercot_project":"78495","title":"Hillje 345kV Substation Expansion for Space City Solar - Generator Interconnection (21INR0341)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hillje","to":"MIDANE","county_from":"Wharton","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand Hillje 345kV substation and install one generator lead for new interconnection to MIDANE customer substation for Space City Solar"},{"id":"ercot-tpit:73065","ercot_project":"73065","title":"Magana Hein: Build new 138 kV distribution station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":2.6,"cm_rebuilt":0,"from":"Magana Hein","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new distribution station on the Molina to Wormser Road 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:73352A","ercot_project":"73352A","title":"PH Robinson Area 138kV Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"PH Robinson","to":"BACLIF","county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reposition existing PH Robinson to BACLIF generator lead from the PHR_South bus to the PHR_North bus."},{"id":"ercot-tpit:76237","ercot_project":"76237","title":"Lobo: Construct New 345 kV Terminal","owner":"ETT/AEP TCC/ETT","owner_project":"TP2023320","kv":345,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2027-12-31","actual_isd":"2025-06-01","cm_new":0,"cm_rebuilt":0,"from":"Lobo","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Cuchillas Solar to the Lobo 345 kV station"},{"id":"ercot-tpit:90161C","ercot_project":"90161C","title":"Install new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pinehurst","to":null,"county_from":"Montgomery","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert Pinehurst to unity power factor substation."},{"id":"ercot-tpit:103501","ercot_project":"103501","title":"LCRATSC Beecham Gap Area Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kempner","to":null,"county_from":"Lampasas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC provide a new transmission point of interconnection (POI) for Brazos Electric Cooperative-owned transmission line to their Beecham Gap Substation at Kempner substation."},{"id":"ercot-tpit:102779","ercot_project":"102779","title":"Fairbanks (FB) Substation Expansion","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fairbanks","to":"TH Wharton/Deihl","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand existing 138kV Fairbanks substation with in-series breakers."},{"id":"ercot-tpit:109638","ercot_project":"109638","title":"Install new Bypass BESS II generator storage and connect to WA Parish 345kV North. Utilize same generator lead as Bypass BESS.","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110055","ercot_project":"110055","title":"Clear Crossing: Install New 345 kV Capacitor Bank","owner":"AEP TNC/ETT","owner_project":"TP2026076","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clear Crossing","to":null,"county_from":"Haskell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Reactive Capability Update","description":"Install a new capacitor bank at the Clear Crossing 345 kV station"},{"id":"ercot-tpit:111604","ercot_project":"111604","title":"LCRATSC Gillespie Nimitz Storm Hardening","owner":"LCRATSC","owner_project":"PLC-8473","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.9006,"from":"Gillespie","to":"Nimitz","county_from":"Gillespie","county_to":"Gillespie","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will replace the conductor between Gillespie and Nimitz (T266) as part of an effort to rebuild and harden the circuit resulting in greater durability and reliability of assets in the area.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/192729237","name":"Gillespie Substation","coordinates":[-98.90407,30.30543]},{"osm_id":"osm:way/192729242","name":"Nimitz Substation","coordinates":[-98.86589,30.3068]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/192729232","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":2,"straight_mi":null},{"id":"ercot-tpit:102538","ercot_project":"102538","title":"Install distribution transformers at Intercontinental distribution substation.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Intercontinental","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109858","ercot_project":"109858","title":"Gillespie - Goehmann Lane Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.6,"from":"Gillespie","to":"Goehmann Lane","county_from":"Gillespie","county_to":"Gillespie","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the 69-kV 3.6 mile Gillespie - Goehmann Lane transmission line to achieve a 67 MVA minimum emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/192729237","name":"Gillespie Substation","coordinates":[-98.90407,30.30543]},{"osm_id":"osm:way/504095322","name":"Goehmann Lane Substation","coordinates":[-98.84334,30.26196]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:90189","ercot_project":"90189","title":"Meadow 345kV Substation Expansion for Aldrin 345 BESS(25INR0425).","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Meadow","to":null,"county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand 345kV Meadow (MDO) substation for ALDRIN (ALD) / Aldrin 345 BESS (25INR0425)."},{"id":"ercot-tpit:105424","ercot_project":"105424","title":"Cascabel: Expand 345 kV Station","owner":"ETT/AEP TNC","owner_project":"TP2026076","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cascabel","to":null,"county_from":"Stonwall","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the Crusoe load at the Cascabel 345 kV station"},{"id":"ercot-tpit:104744A","ercot_project":"104744A","title":"High Voltage Mitigation - WA Parish Area","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (2) 40 MVAr shunt reactors on the tertiary of Bellaire Auto A1"},{"id":"ercot-tpit:104744D","ercot_project":"104744D","title":"High Voltage Mitigation - WA Parish Area","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jeanetta","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (2) 40 MVAr shunt reactors on the tertiary of Jeanetta Auto A2"},{"id":"ercot-tpit:104744C","ercot_project":"104744C","title":"High Voltage Mitigation - WA Parish Area","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jeanetta","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (2) 40 MVAr shunt reactors on the tertiary of Jeanetta Auto A1"},{"id":"ercot-tpit:104744B","ercot_project":"104744B","title":"High Voltage Mitigation - WA Parish Area","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (2) 40 MVAr shunt reactors on the tertiary of Bellaire Auto A2"},{"id":"ercot-tpit:109610A","ercot_project":"109610A","title":"Missouri City to HO Clarke - Hardening Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":6.26,"from":"HO Clarke","to":"Missouri City","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild/reconductor Ckt.02A HO Clarke to Blue Ridge to Missouri City as a Hardening upgrade. Rebuild/reconductor Ckt.02A Blue Ridge tap section as a Hardening upgrade.","terminal_match":{"from":"not_in_osm","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:relation/14672812","name":"Blueridge Substation","coordinates":[-95.49672,29.62858]},{"osm_id":"osm:way/129126589","name":"Missouri City Substation","coordinates":[-95.53006,29.61265]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","link_note":"mapped connection is 2.2 mi but ERCOT reports 6.26 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:102540","ercot_project":"102540","title":"Upgrade Ckt.67B North Belt to DRILCO to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"North Belt","to":"DRILCO","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:90161A","ercot_project":"90161A","title":"Install new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":9,"cm_rebuilt":0,"from":"Mill Creek","to":"Pinehurst /Tomball","county_from":"Montgomery","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new Mill Creek (MLC) distribution substation with (2) 100 MVA transformers. Loop substation on Ckt.81G to create new Ckt.81G Pinehurst to Mill Creek to Tomball.","terminal_match":{"from":"not_in_osm","to":"multi_or_missing","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/127580895","name":"Pinehurst Substation","coordinates":[-95.67297,30.16141]},{"osm_id":"osm:way/127286697","name":"Tomball Substation","coordinates":[-95.60603,30.0901]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","osm_matches":[{"osm_id":"osm:way/127580891","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":7.1,"straight_mi":null},{"id":"ercot-tpit:98994A","ercot_project":"98994A","title":"Replace Harrisburg with new Manchester Subsation","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Deepwater","to":"TEXPET","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove Harrisburg from Ckts. 33B & 33C service to create new Ckt.33 TEXPET to Clinton."},{"id":"ercot-tpit:72059","ercot_project":"72059","title":"Hillje 345kV Substation Expansion for Ramsey Storage - Generator Interconnection to FLATLA (FLA) (21INR0505)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hillje","to":null,"county_from":"Wharton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand Hillje 345kV substation and install one generator lead for new interconnection to FLATLA (FLA) customer substation for Ramsey Storage"},{"id":"ercot-tpit:73352D","ercot_project":"73352D","title":"PH Robinson Area 138kV Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"PH Robinson","to":null,"county_from":"Galveston","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade PH Robinson 'North' Bus fault duty to 80KA"},{"id":"ercot-tpit:110447","ercot_project":"110447","title":"STEC Ammonia Plant Load Phase 2","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2027-12-31","actual_isd":null,"cm_new":7.66,"cm_rebuilt":15.32,"from":"Victoria","to":"Dupont","county_from":"Victoria","county_to":"Victoria","tier":"Tier 1","rpg":"25RPG012","rpg_completed":"2026-01-13","bod_reviewed":null,"comments":null,"description":"-Rebuild the existing Victoria Plant to Shepley to Dupont 138-kV transmission line with normal and emergency ratings of at least 485 MVA, approximately 7.66-mile; -Rebuild the existing Victoria Plant to Dupont 138-kV transmission line ckt2 ","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/515655402","name":"Victoria Switching Station","coordinates":[-97.0105,28.7867]},{"osm_id":"osm:way/337345667","name":"Dupont Switching Station","coordinates":[-96.94558,28.69293]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 7.6 mi but ERCOT reports 22.98 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:80342","ercot_project":"80342","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-06","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"HILLTOP LAKES","to":"HILLTOP LAKES","county_from":"Leon","county_to":"Leon","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102659","ercot_project":"102659","title":"BEPC_TPIT102659_KellerUpgrade","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-07","actual_isd":null,"cm_new":0,"cm_rebuilt":0.27,"from":"565","to":"1856","county_from":"Tarrant","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:73100","ercot_project":"73100","title":"Asherton to Piloncillo: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2028-01-13","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":13.43,"from":"Asherton","to":"Piloncillo","county_from":"Dimmit","county_to":"Dimmit","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rehab the Asherton to Piloncillo 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/6697271","name":"Asherton Substation","coordinates":[-99.75572,28.44234]},{"osm_id":"osm:relation/6697270","name":"Piloncillo Substation","coordinates":[-99.62643,28.28756]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/451971481","layer":"lines-138"},{"osm_id":"osm:way/822462020","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":13.4,"straight_mi":13.3},{"id":"ercot-tpit:70675","ercot_project":"70675","title":"Aransas Pass to Rincon: Rebuild 69 kV Line","owner":"AEP TCC","owner_project":"TP2022132","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-14","actual_isd":null,"cm_new":0,"cm_rebuilt":8.5,"from":"Aransas Pass","to":"Rincon","county_from":"San Patricio","county_to":"San Patricio","tier":"Tier 2","rpg":"24RPG035","rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Rebuild the Aransas Pass to Gregory to Rincon 69 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/514740534","name":"Aransas Pass Substation","coordinates":[-97.18176,27.92685]},{"osm_id":"osm:way/194687600","name":"Rincon Substation","coordinates":[-97.32971,27.9868]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:105624","ercot_project":"105624","title":"AEN_McNeil_JustinLn_Ckt_811_Reconductor","owner":"AEN","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-19","actual_isd":null,"cm_new":0,"cm_rebuilt":3.98,"from":"9291","to":"9342","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor 3.98 miles of circuit to 3000 Amps.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:87367","ercot_project":"87367","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-28","actual_isd":null,"cm_new":0,"cm_rebuilt":2,"from":"Temple Switch","to":"Poage","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:78468A","ercot_project":"78468A","title":"Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pradera","to":"Savannah/Seabreeze","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New 345kV Pradera (PRD) substation for generator interconnection to Austin Bayou Solar (25INR0102). Loop Ckt.27 into Pradera substation to create new Ckt.27 Seabreeze to Pradera to Savannah."},{"id":"ercot-tpit:73055","ercot_project":"73055","title":"Hamlin to Roby: Rebuild 69 kV line","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":25.23,"from":"Hamlin","to":"Roby","county_from":"Fisher","county_to":"Jones","tier":"Tier 4","rpg":"23RPG002","rpg_completed":"2023-02-28","bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rehab Hamlin to Roby 69 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:72479","ercot_project":"72479","title":"Cobia: Build new 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Cobia","to":null,"county_from":"Calhoun","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Build new 138 kV station along the Carbide to Joslin 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:70673","ercot_project":"70673","title":"Clairmont Sun Oil Tap: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"TA2021233","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clairmont","to":"Sun Clairmont","county_from":"Kent","county_to":"Kent","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rehab Clairmont Sun Oil Tap 69 kV Line"},{"id":"ercot-tpit:92743","ercot_project":"92743","title":"Rebuild ~3 miles of double-ckt from VLSI to Grissom transmission line with normal and emergency ratings of at least 478MVA","owner":"CPS/NO","owner_project":"T-0377","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.03,"from":"5467","to":"5185","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild ~3 miles of double-ckt from VLSI to Grissom transmission line with normal and emergency ratings of at least 478MVA. Note: Only the conductor needs to be upgraded. All other substation equipment is rated at least 2000A or 478MVA.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:103454","ercot_project":"103454","title":"Viper: Construct New 138 kV Station","owner":"AEP TCC","owner_project":"TP2025819","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"VIPER","to":null,"county_from":"Maverick","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact and Transmision Circuit Miles New Update","description":"Interconnect Sugaree Solar and Althea Storage to the new Viper 138 kV station on the Brackettville to Escondido 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:100700","ercot_project":"100700","title":"Install a 28.57MVAr Capacitor Bank at Ranchtown Substation","owner":"CPS/NO","owner_project":"S-1042","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5358","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:77144A","ercot_project":"77144A","title":"Pompano: New 138 kV Station","owner":"AEP TCC","owner_project":"TP2015151","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Skid Station"},{"id":"ercot-tpit:98582","ercot_project":"98582","title":"Rapido: Expand 345 kV Station","owner":"ETT","owner_project":"TP2025226","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rapido","to":null,"county_from":"Starr","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Owner, Company Contact and In-Service Date Update","description":"Interconnect Barrosos Creek to the existing Rapido 345 kV station"},{"id":"ercot-tpit:86933","ercot_project":"86933","title":"Paladio: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2024012","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Paladio","to":null,"county_from":"Bee","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Interconnect Argenta Solar and Storage to the new Paladio 345 kV station on the Goddard to Tango 345 kV line"},{"id":"ercot-tpit:78468B","ercot_project":"78468B","title":"Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pradera","to":"AUSTIN","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Pradera (PRD) substation to AUSTIN (ABY) customer substation (25INR0102)."},{"id":"ercot-tpit:110657","ercot_project":"110657","title":"Ad Hoc TPIT: Rebuild approximately 3.33-mile 345 kV double circuit from WETT's Mhos to Oncor's Dermott Switch station","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-02-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.33,"from":"Mhos 345 kV","to":"Oncor's Dermott Switch 345 kV station","county_from":"Scurry","county_to":"Scurry","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110729","ercot_project":"110729","title":"Ad Hoc TPIT: Rebuild approximately 33-mile 345 kV double circuit from Nova Prime to Mhos","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-02-01","actual_isd":null,"cm_new":0,"cm_rebuilt":33,"from":"Nova Prime 345 kV","to":"Mhos 345 kV","county_from":"Kent","county_to":"Scurry","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110639","ercot_project":"110639","title":"Ad Hoc TPIT: Rebuild approximately 8.1-mile 345 kV double circuit from WETT's Galvani to Oncor's Scurry County South station","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-02-01","actual_isd":null,"cm_new":0,"cm_rebuilt":8.1,"from":"Galvani 345 kV","to":"Oncor's Scurry County South","county_from":"Scurry","county_to":"Scurry","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:103998","ercot_project":"103998","title":"BRYN_Tabor_Load_Addition","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-04","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BTU Tabor","to":null,"county_from":"Brazos","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding transmission load to Tabor 138-kV"},{"id":"ercot-tpit:80317","ercot_project":"80317","title":"Dilley Switch to Pearsall: Convert to 138 kV, Reroute from Dilley to Dilley Switch, Rebuild Dilley to Dilley Switch 69 kV, and Double Circuit Dilley Switch to Pearsall with Dilley to Dilley Switch","owner":"AEP TCC","owner_project":"3822","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-15","actual_isd":null,"cm_new":0,"cm_rebuilt":19.8,"from":"Dilley Switch","to":"Pearsall","county_from":"Frio","county_to":"Frio","tier":"Tier 4","rpg":"23RPG024","rpg_completed":"2023-09-28","bod_reviewed":null,"comments":null,"description":"Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/344295522","name":"Dilley Switching Station","coordinates":[-99.20512,28.66879]},{"osm_id":"osm:way/125729481","name":"Pearsall Switchyard","coordinates":[-99.09251,28.92742]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/344295513","layer":"lines-138"},{"osm_id":"osm:way/344295477","layer":"lines-138"},{"osm_id":"osm:way/344295510","layer":"lines-138"},{"osm_id":"osm:way/344295498","layer":"lines-138"},{"osm_id":"osm:way/344086360","layer":"lines-138"},{"osm_id":"osm:way/344086390","layer":"lines-138"},{"osm_id":"osm:way/1548226989","layer":"lines-138"},{"osm_id":"osm:way/344086405","layer":"lines-138"},{"osm_id":"osm:way/344086335","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":23.5,"straight_mi":19.1},{"id":"ercot-tpit:80315","ercot_project":"80315","title":"Big Foot to Pearsall: Convert to 138 kV","owner":"AEP TCC","owner_project":"3821","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-17","actual_isd":null,"cm_new":0,"cm_rebuilt":14.79,"from":"Big Foot","to":"Pearsall","county_from":"Frio","county_to":"Frio","tier":"Tier 4","rpg":"23RPG024","rpg_completed":"2023-09-28","bod_reviewed":null,"comments":null,"description":"Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/340165281","name":"Big Foot Substation","coordinates":[-98.95036,29.05973]},{"osm_id":"osm:way/125729481","name":"Pearsall Switchyard","coordinates":[-99.09251,28.92742]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/20879631","layer":"lines-138"},{"osm_id":"osm:way/20877819","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":17.2,"straight_mi":12.5},{"id":"ercot-tpit:100054","ercot_project":"100054","title":"Luna to Mesquite: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TP2025785","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":1.25,"from":"Luna","to":"Mesquite","county_from":"Cameron","county_to":"Cameron","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rebuild the Luna to Mesquite 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:100291","ercot_project":"100291","title":"Most_Limiting_Series_Element_FY2025_Substation_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Increase the capacity of transmission circuits by upgrading the limiting elements at various substations."},{"id":"ercot-tpit:91744A","ercot_project":"91744A","title":"New 138kV CEHE Station Grassland for OCI SunRoper (24INR0257)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Grassland","to":"Dyann/South Lane City","county_from":"Wharton","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new Grassland (GRS) CEHE 138kV substation into Ckt.60D Dyann to South Lane City to create new Ckt.60 Dyann to Grassland to South Lane City."},{"id":"ercot-tpit:93163","ercot_project":"93163","title":"Diablo: Construct New Distribution Station","owner":"AEP TNC","owner_project":"DR24N0002","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":8.4,"cm_rebuilt":0,"from":"Diablo","to":null,"county_from":"Upton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new distribution station on the North McCamey to Palouse 138 kV line between Crossover and Palouse","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:98798","ercot_project":"98798","title":"Beecher: Expand 138 kV Station","owner":"AEP TCC","owner_project":"TP2025255","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Beecher","to":null,"county_from":"Victoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Leopard BESS to the existing Beecher 138 kV station"},{"id":"ercot-tpit:65154","ercot_project":"65154","title":"Mason Switch to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"2836","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":26.45,"from":"Mason Switch","to":"Yellowjacket","county_from":"Menard","county_to":"Mason","tier":"Tier 4","rpg":"21RPG014","rpg_completed":"2021-09-01","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rehab the Mason Switch to Yellowjacket 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:73441","ercot_project":"73441","title":"Dupont Switch to Joslin: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":32.6,"from":"Dupont","to":"Joslin","county_from":"Victoria","county_to":"Calhoun","tier":"Tier 4","rpg":"22RPG040","rpg_completed":"2022-12-01","bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rehab the Dupont Switch to Joslin 138 kV Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/337345667","name":"Dupont Switching Station","coordinates":[-96.94558,28.69293]},{"osm_id":"osm:way/337681589","name":"Joslin Substation","coordinates":[-96.54644,28.64874]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/515589349","layer":"lines-138"},{"osm_id":"osm:way/515589342","layer":"lines-138"},{"osm_id":"osm:way/337764367","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":33.5,"straight_mi":24.4},{"id":"ercot-tpit:76286","ercot_project":"76286","title":"Hecker to Resnik: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TP2023506","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hecker","to":"Resnik","county_from":"San Patricio","county_to":"San Patricio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rebuild the Hecker to Resnik 138 kV line"},{"id":"ercot-tpit:104448","ercot_project":"104448","title":"Salvare: Install New 345 kV Feed","owner":"ETT","owner_project":"TP2026040","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Salvare","to":null,"county_from":"Childress","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Install 2nd POI for IRIS Data center"},{"id":"ercot-tpit:110866","ercot_project":"110866","title":"Stewart Road to Progresso: Convert to 138 kV","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":19.4,"from":"Stewart Road","to":"Progresso","county_from":"Cameron","county_to":"Hidalgo","tier":"Tier 3","rpg":"23RPG005","rpg_completed":"2023-03-23","bod_reviewed":null,"comments":"Dollars Should be Update","description":"Convert Stewart Road to Progresso 69 kV line to 138 kV","terminal_match":{"from":"not_in_osm","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/513282622","name":"Rio Rico Substation","coordinates":[-97.90049,26.0918]},{"osm_id":"osm:way/337244621","name":"Stewart Substation","coordinates":[-94.91068,29.22779]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:110441","ercot_project":"110441","title":"Rio Bravo: Add Capacitor","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rio Bravo","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"County Location, SSWG Base Case Bus Number, and Other (optional) updates","description":"Install additional reactive support at Rio Bravo 138 kV station"},{"id":"ercot-tpit:110439","ercot_project":"110439","title":"Molina: Add Capacitor","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Molina","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"County Location, SSWG Base Case Bus Number Updates, and Other (optional) updates","description":"Install additional reactive support at Molina 138 kV station"},{"id":"ercot-tpit:107136","ercot_project":"107136","title":"LCRATSC Duff Ranch Substation Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Duff Ranch","to":null,"county_from":"Tom Green","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will install the transmission interconnection facilities including constructing a new 345-kV substation (\"Duff Ranch Substation Addition\")."},{"id":"ercot-tpit:80319","ercot_project":"80319","title":"Devine: Install Cap Bank","owner":"AEP TCC/ETT","owner_project":"TA2018040","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Devine","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 4","rpg":"23RPG024","rpg_completed":"2023-09-28","bod_reviewed":null,"comments":"In-Service Date, RPG submitted date and review date Update","description":"Convert the Big Foot to Dilley 69 kV line to 138 kV, rebuild the Dilley to Dilley Switch 69 kV line, and reroute the Big Foot to Dilley line from Dilley to Dilley Switch"},{"id":"ercot-tpit:91744B","ercot_project":"91744B","title":"New 138kV CEHE Station Grassland for OCI SunRoper (24INR0257)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Grassland","to":null,"county_from":"Wharton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from Grassland (GRS) CEHE 138kV substation to SUNROP (SUN) / OCI SunRoper"},{"id":"ercot-tpit:103456","ercot_project":"103456","title":"Frontera to Key Switch: Rebuild/Re-conductor 138 kV Line","owner":"AEP TCC","owner_project":"TP2025872","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-29","actual_isd":null,"cm_new":0,"cm_rebuilt":9.3,"from":"Frontera","to":"Key Switch","county_from":"Hidalgo","county_to":"Hidalgo","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rebuild/Re-conductor the Frontera to Key Switch 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/512644995","name":"Frontera Substation","coordinates":[-98.39713,26.21789]},{"osm_id":"osm:way/512644955","name":"Key Switching Station","coordinates":[-98.29729,26.26086]}],"endpoint_method":"name + voltage + county","link_note":"more than one mapped corridor of similar length; no segment linked"},{"id":"ercot-tpit:91774","ercot_project":"91774","title":"Janka: Construct New 345 kV Station","owner":"ETT/AEP TNC","owner_project":"TP2025126","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-02-29","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"Janka","to":null,"county_from":"Hardeman","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Owner Update","description":"Interconnect the Evergrid load to the new Janka 345 kV station on the Edith Clarke to Tesla 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:70012B","ercot_project":"70012B","title":"BEPC_NOTPIT_ClarkLakeVoltConv1","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:70012C","ercot_project":"70012C","title":"BEPC_NOTPIT_ClarkLakeVoltConv1","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-14","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Parker","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:77144B","ercot_project":"77144B","title":"Pompano: New 138 kV Station","owner":"AEP TCC","owner_project":"TP2015151","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-20","actual_isd":null,"cm_new":0,"cm_rebuilt":20.4,"from":"Pompano","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Final Station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:70012D","ercot_project":"70012D","title":"BEPC_NOTPIT_ClarkLakeVoltConv1","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-21","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99453B","ercot_project":"99453B","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Greens Bayou","to":"Deepwater","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.69B Greens Bayou to Deepwater to increase thermal limits as part of FRM2 upgrades"},{"id":"ercot-tpit:72044A","ercot_project":"72044A","title":"Clute 138kV Switching Station","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clute","to":"RIWOOD/CAVERN","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"22RPG038","rpg_completed":"2022-12-01","bod_reviewed":"2022-12-01","comments":null,"description":"Reconfigure existing Ckt.82F RIWOOD to CAVERN to BIPORT and loop into new CEHE-owned 138kV Clute switching station to create new Ckt.82 RIWOOD to Clute to CAVERN to BIPORT."},{"id":"ercot-tpit:72044C","ercot_project":"72044C","title":"Clute 138kV Switching Station","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clute","to":"SINTEK","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"22RPG038","rpg_completed":"2022-12-01","bod_reviewed":"2022-12-01","comments":null,"description":"Reconfigure existing Ckt.26D STRATT to SINTEK and loop into new CEHE-owned 138kV Clute switching station to create new Ckt.26 STRATT to Clute to SINTEK."},{"id":"ercot-tpit:52464","ercot_project":"52464","title":"Alamito Creek to Ft. Davis: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"2831","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":20.5,"from":"Alamito Creek","to":"Ft Davis","county_from":"Presidio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Alamito Creek to Ft. Davis: Rebuild 69 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:100073","ercot_project":"100073","title":"Rio Pecos: Expand 138 kV Station","owner":"AEP TNC","owner_project":"TP2025332","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-31","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Rio Pecos","to":null,"county_from":"Crockett","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Midnight Sun BESS to the existing Rio Pecos 138 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:99540","ercot_project":"99540","title":"Anastase: Construct New 138 kV Station","owner":"AEP TNC","owner_project":"TP2025343","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Anastase","to":null,"county_from":"Runnels","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Rutile BESS to the new Anastase 138 kV station on the Ballinger to Red Creek 138 kV line between Ballinger and Weiss"},{"id":"ercot-tpit:81686","ercot_project":"81686","title":"Chalcedony: Construct New 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-03-31","actual_isd":null,"cm_new":1.5,"cm_rebuilt":0,"from":"Chalcedony","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect the Monarch load to the new Chalcedony 345 kV station on the Lon Hill to Nelson Sharpe 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:102755","ercot_project":"102755","title":"BEPC_TPIT102755_Dennis","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Parker","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:111374","ercot_project":"111374","title":"Gliese: Construct New 138 kV Station","owner":"ETT","owner_project":"TP2026120","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-31","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Gliese","to":null,"county_from":"Jim Wells","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the Valverde load to the new Gliese 138 kV Station on the Hamilton Road to Picacho 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:104028","ercot_project":"104028","title":"Steppe: Construct New 345 kV Station","owner":"ETT","owner_project":"TP2025777","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Steppe","to":null,"county_from":"Knox","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect West Munday Wind to the new Steppe 345 kV station on the Joule to Quasar 345 kV line between Gauss and Quasar"},{"id":"ercot-tpit:110092","ercot_project":"110092","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CEHEsub","to":"Jordan/DUNCAN","county_from":"Chambers","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 138kV CEHEsub Customer substation. Loop on Ckt. 48 to create new Ckt. 48 Jordan to CEHEsub to DUNCAN."},{"id":"ercot-tpit:110575","ercot_project":"110575","title":"Ad Hoc TPIT: 345 kV Second Circuit from Long Draw to Venturi to Volta to Grelton to Oncor's ODESEHV2_5 station","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-04-01","actual_isd":null,"cm_new":108.38,"cm_rebuilt":0,"from":"Long Draw 345 kV","to":"Oncor's ODESEHV2_5 345 kV station","county_from":"Borden","county_to":"Ector","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:111822","ercot_project":"111822","title":"Saltdome Capacitor 2nd step addition","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Saltdome","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110828","ercot_project":"110828","title":"STEC Mesquite Large Load Project Phase 1","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct Mesquite large load 345-kV POI"},{"id":"ercot-tpit:102670","ercot_project":"102670","title":"BEPC_TPIT102670_Rockett","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-03","actual_isd":null,"cm_new":0,"cm_rebuilt":6.5,"from":null,"to":null,"county_from":"Ellis","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:102634","ercot_project":"102634","title":"BEPC_TPIT10264_Egan_HappyHill_Improvement","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-03","actual_isd":null,"cm_new":0,"cm_rebuilt":2,"from":"438","to":"412","county_from":"Johnson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:107132","ercot_project":"107132","title":"Water Valley Substation Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-04","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Water Valley Substation","to":null,"county_from":"Tom Green","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will install the transmission interconnection facilities including constructing a new 345-kV substation (\"Water Valley\")."},{"id":"ercot-tpit:110282","ercot_project":"110282","title":"New CTT Celtic Green 345 kV station","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-04-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CTT Gray","to":"AEP Tesla","county_from":"Wheeler","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110304","ercot_project":"110304","title":"Add double circuit line from CTT Red Rock to Oncor Ogallala","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-04-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CTT Red Rock","to":"Oncor Ogallala","county_from":"Hall","county_to":"Castro","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:103474","ercot_project":"103474","title":"Pomelo: Expand 345 kV Station","owner":"ETT","owner_project":"TP2025925","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pomelo","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect Monte Cristo 2 to the existing Pomelo 345 kV station"},{"id":"ercot-tpit:80907","ercot_project":"80907","title":"Fort Stockton Plant: Rebuild 138/69 kV Station","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fort Stockton Plant","to":null,"county_from":"Pecos","county_to":null,"tier":"Tier 3","rpg":"25RPG032","rpg_completed":"2025-10-15","bod_reviewed":null,"comments":"Dollars, Tier, RPG Number and RPG Date Update","description":"Rebuild the Fort Stockton Plant 138/69 kV station"},{"id":"ercot-tpit:91747","ercot_project":"91747","title":"Install (1) 60 MVAr switchable cap bank at Willow substation. Connect CB1 at the Willow breaker position with Willow TR3 distribution transformer","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Willow","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (1) 60 MVAr switchable cap bank at Willow substation. Connect CB1 at the Willow breaker position with Willow TR3 distribution transformer"},{"id":"ercot-tpit:93461A","ercot_project":"93461A","title":"Willow Substation Load Addition Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Willow","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (1) 60 MVAr switchable cap bank at Willow substation."},{"id":"ercot-tpit:98584","ercot_project":"98584","title":"Tiempo: Expand 345 kV Station","owner":"ETT","owner_project":"TP2025252","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tiempo","to":null,"county_from":"Zapata","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Owner, Company Contact and In-Service Date Update","description":"Interconnect Corralitos Wind 1 and 2 to the existing Tiempo 345 kV station"},{"id":"ercot-tpit:103392","ercot_project":"103392","title":"Cuernos: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2025856","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cuernos","to":null,"county_from":"La Salle","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":"2026-02-12","bod_reviewed":"2026-02-12","comments":"NEW","description":"Interconnect La Salle Solar to the new Cuernos 345 kV station on the Lobo to Fowlerton 345 kV line"},{"id":"ercot-tpit:104030","ercot_project":"104030","title":"Sunflower: Construct New 138 kV Station","owner":"AEP TNC","owner_project":"TP2025812","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sunflower","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect August Draw Solar to the new Sunflower 138 kV station on the Scissortail to Solstice 138 kV line between Hoefs Road and Scissortail"},{"id":"ercot-tpit:99551","ercot_project":"99551","title":"Chalice: Construct New 345 kV Station","owner":"ETT","owner_project":"TP2025348","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Chalice","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Corvus Solar to the new Chalice 345 kV station on the Cenizo to Lobo 345 kV line"},{"id":"ercot-tpit:99825","ercot_project":"99825","title":"Boiken: Construct New 345 kV Station","owner":"AEP TNC","owner_project":"TP2025947","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"Boiken","to":null,"county_from":"Hall","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Title, Description, Terminal from and Reactive Capability Update","description":"Interconnect Lancium data center load to the new Boiken 345 kV station on the Tesla to Tule Canyon 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:86884","ercot_project":"86884","title":"Saragosa: Construct New 138 kV Terminal","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0.5,"cm_rebuilt":0,"from":"Saragosa","to":"Bracero Pecan","county_from":"Reeves","county_to":"Reeves","tier":"Tier 4","rpg":null,"rpg_completed":"2024-04-12","bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Bracero Pecan Storage to the Saragosa 138 kV station","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:90043","ercot_project":"90043","title":"Candela: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2024073","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Kelvin","to":"Eneus","county_from":"Cameron","county_to":"Cameron","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Interconnect the new Eneus load station to the new Candela 345 kV station on the Gulch to La Palma 345 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:98737","ercot_project":"98737","title":"Agrios: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2025218","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Agrios","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Grapefruit Solar to the new Agrios 345 kV station on the North Edinburg to Reforzar 345 kV line"},{"id":"ercot-tpit:93461B","ercot_project":"93461B","title":"Willow Substation Load Addition Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Klein","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (1) 60 MVAr cap bank at Klein substation. Tap the cap bank on Ckt.81F Klein to Kluge."},{"id":"ercot-tpit:90255D","ercot_project":"90255D","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":2.8,"from":"BRINE","to":"Mont Belvieu","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":"24RPG026","rpg_completed":"2024-09-12","bod_reviewed":"2024-09-12","comments":null,"description":"Upgrade Ckt.86H BRINE to Mont Belvieu to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:93461C","ercot_project":"93461C","title":"Willow Substation Load Addition Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Klein","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (3) 14.4 MVAr switchable cap banks at Klein substation. Connect cap banks at the 35kV distribution level."},{"id":"ercot-tpit:76777","ercot_project":"76777","title":"Rebuild Nursery-El Toro","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":24.8,"from":"Nursery","to":"El Toro","county_from":"Victoria","county_to":"Jackson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Nursery- Fordtran Sw- Inez - El Toro Sw Station to 795 ACSR","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:110437","ercot_project":"110437","title":"Rio Hondo to Bonilla: Rebuild/Reconductor 345 kV Line","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":11.6,"from":"Rio Hondo","to":"Bonilla","county_from":"Cameron","county_to":"Cameron","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"SSWG Base Case Number and Other (Optional) Updates","description":"Rebuild/Reconductor Rio Hondo to Bonilla 345 kV line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:110751","ercot_project":"110751","title":"Related_WylieSW_LCP_Upgrades_Jupiter_College_Line","owner":"GPL","owner_project":"0","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":2.82,"from":"Jupiter","to":"College","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Related_WylieSW_LCP_Upgrades_Jupiter_College_Line","duplicate_listing":true,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:88049","ercot_project":"88049","title":"24RPG004: Omicron Reliability Project : Loop in Cagnon to Howard into Omicron","owner":"CPS/NO","owner_project":"T-0394","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-01","actual_isd":null,"cm_new":10,"cm_rebuilt":0,"from":"5326","to":"5054, 5230","county_from":"Bexar","county_to":"Bexar","tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":"Install new 138kV double-ckt line (~5 miles) from new Omicron substation to loop into existing Cagnon-Howard line","terminal_match":{"from":"unnamed","to":"multi_or_missing"}},{"id":"ercot-tpit:45125","ercot_project":"45125","title":"Quintana Rd to South San Rebuild","owner":"CPS/NO","owner_project":"T-0271","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":1.29,"from":"5350","to":"5385","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild 1.3 miles of 138 kV transmission line form Quintana Rd substation to South San substation.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:72956","ercot_project":"72956","title":"Bellville South - Prairie View Transmission Line Upgrade","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellville South","to":"Prairie View","county_from":"Austin","county_to":"Waller","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"the proposed project converts the existing 69kV transmission line T283 from Bellville South- Quanex Sw - Sunnyside - Prarie View substation to 138kV. The proposed project improves the reliabiltiy of transmission facilities on the 26.1 mile "},{"id":"ercot-tpit:76107","ercot_project":"76107","title":"Riverside Capacitor","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Riverside","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add a new cap bank at Riverside sub with 2 9.6 MVAR steps"},{"id":"ercot-tpit:110751","ercot_project":"110751","title":"Related_WylieSW_LCP_Upgrades_Jupiter_College_Line","owner":"GPL","owner_project":"0","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":2.82,"from":"Jupiter","to":"College","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Related_WylieSW_LCP_Upgrades_Jupiter_College_Line","duplicate_listing":true,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:1549","ercot_project":"1549","title":"Devine Switch breaker addition","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Devine Switch","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds breakers to Devine Switch to allow closing of normally open Devine Switch to Devine. Creates 3- terminal switching station"},{"id":"ercot-tpit:102875","ercot_project":"102875","title":"Upgrade Franklins Camp Auto","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110084B","ercot_project":"110084B","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CEHE_Newsub","to":"WAParish/Wolf","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade substation equipment at 345kV Ckt 64 WAP-Wolf."},{"id":"ercot-tpit:85955","ercot_project":"85955","title":"Olmos to LaVernia TL, T533","owner":"GVEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2028-05-10","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":5.1,"from":"Olmos","to":"LaVernia","county_from":"Wilson","county_to":"Wilson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Olmos to LaVernia TL, Rebuild 5.1 miles of 69 kV line to 138 kV transmission line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99532","ercot_project":"99532","title":"Establish Guthrie 138 kV Switch","owner":"ONCOR","owner_project":"R8916","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Big Spring Switch","to":"Tributary","county_from":"Howard","county_to":"Mitchell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish 138 kV Switch"},{"id":"ercot-tpit:81236","ercot_project":"81236","title":"Cattleman – Longshore 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","owner_project":"R3027 R8719","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":66.8,"from":"Cattleman","to":"Longshore","county_from":"Howard","county_to":"Midland","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 345 kV Double Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:81268","ercot_project":"81268","title":"Longshore – Consavvy 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","owner_project":"R3027","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":66.8,"from":"Cattleman","to":"Longshore","county_from":"Howard","county_to":"Midland","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild existing 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:103305","ercot_project":"103305","title":"LCRATSC Beback circuit breaker addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Beback","to":null,"county_from":"Hays","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Increase the reliability of Beback by installing circuit breakers and increase the transmission line capacity by upgrading the transmission bus."},{"id":"ercot-tpit:103310","ercot_project":"103310","title":"LCRATSC Airline - Naval Base Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9.3,"from":"Airline","to":"Naval Base","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 9.4 mile T475 Airline - Naval Base 138-kV transmission line.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/203655558","name":"Airline Substation","coordinates":[-97.37339,27.69577]},{"osm_id":"osm:way/193803695","name":"Naval Base Substation","coordinates":[-97.27215,27.67903]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/1347824320","layer":"lines-138"},{"osm_id":"osm:way/487230352","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":8,"straight_mi":6.3},{"id":"ercot-tpit:93250A","ercot_project":"93250A","title":"Utley_Substation_and_Transmission_Line_Addition","owner":"LCRATSC","owner_project":"PLC-8065","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104557","ercot_project":"104557","title":"Dale to Lockhart Transmission line overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":7.26,"from":"Lockhart","to":"Dale","county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul and voltage conversion on T125 Dale - Lockhart transmission line from Dale Substation to Lockhart Substation.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99344","ercot_project":"99344","title":"Rebuild the MInerva - Cannon 138 kV Line","owner":"ONCOR","owner_project":"R6414","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":10.2,"from":"Minerva","to":"Cannon","county_from":"Milam","county_to":"Milam","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the MInerva - Cannon 138 kV Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99346","ercot_project":"99346","title":"Rebuild the Temple Pecan Creek Switch - Belfalls/STR 26/4C 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R6434","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":2.6,"from":"Temple Pecan Creek","to":"Belfalls","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Temple Pecan Creek Switch - Belfalls/STR 26/4C 345 kV Double Circuit Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99479C","ercot_project":"99479C","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","owner_project":"PB_L23","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":10.2,"from":"China Grove","to":"Snyder","county_from":"Scurry","county_to":"Scurry","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds part of Permian Basin Reliability Plan Upgrade ID L23. Convert the existing Snyder - Scurry - China Grove and Snyder - Amoco Tap - China Grove 69-kV lines to 138-kV. This converts the China Grove - Snyder 69 kV Line into 138 kV and ret","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99522","ercot_project":"99522","title":"Upgrading line","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrading conductor to 1xSuwannee"},{"id":"ercot-tpit:99774","ercot_project":"99774","title":"Butler_Elgin_Transmission_Line_Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Butler","to":"Elgin","county_from":"Bastrop","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 2.8-mile T260 Butler - Elgin 138-kV transmission line."},{"id":"ercot-tpit:99818","ercot_project":"99818","title":"LCRATSC_Manor_Shadow_Glen_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":1.74,"from":"7323","to":"7330","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the existing T649 Manor - Shadow Glen 138-kV transmission line to a minimum 105 deg. F ambient temperature rating of 700 MVA","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:99827A","ercot_project":"99827A","title":"LCRATSC_Canyon-Gofort_Transmission_Line_Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":4.5,"from":"7200 Canyon","to":"7515 Rohr","county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/33692087","name":"Canyon Substation","coordinates":[-97.9001,29.91153]},{"osm_id":"osm:way/508455364","name":"Rohr Substation","coordinates":[-97.87888,29.93556]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/508455332","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":2.2,"straight_mi":null},{"id":"ercot-tpit:99827B","ercot_project":"99827B","title":"LCRATSC_Canyon-Gofort_Transmission_Line_Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0.51,"from":"7515 Rohr","to":"7514 Yarrington","county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99827C","ercot_project":"99827C","title":"LCRATSC_Canyon-Gofort_Transmission_Line_Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":4.16,"from":"7514 Yarrington","to":"7501 Goforth","county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:100078","ercot_project":"100078","title":"Provide 345 kV POD to customer via POI from LCRA's Bow Wood 345 kV Switch","owner":"ONCOR","owner_project":"R6476","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mikeska","to":"Bow Wood","county_from":"McCulloch","county_to":"McCulloch","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Provide 345 kV POD to customer via POI from LCRA's Bow Wood 345 kV Switch"},{"id":"ercot-tpit:100155","ercot_project":"100155","title":"Establish Mormino 345 kV Switch for customer POD","owner":"ONCOR","owner_project":"R6370","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mormino","to":"Mormino","county_from":"McLennan","county_to":"McLennan","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Mormino 345 kV Switch for customer POD"},{"id":"ercot-tpit:100178","ercot_project":"100178","title":"HarrisBranch_McNeil_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Harris Branch","to":"Mcneil","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T146 Harris Branch - McNeil 138-kV transmission line to achieve a higher operational rating."},{"id":"ercot-tpit:100180","ercot_project":"100180","title":"HarrisBranch_ShadowGlen_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Harris Branch","to":"Shadow Glen","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T574 Harris Branch - Shadow Glen 138-kV transmission line to achieve a higher operational rating."},{"id":"ercot-tpit:100182","ercot_project":"100182","title":"Henne_Zorn_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Henne","to":"Zorn","county_from":"Comal","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T204 Henne - Zorn 138-kV transmission line to achieve a higher operational rating."},{"id":"ercot-tpit:100279","ercot_project":"100279","title":"Alford_Benedum_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Alford","to":"Benedum","county_from":"Upton","county_to":"Upton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T611 Alford (Midkiff) - Benedum 138-kV transmission line to obtain a higher operational rating."},{"id":"ercot-tpit:100283","ercot_project":"100283","title":"Comfort_Cypress_Creek_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Comfort","to":"Cypress Creek","county_from":"Kendall","county_to":"Kendall","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T121 Comfort - Cypress Creek 138-kV transmission line to achieve a higher operational rating."},{"id":"ercot-tpit:100285A","ercot_project":"100285A","title":"Comfort_Kendall_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Comfort","to":"Kendall","county_from":"Kendall","county_to":"Kendall","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:100287","ercot_project":"100287","title":"Comfort_Raymond_Barker_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Comfort","to":"Raymond Barker","county_from":"Kendall","county_to":"Kerr","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T122 Comfort - Raymond F. Barker 138-kV transmission line to achieve a higher operational rating."},{"id":"ercot-tpit:100289","ercot_project":"100289","title":"CypressCreek_Raymond_Barker_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cypress Creek","to":"Raymond Barker","county_from":"Kerr","county_to":"Kendall","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T662 Cypress Creek - Raymond F. Barker 138-kV transmission line to achieve a higher operational rating."},{"id":"ercot-tpit:100293","ercot_project":"100293","title":"Zorn_Load_Circuit_Breaker_Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Zorn","to":null,"county_from":"Guadalupe","county_to":"Guadalupe","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install a new 345-kV transmission point of interconnection to serve GVEC member load"},{"id":"ercot-tpit:91392","ercot_project":"91392","title":"Bergheim_Autotransformer_Upgrade","owner":"LCRATSC","owner_project":"PLC-7662","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":12.7,"from":"Bergheim","to":null,"county_from":"Comal","county_to":"Comal","tier":"Tier 3","rpg":"24RPG038","rpg_completed":"2025-01-13","bod_reviewed":null,"comments":null,"description":"To improve efficiency and reliability of the transmission system, LCRA TSC will replace the existing Bergheim AT1 autotransformer with a higher capacity unit and install a second autotransformer at Bergheim Substation.","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:91628","ercot_project":"91628","title":"Upgrading Buda to Rutherford","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrading Buda to Rutherford branch to minimum 379 MVA."},{"id":"ercot-tpit:91293","ercot_project":"91293","title":"LCRATSC_Gabriel-Schwertner TL conversion","owner":"LCRATSC","owner_project":"PLC-8197","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This project is needed to meet a request from BEPC to voltage convert (69-138-kV) and increase the capacity of the BEPC-owned Gabriel - Schwertner circuit on the TSC-owned 138-kV T359 transmission line. As part of this upgrade, LCRA TSC wil"},{"id":"ercot-tpit:92565","ercot_project":"92565","title":"Sim_Gideon_Winchester_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":"PLC-7654","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade Sim Gideon - Winchester 138-kV transmission line to achieve a higher operational rating"},{"id":"ercot-tpit:92572","ercot_project":"92572","title":"Lockhart Mendoza Transmission Line Overhaul","owner":"LCRATSC","owner_project":"PLC-8191","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee"},{"id":"ercot-tpit:92602","ercot_project":"92602","title":"Bastrop West - Bluebonnet Transmission Line Upgrade","owner":"LCRATSC","owner_project":"PLC-8101","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.1,"from":"7555","to":"7556","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:17TPIT0001","ercot_project":"17TPIT0001","title":"36th St to Merida - 138 kV Transmission Line Rebuild","owner":"CPS","owner_project":"T-0196","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":2.95,"from":"5427","to":"5310","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild approximately four circuit miles of 138 kV transmission from 36th Street to Merida","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:45136","ercot_project":"45136","title":"New Midtown 138kV Substation","owner":"CPS/NO","owner_project":"T-0283","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"5311","to":"5096, 5325","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New Mid Town substation looped into Comal St to Olmos transmission line.","terminal_match":{"from":"unnamed","to":"multi_or_missing"}},{"id":"ercot-tpit:50645","ercot_project":"50645","title":"CPSE_Rafter 138kV Cap Bank","owner":"CPS/NO","owner_project":"S-0922","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5355","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 4","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:73762","ercot_project":"73762","title":"Peppergrass Substation Addition","owner":"LCRATSC","owner_project":"PLC-4477","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Peppergrass","to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"American Electric Power (AEP) is building a new load serving substation and needs transmission service from the LCRA TSC owned 138-kV T470 Abilene South to McElmurray transmission line. LCRA TSC will install a new 138-kV bus and provide tra"},{"id":"ercot-tpit:110180","ercot_project":"110180","title":"Harris Branch - Shadow Glen Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":2.97,"from":"Harris Branch","to":"Shadow Glen","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the 2.97-mile Harris Branch - Shadow Glen 138-kV circuit to achieve a minimum 706 MVA emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/339167561","name":"Harris Branch Substation","coordinates":[-97.58091,30.37125]},{"osm_id":"osm:way/374913110","name":"Shadow Glen Substation","coordinates":[-97.53549,30.35705]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/15373805","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":3,"straight_mi":null},{"id":"ercot-tpit:100285B","ercot_project":"100285B","title":"Comfort_Kendall_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:103308","ercot_project":"103308","title":"LCRATSC Lago Vista Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lago Vista","to":null,"county_from":"Travis","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will improve reliability at the Lago Vista substation by replacing obsolete oil circuit breakers and its adjacent switches and making other improvements."},{"id":"ercot-tpit:111724","ercot_project":"111724","title":"Gossip 345 kV Switch","owner":"ONCOR","owner_project":"M43505","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gossip Switch","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Gossip 345 kV Switch"},{"id":"ercot-tpit:110320","ercot_project":"110320","title":"Lomond 345 kV Switch Capacitor Banks","owner":"ONCOR","owner_project":"M3521","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lomond Switch","to":"Lomond Switch","county_from":"Wichita","county_to":"Wichita","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Lomond 345 kV Switch Capacitor Banks"},{"id":"ercot-tpit:113229","ercot_project":"113229","title":"Oncor_MNW_113229_Cashion_Switch","owner":"ONCOR","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Cashion 345 kV Switch POI for Nymphaea"},{"id":"ercot-tpit:104832","ercot_project":"104832","title":"Oncor_MW_104832_CarolinaStorage_Switch","owner":"ONCOR","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bowman Switch","to":"Cobb Switch","county_from":"Wichita","county_to":"Wichita","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Switch for Carolina Storage"},{"id":"ercot-tpit:105012","ercot_project":"105012","title":"Lomond_Switch_345kV","owner":"ONCOR","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bowman Switch","to":"Fisher Road Switch","county_from":"Wichita","county_to":"Wichita","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Lomond 345 kV Switch"},{"id":"ercot-tpit:105312","ercot_project":"105312","title":"Alba Road 345 kV Switch","owner":"ONCOR","owner_project":"M4385","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Alba Road Switch","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Alba Road 345 kV Switch","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:105343","ercot_project":"105343","title":"Big Spring - Tributary Switch 138 kV Line","owner":"ONCOR","owner_project":"R8890","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Big Spring","to":"Tributary","county_from":null,"county_to":null,"tier":"Tier 3","rpg":"26RPG010","rpg_completed":"2026-03-30","bod_reviewed":null,"comments":null,"description":"Rebuild the existing 14.0-mile Big Spring - Tributary Switch 138 kV line"},{"id":"ercot-tpit:105418","ercot_project":"105418","title":"Establish Lufkin Chipper Mill Capacitor Bank","owner":"ONCOR","owner_project":"R6458","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lufkin Chipper Mill","to":"Lufkin Chipper Mill","county_from":"Angelina","county_to":"Angelina","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Lufkin Chipper Mill Capacitor Bank"},{"id":"ercot-tpit:109788","ercot_project":"109788","title":"Upgrade LYLEWOLZ Cap Bank from 15.6 MVAR to 31.2 MVAR","owner":"LCRATSC","owner_project":"PLC-8446","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lyle Wolz","to":null,"county_from":"Burleson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will improve reliability at various substations by replacing capacitor banks"},{"id":"ercot-tpit:110014","ercot_project":"110014","title":"Install 138 kV Capacitor Bank at Hutto 138 kV Switch","owner":"ONCOR","owner_project":"R6534","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hutto","to":"Hutto","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 138 kV Capacitor Bank at Hutto 138 kV Switch"},{"id":"ercot-tpit:110026","ercot_project":"110026","title":"Upgrade Temple Switch - Voss Lake Switch - Sandow Switch 138 kV Line","owner":"ONCOR","owner_project":"R6531","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":38.9,"from":"Temple","to":"Sandow","county_from":"Bell","county_to":"Milam","tier":"Tier 1","rpg":"25RPG009","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Temple Switch - Voss Lake Switch - Sandow Switch 138 kV Line","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:110263","ercot_project":"110263","title":"A new Helotes 345kV substation will be constructed","owner":"CPS/NO","owner_project":"T-0410","kv":345,"list":"future","status_reported":"Under Construction","status":"Under construction","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5201","to":"5056, 5211, 5200","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null},{"id":"ercot-tpit:103271","ercot_project":"103271","title":"LCRATSC Aviation Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gabriel","to":"Glasscock","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"The new Aviation Substation will be constructed along LCRA TSC transmission line T359 Gabriel to Glasscock. Aviation will serve GUS customer load."},{"id":"ercot-tpit:104635","ercot_project":"104635","title":"LCRATSC Garfield - Lytton Springs Transmission Line Upgrade","owner":"LCRATSC","owner_project":"PLC-8063, PLC-8139, PLC-8140","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":24.7,"from":"7048","to":"9074","county_from":"Bastrop","county_to":"Caldwell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade the Austrop - Zorn 345-kV double-circuit transmission line to achieve a higher operational rating. Coordinating PMCRs include 91312, 104635, and 104639.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:93274B","ercot_project":"93274B","title":"Bastrop_Mesquite_Substation_Addition","owner":"LCRATSC","owner_project":"PLC-4500","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:93250B","ercot_project":"93250B","title":"Utley_Substation_and_Transmission_Line_Addition","owner":"LCRATSC","owner_project":"PLC-8065","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:93274A","ercot_project":"93274A","title":"Bastrop_Mesquite_Substation_Addition","owner":"LCRATSC","owner_project":"PLC-4500","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"7320","to":"7320","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:93679","ercot_project":"93679","title":"New BPUB substation","owner":"BPUB","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-25","actual_isd":null,"cm_new":24,"cm_rebuilt":0,"from":"Loma Alta/CRONUS","to":"NIMZO","county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"not_in_osm"}},{"id":"ercot-tpit:77172","ercot_project":"77172","title":"Caravel: Construct New 138 kV Station","owner":"AEP TCC/ETT","owner_project":"TP2024088","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Caravel","to":null,"county_from":"Kleberg","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Reactive Capability Update","description":"Interconnect the 1PointFive USA load to the new Caravel 138 kV station on the Barney Davis to Nelson Sharpe 138 kV line between Alazan and Barney Davis"},{"id":"ercot-tpit:78461A","ercot_project":"78461A","title":"West Columbia to Damon and Needville to Big Creek Ckt.89A Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":6.6,"from":"West Columbia","to":"Damon","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":"23RPG021","rpg_completed":"2023-08-31","bod_reviewed":"2023-08-31","comments":null,"description":"Rebuild/reconductor portions of West Columbia to Damon Ckt.89A as a Hardening upgrade.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:103450","ercot_project":"103450","title":"Bodkin: Construct New 138 kV Station","owner":"AEP TCC","owner_project":"TP2025808","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bodkin","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Terminal \"from\" Update","description":"Interconnect Bowstring BESS to the new Bodkin 138 kV station on the Rincon to Whitepoint 138 kV line"},{"id":"ercot-tpit:99644","ercot_project":"99644","title":"Victoria to Warburton: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TA2022330","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":14.64,"from":"Victoria","to":"Warburton","county_from":"Victoria","county_to":"Victoria","tier":"Tier 3","rpg":"25RPG021","rpg_completed":"2025-07-22","bod_reviewed":null,"comments":"Terminal from, Terminal to, and In-Service Date Update","description":"Rebuild the Victoria to Warburton 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/515655402","name":"Victoria Switching Station","coordinates":[-97.0105,28.7867]},{"osm_id":"osm:way/515325963","name":"Warburton Substation","coordinates":[-97.04744,28.59831]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/209410667","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":14.3,"straight_mi":null},{"id":"ercot-tpit:84894","ercot_project":"84894","title":"23RPG028: STEC Rio Medina Project: Upgrade transmission line between Tally and Texas Research","owner":"CPS/NO","owner_project":"T-0392","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":8,"from":"5422","to":"5430","county_from":"Medina","county_to":"Bexar","tier":"Tier 2","rpg":"23RPG028","rpg_completed":"2024-02-16","bod_reviewed":null,"comments":null,"description":"Upgrade existing Talley to TX Research line (~8 miles) to at least 469 MVA with a two-hour emergency rating, based on preliminary review should not require pole replacement. This transmission rebuild is in support of the Rio Medina RPG Proj","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:91843","ercot_project":"91843","title":"East Munday: Rebuild 138 kV Station","owner":"AEP TNC","owner_project":"TP2023800","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"East Munday","to":null,"county_from":"Knox","county_to":null,"tier":"Tier 4","rpg":"25RPG002","rpg_completed":"2025-02-12","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rebuild the East Munday 138 kV station"},{"id":"ercot-tpit:109607","ercot_project":"109607","title":"Upgrade Ckt.25B Clodine to Roark to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clodine","to":"Roark","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:73366","ercot_project":"73366","title":"New Wiseman 138kV Substation","owner":"CPS/NO","owner_project":"S-0934","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5487","to":"5055, 5200","county_from":"Bexar","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new 138 kV substation into existing 138kV Cagnon to Helotes Transmission Line."},{"id":"ercot-tpit:90255F","ercot_project":"90255F","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Sjolander","to":"Cedar Bayou /HOPSON","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":"24RPG026","rpg_completed":"2024-09-12","bod_reviewed":"2024-09-12","comments":null,"description":"Install new CEHE-owned Sjolander substation. Reconfigure existing Ckt.84D Cedar Bayou to CD/HOPSON and loop into Sjolander substation to create new Ckt.84 Cedar Bayou to Cedar Bayou tap to Sjolander to HOPSON.","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:99009A","ercot_project":"99009A","title":"138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":5.03,"from":"Flewellen","to":"Brazos Valley","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 3","rpg":"25RPG010","rpg_completed":"2025-04-18","bod_reviewed":"2025-04-18","comments":null,"description":"Upgrade Ckt.09G Flewellen to Brazos Valley to increase thermal limits. Expect 2-959ACSS reconductor as first phase of Ckt.09G upgrade.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/127588213","name":"Flewellen Substation","coordinates":[-95.82088,29.6954]},{"osm_id":"osm:way/127588218","name":"Brazos Valley Substation","coordinates":[-95.81246,29.62705]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/127588215","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":4.7,"straight_mi":null},{"id":"ercot-tpit:111323E","ercot_project":"111323E","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":9.03,"from":"Plaza","to":"Gulfgate","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Upgrade Ckt.06L Plaza to Knight to Gulfgate to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/336554484","name":"Plaza Substation","coordinates":[-95.38956,29.68943]},{"osm_id":"osm:way/47634032","name":"Gulfgate Substation","coordinates":[-95.3001,29.69311]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:90255H","ercot_project":"90255H","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kilgore","to":"Sjolander/LANGSTON","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":"24RPG026","rpg_completed":"2024-09-12","bod_reviewed":"2024-09-12","comments":null,"description":"Install new CEHE-owned Sjolander substation. Reconfigure existing Ckt.86 CHEVRON to Kilgore to LANGSTON and loop into Sjolander substation to create new Ckt.86 Sjolander to Kilgore to LANGSTON."},{"id":"ercot-tpit:90255G","ercot_project":"90255G","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Bayou","to":"Sjolander","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":"24RPG026","rpg_completed":"2024-09-12","bod_reviewed":"2024-09-12","comments":null,"description":"Install new CEHE-owned Sjolander substation. Reconfigure existing Ckt.86A Cedar Bayou to CHEVRON and loop into Sjolander substation to create new Ckt.86 Cedar Bayou to Sjolander to Kilgore to Langston."},{"id":"ercot-tpit:90255I","ercot_project":"90255I","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sjolander","to":"CHEVRON","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":"24RPG026","rpg_completed":"2024-09-12","bod_reviewed":"2024-09-12","comments":null,"description":"Install new CEHE-owned Sjolander substation. Disconnect existing circuits 86A and 86B from CHEVRON customer substation. Reconnect CHEVRON substation to Sjolander substation as Ckt.13 Sjolander to CHEVRON and Ckt.23 Sjolander to CHEVRON."},{"id":"ercot-tpit:76196","ercot_project":"76196","title":"Lobo: 138 kV Breaker Replacement","owner":"AEP TCC","owner_project":"TP2023015","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lobo","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Replace 138 kV breakers at the Lobo 138 kV station"},{"id":"ercot-tpit:104559A","ercot_project":"104559A","title":"Hockley Distribution Transformer Addition with Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hockley","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 3rd Transformer and 8th 35 kV feeder at Hockley distribution substation"},{"id":"ercot-tpit:75830A","ercot_project":"75830A","title":"New 345kV Savannah (SAV) substation for generator interconnection to Cascade Solar (23INR0091).","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Savannah","to":"Seabreeze/Oasis","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New 345kV Savannah (SAV) substation for generator interconnection to Cascade Solar (23INR0091). Loop Ckt.27 into Savannah substation to create new Ckt.27 Seabreeze to Savannah to Oasis."},{"id":"ercot-tpit:100534","ercot_project":"100534","title":"Misty Substation Addition","owner":"LCRATSC","owner_project":"PLC-8282","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Misty","to":null,"county_from":"Caldwell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will construct a new load-serving Misty Substation cut-in to T185 Austrop - Zorn & T246 Lytton Springs - Zorn 345-kV double-circuit transmission line."},{"id":"ercot-tpit:110075A","ercot_project":"110075A","title":"Install Morton 138/35kV Distribution Substation with double-tap service.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Morton","to":"Katy /Franz","county_from":"Harris","county_to":"Waller","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Morton 138/35kV Distribution Substation with double-tap service. Tap Ckt.09H to create new Ckt.09H Katy to Morton to Franz"},{"id":"ercot-tpit:109920","ercot_project":"109920","title":"Rebuild Bandera to Hamilton Wolfe 138kV Transmission Line","owner":"CPS/NO","owner_project":"T-0417","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":1.87,"from":"5020","to":"5187","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:104607","ercot_project":"104607","title":"Pronto: Expand 345 kV Station","owner":"AEP/ETT","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0.25,"cm_rebuilt":0,"from":"Pronto","to":null,"county_from":"Starr","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect Half Moon Solar to the existing Pronto 345 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:104611","ercot_project":"104611","title":"Asherton: Expand 138 kV Station","owner":"AEP TCC","owner_project":"Asherton","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0.4,"cm_rebuilt":0,"from":"Asherton","to":null,"county_from":"Dimmit","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Terminal \"from\" Update","description":"Interconnect Wilks data center load to the existing Asherton138 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:99274A","ercot_project":"99274A","title":"Cedar Bayou RPG - Substation Upgrades (25RPG014)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Bayou","to":null,"county_from":"Chambers","county_to":null,"tier":"Tier 3","rpg":"25RPG014","rpg_completed":"2025-06-13","bod_reviewed":"2025-06-16","comments":null,"description":"Replace existing 600 MVA 345/138kV Cedar Bayou Auto A1 with new 800 MVA autotransformer. Install 2.5-Ohm reactor in-series with new CBY-A1 on the 138kV side of the autotransformer."},{"id":"ercot-tpit:99274B","ercot_project":"99274B","title":"Cedar Bayou RPG - Substation Upgrades (25RPG014)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Bayou","to":null,"county_from":"Chambers","county_to":null,"tier":"Tier 3","rpg":"25RPG014","rpg_completed":"2025-06-13","bod_reviewed":"2025-06-16","comments":null,"description":"Replace existing Cedar Bayou parallel 345/138kV autotransformers 2A/2B with new 800 MVA autotransformer as CBY-A2. Remove existing 10-Ohm reactor from the 138kV side of the 2A/2B parallel autotransformers. Replace with 2.5-Ohm reactor in-se"},{"id":"ercot-tpit:99274C","ercot_project":"99274C","title":"Cedar Bayou RPG - Substation Upgrades (25RPG014)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Bayou","to":null,"county_from":"Chambers","county_to":null,"tier":"Tier 3","rpg":"25RPG014","rpg_completed":"2025-06-13","bod_reviewed":"2025-06-16","comments":null,"description":"Install 2.5-Ohm reactor in-series with existing Cedar Bayou A3 on the 138kV side of the autotransformer."},{"id":"ercot-tpit:99802","ercot_project":"99802","title":"Aetos: Construct New 138 kV Station","owner":"AEP TCC","owner_project":"TP2025254","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Aetos","to":null,"county_from":"Atascosa","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Interconnect Paradiso BESS to the new Aetos 138 kV station on the Big Foot to Pleasanton 138 kV line"},{"id":"ercot-tpit:99863","ercot_project":"99863","title":"Doffing: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Doffing","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new distribution station on the Stewart Road to Hi-Line 138 kV line"},{"id":"ercot-tpit:99933","ercot_project":"99933","title":"La Plaza: Construct New Distribution Station","owner":"AEP TCC","owner_project":"DP25X0035","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0.6,"cm_rebuilt":0,"from":"La Plaza","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new distribution station on the Polk Avenue to South McAllen 138 kV line between Hall Acres and South McAllen","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:84896","ercot_project":"84896","title":"23RPG028: STEC Rio Medina Project: New 138kV Legend Falls Substation","owner":"CPS/NO","owner_project":"S-1055","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5259","to":"5422, 5430","county_from":"Medina","county_to":null,"tier":"Tier 2","rpg":"23RPG028","rpg_completed":"2024-02-16","bod_reviewed":null,"comments":null,"description":"New 138kV Legend Falls Substation looped into the existing Tally to Texas Research transmission line. This station supports the RPG approved Rio Medina project"},{"id":"ercot-tpit:86829","ercot_project":"86829","title":"Fort Stockton Plant to Lynx: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":37,"from":"Fort Stockton Plant","to":"Lynx","county_from":"Pecos","county_to":"Pecos","tier":"Tier 4","rpg":"23RPG008","rpg_completed":"2023-05-05","bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rehab the Fort Stockton Plant to Lynx 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/502392995","name":"Fort Stockton Plant Substation","coordinates":[-102.95521,30.92727]},{"osm_id":"osm:way/1006095202","name":"Lynx Substation","coordinates":[-102.39351,31.07185]}],"endpoint_method":"name + voltage + county","link_note":"more than one mapped corridor of similar length; no segment linked"},{"id":"ercot-tpit:86857","ercot_project":"86857","title":"Blessing: Install New 345 kV Cap Bank","owner":"AEP TCC","owner_project":"TP2023803","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Blessing","to":null,"county_from":"Matagorda","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Install new capacitor bank at the Blessing 345 kV station"},{"id":"ercot-tpit:91537","ercot_project":"91537","title":"Starlite_Substation_Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2028-05-31","actual_isd":"2027-03-31","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will construct the 138-kV Starlite Substation to facilitate the Generation Interconnection Request (GINR) submitted for by the Interconnecting Entity, \"Blanquilla BESS LLC\" (Generator)."},{"id":"ercot-tpit:93224","ercot_project":"93224","title":"Eastpoint: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":7.2,"cm_rebuilt":0,"from":"Eastpoint","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new distribution station on the North Laredo Switch to Wormser Road 138 kV line between Gateway West Tap and Unitec","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:98997","ercot_project":"98997","title":"Rebuild/reconductor Ckt.89A West Columbia to Damon and Ckt.89A Damon to Needville to increase thermal limits. Upgrade Ckt.89A West Columbia equipment to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":13.84,"from":"West Columbia","to":"Needville","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"25RPG011","rpg_completed":"2025-05-28","bod_reviewed":"2025-05-28","comments":null,"description":"Rebuild/reconductor Ckt.89A West Columbia to Damon (3.74 miles) and Ckt.89A Damon to Needville (10.1 miles) to increase thermal limits. Upgrade Ckt.89A West Columbia equipment to increase thermal limits.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99009C","ercot_project":"99009C","title":"138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":8.63,"from":"Flewellen","to":"Fort Bend","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 3","rpg":"25RPG010","rpg_completed":"2025-04-18","bod_reviewed":"2025-04-18","comments":null,"description":"Upgrade Ckt.60E Flewellen to Fort Bend to increase thermal limits. Expect 2-959ACSS reconductor as first phase of Ckt.60E upgrade","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/127588213","name":"Flewellen Substation","coordinates":[-95.82088,29.6954]},{"osm_id":"osm:way/127588217","name":"Fort Bend Substation","coordinates":[-95.80048,29.56323]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/127588215","layer":"lines-138"},{"osm_id":"osm:way/127588219","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":10.1,"straight_mi":9.2},{"id":"ercot-tpit:102544","ercot_project":"102544","title":"Expand Sjolander 9-breaker BAAH substation to 12-breaker BAAH for a total of four line positions to Chevron. Relocate existing Sjolander Ckt.84 to Cedar Bayou to new line position.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sjolander","to":"Cedar Bayou","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:111323G","ercot_project":"111323G","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":9.97,"from":"PH Robinson","to":"HUNTER","county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:111323H","ercot_project":"111323H","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bayway","to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Install (3) 7.2 MVAR distribution cap banks at Bayway substation."},{"id":"ercot-tpit:111323I","ercot_project":"111323I","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mykawa","to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Install (1) 60 MVAR cap bank at Mykawa substation."},{"id":"ercot-tpit:111323J","ercot_project":"111323J","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Humble","to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Install (1) 60 MVAR switchable cap bank at Humble substation."},{"id":"ercot-tpit:111323B","ercot_project":"111323B","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.39,"from":"DALTON","to":"BRINE","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:111323D","ercot_project":"111323D","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0.97,"from":"Hermann","to":"Grant","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Upgrade Ckt.08 Hermann to Grant to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:111323A","ercot_project":"111323A","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":1.27,"from":"HOPSON","to":"WARVUE","county_from":"Chambers","county_to":"Chambers","tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:111323C","ercot_project":"111323C","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lyondell","to":"Channelview","county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Upgrade Ckt.03G Lyondell to Channelview (distribution) to Channelview (ring bus) in order to increase thermal limits."},{"id":"ercot-tpit:111323F","ercot_project":"111323F","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":7.19,"from":"Britmoore","to":"Westheimer","county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Upgrade Ckt.73B Britmoore to Woodcreek to Memorial to Westheimer in order to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/126452424","name":"Brittmoore Substation","coordinates":[-95.57216,29.79434]},{"osm_id":"osm:way/304987725","name":"Westheimer Substation","coordinates":[-95.6173,29.73661]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","osm_matches":[{"osm_id":"osm:way/585813550","layer":"lines-138"},{"osm_id":"osm:way/126746288","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":7.1,"straight_mi":4.8},{"id":"ercot-tpit:111323K","ercot_project":"111323K","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Treaschwig","to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-03-06","bod_reviewed":"2026-03-25","comments":null,"description":"Install (2) 14.4 MVAR distribution cap banks at Treaschwig substation."},{"id":"ercot-tpit:109585B","ercot_project":"109585B","title":"TEXPET Customer and Area 138kV Conversions.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mag Park","to":"NINTH","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand Mag Park 138kV substation and upgrade to 63KA fault duty. Reposition Ckt.08C Mag Park to NINTH to expanded substation position and remove existing MP-TR5 service from this circuit."},{"id":"ercot-tpit:110649","ercot_project":"110649","title":"Loop in 345 kV double circuit lines from Singleton to Jewett into Iron Horse substation","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-05-31","actual_isd":null,"cm_new":10,"cm_rebuilt":0,"from":"Limestone","to":"Twin Oak","county_from":"Limestone","county_to":"Robertson","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:110655","ercot_project":"110655","title":"Loop in 345 kV double circuit lines from Limestone to Twin Oak into Iron Horse substation","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-05-31","actual_isd":null,"cm_new":10,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110182","ercot_project":"110182","title":"Add 230 MVAr of cap bank","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Leon","county_to":"Leon","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99000B","ercot_project":"99000B","title":"Install (2) 14.4 MVAR distribution cap banks at Twinwood substation. Install (2) 14.4 MVAR distribution cap banks at Fulshear substation. Install (2) 40 MVAR transmission cap bank at Peters substation.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Peters","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (1) 40 MVAR transmission cap bank at Peters substation. (first of two)"},{"id":"ercot-tpit:109571","ercot_project":"109571","title":"Upgrade Ckt.86E Newport to King to Jonte to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":11.21,"from":"Newport","to":"Jonte","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"26RPG019","rpg_completed":"2026-05-29","bod_reviewed":"2026-06-01","comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109573","ercot_project":"109573","title":"Upgrade Ckt.60A Fort Bend to Rosenberg to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fort Bend","to":"Rosenberg","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109603A","ercot_project":"109603A","title":"HO Clarke to University 69kV to 138kV Conversion.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":12.3,"from":"HO Clarke","to":"University","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"26RPG011","rpg_completed":"2026-03-27","bod_reviewed":"2026-03-30","comments":null,"description":"Upgrade portions of retired 69kV Ckt.12 Clinton to Garden Villas (4.7 miles) in preparation for 138kV conversion. Upgrade portions of existing 69kV Ckt.19A Garden Villas to HO Clarke (7.6 miles) in preparation for 138kV conversion. Retire C","terminal_match":{"from":"not_in_osm","to":"matched","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/45765506","name":"Garden Villas Substation","coordinates":[-95.31444,29.65103]},{"osm_id":"osm:way/44953001","name":"University Substation","coordinates":[-95.33141,29.71682]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:109603B","ercot_project":"109603B","title":"HO Clarke to University 69kV to 138kV Conversion.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.27,"from":"HO Clarke","to":"University","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"26RPG011","rpg_completed":"2026-03-27","bod_reviewed":"2026-03-30","comments":null,"description":"Reconductor portions (2.27 miles) of Ckt.08L HOC to Bunker as part of Ckt.19A Garden Villas to HO Clarke pre-conversion rebuild.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109603C","ercot_project":"109603C","title":"HO Clarke to University 69kV to 138kV Conversion.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.48,"from":"Plaza","to":"Gulfgate","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"26RPG011","rpg_completed":"2026-03-27","bod_reviewed":"2026-03-30","comments":null,"description":"Reconductor portions (2.48 miles) of Ckt.06L Knight to Gulfgate as part of Ckt.19A Garden Villas to HO Clarke pre-conversion rebuild.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/336554484","name":"Plaza Substation","coordinates":[-95.38956,29.68943]},{"osm_id":"osm:way/47634032","name":"Gulfgate Substation","coordinates":[-95.3001,29.69311]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:109640","ercot_project":"109640","title":"Convert existing Needville 138/12kV distribution substation to 138/35kV. Remove existing Big Creek 138/12kV distribution substation to create new Ckt.89B Needville to Pleak.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Needville","to":"Pleak","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109646","ercot_project":"109646","title":"Install Pine Island (PNI) 35kV Distribution Substation. Loop on Ckt.65B to create new Ckt.65B Waller (tap) to Pine Island to Peters.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pine Island","to":"Waller / Peters","county_from":"Waller","county_to":"Waller","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99409","ercot_project":"99409","title":"Hockley Cap Bank Addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hockley","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Hockley Cap Bank Addition, originally added to cases as part of Project 91713"},{"id":"ercot-tpit:110075B","ercot_project":"110075B","title":"Install Morton 138/35kV Distribution Substation with double-tap service.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Morton","to":"Village Creek /Franz","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Morton 138/35kV Distribution Substation with double-tap service. Tap Ckt.09K to create new Ckt.09K Village Creek to Morton to Franz."},{"id":"ercot-tpit:109585A","ercot_project":"109585A","title":"TEXPET Customer and Area 138kV Conversions.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"TEXPET","to":"Clinton/Deepwater","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove 69kV TEXPET customer substation facilities. Install new 138kV TEXPET customer substation. Expand Clinton 138kV and Mag Park 138kV substations. Deenergize the non-upgraded portions of Ckt.33x. Energize the rebuilt portions of Ckt.33x "},{"id":"ercot-tpit:75830B","ercot_project":"75830B","title":"New 345kV Savannah (SAV) substation for generator interconnection to Cascade Solar (23INR0091).","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Savannah","to":"CASCAD","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Savannah (SAV) substation to CASCAD (CSC) customer substation (23INR0091)."},{"id":"ercot-tpit:109585C","ercot_project":"109585C","title":"TEXPET Customer and Area 138kV Conversions.","owner":"CNP","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Deepwater","to":"South Channel","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"De-energize 69kV Ckt.16C Deepwater to South Channel. De-energize 69kV Ckt.23A Deepwater to South Channel. De-energize 138/69kV South Channel auto A1 and all remaining South Channel 69kV facilities. Retire all remaining Deepwater 69kV facili"},{"id":"ercot-tpit:109585D","ercot_project":"109585D","title":"TEXPET Customer and Area 138kV Conversions.","owner":"CNP","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clinton","to":"Greens Bayou","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"De-energize 69kV Ckt.10A Clinton to Greens Bayou. De-energize 138/69kV Clinton auto A1 and all remaining Clinton 69kV facilities. De-energize 138/69kV Greens Bayou auto A5 and all remaining Greens Bayou 69kV facilities."},{"id":"ercot-tpit:91399","ercot_project":"91399","title":"Bitter_Creek_Substation_Upgrade","owner":"LCRATSC","owner_project":"PLC-8256","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bitter Creek","to":"Bitter Creek","county_from":"Nolan","county_to":"Nolan","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Oncor will upgrade the existing 345-kV double-circuit transmission lines Bitter Creek - Morgan Creek (Cattleman) and Bitter Creek - Sweetwater East. Part of the Permian Basin Reliability Plan released by ERCOT, under transmission upgrades L"},{"id":"ercot-tpit:70282","ercot_project":"70282","title":"New 138kV Brushy Creek Substation","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":2.81,"cm_rebuilt":0,"from":"Thompson Creek","to":"Snook","county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:80420","ercot_project":"80420","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":4.5,"from":"Bryn South Switch","to":"Greens Pairie","county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild / Reconductor Greens Prairie to South Switch 138kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:92734","ercot_project":"92734","title":"Construct Mascho - Border - Drill Hole 345 kV DCKT Line","owner":"ONCOR","owner_project":"R8792 R8802 R8803","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":196.8,"cm_rebuilt":0,"from":"Mascho","to":"Drill Hole","county_from":"Andrews","county_to":"Culberson","tier":"Tier 1","rpg":"24RPG015","rpg_completed":"2025-06-26","bod_reviewed":null,"comments":null,"description":"Construct Mascho - Border - Drill Hole 345 kV DCKT Line. Also adds Permian Basin Reliability Plan Upgrade ID L2B. Loop the Stage 5 upgrade of new Clearfork - Drill Hole 345-kV double-circuit line into the new Border 345-kV substation","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110909","ercot_project":"110909","title":"Rebuild Tri County to Parkway and Fratt to Parkway 138kV circuits","owner":"CPS/LCRA","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5156, 5445","to":"7611","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110911","ercot_project":"110911","title":"Helotes to Hill Country 2nd Ckt Addition and Rebuild","owner":"CPS","owner_project":"T-XXXX","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-01","actual_isd":null,"cm_new":9,"cm_rebuilt":9,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110921","ercot_project":"110921","title":"Add Reactive Support at Spruce","owner":"CPS","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:100678","ercot_project":"100678","title":"Install a 50MVAr Capacitor Bank at Fratt Substation","owner":"CPS/NO","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5165","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:100693","ercot_project":"100693","title":"Install a 35.72MVAr Capacitor Bank at Legend Falls Substation","owner":"CPS/NO","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5259","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:103257","ercot_project":"103257","title":"Models TNMP Galveston RPG study","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":3.1,"cm_rebuilt":21.4,"from":null,"to":null,"county_from":"Galveston","county_to":"Brazoria","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:103787","ercot_project":"103787","title":"BRYN_ColeLane","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct Cole Lane 138-kV Substation by cutting into the existing Keith Switch to Steep Hollow 138-kV transmission line."},{"id":"ercot-tpit:103820","ercot_project":"103820","title":"BRYN_Snook_Rebuild","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BTU Snook","to":null,"county_from":"Burleson","county_to":"Burleson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Snook Substation to remove the 69-kV bus and transfer distribution load to the 138-kV bus."},{"id":"ercot-tpit:80424","ercot_project":"80424","owner":"BRYN","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.3,"from":"Dansby","to":"Bryn Business Park","county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild / Reconductor Dansby to Business Park 69kV for Rail Spur","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99022","ercot_project":"99022","title":"Border - Quarry Field 345 kV double-circuit line","owner":"ONCOR","owner_project":"PB_L2_C","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":23.6,"cm_rebuilt":0,"from":"Border","to":"Quarry Field","county_from":"Loving","county_to":"Loving","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L2C Add a new Border - Quarry Field 345-kV double-circuit line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99100A","ercot_project":"99100A","title":"BRYN_99100_RELLIS_CAPS","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"RELLIS","to":null,"county_from":"Brazos","county_to":null,"tier":"Tier 1","rpg":"25RPG001","rpg_completed":"2025-07-05","bod_reviewed":null,"comments":null,"description":"Install first 54 MVAr (in three 18 MVAr stages) 138-kV capacitor bank at RELLIS"},{"id":"ercot-tpit:99100B","ercot_project":"99100B","title":"BRYN_99100_RELLIS_CAPS","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"RELLIS","to":null,"county_from":"Brazos","county_to":null,"tier":"Tier 1","rpg":"25RPG001","rpg_completed":"2025-07-05","bod_reviewed":null,"comments":null,"description":"Install second 54 MVAr (in three 18 MVAr stages) 138-kV capacitor bank at RELLIS"},{"id":"ercot-tpit:99516","ercot_project":"99516","title":"Upgrading line to bundled drake","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99520","ercot_project":"99520","title":"Union (fka Sun) - Ranger Camp 138 kV Line Rebuild","owner":"ONCOR","owner_project":"PB_L22_B","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":32.88,"from":"Union","to":"Dermott","county_from":"Scurry","county_to":"Scurry","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L22B. Upgrade the existing Union (fka Sun) - Ranger Camp 138-kV line.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:70299","ercot_project":"70299","title":"New Holleman Substation","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:91621","ercot_project":"91621","title":"Adding Highway 71 between Wirtz and Johnson city","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding highway 71 into the model Summer 2028"},{"id":"ercot-tpit:14TPIT0038","ercot_project":"14TPIT0038","title":"Northland to Mag Plant Circuit 979 Upgrade","owner":"AEN","owner_project":"NEW","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":4.11,"from":"Northland Substation","to":"Mag Plant Substation","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor the existing Northland to Mag Plant circuit from single 795SCAR to bundle 795 ACSR Drake and increase rating to 3000 Amp","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:110453","ercot_project":"110453","title":"STEC Hammer Load Project Phase 2","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":18.25,"from":"George West, San Miguel","to":"Cruce","county_from":"Live Oak","county_to":"Live Oak","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-Tap STEC San Miguel to Cruce 345kV ckt 1 to create a new 345kV station -Install 2 345/138kV autos and expand the new station to a 345/138 station - Construct and approximately 18.25 mile 138kV transmission line from the new 138kV station t","terminal_match":{"from":"multi_or_missing","to":"not_in_osm"}},{"id":"ercot-tpit:64067","ercot_project":"64067","title":"Bessel to King Ranch: 138 kV Line Rebuild","owner":"AEP TCC","owner_project":"TA2020081","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-15","actual_isd":null,"cm_new":0,"cm_rebuilt":26.59,"from":"Bessel","to":"Stratton","county_from":"Nueces","county_to":"Kleberg","tier":"Tier 4","rpg":"23RPG001","rpg_completed":"2023-02-24","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rehab the Bessel to King Ranch 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:81895","ercot_project":"81895","title":"BPUB Branch Changes","owner":"BPUB","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-23","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"59410, 5962","to":"79601, 79601","county_from":"Cameron","county_to":"Cameron","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Removing branch Price to Loma, adding Price to Stillman, adding another branch Loma Alta to Stillman."},{"id":"ercot-tpit:79451B","ercot_project":"79451B","title":"Loop new Ancla CEHE 138kV substation into Ckt.04E Angleton to West Columbia to create new Ckt.04 Angleton to Ancla to West Columbia. Install one generator lead from Ancla CEHE 138kV substation to ROYAL / Royal River BESS.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ancla","to":"ROYAL","county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from Ancla CEHE 138kV substation to ROYAL / Royal River BESS."},{"id":"ercot-tpit:109847B","ercot_project":"109847B","title":"DRILCO Area improvements in support of proposed load addition.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Humble","to":"Treaschwig","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Substation equipment at Humble and Treaschwig to increase rating of ckt 66"},{"id":"ercot-tpit:110162","ercot_project":"110162","title":"County Line - Garfield Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-30","actual_isd":null,"cm_new":1.4,"cm_rebuilt":0,"from":"County Line","to":"Garfield","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will construct a new 138-kV transmission line between County Line and Garfield substations. Project marked as conceptual for the moment as this project is also identified as an LCP Upgrade project to support Batch Zero Base Load.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109769A","ercot_project":"109769A","title":"This models upgrades related to the Willow Phase 3 Load addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-30","actual_isd":null,"cm_new":13.46,"cm_rebuilt":0,"from":"Willow","to":"Tomball/TH Wharton","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"26RPG023","rpg_completed":"2026-06-23","bod_reviewed":null,"comments":null,"description":"Build a new 138 kV circuit between Tomball and T.H. Wharton using the open circuit position on the existing double circuit towers. Loop the new circuit into Willow substation creating TH Wharton to Willow to Tomball.","terminal_match":{"from":"matched","to":"multi_or_missing","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/127223861","name":"Klein Substation","coordinates":[-95.57016,30.02391]},{"osm_id":"osm:way/127286697","name":"Tomball Substation","coordinates":[-95.60603,30.0901]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","link_note":"mapped connection is 4.6 mi but ERCOT reports 13.46 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:91567","ercot_project":"91567","owner":"BEPC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"New station Rhew","to":"New station Rhew","county_from":"Wilson","county_to":"Wilson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:91386","ercot_project":"91386","title":"Smithville_Substation_Upgrade","owner":"LCRATSC","owner_project":"PLC-7727","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Increase the reliability of the Smithville substation by replacing assets identified as a high failure risk, removing the 138x69-kV auto transformer, and converting T344 New Rosanky - Smithville to 138-kV"},{"id":"ercot-tpit:111459","ercot_project":"111459","title":"Upgrade Driscoll - San Diego","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":32.66,"from":"Driscoll","to":"San Diego","county_from":"Nueces","county_to":"Duval","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Driscoll - Central - Ben Bolt - San Diego","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:93088B","ercot_project":"93088B","title":"Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV Double-Circuit Line Rebuild 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","owner_project":"PB_L24_A","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cattleman","to":"Longshore","county_from":"Nolan","county_to":"Mitchell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L24A. LCRA and Oncor joint project to add L24A Upgrade the existing Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV double-circuit line"},{"id":"ercot-tpit:109751","ercot_project":"109751","title":"Big Sandy Circuit Breaker Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Big Sandy","to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Provide transformation by installing circuit breakers for 138-kV bus terminations on the transmission bus at Big Sandy Substation"},{"id":"ercot-tpit:109759","ercot_project":"109759","title":"Hardening Project for circuit 05 WAP to Missouri City(26RPG021).","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":9.62,"from":"HO Clarke","to":"Missouri City","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":"26RPG021","rpg_completed":"2026-06-12","bod_reviewed":"2026-06-15","comments":null,"description":"Hardening Project for circuit 05 WAP to Missouri City(26RPG021).","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109761","ercot_project":"109761","title":"Rebuild/reconductor portions of Ckt.05D Missouri City to Westchase as a Hardening Upgrade(26RPG024).","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":8.5,"from":"Westchase","to":"Missouri City","county_from":"Harris","county_to":"Fort Bend","tier":"Tier 3","rpg":"26RPG024","rpg_completed":"2026-06-24","bod_reviewed":"2026-06-25","comments":null,"description":"Rebuild/reconductor portions of Ckt.05D Missouri City to Westchase as a Hardening Upgrade(26RPG024).","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/14500641","name":"Westchase Substation","coordinates":[-95.55875,29.71875]},{"osm_id":"osm:way/129126589","name":"Missouri City Substation","coordinates":[-95.53006,29.61265]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:70712","ercot_project":"70712","title":"SAPS to Red Creek: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":"TA2020210","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":18.62,"from":"SAPS","to":"Red Creek","county_from":"Tom Green","county_to":"Tom Green","tier":"Tier 3","rpg":"26RPG003","rpg_completed":"2026-03-31","bod_reviewed":null,"comments":"In-Service Date, Dollars and Miles Rebuild Update","description":"Rehab the SAPS to Red Creek 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109769B","ercot_project":"109769B","title":"This models upgrades related to the Willow Phase 3 Load addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"TH Wharton","to":"Klein","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"26RPG023","rpg_completed":"2026-06-23","bod_reviewed":null,"comments":null,"description":"Disconnect Willow substation from existing ckt.81 leaving a T.H. Wharton to Klein ckt.81."},{"id":"ercot-tpit:109769C","ercot_project":"109769C","title":"This models upgrades related to the Willow Phase 3 Load addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tomball","to":"Pinehurst","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"26RPG023","rpg_completed":"2026-06-23","bod_reviewed":null,"comments":null,"description":"Reconfigure 138 kV ckt.81 Tomball to Mill Creek to Pinehurst to Kluge by looping the Pinehurst to Kluge ckt.81 segment into Tomball creating the following circuit Tomball to Mill Creek to Pinehurst to Tomball."},{"id":"ercot-tpit:109769D","ercot_project":"109769D","title":"This models upgrades related to the Willow Phase 3 Load addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kluge","to":"Tomball","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"26RPG023","rpg_completed":"2026-06-23","bod_reviewed":null,"comments":null,"description":"Reconfigure 138 kV ckt.81 Tomball to Mill Creek to Pinehurst to Kluge to create a new cicuit from Kluge to Tomball"},{"id":"ercot-tpit:103259","ercot_project":"103259","title":"Llano: Build new 69 kV Station","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Llano","to":null,"county_from":"Kimble","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":"2026-02-10","comments":"NEW","description":"Interconnect PEC's New Junction Station to the Junction to Mason Switch 69 kV Line"},{"id":"ercot-tpit:103459","ercot_project":"103459","title":"Clear Crossing: Expand 345 kV Station","owner":"ETT/AEP TNC","owner_project":"TP2025843","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":3.4,"cm_rebuilt":0,"from":"Clear Crossing","to":null,"county_from":"Haskell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Description and Transmission Owner Update","description":"Interconnect the Google Ranger load to the existing Clear Crossing 345 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:86791","ercot_project":"86791","title":"Crane to Rio Pecos: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":23.65,"from":"Crane","to":"Rio Pecos","county_from":"Crane","county_to":"Crockett","tier":"Tier 1","rpg":"23RPG023","rpg_completed":"2024-01-18","bod_reviewed":"2024-01-24","comments":"In-Service Date Update","description":"Rebuild the Crane to Rio Pecos 138 kV line","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:90000","ercot_project":"90000","title":"Upgrade San Diego - Orange Grove SW","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":21.56,"from":"San Diego","to":"Orange Grove SW","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade San Diego - Orange Grove SW to 795 ACSR. 2024 RTP","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110240","ercot_project":"110240","title":"Southeast Brownsville Large load transmission system improvements project","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-06-30","actual_isd":null,"cm_new":19.1,"cm_rebuilt":4.5,"from":"Portsouth","to":"Boca Chica","county_from":"Cameron","county_to":"Cameron","tier":"Tier 2","rpg":"25RPG039","rpg_completed":"2026-05-14","bod_reviewed":null,"comments":null,"description":"-Construct a new Portsouth 138-kV substation with six terminals: Hairpin the new Portsouth 138kV substaiton onto the existing HWY 511 to S Carbide (Chalybe) 138kV tline using single ckt structures which creates the new HWY511- Portsouth and","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:111376","ercot_project":"111376","title":"Add Boca Chica and double ckt to portsouth","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":38.2,"cm_rebuilt":0,"from":"Boca Chica","to":"PORTSOUTH","county_from":"Cameron","county_to":"Cameron","tier":"Tier 2","rpg":"25RPG039","rpg_completed":"2026-05-15","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:111361","ercot_project":"111361","title":"Add Portsouth loop in Southmost - Waterport","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"PORTSOUTH","to":"PORTSOUTH","county_from":"Cameron","county_to":"Cameron","tier":"Tier 2","rpg":"25RPG039","rpg_completed":"2026-05-15","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110077C","ercot_project":"110077C","title":"This models upgrades required for a proposed load addition.","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NewSub","to":null,"county_from":"Waller","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 300 MVAR capacitor bank at the NewSub."},{"id":"ercot-tpit:104562","ercot_project":"104562","title":"Glint: Construct New 138 kV Station","owner":"AEP TCC","owner_project":"TP2026040","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Glint","to":null,"county_from":"Zapata","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect Falcon BESS to the new Glint 138 kV station on the Lopeno to Zapata 138 kV line"},{"id":"ercot-tpit:110077A","ercot_project":"110077A","title":"This models upgrades required for a proposed load addition.","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NewSub","to":"Zenith/Mission","county_from":"Harris","county_to":"Waller","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 345 kV substation (NewSub). Loop into the existing Zenith to Mission ckt. 18."},{"id":"ercot-tpit:110086B","ercot_project":"110086B","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":7.2,"cm_rebuilt":0,"from":"NEWSUB","to":"Zenith/Gibbons Creek","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new customer 345 kV sub. Loop into new 345 kV CEHE sub with two leads each 3.6 miles.","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:110086A","ercot_project":"110086A","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Becker","to":"Zenith/Gibbons Creek","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 345 kV CEHE-owned sub. Loop on 345 kV Zenith to Gibbons Creek Ckt.18 & 50"},{"id":"ercot-tpit:110219B","ercot_project":"110219B","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.95,"from":"Haney","to":"Crosby","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild/Reconductor 138kV ckt.66 from Haney to Crosby. Upgrade substation equipment at Haney substation.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/129320300","name":"Haney Substation","coordinates":[-94.99082,29.82105]},{"osm_id":"osm:way/129320299","name":"Crosby Substation","coordinates":[-95.01975,29.87283]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/129320303","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":4,"straight_mi":null},{"id":"ercot-tpit:110057A","ercot_project":"110057A","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NewSub","to":"Zenith/Gibbons Creek;","county_from":"Harris","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 345 kV substation (NewSub). Loop into the existing Zenith to Mission ckt.18 and Zenith to Gibbons Creek ckt.50."},{"id":"ercot-tpit:110077B","ercot_project":"110077B","title":"This models upgrades required for a proposed load addition.","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NewSub","to":"Zenith/Gibbon's Creek","county_from":"Harris","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop NewSub into the existing Zenith to Gibbons Creek ckt. 50."},{"id":"ercot-tpit:110086C","ercot_project":"110086C","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Becker","to":null,"county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one 300 MVAR capacitor bank at new 345 kV CEHE sub."},{"id":"ercot-tpit:110077D","ercot_project":"110077D","title":"This models upgrades required for a proposed load addition.","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Zenith","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 300 MVAR capacitor bank at the 345 kV Zenith substation."},{"id":"ercot-tpit:110219A","ercot_project":"110219A","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Newsub","to":"Crosby/Danek","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop Newsub into ckt.08 between Crosby and Danek. Upgrade substation equipment at Crosby and Danek."},{"id":"ercot-tpit:90025","ercot_project":"90025","title":"Festin: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2024111","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Festin","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Sunscape Renewable Solar and Storage to the new Festin 345 kV station on the Lon Hill to Reforzar 345 kV line"},{"id":"ercot-tpit:110577","ercot_project":"110577","title":"Add CTT Comanchero station on Tule Canyon - Red Rock (Cross) dbl ckt","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tule Canyon","to":"Red Rock","county_from":"Briscoe","county_to":"Hall","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110286","ercot_project":"110286","title":"New double circuit line from CTT Railhead to Celtic Green","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-31","actual_isd":null,"cm_new":63.24,"cm_rebuilt":0,"from":"Railhead","to":"Celtic Green","county_from":"Carson","county_to":"Wheeler","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:55550","ercot_project":"55550","title":"Brushline: Construct New Distribution Station","owner":"AEP TCC","owner_project":"3826","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Brushline","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Construct new 138/13 kV station Brushline"},{"id":"ercot-tpit:110589","ercot_project":"110589","title":"Add two lines between CTT Comanchero and White River","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Comanchero","to":"White River","county_from":"Briscoe","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110595","ercot_project":"110595","title":"Add dbl ckt between CTT Red Rock and Edith Clark","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-31","actual_isd":null,"cm_new":60,"cm_rebuilt":0,"from":"Red Rock","to":"Edith Clark","county_from":"Hall","county_to":"Foard","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110316","ercot_project":"110316","title":"Taps 2nd Alibates to Gray ckt into CTT Railhead","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Alibates","to":"Gray","county_from":"Carson","county_to":"Gray","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:103816","ercot_project":"103816","title":"Montura: Construct New 345 kV Station","owner":"ETT","owner_project":"TP2025870","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Montura","to":null,"county_from":"Starr","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect Bullring Wind 1, 2, and 3 to the new Montura 345 kV station on the Cruce to Del Sol 345 kV line"},{"id":"ercot-tpit:110467","ercot_project":"110467","title":"Adds 2nd circuit from Allen Creek to Gray","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-08-31","actual_isd":null,"cm_new":23.4,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Gray","county_to":"Hall","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110471","ercot_project":"110471","title":"Add double ckt line from Allen Creek to Cross (Red Rock)","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-08-31","actual_isd":null,"cm_new":63,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Gray","county_to":"Hall","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110681","ercot_project":"110681","title":"Add double ckt line from Ghost Town to Alibates","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-08-31","actual_isd":null,"cm_new":41,"cm_rebuilt":0,"from":"Ghost Town","to":"Alibates","county_from":"Gray","county_to":"Carson","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:76082","ercot_project":"76082","title":"Union Carbide: Rebuild 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2028-08-31","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Union Carbide","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Dollars Update","description":"Rebuild Union Carbide as new AIS station Chalybe"},{"id":"ercot-tpit:107551","ercot_project":"107551","title":"Robertson Prison: Convert to 138 kV","owner":"AEP TNC","owner_project":"TP2026066","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.2,"from":"Robertson Prison","to":null,"county_from":"Jones","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Hamby Solar to the Robertson Prison 138 kV station on the Fort Phantom Plant to Abilene South 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:103822","ercot_project":"103822","title":"Red Creek: Expand 345 kV Station","owner":"AEP TNC","owner_project":"TP2025786","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Red Creek","to":null,"county_from":"Tom Green","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Description Update","description":"Interconnect the Juvo load to the existing Red Creek 345 kV station"},{"id":"ercot-tpit:110645","ercot_project":"110645","title":"Tap 2nd Limestone - Gibbons Creek ckt into CTT Iron Horse","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Leon","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:70706","ercot_project":"70706","title":"Tungsten (Carbide): Rebuild 138/69 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tungsten","to":null,"county_from":"Calhoun","county_to":null,"tier":"Tier 4","rpg":"21RPG024","rpg_completed":"2022-01-18","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rehab the Tungsten (Carbide) 138/69 kV station"},{"id":"ercot-tpit:111370","ercot_project":"111370","title":"Hairpin Portsouth HWY511 to Chalybe","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":4.5,"from":"PORTSOUTH","to":"PORTSOUTH","county_from":"Cameron","county_to":"Cameron","tier":"Tier 2","rpg":"25RPG039","rpg_completed":"2026-05-15","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99357","ercot_project":"99357","title":"Add Permian Basin Reliability Plan Upgrade ID L25D and L25E.","owner":"ONCOR","owner_project":"R8805","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-01","actual_isd":null,"cm_new":2.4,"cm_rebuilt":0,"from":"Oak Spring","to":"Plowboy","county_from":"Nolan","county_to":"Nolan","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L25D and L25E. Build Oak Spring - Plowboy 138-kV line. Move the Eskota 138/69-kV transformer 1 to Plowboy.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:91615","ercot_project":"91615","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":9.3,"from":"Concord","to":"Crowley","county_from":"Johnson","county_to":"Johnson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102685","ercot_project":"102685","title":"BEPC_TPIT102685_Add_Delia","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-01","actual_isd":null,"cm_new":1.5,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Limestone","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:55626","ercot_project":"55626","title":"Ganso to Hamilton Road: Rebuild 138 kV line","owner":"AEP TCC","owner_project":"3824","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-14","actual_isd":null,"cm_new":0,"cm_rebuilt":41.1,"from":"Maverick","to":"Hamilton Road","county_from":"Maverick","county_to":"Val Verde","tier":"Tier 3","rpg":"22RPG044","rpg_completed":"2023-01-17","bod_reviewed":null,"comments":null,"description":"Rebuild 138 kV line from Ganso to Hamilton Road","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/21121944","name":"Maverick Substation","coordinates":[-100.55059,28.86676]},{"osm_id":"osm:relation/5129437","name":"Hamilton Road Substation","coordinates":[-100.84918,29.37382]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/21064934","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":41.2,"straight_mi":null},{"id":"ercot-tpit:66492D","ercot_project":"66492D","title":"Chico West - Grindstone Switch 69 kV Line rebuild","owner":"ONCOR","owner_project":"M3006","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6,"from":"Chico City Services","to":"Chico West","county_from":"Jack","county_to":"Jack","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Chico West - Chico City Services 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:55624","ercot_project":"55624","title":"Escondido to Ganso: Rebuild 138 kV line","owner":"AEP TCC","owner_project":"3825","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-21","actual_isd":null,"cm_new":0,"cm_rebuilt":10.198,"from":"Escondido","to":"Ganso","county_from":"Maverick","county_to":"Maverick","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild 138 kV line from Escondido to Ganso","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:58010","ercot_project":"58010","title":"North McAllen: Rebuild 138 kV Station","owner":"AEP TCC","owner_project":"3837","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-21","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"McAllen","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rehab the North McAllen 138 kV station"},{"id":"ercot-tpit:110832","ercot_project":"110832","title":"Ad Hoc TPIT: Arrow Load Serving Station","owner":"SLU","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-09-29","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kingfisher","to":"Stewart Road","county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Construct a new 345 kV load serving station by tapping the existing Kingfisher to North Edinburg/Stewart Road Circuits"},{"id":"ercot-tpit:109847C","ercot_project":"109847C","title":"DRILCO Area improvements in support of proposed load addition.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Intercontinental","to":null,"county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 80 MVAR capacitor bank at the 138 kV Intercontinental substation by tapping into Ckt 67 Intercontinental to INTEQ"},{"id":"ercot-tpit:54892","ercot_project":"54892","title":"Eden to North Brady: Rebuild 69 kV line","owner":"AEP TNC","owner_project":"1856","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":32.7,"from":"Eden","to":"North Brady","county_from":"Concho","county_to":"McCulloch","tier":"Tier 4","rpg":"22RPG009","rpg_completed":"2022-04-14","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rehab Eden to North Brady 69 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/493048288","name":"Eden Substation","coordinates":[-99.83623,31.21574]},{"osm_id":"osm:way/493666737","name":"North Brady Substation","coordinates":[-99.3362,31.15554]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/493666743","layer":"lines-69"},{"osm_id":"osm:way/493666744","layer":"lines-69"},{"osm_id":"osm:way/21104368","layer":"lines-69"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":29.9,"straight_mi":29.8},{"id":"ercot-tpit:111305","ercot_project":"111305","title":"Goddard: Expand 345 kV Station","owner":"AEP TCC","owner_project":"TP2026163","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-30","actual_isd":null,"cm_new":1.3,"cm_rebuilt":0,"from":"Goddard","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Bayou Creek Solar to the existing Goddard 345 kV Statiom","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:99111A","ercot_project":"99111A","title":"Loop new CEHE 138kV substation Persimmon (PER) into Ckt.04A Mustang Bayou to HUDSON to create new Ckt.04 Mustang Bayou to Persimmon to HUDSON. Install one generator lead from CEHE 138kV substation Persimmon (PER) to KINETIC (KIN) / Willow Beach Wind.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Persimmon","to":"Mustang Bayou/HUDSON","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new CEHE 138kV substation Persimmon (PER) into Ckt.04A Mustang Bayou to HUDSON to create new Ckt.04 Mustang Bayou to Persimmon to HUDSON."},{"id":"ercot-tpit:52070","ercot_project":"52070","title":"Carver to Maxwell: Rebuild 138 kV line","owner":"AEP TCC/AEP TNC","owner_project":"3804","kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2028-09-30","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":60.24,"from":"Carver","to":"Maxwell","county_from":"Sutton","county_to":"Val Verde","tier":"Tier 3","rpg":"22RPG042","rpg_completed":"2022-12-28","bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rehab Carver to Maxwell 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99111B","ercot_project":"99111B","title":"Loop new CEHE 138kV substation Persimmon (PER) into Ckt.04A Mustang Bayou to HUDSON to create new Ckt.04 Mustang Bayou to Persimmon to HUDSON. Install one generator lead from CEHE 138kV substation Persimmon (PER) to KINETIC (KIN) / Willow Beach Wind.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Persimmon","to":"KINETIC","county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from CEHE 138kV substation Persimmon (PER) to KINETIC (KIN) / Willow Beach Wind."},{"id":"ercot-tpit:91453","ercot_project":"91453","title":"Canton area RPG update","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":4.2,"from":null,"to":null,"county_from":"Van Zandt","county_to":"Van Zandt","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Canton Rebuild as a 3 breaker ring bus and tapping Oncor Canton to Explorer Pipeline 138kV line.","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110084D","ercot_project":"110084D","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Raider","to":null,"county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Capacitor to nearby Raider substation."},{"id":"ercot-tpit:109810","ercot_project":"109810","title":"PSH Large Load","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.46,"from":null,"to":null,"county_from":"Hunt","county_to":"Hunt","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade 138 kV line from Nquin_RC (6883) to Quinl_RC (6884) to Cumberland conductor.","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:109704","ercot_project":"109704","title":"Carnelian: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2026075","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-01","actual_isd":null,"cm_new":2.5,"cm_rebuilt":0,"from":"Angstrom","to":"White point","county_from":"San Patricio","county_to":"San Patricio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect the Somerset Rebel load to the new Carnelian 345 kV station on the Whitepoint to Angstrom 345 kV line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:103468","ercot_project":"103468","title":"Misty Power Transformer Addition","owner":"LCRATSC","owner_project":"PLC-8282","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Misty","to":null,"county_from":"Caldwell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add two power transformers at Misty substations"},{"id":"ercot-tpit:110084C","ercot_project":"110084C","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Raider","to":null,"county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Capacitor to nearby Raider substation."},{"id":"ercot-tpit:110084E","ercot_project":"110084E","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Raider","to":null,"county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add additional capacitor to nearby Raider substation."},{"id":"ercot-tpit:99530","ercot_project":"99530","title":"Deep Creek - Snyder - China Grove 138 kV Line Rebuild","owner":"ONCOR","owner_project":"PB_L22_E","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":14.56,"from":"Deep Creek","to":"China Grove","county_from":"Scurry","county_to":"Scurry","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L22E. Upgrade the existing Deep Creek - China Grove 138-kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:93831","ercot_project":"93831","title":"New substation to replace Loma Alta","owner":"BPUB","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-02","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Stillman, Waterport, and also future Nimzo Substations","to":"Cipher (Loma Alta)","county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99648","ercot_project":"99648","title":"Pecan Bayou: 138 kV Circuit Breaker Addition","owner":"AEP TNC","owner_project":"TP2023323","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pecan Bayou","to":null,"county_from":"Callahan","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date and County Update","description":"Install two 138 kV circuit breakers at the Pecan Bayou 138 kV station"},{"id":"ercot-tpit:98622","ercot_project":"98622","title":"Chalybe to Palmito: Construct New 345 kV Double Circuit Line","owner":"AEP TCC/AEP TCC/SLU","owner_project":"TP2025010","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Chalybe","to":"Palmito","county_from":"Cameron","county_to":"Cameron","tier":"Tier 1","rpg":"24RPG008","rpg_completed":"2024-09-27","bod_reviewed":"2024-12-03","comments":"Company Contact, In-Service Date and Dollars Update","description":"Construct a new 345 kV double circuit line from Chalybe to Palmito","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:98632","ercot_project":"98632","title":"Chalybe: Install two STATCOMs at the 138 kV Station","owner":"AEP TCC","owner_project":"TP2025010","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Chalybe","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 1","rpg":"24RPG008","rpg_completed":"2024-09-27","bod_reviewed":"2024-12-03","comments":"Company Contact, In-Service Date, Dollars and Reactive Capability Update","description":"Install two 150 MVAR STATCOMs at the Chalybe 138 kV station"},{"id":"ercot-tpit:98637","ercot_project":"98637","title":"Chalybe to Stillman: Construct New 138 kV Line","owner":"AEP TCC/SLU","owner_project":"TP2025010","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Chalybe","to":"Stillman","county_from":"Cameron","county_to":"Cameron","tier":"Tier 1","rpg":"24RPG008","rpg_completed":"2024-09-27","bod_reviewed":"2024-12-03","comments":"Company Contact, In-Service Date and Dollars Update","description":"Construct a new 138 kV single circuit line from Chalybe to Stillman","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:5889","ercot_project":"5889","title":"MIRAGE - 138kV Substation Removal","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"MIRAGE","to":"MCCABE/BIMONT","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove 138kV MIRAGE customer-owned substation from CEHE service."},{"id":"ercot-tpit:98620","ercot_project":"98620","title":"Chalybe to Kingfisher: Construct New 345 kV Double Circuit Line","owner":"AEP TCC/AEP TCC/SLU","owner_project":"TP2025010","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":22,"cm_rebuilt":0,"from":"Chalybe","to":"Kingfisher","county_from":"Cameron","county_to":"Cameron","tier":"Tier 1","rpg":"24RPG008","rpg_completed":"2024-09-27","bod_reviewed":"2024-12-03","comments":"Company Contact, In-Service Date and Dollars Update","description":"Construct a new 345 kV double circuit line from Chalybe to Kingfisher","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:98618","ercot_project":"98618","title":"Chalybe: Expand 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Chalybe","to":null,"county_from":"Cameron","county_to":"Cameron","tier":"Tier 1","rpg":"24RPG008","rpg_completed":"2025-09-24","bod_reviewed":"2025-12-24","comments":"Company Contact, In-Service Date and Dollars Update","description":"Install two 345/138 kV autotransformers at the Chalybe 345/138 kV station"},{"id":"ercot-tpit:90191","ercot_project":"90191","title":"Bromine 138/35kV Distribution Substation","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bromine","to":"Katy/Freeman","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Bromine 138/35kV Distribution Substation. Loop on Ckt.66A to create new Ckt.66A Katy tap to Bromine to Freeman."},{"id":"ercot-tpit:76131","ercot_project":"76131","title":"Pendulo: Build New 345 kV terminal","owner":"ETT/AEP TNC/ETT","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pendulo","to":null,"county_from":"Haskell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Inertia Solar and BESS 2 to the Pendulo 345 kV Station on the Clear Crossing to Smoky Hill line"},{"id":"ercot-tpit:102968B","ercot_project":"102968B","title":"Circle Lake (CIR) CEHE Substation for Two Barbaras BESS (27INR0109)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Circle Lake","to":"TWO_BA","county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from Circle Lake (CIR) 138kV CEHE Substation to customer-owned TWO_BA (TBB) substation for Two Barbaras BESS (27INR0109)."},{"id":"ercot-tpit:111348","ercot_project":"111348","title":"Dry Hollow: Construct New Switch Station","owner":"AEP TNC","owner_project":"TP2026180","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Dry Hollow","to":null,"county_from":"Concho","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect CVEC's Hog Creek substation to the new Dry Hollow 69 kV switch station on the Redbo to Eola Tap 69 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:111258B","ercot_project":"111258B","title":"Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Newby","to":"Limestone / Jewett","county_from":"Freestone","county_to":"Leon","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new Newby (NBY) 345kV CEHE Substation into Ckt.98 to create new Ckt.98 Limestone to Newby to Jewett. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.98 Newby to Limestone."},{"id":"ercot-tpit:111258A","ercot_project":"111258A","title":"Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Newby","to":"Jewett / Limestone","county_from":"Freestone","county_to":"Leon","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new Newby (NBY) 345kV CEHE Substation into Ckt.74 to create new Ckt.74 Jewett to Newby to Limestone. Install (1) 6-Ohm reactor at Newby substation in-series with Ckt.74 Newby to Limestone."},{"id":"ercot-tpit:103414","ercot_project":"103414","title":"Rio Hondo: 138 kV Breaker Replacement","owner":"AEP TCC","owner_project":"TP2025950","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rio Hondo","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Replace 138 kV breakers at the Rio Hondo 138 kV station"},{"id":"ercot-tpit:111258C","ercot_project":"111258C","title":"Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Newby","to":"DEWEY","county_from":"Freestone","county_to":"Leon","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install dual generator leads from Newby (NBY) 345kV CEHE Substation to customer-owned Dewey Prairie - DEWEY_ (DWP)"},{"id":"ercot-tpit:102968A","ercot_project":"102968A","title":"Circle Lake (CIR) CEHE Substation for Two Barbaras BESS (27INR0109)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Circle Lake","to":"Pinehurst /Mill Creek","county_from":"Montgomery","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new Circle Lake (CIR) 138kV CEHE Substation for generator interconnection to Two Barbaras BESS. Connect to Ckt.81G Pinehurst to Mill Creek to create new Ckt.81 Pinehurst to Circle Lake to Mill Creek."},{"id":"ercot-tpit:111985","ercot_project":"111985","title":"This is a new planned substation project","owner":"BPUB","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"BPUB has a planned new substation project that will be between our existing Waterport Substation and STEC's Southmost Substation."},{"id":"ercot-tpit:107126","ercot_project":"107126","title":"Crabapple Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-20","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Crabapple","to":null,"county_from":"Gillespie","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will provide one (1) 138-kV POI(s) at Crabapple for a generation interconnection."},{"id":"ercot-tpit:90029","ercot_project":"90029","title":"Dupont Switch to Dupont PP1 Circuit 2: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TP2024138","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":1.52,"from":"Dupont Switch","to":"Dupont PP1","county_from":"San Patricio","county_to":"San Patricio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rebuild the Dupont Switch to Dupont PP1 Circuit 2 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/194687575","name":"Dupont Switching Station","coordinates":[-97.24682,27.90024]},{"osm_id":"osm:way/514740668","name":"Dupont PP1 Substation","coordinates":[-97.24746,27.88039]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 4.9 mi but ERCOT reports 1.52 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:102774B","ercot_project":"102774B","title":"Twinwood (TWN) 138kV CEHE Substation RHEMAN (RHE) / Twinwood Solar (26INR0425) and Maderagemela BESS (26INR0426)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Twinwood (new)","to":"RHEMAN","county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from Twinwood (TWN) 138kV Substation to RHEMAN (RHE) / Twinwood Solar (26INR0425) and Maderagemela BESS (26INR0426)."},{"id":"ercot-tpit:110417","ercot_project":"110417","title":"Cascabel: Install New 345 kV Capacitor Bank","owner":"AEP TNC/ETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cascabel","to":null,"county_from":"Jones","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Owner and Reactive Capability Update","description":"Install a new capacitor bank at the Cascabel 345 kV station"},{"id":"ercot-tpit:102774A","ercot_project":"102774A","title":"Twinwood (TWN) 138kV CEHE Substation RHEMAN (RHE) / Twinwood Solar (26INR0425) and Maderagemela BESS (26INR0426)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Twinwood (new)","to":"Fulshear/Twinwood","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new Twinwood (TWN) 138kV Substation for generator interconnection to RHEMAN (RHE) / Twinwood Solar (26INR0425) and Maderagemela BESS (26INR0426). Loop into existing Ckt.25E to create new Ckt.25 Fulshear to Twinwood (new) to Twinwood"},{"id":"ercot-tpit:103518","ercot_project":"103518","title":"Faisan: Construct New 345 kV Station","owner":"AEP TNC","owner_project":"TP2025943","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Faisan","to":null,"county_from":"Dickens","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect the Helios II load to the new Faisan 345 kV station"},{"id":"ercot-tpit:104026","ercot_project":"104026","title":"Morado (Abilene Northwest): Rebuild 138 kV Station","owner":"AEP TNC","owner_project":"TP2023700","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0.1,"from":"Morado","to":null,"county_from":"Jones","county_to":null,"tier":"Tier 3","rpg":"25RPG036","rpg_completed":"2025-10-31","bod_reviewed":null,"comments":"In-Service Date and RPG Dates Update","description":"Rebuild the Morado (Abilene Northwest) 138 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:99794","ercot_project":"99794","title":"Frontera: 138 kV Breaker Replacement","owner":"AEP TCC","owner_project":"TP2025213","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Frontera","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Replace 138 kV breakers at the Frontera 138 kV station"},{"id":"ercot-tpit:90016","ercot_project":"90016","title":"Dupont Switch to Dupont PP1 Circuit 1: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TP2024138","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":1.46,"from":"Dupont Switch","to":"Dupont PP1","county_from":"San Patricio","county_to":"San Patricio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rebuild the Dupont Switch to Dupont PP1 Circuit 1 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/194687575","name":"Dupont Switching Station","coordinates":[-97.24682,27.90024]},{"osm_id":"osm:way/514740668","name":"Dupont PP1 Substation","coordinates":[-97.24746,27.88039]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 4.9 mi but ERCOT reports 1.46 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:90002","ercot_project":"90002","title":"Salvare: Install New 345 kV Capacitor Bank","owner":"ETT","owner_project":"TP2024109","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Salvare","to":null,"county_from":"Childress","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"ISD Update","description":"Install a new capacitor bank at the Salvare 345 kV station"},{"id":"ercot-tpit:91853","ercot_project":"91853","title":"Fort Stockton Plant to Solstice: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":"TP2025145","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":25,"from":"Fort Stockton Plant","to":"Solstice","county_from":"Pecos","county_to":"Pecos","tier":"Tier 3","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"In-Service Date Update","description":"Rebuild the Fort Stockton Plant to Solstice 138 kV line and retire the PST at Solstice","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/502392995","name":"Fort Stockton Plant Substation","coordinates":[-102.95521,30.92727]},{"osm_id":"osm:way/500535889","name":"Solstice Substation","coordinates":[-103.36171,30.94832]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/500535891","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":25.3,"straight_mi":null},{"id":"ercot-tpit:91906","ercot_project":"91906","title":"Carver to Friend Ranch: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":"TP2025168","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":33,"from":"Carver","to":"Friend Ranch","county_from":"Sutton","county_to":"Crockett","tier":"Tier 3","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"TSP/Company Contact and In-Service Date Update","description":"Rebuild the Carver to Friend Ranch 138 kV line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:98561","ercot_project":"98561","title":"Solstice to Hayter Tap: Rebuild 138 kV Line Double Circuit","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":1.7,"cm_rebuilt":1.7,"from":"Solstice","to":"Hayter Tap","county_from":"Pecos","county_to":"Pecos","tier":"Tier 2","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"In-Service Date Update","description":"Rebuild the Solstice to Hayter Tap 138 kV line as a double circuit","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:50876","ercot_project":"50876","title":"Victoria to Port Lavaca: Retire 69 kV Line","owner":"AEP TCC","owner_project":"3782","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":29,"from":"Port Lavaca","to":"Victoria","county_from":"Calhoun","county_to":"Victoria","tier":"Tier 1","rpg":"21RPG002","rpg_completed":"2021-09-16","bod_reviewed":"2021-10-22","comments":"TSP/Company Contact Update","description":"Retire 69 kV Line on Victoria to Port Lavaca","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:55470","ercot_project":"55470","title":"Bison to Lightyear: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"1863","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":27,"from":"Bison","to":"Lightyear","county_from":"Reagan","county_to":"Crockett","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Title, Project Description, Terminal To Location, and TSP/Company Contact Update","description":"Rehab the Bison to Lightyear 69 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:69277","ercot_project":"69277","title":"Cangrejo to Carbide: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":11,"from":"Cangrejo","to":"Carbide","county_from":"Calhoun","county_to":"Calhoun","tier":"Tier 1","rpg":"21RPG002","rpg_completed":"2021-09-16","bod_reviewed":"2021-10-22","comments":null,"description":"Rebuild 138 kV Line from Cangrejo to Carbide","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:78545","ercot_project":"78545","title":"Brookhollow to Cangrejo: Rebuild 69 kV Line","owner":"AEP TCC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":2.15,"from":"Brookhollow","to":"Cangrejo","county_from":"Calhoun","county_to":"Calhoun","tier":"Tier 1","rpg":"21RPG002","rpg_completed":"2021-09-16","bod_reviewed":"2021-10-22","comments":null,"description":"Rebuild 69 kV line from Brookhollow to Cangrejo","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:102980","ercot_project":"102980","title":"Expand 138kV Weinbrenner substation for LIATRI (LIA)/Liatris Flexible Gas - 26INR0408. Install one new generator lead from Weinbrenner to LIATRI/Liatris Flexible Gas","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Weinbrenner","to":null,"county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand 138kV Weinbrenner substation for LIATRI (LIA)/Liatris Flexible Gas - 26INR0408. Install one new generator lead from Weinbrenner to LIATRI/Liatris Flexible Gas"},{"id":"ercot-tpit:103421","ercot_project":"103421","title":"Weslaco Unit: 138 kV Breaker Replacement","owner":"AEP TCC","owner_project":"TP2025944","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Weslaco Unit","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Replace 138 kV breakers at the Weslaco Unit 138 kV station"},{"id":"ercot-tpit:99513","ercot_project":"99513","title":"Dry Lake (fka 900005Tap) - Faulkner (TNMP) 345 kV double-circuit line","owner":"ONCOR","owner_project":"PB_L5_F","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":63.36,"cm_rebuilt":0,"from":"Dry Lake (ONCOR)","to":"Faulkner (TNMP)","county_from":"Reeves","county_to":"Reeves","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Joint Oncor and TNMP project to Add Permian Basin Reliability Plan Upgrade ID L5F Add a new 900005Tap - Faulkner 345-kV double-circuit line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99020","ercot_project":"99020","title":"Border 345/138 kV Switch and two new 345/138 kV Autotransformers","owner":"ONCOR","owner_project":"PB_L2_A_B","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Border","to":"Border","county_from":"Loving","county_to":"Loving","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L2A Establish a new Border 345/138-kV substation and install two new 345/138-kV transformers"},{"id":"ercot-tpit:92278","ercot_project":"92278","title":"Faulkner 345kV - Part of Upgrade L5 2024 Permian Basin Study","owner":"TNMP","owner_project":"PBRP Upgrade L5","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":79.28,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Pecos","county_to":"Reeves","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/501745940","name":"Faulkner Substation","coordinates":[-103.7932,31.26104]},{"osm_id":"osm:way/500535889","name":"Solstice Substation","coordinates":[-103.36171,30.94832]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:99518","ercot_project":"99518","title":"Dry Lake (ONC900005_TAP 11610) - Faulkner (TNMP) 138 kV double-circuit line","owner":"ONCOR","owner_project":"PB_L3_A","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":120,"cm_rebuilt":0,"from":"Dry Lake (ONCOR)","to":"FAULKNER (TNMP)","county_from":"Reeves","county_to":"Reeves","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Joint Oncor and TNMP project to Add Permian Basin Reliability Plan Upgrade ID L3 Connect new load buses to ONC900005_TAP (11610) and Faulkner and form a 138-kV double-circuit loop: 11610 - 900005 - 900111 - 900023 - 900012 - 900021 - 900038","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99018","ercot_project":"99018","title":"Dry Lake 345/138 kV Switch (fka ONC900005_TAP 11610) and two new 345/138 kV autotransformers","owner":"ONCOR","owner_project":"PB_L5_B_E","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":50,"cm_rebuilt":0,"from":"El Capitan","to":"Dry Lake","county_from":"Culberson","county_to":"Reeves","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L5B and L5E Establish a new ONC900005_TAP 345/138-kV substation and install two new 345/138-kV transformers and Add a new El Capitan - Dry Lake (fka 900005Tap) 345-kV double-circuit line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:98953","ercot_project":"98953","title":"McDonald Road - Polecat Creek 138 kV Rebuild","owner":"ONCOR","owner_project":"R8207","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":13.75,"from":"McDonald Road","to":"Polecat Creek","county_from":"Glasscock","county_to":"Glasscock","tier":"Tier 3","rpg":"25RPG035","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the 13.75 mile McDonald Road Switch - Polecat Creek Switch 138 kV Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/354601987","name":"McDonald Road Substation","coordinates":[-101.27561,32.08625]},{"osm_id":"osm:way/458134449","name":"Polecat Creek Substation","coordinates":[-101.48221,31.99481]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/20988737","layer":"lines-138"},{"osm_id":"osm:way/468019563","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":13.5,"straight_mi":13.7},{"id":"ercot-tpit:98991A","ercot_project":"98991A","title":"Kinnebrew POI - Chalk 69 kV to 138 kV Line Conversion","owner":"ONCOR","owner_project":"PB_L27_B","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":13.6,"cm_rebuilt":0,"from":"Kinnebrew","to":"Chalk","county_from":"Sterling","county_to":"Sterling","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Oncor's portion of the Permian Basin Reliability Plan Upgrade ID L27B. Convert the existing Chalk - Kinnebrew POI 69-kV line to 138-kV.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:76768","ercot_project":"76768","title":"Upgrade Pearson -Pearsall","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":34.62,"from":"Pearson","to":"Pearsall","county_from":"Frio","county_to":"Medina","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the Pearson-Natalia-Devine-Moore-Pearsall to 795 ACSR","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109808","ercot_project":"109808","title":"Rivercrest Switch - Hawk Hallow Switch 138 kV Line","owner":"ONCOR","owner_project":"M3234","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":25.5,"from":"Rivercrest Switch","to":"Hawk Hallow Switch","county_from":"Red River","county_to":"Lamar","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Rivercrest Switch - Hawk Hallow Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109845","ercot_project":"109845","title":"Oncor_ME_109845_Cleburne Switch - Venus 138 kV Line Section and Rebuild Cleburne 138 kV Switch","owner":"ONCOR","owner_project":"M5371, M5196","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":19.5,"from":"Venus Substation","to":"Cleburne Switch","county_from":"Ellis","county_to":"Johnson","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Cleburne Switch - Venus 138 kV Line Section and Rebuild Cleburne 138 kV Switch","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/147127242","name":"Venus Substation","coordinates":[-97.07272,32.44401]},{"osm_id":"osm:way/342357914","name":"Cleburne Substation","coordinates":[-97.37487,32.3541]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/147127247","layer":"lines-138"},{"osm_id":"osm:way/342357911","layer":"lines-138"},{"osm_id":"osm:way/342357902","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":19.4,"straight_mi":18.7},{"id":"ercot-tpit:110377","ercot_project":"110377","title":"Greene Switch - Wilmer Switch 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4364","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":3,"cm_rebuilt":0,"from":"Greene Switch","to":"Wilmer Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Establish Greene Switch - Wilmer Switch 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110268","ercot_project":"110268","title":"Lavon 345/138 kV Switch","owner":"ONCOR","owner_project":"M3313","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lavon 345/138 kV Switch","to":"Lavon 345/138 kV Switch","county_from":"Collin","county_to":"Collin","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Lavon 345/138 kV Switch"},{"id":"ercot-tpit:105345","ercot_project":"105345","title":"Black Hawk 138 kV Switch","owner":"ONCOR","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish new 138 kV Switch"},{"id":"ercot-tpit:92911","ercot_project":"92911","title":"Adds Capacitor Bank at Wildhorse POD","owner":"ONCOR","owner_project":"R8664","kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2028-12-06","actual_isd":"2027-05-15","cm_new":0,"cm_rebuilt":0,"from":"Wildhorse POD","to":"Wildhorse POD","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds Capacitor Bank at Wildhorse POD"},{"id":"ercot-tpit:102561","ercot_project":"102561","title":"BEPC_TPIT_FortGatesSW_FortGates","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-08","actual_isd":null,"cm_new":0,"cm_rebuilt":2,"from":"250","to":"254","county_from":"Coryell","county_to":"Coryell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:99620","ercot_project":"99620","title":"Rebuild Pin Oak Switch - Jewett Switch 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R1704","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":65,"from":"Pin Oak Switch","to":"Jewett Switch","county_from":"Freestone","county_to":"Leon","tier":"Tier 1","rpg":"25RPG004","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Pin Oak Switch - Jewett Switch 345 kV Double Circuit Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99626","ercot_project":"99626","title":"Upgrade Richland Chambers Switch - Trinidad Switch 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R6027","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":33,"from":"Richland Chambers Switch","to":"Trinidad Switch","county_from":"Freestone","county_to":"Henderson","tier":"Tier 1","rpg":"25RPG004","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Richland Chambers Switch - Trinidad Switch 345 kV Double Circuit Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/172583750","name":"Richland Chambers Substation","coordinates":[-96.11341,31.89026]},{"osm_id":"osm:relation/6810017","name":"Trinidad Substation","coordinates":[-96.1046,32.1261]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/172367690","layer":"lines-345plus"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":16.2,"straight_mi":null},{"id":"ercot-tpit:87699","ercot_project":"87699","title":"Belton - Killeen 138 kV Line via Belton Southwest","owner":"ONCOR","owner_project":"R902","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":17.2,"from":"Belton","to":"Killeen","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Belton - Killeen 138 kV Line via Belton Southwest","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:87703","ercot_project":"87703","title":"Belton - Killeen 138 kV Line via Nolanville","owner":"ONCOR","owner_project":"R6347","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":24.8,"from":"Belton","to":"Killeen","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor the Belton - Killeen 138 kV Line via Nolanville","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:87711","ercot_project":"87711","title":"Watercrest - Killeen 138 kV Line","owner":"ONCOR","owner_project":"R6355","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":7,"from":"Watercrest","to":"Killeen","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the Watercrest - Killeen 138 kV Line","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:71910C","ercot_project":"71910C","title":"Rebuild the Hillsboro - Elm Mott 69 kV Line","owner":"ONCOR","owner_project":"R6221","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":10.1,"from":"Abbott 69 kV Substation","to":"Hillsboro 69 kV Switch","county_from":"Hill","county_to":"Hill","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Abbott - Hillsboro Switch 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:92852B","ercot_project":"92852B","title":"Monticello_Paris_Line_Upgrade","owner":"ONCOR","owner_project":"R986","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":16.8,"from":"Woodard","to":"Paris","county_from":"Lamar","county_to":"Lamar","tier":"Tier 1","rpg":"25RPG026","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Woodard - Paris 345 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:68700","ercot_project":"68700","title":"Bonham - Toco Switch 69 kV Line Rebuild","owner":"ONCOR","owner_project":"M3016","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":35,"from":"Bonham","to":"Toco","county_from":"Fannin","county_to":"Lamar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:81296A","ercot_project":"81296A","title":"Prong Moss – Rockhound 345 kV Line Rebuild","owner":"ONCOR","owner_project":"R3025","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":60.2,"from":"Prong Moss","to":"Rockhound","county_from":"Midland","county_to":"Howard","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Prong Moss – Rockhound 345 kV Line Rebuild","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105322","ercot_project":"105322","title":"Ironwood 345/138 kV Switch","owner":"ONCOR","owner_project":"M4398","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":2,"cm_rebuilt":0.5,"from":"Ironwood Switch","to":null,"county_from":"Ellis","county_to":null,"tier":"Tier 1","rpg":"25RPG004, 26RPG028","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Ironwood 345/138 kV Switch","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:105318","ercot_project":"105318","title":"Greene 345/138 kV Switch","owner":"ONCOR","owner_project":"M4255","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Greene Switch","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Greene 345/138 kV Switch","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:109876","ercot_project":"109876","title":"Establish Windy Ridge 138 kV Switch","owner":"ONCOR","owner_project":"R6483","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":5,"cm_rebuilt":0,"from":"Windy Ridge","to":"Windy Ridge","county_from":"Williamson","county_to":"Williamson","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Windy Ridge 138 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105326","ercot_project":"105326","title":"Parker Switch – Hicks Switch 345kV Line","owner":"ONCOR","owner_project":"M5105","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":23,"from":"Parker Switch","to":"Hick Switch","county_from":"Parker","county_to":"Tarrant","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Parker Switch – Hicks Switch 345kV Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:105328","ercot_project":"105328","title":"Pebble Creek Switch – Shankle Switch 138kV Line Upgrade","owner":"ONCOR","owner_project":"M4397","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":16.6,"from":"Pebble Creek Switch","to":"Shankle Switch","county_from":"Ellis","county_to":"Ellis","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Pebble Creek Switch – Shankle Switch 138kV Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110036","ercot_project":"110036","title":"Construct the Voss Lake - Walleye Creek 138 kV Line","owner":"ONCOR","owner_project":"R6552","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Voss Lake","to":"Walleye Creek","county_from":"Milam","county_to":"Milam","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct the Voss Lake - Walleye Creek 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110246","ercot_project":"110246","title":"Roanoke - Kingsridge 138 kV Line","owner":"ONCOR","owner_project":"M5351","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Roanoke","to":"Kingsridge","county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Roanoke - Kingsridge 138 kV Line"},{"id":"ercot-tpit:100599","ercot_project":"100599","title":"Establish Hillsboro Switch 138/69 kV Auto #2","owner":"ONCOR","owner_project":"R6488","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hillsboro 138 kV Switch","to":"Hillsboro 69 kV Switch","county_from":"Hill","county_to":"Hill","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Hillsboro Switch 138/69 kV Auto #2"},{"id":"ercot-tpit:104158","ercot_project":"104158","title":"Pecos Trail to Wolf 138 kV Line Section Rebuild","owner":"ONCOR","owner_project":"R8527","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9.7,"from":"Pecos Trail","to":"Wolf","county_from":"Ward","county_to":"Ward","tier":"Tier 3","rpg":"25RPG008","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 138 kV line section from Pecos Trail to Wolf 138 kV.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:104328","ercot_project":"104328","title":"New 138 KV BOLM Substation Cut-in on CKT1021 BE to KB","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0.2,"from":"9180","to":"9163, 9123","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New 138 KV BOLM Substation Cut-in on CKT1021 BE to KB","terminal_match":{"from":"unnamed","to":"multi_or_missing"}},{"id":"ercot-tpit:99066","ercot_project":"99066","title":"Royse Switch – Farmersville Switch 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4255","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Farmersville Switch","to":"Royse Switch","county_from":"Collin","county_to":"Rockwall","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Royse Switch – Farmersville Switch 345 kV Double-Circuit Line","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:99350","ercot_project":"99350","title":"Rebuild the Bell County East - Voss Lake 345 kV DCKT Line","owner":"ONCOR","owner_project":"R6401","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":29.6,"from":"Bell County East","to":"Voss Lake","county_from":"Bell","county_to":"Milam","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Bell County East - Voss Lake 345 kV DCKT Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99359","ercot_project":"99359","title":"Sweetwater Creek POI - Eskota 69 kV line and convert to 138 kV","owner":"ONCOR","owner_project":"R9000","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":24.6,"from":"Eskota","to":"Oak Spring","county_from":"Nolan","county_to":"Nolan","tier":"Tier 2","rpg":"24RPG040","rpg_completed":"2025-05-30","bod_reviewed":null,"comments":null,"description":"Rebuild the Sweetwater Creek POI - Eskota 69 kV line and convert to 138 kV approved as part of the 24RPG040 Oncor Roscoe Area Upgrades Project.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99383","ercot_project":"99383","title":"Establish Paramount 345 kV Switch","owner":"ONCOR","owner_project":"R6454","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":1.2,"cm_rebuilt":0,"from":"Tower","to":"Tower","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Paramount 345 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99361","ercot_project":"99361","title":"Permian Basin Reliability Plan Upgrade ID L25C","owner":"ONCOR","owner_project":"R8805 R8806 R8823","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":10.88,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L25C. Convert the existing Plowboy - Eskota 69-kV line to 138 kV. Rebuild the Eskota 138/69 kV Switch approved as part of the part of Permian Basin Reliability Plan Upgrade ID L25C. Required to ","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:99479D","ercot_project":"99479D","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","owner_project":"PB_L23","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":13.2,"from":"Snyder","to":"Bluff Creek","county_from":"Scurry","county_to":"Scurry","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds part of Permian Basin Reliability Plan Upgrade ID L23. Convert the existing Snyder - Scurry - China Grove and Snyder - Amoco Tap - China Grove 69-kV lines to 138-kV. This converts the Snyder - Scurry 69 kV Line into 138 kV and retermin","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/467959259","name":"Snyder Substation","coordinates":[-100.90264,32.70397]},{"osm_id":"osm:way/467959305","name":"Bluff Creek Substation","coordinates":[-101.05435,32.62715]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:99239A","ercot_project":"99239A","title":"Establish Muscovy 345/138 kV Switch","owner":"ONCOR","owner_project":"R6212, R6342, R6362","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Muscovy","to":"Muscovy","county_from":"Williamson","county_to":"Williamson","tier":"Tier 1","rpg":"25RPG009","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish the Muscovy 345/138 kV Switch"},{"id":"ercot-tpit:99239C","ercot_project":"99239C","title":"Establish Muscovy 345/138 kV Switch","owner":"ONCOR","owner_project":"R6212, R6342, R6362","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-16","actual_isd":null,"cm_new":4,"cm_rebuilt":0,"from":"Muscovy","to":"Limmer (LCRA TSC)","county_from":"Williamson","county_to":"Williamson","tier":"Tier 1","rpg":"25RPG009","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct the Muscovy - Limmer (LCRA TSC) 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99387","ercot_project":"99387","title":"Rebuild the Paramount - Salado 345 kV DCKT Line","owner":"ONCOR","owner_project":"R6358","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-16","actual_isd":null,"cm_new":0,"cm_rebuilt":12.4,"from":"Tower","to":"Salado","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Paramount - Salado 345 kV DCKT Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99389","ercot_project":"99389","title":"Rebuild the Paramount - Temple 345 kV DCKT Line","owner":"ONCOR","owner_project":"R6402","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-16","actual_isd":null,"cm_new":0,"cm_rebuilt":2.9,"from":"Tower","to":"Temple","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Paramount - Temple 345 kV DCKT Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:104460","ercot_project":"104460","title":"Kingsbury Substation Addition","owner":"GVEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-22","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Guadalupe","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add new load serving substation 1.5 miles northwest of Kingsbury w/40 MVA PWT, station to be cut into LCRA T158 ckt."},{"id":"ercot-tpit:80373","ercot_project":"80373","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-29","actual_isd":null,"cm_new":0,"cm_rebuilt":5.5,"from":"IOLA","to":"CRUTCHFIELD","county_from":"Grimes","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/452820077","name":"Iola Substation","coordinates":[-96.04633,30.73153]},{"osm_id":"osm:way/452817052","name":"Crutchfield Substation","coordinates":[-95.93413,30.58446]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:91623","ercot_project":"91623","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-29","actual_isd":null,"cm_new":null,"cm_rebuilt":5.5,"from":"Lillian","to":"Highpoint","county_from":"Johnson","county_to":"Johnson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:85953","ercot_project":"85953","title":"Camp Wood - Leakey Transmission Line Conversion","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2028-12-30","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Bandera 7438","to":"Leakey 7426","county_from":"Bandera","county_to":"Real","tier":"Tier 4","rpg":"24RPG009","rpg_completed":"2024-04-12","bod_reviewed":null,"comments":null,"description":"LCRATSC will perform a voltage conversion on Camp Wood – Leakey (T269) 69-kV transmission line. This project will increase the reliability of transmission facilities by converting the substation equipment at Camp Wood and Leakey substation "},{"id":"ercot-tpit:112127","ercot_project":"112127","title":"Upgrade Batesville - Crystal City SW as part of Crystal City SW to Downie upgrade","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":17.3,"from":"Batesville","to":"Crystal City SW","county_from":"Zavala","county_to":"Zavala","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:104632","ercot_project":"104632","title":"Canopy: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2026011","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Canopy","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect Palo Verde Wind to the New Canopy 345 kV Station on the Grissom to Lon Hill 345 kV line"},{"id":"ercot-tpit:103344G","ercot_project":"103344G","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":19.58,"from":"Oasis","to":"WA Parish","county_from":null,"county_to":null,"tier":"Tier 4","rpg":"25RPG028","rpg_completed":"2026-02-06","bod_reviewed":null,"comments":null,"description":"Rebuild and reconductor Ckt.99B Oasis to WA Parish as a Hardening upgrade.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:103344E","ercot_project":"103344E","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":19.56,"from":"Oasis","to":"WA Parish","county_from":null,"county_to":null,"tier":"Tier 4","rpg":"25RPG028","rpg_completed":"2026-02-06","bod_reviewed":null,"comments":null,"description":"Rebuild and reconductor Ckt.18C Oasis to WA Parish as a Hardening upgrade","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:103344C","ercot_project":"103344C","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":3.18,"from":"Meadow","to":"Oasis","county_from":null,"county_to":null,"tier":"Tier 4","rpg":"25RPG028","rpg_completed":"2026-02-06","bod_reviewed":null,"comments":null,"description":"Rebuild and reconductor Ckt.99E Meadow to Oasis as a Hardening upgrade","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/583408103","name":"Meadow Substation","coordinates":[-95.25798,29.46024]},{"osm_id":"osm:way/174317157","name":"Oasis Substation","coordinates":[-95.30817,29.45627]}],"endpoint_method":"name + voltage","osm_matches":[{"osm_id":"osm:way/174317145","layer":"lines-345plus"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":3.3,"straight_mi":null},{"id":"ercot-tpit:103344A","ercot_project":"103344A","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":17.4,"from":"PH Robinson","to":"Meadow","county_from":"Galveston","county_to":"Brazoria","tier":"Tier 4","rpg":"25RPG028","rpg_completed":"2026-02-06","bod_reviewed":null,"comments":null,"description":"Rebuild and reconductor Ckt.99A PH Robinson to Meadow as a Hardening upgrade","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:100647","ercot_project":"100647","title":"Install a 50MVAr Capacitor Bank at Anderson Substation","owner":"CPS/NO","owner_project":"S-1043","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5003","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:112131","ercot_project":"112131","title":"Upgrade N.Batesville - Leona - Uvalde Sw - Uvalde Sub - Downie","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":24.5,"from":"N. Batesville","to":"Downie","county_from":"Zavala","county_to":"Uvalde","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade N.Batesville - Leona - Uvalde Sw - Uvalde Sub - Downie as part of Crystal City SW to Downie rebuild","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:112129","ercot_project":"112129","title":"Upgrade N.Batesville - S. Batesville - Batesville Sw","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":7.5,"from":"N. Batesville","to":"Batesville","county_from":"Zavala","county_to":"Zavala","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade N.Batesville - S. Batesville - Batesville Sw as part of Crystal City SW to Downie rebuild","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:81238","ercot_project":"81238","title":"Zoisite: Construct New 345 kV Station and 345 kV Lines to STP","owner":"AEP TCC","owner_project":"TP2023803","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-30","actual_isd":null,"cm_new":1.6,"cm_rebuilt":0,"from":"STP","to":"Zoisite","county_from":"Matagorda","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Description and In-Service Date Update","description":"Interconnect the HIF load to the new Zoisite 345 kV station and construct two new STP to Zoisite 345 kV lines. Install two (2) capacitor banks.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110383","ercot_project":"110383","title":"Add 210 MVAr cap bank to Sycamore station","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Leon","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110375","ercot_project":"110375","title":"Lane City Pump to Lane City: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":4.5,"from":"Lane City Pump","to":"Lane City","county_from":"Wharton","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Title and Description Update","description":"Rebuild the Lane City Pump to Lane City 138 kV Line for CNP base load","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:55217","ercot_project":"55217","title":"Putnam to Leon: Rebuild 138 kV line","owner":"AEP TNC","owner_project":"1859","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":20.81,"from":"Putnam","to":"Leon","county_from":"Callahan","county_to":"Eastland","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rehab the Putnam to Leon (Oncor) 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/518641237","name":"Putnam Switching Station","coordinates":[-99.19403,32.38369]},{"osm_id":"osm:way/527832006","name":"Leon Switching Station","coordinates":[-98.76882,32.37395]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/20842523","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":29.8,"straight_mi":null},{"id":"ercot-tpit:59394","ercot_project":"59394","title":"Pointer to Rule: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"1867","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":14.78,"from":"Pointer","to":"Rule","county_from":"Haskell","county_to":"Knox","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rehab the Pointer to Rule 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:45566","ercot_project":"45566","title":"Holly to Southside: Upgrade 138 kV Line","owner":"AEP TCC","owner_project":"3747 TP-2019-065","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":1.8,"from":"Holly","to":"Southside","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Upgrade the Holly to Southside 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/203621090","name":"Holly Substation","coordinates":[-97.39735,27.70845]},{"osm_id":"osm:way/252173830","name":"Southside Substation","coordinates":[-97.38347,27.73187]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/252173816","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":1.6,"straight_mi":null},{"id":"ercot-tpit:70891","ercot_project":"70891","title":"Eola Tap: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":11.69,"from":"Eola Tap","to":"Eola","county_from":"Concho","county_to":"Concho","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Rehab Eola Tap 69 kV Line","terminal_match":{"from":"matched","to":"matched"}},{"id":"ercot-tpit:110350","ercot_project":"110350","title":"Tap 2nd Limestone - Gibbons Creek into Yellow Wolf","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Limestone","to":"Gibbons Creek","county_from":"Leon","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:111307","ercot_project":"111307","title":"Resnik: Epand 138 kV Station","owner":"AEP TCC","owner_project":"TP2026170","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Resnik","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Gregory Power Partners (GPP) to the Existing Resnik 138 kV Station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:103419","ercot_project":"103419","title":"Weslaco Switch: 138 kV Breaker Replacement","owner":"AEP TCC","owner_project":"TP2026026","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Weslaco Switch","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Replace 138 kV breakers at the Weslaco Switch 138 kV station"},{"id":"ercot-tpit:103472","ercot_project":"103472","title":"LCRATSC Limmer Muscovy Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":4,"cm_rebuilt":0,"from":"Limmer (LCRA)","to":"Muscovy (ONCOR)","county_from":"Williamson","county_to":"Williamson","tier":"Tier 1","rpg":"25RPG009","rpg_completed":"2026-05-08","bod_reviewed":null,"comments":null,"description":"LCRATSC shall build 50% of two new transmission lines from Limmer to ONCOR Muscovy.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:111116","ercot_project":"111116","title":"Cruce: Expand 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Cruce","to":null,"county_from":"Duval","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the Duval Data Center load to the Cruce 345 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:76696","ercot_project":"76696","title":"Border - Shifting Sands 138 kV Line and add Wink - Shifting Sands 138 kV second circuit","owner":"ONCOR","owner_project":"R8628","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":64.6,"cm_rebuilt":0,"from":"Atchison","to":"Wink","county_from":"Loving","county_to":"Winkler","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L1B and L1C Construct a new Border – Shifting Sands 138 kV Line and Add Wink - Shifting Sands 138-kV second circuit","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:91487","ercot_project":"91487","title":"Austrop - Sim Gideon Transmission Line Upgrade","owner":"LCRATSC","owner_project":"PLC-8100","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":34.65,"from":"Austrop","to":"Sim Gideon","county_from":"Travis","county_to":"Bastrop","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade the Austrop - Sim Gideon 138-kV double-circuit transmission line to achieve a higher operational rating. This line consists of the following transmission circuits. T171 Austrop - Sim Gideon T172 Bastrop City - Sim Gide","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/127245722","name":"Austrop Substation","coordinates":[-97.48729,30.2513]},{"osm_id":"osm:way/127247651","name":"Sim Gideon Station","coordinates":[-97.2688,30.14611]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/173223967","layer":"lines-138"},{"osm_id":"osm:way/146887273","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":15.5,"straight_mi":14.9},{"id":"ercot-tpit:104628","ercot_project":"104628","title":"LCRATSC Joliet Substation Addition","owner":"LCRATSC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Caldwell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new substation to serve load for BBEC. This substation will be located in the south of the city of Lockhart area close to LCRA TSC owned T157 Lockhart - Magnolia Mercer."},{"id":"ercot-tpit:99549","ercot_project":"99549","title":"Long Creek - Sweetwater East 345 kV Double Circuit Line Rebuild","owner":"ONCOR","owner_project":"PB_L24_B","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":84.6,"from":"Sweetwater East","to":"Long Creek","county_from":"Nolan","county_to":"Shackelford","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L24B. Upgrade the existing Long Creek - Mulberry Creek (Oncor) - Sweetwater East 345-kV double-circuit line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/171798857","name":"Sweetwater East Substation","coordinates":[-100.21691,32.46389]},{"osm_id":"osm:way/171742039","name":"Long Creek Substation","coordinates":[-99.54135,32.62922]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/171734089","layer":"lines-345plus"},{"osm_id":"osm:way/171734095","layer":"lines-345plus"},{"osm_id":"osm:way/1537802642","layer":"lines-345plus"},{"osm_id":"osm:way/171734090","layer":"lines-345plus"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":41.7,"straight_mi":41},{"id":"ercot-tpit:103006A","ercot_project":"103006A","title":"CEHE Upgrades as part of TNMP's Galveston Region Project","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0.46,"cm_rebuilt":0,"from":"PH Robinson","to":"TNMP-Hidden Lakes","county_from":"Galveston","county_to":"Galveston","tier":"Tier 3","rpg":"24RPG039","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 138kV PH Robinson to TNMP-Hidden Lakes tie-line.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110185","ercot_project":"110185","title":"Austrop - Sim Gideon Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":17.3,"from":"Austrop","to":"Sim Gideon","county_from":"Travis","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the Austrop - Sim Gideon 138-kV double-circuit transmission line, including lines connecting to Bastrop City and Webberville, to achieve a minimum 560 MVA emergency rating for all lines in series at the Austrop, Webberville, Sim Gid","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/127245722","name":"Austrop Substation","coordinates":[-97.48729,30.2513]},{"osm_id":"osm:way/127247651","name":"Sim Gideon Station","coordinates":[-97.2688,30.14611]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/173223967","layer":"lines-138"},{"osm_id":"osm:way/146887273","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":15.5,"straight_mi":14.9},{"id":"ercot-tpit:103344I","ercot_project":"103344I","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Oasis","to":"WA Parish","county_from":null,"county_to":null,"tier":"Tier 4","rpg":"25RPG028","rpg_completed":"2026-02-06","bod_reviewed":null,"comments":null,"description":"Upgrade Oasis 345kV fault duty to 63KA."},{"id":"ercot-tpit:109648A","ercot_project":"109648A","title":"PH Robinson to Algoa Corner P1056 Hardening (26RPG020)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":9.46,"from":"PH Robinson","to":"Alta Loma","county_from":"Galveston","county_to":"Galveston","tier":"Tier 3","rpg":"26RPG020","rpg_completed":"2026-06-09","bod_reviewed":"2026-06-10","comments":null,"description":"Rebuild/reconductor portions of Ckt.93B PH Robinson to Alta Loma as a Hardening upgrade. Increase PH Robinson Ckt.93B equipment to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109648B","ercot_project":"109648B","title":"PH Robinson to Algoa Corner P1056 Hardening (26RPG020)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0.35,"from":"PH Robinson","to":"Pilgrim","county_from":"Harris","county_to":"Galveston","tier":"Tier 3","rpg":"26RPG020","rpg_completed":"2026-06-09","bod_reviewed":"2026-06-10","comments":null,"description":"Rebuild/reconductor portions of Ckt.06K PH Robinson to Pilgrim as a Hardening upgrade","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109648C","ercot_project":"109648C","title":"PH Robinson to Algoa Corner P1056 Hardening (26RPG020)","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":7.05,"from":"Friendswood","to":"Mustang Bayou","county_from":"Harris","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG020","rpg_completed":"2026-06-09","bod_reviewed":"2026-06-10","comments":null,"description":"Rebuild/reconductor portions of Ckt.04A Friendswood to Mustang Bayou as a Hardening upgrade","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/336628609","name":"Friendswood Substation","coordinates":[-95.15338,29.52266]},{"osm_id":"osm:way/338305192","name":"Mustang Bayou Substation","coordinates":[-95.20371,29.36273]}],"endpoint_method":"name + voltage + county","link_note":"more than one mapped corridor of similar length; no segment linked"},{"id":"ercot-tpit:109743","ercot_project":"109743","title":"Mulberry Creek: Expand 345 kV Station","owner":"AEP TNC","owner_project":"TP2026091","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":2.5,"cm_rebuilt":0,"from":"Mulberry Creek","to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the Lancium load to the Mulberry Creek 345 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:110324","ercot_project":"110324","title":"Add new CTT Sycamore 345 kV station","owner":"CTT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Leon","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99122","ercot_project":"99122","title":"Drill Hole 765/345 kV Autotransformer #1","owner":"ONCOR","owner_project":"PB_765_Import1_C","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Drill Hole","to":"Drill Hole","county_from":"Culberson","county_to":"Culberson","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_1C. Establish the Drill Hole 765/345 kV Switch with one 765/345 kV autotransformer"},{"id":"ercot-tpit:99124","ercot_project":"99124","title":"Longshore 765/345 kV Autotransformer #1","owner":"ONCOR","owner_project":"PB_765_Import1_B","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Longshore","to":"Longshore","county_from":"Howard","county_to":"Howard","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_1B. Establish the Longshore 765/345 kV Switch with one 765/345 kV autotransformer"},{"id":"ercot-tpit:103344B","ercot_project":"103344B","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"PH Robinson","to":"Meadow","county_from":"Galveston","county_to":"Brazoria","tier":"Tier 4","rpg":"25RPG028","rpg_completed":"2026-02-06","bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits."},{"id":"ercot-tpit:99126","ercot_project":"99126","title":"Drill Hole - Longshore 765 kV Line","owner":"ONCOR","owner_project":"PB_765_Import1_E","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":184.8,"cm_rebuilt":0,"from":"Drill Hole","to":"Longshore","county_from":"Culberson","county_to":"Howard","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_1E. Add a new Longshore – Drill Hole 765-kV single-circuit line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:103344D","ercot_project":"103344D","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Meadow","to":"Oasis","county_from":null,"county_to":null,"tier":"Tier 4","rpg":"25RPG028","rpg_completed":"2026-02-06","bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.99E Meadow to Oasis to increase thermal limits."},{"id":"ercot-tpit:87092","ercot_project":"87092","title":"Arcadia to Southside: Upgrade 138 kV Line","owner":"AEP TCC","owner_project":"3747 TP-2019-065","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.59,"from":"Arcadia","to":"Southside","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Upgrade the Arcadia to Southside 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/371318816","name":"Arcadia Substation","coordinates":[-97.42169,27.74575]},{"osm_id":"osm:way/252173830","name":"Southside Substation","coordinates":[-97.38347,27.73187]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/488508082","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":2.7,"straight_mi":null},{"id":"ercot-tpit:103344F","ercot_project":"103344F","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Oasis","to":"WA Parish","county_from":null,"county_to":null,"tier":"Tier 4","rpg":"25RPG028","rpg_completed":"2026-02-06","bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.18C Oasis to WA Parish to increase thermal limits."},{"id":"ercot-tpit:100281","ercot_project":"100281","title":"Benedum_Autotransformer_Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Benedum","to":null,"county_from":"Upton","county_to":"Upton","tier":"Tier 3","rpg":"24RPG024","rpg_completed":"2025-01-01","bod_reviewed":null,"comments":null,"description":"Benedum Substation will be cut-in to the PUCT-approved Bearkat to North McCamey 345-kV transmission line and two 345/138-kV autotransformers will be installed at Benedum Substation"},{"id":"ercot-tpit:103344H","ercot_project":"103344H","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Oasis","to":"WA Parish","county_from":null,"county_to":null,"tier":"Tier 4","rpg":"25RPG028","rpg_completed":"2026-02-06","bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.99B Oasis to WA Parish to increase thermal limits."},{"id":"ercot-tpit:81783","ercot_project":"81783","title":"Ingleside to Seabird: Construct New 138 kV Line","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-12-31","actual_isd":null,"cm_new":2.9,"cm_rebuilt":0,"from":"Ingleside","to":"Seabird","county_from":"San Patricio","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect the Mu load to the new Seabird 138 kV station on the Homeport to Ingleside 138 kV line, construct a new 138 kV line from Ingleside to Seabird, and add capacitors","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:81659","ercot_project":"81659","title":"Lytle: Construct New 138 kV Terminal","owner":"AEP TCC/ETT","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lytle","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect the Cinco II load to the existing Lytle 138 kV station and add capacitors"},{"id":"ercot-tpit:98599","ercot_project":"98599","title":"Bluff Creek to Mulberry Creek: Rebuild 345 kV Line as a Double Circuit","owner":"AEP TNC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":26.9,"cm_rebuilt":0,"from":"Bluff Creek","to":"Mulberry Creek","county_from":"Taylor","county_to":"Jones","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"Tier, RPG number and Review Date Update","description":"Rebuild existing 345 kV line from Bluff Creek to Mulberry Creek as a double circuit line","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:71004B","ercot_project":"71004B","title":"Julia CEHE-Owned Sub for Melaza Solar (21INR0220)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"In-Service","status":"In service","projected_isd":"2028-12-31","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"Julia","to":"MALEZA","county_from":"Wharton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Julia (JUL) CEHE substation to MALEZA/Maleza Solar"},{"id":"ercot-tpit:103006B","ercot_project":"103006B","title":"CEHE Upgrades as part of TNMP's Galveston Region Project","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Meadow","to":null,"county_from":"Brazoria","county_to":null,"tier":"Tier 3","rpg":"24RPG039","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Meadow Auto A1 to increase thermal limits."},{"id":"ercot-tpit:51001","ercot_project":"51001","title":"Friess Ranch to Sonora: Rebuild 69 kV line","owner":"AEP TNC/AEP TCC","owner_project":"2791","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":24.3,"from":"Friess Ranch","to":"Sonora","county_from":"Sutton","county_to":"Sutton","tier":"Tier 3","rpg":"19RPG018","rpg_completed":"2019-11-18","bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rehab Rocksprings to Sonora 69 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/424593423","name":"Friess Ranch Substation","coordinates":[-100.51392,30.40037]},{"osm_id":"osm:way/345127797","name":"Sonora Substation","coordinates":[-100.65576,30.56765]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/345127785","layer":"lines-69"},{"osm_id":"osm:way/1497495264","layer":"lines-69"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":16.5,"straight_mi":14.3},{"id":"ercot-tpit:110449","ercot_project":"110449","title":"STEC Ammonia Plant Load Project Phase 3","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":23.5,"from":"Formosa,Tungsten","to":"Joslin,Dupont","county_from":"Victoria","county_to":"Victoria","tier":"Tier 1","rpg":"25RPG012","rpg_completed":"2026-01-13","bod_reviewed":null,"comments":null,"description":"-Rebuild the existing Formosa to Joslin 138-kV transmission line with normal and emergency ratings of at least 485 MVA, approximately 2.41-mile -Rebuild the existing Tungsten to Vistron to Black Bayou to Big Three to Dupont 138-kV transmiss","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:49564","ercot_project":"49564","title":"Mantle: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"3774 TP2018166","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mantle","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Mantle: Construct New 345 kV Station"},{"id":"ercot-tpit:111193","ercot_project":"111193","title":"LCRATSC Webberville Power Transformer Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Webberville","to":null,"county_from":"Travis","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will improve reliability at the Webberville Substation by installing a second power transformer. New circuit breakers and switches shall meet LCRA TSC minimum 138-kV design standards."},{"id":"ercot-tpit:80330","ercot_project":"80330","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-05","actual_isd":null,"cm_new":0,"cm_rebuilt":7.45,"from":"DWU Southside","to":"McCree","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:80334","ercot_project":"80334","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-05","actual_isd":null,"cm_new":0,"cm_rebuilt":4.9,"from":"CONCORD","to":"WILDCAT TAP","county_from":"Johnson","county_to":"Johnson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:100702","ercot_project":"100702","title":"Install a 28.57MVAr Capacitor Bank at Tallly Rd Substation","owner":"CPS/NO","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5422","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99726","ercot_project":"99726","title":"Dulce: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2025344","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Dulce","to":null,"county_from":"Victoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Interconnect Iguala Solar to the new Dulce 345 kV station on the Static to STP 345 kV line"},{"id":"ercot-tpit:49556","ercot_project":"49556","title":"Ozona: Rebuild 69 kV station","owner":"AEP TNC","owner_project":"2780","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ozona","to":null,"county_from":"Crockett","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Replace existing Ozona 69 kV station with a new 69 kV ring bus"},{"id":"ercot-tpit:109933","ercot_project":"109933","title":"Install new 345kV transmission loop in conjunction with S-0996 Nockenut switchyard and 1st structure outside new switchyard for Point of Interconnect (POI)","owner":"CPS/NO","owner_project":"T-0337","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5326","to":"51335380","county_from":"Guadalupe","county_to":"Wilson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109739","ercot_project":"109739","title":"Donatello: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2026135","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Donatello","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the Mirando Valley Wind and the Viento Bravo Wind to the new Donatello 345 kV station on the Cenizo to Cruze 345 kV line"},{"id":"ercot-tpit:72999","ercot_project":"72999","title":"Haskell to Munday: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":21.71,"from":"Haskell","to":"Munday","county_from":"Haskell","county_to":"Knox","tier":"Tier 4","rpg":"22RPG043","rpg_completed":"2023-01-11","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rehab Haskell to Munday 69 kV Line","terminal_match":{"from":"ambiguous","to":"ambiguous"}},{"id":"ercot-tpit:73116","ercot_project":"73116","title":"Install new Cedar Port Mobile (CDM) 138kV Distribution Substation","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Port Mobile","to":"Trinity","county_from":"Chambers","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new Cedar Port Mobile (CDM) 138kV Distribution Substation. Loop from existing Ckt.03B to create new Ckt.03B Trinity Bay to Cedar Port Mobile to KENNY tap."},{"id":"ercot-tpit:103412","ercot_project":"103412","title":"Brownsville SW: 69 kV Breaker Replacement","owner":"AEP TCC","owner_project":"TP2025939","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Brownsville SW","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Replace 69 kV breakers at the Brownsville 69 kV station"},{"id":"ercot-tpit:99207","ercot_project":"99207","title":"25RPG020 CPS Energy Large Load Additions Project: Rebuild Cagnon to VLSI transmission line","owner":"CPS/NO","owner_project":"T-0397","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":8.74,"from":"5055","to":"5467","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG020","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild (8.7 miles) Cagnon to VLSI transmission line to at least 478MVA","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:103962","ercot_project":"103962","title":"Wesmer: 138 kV Breaker and Circuit Switcher Replacement","owner":"AEP TCC","owner_project":"TP2025940","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Wesmer","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Replace 138 kV breakers and circuit switches at the Wesmer 138 kV station"},{"id":"ercot-tpit:110943B","ercot_project":"110943B","title":"Cooke County Resiliency Project","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-02-01","actual_isd":null,"cm_new":null,"cm_rebuilt":7.5,"from":null,"to":null,"county_from":"Cooke","county_to":"Cooke","tier":"Tier 2","rpg":"26RPG007","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Sivells Bend Tap to Sivell’s bend transmission line","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:111302","ercot_project":"111302","title":"Harligen SW: Expand 138 kV Station","owner":"AEP TCC","owner_project":"TP2026149","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-02-28","actual_isd":null,"cm_new":0.5,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the Power Proof Properties load to the existing Harligen SW 138 kV station","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:111350","ercot_project":"111350","title":"Specter: Construct New Switch Station","owner":"AEP TNC","owner_project":"TP2026164","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Specter","to":null,"county_from":"Callahan","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect TEC's Rainey substation to the new Specter 138 kV switch station on the Abilene Plant to Putnam 138 kV line"},{"id":"ercot-tpit:110419","ercot_project":"110419","title":"Cesium: Install New 345 kV Capacitor Bank","owner":"AEP TNC/ETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cascabel","to":null,"county_from":"Fisher","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Transmission Owner and Reactive Capability Update","description":"Install a new capacitor bank at the Cesium 345 kV station"},{"id":"ercot-tpit:111248","ercot_project":"111248","title":"Elmdale: Install capacitor bank","owner":"ETT","owner_project":"TP2026164","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Elmdale","to":null,"county_from":"Callahan","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install a new capacitor bank at the Elmdale 69 kV station"},{"id":"ercot-tpit:72502","ercot_project":"72502","title":"Tarpley Substation Upgrade","owner":"BEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-02-28","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Tarpley","to":null,"county_from":"Bandera","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Provide transmission point of interconnection to Battery energy storage system near the Tarpley Substation. Add a 138kV bay and associated circuit breaker to existing substation (25INR0196)","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:91903","ercot_project":"91903","title":"Iowa: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Iowa","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Construct new distribution station on the Bates to Liston 138 kV line"},{"id":"ercot-tpit:99629","ercot_project":"99629","title":"BEPC_TPIT_HAMILTONGTC_GUSTINETOINDIANGAP","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":12.8,"from":"Gustine","to":"Indian Gap","county_from":"Comanche","county_to":"Hamilton","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/508017142","name":"Gustine Substation","coordinates":[-98.34432,31.81803]},{"osm_id":"osm:way/508017139","name":"Indian Gap Substation","coordinates":[-98.419,31.66249]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/20931723","layer":"lines-69"},{"osm_id":"osm:way/20796506","layer":"lines-69"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":11.7,"straight_mi":11.6},{"id":"ercot-tpit:91483","ercot_project":"91483","title":"RCEC_Watkins_Station","owner":"RCEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":19,"from":null,"to":null,"county_from":"Van Zandt","county_to":"Van Zandt","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New REC station cutting into Ray Raymond to Explorer line and new 12.35 mile from new REC station to Watkins","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:109724","ercot_project":"109724","title":"Wadsworth: Retire Station","owner":"AEP TCC","owner_project":"DP26X0012","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Plotner","to":null,"county_from":"Matagorda","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Retire the Wadsworth station"},{"id":"ercot-tpit:109958","ercot_project":"109958","title":"Install a new 138kV transmission loop and switchyard to connect new Moonstone Solar PV Generation","owner":"CPS/NO","owner_project":"T-0414","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5313","to":"5132, 5155","county_from":"Wilson","county_to":"Wilson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99639","ercot_project":"99639","title":"BEPC_TPIT_HAMILTONGTC_PancakeSyrup","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pancake","to":"Pancake","county_from":"Coryell","county_to":"Coryell","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99652","ercot_project":"99652","title":"BEPC_TPIT_HAMILTONGTC_Energize_Odell","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-22","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hasse","to":"Odell","county_from":"Comanche","county_to":"Comanche","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99674","ercot_project":"99674","title":"BEPC_TPIT_HAMILTONGTC_Energize_IndianGap","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-29","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Odell","to":"Indian Gap","county_from":"Comanche","county_to":"Hamilton","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:77031","ercot_project":"77031","title":"Las Lomas: Construct New Distribution Station","owner":"AEP TCC","owner_project":"DP24X0003","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Las Lomas","to":null,"county_from":"Starr","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct new distribution station on the La Grulla to Rio Grande City 138 kV line"},{"id":"ercot-tpit:70630","ercot_project":"70630","title":"Ballinger to Santa Anna: Rebuild 69 kV line","owner":"AEP TNC","owner_project":"TA2021193","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ballinger","to":"Santa Anna","county_from":"Runnels","county_to":"Coleman","tier":"Tier 3","rpg":"22RPG028","rpg_completed":"2022-09-01","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rebuild 69 kV line and rebuild taps on the Ballinger to Santa Anna 69 kV line."},{"id":"ercot-tpit:49550","ercot_project":"49550","title":"Port Isabel: Rebuild As GIS Station","owner":"AEP TCC","owner_project":"3716","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Port Isabel","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rebuild Port Isabel as a GIS"},{"id":"ercot-tpit:104630","ercot_project":"104630","title":"Colmena: Construct new 345 kV Station","owner":"AEP TCC","owner_project":"TP2026011","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Colmena","to":null,"county_from":"Bee","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect Abeja Solar to the new Colmena 345 kV Station on the Tango to Goddard 345 kV line"},{"id":"ercot-tpit:109767","ercot_project":"109767","title":"North Laredo: Expand 345 kV Station","owner":"AEP TCC","owner_project":"TP2026106","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-31","actual_isd":null,"cm_new":4.5,"cm_rebuilt":0,"from":"North Laredo","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the Regis Sumlin load to the existing North Laredo 345 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:109765","ercot_project":"109765","title":"Goddard: Expand 345 kV Station","owner":"AEP TCC","owner_project":"TP2026107","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Goddard","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the FrontierGen Load to the existing Goddard 345 kV station"},{"id":"ercot-tpit:109763","ercot_project":"109763","title":"Smoky Hill: Expand 345 kV Station","owner":"ETT","owner_project":"TP2026103","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Smoky Hill","to":null,"county_from":"Haskell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect the Crusoe Haskell II load to the Smoky Hill 345 kV station"},{"id":"ercot-tpit:109733","ercot_project":"109733","title":"Plotner: Construct New Distribution Station","owner":"AEP TCC","owner_project":"DP26X0012","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-03-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Plotner","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Construct new distribution station on the Wadsworth to Celanese 138 kV line"},{"id":"ercot-tpit:102667","ercot_project":"102667","title":"BEPC_TPIT102667_Bream","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-02","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Robertson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99679","ercot_project":"99679","title":"BEPC_TPIT_HAMILTONGTC_Energize_Waring","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-05","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Indian Gap","to":"Waring","county_from":"Hamilton","county_to":"Comanche","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99683","ercot_project":"99683","title":"BEPC_TPIT_HAMILTONGTC_Energize_Gustine","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-12","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Odell","to":"Gustine","county_from":"Comanche","county_to":"Comanche","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99689","ercot_project":"99689","title":"BEPC_TPIT_HAMILTONGTC_Energize_Resley","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-19","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gustine","to":"Resley","county_from":"Comanche","county_to":"Comanche","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99691","ercot_project":"99691","title":"BEPC_TPIT_HAMILTONGTC_Energize_Potsville","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-26","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Resley","to":"Potsville","county_from":"Comanche","county_to":"Hamilton","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104082","ercot_project":"104082","title":"Alice to Falfurrias: Convert to 138 kV","owner":"AEP TCC","owner_project":"TP2026020","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Alice","to":"Falfurrias","county_from":"Jim Wells","county_to":"Brooks","tier":"Tier 3","rpg":"25RPG045","rpg_completed":"2026-01-07","bod_reviewed":null,"comments":"NEW","description":"Convert Alice to Falfurrias to 138 Kv opertions and Build Alice, North Ella, and Premont to 138 kV standard"},{"id":"ercot-tpit:104388","ercot_project":"104388","title":"Government Wells: Capacitor Bank Installation","owner":"AEP TCC","owner_project":"TP2026024","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Government Wells","to":null,"county_from":"Duval","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-01-09","bod_reviewed":"2026-01-12","comments":null,"description":"Install Capacitor Bank at the Government Wells 69 kV station (Alice Area Upgrades)"},{"id":"ercot-tpit:109601","ercot_project":"109601","title":"Expand Mykawa 138kV substation and install one generator lead for new interconnection to Megamouth Energy Storage (26INR0341).","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mykawa","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:105912","ercot_project":"105912","title":"Ciruela: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2026093","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ciruela","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect the Panther load to the new Ciruela 345 kV station on the Bonilla to Rio Hondo 345 kV line"},{"id":"ercot-tpit:93226","ercot_project":"93226","title":"Fort Stockton Switch: Expand 345 kV Station","owner":"AEP TNC","owner_project":"TP2025141","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fort Stockton Switch","to":null,"county_from":"Pecos","county_to":null,"tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"Company Contact, RPG Number and BOD Review date Update","description":"Install three 345/138 kV autotransformers at the Fort Stockton Switch 345/138 kV station"},{"id":"ercot-tpit:109735","ercot_project":"109735","title":"Jacaranda: Construct New 345 kV Station","owner":"AEP TNC","owner_project":"TP2026088","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-30","actual_isd":null,"cm_new":3,"cm_rebuilt":0,"from":"Jacaranda","to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect the Lancium load to the new Jacaranda 345 kV station and install two autotransformers","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:109737","ercot_project":"109737","title":"Jacaranda to Mulberry Creek: Construct two new 345 kV lines","owner":"AEP TNC","owner_project":"TP2026088","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-30","actual_isd":null,"cm_new":6,"cm_rebuilt":0,"from":"Jacaranda","to":"Mulberry Creek","county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct two new 345 kV lines between Jacaranda and Mulberry Creek","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104390","ercot_project":"104390","title":"Stadium: Capacitor Bank Installation","owner":"AEP TCC","owner_project":"TP2026024","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Stadium","to":null,"county_from":"Jim Wells","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-01-09","bod_reviewed":"2026-01-12","comments":null,"description":"Install Capacitor Bank at the Stadium 69 kV station (Alice Area Upgrades)"},{"id":"ercot-tpit:111346","ercot_project":"111346","title":"Jacaranda to Paulownia (Oncor): Construct two new 345 kV lines","owner":"AEP TNC","owner_project":"TP2026088","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-04-30","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"Jacaranda","to":"Paulownia","county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct two new 345 kV lines between Jacaranda and Paulownia (Oncor)","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110425","ercot_project":"110425","title":"San Angelo Red Creek to San Angelo Paulann: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":6.4,"from":"SA Red Creek","to":"SA Paulann","county_from":"Tom Green","county_to":"Tom Green","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Rebuild the SA Red Creek to SA Paulann 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110084F","ercot_project":"110084F","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Raider","to":null,"county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add additional Capacitor to nearby Raider substation."},{"id":"ercot-tpit:110753","ercot_project":"110753","title":"Related_WylieSW_LCP_Upgrades_Nevada_WylieSW_Line","owner":"GPL","owner_project":"0","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.71,"from":"Nevada","to":"WylieSW","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Related_WylieSW_LCP_Upgrades_Nevada_WylieSW_Line","duplicate_listing":true,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110753","ercot_project":"110753","title":"Related_WylieSW_LCP_Upgrades_Nevada_WylieSW_Line","owner":"GPL","owner_project":"0","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.71,"from":"Nevada","to":"WylieSW","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Related_WylieSW_LCP_Upgrades_Nevada_WylieSW_Line","duplicate_listing":true,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110870","ercot_project":"110870","title":"STEC_110870_MesquiteLargeLoadProjectPhase2","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install up to 250 MVAR of dynamic reactive support at 91302 RODG_EDW POI 138-kV Substation Install up to 250 MVAR of dynamic reactive support at 5727 PAWNEESUB8 138-kV Substation"},{"id":"ercot-tpit:110581","ercot_project":"110581","title":"STEC Palangana Large Load Addition Phase 1","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install up to 250 MVAR of dynamic reactive support at 91302 RODG_EDW POI 138-kV Substation Install up to 250 MVAR of dynamic reactive support at 5727 PAWNEESUB8 138-kV Substation"},{"id":"ercot-tpit:99693","ercot_project":"99693","title":"BEPC_TPIT_HAMILTONGTC_Energize_HamiltonSyrup","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-03","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Potsville","to":"Syrup","county_from":"Hamilton","county_to":"Cooke","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99718","ercot_project":"99718","title":"BEPC_TPIT_HAMILTONGTC_Energize_Gatesville","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-10","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Syrup","to":"Gatesville","county_from":"Coryell","county_to":"Coryell","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:111644","ercot_project":"111644","title":"GVEC FM725 Substation Addition","owner":"GVEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"McQueeney","to":"Schumansville","county_from":"Guadalupe","county_to":"Guadalupe","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"GVEC is adding a new 138 kV substation 2.5 Miles Northwest of the McQueeney Substation, cutting into T498, to serve a 40 MVA load added to the area."},{"id":"ercot-tpit:4270","ercot_project":"4270","title":"Handley - Hemphill 138 kV Line","owner":"ONCOR","owner_project":"M5214","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":7.4,"from":"Handley","to":"Hemphill","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Deferral","description":"Upgrade existing line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:73570","ercot_project":"73570","title":"Steger Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Steger","to":null,"county_from":"Travis","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Substation addition to provide Point of Interconnection for Oncor New Sweden substation addition."},{"id":"ercot-tpit:73567","ercot_project":"73567","title":"Berry Creek Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Berry Creek","to":null,"county_from":"Williamson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Substation addition to provide Point of Interconnection for Oncor Andice substation addition."},{"id":"ercot-tpit:66023","ercot_project":"66023","title":"T340 T-Line Upgrade","owner":"NBU","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.8,"from":"Marion","to":"Sheriff's Posse","county_from":"Guadalupe","county_to":"Comal","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Contracting has taken longer than originally expected.","description":"Upgrading the Marion to Sheriff's Posse Transmission Line T340 from 795 ACSR to 959 ACSS conductor. Upgrades to conductor and structures are included. Structures designed for ultimate build-out of double-circuit bundled 959 ACSS in preparat","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174246028","name":"Marion Substation","coordinates":[-98.14876,29.62083]},{"osm_id":"osm:way/190594587","name":"Sheriff's Posse Substation","coordinates":[-98.16259,29.66468]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/339339032","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":3,"straight_mi":null},{"id":"ercot-tpit:81551","ercot_project":"81551","title":"Dos Rios 138 kV Switch","owner":"ONCOR","owner_project":"R6231","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Dos Rios Switch","to":"Dos Rios Switch","county_from":"Milam","county_to":"Milam","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Dos Rios 138 kV Switch"},{"id":"ercot-tpit:92854","ercot_project":"92854","title":"Carrollton East Switch-Carrollton Tarpley Rd 138 kV Double-Circuit Line Section","owner":"ONCOR","owner_project":"M4246","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Carrollton East","to":"Carrollton Tarpley Road","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Carrollton East Switch-Carrollton Tarpley Rd 138 kV Double-Circuit Line Section"},{"id":"ercot-tpit:93306","ercot_project":"93306","title":"Bastrop_Mesquite_Utley_Transmission_Line_Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"7320","to":"7317","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Provide looped transmission service for BBEC-member load at 138-kV Utley Substation"},{"id":"ercot-tpit:99243","ercot_project":"99243","title":"Big Spring - Signal Mountain 69 kV Conversion to 138 kV","owner":"ONCOR","owner_project":"PB_L20_E_F","kv":null,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":8.7,"from":"Big Spring","to":"Prong Moss","county_from":"Howard","county_to":"Howard","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L20E and L20F. Convert the existing Big Spring - Signal Mountain 69-kV line to 138-kV. Connect Signal Mountain to Prong Moss."},{"id":"ercot-tpit:99417","ercot_project":"99417","title":"Establish Lamesa 345/138 kV Switch","owner":"ONCOR","owner_project":"R8800","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lamesa","to":"Lamesa","county_from":"Dawson","county_to":"Dawson","tier":"Tier 1","rpg":"24RPG015","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct Lamesa 345/138 kV Switch approved as part of 24RPG015"},{"id":"ercot-tpit:99419","ercot_project":"99419","title":"Lamesa - Faraday 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R8792","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":154,"cm_rebuilt":0,"from":"Lamesa","to":"Faraday","county_from":"Dawson","county_to":"Borden","tier":"Tier 1","rpg":"24RPG015","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Oncor and WETT joint project to construct the Lamesa (Oncor) - Faraday (WETT) 345 kV DCKT Line approved as part of 24RPG015","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99524","ercot_project":"99524","title":"Upgrading line","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade conductor to 1xSuwannee"},{"id":"ercot-tpit:99823","ercot_project":"99823","title":"LCRATSC_Flatonia-Luling_Transmission_Line_Conversion","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"7248 Flatonia","to":"7224 Luling","county_from":"Fayette","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade terminal facilities at Luling, Harwood, Bluestem, Thompsonville, Waelder, and Flatonia substations along the Flatonia - Luling 69-kV transmission line to operate at 138-kV."},{"id":"ercot-tpit:99831","ercot_project":"99831","title":"LCRATSC_Cedar_Hill_Manor_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":8.2,"from":"7330 Manor","to":"7331 Cedar Hill","county_from":"Travis","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T495 Cedar Hill - Manor 138-kV transmission line to achieve a higher operational rating.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/462642540","name":"Manor Substation","coordinates":[-97.50927,30.34948]},{"osm_id":"osm:way/173171878","name":"Cedar Hill Substation","coordinates":[-97.37942,30.31398]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/859847709","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":8.1,"straight_mi":null},{"id":"ercot-tpit:99913","ercot_project":"99913","title":"Eagle Lake - El Campo Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 38.2 mile T548 Eagle Lake - El Campo (including all tap lines) 69-kV transmission line. Per LCRA TSC Transmission System Planning procedure, replacement structures will be capable of operating at 138-kV."},{"id":"ercot-tpit:99922","ercot_project":"99922","title":"Green Valley Substation Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Guadalupe","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Provide a transmission point of interconnection at the new Green Valley Substation. A new GVEC customer has requested 500 MW of load on LCRA TSC-owned 345-kV double-circuit line, T248 Marion -Zorn and T419 Clear Springs - Marion."},{"id":"ercot-tpit:99928","ercot_project":"99928","title":"Three Lakes Substation Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Caldwell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Provide a transmission point of interconnection at the new Three Lakes Substation. A new PEC customer has requested 800 MW of load on LCRA TSC-owned 345-kV T775 John Dumas - Hornsby"},{"id":"ercot-tpit:81296B","ercot_project":"81296B","title":"Prong Moss – Rockhound 345 kV Line Rebuild","owner":"ONCOR","owner_project":"R3025","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":60.2,"from":"Prong Moss","to":"Rockhound","county_from":"Midland","county_to":"Howard","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Prong Moss – Rockhound 345 kV Second Circuit Addition","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:103301","ercot_project":"103301","title":"LCRATSC Paige - Sim Gideon Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9.8,"from":"Gideon","to":"Paige","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will perform an overhaul on the 9.8-mile T151 Paige - Sim Gideon 138-kV transmission line and upgrade the line to achieve a higher operational rating.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:103835","ercot_project":"103835","title":"LCRATSC Brenham North - Highway 36 Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9.1,"from":"Brenham North","to":"Highway 36","county_from":"Washington","county_to":"Washington","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 9.1 mile T215 Brenham North - Highway 36 138-kV transmission line.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/99881513","name":"Brenham North Substation","coordinates":[-96.38176,30.18182]},{"osm_id":"osm:way/97843772","name":"Highway 36 Substation","coordinates":[-96.3738,30.12262]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:104639","ercot_project":"104639","title":"LCRA TSC Lytton Springs - Zorn Transmission Line Upgrade","owner":"LCRATSC","owner_project":"PLC-8063, PLC-8139, PLC-8140","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":46.2,"from":"9074","to":"7042","county_from":"Caldwell","county_to":"Guadalupe","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade the Austrop - Zorn 345-kV double-circuit transmission line to achieve a higher operational rating. Coordinating PMCRs include 91312, 104635, and 104639.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:105749","ercot_project":"105749","title":"Goatpad 138kV Switch","owner":"ONCOR","owner_project":"M4525","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Goatpad","to":"Goatpad","county_from":"Ellis","county_to":"Ellis","tier":"Tier 1","rpg":"25RPG004","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Goatpad 138kV Switch","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:105833","ercot_project":"105833","title":"Alba Road 345kV Statcom","owner":"ONCOR","owner_project":"M4386","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Alba Switch","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Alba Road 345kV Statcom","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:105836","ercot_project":"105836","title":"Greene 345kV STATCOM","owner":"ONCOR","owner_project":"M4387","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Greene","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Greene 345kV STATCOM","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:99318","ercot_project":"99318","title":"Mascho - Lamesa 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R8792","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mascho 345 kV Switch","to":"Lamesa 345 kV Switch","county_from":"Andrews","county_to":"Dawson","tier":"Tier 1","rpg":"24RPG015","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct Mascho - Lamesa 345 kV DCKT Line approved as part of 24RPG015"},{"id":"ercot-tpit:109749","ercot_project":"109749","title":"Settlers Autotransformer Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Settlers","to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 345-kV yard adjacent to the existing 138-kV Settlers Substation and cut-in to the Austrop - Lost Pines 345-kV double-circuit transmission line (owned by Austin Energy). LCRA TSC will install two 345/138-kV autotransformers a"},{"id":"ercot-tpit:109786","ercot_project":"109786","title":"LCRATSC Sim Gideon Substation Upgrade","owner":"LCRATSC","owner_project":"PLC-8317","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sim Gideon","to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"The upgrade of the Sim Gideon Substation to increase its current-carrying capability and improve overall system reliability."},{"id":"ercot-tpit:109790","ercot_project":"109790","title":"LCRATSC Gabriel Rivery Transmission Line Upgrade","owner":"LCRATSC","owner_project":"PLC-8540","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":2.44,"from":"Gabriel","to":"Rivery","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":"25RPG009","rpg_completed":"2026-08-19","bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T457 Gabriel - Rivery 138-kV transmission line to achieve a higher operational rating. The need for this project with identified by ERCOT in the EIR for RPG 25RPG009.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/122981720","name":"Gabriel Substation","coordinates":[-97.66087,30.66727]},{"osm_id":"osm:way/339937464","name":"Rivery Substation","coordinates":[-97.68965,30.6485]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/339937449","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":1.9,"straight_mi":null},{"id":"ercot-tpit:110010","ercot_project":"110010","title":"Rebuild the Revolution Switch - Ash Creek Switch 138 kV Line","owner":"ONCOR","owner_project":"R6415","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":32.4,"from":"Revolution Switch","to":"Ash Creek Switch","county_from":"Hill","county_to":"Navarro","tier":"Tier 1","rpg":"25RPG041, 25RPG043","rpg_completed":"2026-08-19","bod_reviewed":null,"comments":null,"description":"Rebuild the Revolution Switch - Ash Creek Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110018A","ercot_project":"110018A","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R6532","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":8.8,"from":"Temple","to":"Temple Pecan Creek","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"25RPG009","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Temple - Temple Pecan Creek 345 kV Lines","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/172709714","name":"Temple Switching Station","coordinates":[-97.3078,31.07902]},{"osm_id":"osm:way/172709713","name":"Temple Pecan Creek Substation","coordinates":[-97.26106,31.12964]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/172709730","layer":"lines-345plus"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":3.9,"straight_mi":null},{"id":"ercot-tpit:110030","ercot_project":"110030","title":"Establish Lorraine 345 kV Switch","owner":"ONCOR","owner_project":"R6541","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0.6,"cm_rebuilt":0,"from":"Lorraine","to":"Lorraine","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Lorraine 345 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110018B","ercot_project":"110018B","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R6532","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":8.8,"from":"Temple","to":"Temple Pecan Creek","county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG009","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Temple - Temple Pecan Creek 138 kV Lines","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:111240","ercot_project":"111240","title":"LCRATSC Crosswinds Goforth Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3.14,"from":"Crosswinds","to":"Goforth","county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 3 mile T661 Crosswinds - Goforth 138kV transmission line.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:111242","ercot_project":"111242","title":"LCRATSC Crosswinds Turnersville Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3.69,"from":"Crosswinds","to":"Turnersville","county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 3.8 mile T272 Crosswinds - Turnersville transmission line.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:111245A","ercot_project":"111245A","title":"Gillespie - Fredericksburg - Goehmann Lane - Kendall Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":14.6,"from":"Gillespie","to":"Goehmann Lane","county_from":"Gillespie","county_to":"Gillespie","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:111280","ercot_project":"111280","title":"Chappell Hill - Waller Transmission Line Overhaul","owner":"LCRATSC","owner_project":"PLC-8346","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":15.93,"from":"Chappell Hill","to":"Waller","county_from":"Washington","county_to":"Waller","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 16 mile T232 Chappell Hill - Waller transmission line replacing conductor with single-Suwannee.","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:111282","ercot_project":"111282","title":"Hunt - Turtle Creek Transmission Line Storm Hardening","owner":"LCRATSC","owner_project":"PLC-8473","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":12.8643,"from":"Hunt","to":"Turtle Creek","county_from":"Kerr","county_to":"Kerr","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will replace the conductor between Hunt and Turtle Creek as part of an effort to rebuild and storm harden the circuit resulting in greater durability and reliability of assets in the area.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/339059838","name":"Hunt Substation","coordinates":[-99.33602,30.07613]},{"osm_id":"osm:way/339059836","name":"Turtle Creek Substation","coordinates":[-99.20726,29.96892]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/339059837","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":12.9,"straight_mi":null},{"id":"ercot-tpit:111372","ercot_project":"111372","title":"LCRATSC Cedar Hill Power Transformer Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Hill","to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This project will add a second power transformer (T2) to Cedar Hill substation."},{"id":"ercot-tpit:111378","ercot_project":"111378","title":"LCRATSC Giddings Winchester Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Giddings","to":"Winchester","county_from":"Lee","county_to":"Fayette","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This project performs an overhaul on the T222 Giddings - Winchester 138-kV transmission line."},{"id":"ercot-tpit:111702","ercot_project":"111702","title":"Sunrise 138 kV Switch","owner":"ONCOR","owner_project":"M5018","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":1.4,"cm_rebuilt":0,"from":"Sunrise Switch","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Sunrise 138 kV Switch","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:100136","ercot_project":"100136","title":"WETT project to loop Faraday station in the existing Long Draw to Scurry 345 kV double circuit transmission line approved as part of 24RPG015.","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Faraday","to":"Faraday","county_from":"Borden","county_to":"Borden","tier":"Tier 1","rpg":"24RPG015","rpg_completed":"2024-05-28","bod_reviewed":"2025-05-16","comments":null,"description":null},{"id":"ercot-tpit:111533","ercot_project":"111533","title":"NBU Comal Substation Breaker and a Half Upgrade","owner":"NBU","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Comal","to":"Loop 337","county_from":"Comal","county_to":"Comal","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"In conjunction with LCRA's Breaker and a Half upgrade at Comal Substation, NBU will upgrade the T335 line terminal and three transformer terminals."},{"id":"ercot-tpit:110172","ercot_project":"110172","title":"Sim Gideon Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sim Gideon","to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade terminal equipment in series L_WINCHE8_1Y (Bus #7306) - L_SIMGID8_1Y (Bus #7310) 138.0-kV line transmission line to achieve a higher operational rating, minimum 4000A, as an LCP upgrade for Batch Zero Base Load."},{"id":"ercot-tpit:109874","ercot_project":"109874","title":"Rebuild Sandow 345 kV Switch","owner":"ONCOR","owner_project":"R6281","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sandow Switch","to":"Sandow Switch","county_from":"Milam","county_to":"Milam","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Sandow 345 kV Switch"},{"id":"ercot-tpit:109890","ercot_project":"109890","title":"Rebuild Lufkin Switch - Nacogdoches Southeast Switch 138 kV Line","owner":"ONCOR","owner_project":"R6062","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":22.4,"from":"Lufkin Switch","to":"Nacogdoches Southeast Switch","county_from":"Angelina","county_to":"Nacogdoches","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Lufkin Switch - Nacogdoches Southeast Switch 138 kV Line","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:109851","ercot_project":"109851","title":"Establish Redland Switch 345/138 kV Auto #2","owner":"ONCOR","owner_project":"R6508","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Redland 345 kV Switch","to":"Redland 138 kV Switch","county_from":"Angelina","county_to":"Angelina","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Redland Switch 345/138 kV Auto #2"},{"id":"ercot-tpit:109886A","ercot_project":"109886A","title":"Establish Kolb Lake 138 kV Switch And Capacitor Bank","owner":"ONCOR","owner_project":"R6505","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kolb Lake Switch","to":"Kolb Lake Switch","county_from":"Angelina","county_to":"Angelina","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Kolb Lake 138 kV Switch"},{"id":"ercot-tpit:110038","ercot_project":"110038","title":"Establish Rosebud 345 kV Switch","owner":"ONCOR","owner_project":"R6559","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rosebud","to":"Rosebud","county_from":"Milam","county_to":"Milam","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Rosebud 345 kV Switch"},{"id":"ercot-tpit:110132","ercot_project":"110132","title":"River Oaks Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"River Oaks","to":null,"county_from":"Comal","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will upgrade terminal equipment at River Oaks Substation to increase the operational rating of the terminating 138 kV lines as an LCP project for Batch Zero Base Load"},{"id":"ercot-tpit:110024","ercot_project":"110024","title":"Rebuild the Hutto - Gilleland Creek 138 kV DCKT Line","owner":"ONCOR","owner_project":"R6521","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":34.5,"from":"Hutto","to":"Gilleland Creek (LCRA TSC)","county_from":"Williamson","county_to":"Travis","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Hutto - Gilleland Creek 138 kV DCKT Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174024844","name":"Hutto Switching Station","coordinates":[-97.56134,30.55117]},{"osm_id":"osm:way/156262426","name":"Gilleland Creek Substation","coordinates":[-97.57422,30.41013]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 12 mi but ERCOT reports 34.5 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:103303","ercot_project":"103303","title":"LCRATSC Paige - Winchester Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":14.85,"from":"Paige","to":"Winchester","county_from":"Bastrop","county_to":"Fayette","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will perform an overhaul on the 15-mile T615 Paige - Winchester 138-kV transmission line and upgrade the line to achieve a higher operational rating.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/509586591","name":"Paige Substation","coordinates":[-97.13469,30.21443]},{"osm_id":"osm:way/173301469","name":"Winchester Substation","coordinates":[-96.98653,30.04443]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/509586592","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":14.9,"straight_mi":null},{"id":"ercot-tpit:111245B","ercot_project":"111245B","title":"Gillespie - Fredericksburg - Goehmann Lane - Kendall Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":20.5,"from":"Goehmann Lane","to":"Kendall","county_from":"Gillespie","county_to":"Kendall","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109886B","ercot_project":"109886B","title":"Establish Kolb Lake 138 kV Switch And Capacitor Bank","owner":"ONCOR","owner_project":"R6505","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kolb Lake Switch","to":"Kolb Lake Switch","county_from":"Angelina","county_to":"Angelina","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Kolb Lake 138 kV Switch Capacitor Bank"},{"id":"ercot-tpit:103784","ercot_project":"103784","title":"BEPC_TPIT_Beecham_Gap","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":15,"from":"Kempner","to":"Beecham Gap","county_from":"Coryell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99720","ercot_project":"99720","title":"BEPC_TPIT_HAMILTONGTC_Energize_FortGates","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gatesville","to":"Fort Gates","county_from":"Coryell","county_to":"Coryell","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99722","ercot_project":"99722","title":"BEPC_TPIT_HAMILTONGTC_Energize_Snelling","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-24","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fort Gates","to":"Snelling","county_from":"Coryell","county_to":"Coryell","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110397","ercot_project":"110397","title":"Lon Hill to Bunsen: Rebuild 138 kV","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-29","actual_isd":null,"cm_new":2.6,"cm_rebuilt":0,"from":"Lon Hill","to":"Bunsen","county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG016","rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Rebuild Bunsen to Lon Hill 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174682093","name":"Lon Hill Substation","coordinates":[-97.61559,27.84382]},{"osm_id":"osm:way/490190261","name":"Bunsen Substation","coordinates":[-97.81832,27.76168]}],"endpoint_method":"name + voltage","link_note":"mapped connection is 17.4 mi but ERCOT reports 2.6 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:93661","ercot_project":"93661","title":"New BPUB substation needed to service new load. Will require 6 miles of 138kV transmission line.","owner":"BPUB","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-29","actual_isd":null,"cm_new":12,"cm_rebuilt":0,"from":"Nimzo","to":"DEMETER","county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:72051","ercot_project":"72051","title":"Twinwood Mobile (TWM) 138kV Distribution Substation","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Twinwood","to":"Foster","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new Twinwood Mobile (TWM) 138kV Distribution Substation. Loop from existing Ckt.25E to create new Ckt.25E Foster to Twinwood Mobile to Peters"},{"id":"ercot-tpit:59260","ercot_project":"59260","title":"Mason Phillips Tap to Mason Phillips: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"1872","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":13.7,"from":"Seaquist","to":"Mason Phillips","county_from":"Mason","county_to":"Mason","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Rehab the Mason Phillips Tap to Mason Phillips 69 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109575I","ercot_project":"109575I","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"SINTEK","to":"CAMDEN","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG012","rpg_completed":"2026-04-06","bod_reviewed":"2026-04-07","comments":null,"description":"Upgrade Ckt.26E SINTEK to CAMDEN to increase thermal limits."},{"id":"ercot-tpit:109575H","ercot_project":"109575H","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BIPORT","to":"Oyster Creek","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG012","rpg_completed":"2026-04-06","bod_reviewed":"2026-04-07","comments":null,"description":"Upgrade Ckt.82G BIPORT to Oyster Creek to increase thermal limits."},{"id":"ercot-tpit:109950","ercot_project":"109950","title":"Install a new 138kV transmission loop in conjunction with the S-1086 Taormina BESS switchyard project","owner":"CPS/NO","owner_project":"T-0373","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5425","to":"5465, 5025","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109966","ercot_project":"109966","title":"The New Generation Facility will be looped into the 345 kV Elm Creek to South Texas Project (STP) circuit 1","owner":"CPS/NO","owner_project":"T-0420","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5236","to":"5320, 5380","county_from":"Guadalupe","county_to":"Wilson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109980","ercot_project":"109980","title":"Loop In Foster Rd Substation into Beck Road to Kirby 138kV transmission line","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5162","to":"5035, 5250","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110569","ercot_project":"110569","title":"Janka: Add Reactive Support","owner":"ETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Janka","to":null,"county_from":"Hardeman","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Add Reactive Support at the Janka 345 kV Station"},{"id":"ercot-tpit:111043A","ercot_project":"111043A","title":"Install new 138/35 kV Lee Road Distribution Substation.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lee Road","to":"Humble / Treaschwig","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Lee Road 138/35kV Distribution Substation. Loop on existing circuit as Ckt.66D Humble to Lee Road to Treaschwig."},{"id":"ercot-tpit:100071","ercot_project":"100071","title":"Taurus: Construct New 345 kV Station","owner":"AEP TNC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"Taurus","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Description and In-Service Date Update","description":"Interconnect TNMP data center load to the new Taurus 345 kV station on the Solstice to Sand Lake 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:111364","ercot_project":"111364","title":"Install new 138kV transmission loop and substation","owner":"CPS/NO","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5230","to":"5326","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110068B","ercot_project":"110068B","title":"This models the new CEHE Raider Substation and upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Raider","to":"Wolf/Hillje","county_from":"Wharton","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop 345 kV Ckt. 64 Wolf-Hillje line into the new 345 kV CEHE Raider substation. Upgrade line relaying on Ckt 64 WOLF-Raider-Hillje."},{"id":"ercot-tpit:109575G","ercot_project":"109575G","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CAVERN","to":"Clute/BIPORT","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG012","rpg_completed":"2026-04-06","bod_reviewed":"2026-04-07","comments":null,"description":"Upgrade Ckt.82 Clute to CAVERN to BIPORT to increase thermal limits."},{"id":"ercot-tpit:109575F","ercot_project":"109575F","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clute","to":"SINTEK","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG012","rpg_completed":"2026-04-06","bod_reviewed":"2026-04-07","comments":null,"description":"Upgrade Ckt.82 RIWOOD to Clute to increase thermal limits."},{"id":"ercot-tpit:109575E","ercot_project":"109575E","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clute","to":"SINTEK","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG012","rpg_completed":"2026-04-06","bod_reviewed":"2026-04-07","comments":null,"description":"Upgrade Ckt.82C Angleton to RIWOOD to increase thermal limits."},{"id":"ercot-tpit:109575D","ercot_project":"109575D","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clute","to":"SINTEK","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG012","rpg_completed":"2026-04-06","bod_reviewed":"2026-04-07","comments":null,"description":"Upgrade Ckt.26 Clute to SINTEK to increase thermal limits."},{"id":"ercot-tpit:109575C","ercot_project":"109575C","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"STRATT","to":"Clute","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG012","rpg_completed":"2026-04-06","bod_reviewed":"2026-04-07","comments":null,"description":"Upgrade Ckt.26 STRATT to Clute to increase thermal limits."},{"id":"ercot-tpit:109575B","ercot_project":"109575B","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Samaritan","to":"STRATT","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG012","rpg_completed":"2026-04-06","bod_reviewed":"2026-04-07","comments":null,"description":"Upgrade Ckt.26I Samaritan to STRATT to increase thermal limits."},{"id":"ercot-tpit:109575A","ercot_project":"109575A","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.23,"from":"Angleton","to":"Samaritan","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"26RPG012","rpg_completed":"2026-04-06","bod_reviewed":"2026-04-07","comments":null,"description":"Upgrade Ckt.26C Angleton to Samaritan to increase thermal limits.","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:99000C","ercot_project":"99000C","title":"Install (2) 14.4 MVAR distribution cap banks at Twinwood substation. Install (2) 14.4 MVAR distribution cap banks at Fulshear substation. Install (2) 40 MVAR transmission cap bank at Peters substation.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Peters","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (1) additional 40 MVAR switchable transmission cap bank at Peters substation. (second of two)"},{"id":"ercot-tpit:109615A","ercot_project":"109615A","title":"WA Parish 138kV Fault Upgrade with Bus Reactors","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":"WA Parish","county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (2) 5-Ohm Reactors at WA Parish as a fault duty upgrade. Split the existing WA Parish 138kV West bus. Install equipment to maintain 80KA fault duty."},{"id":"ercot-tpit:110423","ercot_project":"110423","title":"San Angelo Red Creek to San Angelo Coke Street: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":8.1,"from":"SA Red Creek","to":"SA Coke Street","county_from":"Tom Green","county_to":"Tom Green","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Rebuild the SA Red Creek to Coke Street 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:111043B","ercot_project":"111043B","title":"Install new 138/35 kV Lee Road Distribution Substation.","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Treaschwig","to":"Westfield","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.66D Treaschwig to Westfield to increase thermal limits."},{"id":"ercot-tpit:99724","ercot_project":"99724","title":"BEPC_TPIT_HAMILTONGTC_Energize_LeonCrusader","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Snelling","to":"Crusader","county_from":"Coryell","county_to":"Coryell","tier":"Tier 2","rpg":"25RPG003","rpg_completed":"2025-08-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99009D","ercot_project":"99009D","title":"138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Flewellen","to":"Fort Bend","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 3","rpg":"25RPG010","rpg_completed":"2025-04-18","bod_reviewed":"2025-04-18","comments":null,"description":"Upgrade Ckt.60E Flewellen to Fort Bend to increase thermal limits. Expect Flewellen equipment upgrades and Fort Bend equipment/Relay upgrades to reach the Minimum ratings as second phase of upgrade"},{"id":"ercot-tpit:99009B","ercot_project":"99009B","title":"138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Flewellen","to":"Brazos Valley","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 3","rpg":"25RPG010","rpg_completed":"2025-04-18","bod_reviewed":"2025-04-18","comments":null,"description":"Upgrade Ckt.09G Flewellen to Brazos Valley to increase thermal limits. Expect FL/BV equipment upgrade as second phase of Ckt.09G upgrade."},{"id":"ercot-tpit:93217","ercot_project":"93217","title":"Update Topology in Brownsville Area per Approved RPG Project","owner":"SLU","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":47,"cm_rebuilt":0,"from":"Chalybe","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 1","rpg":"24RPG008","rpg_completed":"2024-09-25","bod_reviewed":"2024-12-03","comments":"Added two (2) 675 MVA Autotransformers to serve load on 138 kV system","description":"Adding in 345 kV topology for LRGV Brownsville area (new 345 kV Chalybe station with two (2) 675 MVA autos being fed from Sharyland's Kingfisher and Palmito stations) per the BOD approved RPG project. Also added additional 138 kV feed from ","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:93134","ercot_project":"93134","title":"Minnesota: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Minnesota","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new distribution station on the North Edinburg to Pharr 138 kV line between McColl Road and Pharr"},{"id":"ercot-tpit:87427","ercot_project":"87427","title":"Rebuild Magnolia to Seminole 138kV line.","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.3,"from":"Magnolia Sub","to":"Seminole Sub","county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replacement for recently committed PMCR # 4010.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174401050","name":"Magnolia Substation","coordinates":[-95.13398,29.4883]},{"osm_id":"osm:way/338758527","name":"Seminole Substation","coordinates":[-95.17915,29.46842]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/338758513","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":3.2,"straight_mi":null},{"id":"ercot-tpit:54120","ercot_project":"54120","title":"Rebuild Tejas-Commanche (Bundled 795 ACSS)","owner":"TNMP","owner_project":"STE07318","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0.95,"from":"Tejas 138 kV Substation (Bus # 38530)","to":"Commanche 138 kV Substation (Bus # 38560)","county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Tejas - Commanche 138 kV line with Bundled 795 ACSS conductor.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:60502","ercot_project":"60502","title":"Rebuild Apache-Amoco with bundled 795 ACSS","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:60504","ercot_project":"60504","title":"Rebuild Caddo-Apache with bundled 795 ACSS","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:60522","ercot_project":"60522","title":"Rebuild Hidden Lakes-League City with 795 ACSS","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:60526","ercot_project":"60526","title":"Rebuild West Columbia Local-Angleton with 795 ACSS","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:61550","ercot_project":"61550","title":"East Munday to Lake Pauline: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":"1874","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":59.97,"from":"East Munday","to":"Lake Pauline","county_from":"Knox","county_to":"Hardeman","tier":"Tier 4","rpg":"20RPG018","rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Rehab East Munday to Lake Pauline 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/295396060","name":"East Munday Substation","coordinates":[-99.60308,33.45338]},{"osm_id":"osm:way/231066354","name":"Lake Pauline Substation","coordinates":[-99.68475,34.25233]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:66204","ercot_project":"66204","title":"Rebuild Hidden Lakes-PH Robinson with bundled 795 ACSS","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.15,"from":"TNMP Hidden Lakes (bus # 38900)","to":"CenterPoint PH Robinson (bus # 42015)","county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:70796","ercot_project":"70796","title":"El Campo to Corichi: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TA2018020","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":13.26,"from":"El Campo","to":"Corichi","county_from":"Wharton","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rehab the El Campo to Corichi 138 kV line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:76348","ercot_project":"76348","title":"Reconductor Foxtail-PIGCreek-1926ACSS-138KV","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0.68,"from":"Foxtail","to":"PIG Creek","county_from":"Pecos","county_to":"Pecos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109615D","ercot_project":"109615D","title":"WA Parish 138kV Fault Upgrade with Bus Reactors","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":"Phelps","county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reposition existing Ckt.02B WA Parish to Nash (Phelps) as part of WAP 138kV West reactor additions"},{"id":"ercot-tpit:109615G","ercot_project":"109615G","title":"WA Parish 138kV Fault Upgrade with Bus Reactors","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Thompsons","to":"WA Parish","county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reposition existing Ckt.82A WA Parish to Thompsons as part of WAP 138kV West reactor additions"},{"id":"ercot-tpit:109615B","ercot_project":"109615B","title":"WA Parish 138kV Fault Upgrade with Bus Reactors","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Modeling change only for this line position (No reposition"},{"id":"ercot-tpit:109615E","ercot_project":"109615E","title":"WA Parish 138kV Fault Upgrade with Bus Reactors","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reposition existing WAP GT-1 generator lead as part of WAP 138kV West reactor additions"},{"id":"ercot-tpit:109615F","ercot_project":"109615F","title":"WA Parish 138kV Fault Upgrade with Bus Reactors","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Thompsons","to":"WA Parish","county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reposition existing Ckt.80A WA Parish to Thompsons as part of WAP 138kV West reactor additions"},{"id":"ercot-tpit:109615H","ercot_project":"109615H","title":"WA Parish 138kV Fault Upgrade with Bus Reactors","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reposition existing Standby transformers ST5A / ST5B as part of WAP 138kV West reactor additions"},{"id":"ercot-tpit:109615C","ercot_project":"109615C","title":"WA Parish 138kV Fault Upgrade with Bus Reactors","owner":"CNP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reposition existing WAP GT-2 generator lead as part of WAP 138kV West reactor additions"},{"id":"ercot-tpit:109878","ercot_project":"109878","title":"Seagoville Switch Auto #2","owner":"ONCOR","owner_project":"M4535","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Seagoville Switch","to":"Seagoville Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"TBD","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Seagoville Switch Auto #2 + Rebuild Seagoville 345 kV Switch"},{"id":"ercot-tpit:100687","ercot_project":"100687","title":"Install a 50MVAr Capacitor Bank at Helotes Substation","owner":"CPS/NO","owner_project":"S-1075","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5200","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110511","ercot_project":"110511","title":"Carmichael Bend Switch - DeCordova Dam 138 kV Line","owner":"ONCOR","owner_project":"M5117","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Carmichael Bend Switch","to":"DeCordova Dam","county_from":"Hood","county_to":"Hood","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Carmichael Bend Switch - DeCordova Dam 138 kV Line"},{"id":"ercot-tpit:110603","ercot_project":"110603","title":"Scurry County South - China Grove 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R8887","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-01","actual_isd":null,"cm_new":5.3,"cm_rebuilt":null,"from":"Scurry County South","to":"Buford (China Grove)","county_from":"Scurry","county_to":"Scurry","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop the existing Snyder - Buford 138 kV Line into the existing Scurry County South 345/138 kV switch to establish the new Scurry County South Switch - Buford Switch138 kV Line. Install a new 5.6-mile, 138 kV second conductor on existing do","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:100665","ercot_project":"100665","title":"Install a 21.42MVAr Capacitor Bank at Bulverde Substation","owner":"CPS/NO","owner_project":"S-1046","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5051","to":null,"county_from":"Comal","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:86240","ercot_project":"86240","title":"AEN_REPLACE_LYTTON__345kV_LYAT1_and_LYAT2_AUTOS_WITH__New_672_MVAs","owner":"AEN","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lytton 9074","to":"Lytton 9075","county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace the two existing 345kV Lytton Autos with two new 672 MVA/345kV autos"},{"id":"ercot-tpit:67091","ercot_project":"67091","title":"Second 138 kV transmission Line from DL-DP CKT1034","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":5.22,"cm_rebuilt":0,"from":"9045","to":"9188","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Second 138 kV transmission Line from Dunlap to Decker CKT1034","terminal_match":{"from":"unnamed","to":"unnamed","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/462642771","name":"Dunlap Substation","coordinates":[-97.53973,30.27538]},{"osm_id":"osm:way/276827871","name":"Decker Switchyard","coordinates":[-97.61415,30.30498]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","osm_matches":[{"osm_id":"osm:way/402575952","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":4.3,"straight_mi":null},{"id":"ercot-tpit:45029","ercot_project":"45029","title":"Grandview Highland Hills Rebuild","owner":"CPS/NO","owner_project":"T-0273","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":5.7,"from":"5175","to":"5205","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"CPSE_Rebuild of 138 kV double circuit line Line between Grandview to Highland Hills.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:6687","ercot_project":"6687","title":"Rebuild Rio Hondo to East Rio Hondo","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":8.19,"from":"Rio Hondo","to":"East Rio Hondo","county_from":"Cameron","county_to":"Cameron","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the 138 kV line from Rio Hondo to East Rio Hondo.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174719027","name":"Rio Hondo Substation","coordinates":[-97.61337,26.27748]},{"osm_id":"osm:way/512007640","name":"East Rio Hondo Substation","coordinates":[-97.53404,26.22753]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/512007637","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":8.3,"straight_mi":null},{"id":"ercot-tpit:70307A","ercot_project":"70307A","title":"BRYN_Standard_PMCR_Dansby_Rebuild_fix","owner":"BRYN","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazos","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reference Project 4577 which was added to convert Dansby 69kV bus to Breaker and a Half configuration"},{"id":"ercot-tpit:70307B","ercot_project":"70307B","title":"BRYN_Standard_PMCR_Dansby_Rebuild_fix","owner":"BRYN","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazos","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109931","ercot_project":"109931","title":"Cedar Hill Switch - Webb 345 kV Line","owner":"ONCOR","owner_project":"M4522, M4230","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":7.5,"from":"Cedar Hill Switch","to":"Webb","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Cedar Hill Switch - Webb 345 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110587","ercot_project":"110587","title":"Longshore - Rockhound 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R8728","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-01","actual_isd":null,"cm_new":51,"cm_rebuilt":0,"from":"Rockhound","to":"Longshore","county_from":"Howard","county_to":"Midland","tier":"Tier 2","rpg":"26RPG015","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new 25.5-mile Rockhound - Longshore 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104001","ercot_project":"104001","title":"BRYN_KoppeBridge_Load_Addition","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BTU Koppe Bridge","to":null,"county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding second distribution transformer at Koppe Bridge"},{"id":"ercot-tpit:109952","ercot_project":"109952","title":"Commerce Switch - Paris Switch 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M3327","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":36.1,"from":"Commerce Switch","to":"Paris Switch","county_from":"Hunt","county_to":"Lamar","tier":"Tier 1","rpg":"25RPG040, 25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Commerce Switch - Paris Switch 138 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110389","ercot_project":"110389","title":"Loop Nine Switch - Watermill Switch 345 kV Line","owner":"ONCOR","owner_project":"M4443","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":4,"from":"Loop Nine Switch","to":"Watermill Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Loop Nine Switch - Watermill Switch 345 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110667","ercot_project":"110667","title":"Grand Prairie 138 kV Capacitor","owner":"ONCOR","owner_project":"M4019","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Grand Prairie","to":"Grand Prairie","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Install Grand Prairie 138 kV Capacitor"},{"id":"ercot-tpit:110669","ercot_project":"110669","title":"Park Row 138 kV Capacitor","owner":"ONCOR","owner_project":"M4523","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Park Row","to":"Park Row","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Install Park Row 138 kV Capacitor"},{"id":"ercot-tpit:112454","ercot_project":"112454","title":"BRYN_Rayburn_Load_Addition","owner":"BRYN","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BTU Rayburn","to":null,"county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding second distribution transformer at Rayburn"},{"id":"ercot-tpit:104084","ercot_project":"104084","title":"Rincon to Tungsten: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TP2026007","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":54.1,"from":"Rincon","to":"Tungsten","county_from":"Calhoun","county_to":"Refugio","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Rebuild the Rincon to Tungsten 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99908","ercot_project":"99908","title":"Altair - Eagle Lake Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 11.4 mile T547 Altair - Eagle Lake (including all tap lines) 69-kV transmission line. Per LCRA TSC Transmission System Planning procedure, replacement structures will be capable of operating at 138-kV."},{"id":"ercot-tpit:103831","ercot_project":"103831","title":"Songbird: Construct New 345 kV Station","owner":"AEP TNC","owner_project":"TP2025938","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Songbird","to":null,"county_from":"Knox","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect Oriole Solar to the new Songbird 345 kV station on the Foxtail - Perigee 345 kV line"},{"id":"ercot-tpit:98569","ercot_project":"98569","title":"Oso Creek to Westside: Construct New 138 kV Line","owner":"AEP TCC","owner_project":"TP2025225","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-30","actual_isd":null,"cm_new":6,"cm_rebuilt":0,"from":"Oso Creek","to":"Westside","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct a new 138 kV single circuit line from Oso Creek to Westside","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109722","ercot_project":"109722","title":"Facet: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2026145","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-06-30","actual_isd":null,"cm_new":0.25,"cm_rebuilt":0,"from":"Facet","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect Titus Solar and Diamond Cowboy Storage to the new Facet 345 kV station on the Angstrom to Grissom 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:110523","ercot_project":"110523","title":"STEC Rogers Large Load addition Phase 1","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG046","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-Install a new 385 MVAR capacitor bank on the 138kV side of the new STEC-owned Alsatian 345/138kV station -Add the second 138kV ckt along the existing Legend Falls to STEC Castroville corridor: Legend Falls - San Geronimo, San Geronimo - Ri"},{"id":"ercot-tpit:110461","ercot_project":"110461","title":"STEC Edwards Large Load Addition Phase 1","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":null,"from":"Pearson","to":"Castroville","county_from":"Medina","county_to":"Medina","tier":"Tier 1","rpg":"25RPG046","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-(CPS South San Antonio Reliability Project 1 & 2) - Install 162 MVAr of reactive support at the Edward POI - Add a second 138kV ckt from Pearson to Edward to Castroville with 474 MVA rating - Install 19./2 MVAR of reactive power compensati"},{"id":"ercot-tpit:71881","ercot_project":"71881","title":"Install 31.3 Mvar capacitor bank at Andice.","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Andice","to":null,"county_from":"Williamson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 31.3 Mvar capacitor bank at Andice. Formerly TPIT project number 70365."},{"id":"ercot-tpit:110057B","ercot_project":"110057B","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NewSub","to":"Singleton","county_from":"Harris","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one 300 MVAR capacitor bank at 345 kV NewSub. Install one 300 MVAR capacitor bank at 345 kV Singleton."},{"id":"ercot-tpit:110090B","ercot_project":"110090B","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NEWSUB","to":"Jordan/North Belt","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 345 kV substation. Loop 345 kV Circuit 97 Jordan to King into the new 345 kV substation. Install 200MVAR Cap Bank at new sub."},{"id":"ercot-tpit:76818","ercot_project":"76818","title":"Upgrade Rayburn Auto Station","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rayburn","to":"Rayburn","county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Rayburn Auto"},{"id":"ercot-tpit:110872","ercot_project":"110872","title":"STEC Mesquite Large Load Project Phase 3","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":null,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade 8162 COLETO4A - 8172 VICTORIA4A 138-kV Line CKT 1 Upgrade 8162 COLETO4A - 8172 VICTORIA4A 138-kV Line CKT 2 Upgrade 8535 POMPANO4A - 8735 CHALYBE4A 138-kV Line CKT 1 Upgrade 5705 FOWLERTNSUB8 - 5723 LOSANGLESUB8 138-kV Line CKT 1 Ad"},{"id":"ercot-tpit:110845","ercot_project":"110845","title":"STEC Palangana Large Load Project Phase 2","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install reactive support at 80013 LARDVNTH4A 138-kV Substation"},{"id":"ercot-tpit:109972","ercot_project":"109972","title":"Construct a new CPS Owned switchyard to connect new Lavender BESS Generation Project","owner":"CPS/NO","owner_project":"T-0419","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-07-03","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5280","to":"5110, 5255","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:111221","ercot_project":"111221","title":"Angstrom: Expand 345 kV Station","owner":"AEP TCC","owner_project":"TP2026123","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-07-31","actual_isd":null,"cm_new":1.6,"cm_rebuilt":0,"from":"Angstrom","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the Ripper Industrial load to the existing Angstrom 345 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:73053A","ercot_project":"73053A","title":"Wimberley Loop to New Substation","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-08-01","actual_isd":null,"cm_new":13.44,"cm_rebuilt":0,"from":"Wimberley","to":"Cebolla Creek","county_from":"Hays","county_to":"Hays","tier":"Tier 2","rpg":"22RPG026","rpg_completed":"2023-02-03","bod_reviewed":null,"comments":null,"description":"Adds new 138 kV branch (219 MVA) from Wimberley to a new three terminal ring bus substation between Dripping Springs and Rutherford.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:91937","ercot_project":"91937","title":"Cryo to Faulkner: Construct New 138 kV Line","owner":"AEP TNC/TNMP","owner_project":"TP2025146","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-08-31","actual_isd":null,"cm_new":11.5,"cm_rebuilt":0,"from":"Cryo","to":"Faulkner","county_from":"Reeves","county_to":"Reeves","tier":"Tier 2","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"TSP/Company Contact and In-Service Date Update","description":"Construct a new 138 kV single circuit line from Cryo to Faulkner","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/1006095232","name":"Cryo Substation","coordinates":[-103.72058,31.0469]},{"osm_id":"osm:way/501745940","name":"Faulkner Substation","coordinates":[-103.7932,31.26104]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:110591","ercot_project":"110591","title":"Ad Hoc TPIT: 432 MVAR Reactive Compensation at Pitchfork 345 kV","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pitchfork 34k kV","to":"Pitchfork 345 kV","county_from":"Dickens","county_to":"Dickens","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110847","ercot_project":"110847","title":"STEC Palangana Large Load Project Phase3","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish CCNG Palangana 345-kV POI Install reactive support at Palanaga POI to achieve unity power factor AEP Laredo Area Upgrades RPG Option 3"},{"id":"ercot-tpit:110874","ercot_project":"110874","title":"STEC Mesquite Large Load Project Phase 4","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"0","to":"0","county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 200MVAR reactive support at Palangana POI to achieve unity power factor"},{"id":"ercot-tpit:102672A","ercot_project":"102672A","title":"BEPC_TIER3_MillerRPG","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-09-03","actual_isd":null,"cm_new":0,"cm_rebuilt":41.34,"from":"RW Miller","to":"Bunker","county_from":"Palo Pinto","county_to":null,"tier":"Tier 3","rpg":"26RPG002","rpg_completed":"2026-03-17","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110373","ercot_project":"110373","title":"Rebuild Black Fork Switch - Hideaway Lake Tap 138 kV Line Section","owner":"ONCOR","owner_project":"R6368","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-09-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9.1,"from":"Black Fork Switch","to":"Hideaway Lake Tap","county_from":"Smith","county_to":"Smith","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Black Fork Switch - Hideaway Lake Tap 138 kV Line Section","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:6666","ercot_project":"6666","title":"BRYN_6666_Steele_Store_to_Cooks_Point","owner":"BRYN/BTU AND LCRA TSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-01","actual_isd":null,"cm_new":7.2,"cm_rebuilt":0,"from":"32852","to":"7569","county_from":"Brazos","county_to":"Burleson","tier":"Tier 1","rpg":"25RPG001","rpg_completed":"2025-07-05","bod_reviewed":null,"comments":null,"description":"Construct 138kV line from BTU Steele Store to LCRA Cooks Point (Bundled 1033 ACSR - Curlew & 959 ACSS Suwannee)","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:99105B","ercot_project":"99105B","title":"BRYN_99105_RIVERSIDE","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-01","actual_isd":null,"cm_new":6.1,"cm_rebuilt":0,"from":"RELLIS","to":"Riverside","county_from":"Brazos","county_to":"Brazos","tier":"Tier 1","rpg":"25RPG001","rpg_completed":"2025-07-05","bod_reviewed":null,"comments":null,"description":"Construct RELLIS to Riverside 138-kV transmission line on double-circuit capable structures.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99103","ercot_project":"99103","title":"BRYN_99103_RELLIS_TNPONE_DC345KV","owner":"BRYN/BTU AND TNMP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-01","actual_isd":null,"cm_new":43,"cm_rebuilt":0,"from":"RELLIS","to":"TNP One","county_from":"Brazos","county_to":"Robertson","tier":"Tier 1","rpg":"25RPG001","rpg_completed":"2025-07-05","bod_reviewed":null,"comments":null,"description":"Expand the existing RELLIS 138 kV Substation to establish the BTU RELLIS 345/138 kV Switchyard. Install at RELLIS Switchyard two 345/138 kV autotransformers with a nameplate rating of 600 MVA. Expand the TNP One Substation to accommodate tw","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99105A","ercot_project":"99105A","title":"BRYN_99105_RIVERSIDE","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG001","rpg_completed":"2025-07-05","bod_reviewed":null,"comments":null,"description":"Construct Riverside 138-kV switching station by cutting into the existing Dansby to Thompson Creek 138-kV transmission line."},{"id":"ercot-tpit:110230","ercot_project":"110230","title":"Nikola: Construct New 345 kV Station","owner":"ETT","owner_project":"TP2024089","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-30","actual_isd":null,"cm_new":18,"cm_rebuilt":0,"from":"Nikola","to":null,"county_from":"Childress","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect the Lancium load to the new Nikola 345 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:91941","ercot_project":"91941","title":"Solstice to Faulkner: Construct New 345 kV Double Circuit Line","owner":"AEP TNC/TNMP","owner_project":"TP2024165","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-30","actual_isd":null,"cm_new":40,"cm_rebuilt":0,"from":"Solstice","to":"Faulkner","county_from":"Pecos","county_to":"Reeves","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"RPG Number and BOD Review date Update","description":"Construct a new 345 kV double circuit line from Solstice to Faulkner","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99453G","ercot_project":"99453G","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kuykendahl","to":"Roans Prairie","county_from":"Harris","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.75B Kuykendahl to Roans Prairie to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453Q","ercot_project":"99453Q","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Smithers","to":"WA Parish","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.98G Smithers to WA Parish to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453T","ercot_project":"99453T","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tomball","to":"Singleton","county_from":"Harris","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.74C Tomball to Singleton to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:102771A","ercot_project":"102771A","title":"Aquila (AQU) CEHE-Owned 345kV Substation for TALON (TAL) / Eagle Claw Energy Storage (27INR0085)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Aquila","to":"Zenith / Singleton","county_from":"Grimes","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 345kV Aquila (AQU) substation for generator interconnection to TALON (TAL) / Eagle Claw Energy Storage (27INR0085). Loop Ckt.99D Singleton to Zenith to create new Ckt.99 Singleton to Aquila to Zenith."},{"id":"ercot-tpit:109753","ercot_project":"109753","title":"Vitex: Construct New 345 kV Station","owner":"AEP TNC","owner_project":"TP2026090","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-31","actual_isd":null,"cm_new":15,"cm_rebuilt":0,"from":"Vitex","to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect the Lancium load to the new Vitex 345 kV station on the Bluff Creek to Mulberry Creek 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:55605","ercot_project":"55605","title":"New Barksdale to Rocksprings: Rebuild 69 kV Line","owner":"AEP TCC","owner_project":"3819","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":19.51,"from":"New Barksdale","to":"Rocksprings","county_from":"Edwards","county_to":"Edwards","tier":"Tier 4","rpg":"24RPG009","rpg_completed":"2024-04-12","bod_reviewed":null,"comments":"Transmission Owner and In-Service Date Update","description":"Rebuild the Campwood to Rocksprings 69 kV line","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:55617","ercot_project":"55617","title":"Campwood to New Barksdale: Rebuild 69 kV Line","owner":"AEP TCC/ETT","owner_project":"3820","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":7.73,"from":"Campwood","to":"New Barksdale","county_from":"Edwards","county_to":"Edwards","tier":"Tier 4","rpg":"24RPG009","rpg_completed":"2024-04-12","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rebuild the Campwood to Rocksprings 69 kV line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99453F","ercot_project":"99453F","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Roans Prairie","to":"Singleton","county_from":"Grimes","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.75D Roans Prairie to Singleton increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:102771B","ercot_project":"102771B","title":"Aquila (AQU) CEHE-Owned 345kV Substation for TALON (TAL) / Eagle Claw Energy Storage (27INR0085)","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Aquila","to":"TALON","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Aquila (AQU) substation to TALON (TAL) customer substation (27INR0085)."},{"id":"ercot-tpit:92432","ercot_project":"92432","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Reno","to":"New Station Nofoul","county_from":"Parker","county_to":"Parker","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:59086","ercot_project":"59086","title":"Corichi to Victoria: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TP2020888","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-15","actual_isd":null,"cm_new":0,"cm_rebuilt":42.76,"from":"Corichi","to":"Victoria","county_from":"Jackson","county_to":"Victoria","tier":"Tier 3","rpg":null,"rpg_completed":"2022-03-01","bod_reviewed":null,"comments":"In-Service Date Update","description":"Rebuild the Corichi to Victoria 138 kV line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109839","ercot_project":"109839","title":"Lightyear: Construct New 138 kV Station","owner":"AEP TNC","owner_project":"TP2026095","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-29","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Lightyear","to":null,"county_from":"Crockett","county_to":"Crockett","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new 138 kV station on the Illinois # 4 to Ozona 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:98991B","ercot_project":"98991B","title":"Kinnebrew POI - Chalk 69 kV to 138 kV Line Conversion","owner":"ONCOR","owner_project":"PB_L27_B","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-29","actual_isd":null,"cm_new":10.6,"cm_rebuilt":0,"from":"Kinnebrew","to":"Sterling County","county_from":"Sterling","county_to":"Sterling","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Oncor's portion of the Permian Basin Reliability Plan Upgrade ID L27B. Convert the existing Sterling County - Kinnebrew POI 69-kV line to 138-kV.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:93428","ercot_project":"93428","title":"Creosote to Toyah Creek: Construct New 345 kV Double Circuit Line","owner":"AEP TNC/ONCOR","owner_project":"TP2024162","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":11.5,"cm_rebuilt":0,"from":"Creosote","to":"Toyah Creek","county_from":"Reeves","county_to":"Reeves","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"Transmission Owner, TSP/Company Contact, Dollars should be and Miles New Update","description":"Construct a new 345 kV double circuit line from Creosote to Toyah Creek","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:93624","ercot_project":"93624","title":"L7C Add a new Creosote - Blue Goose (fka Toyah Creek) 345-kV double-circuit line","owner":"ONCOR","owner_project":"PB_L7C","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":46,"cm_rebuilt":0,"from":"Creosote","to":"Blue Goose","county_from":"Ward","county_to":"Pecos","tier":"Tier 1","rpg":null,"rpg_completed":"2023-06-09","bod_reviewed":null,"comments":null,"description":"AEP and Oncor joint project to add the 23-mile L7C Creosote - Blue Goose (fka Toyah Creek) 345-kV double-circuit transmission line part of the local common projects approved as part of the Permian Basin Reliability Plan","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:98556","ercot_project":"98556","title":"Cedar Hill to Sterling City: Convert to 138 kV","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":36.5,"from":"Cedar Hill","to":"Sterling City","county_from":"Coke","county_to":"Sterling","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"Company Contact Update","description":"Convert the Cedar Hill to Sterling City 69 kV line to 138 kV","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:98559","ercot_project":"98559","title":"Sterling City to Chalk: Convert to 138 kV","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":1.6,"from":"Sterling City","to":"Chalk","county_from":"Sterling","county_to":"Sterling","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"Company Contact, Transmission Owner Project Number, In-Service Date, and RPG Dates Update","description":"Convert the Sterling City to Chalk 69 kV line to 138 kV","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:98574","ercot_project":"98574","title":"Cedar Hill to Oak Creek: Rebuild 138 kV Line","owner":"AEP TNC/AEP TNC/ETT","owner_project":"TP2025197","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":2,"cm_rebuilt":26,"from":"Cedar Hill","to":"Oak Creek","county_from":"Coke","county_to":"Coke","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"In-Service Date Update","description":"Rebuild the Cedar Hill to Oak Creek 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/491401754","name":"Cedar Hill Switching Station","coordinates":[-100.73896,32.01441]},{"osm_id":"osm:way/491192844","name":"Oak Creek Switching Station","coordinates":[-100.29299,32.04673]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/20789438","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":26.4,"straight_mi":null},{"id":"ercot-tpit:99749","ercot_project":"99749","title":"Friend Ranch to Illinois #4: Convert to 138 kV","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":23.8,"from":"Friend Ranch","to":"Illinois #4","county_from":"Crockett","county_to":"Crockett","tier":"Tier 2","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"Transmission Owner and Company Contact Update","description":"Convert the Friend Ranch to Illinois #4 69 kV line to 138 kV","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:98626","ercot_project":"98626","title":"Abilene Northwest to Oak Creek: Reterminate 138 kV Line Into Nicole","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":0.75,"cm_rebuilt":0,"from":"Abilene Northwest","to":"Nicole","county_from":"Taylor","county_to":"Coke","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"Company Contact, Transmission Owner Project Number, In-Service Date, and RPG Date Update","description":"Reterminate the Abilene Northwest to Oak Creek 138 kV line from Oak Creek into the existing Nicole 138 kV station","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/491192963","name":"Abilene Northwest Substation","coordinates":[-99.78988,32.5028]},{"osm_id":"osm:way/491192845","name":"Nicole Switching Station","coordinates":[-100.29036,32.02332]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 53.9 mi but ERCOT reports 0.75 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:98628","ercot_project":"98628","title":"Ballinger to Oak Creek: Reterminate 138 kV Line Into Nicole","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":0.25,"cm_rebuilt":0,"from":"Ballinger","to":"Nicole","county_from":"Runnels","county_to":"Coke","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"Company Contact, Transmission Owner Project Number, In-Service Date, and RPG Date Update","description":"Reterminate the Ballinger to Oak Creek 138 kV line from Oak Creek into the existing Nicole 138 kV station","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/119137383","name":"Ballinger Substation","coordinates":[-99.94456,31.74117]},{"osm_id":"osm:way/491192845","name":"Nicole Switching Station","coordinates":[-100.29036,32.02332]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:91939","ercot_project":"91939","title":"Solstice to Bottlebrush: Construct New 345 kV Double Circuit Line","owner":"AEP TNC/TNMP","owner_project":"TP2024076","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":31,"cm_rebuilt":0,"from":"Solstice","to":"Bottlebrush","county_from":"Pecos","county_to":"Reeves","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"In-Service Date Update","description":"Construct a new 345 kV double circuit line from Solstice to Bottlebrush","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:103416","ercot_project":"103416","title":"South McAllen: 138 kV Breaker Replacement","owner":"AEP TCC","owner_project":"TP2026008","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"South McAllen","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Replace 138 kV breakers at the South McAllen 138 kV station"},{"id":"ercot-tpit:93453","ercot_project":"93453","title":"Creosote: Expand 345 kV Station","owner":"AEP TNC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Creosote","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"TSP/Company Contact, Dollars should be and Autotransformer Capability Update","description":"Install two 345/138 kV autotransformers at the Creosote 345/138 kV station"},{"id":"ercot-tpit:110622","ercot_project":"110622","title":"Ad Hoc TPIT: Build approximately 60-mile 345 kV double circuit from WETT's Buck Canyon to Nova Prime","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-01","actual_isd":null,"cm_new":60,"cm_rebuilt":0,"from":"Buck Canyon 345 kV","to":"Nova Prime 345 kV","county_from":"Borden","county_to":"Kent","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99411","ercot_project":"99411","title":"Daybreak_Substation_Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Substation addition to provide Point of Interconnection for Oncor's Good Morning substation addition. Requires coordination with Oncor."},{"id":"ercot-tpit:6685","ercot_project":"6685","title":"Van Vleck substation loop","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-01","actual_isd":null,"cm_new":2,"cm_rebuilt":2,"from":"Van Vleck Substation","to":"Van Vleck Switch","county_from":"Matagorda","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replaces single circuit radial line connected to a pole mounted switch with a double circuit transmission loop to the Van Vleck substation and upgrades the 4/0 ACSR to 795 ACSR on 138 kV capable poles.","terminal_match":{"from":"matched","to":"matched"}},{"id":"ercot-tpit:110853","ercot_project":"110853","title":"Build approximately 43.36-mile 345 kV double circuit line from Muleshoe to Mhos substation","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Muleshoe 345kv bus","to":"Mhos 345kv bus","county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110851","ercot_project":"110851","title":"Build approximately 94.5-mile 345 kV double circuit line from Buck Canyon to Pitchfork substation","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-01","actual_isd":null,"cm_new":94.5,"cm_rebuilt":0,"from":"Buck Canyon 345 kV","to":"Pitchfork 345 kV","county_from":"Borden","county_to":"Dickens","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110573","ercot_project":"110573","title":"Buford (fka China Grove) Switch - Barber Lake Switch 138 kV Line (West Circuit)","owner":"ONCOR","owner_project":"R8846","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":9.03,"from":"Buford (fka China Grove) Switch","to":"Barber Lake Switch","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the 9.03-mile west circuit of Buford (fka China Grove) Switch - Barber Lake Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110362","ercot_project":"110362","title":"Desoto 345/138 kV Autotransformer #2","owner":"ONCOR","owner_project":"M4027","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Desoto Switch","to":"Desoto Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Install Desoto 345/138 kV Autotransformer #2"},{"id":"ercot-tpit:110342","ercot_project":"110342","title":"Desoto Switch - Loop Nine Switch 138 kV Line","owner":"ONCOR","owner_project":"M4011","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.82,"from":"Desoto Switch","to":"Loop Nine Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Establish Desoto Switch - Loop Nine Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109812","ercot_project":"109812","title":"Rivercrest Switch - Sulphur Springs East Tap 138 kV Line","owner":"ONCOR","owner_project":"M3326","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":30.1,"from":"Rivercrest Switch","to":"Sulphur Springs East Tap","county_from":"Red River","county_to":"Hopkins","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Rivercrest Switch - Sulphur Springs East Tap 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110521","ercot_project":"110521","title":"Farmland 345 kV Switch Rebuild and Farmland - Long Draw 345 kV Line","owner":"ONCOR","owner_project":"R8786","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":22.8,"from":"Farmland","to":"Long Draw","county_from":"Lynn","county_to":"Borden","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 22.8-mile Farmland - Long Draw 345 kV Line and terminate the circuit into the newly rebuilt Farmland 345 kV Switch and WETT's existing Long Draw 345 kV Switch","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:104609","ercot_project":"104609","title":"BBEC Brenham North to Sandy Hill Transmission Line Upgrade","owner":"BBEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":8.6,"from":"Brenham North","to":"Sandy Hill","county_from":"Washington","county_to":"Washington","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace 336 (Linnet) conductor with 959 (Suwannee) and replace a limited number of structures to accommodate the new conductor.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/99881513","name":"Brenham North Substation","coordinates":[-96.38176,30.18182]},{"osm_id":"osm:way/511344241","name":"Sandy Hill Substation","coordinates":[-96.32728,30.27798]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/511344236","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":8.6,"straight_mi":null},{"id":"ercot-tpit:112560","ercot_project":"112560","title":"Desoto 345/138 kV Switch Rebuild","owner":"ONCOR","owner_project":"M4448","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Desoto Switch","to":"Desoto Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Desoto 345/138 kV Switch Rebuild","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:110579","ercot_project":"110579","title":"Buford (fka China Grove) Switch - Barber Lake Switch 138 kV Line (East Circuit)","owner":"ONCOR","owner_project":"R8845","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":9.03,"from":"Buford (fka China Grove) Switch","to":"Barber Lake Switch","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the 9.03-mile east circuit of Buford (fka China Grove) Switch - Barber Lake Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110683","ercot_project":"110683","title":"Ad Hoc TPIT: Build 345 kV double circuit from WETT's Buck Canyon to Oncor's White River station","owner":"WETT","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-01","actual_isd":null,"cm_new":110,"cm_rebuilt":0,"from":"Buck canyon 345 kV","to":"Oncor's White River 345 kV station","county_from":"Borden","county_to":"Floyd","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110553","ercot_project":"110553","title":"Sulphur Springs East Tap - Sulphur Springs East Switch 138 kV Line","owner":"ONCOR","owner_project":"M3326","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":5.5,"from":"Sulphur Springs East Switch","to":"Sulphur Springs East Tap","county_from":"Hopkins","county_to":"Hopkins","tier":"Tier 3","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Sulphur Springs East Tap - Sulphur Springs East Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105626","ercot_project":"105626","title":"BEPC_TIER1_Goatherd","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-03","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Ellis","county_to":null,"tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":null,"rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:110004","ercot_project":"110004","title":"Rebuild the Hillsboro Switch - Ash Creek Switch 138 kV Line","owner":"ONCOR","owner_project":"R6426","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":19.3,"from":"Hillsboro Switch","to":"Ash Creek Switch","county_from":"Hill","county_to":"Hill","tier":"Tier 1","rpg":"25RPG041, 25RPG043","rpg_completed":"2026-08-19","bod_reviewed":null,"comments":null,"description":"Rebuild the Hillsboro Switch - Ash Creek Switch 138 kV Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:89918","ercot_project":"89918","title":"GVEC Gonzales substation","owner":"GVEC","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"In service","projected_isd":"2029-12-15","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Gonzales","to":null,"county_from":"Gonzales","county_to":"Gonzales","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild existing substation, 138 kV bus, new PWT, new Control House, new HV and LV structures, containment foundations, bus, panels, etc"},{"id":"ercot-tpit:99314","ercot_project":"99314","title":"Establish Dinosaur 765/345 kV Switch","owner":"ONCOR","owner_project":"PB_765_Import1_A","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Dinosaur","to":"Dinosaur","county_from":"Somervell","county_to":"Somervell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_1A. Establish the Dinosaur 765/345 kV Switch with two 765/345 kV autotransformers"},{"id":"ercot-tpit:110178","ercot_project":"110178","title":"Bowman 345 kV Switch Capacitor Bank","owner":"ONCOR","owner_project":"M3568","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bowman Switch","to":"Bowman Switch","county_from":"Wichita","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Bowman 345 kV Switch Capacitor Bank"},{"id":"ercot-tpit:99239B","ercot_project":"99239B","title":"Establish Muscovy 345/138 kV Switch","owner":"ONCOR","owner_project":"R6212, R6342, R6362","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":30,"cm_rebuilt":0,"from":"Muscovy","to":"Voss Lake","county_from":"Williamson","county_to":"Milam","tier":"Tier 1","rpg":"25RPG009","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct the Muscovy - Voss Lake 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110608","ercot_project":"110608","title":"Venus 345 kV Switch Terminal Equipment","owner":"ONCOR","owner_project":"M5374","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Venus Switch","to":null,"county_from":"Ellis","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Venus 345 kV Switch Terminal Equipment"},{"id":"ercot-tpit:92867","ercot_project":"92867","title":"Renner Switch – Plano West Switch 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4246","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Renner","to":"Plano West","county_from":"Collin","county_to":"Collin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Renner Switch – Plano West Switch 138 kV Double-Circuit Line"},{"id":"ercot-tpit:105838","ercot_project":"105838","title":"Wilmer 345kV Statcom","owner":"ONCOR","owner_project":"M5016","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Wilmer","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Wilmer 345kV Statcom","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:110016","ercot_project":"110016","title":"Install Voss Lake 345/138 kV Auto #2","owner":"ONCOR","owner_project":"R6551","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Voss Lake","to":"Voss Lake","county_from":"Milam","county_to":"Milam","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Voss Lake 345/138 kV Auto #2"},{"id":"ercot-tpit:110044","ercot_project":"110044","title":"Rebuild Hutto - Round Rock Northeast 138 kV DCKT Line Section","owner":"ONCOR","owner_project":"R6553","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":5.3,"from":"Hutto","to":"Round Rock Northeast","county_from":"Williamson","county_to":"Williamson","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Hutto - Round Rock Northeast 138 kV DCKT Line Section","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174024844","name":"Hutto Switching Station","coordinates":[-97.56134,30.55117]},{"osm_id":"osm:way/340389556","name":"Round Rock Northeast Substation","coordinates":[-97.6489,30.54146]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/339132896","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":5.1,"straight_mi":null},{"id":"ercot-tpit:81240","ercot_project":"81240","title":"Consavvy – Odessa EHV 345 kV Double Circuit Line Rebuild","owner":"ONCOR","owner_project":"R3027","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":40,"from":"Consavvy","to":"Odessa EHV","county_from":"Midland","county_to":"Ector","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110034","ercot_project":"110034","title":"Establish Bob White 345 kV Switch","owner":"ONCOR","owner_project":"R6542","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bob White","to":"Bob White","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Bob White 345 kV Switch"},{"id":"ercot-tpit:81302","ercot_project":"81302","title":"Rockhound - Midland East 345 kV Line Rebuild","owner":"ONCOR","owner_project":"R3025","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":24.2,"from":"Rockhound","to":"Midland East","county_from":"Midland","county_to":"Midland","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 345 kV line and add a second circuit to the new line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110022","ercot_project":"110022","title":"Rebuild the Cannon - Dos Rios - Robertson 138 kV Line","owner":"ONCOR","owner_project":"R6460","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":19.2,"from":"Cannon","to":"Robertson","county_from":"Milam","county_to":"Robertson","tier":"Tier 1","rpg":"25RPG009","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Cannon - Dos Rios - Robertson 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110012","ercot_project":"110012","title":"Rebuild the Trinidad Switch - Mankin Switch 138 kV Line","owner":"ONCOR","owner_project":"R6048","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":4.1,"from":"Trinidad Switch","to":"Mankin Switch","county_from":"Henderson","county_to":"Henderson","tier":"Tier 1","rpg":"25RPG041, 25RPG043","rpg_completed":"2026-08-19","bod_reviewed":null,"comments":null,"description":"Rebuild the Trinidad Switch - Mankin Switch 138 kV Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:80346","ercot_project":"80346","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-21","actual_isd":null,"cm_new":0,"cm_rebuilt":3.2,"from":"SANDY SWITCH","to":"CRUTCHFIELD","county_from":"Grimes","county_to":"Grimes","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:100163","ercot_project":"100163","title":"BowWood_Load_Circuit_Breaker_Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bow Wood","to":"Bow Wood","county_from":"McCulloch","county_to":"McCulloch","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install a new transmission point of interconnection for a large load at Bow Wood Substation."},{"id":"ercot-tpit:109860","ercot_project":"109860","title":"Red Rock Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Red Rock","to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment of L_LOCKHA8_1Y (Bus #7216) - L_REDROC8_1Y (Bus #7560) 138.0-kV line as an LCP project for Batch Zero Base Load"},{"id":"ercot-tpit:109798","ercot_project":"109798","title":"Antler Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":null,"from":"Antler","to":null,"county_from":"Comal","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment at Antler (Bus #7171) to increase operational rating of terminating 138.0-kV lines, minimum 943 MVA, as an LCP Upgrade project for Batch Zero Base Load."},{"id":"ercot-tpit:66118","ercot_project":"66118","title":"Reconductor TI-Lakepointe with 959 ACSS/TW","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.78,"from":"Lakepoint (bus # 37010)","to":"TI (bus # 37080)","county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Project ISD anticipated in 2025.","terminal_match":{"from":"not_in_osm","to":"unnamed"}},{"id":"ercot-tpit:110164","ercot_project":"110164","title":"Austrop Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Austrop","to":null,"county_from":"Travis","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment of Austrop (Bus #9328) to increase operational rating of terminating 138-kV lines to 643 MVA. Upgrade project for Batch Zero Base Load"},{"id":"ercot-tpit:109882","ercot_project":"109882","title":"Winchester Dynamic Reactive Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Winchester","to":null,"county_from":"Fayette","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add 350MVAr cap bank at the Winchester 345kV substation as an LCP project for Batch Zero Base Load"},{"id":"ercot-tpit:109916","ercot_project":"109916","title":"Highway 46 Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Highway46","to":null,"county_from":"Comal","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment at Highway46 (Bus #7177) to increase operational rating of terminating 138.0-kV lines as an LCP Upgrade project for Batch Zero Base Load."},{"id":"ercot-tpit:109856","ercot_project":"109856","title":"Robert Brown Jr Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Robert Brown Jr","to":null,"county_from":"Caldwell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment of L_ROBRJR8_1Y (Bus #7194) - L_CAMPGA8_1Y (Bus #7196) 138.0-kV line as an LCP project for Batch Zero Base Load"},{"id":"ercot-tpit:109862","ercot_project":"109862","title":"Clear Fork Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clear Fork","to":null,"county_from":"Caldwell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment of L_ROBRJR8_1Y (Bus #7194) - L_CLEAFO8_1Y (Bus #7195) 138.0-kV line as an LCP project for Batch Zero Base Load"},{"id":"ercot-tpit:99857","ercot_project":"99857","title":"LCRATSC_Gooseneck_Substation_Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"7052 Gooseneck","to":null,"county_from":"Guadalupe","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Gooseneck substation cut into LCRA TSC-owned 345-kV double-circuit line, T248 Marion -Zorn and T250 Clear Springs - Zorn."},{"id":"ercot-tpit:100025","ercot_project":"100025","title":"Naismith: Expand 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":4,"cm_rebuilt":0,"from":"Naismith","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Description Update","description":"Interconnect Arcadia eFuels load to the existing Naismith 138 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:110136","ercot_project":"110136","title":"Lyle Wolz Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lyle Wolz","to":null,"county_from":"Burleson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will upgrade terminal equipment at LYLEWO (7567) to achieve a minimum 345 MVA rating. Upgrade project for Batch Zero Base Load"},{"id":"ercot-tpit:99323","ercot_project":"99323","title":"Longshore - Dinosaur 765 kV Line","owner":"ONCOR","owner_project":"PB_765_Import1_D","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":257.45,"cm_rebuilt":0,"from":"Longshore","to":"Dinosaur","county_from":"Howard","county_to":"Somervell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_1D. Add a new New Substation 2 – Longshore 765-kV single-circuit line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99141","ercot_project":"99141","title":"Rebuild Flower Grove - Vincent 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8736","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":20.3,"from":"Flower Grove","to":"Vincent","county_from":"Howard","county_to":"Howard","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the existing Flower Grove - Vincent 138 kV Line Section","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99130","ercot_project":"99130","title":"Drill Hole 765/345 kV Autotransformer #2","owner":"ONCOR","owner_project":"PB_765_Import1_C","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Drill Hole","to":"Drill Hole","county_from":"Culberson","county_to":"Culberson","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_1C. Add a second 765/345 kV autotransformer at Drill Hole"},{"id":"ercot-tpit:99128","ercot_project":"99128","title":"Longshore 765/345 kV Autotransformer #2","owner":"ONCOR","owner_project":"PB_765_Import1_B","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Longshore","to":"Longshore","county_from":"Howard","county_to":"Howard","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_1B. Add a second 765/345 kV autotransformer at Longshore"},{"id":"ercot-tpit:105247","ercot_project":"105247","title":"Dinolong 765 kV Switch","owner":"ONCOR","owner_project":"R8970","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2029-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Dinosaur","to":"Longshore","county_from":"Scurry","county_to":"Scurry","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish a 765 kV midpoint station to support reactive compensation needs for the Dinosaur - Longshore 765 kV Line"},{"id":"ercot-tpit:110455","ercot_project":"110455","title":"STEC Amphion Load Project Phase 1","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-01-01","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"San Miguel","to":"Fowlerton, Cruce","county_from":"Atascosa","county_to":"McMullen","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-Hairpin San Miguel to Fowlerton ckt 2 into STEC Amphion load serving station -Loop in and out San Miguel to Cruce into STEC Amphion load station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:110126","ercot_project":"110126","title":"Install a 3rd 600MVA autotransformer at Eastside.","owner":"CPS/NO","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-01-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5137","to":"5136","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null},{"id":"ercot-tpit:84898","ercot_project":"84898","title":"New Eastside Switching Station","owner":"CPS","owner_project":"T-0399","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"23RPG032: San Antonio South Reli","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104603","ercot_project":"104603","title":"Chalybe: Expand 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Chalybe","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Terminal \"from\" and TSP/Company Contact Update","description":"Install two (2) 138 kV breakers at the Chalybe 138 kV station"},{"id":"ercot-tpit:87693","ercot_project":"87693","title":"Rebuild Spruce to Eastside Double Circuit","owner":"CPS","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:100676","ercot_project":"100676","title":"Install a 50MVAr Capacitor Bank at the future Eastside Substation","owner":"CPS/NO","owner_project":"S-1049","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5136","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104593","ercot_project":"104593","title":"Chalybe to Endpoint: Construct New 138 kV Double Circuit Line","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-01-31","actual_isd":null,"cm_new":10.5,"cm_rebuilt":0,"from":"Chalybe","to":"Endpoint","county_from":"Cameron","county_to":"Cameron","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Construct a new 138 kV double circuit line from Chalybe to Endpoint","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104597","ercot_project":"104597","title":"Endpoint: Construct New 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Endpoint","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect Texas LNG load to the new Endpoint 138 kV station"},{"id":"ercot-tpit:109729","ercot_project":"109729","title":"O'Connor: Retire Station","owner":"AEP TCC","owner_project":"DR26X0018","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-02-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"O'Conner","to":null,"county_from":"Refugio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Retire the O'Connor station"},{"id":"ercot-tpit:109814","ercot_project":"109814","title":"LCRATSC Gabriel Glasscock Transmission Line Upgrade","owner":"LCRATSC","owner_project":"PLC-8461","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-02-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.5,"from":"Structure 21","to":"Glasscock Sub","county_from":"Williamson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will upgrade T359 Gabriel - Glasscock 138-kV transmission line to achieve a higher operational rating. This project is coordinated with the Gabriel – Schwertner Transmission Line Upgrade project","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109792","ercot_project":"109792","title":"Hutto - Limmer Transmission Line Upgrade","owner":"LCRATSC","owner_project":"PLC-8544","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-02-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.38,"from":"Hutto","to":"Limmer","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":"25RPG009","rpg_completed":"2025-08-19","bod_reviewed":null,"comments":null,"description":"This project will install the Hutto - Limmer 345-kV transmission line on separate structures to remove an ERCOT double-circuit contingency event. This project will require coordination with Oncor. The need for this project with identified b","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:109745","ercot_project":"109745","title":"Tivoli: Construct New Distribution Station","owner":"AEP TCC","owner_project":"DR26X0018","kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2030-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"TIVOLI","to":null,"county_from":"Refugio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Construct new distribution station on the Rincon to Airco 138 kV line"},{"id":"ercot-tpit:104554","ercot_project":"104554","title":"Addition of the Red Gulch 138 kV substation","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Addition of Red Gulch station on existing Bertram - Andice transmission line."},{"id":"ercot-tpit:110943A","ercot_project":"110943A","title":"Cooke County Resiliency Project","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-03-01","actual_isd":null,"cm_new":16,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Cooke","county_to":"Cooke","tier":"Tier 2","rpg":"26RPG007","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new breaker station “Bulcher” near Bulcher, TX Construct a new transmission line from Bulcher to Capps Corner Construct a new transmission line from Bulcher to Sivell’s Bend","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110677","ercot_project":"110677","title":"Add 180MAr Cap at Elm Creek","owner":"CPS/NO","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5133","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110665","ercot_project":"110665","title":"Rebuild Elm Creek to STP dbl Ckt","owner":"CPS/NO","owner_project":"T-XXXX","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102762","ercot_project":"102762","title":"BEPC_TPIT102762_Whitney_Itasca","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":16.1,"from":null,"to":null,"county_from":"Bosque","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110931","ercot_project":"110931","title":"Pig Creek: Install new 138 kV Capacitor Bank","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-03-02","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pig Creek","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new capacitor banks at the Pig Creek 138 kV station"},{"id":"ercot-tpit:110939","ercot_project":"110939","title":"Musquiz: Install new 138 kV Capacitor Bank","owner":"AEP TNC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-03-02","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Install new capacitor banks at the Musquiz 138 kV station"},{"id":"ercot-tpit:109718","ercot_project":"109718","title":"Ferranti: Construct New 345 kV Station","owner":"AEP","owner_project":"TP2026092","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-03-30","actual_isd":null,"cm_new":3,"cm_rebuilt":0,"from":"Ferranti","to":null,"county_from":"Wilbarger","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect the OPS 2.0 load to the Ferranti 345 kV station on the Edith Clarke to Riley double circuit line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:103470","ercot_project":"103470","title":"Welsh HVDC: Build 345 kV Bypass Line","owner":"AEP TCC","owner_project":"TP2024163","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-03-31","actual_isd":null,"cm_new":0.25,"cm_rebuilt":0,"from":"Welsh HVDC","to":"Welsh HVDC","county_from":"Titus","county_to":"Titus","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new 345 kV bypass line at the Welsh HVDC 345 kV station","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109818","ercot_project":"109818","title":"Venus â€“ Old Country Switch 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4282","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":15.9,"from":"Venus Switch","to":"Old Country Switch","county_from":"Ellis","county_to":"Ellis","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Venus – Old Country Switch 345 kV Double-Circuit Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:91883","ercot_project":"91883","title":"La Palma to Stillman: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TP2025011","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":22.3,"from":"La Palma","to":"Stillman","county_from":"Cameron","county_to":"Cameron","tier":"Tier 1","rpg":"24RPG008","rpg_completed":"2024-09-27","bod_reviewed":"2024-12-03","comments":"In-Service Date Update","description":"Rebuild the La Palma to Stillman 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:91896","ercot_project":"91896","title":"La Palma to Military Highway: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TP2025011","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":22.2,"from":"La Palma","to":"Military Highway","county_from":"Cameron","county_to":"Cameron","tier":"Tier 1","rpg":"24RPG008","rpg_completed":"2024-09-27","bod_reviewed":"2024-12-03","comments":"In-Service Date Update","description":"Rebuild the La Palma to Military Highway 138 kV line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110084G","ercot_project":"110084G","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CEHE_Newsub","to":"WAParish/Wolf","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor of 345 kV W.A. Parish to Wolf to Raider ckt 64."},{"id":"ercot-tpit:76123","ercot_project":"76123","title":"D'Hanis Capacitor 2nd step addition","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"D'Hanis","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"D'Hanis Capacitor 2nd step addition 9.6 MVAR"},{"id":"ercot-tpit:102873","ercot_project":"102873","title":"Upgrade Aloe to Warburton","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102877","ercot_project":"102877","title":"Upgrade Bakersfield to Schneeman Draw","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Bakersfield - Cedar Canyon - Noelke - Schneeman Draw as part of the Permian Basin Reliability plan (project L15)"},{"id":"ercot-tpit:90022","ercot_project":"90022","title":"Upgrade Sam Rayburn to Aloe","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":9.6,"from":"Sam Rayburn","to":"Aloe","county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Sam Rayburn to Aloe to 795 ACSR conductor. 2025 RTP.","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:75989","ercot_project":"75989","title":"Rebuild Vanderbilt -Pt Lavaca","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":26.47,"from":"Vanderbilt","to":"Port Lavaca","county_from":"Victoria","county_to":"Calhoun","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Vanderbilt - Placedo - Kamey -Pt Lavaca 69kV to 795 ACSR","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:110084H","ercot_project":"110084H","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CEHE_Newsub","to":"WAParish","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor of 345kV ckt.72 W.A. Parish to CEHE_Newsub."},{"id":"ercot-tpit:110296","ercot_project":"110296","title":"Allen Switch - Lavon Switch 138 kV Line","owner":"ONCOR","owner_project":"M3342","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-01","actual_isd":null,"cm_new":12.7,"cm_rebuilt":0,"from":"Allen Switch","to":"Lavon Switch","county_from":"Collin","county_to":"Collin","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Establish Allen Switch - Lavon Switch 138 kV Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/172032306","name":"Allen Switching Station","coordinates":[-96.70021,33.06014]},{"osm_id":"osm:way/1362050196","name":"Lavon Substation","coordinates":[-96.42142,33.0125]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:110637","ercot_project":"110637","title":"Rebuild Elm Creek to Skyline","owner":"CPS/NO","owner_project":"T-XXXX","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5133","to":"5371","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102663","ercot_project":"102663","title":"BEPC_TPIT102663_Pursley_Emmett","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-10","actual_isd":null,"cm_new":0,"cm_rebuilt":10.5,"from":null,"to":null,"county_from":"Navarro","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110006","ercot_project":"110006","title":"Rebuild the Lake Creek Switch - Riesel Switch 138 kV Line","owner":"ONCOR","owner_project":"R6433","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.1,"from":"Lake Creek Switch","to":"Riesel Switch","county_from":"McLennan","county_to":"Falls","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Lake Creek Switch - Riesel Switch 138 kV Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:110000","ercot_project":"110000","title":"Install Jewett Switch - Crockett Switch 138 kV Line Ckt #2","owner":"ONCOR","owner_project":"R6554","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-15","actual_isd":null,"cm_new":39,"cm_rebuilt":null,"from":"Jewett Switch","to":"Crockett Switch","county_from":"Leon","county_to":"Houston","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Jewett Switch - Crockett Switch 138 kV Line Ckt #2","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:110338","ercot_project":"110338","title":"Rebuild Voss Lake Switch - Minerva Switch 138 kV Line","owner":"ONCOR","owner_project":"R6571","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":13.5,"from":"Voss Lake","to":"Minerva","county_from":"Milam","county_to":"Milam","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Voss Lake Switch - Minerva Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110008","ercot_project":"110008","title":"Rebuild the Mankin Switch - Seven Points 138 kV Line Section","owner":"ONCOR","owner_project":"R6466","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":11.2,"from":"Mankin Switch","to":"Seven Points","county_from":"Henderson","county_to":"Henderson","tier":"Tier 1","rpg":"25RPG041, 25RPG043","rpg_completed":"2026-08-19","bod_reviewed":null,"comments":null,"description":"Rebuild the Mankin Switch - Seven Points 138 kV Line Section","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110020","ercot_project":"110020","title":"Rebuild Bell County East - Little Pond/Brangus 345 kV DCKT Line","owner":"ONCOR","owner_project":"R6422","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":46.8,"from":"Bell County East","to":"Little Pond/Brangus","county_from":"Bell","county_to":"Milam","tier":"Tier 1","rpg":"25RPG009","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Bell County East - Little Pond/Brangus 345 kV DCKT Line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:110154","ercot_project":"110154","title":"Rebuild Possum Trot Switch - Belfalls-STR 26-4C 345 kV DCKT Line","owner":"ONCOR","owner_project":"R6459","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":52.2,"from":"Possum Trot","to":"Belfalls","county_from":"McLennan","county_to":"Bell","tier":"Tier 1","rpg":"25RPG043","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Possum Trot Switch - Belfalls-STR 26-4C 345 kV DCKT Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110274","ercot_project":"110274","title":"Gunter Switch - Collin Switch 138 kV Line","owner":"ONCOR","owner_project":"M3319","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":16.4,"cm_rebuilt":0,"from":"Gunter Switch","to":"Collin Switch","county_from":"Grayson","county_to":"Collin","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Gunter Switch - Collin Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109894","ercot_project":"109894","title":"Rebuild the Redland Switch - Nacogdoches Southeast Switch 138 kV Line","owner":"ONCOR","owner_project":"R6538","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":13.4,"from":"Redland Switch","to":"Nacogdoches Southeast Switch","county_from":"Angelina","county_to":"Nacogdoches","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Redland Switch - Nacogdoches Southeast Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109872","ercot_project":"109872","title":"Establish new Belton 138 kV Switch","owner":"ONCOR","owner_project":"R6351","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Belton","to":"Belton","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish new Belton 138 kV Switch"},{"id":"ercot-tpit:110138","ercot_project":"110138","title":"Bastrop West - Sim Gideon Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.73,"from":"Sim Gideon","to":"Bastrop West","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will upgrade the transmission line from SIMGID (7130) - BASTWE (7555), to achieve a 533 MVA min rating. Upgrade project to support Batch Zero Base Load","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/127247651","name":"Sim Gideon Station","coordinates":[-97.2688,30.14611]},{"osm_id":"osm:way/173298450","name":"Bastrop West Substation","coordinates":[-97.33518,30.10173]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/173298424","layer":"lines-138"},{"osm_id":"osm:way/173298396","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":6.6,"straight_mi":5},{"id":"ercot-tpit:6287","ercot_project":"6287","title":"Sherry Sw. - Webb/Kennedale 345 kV DCKT Line","owner":"ONCOR","owner_project":"M4252","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":11.2,"from":"Sherry","to":"Webb/Kennedale","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the existing 345 kV Line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:80579","ercot_project":"80579","title":"La Palma to Progresso: Convert to 138 kV","owner":"AEP TCC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":18.1,"from":"La Palma","to":"Progresso","county_from":"Cameron","county_to":"Hidalgo","tier":"Tier 3","rpg":"23RPG005","rpg_completed":"2023-03-23","bod_reviewed":null,"comments":"Dollars Should Be Update","description":"Convert the La Palma to Progreso 69 kV line to 138 kV","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:87770","ercot_project":"87770","title":"Establish a 110.4 MVAR Capacitor Bank at Midnight 138 kV Substation","owner":"ONCOR","owner_project":"R6346","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Midnight","to":"Midnight","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish a 110.4 MVAR Capacitor Bank at Midnight 138 kV Substation"},{"id":"ercot-tpit:99605","ercot_project":"99605","title":"Establish Belltown 138 kV Switch","owner":"ONCOR","owner_project":"R6414","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Belltown 138 kV Switch","to":"Belltown 138 kV Switch","county_from":"Van Zandt","county_to":"Van Zandt","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Belltown 138 kV Switch"},{"id":"ercot-tpit:102795","ercot_project":"102795","title":"Bakersfield_NevillRoad_NorthMcCamey_Transmission_Line_Upgrade","owner":"GPL","owner_project":"PBRP_L14_Joint","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":16.27,"cm_rebuilt":16.27,"from":"Nevill Road","to":"Bakersfield/North McCamey","county_from":"Upton","county_to":"Pecos","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"PL and LCRA joint PBRP_L14 project by upgrading of the existing Bakersfield - Nevill Road - North McCamey 345kV transmission lines and adding of new 345kV Bakersfield - Nevill Road - North McCamey second circuits","duplicate_listing":true,"terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:102795","ercot_project":"102795","title":"Bakersfield_NevillRoad_NorthMcCamey_Transmission_Line_Upgrade","owner":"GPL","owner_project":"PBRP_L14_Joint","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":16.27,"cm_rebuilt":16.27,"from":"Nevill Road","to":"Bakersfield/North McCamey","county_from":"Upton","county_to":"Pecos","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"PL and LCRA joint PBRP_L14 project by upgrading of the existing Bakersfield - Nevill Road - North McCamey 345kV transmission lines and adding of new 345kV Bakersfield - Nevill Road - North McCamey second circuits","duplicate_listing":true,"terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:103782","ercot_project":"103782","title":"Drill Hole - Sand Lake 765 kV Line","owner":"ONCOR","owner_project":"R8892","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-15","actual_isd":null,"cm_new":57.6,"cm_rebuilt":0,"from":"Drill Hole","to":"Sand Lake","county_from":"Culberson","county_to":"Ward","tier":"Tier 1","rpg":"25RPG022","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add a new Drill Hole - Sand Lake 765 kV Line","rpg_project":"ercot-rpg:25RPG022","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:4320","ercot_project":"4320","title":"CPSE_Brooks to Chavaneaux MLSE","owner":"CPS","owner_project":"S-0733","kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2030-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Brooks","to":"Chavaneaux","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminals at Brooks and Chavaneaux to ensure a 1364 A rating (minimum)"},{"id":"ercot-tpit:109635A","ercot_project":"109635A","title":"WA Parish 345kV 80kA Fault Upgrade","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":null,"county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade WA Parish 345kV [44000] fault duty to 80KA"},{"id":"ercot-tpit:90027","ercot_project":"90027","title":"Cross Plains to Rising Star: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":12.96,"from":"Cross Plains","to":"Rising Star","county_from":"Callahan","county_to":"Eastland","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rehab the Cross Plains to Rising Star 69 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/516664074","name":"Cross Plains Substation","coordinates":[-99.16873,32.1218]},{"osm_id":"osm:way/516664056","name":"Rising Star Substation","coordinates":[-98.9727,32.09445]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/516664077","layer":"lines-69"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":12.9,"straight_mi":null},{"id":"ercot-tpit:109635B","ercot_project":"109635B","title":"WA Parish 345kV 80kA Fault Upgrade","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":null,"county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade WA Parish 345kV [44005] fault duty to 80KA"},{"id":"ercot-tpit:15TPIT0031","ercot_project":"15TPIT0031","title":"Chavaneaux_Chavaneaux Tap Rebuild (Brooks to Chavaneaux ckt)","owner":"CPS","owner_project":"T-0260","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Brooks","to":"Chavaneaux","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild 138 kV transmission from Chavaneaux to Chavaneaux Tap. This rebuild is for Brooks to Chavaneaux ckt."},{"id":"ercot-tpit:15TPIT0033","ercot_project":"15TPIT0033","title":"Randolph - 138 kV Substation Equipment Upgrade","owner":"CPS","owner_project":"S-0645b","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Randolph","to":"Tuttle-Weiderstein","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the Weiderstein and Tuttle terminals and ensure a 2000 A rating (minimum). Reconfigure and-or upgrade the main bus to ensure a 2000 A rating (minimum)."},{"id":"ercot-tpit:110935","ercot_project":"110935","title":"Orchrid_138_Switchyard","owner":"CPS","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104249B","ercot_project":"104249B","title":"BRYN_SOSW-HLMN-DWLRD_Upgrade","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":1.1,"from":"BTU Dowling Road","to":"BTU Holleman","county_from":"Brazos","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Dowling Road to Holleman 138kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104249A","ercot_project":"104249A","title":"BRYN_SOSW-HLMN-DWLRD_Upgrade","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":1.35,"from":"BTU Holleman","to":"BTU South Switch","county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade South Switch to Holleman 138kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:92282","ercot_project":"92282","title":"Faulkner - Cryo 138kV - Part of Upgrade L4 2024 Permian Basin Study","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":22.8,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Reeves","county_to":"Reeves","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/501745940","name":"Faulkner Substation","coordinates":[-103.7932,31.26104]},{"osm_id":"osm:way/1006095232","name":"Cryo Substation","coordinates":[-103.72058,31.0469]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:92276","ercot_project":"92276","title":"Bottlebrush 345kV - Part of Upgrade L13 2024 Permian Basin Study","owner":"TNMP","owner_project":"PBRP Upgrade L13","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":174.84,"cm_rebuilt":29.81,"from":null,"to":null,"county_from":"Pecos","county_to":"Pecos","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110565","ercot_project":"110565","title":"Carmichael Bend Switch - Cleburne North 138 kV Line Section","owner":"ONCOR","owner_project":"M5226","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Carmichael Bend Switch","to":"Cleburne North","county_from":"Johnson","county_to":"Johnson","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Carmichael Bend Switch - Cleburne North 138 kV Line Section"},{"id":"ercot-tpit:110907","ercot_project":"110907","title":"Castroville_to_Rafter_DblCkt_&_Rebuild","owner":"CPS","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-01","actual_isd":null,"cm_new":6,"cm_rebuilt":6,"from":"5083","to":"5355","county_from":"Medina","county_to":"Medina","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild existing Castroville to Rafter ckt 1 (~6 miles) single circuit to have normal and emergency ratings of at least 3000A. Construct new Castroville to Rafter ckt 2 (~6 miles) to match ratings of ckt 1","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110913","ercot_project":"110913","title":"WOH Area Upgrades","owner":"CPS","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110915","ercot_project":"110915","title":"Omicron Area Upgrades","owner":"CPS","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110917","ercot_project":"110917","title":"New_Grissom_Ingram_Circuit","owner":"CPS","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110919","ercot_project":"110919","title":"CPS Lylte Tline Rebuilds","owner":"CPS","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110923","ercot_project":"110923","title":"Castroville_345KVSwitchingStation_Changes","owner":"CPS","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110925","ercot_project":"110925","title":"Add Reactive Support","owner":"CPS","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104571","ercot_project":"104571","title":"Addition of the Feldspar 138 kV substation","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding 138 kV Feldspar station to the line connecting Buda to Rutherford."},{"id":"ercot-tpit:16TPIT0007","ercot_project":"16TPIT0007","title":"McNeil to MagPlant Ckt 977 Upgrade","owner":"AEN","owner_project":"P396","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.24,"from":"McNeil Substation","to":"Mag Plant Substation","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor existing McNeil to MagPlant circuit from 2000 to 3000 Amp. Relocate McNeil to Summit Circuit 907 and McNeil to MagPlant Circuit 977 to separate structures. Kramer Lane (KA) substation will be cut-into this line in 2023","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:71408","ercot_project":"71408","title":"Upgrade CKT943 to 3000 amperes","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":11.13,"from":"Lytton Springs","to":"Pilot Knob","county_from":"Caldwell","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace existing 2-795ACSR conductors with 2-795 ACSS conductors and the upgrade the terminal equipment to 3000 amperes.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/173981611","name":"Lytton Springs Substation","coordinates":[-97.67431,30.00537]},{"osm_id":"osm:way/217282331","name":"Pilot Knob Substation","coordinates":[-97.68163,30.16249]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/217282332","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":11.2,"straight_mi":null},{"id":"ercot-tpit:86315","ercot_project":"86315","title":"AEN_Barton_Vega_Ckt_928_Reconductor","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"9158","to":"9285","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:86317","ercot_project":"86317","title":"AEN_DP_OnionCreek_Ckt_924_Reconductor","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"9187","to":"9251","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:86333","ercot_project":"86333","title":"AEN_OnionCreek_StoneyRidge_Ckt_1026_Reconductor","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"9237","to":"9251","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:86838","ercot_project":"86838","title":"AEN_JustinLane_KoenigLane_Ckt__conversion_to_138kV","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"9225","to":"9227","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Justin Lane Koenig Lane convert to 138kV"},{"id":"ercot-tpit:110830","ercot_project":"110830","title":"STEC_110830_OuroborosLargeLoadProject","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the 345 kV AEP Rio Hondo (8318) to Candela (8013) Ckt #1 to at least NMRL/EMR rating of 2850 MVA Upgrade 345 kV SHRY Kingfisher (79501) to AEP La Palma (8317) to Candela (8013) Ckt #1 to at least NMRL/EMR rating of 2600 MVA Upgrade "},{"id":"ercot-tpit:100466","ercot_project":"100466","title":"Big Hill 765-kV Substation Addition","owner":"LCRATSC","owner_project":"PLC-8263","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Big Hill","to":null,"county_from":"Schleicher","county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2026-03-02","bod_reviewed":null,"comments":null,"description":"LCRA TSC will construct a new Big Hill 765-kV yard adjacent to the existing Big Hill 345-kV Substation and install two new 765/345-kV autotransformers."},{"id":"ercot-tpit:103248","ercot_project":"103248","title":"Nevill_Road_North_McCamey_Transmission_Line_Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Nevill Road","to":"North McCamey","county_from":"Pecos","county_to":"Upton","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install a 345-kV circuit on the second position of the North McCamey – Nevill Road 345-kV transmission line from North McCamey Substation to a POI with Garland Power & Light (GP&L). Upgrade North McCamey Substation terminal equipment to int"},{"id":"ercot-tpit:102395","ercot_project":"102395","title":"Bakersfield_SchneemanDraw_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bakersfield","to":"Schneeman Draw","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade substation equipment at Bakersfield, Cedar Canyon, Twelvemile, Noelke, Single Tree, and Schneeman Draw to support the upgrade of the STEC 345-kV double circuit line from Bakersfield to Schneeman Draw. Transmission line scope will be"},{"id":"ercot-tpit:110457","ercot_project":"110457","title":"STEC Amphion Load Project Phase 2","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-06-30","actual_isd":null,"cm_new":108.68,"cm_rebuilt":null,"from":"Coleto,Angstrom, Hillje","to":"Victoria,Whitepoint,Crasco","county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-RTP project 2025-MDS01:Upgrade Coleto to Victoria ckt 1 to 485 MVA -RTP project 2025-MDS01: Upgrade Coleto to Victoria ckt 2 to 485 MVA -Upgrade Coleto 345/138 auto 1 to 780 MVA -Upgrade Coleto 345/138 auto 2 to 770 MVA -RTP project 2025-S","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110077F","ercot_project":"110077F","title":"This models upgrades required for a proposed load addition.","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Singleton","to":null,"county_from":"Grimes","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 300 MVAR capacitor bank at the 345 kV Singleton substation."},{"id":"ercot-tpit:110079B","ercot_project":"110079B","title":"This models upgrades required for a proposed load addition near King Substation","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CEHE_NewSub","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 300 MVAR capacitor bank at CEHE_NewSub."},{"id":"ercot-tpit:104613","ercot_project":"104613","title":"Addition of Highway 45 substation","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Addition of Highway 45 138 kV substation between Buda and Manchaca"},{"id":"ercot-tpit:110077E","ercot_project":"110077E","title":"This models upgrades required for a proposed load addition.","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Zenith","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install second 300 MVAR capacitor bank at the 345 kV Zenith substation."},{"id":"ercot-tpit:110057C","ercot_project":"110057C","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Zenith","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one 300 MVAR capacitor bank at 345 kV Zenith substation."},{"id":"ercot-tpit:91586","ercot_project":"91586","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-07-05","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"TENASKA","to":"NEW SUBSTATION PLANK","county_from":"Johnson","county_to":"Johnson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:109822","ercot_project":"109822","title":"Old Country Switch - Notus Switch 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4511","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-08-01","actual_isd":null,"cm_new":0,"cm_rebuilt":14.8,"from":"Old Country Switch","to":"Notus Switch","county_from":"Ellis","county_to":"Ellis","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Old Country Switch – Notus Switch 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110815","ercot_project":"110815","title":"Fisher Road - Wichita Falls 138 kV Line Upgrade","owner":"ONCOR","owner_project":"R191","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-08-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3.52,"from":"Fisher Road Switch","to":"Wichita Falls","county_from":"Wichita","county_to":"Wichita","tier":"Tier 4","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Fisher Road - Wichita Falls 138 kV Line Upgrade","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99117","ercot_project":"99117","title":"BRYN_99117_ATK-TAMU_UPGRADE","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.3,"from":"Atkins","to":"TAMU","county_from":"Brazos","county_to":"Brazos","tier":"Tier 1","rpg":"25RPG001","rpg_completed":"2025-07-05","bod_reviewed":null,"comments":null,"description":"Re-build the existing Atkins to TAMU 138-kV single-circuit transmission line on double-circuit capable structures with one circuit in place with normal and emergency ratings of at least 495 MVA and 521 MVA, respectively, approximately 3.3-m","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102993","ercot_project":"102993","title":"BEPC_TIER3_WhitneyAutoUpgrade","owner":"BEPC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"240","to":null,"county_from":"Hill","county_to":null,"tier":"Tier 3","rpg":"25RPG044","rpg_completed":"2026-01-27","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:89920","ercot_project":"89920","title":"GVEC Nixon substation","owner":"GVEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"In service","projected_isd":"2030-10-25","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Gonzales","to":null,"county_from":"Gonzales","county_to":"Gonzales","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild existing substation, 138 kV bus, new PWT, new Control House, new HV and LV structures, containment foundations, bus, panels, etc"},{"id":"ercot-tpit:111276","ercot_project":"111276","title":"Solstice: Construct New 765 kV Station","owner":"AEP TNC","owner_project":"TP2024146","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-10-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Solstice","to":null,"county_from":"Pecos","county_to":null,"tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":null,"description":"Construct the new Solstice 765 kV station and Install two 765/345 kV autotransformers and two 765 kV shunt reactors"},{"id":"ercot-tpit:98595","ercot_project":"98595","title":"Solstice to Howard: Construct New 765 kV Single Circuit Line","owner":"AEP TNC","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-10-30","actual_isd":null,"cm_new":185,"cm_rebuilt":0,"from":"Solstice","to":"Howard","county_from":"Pecos","county_to":"Bexar","tier":"Tier 1","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"In-Service Date, Dollars, Autotransformer and Reactive Capability Update","description":"Construct a new 765 kV single circuit line from Solstice to Howard","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110379","ercot_project":"110379","title":"San Pedro: Construct 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-11-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"San Pedro","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 1","rpg":"25RPG016","rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Construct 345 kV station to interconnect STEC Nueces Ammonia Load"},{"id":"ercot-tpit:110391","ercot_project":"110391","title":"Chalcedony to San Pedro: Construct 345 kV circuit.","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-11-12","actual_isd":null,"cm_new":4.5,"cm_rebuilt":0,"from":"San Pedro","to":"Chalcedony","county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG016","rpg_completed":null,"bod_reviewed":null,"comments":"Project Title and Project Description Update","description":"Construct new double circuit capable structures from San Pedro to Chalcedony 345 kV. String single circuit initially.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104018","ercot_project":"104018","title":"Lake Pauline to Quanah: Convert to 138 kV","owner":"AEP TNC","owner_project":"TP2025249","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":2.75,"from":"Lake Pauline","to":"Quanah","county_from":"Childress","county_to":"Childress","tier":"Tier 2","rpg":"25RPG018","rpg_completed":"2025-11-10","bod_reviewed":null,"comments":null,"description":"Convert the Lake Pauline to Quanah 69 kV line to 138 kV","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104020","ercot_project":"104020","title":"Nippert: Construct New 138/69 kV Station","owner":"AEP TNC","owner_project":"TP2025249","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-11-30","actual_isd":null,"cm_new":7,"cm_rebuilt":3.2,"from":"Nippert","to":null,"county_from":"Childress","county_to":null,"tier":"Tier 2","rpg":"25RPG018","rpg_completed":"2025-11-10","bod_reviewed":null,"comments":"Terminal From, In-Service Date, RPG Number, Date submitted to ERCOT and Review Completed Date Update","description":"Construct new Nippert 138/69 kV station on the Childress to Quanah 69 kV line between Childress and Goodlet and on the Paducah to West Childress 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:99784","ercot_project":"99784","title":"Surreal: Construct New 345 kV Station","owner":"AEP TCC/ETT","owner_project":"TP2025325","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Surreal","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Title, Description, Terminal from, Transmission Owner, Dollars, and Planning Charter Tier Update","description":"Interconnect the Cinco III load to the new Surreal 345 kV station and install two autotransformers"},{"id":"ercot-tpit:110543","ercot_project":"110543","title":"Timberview Switch - Benbrook Switch 345 kV Line Upgrade","owner":"ONCOR","owner_project":"M5273","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Timberview Switch","to":"Benbrook Switch","county_from":"Johnson","county_to":"Johnson","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Timberview Switch - Benbrook Switch 345 kV Line Upgrade"},{"id":"ercot-tpit:104615","ercot_project":"104615","title":"BBEC Gay Hill to Sandy Hill Transmission Line Upgrade","owner":"BBEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":8.9,"from":"Gay Hill","to":"Sandy Hill","county_from":"Washington","county_to":"Washington","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace 336 (Linnet) conductor with 959 (Suwannee) and replace a limited number of structures to accommodate the new conductor.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/511133231","name":"Gay Hill Substation","coordinates":[-96.47165,30.27112]},{"osm_id":"osm:way/511344241","name":"Sandy Hill Substation","coordinates":[-96.32728,30.27798]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/511344247","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":8.9,"straight_mi":null},{"id":"ercot-tpit:110494","ercot_project":"110494","title":"Oak Spring Switch - Colorado City Switch 69 kV Line","owner":"ONCOR","owner_project":"R8904","kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":18.4,"cm_rebuilt":0,"from":"Nolan","to":"Mitchell","county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the 18.4-mile Oak Spring - Colorado City 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110288","ercot_project":"110288","title":"Graham Plant Switch - Garvey Road Switch 345 kV Line","owner":"ONCOR","owner_project":"M3545","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":17.1,"from":"Garvey Road Switch","to":"Graham Plant Switch","county_from":"Young","county_to":"Young","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Graham Plant Switch - Garvey Road Switch 345 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110232","ercot_project":"110232","title":"LST_Liberty_To_Navarro_New_345kV_Line_BZ_LLI","owner":"LST","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":31,"cm_rebuilt":0,"from":"Navarro","to":"Liberty","county_from":"Hill","county_to":"Navarro","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Build new 345 kV single ckt line connecting LST Liberty Station to LST Navarro Station with 5000 Amps minimum ratings.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110673","ercot_project":"110673","title":"Sherry 345-138 kV Autotransformer B Upgrade","owner":"ONCOR","owner_project":"M5269","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sherry Switch","to":"Sherry Switch","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 3","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Sherry 345-138 kV Autotransformer B Upgrade"},{"id":"ercot-tpit:110393","ercot_project":"110393","title":"Comanche Peak Switch - Johnson Switch 345 kV Line","owner":"ONCOR","owner_project":"M5369","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Comanche Peak","to":"Johnson","county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Comanche Peak Switch - Johnson Switch 345 kV Line"},{"id":"ercot-tpit:110475","ercot_project":"110475","title":"Notus Switch - Navarro Switch 345 kV Line","owner":"ONCOR","owner_project":"M4479","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Notus","to":"Navarro","county_from":null,"county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Notus Switch - Navarro Switch 345 kV Line"},{"id":"ercot-tpit:92340","ercot_project":"92340","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-01","actual_isd":null,"cm_new":4,"cm_rebuilt":0,"from":"New 138 KV station \"Warg\"","to":"New 138 KV station \"Warg\"","county_from":"McLennan","county_to":"McLennan","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110515","ercot_project":"110515","title":"STEC Edwards Large Load Addition","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG046","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-Add a new 345kV path from Howard to Edward - Tap the line from Kendall to Cagnon at 5 miles from Cagnon to add the new CPS substation - Add a new 345kV path from New CPS station to Edward - Add 2 138/345kv autos at Edward with 675 MVA rati"},{"id":"ercot-tpit:110525","ercot_project":"110525","title":"STEC Rodgers Large Load Project Phase 2","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG046","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-Rebuild LCRA Henne to Zorn 138kV line to 245 MVA -Install cap bank 19.2 MVAR at STEC Natalia 69kV - Rebuild Palo Duro to Dilley 138kV line with a conductor rated at least 312 MVA - Install a new 134MVAR cap bank at AEP Lytle 138kV - Rebuil"},{"id":"ercot-tpit:110529","ercot_project":"110529","title":"STEC Rodgers Large Load Phase 3","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG046","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-Upgrade CPS Martinez 345/138kV autos 1,2 to 683 MVA -Rebuild CPS Howard to Spruce 345kV to 1580MVA - Rebuild CPS Howard to Braunig to 1457 MVA -Upgrade CPS Hill Country 345/138kV autos 3,4 to 740MVA rating - Rebuild CPS Cachena to Elmcreek"},{"id":"ercot-tpit:99385","ercot_project":"99385","title":"Establish Bell County East 765/345 kV Switch","owner":"ONCOR","owner_project":"PB_765_Import2_A","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-02","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bell County East","to":"Bell County East","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_2A. Establish Bell County East 765/345 kV Switch"},{"id":"ercot-tpit:102672B","ercot_project":"102672B","title":"BEPC_TIER3_MillerRPG","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-02","actual_isd":null,"cm_new":0,"cm_rebuilt":29.48,"from":"RW Miller","to":"Fox","county_from":"Palo Pinto","county_to":null,"tier":"Tier 3","rpg":"26RPG002","rpg_completed":"2026-03-17","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110270","ercot_project":"110270","title":"AEN_MC_DE_CKT909_Reconductor","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3.79,"from":"9076","to":"9193","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/509006454","name":"McNeil Substation","coordinates":[-97.68929,30.39296]},{"osm_id":"osm:way/156262424","name":"Dessau Substation","coordinates":[-97.64302,30.37348]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","link_note":"mapped connection is 6.2 mi but ERCOT reports 3.79 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:110385","ercot_project":"110385","title":"AEN_DL_AU_CKT920_Reconductor","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3.73,"from":"9045","to":"9328","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110340","ercot_project":"110340","title":"Add Temple Switch - Fryers Creek Switch 138 kV Line Ckt #2","owner":"ONCOR","owner_project":"R6572","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":4.5,"from":"Temple","to":"Fryers Creek","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Temple Switch - Fryers Creek Switch 138 kV Line Ckt #2","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:110336","ercot_project":"110336","title":"Upgrade Salado Switch - Puma 138 kV Line Section","owner":"ONCOR","owner_project":"R6570","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":10.4,"from":"Salado","to":"Puma","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Salado Switch - Puma 138 kV Line Section","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:109904","ercot_project":"109904","title":"Rebuild the Lufkin Switch - Stryker Creek Switch 138 kV Line","owner":"ONCOR","owner_project":"R6040","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":44.4,"from":"Lufkin Switch","to":"Stryker Creek Switch","county_from":"Angelina","county_to":"Cherokee","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Lufkin Switch - Stryker Creek Switch 138 kV Line","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:110168","ercot_project":"110168","title":"AEN_Holman_Hillje_ckt_3123_reconductor","owner":"AEN","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":74.48,"from":"9073","to":"44200","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:86329","ercot_project":"86329","title":"AEN_PilotKnob_CarsonCreek_Ckt_944_RECONDUCTOR","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":2.83,"from":"9175","to":"9259","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:81277","ercot_project":"81277","title":"Midland East – Midland County NW 345 kV Line Rebuild","owner":"ONCOR","owner_project":"R8729","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":42.6,"from":"Midland East","to":"Midland County Northwest","county_from":"Midland","county_to":"Midland","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 345 kV line and add a second circuit to the new line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/1347902253","name":"Midland East Substation","coordinates":[-102.0517,32.02026]},{"osm_id":"osm:way/457746624","name":"Midland County Northwest Substation","coordinates":[-102.24626,32.03738]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/457746502","layer":"lines-345plus"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":17.1,"straight_mi":null},{"id":"ercot-tpit:110032","ercot_project":"110032","title":"Rebuild the TNP One - Herndon/Gibson 345 kV DCKT Line","owner":"ONCOR","owner_project":"R6540","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":34.6,"from":"Herndon/Gibson","to":"TNP One","county_from":"Milam","county_to":"Robertson","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the TNP One - Herndon/Gibson 345 kV DCKT Line","terminal_match":{"from":"multi_or_missing","to":"matched"}},{"id":"ercot-tpit:61224","ercot_project":"61224","title":"AEN_Decker_SH_ckt_1008__reconductor","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":7.04,"from":"Decker [9187]","to":"Sandhill [9216]","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the 7.04 mile Decker to Sand Hill 138 kV transmission line (Ckt 1008) with bundled 795 ACSS Drake conductor rated for 3000 amps","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109900","ercot_project":"109900","title":"Rebuild Redland Switch - Kolb Lake Switch 138 kV Line","owner":"ONCOR","owner_project":"R6509","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":6.7,"from":"Redland Switch","to":"Kolb Lake Switch","county_from":"Angelina","county_to":"Angelina","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Redland Switch - Kolb Lake Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105886","ercot_project":"105886","title":"East Watermill 765 kV Switch","owner":"ONCOR","owner_project":"M4477","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"East Watermill 765 kV Switch","to":null,"county_from":"Dallas","county_to":"Rusk","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-09","comments":null,"description":"Establish East Watermill 765 kV Switch","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:105888","ercot_project":"105888","title":"South Watermill 765 kV Switch","owner":"ONCOR","owner_project":"M4478, M4460, M4459","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"South Watermill 765 kV Switch","to":null,"county_from":"Ellis","county_to":null,"tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-09","comments":null,"description":"Establish South Watermill 765 kV Switch","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:112326","ercot_project":"112326","title":"South Watermill - East Watermill 765 kV Line","owner":"ONCOR","owner_project":"M4478","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-17","actual_isd":null,"cm_new":9.4,"cm_rebuilt":0,"from":"South Watermill","to":"East Watermill","county_from":"Ellis","county_to":null,"tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-09","comments":null,"description":"Establish South Watermill - East Watermill 765 kV Line","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:112324","ercot_project":"112324","title":"South Watermill - Dinosaur 765 kV Line","owner":"ONCOR","owner_project":"M4460","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-17","actual_isd":null,"cm_new":77.8,"cm_rebuilt":0,"from":"South Watermill","to":"Dinosaur","county_from":"Ellis","county_to":"Somervell","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-09","comments":null,"description":"Establish South Watermill - Dinosaur 765 kV Line","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102068","ercot_project":"102068","title":"Construct a new 765kV Howard Rd Switching Station with two 765/345kV autotransformers connnection into the two new positions at Howard Rd 345kV station. Also construct the station with 4 line terminals to accommodate the full 765kV build out. The station w","owner":"CPS/AEP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-30","actual_isd":null,"cm_new":185,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:91578","ercot_project":"91578","title":"buffalo_clover_substation_addition","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":null,"status":"Status not reported","projected_isd":"2030-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding buffalo Clover PEC bus to Brazos Anduin Bus."},{"id":"ercot-tpit:110266","ercot_project":"110266","title":"LCP Hutto - Limmer Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hutto","to":"Limmer","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade 345 kV DCKT line from Hutto to Limmer for a minimum of 1989 MVA rating. Project part of LCP effort for Batch Zero Base Load"},{"id":"ercot-tpit:109918","ercot_project":"109918","title":"Smithville to Winchester Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":14.53,"from":"Winchester","to":"Smithville","county_from":"Bastrop","county_to":"Fayette","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade L_WINCHE8_1Y (Bus #7306) - L_SMITHV8_1Y (Bus #7314) 138.0-kV line as an LCP for Batch Zero Base Load.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110134","ercot_project":"110134","title":"Mason Creek - Pipe Creek Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":8.9,"from":"Mason Creek","to":"Pipe Creek","county_from":"Bandera","county_to":"Bandera","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the 8.9-mile 138-kV Mason Creek - Pipe Creek circuit to achieve a 584 MVA minimum emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/320757394","name":"Mason Creek Substation","coordinates":[-99.02233,29.76058]},{"osm_id":"osm:way/106210970","name":"Pipe Creek Substation","coordinates":[-98.89882,29.71537]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/320757397","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":8.9,"straight_mi":null},{"id":"ercot-tpit:110146","ercot_project":"110146","title":"Medina Lake - Pipe Creek Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":7.9,"from":"Medina Lake","to":"Pipe Creek","county_from":"Bandera","county_to":"Bandera","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the BEC-owned 7.9-mile Medina Lake - Pipe Creek 138-kV circuit to a minimum 723 MVA emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/320743674","name":"Medina Lake Substation","coordinates":[-98.93315,29.61253]},{"osm_id":"osm:way/106210970","name":"Pipe Creek Substation","coordinates":[-98.89882,29.71537]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/15104955","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":7.9,"straight_mi":null},{"id":"ercot-tpit:110057D","ercot_project":"110057D","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NewSub","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 650 MVAR of static and dynamic VAR support at 345 kV NewSub."},{"id":"ercot-tpit:110699","ercot_project":"110699","title":"Upgrading two circuits to bundled Suwannee","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110661","ercot_project":"110661","title":"Upgrading two circuits to bundled Suwannee","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110539","ercot_project":"110539","title":"KC LCP upgrading circuit to bundled Suwanne","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrading line T329 as part of AD_HOC TPIT report. Project is purely conceptual as of 7/2/2026."},{"id":"ercot-tpit:109908","ercot_project":"109908","title":"Esperanza Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":9,"from":"Fair Oaks Ranch","to":"Esperanza","county_from":"Bexar","county_to":"Kendall","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment at the Esperanza Substation to achieve a minimum 602 MVA emergency rating on the 9-mile Esparanza - Fair Oaks Ranch 138-kV circuit. This is an LCP Upgrade project to support Batch Zero Base Load.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/239512095","name":"Fair Oaks Ranch Substation","coordinates":[-98.61238,29.7328]},{"osm_id":"osm:way/854394559","name":"Esperanza Substation","coordinates":[-98.66501,29.80058]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:110073","ercot_project":"110073","title":"Alum Creek to Sim Gideon Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":7.89,"from":"Sim Gideon","to":"Alum Creek","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade L_SIMGID8_1Y (Bus #7310) - L_ALUMCR8_1Y (Bus #7318) 138.0-kV line as an LCP for Batch Zero Base Load.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/127247651","name":"Sim Gideon Station","coordinates":[-97.2688,30.14611]},{"osm_id":"osm:way/467847272","name":"Alum Creek Substation","coordinates":[-97.23313,30.06585]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/173298423","layer":"lines-138"},{"osm_id":"osm:way/509586612","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":7.6,"straight_mi":5.9},{"id":"ercot-tpit:110158","ercot_project":"110158","title":"Boerne Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Boerne","to":null,"county_from":"Kendall","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment at the Boerne Substation to achieve a minimum 584 MVA emergency rating on the 3.9-mile Boerne - Esparanza 138-kV circuit. This is an LCP Upgrade project to support Batch Zero Base Load."},{"id":"ercot-tpit:110144","ercot_project":"110144","title":"Boerne - Welfare Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":9.5,"from":"Boerne","to":"Welfare","county_from":"Kendall","county_to":"Kendall","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the 9.5-mile Boerne - Welfare 138-kV circuit to achieve a minimum 539 MVA emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/146741279","name":"Boerne Substation","coordinates":[-98.72576,29.8042]},{"osm_id":"osm:way/146741284","name":"Welfare Substation","coordinates":[-98.76065,29.88682]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:109902","ercot_project":"109902","title":"Bandera - Mason Creek Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":6.4,"from":"Bandera","to":"Mason Creek","county_from":"Bandera","county_to":"Bandera","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the 6.4-mile Bandera - Mason Creek 138-kV circuit to increase its operational capacity. This is an LCP Upgrade project to support Batch Zero Base Load.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/320757401","name":"Bandera Substation","coordinates":[-99.11157,29.73648]},{"osm_id":"osm:way/320757394","name":"Mason Creek Substation","coordinates":[-99.02233,29.76058]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/106210973","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":6.4,"straight_mi":null},{"id":"ercot-tpit:109914","ercot_project":"109914","title":"Gilleland Creek - McNeil Transmission line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":7.63,"from":"Gilleland Creek","to":"McNeil","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade L_MCNEIL8_1Y (Bus #7334) - L_GILLCR8_1Y (Bus #7336) 138.0-kV line as an LCP project for Batch Zero Base Load","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:109866","ercot_project":"109866","title":"Utley Substation and Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":5,"from":"Big Sandy","to":"Utley","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade L_BIGSAN8_1Y (Bus #7316) - L_UTLEY_8_1Y (Bus #7317) 138.0-kV line as an LCP project for Batch Zero Base Load","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109880","ercot_project":"109880","title":"Concho River Dynamic Reactive Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Concho River","to":null,"county_from":"Concho","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 125 MVar Capacitor Bank and Concho Pearl DC load POI to resolve low voltages as an LCP project for Batch Zero Base Load"},{"id":"ercot-tpit:110276","ercot_project":"110276","title":"Bastrop Mesquite - Utley Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":5,"from":"Utley","to":"Bastrop Mesquite","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will upgrade the Utley (7317) to Bastrop Mesquite (7320) 138 kV transmission line to a 1148 minimum MVA rated circuit as part of the LCP effort for Batch Zero Base Load.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110128","ercot_project":"110128","title":"FPP Yard 2 - Lytton Springs Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":61.1,"from":"Fayetteville Power Plant Yard 2","to":"Lytton Springs","county_from":"Fayette","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the FPP Yard 2 - Lytton Springs 345-kV circuit to achieve a 1351 MVA minimum emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110387","ercot_project":"110387","title":"Lon Hill to Grissom: Loop 345 kV into San Pedro","owner":"AEP TCC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":5.9,"cm_rebuilt":0,"from":"Lon Hill","to":"Grissom","county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG016","rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Loop in Lon Hill to Grissom 345 kV into 345 kV San Pedro Station","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:110142","ercot_project":"110142","title":"Alum Creek - Smithville Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":5.95,"from":"Smithville","to":"Alum Creek","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will upgrade the Transmission Line between Alum Creek (7314) and Smithville (7318) to a minimum rating of 340 MVA. Upgrade project for Batch Zero Base Load","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/509586604","name":"Smithville Substation","coordinates":[-97.15796,30.02053]},{"osm_id":"osm:way/467847272","name":"Alum Creek Substation","coordinates":[-97.23313,30.06585]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/509586586","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":5.1,"straight_mi":5.5},{"id":"ercot-tpit:109906","ercot_project":"109906","title":"Big Hill Dynamic Reactive Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Big Hill","to":null,"county_from":"Schleicher","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add 500Mvar Cap bank at 345kV Big Hill substation as an LCP project for Batch Zero Base Load"},{"id":"ercot-tpit:109796","ercot_project":"109796","title":"Gilleland Creek Statcom Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gilleland Creek","to":null,"county_from":"Travis","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install 300 MVAR reactive support at Gilleland Creek 345-kV Substation as an LCP project for Batch Zero Base Load"},{"id":"ercot-tpit:110152","ercot_project":"110152","title":"Fair Oaks Bus Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fair Oaks","to":null,"county_from":"Kendall","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment at the Fair Oaks substation to achieve a 667 MVA minimum emergency rating on the 4.1-mile Bergheim - Fair Oaks 138-kV circuit. This is an LCP Upgrade project to support Batch Zero Base Load"},{"id":"ercot-tpit:103479","ercot_project":"103479","title":"Taft: Rebuild Distribution Station","owner":"AEP TCC","owner_project":"DP25X0014","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Taft","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Rebuild the Taft distribution station"},{"id":"ercot-tpit:102955","ercot_project":"102955","title":"Solstice to Sand Lake: Construct New 765 kV Single Circuit Line","owner":"AEP TNC","owner_project":"TP2025846","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-31","actual_isd":null,"cm_new":23.5,"cm_rebuilt":0,"from":"Solstice","to":"Sand Lake","county_from":"Pecos","county_to":"Reeves","tier":"Tier 1","rpg":"25RPG022","rpg_completed":"2025-07-28","bod_reviewed":"2025-12-31","comments":"Company Contact Update","description":"Construct a new 765 kV single circuit line from Solstice to Sand Lake","rpg_project":"ercot-rpg:25RPG022","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:98955","ercot_project":"98955","title":"Duende: Construct New 765 kV Station","owner":"AEP TNC","owner_project":"TP2025795","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Duende","to":null,"county_from":"Edwards","county_to":null,"tier":"Tier 4","rpg":"H.B. 5066","rpg_completed":null,"bod_reviewed":"2024-10-31","comments":"Project Number, RPG Number and BOD Review date Update","description":"Install four 765 kV shunt reactors at the new Duende 765 kV station on the new Solstice to Howard 765 kV line"},{"id":"ercot-tpit:99263","ercot_project":"99263","title":"Sand Lake 765/345 kV Autotransformer #2","owner":"ONCOR","owner_project":"PB_765_Import2_C","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sand Lake","to":"Sand Lake","county_from":"Ward","county_to":"Ward","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_2C. Add a second 765/345 kV autotransformer at Sand Lake"},{"id":"ercot-tpit:99241","ercot_project":"99241","title":"Sand Lake 765/345 kV Autotransformer #1","owner":"ONCOR","owner_project":"PB_765_Import2_C","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sand Lake","to":"Sand Lake","county_from":"Ward","county_to":"Ward","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_2C. Establish the Sand Lake 765/345 kV Switch with one 765/345 kV autotransformer"},{"id":"ercot-tpit:100153","ercot_project":"100153","title":"Construct the Big Hill (LCRA TSC) - Bell County East 765 kV Line","owner":"ONCOR/ONCOR, LCRA TSC","owner_project":"PB_765_Import2_D","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-31","actual_isd":null,"cm_new":233.4,"cm_rebuilt":0,"from":"Big Hill (LCRA TSC)","to":"Bell County East","county_from":"Schleicher","county_to":"Bell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_2D. Add a new Bell East (ONCOR) – Big Hill (LCRA) 765-kV single-circuit line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:100597","ercot_project":"100597","title":"Sand Lake - Big Hill (LCRA) 765 kV Line","owner":"ONCOR/LCRA TSC","owner_project":"PB_765_Import2_E","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-31","actual_isd":null,"cm_new":211.2,"cm_rebuilt":0,"from":"Sand Lake","to":"Big Hill","county_from":"Ward","county_to":"Schleicher","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID 765_Import_2E. Add a new Big Hill – Sand Lake 765-kV single-circuit line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:45015","ercot_project":"45015","title":"Barnhart to Cassava: Rebuild 69 kV line","owner":"AEP TNC","owner_project":"2756","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":6.021,"from":"Barnhart","to":"Cassava","county_from":"Irion","county_to":"Irion","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rebuild the Barnhart to Cassava 69 kV line","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:110189","ercot_project":"110189","title":"Upgrade Pawnee - San Miguel 138","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":27.1,"from":"Pawnee","to":"San Miguel","county_from":"Karnes","county_to":"Atascosa","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"(5727) PAWNEE SWITCHING STATION to (5902) SAN MIGUEL GEN 138 kV Ckt 1 Rebuild [276 MVA Minimum]","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:110228","ercot_project":"110228","title":"Upgrade Fowlerton to Los Angeles","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2030-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":16.4,"from":"Fowlerton","to":"Los Angeles","county_from":"McMullen","county_to":"La Salle","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"(5705) FOWLERTON to (5723) LOS ANGELES 138 kV Ckt 1 Rebuild [245 MVA Minimum] or double circuit existing","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/489376594","name":"Fowlerton Substation","coordinates":[-98.80078,28.37146]},{"osm_id":"osm:way/489376589","name":"Los Angeles Substation","coordinates":[-99.00111,28.3909]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/489376592","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":16.4,"straight_mi":null},{"id":"ercot-tpit:104151","ercot_project":"104151","title":"North Edinburg to North McAllen: Rebuild 138 kV line","owner":"AEP TCC","owner_project":"TA2021190","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-01-30","actual_isd":null,"cm_new":0,"cm_rebuilt":9.15,"from":"North Edinburg","to":"North McAllen","county_from":"Hidalgo","county_to":"Hidalgo","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"North Edinburg to North McAllen: Rebuild 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174789429","name":"North Edinburg Substation","coordinates":[-98.18922,26.34411]},{"osm_id":"osm:way/512644918","name":"North McAllen Substation","coordinates":[-98.2388,26.24798]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/512042618","layer":"lines-138"},{"osm_id":"osm:way/512644926","layer":"lines-138"},{"osm_id":"osm:way/1548212358","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":8.7,"straight_mi":7.3},{"id":"ercot-tpit:87648","ercot_project":"87648","title":"Carver to Poblano: Convert 69 kV Line to 138 kV","owner":"AEP TCC/AEP TNC, ETT","owner_project":"TP2024058","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-01-31","actual_isd":null,"cm_new":1,"cm_rebuilt":107.5,"from":"Carver","to":"Poblano","county_from":"Sutton","county_to":"Uvalde","tier":"Tier 4","rpg":"24RPG009","rpg_completed":"2024-04-12","bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Convert the Sonora to Uvalde 69 kV line to 138 kV and reterminate at Carver and Poblano","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110633","ercot_project":"110633","title":"New 138kV Kingsbridge Substation","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5246","to":"5055, 5487","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:105914","ercot_project":"105914","title":"Halcon: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2026109","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-01-31","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Halcon","to":"Ciruela","county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"All fields update","description":"Interconnect the Falcon load to the new Halcon 345 kV station connected to the Ciruela 345 kV station on the Bonilla to Rio Hondo 345 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110427","ercot_project":"110427","title":"San Angelo Red Creek: Upgrade Auto #1","owner":"AEP TNC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"SA Red Creek","to":null,"county_from":"Tom Green","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Upgrade SA Red Creek Auto #1 to 800 MVA Emergency Rating"},{"id":"ercot-tpit:110687","ercot_project":"110687","title":"Rebuild Hill Country to Skyline Dbl Ckt","owner":"CPS/NO","owner_project":"T-XXXX","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":10.96,"from":"5211","to":"5371","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110689","ercot_project":"110689","title":"Rebuild Howard to AVR","owner":"CPS/NO","owner_project":"T-XXXX","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":12.62,"from":"5231","to":"5475","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110691","ercot_project":"110691","title":"Rebuild Hunt Lane to Medina Base","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.8,"from":"5234","to":"5305","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110693","ercot_project":"110693","title":"Rebuild Medina to Pearsal","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.1,"from":"5305","to":"5335","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110695","ercot_project":"110695","title":"Rebuild Talley to Medina","owner":"CPS/LCRA","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":12.36,"from":"5422","to":"7432","county_from":"Medina","county_to":"Bandera","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110663","ercot_project":"110663","title":"Rebuild Helotes to Ranchtown","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":6.6,"from":"5200","to":"5358","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110675","ercot_project":"110675","title":"Rebuild Hill Country to Marion Dbl Ckt","owner":"CPS/LCRA","owner_project":"T-XXXX","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":26.6,"from":"5211","to":"7044","county_from":"Bexar","county_to":"Guadalupe","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110653","ercot_project":"110653","title":"Rebuild Fair Oaks to LCRA Fair Oaks","owner":"CPS/LCRA","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":4.7,"from":"5470","to":"7169","county_from":"Bexar","county_to":"Kendall","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110643","ercot_project":"110643","title":"Rebuild Chav to Palo Alto","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":3.53,"from":"5085","to":"5330","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110519","ercot_project":"110519","title":"Argyle Switch - Corinth 138 kV Line Section","owner":"ONCOR","owner_project":"M5183","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":2.9,"from":null,"to":null,"county_from":"Denton","county_to":"Denton","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Argyle Switch - Corinth 138 kV Line Section","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110943C","ercot_project":"110943C","title":"Cooke County Resiliency Project","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-03-01","actual_isd":null,"cm_new":14.5,"cm_rebuilt":21.44,"from":null,"to":null,"county_from":"Cooke","county_to":"Cooke","tier":"Tier 2","rpg":"26RPG007","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the St Jo to Capps Corner transmission line Rebuild the Capps Corner to Nocona Transmission Line Rebuild the Nocona to Alcorn Transmission Line Construct a new transmission line from Bulcher to Alcorn","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110485","ercot_project":"110485","title":"Benbrook 345/138 kV Autotransformer #1","owner":"ONCOR","owner_project":"M5065","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Benbrook Switch","to":"Benbrook Switch","county_from":"Tarrant","county_to":null,"tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Benbrook 345/138 kV Autotransformer #1"},{"id":"ercot-tpit:110254","ercot_project":"110254","owner":"BEPC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-04-07","actual_isd":null,"cm_new":0,"cm_rebuilt":68,"from":"San Miguel","to":"Marion","county_from":"Atascosa","county_to":"Comal","tier":"Tier 1","rpg":"26RPG026","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:110834","ercot_project":"110834","title":"Ad-Hoc TPIT: Arrow - System Upgrades","owner":"SLU","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-01","actual_isd":null,"cm_new":65,"cm_rebuilt":17.9,"from":"Kingfisher","to":"Frontera","county_from":"Cameron","county_to":"Hidalgo","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"System upgrades to accommodate the full load at Sharyland's Arrow Load Serving station. Includes 345 kV line upgrades for Mantle - Bonilla","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110836","ercot_project":"110836","title":"Ad-Hoc TPIT: Five Point Load Energization","owner":"SLU","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kingfisher","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Energization of a new load seeking interconnection at Sharyland's Kingfisher Station"},{"id":"ercot-tpit:112229","ercot_project":"112229","title":"Adds Farias load serving substation","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-05-01","actual_isd":null,"cm_new":10.4,"cm_rebuilt":2.6,"from":"FARIAS","to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG016","rpg_completed":"2026-05-27","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"multi_or_missing","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/174682093","name":"Lon Hill Substation","coordinates":[-97.61559,27.84382]},{"osm_id":"osm:way/490190261","name":"Bunsen Substation","coordinates":[-97.81832,27.76168]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:110443","ercot_project":"110443","title":"STEC Nueces Green Ammonia Load Interconnection Project","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-01","actual_isd":null,"cm_new":10.4,"cm_rebuilt":2.6,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG016","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"-Construct a new Farias 345-kV substation cutting in on the existing Reforzar to Lon Hill 345-kV transmission line -Loop in the new Farias onto the existing Lon Hill to Grissom 345-kV transmission line using single-circuit structures, with ","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:110876","ercot_project":"110876","title":"STEC Mesquite Large Load Project Phase 5","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade 5068 CACHENA - 5133 ELMCREEK 345-kV Line CKT 2 Upgrade 5068 CACHENA - 5323 OLD_HCKRY_5 345-kV Line CKT 2 Upgrade 5133 ELMCREEK - 5380 SHAULA 345-kV Line CKT 1 Upgrade 5915 SO_TEX__345A - 8676 STATIC7A 345-kV Line CKT 1 Upgrade 8012 "},{"id":"ercot-tpit:110843","ercot_project":"110843","title":"STEC Ouroboros Large Load Project Phase 2","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"AEP Rio Grande Valley System Improvement Project (26RPG009) Construct a new 32-mile 345 kV line (NMRL/EMGY rating of 2400 MVA) from AEP’s Panther to STEC’s Tejon station"},{"id":"ercot-tpit:110868","ercot_project":"110868","title":"STEC_110868_PalanganaLargeLoadProjectPhase4","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"STEC Nueces Green Ammonia Load Interconnection RPG Project: Install reactive support at 8704 GULCH7A 345-kV Substation Rebuild Angstrom - White Point 345-kV Line Rebuild Katoen - Lon Hill 345-kV line Rebuild Goddard - Katoen 345-kV line Reb"},{"id":"ercot-tpit:110170","ercot_project":"110170","title":"Rebuild Possum Trot - Lake Hall Switch - Tradinghouse Switch 345 kV Line","owner":"ONCOR","owner_project":"R1717","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9.6,"from":"Possum Trot","to":"Tradinghouse","county_from":"McLennan","county_to":"McLennan","tier":"Tier 1","rpg":"25RPG043","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Possum Trot - Lake Hall Switch - Tradinghouse Switch 345 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110160","ercot_project":"110160","title":"Rebuild Possum Trot - St Johns Switch - Bale Switch - Stranger Switch 345 kV Line","owner":"ONCOR","owner_project":"R6429","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":18.4,"from":"Possum Trot","to":"Stranger","county_from":"McLennan","county_to":"Limestone","tier":"Tier 1","rpg":"25RPG043","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Possum Trot - St Johns Switch - Bale Switch - Stranger Switch 345 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109870","ercot_project":"109870","title":"Construct Elkton - Shamburger 345 kV DCKT Line","owner":"ONCOR","owner_project":"R6473","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-05-15","actual_isd":null,"cm_new":27.5,"cm_rebuilt":0,"from":"Elkton","to":"Shamburger","county_from":"Smith","county_to":"Smith","tier":"Tier 1","rpg":"25RPG043","rpg_completed":"2026-08-19","bod_reviewed":null,"comments":null,"description":"Construct Elkton - Shamburger 345 kV DCKT Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:104710","ercot_project":"104710","title":"Construct the New Bell County East - Howard (CPS) 765 kV Line","owner":"ONCOR","owner_project":"R6448","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-05-15","actual_isd":null,"cm_new":170.4,"cm_rebuilt":0,"from":"New Bell County East","to":"Howard","county_from":"Bell","county_to":"Bexar","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct the New Bell County East - Howard (CPS) 765 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110346","ercot_project":"110346","title":"Rebuild Hartrick Switch - Crusader - Seaton 138 kV Line","owner":"ONCOR","owner_project":"R6562","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":17.8,"from":"Hartrick Switch","to":"Seaton","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Hartrick Switch - Crusader - Seaton 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110040","ercot_project":"110040","title":"Rebuild Voss Lake Switch - Sandow Switch 345 kV Line","owner":"ONCOR","owner_project":"R6564","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":1.9,"from":"Voss Lake Switch","to":"Sandow Switch","county_from":"Milam","county_to":"Milam","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Voss Lake Switch - Sandow Switch 345 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110002","ercot_project":"110002","title":"Install Crockett Switch - Lufkin Switch 138 kV Line Ckt#2","owner":"ONCOR","owner_project":"R6555","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-15","actual_isd":null,"cm_new":43,"cm_rebuilt":0,"from":"Crockett Switch","to":"Lufkin Switch","county_from":"Houston","county_to":"Angelina","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Crockett Switch - Lufkin Switch 138 kV Line Ckt#2","terminal_match":{"from":"ambiguous","to":"ambiguous"}},{"id":"ercot-tpit:109864","ercot_project":"109864","title":"Establish Shamburger 345/138 kV Switch","owner":"ONCOR","owner_project":"R6403","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Shamburger","to":"Shamburger","county_from":"Smith","county_to":"Smith","tier":"Tier 1","rpg":"25RPG043","rpg_completed":"2026-08-19","bod_reviewed":null,"comments":null,"description":"Establish Shamburger 345/138 kV Switch"},{"id":"ercot-tpit:109868","ercot_project":"109868","title":"Establish Elkton 345-138 kV Switch","owner":"ONCOR","owner_project":"R6474","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Elkton","to":"Elkton","county_from":"Smith","county_to":"Smith","tier":"Tier 1","rpg":"25RPG043","rpg_completed":"2026-08-19","bod_reviewed":null,"comments":null,"description":"Establish Elkton 345-138 kV Switch"},{"id":"ercot-tpit:110429","ercot_project":"110429","title":"San Angelo Red Creek: Upgrade Auto #2","owner":"AEP TNC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"SA Red Creek","to":null,"county_from":"Tom Green","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Upgrade SA Red Creek Auto #2 to 800 MVA Emergency Rating"},{"id":"ercot-tpit:109888","ercot_project":"109888","title":"Salem - Warda Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":33,"from":"Salem","to":"Warda","county_from":"Washington","county_to":"Fayette","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade 33-mile Salem to Round tap top to Warda 138kV lines to 478MVA as an LCP project for Batch Zero Base Load","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/97848904","name":"Salem Substation","coordinates":[-96.42566,30.11121]},{"osm_id":"osm:way/511133298","name":"Warda Substation","coordinates":[-96.92086,30.05032]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/21302230","layer":"lines-138"},{"osm_id":"osm:way/511344189","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":30.7,"straight_mi":29.9},{"id":"ercot-tpit:64065","ercot_project":"64065","title":"Alice to Kingsville 138 kV Line Rebuild","owner":"AEP TCC","owner_project":"TA2021079","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":22.48,"from":"Alice","to":"Kingsville","county_from":"Jim Wells","county_to":"Kleberg","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rehab the Alice to Kingsville 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/490190295","name":"Alice Substation","coordinates":[-98.08746,27.72984]},{"osm_id":"osm:way/490190283","name":"Kingsville Substation","coordinates":[-97.88623,27.5307]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/21021789","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":22.6,"straight_mi":null},{"id":"ercot-tpit:71877","ercot_project":"71877","title":"CPSE_Cagnon to Shepherd Rebuild (Phase B)","owner":"CPS","owner_project":"T-0281","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110487","ercot_project":"110487","title":"Construct new Central Bluff - Oak Spring 345 kV Line","owner":"ONCOR","owner_project":"R8906","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-06-01","actual_isd":null,"cm_new":37.6,"cm_rebuilt":0,"from":"Nolan County","to":"Nolan County","county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new Central Bluff - Oak Spring 345 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110483","ercot_project":"110483","title":"Three Creek Switch - Tri Corner Switch 345 kV Line","owner":"ONCOR","owner_project":"M4520","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Three Creek Switch","to":"Tri Corner Switch","county_from":"Dallas","county_to":"Kaufman","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Three Creek Switch - Tri Corner Switch 345 kV Line"},{"id":"ercot-tpit:3595","ercot_project":"3595","title":"Bevo to AEP Carrizo Springs 69 kV line","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":2,"from":"Bevo","to":"Carrizo Springs","county_from":"Dimmit","county_to":"Dimmit","tier":"Tier 1","rpg":null,"rpg_completed":"2012-08-12","bod_reviewed":"2012-09-12","comments":null,"description":"Add 2 mile line by double circuiting two existing circuits, as recommended in 2013 RTP.","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:73053B","ercot_project":"73053B","title":"Wimberley Loop to New Substation","owner":"PEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-06-01","actual_isd":null,"cm_new":13.44,"cm_rebuilt":0,"from":"Wimberley","to":"Cebolla Creek","county_from":"Hays","county_to":"Hays","tier":"Tier 2","rpg":"22RPG026","rpg_completed":"2023-02-03","bod_reviewed":null,"comments":null,"description":"Adds new 138 kV branch (219 MVA) from Wimberley to a new three terminal ring bus substation between Dripping Springs and Rutherford.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:103826","ercot_project":"103826","title":"BRYN_MillicanSwitch_Rebuild","owner":"BRYN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BTU Millican Switch","to":"BTU Millican","county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Millican Switch to remove the 69-kV bus and transfer distribution load to the 138-kV bus. Remove Millican 69-kV Substation."},{"id":"ercot-tpit:110294","ercot_project":"110294","title":"Bowman Switch - Garvey Road Switch 345 kV Line","owner":"ONCOR","owner_project":"M3546","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":29.18,"from":"Bowman Switch","to":"Garvey Road Switch","county_from":"Archer","county_to":"Young","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Bowman Switch - Garvey Road Switch 345 kV Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:109922","ercot_project":"109922","title":"Hackberry 345 kV Terminal Equipment","owner":"ONCOR","owner_project":"M4476","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hackberry Switch","to":"Hackberry Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Hackberry 345 kV Terminal Equipment"},{"id":"ercot-tpit:105648","ercot_project":"105648","title":"LCRATSC_Euclid_Misty_Transmission_Line_Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-06-30","actual_isd":null,"cm_new":4,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 1","rpg":"26RPG001","rpg_completed":"2026-07-19","bod_reviewed":null,"comments":null,"description":"This project will construct two (2) new 345-kV transmission lines between Euclid and Misty substations.","rpg_project":"ercot-rpg:26RPG001","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:104732","ercot_project":"104732","title":"LCRATSC Euclid to Hillje (Morely) 765kV Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-06-30","actual_isd":null,"cm_new":130.8,"cm_rebuilt":0,"from":"Euclid","to":"Morely","county_from":"Caldwell","county_to":"Wharton","tier":"Tier 1","rpg":"26RPG001","rpg_completed":"2026-07-19","bod_reviewed":null,"comments":null,"description":"Construct a new 765-kV single-circuit transmission line from Euclid Substation to a point-of-interconnection (POI) with CenterPoint Energy (CNPE).","rpg_project":"ercot-rpg:26RPG001","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104118","ercot_project":"104118","title":"LCRATSC Euclid 765-kV Substation Addition","owner":"LCRATSC","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 1","rpg":"26RPG001","rpg_completed":"2026-07-19","bod_reviewed":null,"comments":null,"description":"This project will construct a new Euclid 765-kV yard adjacent to the existing Euclid 345-kV Substation (PLC-7694) and install two new 765/345-kV autotransformers.","rpg_project":"ercot-rpg:26RPG001"},{"id":"ercot-tpit:110459","ercot_project":"110459","title":"STEC Amphion Load Project Phase3","owner":"STEC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":175.87,"from":"Pawnee","to":"San Miguel","county_from":"Karnes","county_to":"Atascosa","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"-RTP project 2024-CS1: Upgrade Cachena to Old Hickory ckt 2 to 1072MVA -RTP Project 2025-SC20: Upgrade Cachena to Elm Creek ckt 2 to 1965 MVA -RTP Project 2024-SC26: Upgrade Elm Creek to Shaula ckt 1 to 1746 MVA -Upgrade Pawnee to San Migue","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174560152","name":"Pawnee Substation","coordinates":[-98.02393,28.73986]},{"osm_id":"osm:way/174405327","name":"San Miguel Switchyard","coordinates":[-98.47431,28.70401]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 30.7 mi but ERCOT reports 175.87 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:110090C","ercot_project":"110090C","title":"This models upgrades required for a proposed load addition","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NEWSUB","to":"Jordan/King","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Increase the size of the first 345 kV capacitor at NEWSUB bank from 200 MVAR to 300 MVAR. Add second 300MVAR capacitor bank."},{"id":"ercot-tpit:110943E","ercot_project":"110943E","title":"Cooke County Resiliency Project","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":7.3,"from":"Gainesville","to":"Sivells Bend","county_from":"Cooke","county_to":"Cooke","tier":"Tier 2","rpg":"26RPG007","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110943D","ercot_project":"110943D","title":"Cooke County Resiliency Project","owner":"BEPC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Cooke","county_to":"Cooke","tier":"Tier 2","rpg":"26RPG007","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert existing 69 kV line from Gainesville to St Jo to 138 kV operation including: Gainesville, (future) Bud Long, (future) Hinton, Red River, (future) Gateway, (future) Army Camp, Sivells Bend, (future) Bulcher, Capps Corner, Nocona, Alc"},{"id":"ercot-tpit:90330","ercot_project":"90330","owner":"BEPC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-09-02","actual_isd":null,"cm_new":1.2,"cm_rebuilt":0,"from":"Red River","to":"JSR1","county_from":"Cooke","county_to":"Cooke","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109805","ercot_project":"109805","title":"Valley Switch - Progress Park Switch 138 kV Line","owner":"ONCOR","owner_project":"M3322","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":15.6,"from":"Valley Switch","to":"Progress Park Switch","county_from":"Fannin","county_to":"Grayson","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Valley Switch - Progress Park Switch 138 kV Line","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:110395","ercot_project":"110395","title":"Kaufman Northwest Switch - Seven Point 138 kV Line Section","owner":"ONCOR","owner_project":"M4450","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":20.8,"from":"Seven Points Switch","to":"Kaufman Northwest Switch","county_from":"Henderson","county_to":"Kaufman","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Kaufman Northwest Switch - Seven Point 138 kV Line Section","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109741","ercot_project":"109741","title":"Bergheim - Hil Country Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bergheim","to":"Hill Country","county_from":"Bexar","county_to":"Comal","tier":"Tier 1","rpg":"25RPG017","rpg_completed":"2026-01-14","bod_reviewed":null,"comments":null,"description":"This project will install a new 345-kV single-circuit transmission line on double-circuit capable structures from Bergheim and CPS Hill Country substations. This project will require a CCN amendment and coordination with CPS Energy. The nee"},{"id":"ercot-tpit:109843","ercot_project":"109843","title":"Red Hill Switch - Rio Vista Tap 138 kV Line","owner":"ONCOR","owner_project":"M5198","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-11-01","actual_isd":null,"cm_new":0,"cm_rebuilt":6.6,"from":"Red Hill Switch","to":"Rio Vista Tap","county_from":"Hill","county_to":"Hill","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Red Hill Switch - Rio Vista Tap 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:104502","ercot_project":"104502","title":"Rudeloff Substation Addition","owner":"GVEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-11-21","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Guadalupe","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add new load serving substation north Seguin, near corner of Hwy 46 & Rudeloff rd, New 40 MVA PWT, station to be cut into GVEC T618 138 circuit."},{"id":"ercot-tpit:67915","ercot_project":"67915","title":"Asherton to West Batesville: Rebuild 138 kV Line","owner":"AEP TCC/ETT","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":36.09,"from":"Asherton","to":"West Batesville","county_from":"Dimmit","county_to":"Zavala","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rehab Asherton to West Batesville 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/6697271","name":"Asherton Substation","coordinates":[-99.75572,28.44234]},{"osm_id":"osm:way/343343400","name":"West Batesville Substation","coordinates":[-99.72874,28.9449]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/15384794","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":36.2,"straight_mi":null},{"id":"ercot-tpit:57910","ercot_project":"57910","title":"Uvalde to West Batesville: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"3836","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":20.6,"from":"Uvalde","to":"West Batesville","county_from":"Uvalde","county_to":"Zavala","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Uvalde to West Batesville 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/343141488","name":"Uvalde Substation","coordinates":[-99.79859,29.21294]},{"osm_id":"osm:way/343343400","name":"West Batesville Substation","coordinates":[-99.72874,28.9449]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/15383747","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":20.7,"straight_mi":null},{"id":"ercot-tpit:110838","ercot_project":"110838","title":"Ad Hoc TPIT: Expansion of Sharyland's Kingfisher 765 kV Station","owner":"SLU","owner_project":null,"kv":765,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-01","actual_isd":null,"cm_new":134,"cm_rebuilt":0,"from":"Kingfisher","to":"Blu Lacy","county_from":"Cameron","county_to":"Nueces","tier":"Tier 1","rpg":"26RPG009","rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Expansion of Sharyland's Kingfisher Station to accommodate 765 kV voltage levels and ties. Proposed alternative is in line with ERCOT's 2024 RTP STEP Plan","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110610","ercot_project":"110610","title":"Mitchell Bend Switch - Carmichael Bend Switch 345 kV Line Upgrade","owner":"ONCOR","owner_project":"M5377","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mitchell Bend","to":"Carmichael Bend","county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Mitchell Bend Switch - Carmichael Bend Switch 345 kV Line Upgrade"},{"id":"ercot-tpit:110629","ercot_project":"110629","title":"Venus Switch - Timberview Switch 345 kV Line Upgrade","owner":"ONCOR","owner_project":"M5375","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Venus Switch","to":"Timberview Switch","county_from":"Ellis","county_to":"Tarrant","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Venus Switch - Timberview Switch 345 kV Line Upgrade"},{"id":"ercot-tpit:110597","ercot_project":"110597","title":"Venus Switch - Britton Road 345 kV Line Section Upgrade","owner":"ONCOR","owner_project":"M5373","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Venus Switch","to":"Britton Road","county_from":"Ellis","county_to":"Johnson","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Venus Switch - Britton Road 345 kV Line Section Upgrade"},{"id":"ercot-tpit:110118","ercot_project":"110118","title":"LCRATSC Gabriel Autotransformer Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-14","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Williamson","county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2026-05-08","bod_reviewed":null,"comments":null,"description":"This project will construct a 345-kV yard adjacent to the Gabriel 138-kV yard and install two (2) 345/138-kV autotransformers; the new 345-kV yard will cut in to a new Hutto - Gabriel - Salado 345-kV double-circuit transmission line. The ne"},{"id":"ercot-tpit:110053","ercot_project":"110053","title":"Rebuild TradingHouse - Sam 345 kV DCKT Line","owner":"ONCOR","owner_project":"R1706","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":45.4,"from":"Tradinghouse","to":"Sam","county_from":"McLennan","county_to":"Hill","tier":"Tier 1","rpg":"25RPG043","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild TradingHouse - Sam 345 kV DCKT Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/172472755","name":"Tradinghouse Substation","coordinates":[-96.96419,31.57473]},{"osm_id":"osm:way/386799112","name":"Sam Switching Station","coordinates":[-97.01809,31.8977]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/1551432575","layer":"lines-345plus"},{"osm_id":"osm:way/1551432576","layer":"lines-345plus"},{"osm_id":"osm:way/454919503","layer":"lines-345plus"},{"osm_id":"osm:way/1365647395","layer":"lines-345plus"},{"osm_id":"osm:way/1365647393","layer":"lines-345plus"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":22.4,"straight_mi":22.5},{"id":"ercot-tpit:109892","ercot_project":"109892","title":"Upgrade Killeen Switch - Salado Switch 345 kV Line Ckt #1","owner":"ONCOR","owner_project":"R6567","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":15.7,"from":"Killeen","to":"Salado","county_from":"Bell","county_to":"Bell","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Killeen Switch - Salado Switch 345 kV Line Ckt #1","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174019658","name":"Killeen Substation","coordinates":[-97.72294,31.03918]},{"osm_id":"osm:way/174019698","name":"Salado Switching Station","coordinates":[-97.51112,30.97213]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/174019721","layer":"lines-345plus"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":14.6,"straight_mi":null},{"id":"ercot-tpit:110122","ercot_project":"110122","title":"LCRATSC Gabriel Salado Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-15","actual_isd":null,"cm_new":14.25,"cm_rebuilt":0,"from":"Gabriel","to":"Salado Switch","county_from":"Williamson","county_to":"Bell","tier":"Tier 1","rpg":"25RPG009","rpg_completed":"2026-05-08","bod_reviewed":null,"comments":null,"description":"This project will construct a new 345-kV double-circuit transmission line between Gabriel and Oncor Salado substations. The need for this project with identified by ERCOT in the EIR for RPG 25RPG009.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110120","ercot_project":"110120","title":"LCRATSC Gabriel Hutto Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-15","actual_isd":null,"cm_new":6.3,"cm_rebuilt":0,"from":"Gabriel","to":"Hutto","county_from":"Williamson","county_to":"Williamson","tier":"Tier 1","rpg":"25RPG009","rpg_completed":"2026-05-08","bod_reviewed":null,"comments":null,"description":"This project will construct a new 345-kV double-circuit transmission line between Gabriel and Oncor Hutto substations. The need for this project with identified by ERCOT in the EIR for RPG 25RPG009.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110272","ercot_project":"110272","title":"Glidden Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Glidden","to":null,"county_from":"Colorado","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA will upgrade Glidden Substation to support voltage conversion Upgrade project is part of the LCP effort and recommendation from CNP/CEHE for Batch Zero Base Load"},{"id":"ercot-tpit:110223","ercot_project":"110223","title":"LST_Liberty_Area_Transmission_Projects_BZ_LLI","owner":"LST","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-31","actual_isd":null,"cm_new":90,"cm_rebuilt":0,"from":"Liberty","to":"Trading House_Bullock_Navarro","county_from":"Hill","county_to":"McLennan","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New double ckt 345 kV line connecting Oncor Trading House to LST Liberty Station. New single ckt 345 kV line connecting LST Liberty Station to LST Bullock Station. New 345 kV ckt from LST Bullock to LST Navarro Station in the existing struc","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109910","ercot_project":"109910","title":"Bellville South - Peters Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":8.7,"from":"Bellville South","to":"Peters","county_from":"Austin","county_to":"Austin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Bellville South – Peters Transmission Line to 4000A minimum (T217) as an LCP project for Batch Zero Base Load","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/95672368","name":"Bellville South Substation","coordinates":[-96.25593,29.92427]},{"osm_id":"osm:way/95161875","name":"Peters Substation","coordinates":[-96.2006,29.84771]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/95672366","layer":"lines-138"},{"osm_id":"osm:way/511343972","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":8.5,"straight_mi":6.2},{"id":"ercot-tpit:110225","ercot_project":"110225","title":"Bellville South Substation Upgrade Project","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Belville South","to":null,"county_from":"Austin","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Bellville South Substation Upgrade (to support voltage conversion), requires coordination with CNP/CEHE. Upgrade Project for Batch Zero Base Load"},{"id":"ercot-tpit:109884","ercot_project":"109884","title":"Piney Creek - Winchester Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-31","actual_isd":null,"cm_new":1.6,"cm_rebuilt":0,"from":"Winchester","to":"Piney Creek","county_from":"Fayette","county_to":"Fayette","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add new Winchester to Piney Creek second circuit with 473MVA minimum rating as an LCP project for Batch Zero Base Load","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:109912","ercot_project":"109912","title":"Bellville South - Glidden Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":31,"from":"Bellville South","to":"Glidden","county_from":"Austin","county_to":"Colorado","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Bellville South – Glidden Transmission Line to 4000A minimum (T113) as an LCP project for Batch Zero Base Load","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/95672368","name":"Bellville South Substation","coordinates":[-96.25593,29.92427]},{"osm_id":"osm:way/98019896","name":"Glidden Substation","coordinates":[-96.57187,29.69691]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:103797A","ercot_project":"103797A","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"MORLEY","to":"HILLJE/JULIA","county_from":"Wharton","county_to":"Wharton","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install new Morley (MLY) 345kV CEHE substation in BAAH configuration. Loop Ckt.72H into Morley substation to create new Ckt.72 Hillje to Morley to Julia.","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:50898","ercot_project":"50898","title":"Alamito Creek to Paisano to Alpine: Rebuild 69 kV line","owner":"AEP TNC","owner_project":"2793","kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":22.26,"from":"Alamito Creek","to":"Alpine","county_from":"Presidio","county_to":"Brewster","tier":"Tier 4","rpg":"20RPG017","rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rehab Alamito Creek to Paisano to Alpine 69 kV line","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:73001","ercot_project":"73001","title":"Truscott Humble Tap: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":13.92,"from":"Moorhouse","to":"Truscott Humble","county_from":"Knox","county_to":"Knox","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rehab Truscott Humble Tap 69 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110088","ercot_project":"110088","title":"Bernardo Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bernardo","to":null,"county_from":"Colorado","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal equipment at Bernardo (Bus #7654) to increase the operational rating of terminating 69.0-kV lines as an LCP Upgrade, identified by CNP/CEHE, for Batch Zero Base Load."},{"id":"ercot-tpit:103797C","ercot_project":"103797C","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"MORLEY","to":null,"county_from":"Wharton","county_to":"Wharton","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install new Morley (MLY) 765kV CEHE substation. Install 765/345kV Autotransformer A1 with connection to Morley 345kV substation.","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:103797B","ercot_project":"103797B","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"MORLEY","to":"HILLJE/WOLF","county_from":"Wharton","county_to":"Wharton","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install new Morley (MLY) 345kV CEHE substation in BAAH configuration. Loop Ckt.64E into Morley substation to create new Ckt.64 Hillje to Morley to Wolf.","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:103797D","ercot_project":"103797D","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"MORLEY","to":null,"county_from":"Wharton","county_to":"Wharton","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install new Morley (MLY) 765kV CEHE substation. Install 765/345kV Autotransformer A2 with connection to Morley 345kV substation.","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:103797E","ercot_project":"103797E","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"MORLEY","to":"HILLJE/WOLF","county_from":"Wharton","county_to":"Wharton","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install new Morley (MLY) 765kV CEHE substation. Install 765/345kV Autotransformer A3 with connection to Morley 345kV substation.","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:103797F","ercot_project":"103797F","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":4,"cm_rebuilt":0,"from":"MORLEY","to":"HILLJE/JULIA","county_from":"Wharton","county_to":"Wharton","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install new Morley (MLY) 345kV CEHE substation in BAAH configuration. Install 345kV Ckt.1 Hillje to Morley. Install 345kV Ckt.2 Hillje to Morley.","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:103797G","ercot_project":"103797G","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":142.8,"cm_rebuilt":0,"from":"MORLEY","to":"Blu Lacy","county_from":"Wharton","county_to":"Nueces","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install 765kV line from CEHE's Morley substation to AEP Blu Lacy substation.","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:103797I","ercot_project":"103797I","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2031-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"MORLEY","to":null,"county_from":"Wharton","county_to":null,"tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install new Morley (MLY) 765kV CEHE substation. Install and connect (1) 300 MVAr switchable bus reactors at Morley 765kV.","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:50647","ercot_project":"50647","title":"CPSE_Merida to Westside MLSE","owner":"CPS","owner_project":"S-0773","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Merida","to":"Westside","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal at Merida to ensure a 2000 A rating."},{"id":"ercot-tpit:103809","ercot_project":"103809","title":"Blu Lacy to Hillje: Construct New 765 kV Line","owner":"AEP TCC","owner_project":"TP2025322","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-30","actual_isd":null,"cm_new":72,"cm_rebuilt":0,"from":"Blu Lacy","to":"Hillje","county_from":"Nueces","county_to":"Wharton","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":"NEW","description":"Construct a new 765 kV single circuit line from Blu Lacy to Howard","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102901","ercot_project":"102901","title":"Blu Lacy to Howard: Construct New 765 kV Line","owner":"AEP TCC","owner_project":"TP2025322","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-30","actual_isd":null,"cm_new":70,"cm_rebuilt":0,"from":"Blu Lacy","to":"Howard","county_from":"Nueces","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":"In-Service Date Update","description":"Construct a new 765 kV single circuit line from Blu Lacy to Howard","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102885","ercot_project":"102885","title":"Blu Lacy: Construct New 765/345 kV Station","owner":"AEP TCC","owner_project":"TP2025322","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-30","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Blu Lacy","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":"In-Service Date Update","description":"Construct new 765/345 kV station on the Lon Hill to Reforzar and Lon Hill to Nelson Sharpe 345 kV lines","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:109994","ercot_project":"109994","title":"Rebuild the existing Five_pts to Wstside 138-kV transmission line","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.78,"from":"5150","to":"5490","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:110478","ercot_project":"110478","title":"Construct a new Hill Country to Bergheim 345-kV transmission line","owner":"CPS/LCRA","owner_project":"T-XXXX","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":14.28,"cm_rebuilt":0,"from":"5211","to":"7770","county_from":"Bexar","county_to":"Comal","tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":"Construct a new Hill Country to Bergheim 345-kV transmission line on double-circuit structures with one circuit in place, with normal and emergency ratings of at least 1980 MVA, which will require a new right of way (ROW), approximately 14.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:109992","ercot_project":"109992","title":"Rebuild Castle to Dresden 138kV Transmission Line","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.79,"from":"5080","to":"5130","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:109986","ercot_project":"109986","title":"Rebuild the existing Leon Creek to Palo Alto 138-kV transmission line","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.64,"from":"5260","to":"5330","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:109984","ercot_project":"109984","title":"Construct a new CPS Owned switchyard construction and gen tie to accommodate connection to the HUISACHE BESS & SOLAR generation site","owner":"CPS/NO","owner_project":"S-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5241","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null},{"id":"ercot-tpit:109982","ercot_project":"109982","title":"Install a 50MVAr Capacitor Bank at Panther Springs Substation","owner":"CPS/NO","owner_project":"S-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5331","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null},{"id":"ercot-tpit:109974","ercot_project":"109974","title":"Rebuild Cagnon to Potranco 138kV Transmission Line","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":5.87,"from":"5055","to":"5346","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:109956","ercot_project":"109956","title":"Rebuild Anderson to Helotes 138kV Transmission Line","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":5.67,"from":"5003","to":"5200","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:109940","ercot_project":"109940","title":"Rebuild the existing Medinabs to 36th Street 138-kV transmission line","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":8.57,"from":"5305","to":"5427","county_from":"Bexar","county_to":"Bexar","tier":"Tier 1","rpg":"25RPG013 and 25RPG017","rpg_completed":"2026-05-13","bod_reviewed":"2026-06-01","comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:100691","ercot_project":"100691","title":"Install a 50MVAr Capacitor Bank at Howard Substation","owner":"CPS/NO","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5230","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110306","ercot_project":"110306","title":"Argyle Switch - Krum Tap Switch 138 kV Line","owner":"ONCOR","owner_project":"M3520","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":8.54,"from":"Argyle Switch","to":"Krum Tap Switch","county_from":"Denton","county_to":"Denton","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Argyle Switch - Krum Tap Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110290","ercot_project":"110290","title":"Paris Switch - Valley South Switch 345 kV Line","owner":"ONCOR","owner_project":"M3325","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":46.3,"from":"Paris Switch","to":"Valley South Switch","county_from":"Fannin","county_to":"Lamar","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Paris Switch - Valley South Switch 345 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102869","ercot_project":"102869","title":"Upgrade Calallen to Driscoll","owner":"STEC","owner_project":null,"kv":69,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:76790","ercot_project":"76790","title":"Upgrade Pearsall Auto","owner":"STEC","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pearsall","to":"Pearsall","county_from":"Frio","county_to":"Frio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Pearsall Auto"},{"id":"ercot-tpit:110278","ercot_project":"110278","title":"Gunter 345/138 kV Autotransformer #2","owner":"ONCOR","owner_project":"M3321","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gunter 345/138 kV Switch","to":null,"county_from":"Collin","county_to":null,"tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Gunter 345/138 kV Autotransformer #2"},{"id":"ercot-tpit:105759","ercot_project":"105759","title":"Wilmer Switch – Navarro Switch (Lonestar) 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4446","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-15","actual_isd":null,"cm_new":106,"cm_rebuilt":0,"from":"Wilmer Switch","to":"Navarro Switch","county_from":"Dallas","county_to":"Navarro","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Wilmer Switch – Navarro Switch (Lonestar) 345 kV Double-Circuit Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:105829A","ercot_project":"105829A","title":"Establish New Martin Lake 765/345 kV Switch","owner":"ONCOR","owner_project":"R6450, R6451","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"New Martin Lake 765/345 kV Switch","to":"New Martin Lake 765/345 kV Switch","county_from":"Rusk","county_to":"Rusk","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-09","comments":null,"description":"Establish New Martin Lake 765/345 kV Switch","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:105744","ercot_project":"105744","title":"Desoto Switch – Sam Switch Switch (Lonestar) 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4448","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-15","actual_isd":null,"cm_new":56,"cm_rebuilt":0,"from":"Desoto Switch","to":"Sam Switch","county_from":"Hill","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Establish Desoto Switch – Sam Switch Switch (Lonestar) 345 kV Double-Circuit Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105747","ercot_project":"105747","title":"Farmersville Switch – Saltillo Switch 345kV Line","owner":"ONCOR","owner_project":"M3314","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":59.9,"from":"Farmersville Switch","to":"Saltillo Switch","county_from":"Collin","county_to":"Hunt","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Farmersville Switch – Saltillo Switch 345kV Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:105751","ercot_project":"105751","title":"Navarro Switch - Pin Oak Switch 345 kV DCKT Line Upgrade","owner":"ONCOR","owner_project":"R6428","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":62.2,"from":"Navarro","to":"Pin Oak","county_from":"Navarro","county_to":"Freestone","tier":"Tier 1","rpg":"25RPG038","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Navarro Switch - Pin Oak Switch 345 kV DCKT Line Upgrade","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:105753","ercot_project":"105753","title":"Navarro Switch - Outlaw Switch 345kV Line","owner":"ONCOR","owner_project":"R6427","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Navarro Switch","to":"Outlaw Switch","county_from":null,"county_to":null,"tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Navarro Switch - Outlaw Switch 345kV Line","rpg_project":"ercot-rpg:25RPG004"},{"id":"ercot-tpit:105755","ercot_project":"105755","title":"Trinidad Switch – Tri Corner 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4045","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":80.8,"from":"Trinidad Switch","to":"Tri Corner Switch","county_from":"Dallas","county_to":"Henderson","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Trinidad Switch – Tri Corner 345 kV Double-Circuit Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105757","ercot_project":"105757","title":"Watermill Switch - Tri Corner Switch 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4442","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":16.8,"from":"Watermill Switch","to":"Tri Corner Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 1","rpg":"25RPG004","rpg_completed":"2026-03-19","bod_reviewed":null,"comments":null,"description":"Upgrade Watermill Switch - Tri Corner Switch 345 kV Double-Circuit Line","rpg_project":"ercot-rpg:25RPG004","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/39353067","name":"Watermill Substation","coordinates":[-96.72636,32.55865]},{"osm_id":"osm:way/30916557","name":"Tri-Corner Substation","coordinates":[-96.53753,32.55366]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/172372060","layer":"lines-345plus"},{"osm_id":"osm:way/30799137","layer":"lines-345plus"},{"osm_id":"osm:way/172349684","layer":"lines-345plus"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":11.3,"straight_mi":11},{"id":"ercot-tpit:116019A","ercot_project":"116019A","title":"Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (2) 300 MVAr switchable line reactors and 2-225MVAR bus reactors.","owner":"CNP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CEHE_NewSub","to":"Morley","county_from":"Grimes","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (1) 300 MVAr switchable line reactors and 2-225MVAR bus reactors."},{"id":"ercot-tpit:105829B","ercot_project":"105829B","title":"Establish New Martin Lake 765/345 kV Switch","owner":"ONCOR","owner_project":"R6450, R6451","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"New Martin Lake 765 kV Switch","to":"New Martin Lake 765 kV Switch","county_from":"Rusk","county_to":"Rusk","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-09","comments":null,"description":"Install Martin Lake 765 kV Reactor","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:116019B","ercot_project":"116019B","title":"Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (2) 300 MVAr switchable line reactors and 2-225MVAR bus reactors.","owner":"CNP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"CEHE_NewSub","to":"Martin Lake","county_from":"Grimes","county_to":"Rusk","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new midpoint 765kV CEHE substation into line from Morley to Martin Lake. Install and connect (1) 300 MVAr switchable line reactors."},{"id":"ercot-tpit:103797H","ercot_project":"103797H","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":292.8,"from":"MORLEY","to":"Martin Lake","county_from":"Wharton","county_to":"Rusk","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install 765kV line from CEHE's Morley substation to Oncor's Martin Lake substation.","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:103797J","ercot_project":"103797J","title":"This models CEHE's Portion of the 765 kV STEP project","owner":"CNP","owner_project":null,"kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Morley","to":null,"county_from":"Grimes","county_to":"Wharton","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-31","comments":null,"description":"Install new Morley (MLY) 765kV CEHE substation. Install and connect (2) 300 MVAr switchable line reactors at Morley 765kV.","rpg_project":"ercot-rpg:25RPG025"},{"id":"ercot-tpit:110534","ercot_project":"110534","title":"Benbrook - Carmichael Bend 345 kV Line","owner":"ONCOR","owner_project":"M5034","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":null,"from":"Benbrook Switch","to":"Carmichael Bend Switch","county_from":"Tarrant","county_to":"Hood","tier":"Tier 3","rpg":null,"rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Benbrook - Carmichael Bend 345 kV Line Upgrade"},{"id":"ercot-tpit:110593","ercot_project":"110593","title":"Stoplight Switch (fka Bluff Creek) - Willow Valley Switch 138 kV Line","owner":"ONCOR","owner_project":"R8840","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Stoplight Switch (fka Bluff Creek)","to":"Willow Valley Switch","county_from":"Scurry","county_to":"Borden","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing 19.9-mile Stoplight Switch (fka Bluff Creek) - Willow Valley Switch 138 kV Line"},{"id":"ercot-tpit:110298","ercot_project":"110298","title":"Graham Plant Switch - Rice Switch 138 kV Line","owner":"ONCOR","owner_project":"M3547","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":9.3,"from":"Graham Plant Switch","to":"Rice Switch","county_from":"Young","county_to":"Young","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Graham Plant Switch - Rice Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110679","ercot_project":"110679","title":"Cedar Hill Switch - Sherry Switch 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M5246","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-06-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cedar Hill Switch","to":"Sherry Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Cedar Hill Switch - Sherry Switch 138 kV Double-Circuit Line"},{"id":"ercot-tpit:112322","ercot_project":"112322","title":"South Watermill - Bell East 765 kV Line","owner":"ONCOR","owner_project":"M4458","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-06-17","actual_isd":null,"cm_new":127.3,"cm_rebuilt":0,"from":"South Watermill","to":"Bell East","county_from":"Ellis","county_to":"Bell","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-09","comments":null,"description":"Establish South Watermill - Bell East 765 kV Line","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:14TPIT0098","ercot_project":"14TPIT0098","title":"Cost Substation Addition","owner":"GVEC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-10-29","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cost","to":null,"county_from":"Gonzales","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the existing 69-kV substation"},{"id":"ercot-tpit:110248","ercot_project":"110248","title":"Argyle Switch - Highlands 138 kV Line and Argyle Switch Rebuild","owner":"ONCOR","owner_project":"M3201","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":7.5,"from":"Argyle 138 kV Switch","to":"Highlands","county_from":"Denton","county_to":"Denton","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Argyle Switch - Highlands 138 kV Line and Argyle Switch Rebuild","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:3334","ercot_project":"3334","title":"Fort Sam to Kirby and Fort Sam to Tenth Street MLSE Upgrade","owner":"CPS","owner_project":"S-0744","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fort Sam","to":"Kirby/Tenth Street","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade entire bus and terminals at Fort Sam and ensure a rating of 2000 A."},{"id":"ercot-tpit:110620","ercot_project":"110620","title":"Benbrook Switch - Parker Switch 345 kV Line Upgrade","owner":"ONCOR","owner_project":"M5376","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Benbrook Switch","to":"Parker Switch","county_from":"Tarrant","county_to":"Johnson","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Benbrook Switch - Parker Switch 345 kV Line Upgrade"},{"id":"ercot-tpit:110627","ercot_project":"110627","title":"Paint Creek Switch - Murray Switch 138 kV Line","owner":"ONCOR","owner_project":"R8938","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Paint Creek Switch","to":"Murray Switch","county_from":"Haskell","county_to":"Young","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Paint Creek Switch - Murray Switch 138 kV Line"},{"id":"ercot-tpit:110238","ercot_project":"110238","title":"Construct new Alibates - Gray 345 kV Line","owner":"ONCOR","owner_project":"R8989","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new Alibates - Gray 345 kV Line"},{"id":"ercot-tpit:110318","ercot_project":"110318","title":"Wichita Falls South Switch - Windthorst Switch 138 kV Line","owner":"ONCOR","owner_project":"M3548","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":17.68,"from":"Wichita Falls South Switch","to":"Windthorst Switch","county_from":"Archer","county_to":"Archer","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Wichita Falls South Switch - Windthorst Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110042","ercot_project":"110042","title":"Rebuild Comanche Switch - Comanche Peak Switch 345 kV Line","owner":"ONCOR","owner_project":"R6565","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Comanche Switch","to":"Comanche Peak Switch","county_from":"Somervell","county_to":"Comanche","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Comanche Switch - Comanche Peak Switch 345 kV Line"},{"id":"ercot-tpit:110328","ercot_project":"110328","title":"Rebuild Comanche Switch - Hasse POI 138 kV Line","owner":"ONCOR","owner_project":"R6149","kv":138,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":10.3,"from":"Comanche Switch","to":"Hasse POI","county_from":"Comanche","county_to":"Comanche","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Comanche Switch - Hasse POI 138 kV Line","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:110332","ercot_project":"110332","title":"Rebuild Bell County East Switch - Bob White Switch - Temple Switch 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R6568","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":5.9,"from":"Bell County East","to":"Temple","county_from":"Bell","county_to":"Bell","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Bell County East Switch - Bob White Switch - Temple Switch 345 kV Double Circuit Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:112226","ercot_project":"112226","title":"East Watermill - Martin Lake 765 kV Line","owner":"ONCOR","owner_project":"M4458","kv":765,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-12-16","actual_isd":null,"cm_new":145.7,"cm_rebuilt":0,"from":"East Watermill 765 kV Switch","to":"Martin Lake 765 kV Switch","county_from":"Dallas","county_to":"Rusk","tier":"Tier 1","rpg":"25RPG025","rpg_completed":"2025-11-12","bod_reviewed":"2025-12-09","comments":null,"description":"Establish East Watermill - Martin Lake 765 kV Line","rpg_project":"ercot-rpg:25RPG025","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110104","ercot_project":"110104","title":"Kendall - Horse Hollow Gen Tie Transmission Loop Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2032-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kendall","to":"Omega","county_from":"Kendall","county_to":"Kendall","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add a Horse Hollow Gen Tie to Kerr Data Center to Kendall 345-kV transmission loop as an LCP Upgrade to support Batch Zero Base Load."},{"id":"ercot-tpit:65663","ercot_project":"65663","title":"Double Ckt Line M138-K","owner":"TNMP","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2032-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":26.2,"from":"Pecos (bus # 38091)","to":"Faulkner (bus # 38124)","county_from":"Reeves","county_to":"Reeves","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Project Delayed Indefinitely.","terminal_match":{"from":"ambiguous","to":"matched","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/501745941","name":"Pecos Substation","coordinates":[-103.4987,31.42951]},{"osm_id":"osm:way/501745940","name":"Faulkner Substation","coordinates":[-103.7932,31.26104]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","osm_matches":[{"osm_id":"osm:way/1454570031","layer":"lines-138"},{"osm_id":"osm:way/501745946","layer":"lines-138"},{"osm_id":"osm:way/1007121380","layer":"lines-138"},{"osm_id":"osm:way/1007121372","layer":"lines-138"},{"osm_id":"osm:way/1007121371","layer":"lines-138"},{"osm_id":"osm:way/1007121378","layer":"lines-138"},{"osm_id":"osm:way/1007121375","layer":"lines-138"},{"osm_id":"osm:way/21300315","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":25.9,"straight_mi":20.9},{"id":"ercot-tpit:12TPIT0004","ercot_project":"12TPIT0004","title":"Sulpher Springs - New 138kV Substation","owner":"CPS","owner_project":"S-0385","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-01-31","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Sulpher Springs","to":"OW Sommers-Kirby","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new 138kV substation into the existing 138kV OW Sommers to Kirby line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110292","ercot_project":"110292","title":"New 138kV Rogers Rd Substation","owner":"CPS/NO","owner_project":"T-XXXX","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5361","to":"5003, 5488","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:110284","ercot_project":"110284","title":"Anna 345 kV Switch Rebuild and Anna Switch - Valley Switch 345 kV Line","owner":"ONCOR","owner_project":"M3324","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":26.6,"from":"Anna 345 kV Switch","to":"Valley 345 kV Switch","county_from":"Collin","county_to":"Fannin","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Anna Switch - Valley Switch 345 kV Line and Anna 345 kV switch Rebuild","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:109824","ercot_project":"109824","title":"Monticello Switch - Allen Switch 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M3317","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":143.2,"from":"Monticello Switch","to":"Allen Switch","county_from":"Collin","county_to":"Titus","tier":"Tier 1","rpg":"25RPG040, 25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Upgrade Monticello Switch - Allen Switch 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110381","ercot_project":"110381","title":"Jewett Switch - Greene Switch 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4428","kv":345,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-05-15","actual_isd":null,"cm_new":112.5,"cm_rebuilt":0,"from":"Greene Switch","to":"Jewett Switch","county_from":"Dallas","county_to":"Leon","tier":"Tier 1","rpg":"25RPG042","rpg_completed":"2026-05-18","bod_reviewed":null,"comments":null,"description":"Establish Jewett Switch - Greene Switch 345 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:110647","ercot_project":"110647","title":"Paris Switch - Valley Switch 138 kV Line","owner":"ONCOR","owner_project":"M3323","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":46.1,"from":"Paris Switch","to":"Valley Switch","county_from":"Fannin","county_to":"Grayson","tier":"Tier 1","rpg":"25RPG040","rpg_completed":"2026-05-18","bod_reviewed":"2026-06-06","comments":null,"description":"Paris Switch - Valley Switch 138 kV Line Upgrade","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:110344","ercot_project":"110344","title":"Rebuild Hutto Switch - Salado Switch 345 kV DKCT Line","owner":"ONCOR","owner_project":"R6529","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2033-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":36.9,"from":"Hutto Switch","to":"Salado Switch","county_from":"Williamson","county_to":"Bell","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Hutto Switch - Salado Switch 345 kV DKCT Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174024844","name":"Hutto Switching Station","coordinates":[-97.56134,30.55117]},{"osm_id":"osm:way/174019698","name":"Salado Switching Station","coordinates":[-97.51112,30.97213]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/174019722","layer":"lines-345plus"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":36,"straight_mi":null},{"id":"ercot-tpit:45068","ercot_project":"45068","title":"Merida to Harlandale Rebuild","owner":"CPS","owner_project":"T-0233","kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":10,"from":null,"to":null,"county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"CPSE_Merida to Harlandale Rebuild","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:86327","ercot_project":"86327","title":"AEN_New_138kV_Southshore_Substation_Addition","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-06-01","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"9179","to":"9132","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:86323","ercot_project":"86323","title":"AEN_MagnesiumPlant_Northland_Ckt_979_RECONDUCTOR","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":4.11,"from":"9128","to":"9238","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:86321","ercot_project":"86321","title":"AEN_Lakeshore_Northland_Ckt_916_Reconductor","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":4.41,"from":"9128","to":"9228","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:86331","ercot_project":"86331","title":"AEN_Wheless_Mueller_Ckt_1016_Reconductor","owner":"AEN","owner_project":null,"kv":138,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":2.13,"from":"9291","to":"9342","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:70889","ercot_project":"70889","title":"SA College Hills: Rebuild 69 kV Station","owner":"AEP TNC","owner_project":null,"kv":69,"list":"future","status_reported":"Planned","status":"Planned","projected_isd":"2033-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"SA College Hills","to":null,"county_from":"Tom Green","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rehab the SA College Hills 69 kV station"},{"id":"ercot-tpit:110334","ercot_project":"110334","title":"Rebuild Austrop Substation (LCRA TSC) - Walleye Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","owner_project":"R6569","kv":345,"list":"future","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2033-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":33.4,"from":"Walleye Creek","to":"Austrop (LCRA TSC)","county_from":"Milam","county_to":"Travis","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Austrop Substation (LCRA TSC) - Walleye Creek Switch 345 kV Double Circuit Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:99746","ercot_project":"99746","title":"16th Street auto transformer replacement/addition.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2025-04-23","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:90446","ercot_project":"90446","title":"Avila BESS 138kV Gen Tie.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2025-05-01","actual_isd":null,"cm_new":0.22,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Pecos","county_to":"Pecos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:99776","ercot_project":"99776","title":"Replacement of Lake Whitney auto transformer.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:90393","ercot_project":"90393","title":"Evelyn BESS 138kV Gen Tie.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2025-05-06","actual_isd":null,"cm_new":0.23,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:93348","ercot_project":"93348","title":"Adds Cochise Customer Sub","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:87889","ercot_project":"87889","title":"Install 2x 40 MVAR Cap bank at League City.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"League City (38920)","to":null,"county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:82321","ercot_project":"82321","title":"PMCR for 2nd TX in Coachwhip","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":null,"status":"Status not reported","projected_isd":"2025-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:90450","ercot_project":"90450","title":"Headcamp BESS 138kV Gen Tie.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2025-06-16","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Pecos","county_to":"Pecos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:93003","ercot_project":"93003","title":"Adds TNMP Turkeyfoot 69kV Substation","owner":"TNMP","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bosque","county_to":"Coryell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:100408","ercot_project":"100408","title":"Add Cochise customer sub.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2025-07-02","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99926","ercot_project":"99926","title":"Addition of Wolfcamp substation","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2025-07-02","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"The addition of Wolfcamp substation, load, and transmission line."},{"id":"ercot-tpit:90448","ercot_project":"90448","title":"Bocanova BESS 138kV Gen Tie.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2025-07-19","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:93681","ercot_project":"93681","title":"New Transformer will be added Loma Alta.","owner":"BPUB","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-07-24","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Loma Alta","to":"Loma Alta","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:87479E","ercot_project":"87479E","title":"Upgrade to increase thermal limits as part of FRM upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jeanetta","to":"WAP","county_from":"Harris","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:87479G","ercot_project":"87479G","title":"Upgrade to increase thermal limits as part of FRM upgrades","owner":"CNP","owner_project":null,"kv":69,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hyde Park","to":"Downtown","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Hyde Park to Downtown Ckt.32A to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:87479F","ercot_project":"87479F","title":"Upgrade to increase thermal limits as part of FRM upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":"Jeanetta","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Bellaire to Jeanetta Ckt.64B to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:87479I","ercot_project":"87479I","title":"Upgrade to increase thermal limits as part of FRM upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kirby","to":"Garrott","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Hyde Park to Downtown Ckt.32A to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:87479D","ercot_project":"87479D","title":"Upgrade to increase thermal limits as part of FRM upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":"WAP","county_from":"Harris","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Bellaire to WAP Ckt.50A to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:87479C","ercot_project":"87479C","title":"Upgrade to increase thermal limits as part of FRM upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NASA","to":"Webster","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.06D NASA to Webster to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:87479A","ercot_project":"87479A","title":"Upgrade to increase thermal limits as part of FRM upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"PSARCO","to":"BIGVUE","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.03A PSARCO to BIGVUE to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:87479B","ercot_project":"87479B","title":"Upgrade to increase thermal limits as part of FRM upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"PH Robinson","to":"Meadow","county_from":"Galveston","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.99A PH Robinson to Meadow to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:87479H","ercot_project":"87479H","title":"Upgrade to increase thermal limits as part of FRM upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Stadium","to":"Fannin","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Stadium to Fannin Ckt.08B to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:90232I","ercot_project":"90232I","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2025-07-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hyde Park","to":"Downtown","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Hyde Park to Downtown Ckt.32A to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:90730","ercot_project":"90730","title":"TNMP Willow 345kV Switching Station","owner":"TNMP","owner_project":null,"kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2025-08-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Robertson","county_to":"Robertson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99956","ercot_project":"99956","title":"Addition of Harrell Ranch substation","owner":"TNMP","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-09-04","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Model of Harrell Ranch substation, load, and lines."},{"id":"ercot-tpit:99859","ercot_project":"99859","title":"Addition of the Mainland to Vertus 138KV line.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-09-04","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:91494","ercot_project":"91494","owner":"BEPC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Perry","to":"Perry","county_from":"Falls","county_to":"Falls","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99546","ercot_project":"99546","title":"Establish Richland Chambers Generator Tie Line","owner":"ONCOR","owner_project":"R6361","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-10-30","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Richland Chambers 345 kV Switch","to":"Generator","county_from":"Freestone","county_to":"Freestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:93657","ercot_project":"93657","title":"Adds Monarch Gen Tie Switching Station","owner":"TNMP","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:87510","ercot_project":"87510","title":"RCEC_BranchChanges_Kaufman_Update3","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Modifying branch impedance between I20_RC and TALTY_RC"},{"id":"ercot-tpit:87475","ercot_project":"87475","title":"RCEC_Add_CavenderBus","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding Cavender Bus, Load and Branch from Cavender to Cavender_P8"},{"id":"ercot-tpit:104036","ercot_project":"104036","title":"Models Pilot Point","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-03","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:82250","ercot_project":"82250","title":"Adds an additional line and energize load.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-12-03","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds a bundled double circuit line and energize both loads at Pilot Point bus #37365."},{"id":"ercot-tpit:113226","ercot_project":"113226","title":"Fixes Islanded Pilot Point and energize load.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-03","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding two transmission lines from Pilot Point to Gunter Switch."},{"id":"ercot-tpit:66492A","ercot_project":"66492A","title":"Chico West - Grindstone Switch 69 kV Line rebuild","owner":"ONCOR","owner_project":"M3006","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":14,"from":"Jacksboro Sinclair","to":"Jacksboro Amoco","county_from":"Jack","county_to":"Jack","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Jacksboro Amoco - Jacksboro Sinclair 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:72579A","ercot_project":"72579A","title":"PEC_MountainTop_Blanco_DevilsHill_VoltageUpgrade","owner":"PEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-12-19","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mountain Top","to":"Blanco","county_from":"Blanco","county_to":"Blanco","tier":"Tier 4","rpg":"22RPG033","rpg_completed":"2022-11-14","bod_reviewed":null,"comments":null,"description":"Rebuild and upgrade Mountain Top to Blanco 69 kV circuit to 138 kV with bundled 795 kcmil conductor (440 MVA). (Replaces ERCOT Project # 70367A)"},{"id":"ercot-tpit:72574","ercot_project":"72574","title":"topo_update","owner":"PEC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-12-25","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NEW JUNCTION 70600","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Junction from tap station to a three terminal ring bus. Replaces Project ID 63916."},{"id":"ercot-tpit:75788","ercot_project":"75788","title":"This project will intercept the second circuit of a common tower at Reata station.","owner":"LST","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Eastland","county_to":"Eastland","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This project will intercept the second circuit of a common tower at Reata station."},{"id":"ercot-tpit:75792","ercot_project":"75792","title":"New substation for generation interconnection project for 21INR0359","owner":"LST","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2025-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bosque","county_to":"Bosque","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New substation for generation interconnection project for 21INR0359"},{"id":"ercot-tpit:72651","ercot_project":"72651","title":"Add_Josephine_Load","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":null,"status":"Status not reported","projected_isd":"2025-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Tapping the Nevada and Shelby transmission line, and adding Josephine Load."},{"id":"ercot-tpit:91565","ercot_project":"91565","owner":"BEPC","owner_project":null,"kv":69,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-01-23","actual_isd":null,"cm_new":0,"cm_rebuilt":1.1,"from":"Navarro Mills Tap","to":"Navarro Mills","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"matched"}},{"id":"ercot-tpit:91285","ercot_project":"91285","title":"TNMP Lago Mar Substation","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-02-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:76788","ercot_project":"76788","title":"Upgrade Victoria-Rayburn","owner":"STEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-03-01","actual_isd":null,"cm_new":0,"cm_rebuilt":11.57,"from":"Rayburn","to":"Victoria","county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Victoria- Loop 463- Rayburn to 403 MVA","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:71985","ercot_project":"71985","title":"Cypress Water 138 kV Switch","owner":"ONCOR","owner_project":"M4353","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-03-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Northlake","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 3","rpg":"23RPG006","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing Northlake(Cypress Waters) 138 kV Switch"},{"id":"ercot-tpit:103801","ercot_project":"103801","title":"Models YELLOWJACKET","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":null,"status":"Status not reported","projected_isd":"2026-04-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99544B","ercot_project":"99544B","title":"Establish Baines Creek 138 kV Switch","owner":"ONCOR","owner_project":"R6375","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-04-07","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Baines Creek 138 kV Switch","to":"Bonham Solar I","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Baines Creek 138 kV Switch Gen Tie","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:89957","ercot_project":"89957","title":"RCEC_Commerce_South_Load","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-05-01","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Hunt","county_to":"Hunt","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding Commerce South Bus, Load and Branch from Saddle to Comm_S1_8","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:63948","ercot_project":"63948","title":"Establish Fallstown 138 kV Switch","owner":"ONCOR","owner_project":"M3018","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fallstown","to":"Fallstown","county_from":"Wichita","county_to":"Wichita","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Fallstown 138 kV Switch"},{"id":"ercot-tpit:92849","ercot_project":"92849","title":"Renner Switch 138kV Capacitor Bank","owner":"ONCOR","owner_project":"M4021","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Renner Switch","to":"Renner Switch","county_from":"Collin","county_to":"Collin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Capacitor Banks at Renner switch"},{"id":"ercot-tpit:7126","ercot_project":"7126","title":"Renner TPL 138 kV Capacitors","owner":"ONCOR","owner_project":"M3048","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"RENNER SWITCH","to":"RENNER SWITCH","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade existing capacitor banks"},{"id":"ercot-tpit:80546B","ercot_project":"80546B","title":"Upgrade the Hutto & Round Rock - Salado 138 kV Line","owner":"ONCOR","owner_project":"R6203, R6202","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-05-15","actual_isd":null,"cm_new":9.1,"cm_rebuilt":9.1,"from":"Round Rock Westinghouse Tap","to":"Georgetown East","county_from":"Williamson","county_to":"Williamson","tier":"Tier 3","rpg":"24RPG018, 25RPG006","rpg_completed":"2025-03-17","bod_reviewed":null,"comments":null,"description":"Rebuild and double-circuit the Round Rock Westinghouse - Georgetown East 138 kV Line Section","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/340398044","name":"Round Rock Westinghouse Substation","coordinates":[-97.69854,30.56704]},{"osm_id":"osm:way/240078927","name":"Georgetown East Substation","coordinates":[-97.64491,30.62372]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 6.3 mi but ERCOT reports 18.2 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:71178","ercot_project":"71178","title":"Seagoville-Watermill 138 kV Line","owner":"ONCOR","owner_project":"M4081","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Seagoville","to":"Watermill","county_from":"Dallas","county_to":"Dallas","tier":"Tier 3","rpg":"23RPG033","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Seagoville-Watermill 138 kV Line"},{"id":"ercot-tpit:78367","ercot_project":"78367","title":"Montfort Switch-Shankle Switch 138 kV Line","owner":"ONCOR","owner_project":"M4002","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-05-17","actual_isd":null,"cm_new":0,"cm_rebuilt":18,"from":"Montfort","to":"Shankle","county_from":"Navarro","county_to":"Ellis","tier":"Tier 3","rpg":"23RPG033","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Montfort Switch - Shankle Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:66208","ercot_project":"66208","title":"Rebuild League City-Hidden Lakes with bundled 795 ACSS","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.21,"from":"Hidden Lakes (bus # 38900)","to":"League City (bus # 38920)","county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:77320","ercot_project":"77320","title":"Add CapBANK in COYANOSA","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"COYANOSA","to":null,"county_from":"Ward","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104040","ercot_project":"104040","title":"Models Rice Tap","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":null,"status":"Status not reported","projected_isd":"2026-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Collin","county_to":"Grayson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:92687","ercot_project":"92687","title":"Burkett 138 kV POD","owner":"ONCOR","owner_project":"M4466","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-06-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Burkett","to":null,"county_from":"Ellis","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Burkett 138 kV POD"},{"id":"ercot-tpit:50866","ercot_project":"50866","title":"Structure 31/8 - Kenedy SS: Line Rebuild","owner":"AEP TCC","owner_project":"3779","kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-06-11","actual_isd":null,"cm_new":0,"cm_rebuilt":14.3,"from":"Rosata","to":"Kenedy SS","county_from":"Karnes","county_to":"Karnes","tier":"Tier 3","rpg":"20RPG014","rpg_completed":"2020-09-11","bod_reviewed":null,"comments":"In-Service Date Update","description":"Coleto Creek - Kenedy SS: Line Rebuild","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:109708","ercot_project":"109708","title":"LCRA North McCamey Switch Station: Cap Bank Retirement","owner":"AEP TCC/LCRA","owner_project":"TP2026117","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-06-27","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"N. McCamey","to":null,"county_from":"Upton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Retire the AEP Cap Banks at the LCRA's North McCamey Switch station"},{"id":"ercot-tpit:111219","ercot_project":"111219","title":"Tynan: Expand 69 kV Station","owner":"AEP TCC","owner_project":"TP2023005","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tynan","to":null,"county_from":"Bee","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"NEW","description":"Interconnect Honeycomb Solar and Storage to the Tynan 69 kV station"},{"id":"ercot-tpit:71952","ercot_project":"71952","title":"LCRA TSC Bluffton to Buchanan Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":7,"from":"Bluffton","to":"Buchanan","county_from":"Llano","county_to":"Llano","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Overhaul circuit and replace conductor with single-Drake conductor (117 MVA) from Bluffton to Buchanan. Replacement structures should be 138-kV double-circuit capable of supporting a single-Suwannee conductor. Install OPGW.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/504555567","name":"Bluffton Substation","coordinates":[-98.48142,30.82609]},{"osm_id":"osm:way/504555685","name":"Buchanan Substation","coordinates":[-98.44809,30.73553]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/504555677","layer":"lines-69"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":6.9,"straight_mi":null},{"id":"ercot-tpit:92629","ercot_project":"92629","title":"Gabriel - Rivery MLSE Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Gabriel Substation","to":null,"county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove an MLSE on T457 Gabriel - Rivery 138-kV transmission line to achieve the full conductor rating."},{"id":"ercot-tpit:102815","ercot_project":"102815","title":"SandLake - North McCamey Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-06-30","actual_isd":null,"cm_new":186,"cm_rebuilt":0,"from":"North McCamey","to":"Sand Lake","county_from":"Glasscock","county_to":"Ward","tier":"Tier 1","rpg":"22RPG010","rpg_completed":"2022-07-13","bod_reviewed":null,"comments":null,"description":"LCRA TSC and ONCOR joint project to add the Sand Lake-North McCamey 345-kV double-circuit transmission line. 22RPG010. Also see PMCR 69709, LCRATSC_Bearkat_NorthMcCamey_TransmissionLineAddition.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:73401","ercot_project":"73401","title":"Fredonia - Mason Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":11,"from":"Fredonia","to":"Mason","county_from":"Mason","county_to":"Mason","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 11 mile T289 Fredonia (CTEC) - Mason (CTEC) 69-kV transmission line. Per LCRA TSC Transmission System Planning procedure, replacement structures will be capable of operating at 138-kV.","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:69709","ercot_project":"69709","title":"Bearkat - North McCamey Transmission Line Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-06-30","actual_isd":null,"cm_new":140,"cm_rebuilt":0,"from":"Bearkat","to":"Sand Lake","county_from":"Glasscock","county_to":"Ward","tier":"Tier 1","rpg":"22RPG010","rpg_completed":"2022-07-13","bod_reviewed":null,"comments":null,"description":"LCRA TSC and WETT joint project to add the Bearkat-North McCamey 345-kV double-circuit transmission line. 22RPG010","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/453310293","name":"Bearkat Substation","coordinates":[-101.5315,31.76605]},{"osm_id":"osm:way/1006103059","name":"Sand Lake Switching Station","coordinates":[-103.46451,31.5105]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:109841","ercot_project":"109841","title":"Red Creek: Expand 345 kV Station","owner":"AEP TNC","owner_project":"TP2026069","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Red Creek","to":null,"county_from":"Tom Green","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect the Skybox load to the existing Red Creek 345 kV station"},{"id":"ercot-tpit:72576B","ercot_project":"72576B","title":"Lago Vista to Nameless Transmission Line Upgrade","owner":"PEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lago Vista","to":"Nameless","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"1/10/2023: Added information to clarify circuit rating.","description":"Upgrade final span into Nameless, upgrade terminal equipment, and achieve circuit rating of 440 MVA. (Replaces ERCOT Project #61277B)"},{"id":"ercot-tpit:90010","ercot_project":"90010","title":"Magill: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":"TP2024104","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-07-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Magill","to":null,"county_from":"Matagorda","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect City Breeze BESS to the Magill 138 kV station"},{"id":"ercot-tpit:91555","ercot_project":"91555","title":"Switchyard to accommodate for Telios Large Load.","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Added Kirkland and Telios bus, along with load and branches"},{"id":"ercot-tpit:91558","ercot_project":"91558","title":"138kV transmission upgrade to serve Kirkland large load.","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Modifying branch info between BLDSW_RC and BLACKLND_8"},{"id":"ercot-tpit:91584","ercot_project":"91584","owner":"BEPC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"HOLDER","to":"RISING STAR","county_from":"Comanche","county_to":"Comanche","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:1205","ercot_project":"1205","title":"Planned reconductor from Hasse to Gustine","owner":"BEPC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-01","actual_isd":null,"cm_new":0,"cm_rebuilt":7.34,"from":"HASSE","to":"GUSTINE","county_from":"Comanche","county_to":"Comanche","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Planned reconductor from Hasse to Gustine","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/507399209","name":"Hasse Substation","coordinates":[-98.50404,31.92446]},{"osm_id":"osm:way/508017142","name":"Gustine Substation","coordinates":[-98.34432,31.81803]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 13.7 mi but ERCOT reports 7.34 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:90851","ercot_project":"90851","title":"add 19.2 MVAR Capacitor at Rio Colorado","owner":"STEC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:81410","ercot_project":"81410","title":"Oncor_FW_81410_Averitt Synchronous Condenser","owner":"ONCOR","owner_project":"D20231","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-13","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Averitt","to":"Averitt","county_from":"Ector","county_to":"Ector","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Averitt Switch Synchronous Condenser"},{"id":"ercot-tpit:75790","ercot_project":"75790","title":"Placeholder Station for Erath Solar POI","owner":"LST","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-27","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Erath","county_to":"Erath","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Placeholder Station for Erath Solar POI"},{"id":"ercot-tpit:90232G","ercot_project":"90232G","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Stadium","to":"Fannin","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Stadium to Fannin Ckt.08B to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:90232A","ercot_project":"90232A","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"PSARCO","to":"BIGVUE","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.03A PSARCO to BIGVUE to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:90232F","ercot_project":"90232F","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":"Jeanetta","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Bellaire to Jeanetta Ckt.64B to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:90232C","ercot_project":"90232C","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"NASA","to":"Webster","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.06D NASA to Webster to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:90232D","ercot_project":"90232D","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":"WA Parish","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Bellaire to WAP Ckt.50A to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:99453M","ercot_project":"99453M","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"King","to":"Rothwood","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.75H King to Rothwood to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:81006","ercot_project":"81006","title":"DIABOX Customer Load Addition with related line upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":2.12,"from":"SOLMER","to":"SR Bertron/MOMENT","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.21E MOMENT to SOLMER to SR Bertron to increase thermal limits","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:70660","ercot_project":"70660","title":"Plaza to Grant Ckt.08I Upgrade","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0.44,"from":"Plaza","to":"Grant","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install parallel underground portion of Ckt.08I Plaza to Grant to increase thermal limits.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/336554484","name":"Plaza Substation","coordinates":[-95.38956,29.68943]},{"osm_id":"osm:way/51813102","name":"Grant Substation","coordinates":[-95.40164,29.70338]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 2.8 mi but ERCOT reports 0.44 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:90452","ercot_project":"90452","title":"Red Egret BESS 138kV Gen Tie.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-08-31","actual_isd":null,"cm_new":1.15,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:78483","ercot_project":"78483","title":"Rebuild Nada to El Campo 69 kV line","owner":"STEC","owner_project":null,"kv":69,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":15.44,"from":"Nada","to":"El Campo","county_from":"Colorado","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Nada to El Campo 69 kV line from 4/0 to 795. 2023 RTP","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/520305269","name":"Nada Substation","coordinates":[-96.38704,29.39207]},{"osm_id":"osm:way/516225579","name":"El Campo Substation","coordinates":[-96.26878,29.23512]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/516225550","layer":"lines-69"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":15.5,"straight_mi":null},{"id":"ercot-tpit:70884","ercot_project":"70884","title":"Rebuild Rio Colorado - Bay City","owner":"STEC","owner_project":null,"kv":69,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-09-01","actual_isd":null,"cm_new":0,"cm_rebuilt":9.5,"from":"Rio Colorado","to":"Bay City","county_from":"Matagorda","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Rio Colorado - Bay City 795 ACSR","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:102871","ercot_project":"102871","title":"Add Fort Bobcat load serving station and Tline to STEC Orange Grove","owner":"STEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-01","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:78169","ercot_project":"78169","title":"Lewisville Switch to Highland","owner":"BEPC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-04","actual_isd":null,"cm_new":0,"cm_rebuilt":2.8,"from":"Lewisville Switch","to":"Highland","county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Lewisville Switch to Highland","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/141723564","name":"Lewisville Substation","coordinates":[-97.00973,33.06617]},{"osm_id":"osm:way/341316597","name":"Highland Substation","coordinates":[-97.05198,33.08594]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/1364138795","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":2.8,"straight_mi":null},{"id":"ercot-tpit:66289C","ercot_project":"66289C","title":"Tyler to Athens 138 kV line Conversion","owner":"ONCOR","owner_project":"R6094","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3.8,"from":"Tyler Switch","to":"Athens","county_from":"Smith","county_to":"Henderson","tier":"Tier 3","rpg":"22RPG015","rpg_completed":"2022-07-01","bod_reviewed":null,"comments":null,"description":"Convert Tyler Switch - Athens 69 kV Line to 138 kV Operation","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:66492B","ercot_project":"66492B","title":"Chico West - Grindstone Switch 69 kV Line rebuild","owner":"ONCOR","owner_project":"M3006","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-15","actual_isd":null,"cm_new":0,"cm_rebuilt":15,"from":"Jacksboro Sinclair","to":"Grindstone","county_from":"Jack","county_to":"Palo Pinto","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Grindstone - Jacksboro Sinclair 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:72579B","ercot_project":"72579B","title":"PEC_MountainTop_Blanco_DevilsHill_VoltageUpgrade","owner":"PEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Blanco","to":"Devil's Hill","county_from":"Blanco","county_to":"Blanco","tier":"Tier 4","rpg":"22RPG033","rpg_completed":"2022-11-14","bod_reviewed":null,"comments":null,"description":"Rebuild and upgrade Blanco to Devil's Hill 69 kV circuits to 138 kV with bundled 795 kcmil conductor (440 MVA). (Replaces ERCOT Project # 70367B)"},{"id":"ercot-tpit:66206A","ercot_project":"66206A","title":"Upgrade Temple - Minerva 69 kV Line","owner":"ONCOR","owner_project":"R6186","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-15","actual_isd":null,"cm_new":20.5,"cm_rebuilt":0,"from":"Temple","to":"Marak","county_from":"Bell","county_to":"Milam","tier":"Tier 3","rpg":"22RPG034","rpg_completed":"2022-11-01","bod_reviewed":null,"comments":null,"description":"Upgrade Temple - Marak 69 kV Line","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:104569","ercot_project":"104569","title":"BBEC Delhi T1","owner":"BBEC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-18","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Delhi","to":null,"county_from":"Caldwell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Transformer at Delhi"},{"id":"ercot-tpit:81305A","ercot_project":"81305A","title":"Expanse - Vealmoor 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8681","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":15.5,"from":"Expanse","to":"Tredway","county_from":"Martin","county_to":"Martin","tier":"Tier 1","rpg":"24RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuilds the existing Vealmoor – Estacado 138 kV Line with both circuits in place and establish the new Tredway 138 kV Switch.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:50890","ercot_project":"50890","title":"Port Lavaca: Station Rebuild (Cangrejo)","owner":"AEP TCC","owner_project":"3787 TA2019045","kv":69,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":37.81,"from":"Port Lavaca","to":null,"county_from":"Calhoun","county_to":null,"tier":"Tier 1","rpg":"21RPG002","rpg_completed":"2021-09-16","bod_reviewed":"2021-10-22","comments":"In-Service Date Update","description":"Rebuild the Port Lavaca (Cangrejo) station","terminal_match":{"from":"ambiguous","to":"multi_or_missing"}},{"id":"ercot-tpit:67326","ercot_project":"67326","title":"Ajo to Reforzar: Construct New 345 kV Double Circuit Line","owner":"AEP TCC/ETT","owner_project":"TP2022030","kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-09-30","actual_isd":null,"cm_new":11,"cm_rebuilt":0,"from":"Ajo","to":"Reforzar","county_from":"Kenedy","county_to":"Brooks","tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-11-29","bod_reviewed":"2021-12-10","comments":"Dollars Update","description":"Construct a new 345 kV double circuit line from Ajo to Reforzar","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:81305B","ercot_project":"81305B","title":"Expanse - Vealmoor 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8681","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":12.8,"from":"Expanse","to":"Tredway","county_from":"Martin","county_to":"Martin","tier":"Tier 1","rpg":"24RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing Expanse – Estacado 138 kV Line section with both circuits in place establish the new Tredway 138 kV Switch.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:90232E","ercot_project":"90232E","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jeanetta","to":"WA Parish","county_from":"Harris","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:89959","ercot_project":"89959","title":"RCEC_RockWallHwy276Load","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding Rockwall Highway Bus, Load and Branch from RockWallHwy to RCKWL_E1_8"},{"id":"ercot-tpit:77807B","ercot_project":"77807B","title":"Silverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"23RPG013","rpg_completed":"2023-11-27","bod_reviewed":"2024-01-09","comments":null,"description":null},{"id":"ercot-tpit:92872","ercot_project":"92872","title":"North Main 138kV Capacitor Bank","owner":"ONCOR","owner_project":"M5187","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"North Main","to":"North Main","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"North Main 138kV Capacitor Bank"},{"id":"ercot-tpit:78177","ercot_project":"78177","owner":"BEPC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pleasant Grove","to":"Pleasant Grove","county_from":"Falls","county_to":"Falls","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:78181","ercot_project":"78181","owner":"BEPC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Midway","to":"Midway","county_from":"Falls","county_to":"Falls","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:87512","ercot_project":"87512","title":"RCEC_BranchChanges_Kaufman_Update4","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Updating branch info between I20_RC and COMBINRC1"},{"id":"ercot-tpit:102563","ercot_project":"102563","title":"BEPC_TPIT102563_BrushieCap","owner":"BEPC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-22","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"199","to":null,"county_from":"Navarro","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:61444","ercot_project":"61444","title":"GVEC Kicaster Substation Addition (formerly Wilson South)","owner":"GVEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-23","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Wilson South","to":null,"county_from":"Wilson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add a new load-serving substation 4.35 miles south of La Vernia along FM 775 with a 40 MVA PWT."},{"id":"ercot-tpit:87799","ercot_project":"87799","title":"Old Country 345 kV Switch","owner":"ONCOR","owner_project":"M4172","kv":345,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2026-10-29","actual_isd":"2026-07-31","cm_new":0,"cm_rebuilt":0,"from":"Old Country","to":null,"county_from":"Ellis","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Old Country 345 kV Switch","puct_project":"mcpr:oncor-electric-delivery:0pt44880","puct_link_method":"owner project code + voltage + shared place name"},{"id":"ercot-tpit:78490C","ercot_project":"78490C","title":"Jeanetta Auto Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0.04,"from":"Clodine","to":"Roark","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG031","rpg_completed":"2023-10-26","bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.25B Roark equipment and reconductor near Roark substation to increase thermal limits","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/304890197","name":"Clodine Substation","coordinates":[-95.62072,29.67479]},{"osm_id":"osm:way/129126591","name":"Roark Substation","coordinates":[-95.56133,29.66605]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 3.7 mi but ERCOT reports 0.04 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:71950","ercot_project":"71950","title":"Twin Buttes Load 138-KV Circuit Breaker Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Twin Buttes","to":null,"county_from":"Tom Green","county_to":"Tom Green","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Provide a 138-kV point of interconnection at the Twin Buttes Substation to connect to a new Golden Spread Electric Cooperative Transmission line. Update contingencies"},{"id":"ercot-tpit:87431","ercot_project":"87431","title":"Rebuild Wickett to Winkler 69kV line.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-30","actual_isd":null,"cm_new":0,"cm_rebuilt":6.8,"from":"TNMP Winkler (37960)","to":"TNMP Wickett (37980)","county_from":"Winkler","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:67320","ercot_project":"67320","title":"Cruce to Reforzar: Construct New 345 kV Double Circuit Line","owner":"AEP TCC","owner_project":"TP2022033","kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-10-30","actual_isd":null,"cm_new":48,"cm_rebuilt":0,"from":"Cruce","to":"Reforzar","county_from":"Jim Hogg","county_to":"Brooks","tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-11-29","bod_reviewed":"2021-12-10","comments":"Dollars Update","description":"Construct a new 345 kV double circuit line from Cruce to Reforzar","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99641","ercot_project":"99641","title":"Static: Expand 345 kV Station","owner":"AEP TCC","owner_project":"TP2025246","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Static","to":null,"county_from":"Refugio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Install two 345 kV breakers at the existing Static 345 kV station"},{"id":"ercot-tpit:45511","ercot_project":"45511","title":"Laredo to Del Mar: 138 kV Line Rebuild","owner":"AEP TCC","owner_project":"3746","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.73,"from":"Laredo","to":"Del Mar","county_from":"Webb","county_to":"Webb","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Rebuild Laredo to Del Mar 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:57906","ercot_project":"57906","title":"Laredo to University: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"3838","kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.73,"from":"Laredo","to":"University","county_from":"Webb","county_to":"Webb","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Reconductor the Del Mar to University 138 kV line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:66101","ercot_project":"66101","title":"Del Sol to Frontera: Build New 345 kV Double Circuit Line","owner":"AEP TCC/ETT","owner_project":"TP2020838","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":36,"cm_rebuilt":0,"from":"Del Sol","to":"Frontera","county_from":"Starr","county_to":"Hidalgo","tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-11-29","bod_reviewed":"2021-12-10","comments":"Service Level Update","description":"Build new 345 kV double circuit line from Del Sol to Frontera. Expand Frontera Station and install two (2) autotransformers.","terminal_match":{"from":"not_in_osm","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/512644995","name":"Frontera Substation","coordinates":[-98.39713,26.21789]},{"osm_id":"osm:way/512360947","name":"Goodwin Substation","coordinates":[-98.45157,26.24529]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:92998","ercot_project":"92998","title":"LeMay: Expand 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"LeMay","to":null,"county_from":"La Salle","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Interconnect the new White Water Midstream load to the existing LeMay 138 kV station"},{"id":"ercot-tpit:109613","ercot_project":"109613","title":"Install generation for Pinewood Solar (25INR0170) at Seabreeze 345kV CEHE substation. Connect at the same generator lead as Tanglewood Solar.","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Seabreeze","to":"TANGLE","county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:90964","ercot_project":"90964","title":"Tier 3 project to add second autotransformer at Long Draw","owner":"WETT","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0.5,"cm_rebuilt":0,"from":"Long Draw 345 kV","to":"Long Draw 138 kV","county_from":"Borden","county_to":"Borden","tier":"Tier 3","rpg":"24RPG027","rpg_completed":"2024-09-20","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:111495","ercot_project":"111495","title":"LCRATSC Warda Generator Circuit Breaker Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Warda","to":null,"county_from":"Fayette","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This project installs a new 138-kV circuit breaker and associated terminal equipment at the Warda Substation, in a ring bus configuration, to provide a new 138-kV Point of Interconnection to Staccato Storage."},{"id":"ercot-tpit:90232H","ercot_project":"90232H","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kirby","to":"Garrott","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Kirby to Garrott Ckt.37A to increase thermal limits as part of FRM upgrades"},{"id":"ercot-tpit:99453R","ercot_project":"99453R","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bailey","to":"Waterhole","county_from":"Wharton","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.62A Bailey to Waterhole to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:90006","ercot_project":"90006","title":"Oklaunion: Construct New 345 kV Terminal","owner":"AEP TNC/AEP TNC/ETT","owner_project":"TP2024106","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Oklaunion","to":null,"county_from":"Wilbarger","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect the OPS load to the existing Oklaunion 345 kV station"},{"id":"ercot-tpit:87861","ercot_project":"87861","title":"Range Rider - Ranger Camp 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R8722","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":1.2,"cm_rebuilt":0,"from":"Ranger Camp 345/138 kV Switch","to":"Range Rider 138 kV Switch","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 138 kV Double-Circuit Line from Range Rider to Ranger Camp Switch.","terminal_match":{"from":"multi_or_missing","to":"not_in_osm"}},{"id":"ercot-tpit:73578A","ercot_project":"73578A","title":"Heights 138kV Loop Conversion","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Dunlavy","to":"Heights","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild/Reconductor Dead Ckt.40Z to prepare for 138kV Conversion. De-energize Ckt.31C Dunlavy to Heights and repurpose as Ckt.09D tap to Dunlavy TR1 load."},{"id":"ercot-tpit:90038","ercot_project":"90038","title":"McKenzie Road to Winthorp: Construct New 138 kV Line","owner":"AEP TCC/ETT","owner_project":"TP2024150","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0.15,"cm_rebuilt":0,"from":"McKenzie Road","to":"Winthorp","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect the new Winthorp load station to the existing McKenzie Road 138 kV station","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:81223","ercot_project":"81223","title":"Range Rider 138 kV Switch","owner":"ONCOR","owner_project":"R8721","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Range Rider 138 kV Switch","to":"Range Rider 138 kV Switch","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 138 kV switch replacing existing Morgan Creek 138 kV Switch."},{"id":"ercot-tpit:91289","ercot_project":"91289","title":"LCRATSC_Settlers Substation Upgrade","owner":"LCRATSC","owner_project":"PLC-6691","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bastrop","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Settlers Substation Addition project will construct a new substation connecting to LCRA TSC owned 138-kV transmission lines T171 Austrop to Sim Gideon and T231 Bastrop to Webberville via a hard tap installation. In this project, LCRA TSC wi"},{"id":"ercot-tpit:78490D","ercot_project":"78490D","title":"Jeanetta Auto Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.67,"from":"Clodine","to":"Roark","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG031","rpg_completed":"2023-10-26","bod_reviewed":null,"comments":null,"description":"Reconductor Ckt.25B Clodine to Roark TR8 tap to increase thermal limits.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/304890197","name":"Clodine Substation","coordinates":[-95.62072,29.67479]},{"osm_id":"osm:way/129126591","name":"Roark Substation","coordinates":[-95.56133,29.66605]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/336647116","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":3.7,"straight_mi":null},{"id":"ercot-tpit:73578B","ercot_project":"73578B","title":"Heights 138kV Loop Conversion","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Dunlavy","to":"HO Clarke","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Repurpose/retire existing 69kV Ckts 34A/34B. Unbundle parallel-bundled portions of Ckt.40A HOC to Dunlavy. Reconfigure Ckt.40A to reach a Minimum 1-2000AAC limiting conductor @ 90/120Deg. Upgrade HOC line relaying on 69kV Ckt.40A HOC to Dun"},{"id":"ercot-tpit:73578D","ercot_project":"73578D","title":"Heights 138kV Loop Conversion","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Heights","to":"San Felipe/White Oak","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert Heights substation to 138kV service. Retire/repurpose portions of 69kV Ckts. 34A/34B for the new Heights 138kV loop. Reconfigure Ckt.09D to create new Ckt.09D Eureka TR2/TR3 tap to HE-DN_TR1 tap to Heights 138kV to White Oak. Recond"},{"id":"ercot-tpit:73578E","ercot_project":"73578E","title":"Heights 138kV Loop Conversion","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"White Oak","to":null,"county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove White Oak auto A2/A4 and remaining 69kV facilities"},{"id":"ercot-tpit:81594","ercot_project":"81594","title":"Dunlay substation","owner":"STEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-11-01","actual_isd":null,"cm_new":null,"cm_rebuilt":0,"from":"Dunlay","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds STEC Dunlay Load serving station"},{"id":"ercot-tpit:81590","ercot_project":"81590","title":"Rio Medina substation","owner":"STEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-01","actual_isd":null,"cm_new":4.5,"cm_rebuilt":0,"from":"Rio Medina","to":null,"county_from":"Medina","county_to":null,"tier":"Tier 2","rpg":null,"rpg_completed":"2024-02-01","bod_reviewed":null,"comments":null,"description":"Adds Rio Medina Load serving station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:71917","ercot_project":"71917","title":"Upgrade STEC castroville to Pearson to 138kV","owner":"STEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-11-01","actual_isd":null,"cm_new":0,"cm_rebuilt":10.51,"from":"5808","to":"5813","county_from":"Medina","county_to":"Medina","tier":"Tier 2","rpg":"22RPG022","rpg_completed":"2022-12-06","bod_reviewed":null,"comments":null,"description":"Upgrade STEC Bader station to 138kV. Upgrade STEC Castroville to bader and bader to pearson to 138kV","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:91174","ercot_project":"91174","title":"Upgrade Eustace-Walton line to Cumberland conductor","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Eustace-Walton line to Cumberland conductor"},{"id":"ercot-tpit:91596","ercot_project":"91596","title":"Addition of PEC CementPlant_Substation","owner":"PEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adding PEC CementPlant_Substation substation. Adding bus, branch, and load."},{"id":"ercot-tpit:91176","ercot_project":"91176","title":"Add Combine Switch station next to the existing Combine station. The new Combine switch will connect to Combine NTMWD","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Combine Switch station next to the existing Combine station. The new Combine switch will connect to Combine NTMWD"},{"id":"ercot-tpit:82298B","ercot_project":"82298B","title":"PMCR for Adding TNMP Woodhouse New Station","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-11-04","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"23RTP023","rpg_completed":null,"bod_reviewed":"2024-02-27","comments":null,"description":null},{"id":"ercot-tpit:70714","ercot_project":"70714","title":"La Cima Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-10","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ranch Road 12","to":"La Cima","county_from":"Hays","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add new substation to 138 kV line between Ranch Road 12 and Hill Top and install 46.7 MVA distribution transformer. The new substation will be located approximately 0.30 miles from Ranch Road 12 substation."},{"id":"ercot-tpit:78175","ercot_project":"78175","owner":"BEPC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-12","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Franklin","to":"Franklin","county_from":"Robertson","county_to":"Robertson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:87514","ercot_project":"87514","title":"RCEC_BranchChanges_Kaufman_Update5","owner":"RCEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Updating line info between Boze and CombineRC1"},{"id":"ercot-tpit:99544A","ercot_project":"99544A","title":"Establish Baines Creek 138 kV Switch","owner":"ONCOR","owner_project":"R6375","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Baines Creek 138 kV Switch","to":"Baines Creek 138 kV Switch","county_from":"Limestone","county_to":"Limestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Baines Creek 138 kV Switch"},{"id":"ercot-tpit:99608","ercot_project":"99608","title":"Establish Foggle Switch - North Athens Switch 138 kV Line","owner":"ONCOR","owner_project":"R6348","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-15","actual_isd":null,"cm_new":0,"cm_rebuilt":1.4,"from":"Foggle Switch","to":"North Athens Switch (Rayburn)","county_from":"Henderson","county_to":"Henderson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Foggle Switch - North Athens Switch 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:64858","ercot_project":"64858","title":"La Palma Expansion","owner":"AEP TCC/SLU","owner_project":"TP2021588","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-16","actual_isd":null,"cm_new":6.5,"cm_rebuilt":0,"from":"La Palma","to":"Kingfisher","county_from":"Cameron","county_to":"Cameron","tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-11-29","bod_reviewed":"2021-12-10","comments":"In-Service Date Update","description":"Construct 3 Breaker Ring Bus. Construct 345 kV Line from La Palma 345 kV station to Kingfisher 345 kV (Sharyland) station.","terminal_match":{"from":"not_in_osm","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/487061712","name":"Palmito Substation","coordinates":[-97.37989,25.98456]},{"osm_id":"osm:way/337244621","name":"Stewart Substation","coordinates":[-94.91068,29.22779]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:93242","ercot_project":"93242","title":"Saxet Substation Upgrade","owner":"LCRATSC","owner_project":"PLC-7500","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-20","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This Saxet Substation Upgrade project (Phase 2) will be a continuation of the Saxet Substation Addition project (Phase 1) where LCRA TSC installed two new transmission hard taps with associated structures to LCRA TSC owned 138-kV transmissi"},{"id":"ercot-tpit:93299","ercot_project":"93299","title":"Add Embar 138 kV POD","owner":"ONCOR","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"In service","projected_isd":"2026-11-27","actual_isd":"2026-11-27","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Embar 138 kV POD"},{"id":"ercot-tpit:64042","ercot_project":"64042","title":"Barrilla Junction: 69 kV Loop Rebuild","owner":"AEP TNC","owner_project":"1886","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":null,"from":"Barrilla Junction","to":"Hoefs Road Station","county_from":"Pecos","county_to":"Reeves","tier":"Tier 3","rpg":"21RPG023","rpg_completed":"2022-01-14","bod_reviewed":null,"comments":"TSP/Company Contact and In-Service Date Update","description":"Rebuild Barrilla Junction to Saragosa to Cherry Creek to Verhalen to Hoefs Road stations, convert to 138 kV"},{"id":"ercot-tpit:67324","ercot_project":"67324","title":"Cruce to Del Sol: Construct New 345 kV Double Circuit Line","owner":"AEP TCC/ETT","owner_project":"TP2022032","kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-11-30","actual_isd":null,"cm_new":54.2,"cm_rebuilt":0,"from":"Cruce","to":"Del Sol","county_from":"Jim Hogg","county_to":"Starr","tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-11-29","bod_reviewed":"2021-12-10","comments":"Dollars Update","description":"Construct a new 345 kV double circuit line from Cruce to Del Sol","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:69489","ercot_project":"69489","title":"Shepley: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Shepley","to":null,"county_from":"Victoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct new distribution station on the Victoria to Dupont Switch 138 kV line"},{"id":"ercot-tpit:80464","ercot_project":"80464","title":"McKenzie Road: Rebuild 138 kV Station","owner":"AEP TCC","owner_project":"TP2023884","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Nueces","to":"Nueces","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect the Bootstrap loads to the rebuilt McKenzie Road 138 kV station"},{"id":"ercot-tpit:80484","ercot_project":"80484","title":"Closner: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Closner","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Gunnar BESS to the Closner 138 kV station"},{"id":"ercot-tpit:80630","ercot_project":"80630","title":"Angstrom to STP: Increase 345 kV Line MOT","owner":"AEP TCC","owner_project":null,"kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Angstrom","to":"STP","county_from":"San Patricio","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Increase the MOT on the Angstrom to STP 345 kV line"},{"id":"ercot-tpit:81576","ercot_project":"81576","title":"Tesla: Construct New 345 kV Terminal","owner":"AEP TNC/ETT","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0.5,"cm_rebuilt":0,"from":"Tesla","to":null,"county_from":"Childress","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect the Lancium load to the existing Tesla 345 kV station","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:86882","ercot_project":"86882","title":"McKenzie to Westside: Reconductor 138 kV Line","owner":"AEP TCC/ETT","owner_project":"TP2024025","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0.32,"from":"McKenzie Road","to":"Westside","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Reconductor the McKenzie to Westside 138 kV line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:69253","ercot_project":"69253","title":"Cangrejo to Dacosta: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":17.97,"from":"Cangrejo","to":"Dacosta","county_from":"Calhoun","county_to":"Calhoun","tier":"Tier 1","rpg":"21RPG002","rpg_completed":"2021-09-16","bod_reviewed":"2021-10-22","comments":null,"description":"Rehab 138 kV line from Cangrejo to Dacosta","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:91630","ercot_project":"91630","title":"Jim Treece: Interconnect New 345 kV Generator","owner":"ETT","owner_project":"TP2025111","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jim Treece","to":null,"county_from":"Wilbarger","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Interconnect Blue Summit II Energy Storage to the existing Jim Treece 345 kV station"},{"id":"ercot-tpit:61396","ercot_project":"61396","title":"Hamilton Road to Maxwell: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TA2019800","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":29,"from":"Hamilton Road","to":"Maxwell","county_from":"Val Verde","county_to":"Val Verde","tier":"Tier 3","rpg":"20RPG022","rpg_completed":"2021-01-19","bod_reviewed":null,"comments":"TSP/Company Contact Update","description":"Rebuild the Hamilton Road to Maxwell 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/5129437","name":"Hamilton Road Substation","coordinates":[-100.84918,29.37382]},{"osm_id":"osm:way/1095751062","name":"Maxwell","coordinates":[-100.8144,29.77949]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/15217287","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":28.6,"straight_mi":null},{"id":"ercot-tpit:67322","ercot_project":"67322","title":"Cenizo to Cruce: Construct New 345 kV Double Circuit Line","owner":"AEP TCC/ETT","owner_project":"TP2022031","kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-11-30","actual_isd":null,"cm_new":69,"cm_rebuilt":0,"from":"Cenizo","to":"Cruce","county_from":"Webb","county_to":"Jim Hogg","tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-11-29","bod_reviewed":"2021-12-10","comments":"Dollars Update","description":"Construct a new 345 kV double circuit line from Cenizo to Cruce","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:109643","ercot_project":"109643","title":"Install temporary tap service on Ckt.60C to create new Ckt.60C South Lane City to Raider tap to New Gulf.","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Raider","to":"South Lane City / New Gulf","county_from":"Wharton","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:67318","ercot_project":"67318","title":"Cruce: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2022034","kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cruce","to":null,"county_from":"Jim Hogg","county_to":null,"tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-11-29","bod_reviewed":"2021-12-10","comments":"TSP/Company Contact Update","description":"Construct a new 345 kV station on the Cenizo to Reforzar 345 kV line and the Del Sol to San Miguel 345 kV line"},{"id":"ercot-tpit:99791A","ercot_project":"99791A","title":"Additional Facility Ratings Methodology Phase 2 (FRM2) Substation Upgrades.","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Zenith","to":"Gibbons Creek","county_from":"Grimes","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.50B Zenith to Gibbons Creek to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:85947","ercot_project":"85947","title":"Euclid_Substation_Addition_Updated","owner":"LCRATSC","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"In service","projected_isd":"2026-11-30","actual_isd":"2026-11-20","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC provide a new transmission point of interconnection by constructing a new 345-kV substation and cut-in T510 Hutto - Zorn. T510 will also be looped into the new Limmer 345-kV substation"},{"id":"ercot-tpit:102534","ercot_project":"102534","title":"Pamela Heights I battery storage at Callisto substation… Connect with HO Clarke 138kV substation at the same generator lead as 01HOCCLO","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"HO Clarke","to":null,"county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99453H","ercot_project":"99453H","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jordan","to":"King","county_from":"Chambers","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.97C Jordan to King to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453I","ercot_project":"99453I","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":"Nash","county_from":"Fort Bend","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.02B WA Parish to Nash to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453P","ercot_project":"99453P","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Waterhole","to":"Jones Creek","county_from":"Wharton","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.62B Waterhole to Jones Creek to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:103003A","ercot_project":"103003A","title":"Bellaire 35kV Distribution Upgrades with 3rd Transformer","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconfigure 35kV Bellaire distribution facilities. Install new 35kV Bellaire distribution TR7 with Ckt.24B service."},{"id":"ercot-tpit:103431","ercot_project":"103431","title":"Rebuild/reconductor portions of DEWALT to MULA Ckt.02A as a Hardening upgrade.","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":1.26,"from":"DEWALT","to":"MULA","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild/reconductor portions of DEWALT to MULA Ckt.02A as a Hardening upgrade.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:103003B","ercot_project":"103003B","title":"Bellaire 35kV Distribution Upgrades with 3rd Transformer","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconfigure 35kV Bellaire distribution facilities. Reconfigure Bellaire 35kV distribution transformer TR6 to receive Ckt.35E service. Reconductor portions of Ckt.35E."},{"id":"ercot-tpit:73371E","ercot_project":"73371E","title":"BP24 Sub Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"In service","projected_isd":"2026-11-30","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Whaley","to":"WA Parish","county_from":"Fort Bend","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Whaley to WA Parish Ckt.72F to increase thermal limits"},{"id":"ercot-tpit:99391A","ercot_project":"99391A","title":"Stanton East - Midland Basin - Spraberry 69 kV Line Conversion to 138 kV","owner":"ONCOR","owner_project":"PB_L18_A","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":5.5,"from":"Spraberry","to":"Consavvy","county_from":"Midland","county_to":"Midland","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds part of Permian Basin Reliability Plan Upgrade ID L18. Convert the existing Stanton East - Midland Basin - Spraberry 69-kV line to 138-kV and cut into Consavvy 138 kV Switch to establish the Spraberry - Consavvy 138 kV Line.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:70371","ercot_project":"70371","title":"D'Hanis Capacitor addition","owner":"STEC","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"D'Hanis","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add 9.6 MVAR capacitor step at D'Hanis"},{"id":"ercot-tpit:70373","ercot_project":"70373","title":"Driscoll Capacitor addition","owner":"STEC","owner_project":null,"kv":69,"list":"planned","status_reported":null,"status":"Status not reported","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Driscoll","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"adds 3 9.6 MVAR capacitor steps at Driscoll"},{"id":"ercot-tpit:71928","ercot_project":"71928","title":"Upgrade Heidelberg to AEP Weslaco line","owner":"STEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":8.6,"from":"Heidelberg","to":"Weslaco","county_from":"Hidalgo","county_to":"Hidalgo","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Heidelberg to STEC WESLACO and STEC WESLACO to AEP Weslaco lines to be 478MVA capable","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:76109","ercot_project":"76109","title":"West Sinton Capacitor addition","owner":"STEC","owner_project":null,"kv":69,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"West Sinton","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add a 3.6 MVAR step to existing West Sinton Capacitor"},{"id":"ercot-tpit:76786","ercot_project":"76786","title":"Upgrade Driscoll- Loyola","owner":"STEC","owner_project":null,"kv":69,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":23.89,"from":"Driscoll","to":"Loyola","county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Driscol-Ricardo-Riviera-Loyola to 795 ACSR","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:78478","ercot_project":"78478","title":"Rebuild Oaks to Poteet to Pearsall 69 kV line","owner":"STEC","owner_project":null,"kv":69,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":38.95,"from":"Oaks","to":"Pearsall","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":"2020-05-21","bod_reviewed":null,"comments":null,"description":"Rebuild Oaks to Poteet to Pearsall 69 kV line from 4/0 to 795. 2023 RTP","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:71182","ercot_project":"71182","title":"Reiter 345/138 kV Switch","owner":"ONCOR","owner_project":"R8629","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Odessa EHV","to":"Wolf/Moss","county_from":"Ector","county_to":"Ector","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 345/138 kV switch","puct_project":"mcpr:oncor-electric-delivery:0pt54566","puct_link_method":"owner project code + voltage + shared place name"},{"id":"ercot-tpit:82298A","ercot_project":"82298A","title":"PMCR for Adding TNMP Woodhouse New Station","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":"23RTP023","rpg_completed":null,"bod_reviewed":"2024-02-27","comments":null,"description":null},{"id":"ercot-tpit:87069","ercot_project":"87069","title":"LST_Phantomhill_Hub Conversion","owner":"LST","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop another circuit of the LST Crez line into Phantom Hill station as part of Gen Interconnection Project 23INR0244, 22INR0457 and 20INR0242"},{"id":"ercot-tpit:81315","ercot_project":"81315","title":"add 19.2 MVAR Capacitor at Rossville","owner":"STEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rossville","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"add 19.2 MVAR Capacitor at Rossville. 2023 RTP"},{"id":"ercot-tpit:91419","ercot_project":"91419","title":"Max Zuehlke_Gay Hill_TL_Upgrade","owner":"BBEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Max Zuehlke","to":"Gay Hill","county_from":"Washington","county_to":"Washington","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace 336 (Linnet) conductor with 959 (Suwannee) and replace a limited number of structures to accommodate the new conductor."},{"id":"ercot-tpit:91988","ercot_project":"91988","title":"Savanna - Canal Road 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8685","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Driver","to":"Canal Road","county_from":"Reagan","county_to":"Upton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing Savanna - Canal Road 138 kV Line"},{"id":"ercot-tpit:93061","ercot_project":"93061","title":"Embar Switch 138 kV Capacitor Bank","owner":"ONCOR","owner_project":"R8874","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fullerton Switch","to":"Fullerton Switch","county_from":"Andrews","county_to":"Andrews","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds Embar Switch 138 kV Capacitor Bank"},{"id":"ercot-tpit:93683","ercot_project":"93683","title":"New Transformer will be added at Titan Substation.","owner":"BPUB","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Titan","to":"Titan","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:91851","ercot_project":"91851","title":"Pinery 138 kV Switch","owner":"ONCOR","owner_project":"R8831","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pinery","to":"Pinery","county_from":"Culberson","county_to":"Culberson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Pinery 138 kV Switch"},{"id":"ercot-tpit:89988","ercot_project":"89988","title":"McGee 345 kV Switch","owner":"ONCOR","owner_project":"R8830","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-03","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Wolf","to":"Meteor","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new 345 kV switch to connect generator"},{"id":"ercot-tpit:99150","ercot_project":"99150","title":"Establish Wags 345 kV Switch","owner":"ONCOR","owner_project":"R6408","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-03","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Wags","to":"Wags","county_from":"Milam","county_to":"Milam","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Wags 345 kV Switch"},{"id":"ercot-tpit:102630","ercot_project":"102630","title":"BEPC_TPIT102630_Merryman","owner":"BEPC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-04","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Robertson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:104830","ercot_project":"104830","title":"WesternWind_Switch","owner":"ONCOR","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-06","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Krum West Switch","to":"Riley","county_from":"Wilbarger","county_to":"Wilbarger","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Western Wind Switch to interconnect Adamstown solar"},{"id":"ercot-tpit:100018","ercot_project":"100018","title":"23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit","owner":"CPS/CPS, STEC","owner_project":"T-0400","kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-08","actual_isd":null,"cm_new":45.83,"cm_rebuilt":45.83,"from":"5400","to":"5725","county_from":"Bexar","county_to":"Karnes","tier":"Tier 1","rpg":"23RPG032","rpg_completed":null,"bod_reviewed":"2024-04-23","comments":null,"description":"This project is Phase 1 of the Spruce to Pawnee Double Circuit Rebuild. This Phase captures the completion of the new second circuit from Spruce to Pawnee with the final rating of circuit 2.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:61601","ercot_project":"61601","title":"Coody Crossing 345 kV Switch","owner":"ONCOR","owner_project":"R8560","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-10","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Clear Crossing","to":"Tecumseh Creek","county_from":"Throckmorton","county_to":"Throckmorton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Coody Crossing 345 kV Switch"},{"id":"ercot-tpit:80376","ercot_project":"80376","owner":"BEPC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"WEST WEATHERFORD","to":"SHADY GROVE","county_from":"Parker","county_to":"Parker","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:102767","ercot_project":"102767","title":"BEPC_TPIT102767_OldGarner","owner":"BEPC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Parker","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99269","ercot_project":"99269","title":"Grady - Coronado Midstream Tap - Sale Ranch 138 kV line","owner":"ONCOR","owner_project":"R8834","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":7.2,"from":"Grady","to":"Sale Ranch","county_from":"Martin","county_to":"Martin","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L19. Upgrade the existing Grady - Coronado Midstream Tap - Sale Ranch 138-kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/457051875","name":"Grady Substation","coordinates":[-101.93238,32.30742]},{"osm_id":"osm:way/457051860","name":"Sale Ranch Substation","coordinates":[-101.89967,32.20767]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:66214","ercot_project":"66214","title":"Upgrade and convert Brownwood - Lake Brownwood 69 kV Line to 138 kV","owner":"ONCOR","owner_project":"R6164","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":10.8,"from":"Brownwood","to":"Lake Brownwood","county_from":"Brown","county_to":"Brown","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade and convert Brownwood - Firerock 69 kV Line to 138 kV, decommission the Brownwood 69 kV Switch and Autotransformer","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:99479A","ercot_project":"99479A","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","owner_project":"PB_L23","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":8,"from":"China Grove","to":"Bluff Creek","county_from":"Scurry","county_to":"Scurry","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds part of Permian Basin Reliability Plan Upgrade ID L23. Convert the existing Snyder - Scurry - China Grove and Snyder - Amoco Tap - China Grove 69-kV lines to 138-kV. This phase converts the existing Snyder - Lake Thomas 69 kV Line into","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:91461A","ercot_project":"91461A","title":"Establish Tarantula 345 kV Switch","owner":"ONCOR","owner_project":"R6412","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Tarantula 345 kV Switch","to":"Tarantula 345 kV Switch","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Tarantula 345 kV Switch"},{"id":"ercot-tpit:62434","ercot_project":"62434","title":"Sargent Road - Industrial Blvd 138 kV DCKT Line","owner":"ONCOR","owner_project":"M4128","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sargent Road Switch","to":"Industrial Blvd Switch","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade existing 138 kV Line"},{"id":"ercot-tpit:72011A","ercot_project":"72011A","title":"Tonkawa - Ranger Camp 345 kV Line Rebuild","owner":"ONCOR","owner_project":"R3025","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":21.3,"from":"Tonkawa","to":"Ranger Camp","county_from":"Mitchell","county_to":"Scurry","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Tonkawa - Ranger Camp 345 kV Second Circuit Addition","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:70900F","ercot_project":"70900F","title":"Roanoke Area Upgrades","owner":"ONCOR","owner_project":"M5281 M5144 M5146 M5148","kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-15","actual_isd":null,"cm_new":11.4,"cm_rebuilt":0,"from":"Roanoke Switch","to":"Exchange Switch","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 1","rpg":"22RPG003","rpg_completed":"2022-03-15","bod_reviewed":"2022-08-15","comments":null,"description":"Establish Roanoke_Exchange 138 kV Line","puct_project_possible":"mcpr:oncor-electric-delivery:0pt49068","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102849A","ercot_project":"102849A","title":"Union 138 kV Switch","owner":"ONCOR","owner_project":"R8608","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":13.6,"from":"Union","to":"Union","county_from":"Scurry","county_to":"Scurry","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Union 138 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:105414","ercot_project":"105414","title":"Establish Phifer Creek Switch","owner":"ONCOR","owner_project":"R6242","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Phifer Creek Switch","to":"Phifer Creek Switch","county_from":"Limestone","county_to":"Limestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Phifer Creek Switch"},{"id":"ercot-tpit:99287","ercot_project":"99287","title":"Mascho (fka Clearfork) 345 kV Switch","owner":"ONCOR","owner_project":"R8801","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mascho","to":"Mascho","county_from":"Andrews","county_to":"Andrews","tier":"Tier 1","rpg":"24RPG015","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct Mascho (fka Clearfork) 345 kV Switch approved as part of 24RPG015"},{"id":"ercot-tpit:111223","ercot_project":"111223","title":"Oncor_MW_62445_BaseCamp(FKA_EglMnt)_138kV_SwitchRebuild","owner":"ONCOR","owner_project":"M5261","kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Base Camp","to":"Base Camp","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 3","rpg":"22RPG039","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild existing Eagle Mountain 345/138 kV Switch and rename to Base Camp 345/138 kV Switch"},{"id":"ercot-tpit:91664","ercot_project":"91664","title":"White Mule (fka Elmar) 138 kV Substation Reconfiguration","owner":"ONCOR","owner_project":"R8804","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"White Mule","to":"White Mule","county_from":"Loving","county_to":"Loving","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new White Mule (fka Elmar) 138 kV Substation on the Quarry Field - Border 138 kV Line"},{"id":"ercot-tpit:111796","ercot_project":"111796","title":"Establish Massey Lake 138 kV Switch","owner":"ONCOR","owner_project":"R6400","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Massey Lake 138 kV Switch","to":"Massey Lake 138 kV Switch","county_from":"Anderson","county_to":"Anderson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Massey Lake 138 kV Switch"},{"id":"ercot-tpit:73436A","ercot_project":"73436A","title":"Rockhound - Connell 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R8718, R8807","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":18,"cm_rebuilt":0,"from":"Rockhound","to":"Sale Ranch","county_from":"Martin","county_to":"Midland","tier":"Tier 1","rpg":"24RPG020","rpg_completed":"2025-11-19","bod_reviewed":null,"comments":null,"description":"Rockhound - Sale Ranch 138 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:22TPIT0000","ercot_project":"22TPIT0000","title":"Parkway Substation T2 Replacement","owner":"GVEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"In service","projected_isd":"2026-12-15","actual_isd":"2025-08-08","cm_new":0,"cm_rebuilt":0,"from":"Parkway","to":null,"county_from":"Guadalupe","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace T2, 20 MVA with a 40 MVA 138-13.09 kV transformer"},{"id":"ercot-tpit:71187","ercot_project":"71187","title":"Reiter - Tesoro 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R8629","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":5,"cm_rebuilt":0,"from":"Tesoro","to":"Reiter","county_from":"Midland","county_to":"Ector","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new 2.5-mile 345 kV double-circuit line from Tesoro to Reiter","puct_project":"mcpr:oncor-electric-delivery:0pt54566","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:66202B","ercot_project":"66202B","title":"Upgrade Palestine-Crockett 69 kV Line","owner":"ONCOR","owner_project":"R6182","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":11,"from":"Elkhart","to":"Grapeland","county_from":"Anderson","county_to":"Houston","tier":"Tier 3","rpg":"22RPG035","rpg_completed":"2022-11-15","bod_reviewed":null,"comments":null,"description":"Rebuild the Elkhart - Grapeland 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:66218B","ercot_project":"66218B","title":"Hillsboro - Italy 69 kV Line","owner":"ONCOR","owner_project":"M4326","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Milford","to":"Italy","county_from":"Ellis","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":"2021-05-18","bod_reviewed":null,"comments":null,"description":"Rebuild the Milford-Italy 69 kV Line"},{"id":"ercot-tpit:76572","ercot_project":"76572","title":"Temple - Temple Pecan 138 kV 2nd Circuit","owner":"ONCOR","owner_project":"R6235","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":4.4,"from":"Temple","to":"Temple Pecan Creek","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Temple - Temple Pecan 138 kV 2nd Circuit","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:76660","ercot_project":"76660","title":"Rebuild Temple Switch and install auto #2","owner":"ONCOR","owner_project":"R6197","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Temple","to":"Temple","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Temple Switch and install auto #2"},{"id":"ercot-tpit:77803","ercot_project":"77803","title":"Cowpen 138kV station from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-15","actual_isd":null,"cm_new":14.26,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Reeves","county_to":"Reeves","tier":"Tier 1","rpg":"23RPG013","rpg_completed":"2023-11-27","bod_reviewed":"2024-01-09","comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:77807A","ercot_project":"77807A","title":"Silverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-15","actual_isd":null,"cm_new":4.05,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Ward","county_to":"Ward","tier":"Tier 1","rpg":"23RPG013","rpg_completed":"2023-11-27","bod_reviewed":"2024-01-09","comments":null,"description":"Construct TNMP Silverleaf 345kV-138kV BAAH substation. Install three 750 MVA 345kV-138kV transformers. Cut both Pecos to Cedarvale 138kV lines and Bone Springs Tap 138kV line into Silverleaf 138kV bus. Construct three 345kV tie lines from T","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:81034","ercot_project":"81034","title":"Lamesa - Willow Valley 138 kV Line","owner":"ONCOR","owner_project":"R8654","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":32.1,"from":"Lamesa Switch","to":"Willow Valley Switch","county_from":"Borden","county_to":"Dawson","tier":"Tier 3","rpg":"25RPG019","rpg_completed":"2025-07-08","bod_reviewed":null,"comments":null,"description":"Rebuild Lamesa to Willow Valley 138 kV line.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:81418","ercot_project":"81418","title":"Reiter to Yarbrough 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8527","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":27.2,"from":"Reiter","to":"Yarbrough","county_from":"Ector","county_to":"Crane","tier":"Tier 3","rpg":"25RPG008","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing138 kV line from Reiter to Yarbrough","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:78361A","ercot_project":"78361A","title":"Lake Creek - Rattlesnake Road 345 kV Line","owner":"ONCOR","owner_project":"R6276","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":5.1,"from":"Lake Creek","to":"Rattlesnake Road","county_from":"McLennan","county_to":"McLennan","tier":"Tier 3","rpg":"23RPG022","rpg_completed":"2023-09-01","bod_reviewed":null,"comments":null,"description":"Establish Lake Creek Switch - St Johns 345 kV Line, rebuild the Lake Creek Switch - Rattlesnake Road 345 kV Line, and install second circuit from Lake Creek Switch - Rattlesnake Road Switch","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/6820578","name":"Lake Creek Substation","coordinates":[-96.98573,31.46665]},{"osm_id":"osm:way/125920534","name":"Rattlesnake Road Substation","coordinates":[-96.96039,31.47349]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 1.5 mi but ERCOT reports 5.1 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:76312","ercot_project":"76312","title":"Establish Ramhorn 138kV Switch","owner":"ONCOR","owner_project":"M5007","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":19,"cm_rebuilt":0,"from":"Ramhorn","to":"Dunham","county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Ramhorn 138kV Switch and Ramhorn -Dunham 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:64239","ercot_project":"64239","title":"Vineyard Switch-Cypress Waters Switch 138 kV Line","owner":"ONCOR","owner_project":"M5320","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":7.4,"cm_rebuilt":0,"from":"Cypress Waters Switch","to":"Vineyard Switch","county_from":"Dallas","county_to":"Tarrant","tier":"Tier 3","rpg":"24RPG019","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 138 kV circuit from Vineyard to Cypress Waters","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:87413","ercot_project":"87413","title":"Establish Fallstown Switch – Pleasant Valley/Fisher Road 138 kV Double-Circuit Line and Fallstown Switch – Ceramic/Wichita Falls PPG 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R4024","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":10.7,"from":"Fallstown Switch","to":"Pleasant Valley/Fisher Road","county_from":"Wichita","county_to":"Wichita","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Fallstown Switch – Pleasant Valley/Fisher Road 138 kV Double-Circuit Line and Fallstown Switch – Ceramic/Wichita Falls PPG 138 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:87017","ercot_project":"87017","title":"Riverton - Sandlake 138 kV Line Conversion 345 kV and Riverton - Sandlake 138 kV Line","owner":"ONCOR","owner_project":"R8793","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":39.9,"cm_rebuilt":0,"from":"Riverton","to":"Sandlake","county_from":"Ward","county_to":"Reeves","tier":"Tier 1","rpg":"24RPG010","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert Riverton – Sandlake 138 kV Line to 345 kV and Establish Riverton – Sandlake 138 kV Line","puct_project_possible":"mcpr:oncor-electric-delivery:0pt54658","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:87768","ercot_project":"87768","title":"Pintail 138 kV Capacitor Bank","owner":"ONCOR","owner_project":"R6346","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Pintail","to":"Pintail","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install a 110.4 MVAR Capacitor Bank at Pintail 138 kV Switch"},{"id":"ercot-tpit:87804","ercot_project":"87804","title":"Establish Notus 345 kV Switch","owner":"ONCOR","owner_project":"R6371","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Notus Switch","to":"Notus Switch","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Notus 345 kV Switch"},{"id":"ercot-tpit:71910A","ercot_project":"71910A","title":"Rebuild the Hillsboro - Elm Mott 69 kV Line","owner":"ONCOR","owner_project":"R6221","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":9,"from":"Elm Mott 69 kV Switch","to":"West 69 kV Substation","county_from":"McLennan","county_to":"McLennan","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Elm Mott Switch - West 69 kV Line Section","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:91881A","ercot_project":"91881A","title":"Medallion 138 kV Switch","owner":"ONCOR","owner_project":"R8821","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Midland","to":"Midland","county_from":"Midland","county_to":"Midland","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds Medallion138 kV Switch"},{"id":"ercot-tpit:92655","ercot_project":"92655","title":"Jersey 138 kV Switch","owner":"ONCOR","owner_project":"M3343","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jersey Switch","to":null,"county_from":"Hopkins","county_to":"Hopkins","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Jersey 138 kV Switch"},{"id":"ercot-tpit:92847","ercot_project":"92847","title":"Norwood 345 kV Terminal Equipment","owner":"ONCOR","owner_project":"M4425","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Norwood","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Norwood Switch 345 kV Terminal Equipment"},{"id":"ercot-tpit:99413","ercot_project":"99413","title":"Establish Pivot 138/69 kV Switch","owner":"ONCOR","owner_project":"R8800","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-15","actual_isd":null,"cm_new":0,"cm_rebuilt":2.1,"from":"Lamesa","to":"Pivot","county_from":"Dawson","county_to":"Dawson","tier":"Tier 1","rpg":"24RPG015","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct Pivot 138/69 kV Switch approved as part of 24RPG015","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:87653","ercot_project":"87653","title":"Stoplight (fka Bluff Creek) - Union 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R9002","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-16","actual_isd":null,"cm_new":0,"cm_rebuilt":16,"from":"Stoplight (fka Bluff Creek)","to":"Union","county_from":"Scurry","county_to":"Scurry","tier":"Tier 3","rpg":"26RPG014","rpg_completed":"2026-05-04","bod_reviewed":null,"comments":null,"description":"Rebuild the existing Stoplight (fka Bluff Creek) - Union 138 kV Line Rebuild","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:78361B","ercot_project":"78361B","title":"Lake Creek - Rattlesnake Road 345 kV Line","owner":"ONCOR","owner_project":"R6276","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Possum Trot","to":"Possum Trot","county_from":"McLennan","county_to":"McLennan","tier":"Tier 3","rpg":"23RPG022","rpg_completed":"2023-09-01","bod_reviewed":null,"comments":null,"description":"Establish Possum Trot 345 kV Switch"},{"id":"ercot-tpit:91457A","ercot_project":"91457A","title":"Establish Drane 345 kV Switch","owner":"ONCOR","owner_project":"R6410","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Drane 345 kV Switch","to":"Drane 345 kV Switch","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Drane 345 kV Switch"},{"id":"ercot-tpit:100689","ercot_project":"100689","title":"Install a 50MVAr Capacitor Bank at Hill Country Substation","owner":"CPS/NO","owner_project":"S-1040","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5210","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:100670","ercot_project":"100670","title":"Install a 50MVAr Capacitor Bank at Cagnon Substation","owner":"CPS/NO","owner_project":"S-1039","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5055","to":null,"county_from":"Bexar","county_to":null,"tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:82714","ercot_project":"82714","title":"Rebuild of Airport of Substation","owner":"BPUB","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"In service","projected_isd":"2026-12-22","actual_isd":"2026-03-02","cm_new":0,"cm_rebuilt":0,"from":"Filter Plant (BPUB), South Plant (BPUB), and Southmost (STEC)","to":"Atlas (BPUB)","county_from":"Cameron","county_to":"Cameron","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Atlas Substation will be replacing Airport Substation."},{"id":"ercot-tpit:104658B","ercot_project":"104658B","title":"Establish Pathfinder 345 kV Switch","owner":"ONCOR","owner_project":"R6364","kv":345,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2026-12-22","actual_isd":"2026-05-14","cm_new":0,"cm_rebuilt":0,"from":"Pathfinder","to":"Piedra Solar","county_from":"Freestone","county_to":"Freestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Pathfinder 345 kV Switch Gen Tie"},{"id":"ercot-tpit:99453X","ercot_project":"99453X","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"STP","to":"Hillje","county_from":"Matagorda","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Hillje equipment on Ckt.44 STP to Hillje to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:68205","ercot_project":"68205","title":"GENRAL to Garden Villas Rebuild","owner":"CNP","owner_project":null,"kv":69,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2026-12-30","actual_isd":"2025-09-11","cm_new":0,"cm_rebuilt":9.91,"from":"GENRAL","to":"Garden Villas","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild and Reconductor portion of Ckt.12B Bringhurst (GENRAL) to Garden Villas to prepare for future 138kV Conversion","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:61394","ercot_project":"61394","title":"Portilla: Construct New Distribution Station","owner":"AEP TCC","owner_project":"DP21X0008","kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-30","actual_isd":null,"cm_new":1.5,"cm_rebuilt":0,"from":"Portilla","to":null,"county_from":"San Patricio","county_to":"San Patricio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct new distribution station on the Lon Hill to Warburton 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:78485C","ercot_project":"78485C","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.09,"from":"Bellaire","to":"Hillcroft","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG025","rpg_completed":"2023-09-28","bod_reviewed":"2023-09-28","comments":null,"description":"Upgrade portions of Ckt.05E Bellaire to Sharpstown to Hillcroft to increase thermal limits.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/8286448","name":"Bellaire Substation","coordinates":[-95.4512,29.72463]},{"osm_id":"osm:way/129117167","name":"Hillcroft Substation","coordinates":[-95.4977,29.72211]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/233437459","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":1.6,"straight_mi":null},{"id":"ercot-tpit:93127","ercot_project":"93127","title":"Lueders: Construct New Distribution Station","owner":"AEP TNC","owner_project":"DR23N0002","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lueders","to":null,"county_from":"Shackelford","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new distribution station on the Fort Phantom to Paint Creek 138 kV line between California Creek and Fort Phantom"},{"id":"ercot-tpit:99427","ercot_project":"99427","title":"Luther - Bulldog 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8553","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":18.6,"from":"Luther","to":"Bulldog","county_from":"Howard","county_to":"Howard","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L20I. Upgrade the existing Luther - Bulldog 138-kV line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99596","ercot_project":"99596","title":"Add Mosquito Lake Gen POI","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99791B","ercot_project":"99791B","title":"Additional Facility Ratings Methodology Phase 2 (FRM2) Substation Upgrades.","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BIGBAY","to":"BAYOU","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.79C BIGBAY to BAYOU to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:100020","ercot_project":"100020","title":"23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit","owner":"CPS/CPS, STEC","owner_project":"T-0400","kv":345,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-31","actual_isd":null,"cm_new":45.83,"cm_rebuilt":45.83,"from":"5400","to":"5725","county_from":"Bexar","county_to":"Karnes","tier":"Tier 1","rpg":"23RPG032","rpg_completed":null,"bod_reviewed":"2024-04-23","comments":null,"description":"This project is phase 2 of the Spruce to Pawnee Double circuit rebuild. Phase 2 captures the CPS owned portion of the existing Spruce to Pawnee circuit 1 being upgraded. The remaining STEC owned portion will be upgraded/completed at a later","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:91847B","ercot_project":"91847B","title":"Hornsby Load Power Transformer Addition","owner":"LCRATSC","owner_project":"PLC-8186","kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99453W","ercot_project":"99453W","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"STP","to":"Hillje","county_from":"Matagorda","county_to":"Wharton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade STP equipment on Ckt.44 STP to Hillje to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453J","ercot_project":"99453J","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":"Smithers","county_from":"Harris","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.98A Bellaire to Smithers to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453K","ercot_project":"99453K","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Jeanetta","to":"WA Parish","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.72A Jeanetta to WA Parish to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:75780A","ercot_project":"75780A","title":"Loop new Elmaton substation into Ckt.39A to create new Ckt.39 STP to Elmaton to WA Parish. Install generator lead from Elmaton (ELM) substation to DUFFY (DUF) / Duffy BESS (26INR0250)","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Elmaton","to":"STP /WA Parish","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new Elmaton substation into Ckt.39A to create new Ckt.39 STP to Elmaton to WA Parish."},{"id":"ercot-tpit:78485D","ercot_project":"78485D","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":6.41,"from":"Bellaire","to":"Hillcroft","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG025","rpg_completed":"2023-09-28","bod_reviewed":"2023-09-28","comments":null,"description":"Upgrade Ckt.24B Bellaire to Ulrich to Hillcroft to increase thermal limits.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/8286448","name":"Bellaire Substation","coordinates":[-95.4512,29.72463]},{"osm_id":"osm:way/129117167","name":"Hillcroft Substation","coordinates":[-95.4977,29.72211]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 1.6 mi but ERCOT reports 6.41 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:69888A","ercot_project":"69888A","title":"Deepwater to Clinton Ckts.33B-33C Line Upgrades","owner":"CNP","owner_project":null,"kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.82,"from":"Deepwater","to":"Harrisburg","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Fully reconductor Ckt.33B Deepwater to Texpet Switchrack to Harrisburg ahead of future 138kV conversions.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:87429","ercot_project":"87429","title":"Reconductor Wickett to Staghorn 138kV line.","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":12.05,"from":"TNMP Wickett (37981)","to":"TNMP Staghorn (37990)","county_from":"Ward","county_to":"Ward","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:87346","ercot_project":"87346","title":"Upgrade Ckt 25 Jeanetta to Westwood to increase thermal limits","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"In service","projected_isd":"2026-12-31","actual_isd":"2026-07-14","cm_new":0,"cm_rebuilt":2.16,"from":"Westwood","to":"Jeanetta","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt 25 Jeanetta to Westwood to increase thermal limits","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/129126575","name":"Westwood Substation","coordinates":[-95.53668,29.68995]},{"osm_id":"osm:way/129119326","name":"Jeanetta Substation","coordinates":[-95.53669,29.7188]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/129126596","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":2.1,"straight_mi":null},{"id":"ercot-tpit:80632","ercot_project":"80632","title":"Install Kilgore 35kV Distribution Substation. Loop on Ckt.86B to create new Ckt.86 CHEVRON to Kilgore to LANGSTON","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":5.12,"cm_rebuilt":0,"from":"Kilgore","to":"CHEVRON/LANGSTON","county_from":"Chambers","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Kilgore 35kV Distribution Substation. Loop on Ckt.86B to create new Ckt.86 CHEVRON to Kilgore to LANGSTON","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:85973","ercot_project":"85973","title":"Georgetown - Rivery Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Georgetown Substation","to":null,"county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T597 Georgetown - Rivery 138-kV transmission line to achieve a higher operational rating."},{"id":"ercot-tpit:85950","ercot_project":"85950","title":"Alford Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"planned","status_reported":null,"status":"Status not reported","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Upton","county_to":"Upton","tier":"Tier 4","rpg":"23RPG019","rpg_completed":"2023-08-25","bod_reviewed":null,"comments":null,"description":"This project will construct the new 138-kV Alford Substation. Alford will be near the existing Oncor Midkiff Substation and the planned Oncor Catclaw Switch. Alford will connect T594 Midkiff to Skywest and T611 Benedum to Midkiff and will p"},{"id":"ercot-tpit:81368","ercot_project":"81368","title":"Rio Pecos: Upgrade 138 kV Terminals","owner":"AEP TNC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Rio Pecos","to":null,"county_from":"Crockett","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the Soaptree and Whitebaker 138 kV terminals at the Rio Pecos 138 kV station"},{"id":"ercot-tpit:103427","ercot_project":"103427","title":"Rebuild/reconductor Ckt.94C Metals Switchrack to METALS as a Hardening upgrade","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":2.13,"from":"Bellaire","to":"Ulrich","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild/reconductor portions of Ckt.35 Bellaire to Ulrich as a Hardening upgrade.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/8286448","name":"Bellaire Substation","coordinates":[-95.4512,29.72463]},{"osm_id":"osm:way/339227608","name":"Ulrich Substation","coordinates":[-95.48381,29.73588]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/587103502","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":2.4,"straight_mi":null},{"id":"ercot-tpit:87637A","ercot_project":"87637A","title":"Install (2) new 100 MVA distribution transformers at Liberty substation to serve customer load.","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Liberty-new distribution tap","to":"White Oak/ Greens Bayou Plant","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (1) new 100 MVA distribution transformer on ckt.03 at Liberty substation to serve customer load."},{"id":"ercot-tpit:70628","ercot_project":"70628","title":"Japhet 138kV Distribution Sub and Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":4.4,"from":"Japhet","to":"University/Clinton","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade portions of 69kV Ckt.12 Garden Villas to Bringhurst to Clinton. Install new 138kV Japhet distribution substation. Move 69kV Bringhurst substation load to new Japhet substation and retire Bringhurst substation. Retire portions of Ckt","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:59197","ercot_project":"59197","title":"Mason to Mason Switch: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"1871","kv":69,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":10.3,"from":"Mason","to":"Mason Switch","county_from":"Mason","county_to":"Mason","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact Update","description":"Rehab the Mason to Mason Switch 69 kV Line","terminal_match":{"from":"ambiguous","to":"ambiguous"}},{"id":"ercot-tpit:66366","ercot_project":"66366","title":"Rebuild Brazoria - Retrieve 138kV with bundled 795 ACSS","owner":"TNMP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":6.17,"from":"TNMP Brazoria (bus # 39600)","to":"CenterPoint Retrieve (bus # 43170)","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Planned ISD is Q4 2024, but project design currently under internal review.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:72268","ercot_project":"72268","title":"New Ingram Rd 138kV Substation","owner":"CPS/NO","owner_project":"S-0978","kv":138,"list":"planned","status_reported":"Under Construction","status":"Under construction","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"5241","to":"5102, 5346","county_from":"Bexar","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install a new 138kV transmission loop in conjunction with the S-0978 QTS Ingram Rd Substation project. The substation will be looped into the Potranco to TCC/Crossroads transmission line and connected to (2) 138kV line terminals."},{"id":"ercot-tpit:73362","ercot_project":"73362","title":"Uribe: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"In service","projected_isd":"2026-12-31","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Uribe","to":null,"county_from":"Zapata","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service Date Update","description":"Construct new distribution station on the Molina to Zapata 138 kV line"},{"id":"ercot-tpit:75786","ercot_project":"75786","title":"This project will create a POI Bus (station) named Skydancer to interconnect 23INR0295","owner":"LST","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bosque","county_to":"Bosque","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This project will create a POI Bus (station) named Skydancer to interconnect 23INR0295"},{"id":"ercot-tpit:76669","ercot_project":"76669","title":"Eiland - Elbow 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8665","kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":18.5,"from":"Elbow","to":"Eiland","county_from":"Howard","county_to":"Howard","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L20H. Upgrade the existing Eiland - Elbow 138-kV line","terminal_match":{"from":"matched","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/456417835","name":"Elbow Substation","coordinates":[-101.47836,32.16885]},{"osm_id":"osm:relation/6772788","name":"Eiland Substation","coordinates":[-101.48221,31.99501]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","osm_matches":[{"osm_id":"osm:way/456417843","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":13.7,"straight_mi":null},{"id":"ercot-tpit:80482","ercot_project":"80482","title":"North McAllen: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":138,"list":"planned","status_reported":"In-Service","status":"In service","projected_isd":"2026-12-31","actual_isd":"2026-03-17","cm_new":0,"cm_rebuilt":0,"from":"North McAllen","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Carambola BESS to the North McAllen 138 kV station"},{"id":"ercot-tpit:72044B","ercot_project":"72044B","title":"Clute 138kV Switching Station","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"22RPG038","rpg_completed":"2022-12-01","bod_reviewed":"2022-12-01","comments":null,"description":null},{"id":"ercot-tpit:78455","ercot_project":"78455","title":"Oasis 345kV Substation / SOHO BESS II (25INR0162)","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Oasis","to":null,"county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install SOHO BESS II at Oasis 345kV substation… Connect at the same generator lead as SOHO BESS (SOHO BESS II - 25INR0162)"},{"id":"ercot-tpit:87637B","ercot_project":"87637B","title":"Install (2) new 100 MVA distribution transformers at Liberty substation to serve customer load.","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Liberty-new distribution tap","to":"Northside/ Greens Bayou Plant","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install (1) new 100 MVA distribution transformer on ckt.21 at Liberty substation to serve customer load."},{"id":"ercot-tpit:75780B","ercot_project":"75780B","title":"Loop new Elmaton substation into Ckt.39A to create new Ckt.39 STP to Elmaton to WA Parish. Install generator lead from Elmaton (ELM) substation to DUFFY (DUF) / Duffy BESS (26INR0250)","owner":"CNP","owner_project":null,"kv":345,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Elmaton","to":"DUFFY","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Elmaton (ELM) substation to DUFFY (DUF) / Duffy BESS (26INR0250)"},{"id":"ercot-tpit:73352C","ercot_project":"73352C","title":"PH Robinson Area 138kV Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"BIGBAY","to":"BAYOU","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Increase thermal limits through the application of 110% Emergency ratings for Ckt.79C BIGBAY to BAYOU. Request customers to approve the 110% Emergency rating of relevant equipment at Bigbay substation on the Ckt.79C line position. Bayou sub"},{"id":"ercot-tpit:72044D","ercot_project":"72044D","title":"Clute 138kV Switching Station","owner":"CNP","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"22RPG038","rpg_completed":"2022-12-01","bod_reviewed":"2022-12-01","comments":null,"description":null},{"id":"ercot-tpit:80468","ercot_project":"80468","title":"Conoco: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":138,"list":"planned","status_reported":"Planned","status":"Planned","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Conoco","to":null,"county_from":"Matagorda","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Company Contact and In-Service Date Update","description":"Interconnect Isaac Solar to the Conoco 138 kV station"},{"id":"ercot-tpit:110445","ercot_project":"110445","title":"STEC Ammonia Plant Load Project Phase 1","owner":"STEC","owner_project":null,"kv":138,"list":"planned","status_reported":"Conceptual","status":"Conceptual","projected_isd":"2026-12-31","actual_isd":null,"cm_new":3.4,"cm_rebuilt":null,"from":"Kemper Bluff","to":"Dupont","county_from":"Victoria","county_to":"Victoria","tier":"Tier 1","rpg":"25RPG012","rpg_completed":"2026-01-13","bod_reviewed":null,"comments":null,"description":"Construct Kemper Bluff substation to serve large load and connect to AEP’s 138-kV Dupont Switching station via a 138-kV transmission line, with normal and emergency ratings of at least 427 MVA and 478 MVA, respectively, which will require a","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:81726","ercot_project":"81726","title":"Mobile substation","owner":"BPUB","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2024-04-15","actual_isd":"2025-05-22","cm_new":0,"cm_rebuilt":0,"from":"59420 Filter Plant, 59500 South Plant","to":"Mobile substation, 5789 Southmost","county_from":"Cameron","county_to":"Cameron","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Project is to add a mobile substation next to Airport Substation tapping into the Transmission line that is Filter Plant to Airport Substation. Then connecting lines South Plant to Southmost by passing Airport Substation. This is due to Air"},{"id":"ercot-tpit:82210","ercot_project":"82210","title":"PMCR for LEAGUE CITY STATION REBUILD","owner":"TNMP","owner_project":null,"kv":138,"list":"completed","status_reported":null,"status":"In service","projected_isd":"2024-05-31","actual_isd":"2025-01-24","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:73368","ercot_project":"73368","title":"Grey Well Draw - Buffalo 138 kV Second Circuit","owner":"ONCOR","owner_project":"R8692","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2024-12-15","actual_isd":"2025-01-01","cm_new":6,"cm_rebuilt":26.2,"from":"Grey Well Draw","to":"Buffalo","county_from":"Midland","county_to":"Midland","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Grey Well Draw - Buffalo 138 kV Second Circuit","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:77074","ercot_project":"77074","title":"Buda to Turnersville Storm Hardening","owner":"PEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2024-12-31","actual_isd":"2025-01-09","cm_new":0,"cm_rebuilt":3.8,"from":"Buda","to":"Turnersville","county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild single circuit section of Buda to Turnersville and reconductor with bundled 795 ACSR Conductor, 439 MVA.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/508455310","name":"Buda Substation","coordinates":[-97.85113,30.0754]},{"osm_id":"osm:way/340000208","name":"Turnersville Substation","coordinates":[-97.78301,30.07377]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/316563192","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":3.8,"straight_mi":null},{"id":"ercot-tpit:72053","ercot_project":"72053","title":"Oasis 345kV Substation Expansion for SOHO BESS (23INR0419)","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2024-12-31","actual_isd":"2026-01-07","cm_new":0,"cm_rebuilt":0,"from":"Oasis","to":null,"county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand 345kV Oasis substation for SOHO BESS (23INR0419). Reposition existing Ckts. 18B and 27B Oasis to Dow and Ckt.99E Meadow to Oasis."},{"id":"ercot-tpit:73352B","ercot_project":"73352B","title":"PH Robinson Area 138kV Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2024-12-31","actual_isd":"2025-01-09","cm_new":0,"cm_rebuilt":0,"from":"PH Robinson","to":"Seabrook","county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.79F PH Robinson to Seabrook to HANNAH to HUNTER to increase thermal limits"},{"id":"ercot-tpit:90790","ercot_project":"90790","title":"Palafox: Construct New 138 kV Temporary Tap","owner":"AEP TCC","owner_project":"TP2024132","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-01-18","actual_isd":"2025-01-18","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Construct new temporary tap on the North Laredo Switch to Reveille 138 kV line between Barrera and North Laredo Switch"},{"id":"ercot-tpit:78167","ercot_project":"78167","title":"Add 2nd autotransformer at Trumbull","owner":"BEPC","owner_project":null,"kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-01-23","actual_isd":"2025-02-20","cm_new":0,"cm_rebuilt":0,"from":"Trumbull","to":"Trumbull","county_from":"Ellis","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add 2nd autotransformer at Trumbull"},{"id":"ercot-tpit:76682","ercot_project":"76682","title":"Add Capacitor Bank at Savanna 138 kV Substation","owner":"ONCOR","owner_project":"R8694","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-01-31","actual_isd":"2025-01-31","cm_new":0,"cm_rebuilt":0,"from":"Savanna","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Capacitor Bank at Savanna 138 kV Substation"},{"id":"ercot-tpit:73371F","ercot_project":"73371F","title":"BP24 Sub Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-01-31","actual_isd":"2025-06-05","cm_new":0,"cm_rebuilt":0,"from":"Jeanetta","to":"WA Parish","county_from":"Harris","county_to":"Fort Bend","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Jeanetta to WA Parish Ckt.64A to increase thermal limits"},{"id":"ercot-tpit:73371H","ercot_project":"73371H","title":"BP24 Sub Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-01-31","actual_isd":"2025-02-11","cm_new":0,"cm_rebuilt":0,"from":"White Oak","to":"Jeanetta","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade White Oak to Jeanetta Ckt.72B to increase thermal limits"},{"id":"ercot-tpit:67919","ercot_project":"67919","title":"Avanzada: Construct New 345 kV Station","owner":"ETT","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-02-14","actual_isd":"2025-02-14","cm_new":0.1,"cm_rebuilt":0,"from":"Avanzada","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Outpost Solar to the Lobo to Fowlerton 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:6216","ercot_project":"6216","title":"Bartlett Switch to Bartlett","owner":"BEPC","owner_project":null,"kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-02-14","actual_isd":"2025-05-12","cm_new":0,"cm_rebuilt":2.7,"from":"Bartlett Switch","to":"Bartlett","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Bartlett Switch to Bartlett","terminal_match":{"from":"matched","to":"matched"}},{"id":"ercot-tpit:50725","ercot_project":"50725","title":"Lean Clay 138 kV Switch","owner":"ONCOR","owner_project":"R8658","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-02-15","actual_isd":"2025-02-01","cm_new":0,"cm_rebuilt":0,"from":"Culberson","to":"Sand Lake","county_from":"Reeves","county_to":"Reeves","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 138 kV switch"},{"id":"ercot-tpit:81605","ercot_project":"81605","title":"Kolb Lake 138 kV POD","owner":"ONCOR","owner_project":"R6229","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-02-15","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Kolb Lake POD","to":"Kolb Lake POD","county_from":"Angelina","county_to":"Angelina","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Kolb Lake 138 kV POD"},{"id":"ercot-tpit:72876A","ercot_project":"72876A","title":"Provide 138 kV POD for Skybox at Teal Switch","owner":"ONCOR","owner_project":"R6259","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-02-15","actual_isd":"9999-01-01","cm_new":0.2,"cm_rebuilt":0,"from":"Teal","to":"Skybox","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:70223","ercot_project":"70223","title":"Mont - Pilot Grove Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-02-17","actual_isd":"2025-02-21","cm_new":0,"cm_rebuilt":8,"from":"Mont","to":"Pilot Grove","county_from":"Lavaca","county_to":"Lavaca","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will perform an overhaul on the 8-mile Mont ¿ Pilot Grove (T140) 138-kV transmission line.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/510838953","name":"Mont Substation","coordinates":[-97.00908,29.40099]},{"osm_id":"osm:way/510838933","name":"Pilot Grove Substation","coordinates":[-97.08812,29.32405]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/21063972","layer":"lines-138"},{"osm_id":"osm:way/510838946","layer":"lines-138"},{"osm_id":"osm:way/510838935","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":7.8,"straight_mi":7.1},{"id":"ercot-tpit:79683","ercot_project":"79683","title":"Add Branch between Padua and Sommers","owner":"CPS","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-02-18","actual_isd":"2025-02-18","cm_new":2.06,"cm_rebuilt":0,"from":"5395","to":"170722","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:54220","ercot_project":"54220","title":"Brazos' member will build McFarland substation, Brazos will install POI Picard","owner":"BEPC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-02-23","actual_isd":"2025-05-18","cm_new":0,"cm_rebuilt":0,"from":"Picard","to":"Picard","county_from":"Parker","county_to":"Parker","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Brazos' member will build McFarland substation, Brazos will install POI Picard"},{"id":"ercot-tpit:76622","ercot_project":"76622","title":"Expand Peters 138kV substation for Walstrom BESS (22INR0540).","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-02-28","actual_isd":"2025-02-28","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Austin","county_to":"Austin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand Peters 138kV substation for Walstrom BESS (22INR0540)."},{"id":"ercot-tpit:78374","ercot_project":"78374","title":"Rockhound 345/138 kV Switch","owner":"ONCOR","owner_project":"R8705","kv":345,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2025-03-01","actual_isd":"2025-02-14","cm_new":0,"cm_rebuilt":0,"from":"Falcon Seaboard","to":"Midland East","county_from":"Midland","county_to":"Martin","tier":"Tier 3","rpg":"24RPG002","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 345/138 kV Switch"},{"id":"ercot-tpit:61392","ercot_project":"61392","title":"Bergheim - Fair Oaks Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-03-12","actual_isd":"2025-03-12","cm_new":0,"cm_rebuilt":4.1,"from":"Bergheim","to":"Fair Oaks Ranch/Kendall","county_from":"Comal","county_to":"Kendall","tier":"Tier 4","rpg":"22RPG005","rpg_completed":"2022-09-09","bod_reviewed":null,"comments":null,"description":"This project will Increase the reliability of transmission facilities on the T238 Bergheim to Fair Oaks 138-kV and T656 Bergheim to Kendall 345-kV 4.1-mile double-circuit transmission line by replacing the aging conductor.","terminal_match":{"from":"matched","to":"multi_or_missing"}},{"id":"ercot-tpit:45501","ercot_project":"45501","title":"Eldorado Live Oak to Sonora: Rebuild 69 kV line","owner":"AEP TNC","owner_project":"2769","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-03-12","actual_isd":"2025-03-12","cm_new":0,"cm_rebuilt":23.92,"from":"Eldorado Live Oak","to":"Sonora","county_from":"Schleicher","county_to":"Sutton","tier":"Tier 3","rpg":"18RPG012","rpg_completed":"2019-01-17","bod_reviewed":null,"comments":"IN-SERVICE","description":"Rehab Eldorado Live Oak to Sonora 69 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/345640847","name":"Eldorado Live Oak Substation","coordinates":[-100.57007,30.87805]},{"osm_id":"osm:way/345127797","name":"Sonora Substation","coordinates":[-100.65576,30.56765]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/21224303","layer":"lines-69"},{"osm_id":"osm:way/493442336","layer":"lines-69"},{"osm_id":"osm:way/493442351","layer":"lines-69"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":23.8,"straight_mi":22},{"id":"ercot-tpit:72500","ercot_project":"72500","title":"Rio Lago - New 138kV Substation","owner":"BEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-03-17","actual_isd":"2025-03-21","cm_new":0.1,"cm_rebuilt":0,"from":"Bandera","to":"Verde Creek","county_from":"Bandera","county_to":"Bandera","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new 138kV substation into the existing 138kV Bandera to Verde Creek line and install 40MVA distribution transformer. The new substation will be located approximately 1.64 miles from Bandera substation (23INR0078)","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:47541","ercot_project":"47541","title":"Crane Circuit Breaker Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-03-17","actual_isd":"2025-02-26","cm_new":0,"cm_rebuilt":0,"from":"Crane Substation","to":"Crane Substation","county_from":"Crane","county_to":"Crane","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Provide transmission service to American Electric Power at Crane Substation. Adding one (1) breaker and associated equipment needed to connect the AEP-owned Crane to Kinnison 138-kV transmission line."},{"id":"ercot-tpit:73895","ercot_project":"73895","title":"Sunglow Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-03-28","actual_isd":"2025-03-12","cm_new":0,"cm_rebuilt":0,"from":"Sunglow","to":null,"county_from":"Maverick","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This project provides a point of interconnection for a new battery energy storage resource at a new 138-kV Sunglow Substation between LCRA TSC T627 and LCRA Rosita Creek Substation."},{"id":"ercot-tpit:69890","ercot_project":"69890","title":"Bailey 345kV Substation Expansion for Ray Gulf Wind (22INR0517)","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-03-31","actual_isd":"2025-07-08","cm_new":0,"cm_rebuilt":0,"from":"Bailey","to":null,"county_from":"Wharton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand 345kV Bailey substation for Ray Gulf Wind generator interconnection (22INR0517)"},{"id":"ercot-tpit:61234","ercot_project":"61234","title":"Antler - Bergheim Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-04-01","actual_isd":"2025-02-24","cm_new":0,"cm_rebuilt":7.2,"from":"Antler","to":"Bergheim","county_from":"Comal","county_to":"Comal","tier":"Tier 3","rpg":"22RPG005","rpg_completed":"2022-09-09","bod_reviewed":null,"comments":null,"description":"This project will increase the reliability and capacity of transmission facilities on the T493 Antler to Bergheim 138-kV and T389 Bergheim to Hays Energy 345-kV 7.2-mile double-circuit transmission line by replacing the aging conductors fro","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:71982","ercot_project":"71982","title":"Upgrade Orange Grove station","owner":"STEC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-04-01","actual_isd":"2025-04-01","cm_new":0,"cm_rebuilt":0,"from":"Orange Grove","to":"Orange Grove","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Orange Grove stationto ring bus"},{"id":"ercot-tpit:81354","ercot_project":"81354","title":"GSEC_9452_Add_Snodgrass_Sub","owner":"GSEC","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-04-01","actual_isd":"2025-04-01","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Add New Load and Sub","description":"Adding new Snodgrass sub to connect to AEP's Juncus Station."},{"id":"ercot-tpit:71954","ercot_project":"71954","title":"Adds new Talitha substation and short line from Talitha to Orange Grove 138","owner":"STEC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-04-01","actual_isd":"2025-04-01","cm_new":0.73,"cm_rebuilt":0,"from":"Orange Grove","to":"Talitha","county_from":"Jim Wells","county_to":"Jim Wells","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds new Talitha substation and short line from Talitha to Orange Grove 138","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:79990","ercot_project":"79990","title":"Add new Yellow Wolf station for 21INR0428","owner":"CTT","owner_project":null,"kv":345,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2025-04-08","actual_isd":"2025-04-23","cm_new":0,"cm_rebuilt":0,"from":"Limestone","to":"Gibbons Creek","county_from":"Leon","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:4323","ercot_project":"4323","title":"CPSE_Brooks_MLSE","owner":"CPS","owner_project":"S-0669","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-04-10","actual_isd":"2025-04-10","cm_new":0,"cm_rebuilt":0,"from":"Braunig","to":"Brooks","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade terminal at Brooks and ensure a rating of 2000 A (minimum) at both Braunig and Brooks terminals"},{"id":"ercot-tpit:72576A","ercot_project":"72576A","title":"Lago Vista to Nameless Transmission Line Upgrade","owner":"PEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-04-15","actual_isd":"2025-04-01","cm_new":0,"cm_rebuilt":0,"from":"Lago Vista","to":"Nameless","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"1/10/2023: Added information to clarify timing for final circuit rating upgrade.","description":"Rebuild and upgrade Nameless to Lago Vista with double-circuit capable structures. Install 1 ckt with bundled 795 kcmil conductor (440 MVA). Final span of conductor and terminal equipment at Nameless will be upgraded to 440 MVA with ERCOT p"},{"id":"ercot-tpit:70922","ercot_project":"70922","title":"Chief Brady - Georgetown Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-04-18","actual_isd":"2025-04-18","cm_new":0,"cm_rebuilt":3,"from":"Chief Brady","to":"Georgetown","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T355 Chief Brady - Georgetown 138-kV transmission line to achieve a higher operational rating.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/339937468","name":"Chief Brady Substation","coordinates":[-97.69587,30.5918]},{"osm_id":"osm:way/122981718","name":"Georgetown Substation","coordinates":[-97.68711,30.63249]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/31744231","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":3,"straight_mi":null},{"id":"ercot-tpit:71956","ercot_project":"71956","title":"Elgin Switch Substation Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-04-24","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":0,"from":"Elgin Switch","to":null,"county_from":"Williamson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRATSC will install a new three-breaker ring bus substation at Elgin Switch. Oncor will relocate its facilities from Elgin Switch to Brushy Creek. Install a temporary shoo-fly between T668 and T260 to maintain through-path during construct"},{"id":"ercot-tpit:71930","ercot_project":"71930","title":"Upgrade RIOHONDO to BURNS line","owner":"STEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2025-05-01","actual_isd":"2025-07-01","cm_new":0,"cm_rebuilt":12.2,"from":"Rio Hondo","to":"Burns","county_from":"Cameron","county_to":"Cameron","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade RIOHONDO to BURNS line to be 478MVA capable","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174719027","name":"Rio Hondo Substation","coordinates":[-97.61337,26.27748]},{"osm_id":"osm:way/120600269","name":"Burns Substation","coordinates":[-97.73433,26.2191]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/513282663","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":12.2,"straight_mi":null},{"id":"ercot-tpit:81544","ercot_project":"81544","title":"GSEC_9466_Add_CampSprings_Sub","owner":"GSEC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-01","actual_isd":"2025-07-01","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Fisher","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"ISD exceeds NMMS model load date","description":"Add Big Country's Camp Springs Sub 9MW"},{"id":"ercot-tpit:80753","ercot_project":"80753","title":"LST_Claytonville to Camp Springs 138 kV line additions","owner":"LST","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-01","actual_isd":"2025-03-31","cm_new":0,"cm_rebuilt":0,"from":"Claytonville 138","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LST_Claytonville to Camp Springs 138 kV line additions"},{"id":"ercot-tpit:69345","ercot_project":"69345","title":"Limmer Substation Addition","owner":"LCRATSC","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-01","actual_isd":"2025-05-01","cm_new":0,"cm_rebuilt":0,"from":"Zorn, Hutto","to":"Limmer","county_from":"Williamson","county_to":"Travis","tier":"Tier 3","rpg":"22RPG027","rpg_completed":"2022-09-27","bod_reviewed":null,"comments":null,"description":"Construct a new LCRA TSC-owned Limmer Substation in the Hutto to Zorn 345 kV line approximately 3 miles east of Hutto. Limmer Substation will be installed initially as a five-breaker 345 kV breaker-and-a-half arrangement."},{"id":"ercot-tpit:89905","ercot_project":"89905","title":"Addition of facilities installed at OCI ALAMO 1 substation to install a Gen-Tie to Power Soportar Battery Energy Storage System (BESS).","owner":"CPS","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-01","actual_isd":"2025-05-07","cm_new":0.06,"cm_rebuilt":0,"from":"5007","to":"171082","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:72588A","ercot_project":"72588A","title":"Trading Post to Cedar Valley Storm Hardening","owner":"PEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-05","actual_isd":"2025-05-01","cm_new":0,"cm_rebuilt":6.8,"from":"Trading Post","to":"Cedar Valley","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/340565891","name":"Trading Post Substation","coordinates":[-97.97129,30.31296]},{"osm_id":"osm:way/207313733","name":"Cedar Valley Substation","coordinates":[-97.95246,30.227]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/340565885","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":6.2,"straight_mi":null},{"id":"ercot-tpit:67992D","ercot_project":"67992D","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-09","actual_isd":"2025-04-16","cm_new":0,"cm_rebuilt":1.02,"from":"5187","to":"5300","county_from":"Bexar","county_to":"Bexar","tier":"Tier 3","rpg":null,"rpg_completed":"2021-12-16","bod_reviewed":null,"comments":null,"description":"Upgrade Hamilton to Medical Center 138KV Line to 469MVA","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:89984","ercot_project":"89984","title":"Kangaroo 345 kV Switch","owner":"ONCOR","owner_project":"R3030","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-14","actual_isd":"2025-06-12","cm_new":0,"cm_rebuilt":0,"from":"Blackwater Draw Switch","to":"Ogallala","county_from":"Castro","county_to":"Castro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Kangaroo 345 kV Switch"},{"id":"ercot-tpit:75889","ercot_project":"75889","title":"Add_Wellborn_Load","owner":"BRYN","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-14","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":0,"from":"Wellborn","to":null,"county_from":"Brazos","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:66569","ercot_project":"66569","title":"Rebuild and reconfigure the existing Mulberry Creek 345 kV Switch","owner":"ONCOR","owner_project":"R9022","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-15","cm_new":0,"cm_rebuilt":0,"from":"Mulberry Creek","to":"Mulberry Creek","county_from":"Jones","county_to":"Jones","tier":"Tier 3","rpg":"21RPG021","rpg_completed":"2022-01-12","bod_reviewed":null,"comments":null,"description":"Rebuild and reconfigure the existing Mulberry Creek 345 kV Switch"},{"id":"ercot-tpit:69552B","ercot_project":"69552B","title":"Teal 345/138 kV Switch connected to LCRA POI (Limmer)","owner":"ONCOR","owner_project":"R6165","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-30","cm_new":0,"cm_rebuilt":0,"from":"Teal","to":"Teal","county_from":"Williamson","county_to":"Williamson","tier":"Tier 3","rpg":"22RPG027","rpg_completed":"2022-09-15","bod_reviewed":null,"comments":null,"description":"Teal 345 kV Switch, Autotransformers, and 345 kV Tie Lines to Limmer (LCRA)"},{"id":"ercot-tpit:76578","ercot_project":"76578","title":"Upgrade the Temple Pecan - Temple Elm 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R6234","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-06-05","cm_new":0,"cm_rebuilt":10,"from":"Temple Pecan Creek","to":"Temple Elm Creek","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":"24RPG001","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the 5-mile Temple Pecan - Temple Elm 138 kV Double-Circuit Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/172709713","name":"Temple Pecan Creek Substation","coordinates":[-97.26106,31.12964]},{"osm_id":"osm:way/340206126","name":"Temple Elm Creek Substation","coordinates":[-97.32996,31.13086]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/172709733","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":4.1,"straight_mi":null},{"id":"ercot-tpit:72007","ercot_project":"72007","title":"Ranger Camp 345/138/69 kV Switch","owner":"ONCOR","owner_project":"R3024","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-04-16","cm_new":0,"cm_rebuilt":0,"from":"Ranger Camp 345/138 kV Switch","to":"Ranger Camp 345/138 kV Switch","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 345/138/69 kV Switch to replace existing Morgan Creek Switch","puct_project":"mcpr:oncor-electric-delivery:0pt53566","puct_link_method":"owner project code + voltage + shared place name"},{"id":"ercot-tpit:78365","ercot_project":"78365","title":"Fryers Creek 138/69 kV Switch","owner":"ONCOR","owner_project":"R6295","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"9999-01-01","cm_new":5,"cm_rebuilt":0,"from":"Boggy Creek","to":"Boggy Creek","county_from":"Bell","county_to":"Bell","tier":"Tier 1","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct the new Fryers Creek 138/69 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:70538","ercot_project":"70538","title":"Pilot Grove - Yoakum Gartner Road Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-15","cm_new":0,"cm_rebuilt":7.8,"from":"Pilot Grove","to":"Yoakum Gartner","county_from":"Lavaca","county_to":"DeWitt","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 7.8 mile T614 Pilot Grove (structure #8/2) - Yoakum Gartner Road 138-kV transmission line. Structure #8/2 and the remaining portion of T614 will be overhauled as part of the FY23 Mont - Pilot Grove Transmission Li","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:70704A","ercot_project":"70704A","title":"Florence Substation Addition","owner":"LCRATSC","owner_project":"PLC-6320","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-15","cm_new":0,"cm_rebuilt":0,"from":"Andice","to":"Glasscock","county_from":"Williamson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:73793","ercot_project":"73793","title":"McCarty Lane - Zorn Transmission Line Storm Hardening","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-01","cm_new":0,"cm_rebuilt":8.58,"from":"McCarty Lane East","to":"Zorn","county_from":"Hays","county_to":"Guadalupe","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Perform storm hardening on the 4.2 mile McCarty Lane - Zorn (T202) 138-kV transmission line. T202 is double-circuited with McCarty Lane - Beback - Zorn (T201) 138-kV transmission line.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:73838","ercot_project":"73838","title":"Redwood - San Marcos Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-13","cm_new":0,"cm_rebuilt":2.5,"from":"Redwood","to":"San Marcos","county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":"24RPG034","rpg_completed":"2024-12-03","bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T200 Redwood - San Marcos 138-kV transmission line to obtain a higher operational rating.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/31110361","name":"Redwood Substation","coordinates":[-97.94476,29.85053]},{"osm_id":"osm:way/31061180","name":"San Marcos Substation","coordinates":[-97.91798,29.87742]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/118145781","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":2.6,"straight_mi":null},{"id":"ercot-tpit:77041","ercot_project":"77041","title":"Leon Switch - Putnam Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-21","cm_new":0,"cm_rebuilt":8.95,"from":"Leon Switch","to":"Putnam","county_from":"Eastland","county_to":"Eastland","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will perform an overhaul on the 8.9-mile Leon Switch – Putnam (T727) 138-kV transmission line between Leon Switch existing structure #1/1 and Putnam existing structure #9/10. This project will increase reliability of the structures","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:85959","ercot_project":"85959","title":"San Marcos - Strahan Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-04-30","cm_new":0,"cm_rebuilt":1.25,"from":"San Marcos (7192)","to":"Strahan (7193)","county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T230 San Marcos - Strahan 138-kV transmission line to achieve a higher operational rating.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/31061180","name":"San Marcos Substation","coordinates":[-97.91798,29.87742]},{"osm_id":"osm:way/30887076","name":"Strahan Substation","coordinates":[-97.9324,29.88969]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/342424260","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":1.3,"straight_mi":null},{"id":"ercot-tpit:70704B","ercot_project":"70704B","title":"Florence Substation Addition","owner":"LCRATSC","owner_project":"PLC-6320","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-15","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Fixes Florence bus disconnection issue by removing temporary equipment associated with FLORENCE substation cut-in"},{"id":"ercot-tpit:72870","ercot_project":"72870","title":"Soda Lake Generator Circuit Breaker Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-06-09","cm_new":0,"cm_rebuilt":0,"from":"Soda Lake","to":null,"county_from":"Crane","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This project provides a point of interconnection for a new 202.99 MW Solar Energy at the 138-kV Soda Lake Substation by reconfiguring the Soda Lake Substation to breaker-and-a-half to add new 138-kV line terminal and one POI structure to ac"},{"id":"ercot-tpit:71199","ercot_project":"71199","title":"Yucca Drive - Moss 138 kV Line","owner":"ONCOR","owner_project":"R9047","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-30","cm_new":0,"cm_rebuilt":35.2,"from":"Yucca Drive","to":"Moss","county_from":"Ector","county_to":"Winkler","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild existing 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:78371","ercot_project":"78371","title":"Richardson East Switch – Richardson Spring Creek 138 kV Line Section","owner":"ONCOR","owner_project":"M4402","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-21","cm_new":0,"cm_rebuilt":2.1,"from":"Richardson East","to":"Richardson Spring Creek","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Richardson East Switch – Richardson Spring Creek 138 kV Line Section","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:78382","ercot_project":"78382","title":"Adds Capacitor Bank at White Dune","owner":"ONCOR","owner_project":"R8669","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-06-30","cm_new":0,"cm_rebuilt":0,"from":"White Dune","to":null,"county_from":"Winkler","county_to":"Winkler","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds Capacitor Bank at White Dune"},{"id":"ercot-tpit:81358A","ercot_project":"81358A","title":"Grindstone 138 kV Switch","owner":"ONCOR","owner_project":"R1754","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-15","cm_new":0,"cm_rebuilt":0,"from":"Grindstone Switch","to":"Grindstone Switch","county_from":"Palo Pinto","county_to":"Palo Pinto","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:82806","ercot_project":"82806","title":"Establish Long Hollow 345 kV Switch (POI for Pinnington Solar)","owner":"ONCOR","owner_project":"M3509","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-06-30","cm_new":0,"cm_rebuilt":0,"from":"Graham Plant Switch","to":"Parker Switch","county_from":"Young","county_to":"Parker","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Long Hollow 345 kV Switch (POI for Pinnington Solar)"},{"id":"ercot-tpit:82808","ercot_project":"82808","title":"Stranger 345 kV Switch","owner":"ONCOR","owner_project":"R6320","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-15","cm_new":0,"cm_rebuilt":0,"from":"Stranger Switch","to":"Stranger Switch","county_from":"Limestone","county_to":"Limestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Stranger 345 kV Switch"},{"id":"ercot-tpit:82810A","ercot_project":"82810A","title":"Olympus 138 kV Switch","owner":"ONCOR","owner_project":"R6330","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-08","cm_new":0,"cm_rebuilt":0,"from":"Olympus Switch","to":"Olympus Switch","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Olympus 138 kV Switch"},{"id":"ercot-tpit:52247","ercot_project":"52247","title":"Marrs - Handley 69 kV Line Conversion to 138 kV","owner":"ONCOR","owner_project":"M5222","kv":138,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-30","cm_new":2.2,"cm_rebuilt":13,"from":"Marrs SW","to":"Handley","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert the existing Marrs-Handley 69 kV line to 138 kV operation","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:87285","ercot_project":"87285","title":"Establish Stouts Creek 345 kV Switch","owner":"ONCOR","owner_project":"R984","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-06-13","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Hopkins","county_to":"Hopkins","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Stouts Creek 345 kV Switch"},{"id":"ercot-tpit:87760","ercot_project":"87760","title":"Full House 138 kV Switch","owner":"ONCOR","owner_project":"R6327","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-08","cm_new":0,"cm_rebuilt":0,"from":"Full House","to":"Full House","county_from":"Erath","county_to":"Erath","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Full House 138 kV Switch for Lucky Bluff BESS"},{"id":"ercot-tpit:89982","ercot_project":"89982","title":"Wrangler 345 kV Switch","owner":"ONCOR","owner_project":"R3032","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-16","cm_new":0,"cm_rebuilt":0,"from":"Cottonwood","to":"White River","county_from":"Motley","county_to":"Motley","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish 345 Switch"},{"id":"ercot-tpit:91060","ercot_project":"91060","title":"Establish Flying Tiger 138 kV Switch","owner":"ONCOR","owner_project":"M3302","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-04-17","cm_new":0,"cm_rebuilt":0,"from":"Flying Tiger 138 kV Switch","to":null,"county_from":"Lamar","county_to":"Lamar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Flying Tiger 138 kV Switch"},{"id":"ercot-tpit:91455","ercot_project":"91455","title":"Establish Dorsett 345 kV Switch","owner":"ONCOR","owner_project":"R6323","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-08","cm_new":0,"cm_rebuilt":0,"from":"Dorsett 345 kV Switch","to":"Dorsett 345 kV Switch","county_from":"Rusk","county_to":"Rusk","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:62666A","ercot_project":"62666A","title":"Upgrade and convert McGregor - Waco West Line","owner":"ONCOR","owner_project":"R6172","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-12-15","cm_new":0,"cm_rebuilt":17.5,"from":"Waco West","to":"McGregor Phillips","county_from":"McLennan","county_to":"McLennan","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild and Upgrade McGregor Phillips - Waco West Switch 69 kV Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/6820579","name":"Waco West Substation","coordinates":[-97.18254,31.51106]},{"osm_id":"osm:way/386702208","name":"McGregor Phillips Substation","coordinates":[-97.39454,31.41725]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:72004","ercot_project":"72004","title":"Cat Claw 138 kV Dynamic Reactive Device (formerly Midkiff)","owner":"ONCOR","owner_project":"R8675 R8680 R8695","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-05-12","cm_new":0,"cm_rebuilt":0,"from":"Cat Claw","to":"Cat Claw","county_from":"Upton","county_to":"Upton","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install a new Dynamic Reactive Device at Cat Claw (formerly Midkiff)"},{"id":"ercot-tpit:71980","ercot_project":"71980","title":"Watermill 345 kV Switch","owner":"ONCOR","owner_project":"M4012","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-15","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Watermill","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 3","rpg":"23RPG017","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing Watermill 345 kV Switch"},{"id":"ercot-tpit:81383","ercot_project":"81383","title":"Edwards Tap - Sandhills Tap 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8528","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-15","actual_isd":"2025-07-24","cm_new":0,"cm_rebuilt":11.71,"from":"Odessa EHV","to":"Wolf","county_from":"Ector","county_to":"Ward","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Edwards Tap - Sandhills Tap 138 kV Line Rebuild","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/6709972","name":"Odessa EHV Substation","coordinates":[-102.32794,31.83513]},{"osm_id":"osm:way/1006561811","name":"Wolf Switching Station","coordinates":[-102.9328,31.6018]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 40.9 mi but ERCOT reports 11.71 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:62068","ercot_project":"62068","title":"Lakeway - Marble Falls Transmission Line Storm Hardening","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-16","actual_isd":"2025-05-16","cm_new":0,"cm_rebuilt":23,"from":"Lakeway","to":"Marble Falls","county_from":"Travis","county_to":"Burnet","tier":"Tier 4","rpg":"22RPG031","rpg_completed":"2022-11-03","bod_reviewed":null,"comments":null,"description":"Increase the reliability of transmission facilities on the T497 Lakeway - Marble Falls 23-mile 138-kV transmission line.","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:66447","ercot_project":"66447","title":"Reforzar: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2022035","kv":345,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2025-05-16","actual_isd":"2025-05-16","cm_new":0,"cm_rebuilt":0,"from":"Reforzar","to":null,"county_from":"Brooks","county_to":null,"tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-11-29","bod_reviewed":"2021-12-10","comments":"IN-SERVICE","description":"Construct a new 345 kV station on the Lon Hill to North Edinburg 345 kV line"},{"id":"ercot-tpit:75887","ercot_project":"75887","title":"Add_SteepHollow_Load","owner":"BRYN","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-19","actual_isd":"2025-05-19","cm_new":0,"cm_rebuilt":0,"from":"Steep Hollow","to":null,"county_from":"Brazos","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:72037A","ercot_project":"72037A","title":"Seabreeze 345kV Substation for Tanglewood Solar (23INR0054)","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-21","actual_isd":"2025-05-21","cm_new":0,"cm_rebuilt":0,"from":"Seabreeze","to":"DOW/Oasis","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New 345kV Seabreeze (SEB) substation for generator interconnection to Tanglewood Solar (23INR0054). Loop Ckt.27B into Seabreeze substation to create new Ckt.27 DOW to Seabreeze to Oasis."},{"id":"ercot-tpit:72037B","ercot_project":"72037B","title":"Seabreeze 345kV Substation for Tanglewood Solar (23INR0054)","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-21","actual_isd":"2025-05-21","cm_new":0,"cm_rebuilt":0,"from":"Seabreeze","to":"TANGLE","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Seabreeze (SEB) substation to TANGLE (TNG) customer substation (23INR0054)."},{"id":"ercot-tpit:88063","ercot_project":"88063","title":"Valley South 345 kV Switch New POI (Platinum Storage)","owner":"ONCOR","owner_project":"M3069","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-22","actual_isd":"2025-05-22","cm_new":0,"cm_rebuilt":0,"from":"Valley South","to":null,"county_from":"Fannin","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new POI"},{"id":"ercot-tpit:67992A","ercot_project":"67992A","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-29","actual_isd":"2025-04-07","cm_new":0.03,"cm_rebuilt":0,"from":"5378, 5465","to":"5320","county_from":"Bexar","county_to":"Bexar","tier":"Tier 3","rpg":null,"rpg_completed":"2021-12-16","bod_reviewed":null,"comments":null,"description":"Shepherd Rd to Valley Rd 138kV line Reconfiguration.","terminal_match":{"from":"multi_or_missing","to":"unnamed"}},{"id":"ercot-tpit:67992C","ercot_project":"67992C","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-29","actual_isd":"2025-04-07","cm_new":0.88,"cm_rebuilt":0,"from":"5056","to":"5400 and 5475","county_from":"Bexar","county_to":"Bexar","tier":"Tier 3","rpg":null,"rpg_completed":"2021-12-16","bod_reviewed":null,"comments":null,"description":"Looping of 345KV Howard Rd switching station into existing Cagnon to AVR and Cagnon to Spruce 34KV lies. The switching station will have 2 600MVA 345KV/138KV autotransformers.","terminal_match":{"from":"unnamed","to":"not_in_osm"}},{"id":"ercot-tpit:6719B","ercot_project":"6719B","title":"Twelvemile Substation Addition","owner":"LCRATSC","owner_project":"1018769","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-05-30","actual_isd":"2025-06-17","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Pecos","county_to":"Crockett","tier":"Tier 4","rpg":"21RPG001","rpg_completed":"2021-06-10","bod_reviewed":null,"comments":null,"description":"Cuts into the second circuit"},{"id":"ercot-tpit:6719A","ercot_project":"6719A","title":"Twelvemile Substation Addition","owner":"LCRATSC","owner_project":"1018769","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-30","actual_isd":"2025-06-17","cm_new":0,"cm_rebuilt":0,"from":"Bakersfield","to":"Schneeman Draw","county_from":"Pecos","county_to":"Crockett","tier":"Tier 4","rpg":"21RPG001","rpg_completed":"2021-06-10","bod_reviewed":null,"comments":null,"description":"Cuts into first circuit"},{"id":"ercot-tpit:78485A","ercot_project":"78485A","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-30","actual_isd":"2025-02-07","cm_new":0,"cm_rebuilt":6.21,"from":"Westchase","to":"Britmoore","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG025","rpg_completed":"2023-09-28","bod_reviewed":"2023-09-28","comments":null,"description":"Upgrade Ckt.24B Westchase to Hayes to increase thermal limits.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:78485E","ercot_project":"78485E","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-31","actual_isd":"2025-06-03","cm_new":0,"cm_rebuilt":6.21,"from":"Westchase","to":"Britmoore","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG025","rpg_completed":"2023-09-28","bod_reviewed":"2023-09-28","comments":null,"description":"Upgrade Ckt.24B Westchase to Hayes to Britmoore to increase thermal limits. Upgrade Ckt.24 Bellaire equipment and relay limits.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:66221L","ercot_project":"66221L","title":"Galena Park Area Conversion Project","owner":"CNP","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-31","actual_isd":"2025-04-11","cm_new":0,"cm_rebuilt":0,"from":"Greens Bayou","to":"GYPSUM","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"21RPG020","rpg_completed":"2021-12-22","bod_reviewed":"2021-12-22","comments":null,"description":"De-energize Ckt.20 Greens Bayou to GYPSUM."},{"id":"ercot-tpit:69902A","ercot_project":"69902A","title":"New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar.","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-31","actual_isd":"2025-05-07","cm_new":0,"cm_rebuilt":0,"from":"MISSION","to":"Gibbons Creek/Zenith","county_from":"Waller","county_to":"Waller","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar. Loop Ckt.18E into Mission substation to create new Ckt.18 Gibbons Creek to Mission to Zenith. (Ckt.18 Gibbons Creek to Mission tie-line)."},{"id":"ercot-tpit:69902C","ercot_project":"69902C","title":"New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar.","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-31","actual_isd":"2025-05-07","cm_new":0,"cm_rebuilt":0,"from":"MISSION","to":"Parliament","county_from":"Waller","county_to":"Waller","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Mission (MSS) substation to Parliament/Parliament Solar"},{"id":"ercot-tpit:73578K","ercot_project":"73578K","title":"Heights 138kV Loop Conversion","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-31","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":1.57,"from":"San Felipe","to":"White Oak","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert Eureka to double-tap service. Tap Ckt.09D to create new Ckt.09D San Felipe to Eureka TR2/TR3 tap to White Oak. Reconductor Ckt.09D Eureka TR2/TR3 tap to White Oak to increase thermal limits. Upgrade San Felipe line relaying Ckt.09D ","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/126832799","name":"San Felipe Substation","coordinates":[-95.44789,29.75058]},{"osm_id":"osm:way/128672826","name":"White Oak Substation","coordinates":[-95.43481,29.81518]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:73578C","ercot_project":"73578C","title":"Heights 138kV Loop Conversion","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-31","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":0,"from":"Wirt","to":"White Oak","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Convert Eureka to double-tap service. Tap Ckt.81J to create new Ckt.81J White Oak to Eureka TR1 tap to Wirt."},{"id":"ercot-tpit:73578J","ercot_project":"73578J","title":"Heights 138kV Loop Conversion","owner":"CNP","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-31","actual_isd":"2025-05-08","cm_new":0,"cm_rebuilt":0,"from":"Dunlavy","to":"HO Clarke","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconfigure Ckt.40A Dunlavy to HO Clarke with a temporary (BP25 to BP26) configuration. Remove the Dunlavy TR3 tap section from Ckt.40A and install tap section to Ckt.90A."},{"id":"ercot-tpit:73578G","ercot_project":"73578G","title":"Heights 138kV Loop Conversion","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-05-31","actual_isd":"2025-05-08","cm_new":0,"cm_rebuilt":0,"from":"Kirby","to":"Garrott","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Tap existing Ckt.90A Kirby to Garrott near Tower 34720 to serve Dunlavy transformer TR3 load. Create Ckt.90A Kirby tap to DN-TR3 tap to Garrott."},{"id":"ercot-tpit:11TPIT0011","ercot_project":"11TPIT0011","title":"East_Village138kV Substation","owner":"AEN","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-01","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":0,"from":"Techridge","to":"East_Village SUB","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"East_Village 138kV Substation"},{"id":"ercot-tpit:70349","ercot_project":"70349","title":"Belknap to Fort Griffin: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-11","actual_isd":"2025-06-11","cm_new":0,"cm_rebuilt":23.6,"from":"Belknap","to":"Fort Griffin","county_from":"Jones","county_to":"Shackelford","tier":"Tier 4","rpg":"22RPG020","rpg_completed":"2022-07-22","bod_reviewed":null,"comments":"IN-SERVICE","description":"Rehab Belknap to Fort Griffin 69 kV line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:90353","ercot_project":"90353","title":"Establish Sandy Ranch 345 kV Switch","owner":"ONCOR","owner_project":"M3125","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-06-20","actual_isd":"2025-06-06","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Hopkins","county_to":"Hopkins","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Sandy Ranch 345 kV Switch"},{"id":"ercot-tpit:72880","ercot_project":"72880","title":"Sisseton: Build 69 kV station","owner":"AEP TNC","owner_project":"TP2022059","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-25","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":0,"from":"Sisseton","to":null,"county_from":"Jones","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Build 69 kV switch station on the Aspermont to Hamlin 69 kV line"},{"id":"ercot-tpit:50900","ercot_project":"50900","title":"Mason to North Brady: Rebuild 69 kV line","owner":"AEP TNC","owner_project":"2794","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-25","actual_isd":"2025-05-23","cm_new":0,"cm_rebuilt":30.24,"from":"Mason","to":"North Brady","county_from":"Mason","county_to":"McCulloch","tier":"Tier 3","rpg":"19RPG019","rpg_completed":"2019-11-01","bod_reviewed":null,"comments":"IN-SERVICE","description":"Rehab Mason to North Brady 69 kV line","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:76918","ercot_project":"76918","title":"Primavera 138 kV: Construct new station","owner":"AEP TCC","owner_project":"TP2023059","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-25","actual_isd":"2025-06-20","cm_new":0,"cm_rebuilt":0,"from":"Primavera","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"New station to serve Tesla load"},{"id":"ercot-tpit:76574","ercot_project":"76574","title":"TexasAg Wind Interconnection","owner":"ETT","owner_project":"TP2023129","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-25","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":0,"from":"Brisita","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect TexasAg to the Brisita 345 kV station"},{"id":"ercot-tpit:69467","ercot_project":"69467","title":"Dupont to Resnik: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-25","actual_isd":"2025-05-15","cm_new":null,"cm_rebuilt":0.83,"from":"Dupont","to":"Resnik","county_from":"San Patricio","county_to":"San Patricio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE / Dollars Update","description":"Rebuild the Dupont to Resnik 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/194687575","name":"Dupont Switching Station","coordinates":[-97.24682,27.90024]},{"osm_id":"osm:way/1089933617","name":"Resnik Substation","coordinates":[-97.25848,27.90361]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 3.7 mi but ERCOT reports 0.83 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:49574","ercot_project":"49574","title":"Tesla: Build 345 kV terminal","owner":"ETT","owner_project":"2785","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-25","actual_isd":"2025-06-17","cm_new":0,"cm_rebuilt":0,"from":"Tesla","to":null,"county_from":"Childress","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Misae II solar farm at Tesla"},{"id":"ercot-tpit:63924","ercot_project":"63924","title":"Quasar: Build New 345 kV Station","owner":"ETT","owner_project":"1883","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-06-25","actual_isd":"2025-06-27","cm_new":0,"cm_rebuilt":0,"from":"Quasar","to":null,"county_from":"Haskell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service","description":"Interconnect Brass Fork Solar to the Clear Crossing to Coulomb 345 kV Line"},{"id":"ercot-tpit:67921","ercot_project":"67921","title":"Sisseton: Build 69 kV tap","owner":"AEP TNC","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-25","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":0,"from":"Sisseton","to":null,"county_from":"Jones","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Build new 69 kV tap on the Aspermont to Hamlin 69 kV line"},{"id":"ercot-tpit:48816","ercot_project":"48816","title":"Mulberry Creek: Rebuild 345 kV station","owner":"AEP TNC","owner_project":"2776","kv":345,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2025-06-25","actual_isd":"2025-06-30","cm_new":0,"cm_rebuilt":0,"from":"Mulberry Creek","to":null,"county_from":"Jones","county_to":null,"tier":"Tier 4","rpg":"21RPG021","rpg_completed":"2022-01-13","bod_reviewed":null,"comments":"IN-SERVICE","description":"Rebuild Mulberry Creek 345 kV station and replace both autotransformers"},{"id":"ercot-tpit:45155","ercot_project":"45155","title":"Ollin: Build 138 kV station","owner":"AEP TNC","owner_project":"2752","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-06-26","actual_isd":"2025-06-26","cm_new":0.1,"cm_rebuilt":0,"from":"Ollin","to":null,"county_from":"Crane","county_to":null,"tier":"Tier 4","rpg":"19RPG013","rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Construct new Ollin 138 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:70019","ercot_project":"70019","title":"Add 138kV Locust-Hickory line 700MVA","owner":"DME","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-06-30","actual_isd":"2025-06-30","cm_new":0,"cm_rebuilt":1.85,"from":"Locust","to":"Hickory","county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":"N/A","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/739644232","name":"Locust Substation","coordinates":[-97.1338,33.20325]},{"osm_id":"osm:way/260225238","name":"Hickory Substation","coordinates":[-97.16184,33.21517]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/346932073","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":2.4,"straight_mi":null},{"id":"ercot-tpit:86043","ercot_project":"86043","title":"Saxet Substation Addition Phase 2","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-06-30","actual_isd":"2025-06-06","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This PMCR models the phase 2 cut-in of T437 Nueces Bay – Lon Hill with the second Saxet Hard Tap. LCRA TSC will add a temporary Tap on T437"},{"id":"ercot-tpit:5430O","ercot_project":"5430O","title":"Conversion to 138kV","owner":"DME","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-07-01","actual_isd":"2025-07-01","cm_new":0,"cm_rebuilt":0,"from":"Hickory","to":"RD Wells","county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":"2016-01-20","comments":null,"description":"Reconnect the 69kV Hickory - RD Wells to the 138kV Hickory and RD Wells substations. Line is already insulated for 138kV."},{"id":"ercot-tpit:5430K","ercot_project":"5430K","title":"Conversion to 138kV","owner":"DME","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-07-01","actual_isd":"2025-07-01","cm_new":0,"cm_rebuilt":0,"from":"Bonnie Brae","to":"Hickory","county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":"2016-01-20","comments":null,"description":"Construct new 138kV Hickory substation and terminate the existing Bonnie Brae - Hickory (which is already insulated for 138kV) at the new 138kV Hickory substation."},{"id":"ercot-tpit:64776","ercot_project":"64776","title":"Upgrade 138kV DentonWest-RDWells line to 700MVA (SUM2024)","owner":"DME","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-07-01","actual_isd":"2025-07-01","cm_new":0,"cm_rebuilt":4.47,"from":"RD Wells","to":"Denton West","county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":"N/A","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:77648B","ercot_project":"77648B","title":"Establish Tiger Creek 345 kV Switch for Jaguar Solar/BESS","owner":"ONCOR","owner_project":"R6223","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-07-14","actual_isd":"2025-10-16","cm_new":0.5,"cm_rebuilt":0,"from":"Tiger Creek Switch","to":"Jaguar Solar/BESS","county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Tiger Creek Switch - Jaguar Solar/BESS 345 kV Line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:82829","ercot_project":"82829","title":"New Furhman Substation","owner":"STEC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-07-24","actual_isd":"2025-08-04","cm_new":0.84,"cm_rebuilt":0,"from":"Rayburn","to":"Vanderbilt","county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds New Furhman switching station on Rayburn - Vanderbilt line for generator interconnect","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:72882","ercot_project":"72882","title":"Lockhart - Luling 69-kV Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-07-30","actual_isd":"2025-06-27","cm_new":0,"cm_rebuilt":15.83,"from":"Lockhart","to":"Luling","county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 4","rpg":"23RPG004","rpg_completed":"2023-03-20","bod_reviewed":null,"comments":null,"description":"LCRA TSC will perform an overhaul on the 15.8-mile Lockhart – Luling (T157) 69-kV transmission line. This project will increase reliability of the structures and conductor by ensuring that the transmission line meets or exceeds current NESC","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:13TPIT0070","ercot_project":"13TPIT0070","title":"Nash Creek Substation","owner":"GVEC","owner_project":null,"kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-07-30","actual_isd":"2025-07-30","cm_new":0,"cm_rebuilt":0,"from":"Nash Creek","to":null,"county_from":"Guadalupe","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild existing substation, and replace existing PWT with new 69kVx13.09 kV, new Control House, CSW, structures, containment foundations, bus, panels, etc"},{"id":"ercot-tpit:87389","ercot_project":"87389","title":"Friendswood Energy GENCO GT (24INR0456)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-07-31","actual_isd":"2025-07-25","cm_new":0,"cm_rebuilt":0,"from":"HO Clarke","to":null,"county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Friendswood Energy GENCO GT at HO Clarke substation. Utilize existing HO Clarke to Friendswood Energy generator lead."},{"id":"ercot-tpit:64069","ercot_project":"64069","title":"Charger Solar Interconnection","owner":"AEP TCC","owner_project":"TP2021165","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-07-31","actual_isd":"2025-07-08","cm_new":0,"cm_rebuilt":0,"from":"Angstrom","to":"STP","county_from":"Refugio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Connect the Charger Interconnection to the Angstrom to STP 345 kV line"},{"id":"ercot-tpit:76076","ercot_project":"76076","title":"Laredo VFT North to North Laredo Switch: Rebuild 138 kV Line","owner":"AEP TCC/ETT","owner_project":"TP2020072 3835","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-08-15","actual_isd":"2025-08-15","cm_new":0,"cm_rebuilt":2.4,"from":"Las Cruces","to":"Milo","county_from":"Webb","county_to":"Webb","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Rebuild Las Cruces to Milo 138 kV line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:77827","ercot_project":"77827","title":"Reconductor TNMP Cottonwood to Oncor Lean Clay","owner":"TNMP","owner_project":null,"kv":138,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2025-08-15","actual_isd":"2025-02-21","cm_new":0,"cm_rebuilt":0.33,"from":"Oncor Lean Clay (11078)","to":"TNMP Cottonwood (38099)","county_from":"Reeves","county_to":"Reeves","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:72876B","ercot_project":"72876B","title":"Provide 138 kV POD for Skybox at Teal Switch","owner":"ONCOR","owner_project":"R6259","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-08-19","actual_isd":"9999-01-01","cm_new":0.2,"cm_rebuilt":0,"from":"Teal","to":"Skybox","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:69552C","ercot_project":"69552C","title":"Teal 345/138 kV Switch connected to LCRA POI (Limmer)","owner":"ONCOR","owner_project":"R6165","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-08-20","actual_isd":"2025-05-30","cm_new":0,"cm_rebuilt":0,"from":"Teal","to":"Teal","county_from":"Williamson","county_to":"Williamson","tier":"Tier 3","rpg":"22RPG027","rpg_completed":"2022-09-15","bod_reviewed":null,"comments":null,"description":"Teal 345 kV Switch, Autotransformers, and 345 kV Tie Lines to Limmer (LCRA)"},{"id":"ercot-tpit:78485B","ercot_project":"78485B","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-08-30","actual_isd":"2025-06-03","cm_new":0,"cm_rebuilt":2,"from":"Britmoore","to":"Alief","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG025","rpg_completed":"2023-09-28","bod_reviewed":"2023-09-28","comments":null,"description":"Upgrade Ckt.09A Britmoore to Hayes to Alief to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:75835A","ercot_project":"75835A","title":"Upgrade Ckt.66B Stone Lake to Tomball to increase thermal limits. Install 40 MVAR cap bank at Hockley substation and tapped on Ckt.66B Hockley to Stone Lake.","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-08-30","actual_isd":"2025-07-29","cm_new":0,"cm_rebuilt":5.71,"from":"Stone Lake","to":"Tomball","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG012","rpg_completed":"2023-05-26","bod_reviewed":"2023-05-26","comments":null,"description":"Partial reconductor Ckt.66B Stone Lake to Tomball. Phase One of overall approved upgrades","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:87846","ercot_project":"87846","title":"Bradberry 138 kV Switch","owner":"ONCOR","owner_project":"M4015","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-08-30","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Bradberry","to":null,"county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Bradberry 138 kV Switch"},{"id":"ercot-tpit:6253","ercot_project":"6253","title":"AEN_New_Kramer_Lane_Substation","owner":"AEN","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-09-04","actual_isd":"2025-09-04","cm_new":0,"cm_rebuilt":0,"from":"9238","to":"9276","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:66210","ercot_project":"66210","title":"Upgrade and convert Lake Creek - Marlin 69 kV Line to 138 kV","owner":"ONCOR","owner_project":"R1743","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-09-15","actual_isd":"2025-12-01","cm_new":0,"cm_rebuilt":13.7,"from":"Lake Creek","to":"Marlin","county_from":"Falls","county_to":"Falls","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade and convert Lake Creek - Marlin 69 kV Line to 138 kV. Relocate the Lake Creek 138/69 kV Auto to Marlin.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:66202A","ercot_project":"66202A","title":"Upgrade Palestine-Crockett 69 kV Line","owner":"ONCOR","owner_project":"R6182","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-09-15","actual_isd":"2025-08-06","cm_new":0,"cm_rebuilt":9.8,"from":"Palestine","to":"Elkhart","county_from":"Anderson","county_to":"Anderson","tier":"Tier 3","rpg":"22RPG035","rpg_completed":"2022-11-15","bod_reviewed":null,"comments":null,"description":"Rebuild the Palestine - Elkhart 69 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:90786","ercot_project":"90786","title":"Establish Yarrelton 345 kV Switch","owner":"ONCOR","owner_project":"R6261","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-09-29","actual_isd":"2025-12-17","cm_new":0,"cm_rebuilt":0,"from":"Yarrelton","to":"Yarrelton","county_from":"Bell","county_to":"Bell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Yarrelton 345 kV Switch for Hermes Solar and Storage"},{"id":"ercot-tpit:76234","ercot_project":"76234","title":"Wormser Road: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":"TP2023311","kv":138,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2025-09-30","actual_isd":"2025-09-15","cm_new":null,"cm_rebuilt":null,"from":"Wormser Road","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Seven Flags BESS to the Wormser Road 138 kV station"},{"id":"ercot-tpit:76686","ercot_project":"76686","title":"Hog Mountain 138 kV POD","owner":"ONCOR","owner_project":"R8673 R8791","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-09-30","actual_isd":"2025-12-30","cm_new":5.4,"cm_rebuilt":0,"from":"Quartz Sand","to":"Hog Mountain POD","county_from":"Glasscock","county_to":"Glasscock","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Hog Mountain 138 kV POD","puct_project":"mcpr:oncor-electric-delivery:0pt52165","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:50878","ercot_project":"50878","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","owner_project":"3786","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-09-30","actual_isd":"2025-11-24","cm_new":0,"cm_rebuilt":0,"from":"North Edinburg","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service","description":"Reconfigure the North Edinburg 345 kV station"},{"id":"ercot-tpit:71935","ercot_project":"71935","title":"Upgrade Hondo Creek to Castroville to 138kV","owner":"STEC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-09-30","actual_isd":"2025-12-08","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 2","rpg":"22RPG022","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Castroville sub to 138kV and line from Hondo creek to Castroville"},{"id":"ercot-tpit:76705","ercot_project":"76705","title":"Prairieland 345/138 kV Switch and 138 kV Line","owner":"ONCOR","owner_project":"R8632","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-09-30","actual_isd":"2025-12-16","cm_new":6,"cm_rebuilt":0,"from":"Prairieland","to":"Quartz Sand","county_from":"Glasscock","county_to":"Glasscock","tier":"Tier 2","rpg":"24RPG006","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Prairieland 345/138 kV Switch and Prairieland – Quartz Sand 138 kV Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:50847","ercot_project":"50847","title":"Sage: Expand 69 kV station","owner":"AEP TNC","owner_project":"2799","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-06","actual_isd":"2025-10-06","cm_new":0,"cm_rebuilt":0,"from":"Sage","to":null,"county_from":"Crane","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2019-06-21","bod_reviewed":null,"comments":"IN-SERVICE","description":"Build Heron 138 kV station with a 138/69 kV auto, expand the Kinnison 138 kV station, expand the Sage 69 kV station, rebuild Heron to Ollin and convert to a 138 kV line, and rebuild Kinnison to Sage 69 kV line"},{"id":"ercot-tpit:81358B","ercot_project":"81358B","title":"Grindstone 138 kV Switch","owner":"ONCOR","owner_project":"R1754","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-15","actual_isd":"2025-10-10","cm_new":0,"cm_rebuilt":0,"from":"Grindstone","to":"Black Springs BESS","county_from":"Palo Pinto","county_to":"Palo Pinto","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:78414","ercot_project":"78414","title":"SW3379 Replacement","owner":"NBU","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-10-26","actual_isd":"2025-09-15","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Comal","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replacing existing 1200 Amp switch and 1800 Amp bypass jumper with new 3000 Amp switch."},{"id":"ercot-tpit:76721","ercot_project":"76721","title":"Winding Oaks 138 kV Switch (Rayburn POI)","owner":"ONCOR","owner_project":"M3095","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-10-30","actual_isd":"2025-11-04","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Collin","county_to":"Collin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Winding Oaks POD 138 kV Switch"},{"id":"ercot-tpit:73364","ercot_project":"73364","title":"New Omicron 138kV Substation","owner":"CPS/NO","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-30","actual_isd":"2025-10-30","cm_new":0,"cm_rebuilt":0,"from":"5326","to":"5055, 5355","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New Omicron 138kV Substation will be looped into the existing Cagnon to Rafter 138kV transmission line."},{"id":"ercot-tpit:88046","ercot_project":"88046","title":"Rebuild the Omicron to Rafter transmission line","owner":"CPS/NO","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-30","actual_isd":"2025-10-30","cm_new":0,"cm_rebuilt":1.7,"from":"5326","to":"5355","county_from":"Bexar","county_to":"Medina","tier":"Tier 2","rpg":"24RPG004","rpg_completed":"2024-07-26","bod_reviewed":null,"comments":null,"description":"Rebuild the Omicron to Rafter 138kV transmission line with normal and emergency ratings of at least 570MVA in accordance with RPG Approval Letter.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:78490B","ercot_project":"78490B","title":"Jeanetta Auto Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-31","actual_isd":"2025-03-23","cm_new":0,"cm_rebuilt":0,"from":"Jeanetta","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 3","rpg":"23RPG031","rpg_completed":"2023-10-26","bod_reviewed":null,"comments":null,"description":"Replace existing 600 MVA Jeanetta Auto A3 with 800 MVA autotransformer"},{"id":"ercot-tpit:78490A","ercot_project":"78490A","title":"Jeanetta Auto Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-31","actual_isd":"2025-05-19","cm_new":0,"cm_rebuilt":0,"from":"Jeanetta","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 3","rpg":"23RPG031","rpg_completed":"2023-10-26","bod_reviewed":null,"comments":null,"description":"Replace existing 600 MVA Jeanetta Auto A1 with 800 MVA autotransformer"},{"id":"ercot-tpit:75938","ercot_project":"75938","title":"Expand Zenith substation with addition of 35kV Distribution Facilities. Tap TR1 on Ckt.09J to create new Ckt.09J Zenith to Zenith TR1 tap to Fry Road tap. Tap TR2 on Ckt.76A to create new Ckt.76A Zenith to Zenith TR2 tap to Fry Road tap.","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-31","actual_isd":"2025-03-05","cm_new":0,"cm_rebuilt":0,"from":"Zenith","to":"Fry Road","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand Zenith substation with addition of 35kV Distribution Facilities. Tap TR1 on Ckt.09J to create new Ckt.09J Zenith to Zenith TR1 tap to Fry Road tap. Tap TR2 on Ckt.76A to create new Ckt.76A Zenith to Zenith TR2 tap to Fry Road tap."},{"id":"ercot-tpit:76274","ercot_project":"76274","title":"Hamilton Road: Construct New 138 kV Terminal","owner":"AEP TCC/ETT","owner_project":"TP2023133","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-31","actual_isd":"2025-10-29","cm_new":0.1,"cm_rebuilt":0,"from":"Hamilton Road","to":null,"county_from":"Val Verde","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"In-Service","description":"Interconnect Tierra Seca BESS to the Hamilton Road 138 kV station","terminal_match":{"from":"matched","to":"multi_or_missing","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/344546792","name":"Picacho Substation","coordinates":[-100.94094,29.43245]},{"osm_id":"osm:way/344546791","name":"Del Rio Substation","coordinates":[-100.89329,29.36704]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","link_note":"mapped connection is 5.5 mi but ERCOT reports 0.1 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:80486","ercot_project":"80486","title":"Loxley: Construct New 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-10-31","actual_isd":"2025-12-18","cm_new":0.1,"cm_rebuilt":0,"from":"Loxley","to":null,"county_from":"Atascosa","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect the Loxley load to the new Loxley 138 kV station on the Pleasanton to Trumbo 138 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:72065","ercot_project":"72065","title":"Lake Jackson Distribution Substation Conversion to Low-Profile","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-31","actual_isd":"2025-09-24","cm_new":0,"cm_rebuilt":0,"from":"Lake Jackson","to":null,"county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Lake Jackson 138/12kV distribution substation to low-profile"},{"id":"ercot-tpit:76624","ercot_project":"76624","title":"WA Parish 345kV Substation Expansion for Crowned Heron Storage (24INR0405)","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-10-31","actual_isd":"2025-12-16","cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":"HERON","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand 345kV WA Parish substation for Crowned Heron Storage (24INR0405)"},{"id":"ercot-tpit:70536","ercot_project":"70536","title":"New 138 kV Verde Circle Substation","owner":"CPS/NO","owner_project":"S-0971","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-11-20","actual_isd":"2025-11-20","cm_new":0,"cm_rebuilt":0,"from":"5466","to":"5467, 5488","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New 138 kV Verde Circle Substation looping into existing 138 kV Westover Hills and VLSI line."},{"id":"ercot-tpit:77122","ercot_project":"77122","title":"Mulberry Creek: Construct New 345 kV Terminal","owner":"AEP TNC","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-11-30","actual_isd":"2025-12-31","cm_new":2.25,"cm_rebuilt":0,"from":"Mulberry Creek","to":null,"county_from":"Jones","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect the Lancium load to the Mulberry Creek 345 kV station","terminal_match":{"from":"ambiguous","to":"multi_or_missing"}},{"id":"ercot-tpit:72566","ercot_project":"72566","title":"Cedar Valley to Friendship Storm Hardening","owner":"PEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-11-30","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":4.3,"from":"Cedar Valley","to":"Friendship","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild single circuit section of Cedar Valley to Friendship and reconductor with bundled 795 ACSR Conductor, 440 MVA. Replaces Project ID 61268","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:78480A","ercot_project":"78480A","title":"Weinbrenner (WEI) 138kV CEHE Station for LONGPO (LNP) / Long Point Solar 19INR0042","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-11-30","actual_isd":"2025-12-10","cm_new":0,"cm_rebuilt":0,"from":"Weinbrenner","to":"Burke/ Eagle Nest","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new CEHE 138kV substation Weinbrenner (WEI) into Ckt.02J Burke to Eagle Nest to create new Ckt.02 Burke to Weinbrenner to Eagle Nest."},{"id":"ercot-tpit:66221K","ercot_project":"66221K","title":"Galena Park Area Conversion Project","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-11-30","actual_isd":"2025-11-07","cm_new":4.31,"cm_rebuilt":0,"from":"CITFIL","to":"Tanker","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"21RPG020","rpg_completed":"2021-12-22","bod_reviewed":"2021-12-22","comments":null,"description":"Rebuild GYPSUM customer substation for 138kV loop-tap service. Tap new GYPSUM substation (Spear Stone) from Ckt.94 between TANKER and new Galena Park tap to create new Ckt.94M CITFIL to Normandy tap to Galena Park tap to Spear Stone to TANK","terminal_match":{"from":"not_in_osm","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/15339389","name":"Galena Park Substation","coordinates":[-95.23091,29.7458]},{"osm_id":"osm:way/336794291","name":"Normandy Substation","coordinates":[-95.20561,29.76955]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","osm_matches":[{"osm_id":"osm:way/1535263295","layer":"lines-138"},{"osm_id":"osm:way/48060910","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":2.1,"straight_mi":2.2},{"id":"ercot-tpit:78480B","ercot_project":"78480B","title":"Weinbrenner (WEI) 138kV CEHE Station for LONGPO (LNP) / Long Point Solar 19INR0042","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-11-30","actual_isd":"2025-12-10","cm_new":0,"cm_rebuilt":0,"from":"Weinbrenner","to":"LONGPO","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from CEHE 138kV substation Weinbrenner (WEI) to LONGPO (LNP) / Long Point Solar (19INR0042)"},{"id":"ercot-tpit:78471","ercot_project":"78471","title":"WA Parish 345kV Substation Expansion for Bypass Storage (23INR0336)","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-11-30","actual_isd":"2025-10-30","cm_new":0,"cm_rebuilt":0,"from":"WA Parish","to":"BYPASS","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand 345kV WA Parish substation for Bypass Storage (23INR0336)"},{"id":"ercot-tpit:66221M","ercot_project":"66221M","title":"Galena Park Area Conversion Project","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-11-30","actual_isd":"2025-11-07","cm_new":0,"cm_rebuilt":0,"from":"Fidelity","to":"Witter","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"21RPG020","rpg_completed":"2021-12-22","bod_reviewed":"2021-12-22","comments":null,"description":"Reconfigure Galena Park by removing the temporary Ckt.94M Galena Park loop. Tap Galena Park transformer on Ckt.21K between Fidelity and Witter."},{"id":"ercot-tpit:92600A","ercot_project":"92600A","title":"John_Dumas_Circuit_Breaker_Addition","owner":"LCRATSC","owner_project":"PLC-7999","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-01","actual_isd":"2025-12-22","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Caldwell","county_to":"Caldwell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:71937","ercot_project":"71937","title":"Caterpillar Substation","owner":"GVEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-01","actual_isd":"2026-01-12","cm_new":0,"cm_rebuilt":0,"from":"Caterpillar","to":null,"county_from":"Guadalupe","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add T6, 40 MVA. 138-26.08 kV PWT to Caterpillar Substation"},{"id":"ercot-tpit:92600B","ercot_project":"92600B","title":"John_Dumas_Circuit_Breaker_Addition","owner":"LCRATSC","owner_project":"PLC-7999","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-01","actual_isd":"2025-12-22","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:70886","ercot_project":"70886","title":"Rebuild TinTop - Rio Colorado","owner":"STEC","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-01","actual_isd":"2025-07-03","cm_new":0,"cm_rebuilt":15.5,"from":"Tin Top","to":"Rio Colorado","county_from":"Matagorda","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild TinTop- Rio Colorado 795ACSR","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:55873","ercot_project":"55873","title":"Upgrade Moore to Hondo Creek 138 kV line","owner":"STEC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-01","actual_isd":"2025-09-24","cm_new":0,"cm_rebuilt":13.5,"from":"Moore","to":"Hondo Creek","county_from":"Medina","county_to":"Frio","tier":"Tier 2","rpg":"19RPG021","rpg_completed":"2020-05-21","bod_reviewed":null,"comments":null,"description":"Replace the 336 ACSR with 1020 ACCC conductor while keeping the existing structures that still meet our standards.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:72588C","ercot_project":"72588C","title":"Trading Post to Cedar Valley Storm Hardening","owner":"PEC","owner_project":null,"kv":138,"list":"completed","status_reported":null,"status":"In service","projected_isd":"2025-12-01","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrading switch to bring line to full rating"},{"id":"ercot-tpit:80913","ercot_project":"80913","title":"Sloan 138 kV Switch.","owner":"ONCOR","owner_project":"R8659","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-04","actual_isd":"2025-05-14","cm_new":0,"cm_rebuilt":0,"from":"Midessa South Switch","to":"Odessa/Midland East Switch","county_from":"Midland","county_to":"Midland","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Sloan 138 kV Switch"},{"id":"ercot-tpit:86633","ercot_project":"86633","title":"Dusty Road 345 kV Switch","owner":"ONCOR","owner_project":"R8809","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-04","actual_isd":"2025-12-04","cm_new":0,"cm_rebuilt":0,"from":"Tonkawa","to":"Graham","county_from":"Haskell","county_to":"Haskell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Dusty Road 345 kV Switch"},{"id":"ercot-tpit:70900D","ercot_project":"70900D","title":"Roanoke Area Upgrades","owner":"ONCOR","owner_project":"M5281 M5144 M5146 M5148","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-14","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":0,"from":"Dunham Switch","to":"Dunham Switch","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 1","rpg":"22RPG003","rpg_completed":"2022-03-15","bod_reviewed":"2022-08-15","comments":null,"description":"Dunham 345 kV Switch and Ramhorn 345 kV Switch","puct_project_possible":"mcpr:oncor-electric-delivery:0pt49068"},{"id":"ercot-tpit:62448","ercot_project":"62448","title":"Rebuild Marlin 69 kV Switch","owner":"ONCOR","owner_project":"R1752","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-01","cm_new":0,"cm_rebuilt":0,"from":"Marlin","to":"Marlin","county_from":"Falls","county_to":"Falls","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Marlin 69 kV Switch"},{"id":"ercot-tpit:72958","ercot_project":"72958","title":"Graham to Graham Switch 69 kV Line Rebuild","owner":"ONCOR","owner_project":"M3001","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":2.6,"from":"Graham","to":"Graham","county_from":"Young","county_to":"Young","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Graham to Graham Switch 69 kV Line Rebuild","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:77174","ercot_project":"77174","title":"Rebuild Old Lake Sw - Ringgold Magnolia 69 kV line","owner":"ONCOR","owner_project":"M3508","kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-15","cm_new":0,"cm_rebuilt":13,"from":"Old Lake Switch","to":"Ringgold Magnolia","county_from":"Clay","county_to":"Montague","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Old Lake Sw - Ringgold Magnolia 69 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:87758","ercot_project":"87758","title":"Badger 345 kV Switch","owner":"ONCOR","owner_project":"R6317","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-05","cm_new":0,"cm_rebuilt":0,"from":"Badger","to":"Badger","county_from":"Milam","county_to":"Milam","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Badger 345 kV Switch for Sypert Branch Solar"},{"id":"ercot-tpit:87830","ercot_project":"87830","title":"Blue Mountain 138 kV Capactior Bank","owner":"ONCOR","owner_project":"R8799","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-11-15","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Loving","county_to":"Loving","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add 138 kV Capacitor Bank at Blue Mountain Switch"},{"id":"ercot-tpit:90899","ercot_project":"90899","title":"Establish Woodbury 138 kV Switch","owner":"ONCOR","owner_project":"R6251","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-05","cm_new":0,"cm_rebuilt":0,"from":"Woodbury","to":"Woodbury","county_from":"Hill","county_to":"Hill","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Woodbury 138 kV Switch for Three W Solar"},{"id":"ercot-tpit:62666B","ercot_project":"62666B","title":"Upgrade and convert McGregor - Waco West Line","owner":"ONCOR","owner_project":"R6172","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":0,"from":"McGregor Phillips","to":"Waco West","county_from":"McLennan","county_to":"McLennan","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"McGregor Phillips - Waco West 138 kV Operation"},{"id":"ercot-tpit:81060","ercot_project":"81060","title":"Riverton-Border-Quarry Field 138 kV Second Circuit","owner":"ONCOR","owner_project":"R8733","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-01","cm_new":29.7,"cm_rebuilt":0,"from":"Riverton","to":"Quarry Field","county_from":"Reeves","county_to":"Loving","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Permian Basin Reliability Plan Upgrade ID L1A and L1D Riverton-Border-Quarry Field 138 kV Second Circuit","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/1006279947","name":"Riverton Switching Station","coordinates":[-103.86083,31.80691]},{"osm_id":"osm:way/1006404970","name":"Quarry Field Switching Station","coordinates":[-103.6387,31.78297]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/21193114","layer":"lines-138"},{"osm_id":"osm:way/1006401466","layer":"lines-138"},{"osm_id":"osm:way/1006401472","layer":"lines-138"},{"osm_id":"osm:way/1006401471","layer":"lines-138"},{"osm_id":"osm:way/1006401376","layer":"lines-138"},{"osm_id":"osm:way/1006401374","layer":"lines-138"},{"osm_id":"osm:way/1006401377","layer":"lines-138"},{"osm_id":"osm:way/21195531","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":12.8,"straight_mi":13.1},{"id":"ercot-tpit:100459","ercot_project":"100459","title":"Establish Token 138 kV POD","owner":"ONCOR","owner_project":"M3040","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-15","cm_new":0,"cm_rebuilt":0,"from":"Token 138 kV","to":null,"county_from":"Collin","county_to":"Collin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:82810B","ercot_project":"82810B","title":"Olympus 138 kV Switch","owner":"ONCOR","owner_project":"R6330","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-05-08","cm_new":0,"cm_rebuilt":0,"from":"Olympus Switch","to":"Kerens","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Topology Correction: Add missing Olympus Switch - Kerens 138 kV Line Section"},{"id":"ercot-tpit:76135","ercot_project":"76135","title":"Hackberry Switch – DFW D-East 2 138 kV DCKT Line Section","owner":"ONCOR","owner_project":"M4347 M4357","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":12.2,"from":"Dallas","to":"Dallas","county_from":"Dallas","county_to":"Dallas","tier":"Tier 3","rpg":"23RPG020","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Hackberry Switch – DFW D-East 2 138 kV DCKT Line Section","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:78363","ercot_project":"78363","title":"Gunter 345/138 kV Switch","owner":"ONCOR","owner_project":"M3301","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2026-03-31","cm_new":0,"cm_rebuilt":0,"from":"Gunter","to":null,"county_from":"Collin","county_to":null,"tier":"Tier 3","rpg":"24RPG025","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Gunter 345/138 kV Switch"},{"id":"ercot-tpit:80546A","ercot_project":"80546A","title":"Upgrade the Hutto & Round Rock - Salado 138 kV Line","owner":"ONCOR","owner_project":"R6203, R6202","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2026-01-06","cm_new":0,"cm_rebuilt":8.8,"from":"Hutto Switch","to":"Round Rock Switch","county_from":"Williamson","county_to":"Williamson","tier":"Tier 3","rpg":"24RPG018, 25RPG006","rpg_completed":"2025-03-17","bod_reviewed":null,"comments":null,"description":"Increase the maximum operating temperature of the Hutto - Round Rock 138 kV Line and rebuild the Round Rock Westinghouse Tap - Round Rock Westinghouse 138 kV Line Section","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174024844","name":"Hutto Switching Station","coordinates":[-97.56134,30.55117]},{"osm_id":"osm:way/339132897","name":"Round Rock Substation","coordinates":[-97.70216,30.5212]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/339132896","layer":"lines-138"},{"osm_id":"osm:way/509602455","layer":"lines-138"},{"osm_id":"osm:way/509602456","layer":"lines-138"},{"osm_id":"osm:way/690519359","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":8.3,"straight_mi":8.6},{"id":"ercot-tpit:81389","ercot_project":"81389","title":"Sandhills Tap - Wolf 138 kV Line Rebuild","owner":"ONCOR","owner_project":"R8528","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-15","cm_new":0,"cm_rebuilt":14.2,"from":"Odessa EHV","to":"Wolf","county_from":"Ector","county_to":"Ward","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Sandhills Tap - Wolf 138 kV Line Rebuild","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/6709972","name":"Odessa EHV Substation","coordinates":[-102.32794,31.83513]},{"osm_id":"osm:way/1006561811","name":"Wolf Switching Station","coordinates":[-102.9328,31.6018]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 40.9 mi but ERCOT reports 14.2 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:66289B","ercot_project":"66289B","title":"Tyler to Athens 138 kV line Conversion","owner":"ONCOR","owner_project":"R6094","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-15","cm_new":0,"cm_rebuilt":6.5,"from":"Athens","to":"Echols","county_from":"Henderson","county_to":"Henderson","tier":"Tier 3","rpg":"22RPG015","rpg_completed":"2022-07-01","bod_reviewed":null,"comments":null,"description":"Establish Foggle Switch, Establish Poynor POI, Echols to Athens 69 kV Line Upgrade","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:81175","ercot_project":"81175","title":"Salt Flat Road 138 kV Switch and Salt Flat Road - Barr Ranch - Reiter 138 kV Second Circuit","owner":"ONCOR","owner_project":"R8704","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-15","cm_new":44,"cm_rebuilt":4.4,"from":"Reiter","to":"Salt Flat Road","county_from":"Ector","county_to":"Midland","tier":"Tier 3","rpg":"25RPG007","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Salt Flat Road 138 kV Switch and Salt Flat Road - Barr Ranch - Reiter 138 kV Second Circuit & De-energize auto at Odessa EHV","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:72009","ercot_project":"72009","title":"Cattleman 345/138 kV Switch","owner":"ONCOR","owner_project":"R8647","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-11-15","cm_new":0,"cm_rebuilt":0,"from":"Cattleman","to":"Cattleman","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 345/138 kV Switch to replace existing Morgan Creek Switch"},{"id":"ercot-tpit:70900C","ercot_project":"70900C","title":"Roanoke Area Upgrades","owner":"ONCOR","owner_project":"M5281 M5144 M5146 M5148","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-15","cm_new":3.4,"cm_rebuilt":0,"from":"Exchange Switch","to":"Kingsridge Switch","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 1","rpg":"22RPG003","rpg_completed":"2022-03-15","bod_reviewed":"2022-08-15","comments":null,"description":"Establish Exchange - Kingsridge 138 kV Double-Circuit Line","puct_project_possible":"mcpr:oncor-electric-delivery:0pt49068","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:5475","ercot_project":"5475","title":"Lufkin Switch - Redland Switch 345 kV Line","owner":"ONCOR","owner_project":"R6077","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-12-15","cm_new":8.1,"cm_rebuilt":0,"from":"Lufkin Switch","to":"Redland Switch","county_from":"Angelina","county_to":"Angelina","tier":"Tier 2","rpg":"20RPG019","rpg_completed":"2022-04-01","bod_reviewed":null,"comments":null,"description":"Construct a new 345 kV Line from Lufkin Switch to Redland Switch","puct_project":"mcpr:oncor-electric-delivery:0pt50023","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:72596C","ercot_project":"72596C","title":"PEC_MarshallFord_Paleface_StormHardening","owner":"PEC/LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-15","actual_isd":"2025-11-01","cm_new":0,"cm_rebuilt":11.5,"from":"Paleface","to":"Marshall Ford","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"1/10/2023: Changes to description based on final design.","description":"Upgrade to terminal equipment and update to final circuit rating. Terminal end equipment update to be completed Fall 2024 based on original project schedule. (Replaces ERCOT Project # 61274C)","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:87477","ercot_project":"87477","owner":"RCEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-16","actual_isd":"2025-04-01","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:76690","ercot_project":"76690","title":"Add Atchison POD","owner":"ONCOR","owner_project":"R8698 R8726","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-16","actual_isd":"2025-12-16","cm_new":7,"cm_rebuilt":0,"from":"Border Switch","to":"Atchison","county_from":"Loving","county_to":"Loving","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add Atchison POD","puct_project":"mcpr:oncor-electric-delivery:0pt52237","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:68183","ercot_project":"68183","title":"Estes to Putnam: Rebuild 138 kV line","owner":"AEP TNC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-16","actual_isd":"2025-12-16","cm_new":0,"cm_rebuilt":15,"from":"Estes","to":"Putnam","county_from":"Callahan","county_to":"Callahan","tier":"Tier 4","rpg":null,"rpg_completed":"2022-03-01","bod_reviewed":"2022-03-01","comments":"IN-SERVICE","description":"Rehab the Abilene South to Putnam 138 kV line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/516467558","name":"Estes Station","coordinates":[-99.52564,32.36587]},{"osm_id":"osm:way/518641237","name":"Putnam Switching Station","coordinates":[-99.19403,32.38369]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/518641239","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":23.1,"straight_mi":null},{"id":"ercot-tpit:99187","ercot_project":"99187","title":"This involves moving Harmony to a different bus/bay at Hill Country to alleviate the loading on HC auto 3 & 4.","owner":"CPS/NO","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-18","actual_isd":"2025-12-18","cm_new":0,"cm_rebuilt":0,"from":"5195","to":"5210","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Move Harmony - Hill Country from Auto 3&4 to Hill Country Auto 1&2. This involves moving Harmony to a different bus/bay at Hill Country to alleviate the loading on HC auto 3 & 4."},{"id":"ercot-tpit:44946","ercot_project":"44946","title":"CPSE_New_Scenic_Loop_138kV_Load_Serving_Station","owner":"CPS/NO","owner_project":"T-0275","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-18","actual_isd":"2025-12-18","cm_new":9,"cm_rebuilt":0,"from":"5363","to":"7665, 5358","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"The new Scenic Loop 138 kV load serving station will be looped into existing Ranchtown to LCRA (Menger Creek) 138 kV transmission line. The substation should be located south west of the existing Fair Oaks Ranch and north east of the existi","terminal_match":{"from":"unnamed","to":"multi_or_missing"}},{"id":"ercot-tpit:81270","ercot_project":"81270","title":"Construct the new Prong Moss 345 kV switch","owner":"ONCOR","owner_project":"R3025","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-30","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":0,"from":"Prong Moss","to":"Prong Moss","county_from":"Howard","county_to":"Howard","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 345 kV switch"},{"id":"ercot-tpit:70665C","ercot_project":"70665C","title":"Danek (DNK) CEHE Substation for Remy Jade - 23INR0339","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-31","actual_isd":"2026-01-12","cm_new":0,"cm_rebuilt":0,"from":"PSARCO","to":"BIGVUE","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.03A PSARCO to BIGVUE to increase thermal limits. Transmission portion of upgrade."},{"id":"ercot-tpit:73123","ercot_project":"73123","title":"Sim Gideon - Swiftex Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-31","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":10,"from":"Sim Gideon","to":"Swiftex","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 3","rpg":"24RPG014","rpg_completed":"2024-05-23","bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T608 Sim Gideon - Swiftex 138-kV transmission line to achieve a higher operational rating.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/127247651","name":"Sim Gideon Station","coordinates":[-97.2688,30.14611]},{"osm_id":"osm:way/462642546","name":"Swiftex Substation","coordinates":[-97.31264,30.20263]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/146887273","layer":"lines-138"},{"osm_id":"osm:way/15099405","layer":"lines-138"},{"osm_id":"osm:way/15097718","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":8.2,"straight_mi":4.7},{"id":"ercot-tpit:72040A","ercot_project":"72040A","title":"Blueridge to WA Parish Ckt.02A Upgrades (22RPG041)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-31","actual_isd":"2025-01-29","cm_new":0,"cm_rebuilt":6.14,"from":"DEWALT","to":"Sienna","county_from":"Harris","county_to":"Fort Bend","tier":"Tier 4","rpg":"22RPG041","rpg_completed":"2022-12-15","bod_reviewed":"2022-12-15","comments":null,"description":"Upgrade portions of Ckt.02A Quail Valley tap to WA Parish and Ckt.02A DEWALT to Sienna tap as a Hardening upgrade.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:100667","ercot_project":"100667","title":"Oncor_MNE_100667_Cloud 138 kV POD","owner":"ONCOR","owner_project":"M3309","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2025-12-31","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":0,"from":"Cloud 138 kV POD","to":null,"county_from":"Collin","county_to":"Collin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Cloud 138 kV POD"},{"id":"ercot-tpit:90784","ercot_project":"90784","title":"Reconductor portions of Ckt.63C Moody to West Galveston as a Hardening project.","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-31","actual_isd":"2025-10-31","cm_new":0,"cm_rebuilt":2.78,"from":"Moody","to":"West Galveston","county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":"24RPG037","rpg_completed":"2025-01-02","bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/337225055","name":"Moody Substation","coordinates":[-94.85341,29.26063]},{"osm_id":"osm:way/336628613","name":"West Galveston Substation","coordinates":[-94.82685,29.29624]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/337225053","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":4,"straight_mi":null},{"id":"ercot-tpit:99397","ercot_project":"99397","title":"Buffalo Creek BESS (26INR0405) at Cedar Creek 345kV CEHE Substation","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2025-12-31","actual_isd":"2025-12-20","cm_new":0,"cm_rebuilt":0,"from":"Cedar Creek","to":"Buffalo Creek","county_from":"Wharton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect new generation facility for Buffalo Creek BESS (26INR0405) at Cedar Creek 345kV CEHE Substation. Utilize existing generator lead. Remove existing generator lead conductor and install new bundled 959ACSS conductor."},{"id":"ercot-tpit:72647","ercot_project":"72647","title":"Add_Blue_Ridge_Load","owner":"RCEC","owner_project":null,"kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-01","actual_isd":"2025-08-01","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Collin","county_to":"Collin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Tapping the Blueridge substation and Climax Switching Station, and adding Blue Ridge load."},{"id":"ercot-tpit:64063","ercot_project":"64063","title":"BRP Antlia BESS Interconnection","owner":"AEP TCC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-08","actual_isd":"2025-01-31","cm_new":0,"cm_rebuilt":0,"from":"Maxwell","to":"Antlia","county_from":"Val Verde","county_to":"Val Verde","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Connect BRP Antlia BESS to the Maxwell 138 kV station"},{"id":"ercot-tpit:50845","ercot_project":"50845","title":"Kinnison: Expand 138 kV station","owner":"AEP TNC","owner_project":"2797","kv":138,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2026-01-08","actual_isd":"2025-07-22","cm_new":0,"cm_rebuilt":0,"from":"Kinnison","to":null,"county_from":"Crane","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":"2019-07-22","bod_reviewed":null,"comments":"IN-SERVICE","description":"Build Heron 138 kV station with a 138/69 kV auto, expand the Kinnison 138 kV station, expand the Sage 69 kV station, rebuild Heron to Ollin and convert to a 138 kV line, and rebuild Kinnison to Sage 69 kV line"},{"id":"ercot-tpit:73408","ercot_project":"73408","title":"Odysseus: Build new 345 kV station","owner":"AEP TNC","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-08","actual_isd":"2025-12-31","cm_new":0,"cm_rebuilt":0,"from":"Odysseus","to":null,"county_from":"Coke","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Ulysses Solar to the Odysseus 345 kV Station on the Bluff Creek to SA Red Creek 345 kV line"},{"id":"ercot-tpit:72935","ercot_project":"72935","title":"Saragosa: Install 2nd Bay","owner":"AEP TNC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-08","actual_isd":"2025-05-30","cm_new":0,"cm_rebuilt":0,"from":"Saragosa","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Install 2nd Bay at Saragosa Substation"},{"id":"ercot-tpit:51012","ercot_project":"51012","title":"Kinnison to Sage: Rebuild 69 kV line","owner":"AEP TNC","owner_project":"2823","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-08","actual_isd":"2025-11-15","cm_new":0,"cm_rebuilt":0.25,"from":"Kinnison","to":"Sage","county_from":"Crane","county_to":"Crane","tier":"Tier 3","rpg":null,"rpg_completed":"2019-07-17","bod_reviewed":null,"comments":"IN-SERVICE","description":"Build Heron 138 kV station with a 138/69 kV auto, expand the Kinnison 138 kV station, expand the Sage 69 kV station, rebuild Heron to Ollin and convert to a 138 kV line, and rebuild Kinnison to Sage 69 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:45174","ercot_project":"45174","title":"Ollin to LCRA Crane: Partial Build, Partial Rebuild, and Conversion","owner":"AEP TNC","owner_project":"2767","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-08","actual_isd":"2025-12-05","cm_new":0.52,"cm_rebuilt":0,"from":"Ollin","to":"LCRA Crane","county_from":"Crane","county_to":"Crane","tier":"Tier 4","rpg":"19RPG013","rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Build new Ollin 138 kV station; partial build, rebuild, and conversion to 138 kV of Ollin to LCRA Crane; and rebuild McElroy to Sage","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:76151","ercot_project":"76151","title":"Gas Pad Tap: Replace CTVT","owner":"AEP TNC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-09","actual_isd":"2025-05-02","cm_new":0,"cm_rebuilt":0,"from":"Gas Pad Tap","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Replace CTVT combination unit at Gas Pad station along the Lote Bush to Yucca Drive 138 kV line"},{"id":"ercot-tpit:68252","ercot_project":"68252","title":"Lobo: Line settings","owner":"ETT","owner_project":null,"kv":345,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2026-01-09","actual_isd":"2025-04-14","cm_new":0,"cm_rebuilt":0,"from":"Lobo","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Guajillo to the Lobo 345 kV station"},{"id":"ercot-tpit:70779","ercot_project":"70779","title":"Tortuga: Install Cap Bank","owner":"AEP TCC","owner_project":"TP2022188","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-09","actual_isd":"2025-05-16","cm_new":0,"cm_rebuilt":0,"from":"Tortuga","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Install a 23.0 MVAR capacitor bank at the Tortuga 138 kV station"},{"id":"ercot-tpit:76214","ercot_project":"76214","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","owner_project":"TP2019168","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-09","actual_isd":"2025-11-24","cm_new":0,"cm_rebuilt":0,"from":"North Edinburg","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Reconfigure North Edinburg 345 kV station: 2nd reactor"},{"id":"ercot-tpit:50868","ercot_project":"50868","title":"Rosata - Structure 31/8: Line Rebuild","owner":"AEP TCC","owner_project":"3780","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-09","actual_isd":"2025-05-15","cm_new":0,"cm_rebuilt":15.5,"from":"Rosata","to":"Kenedy SS","county_from":"Goliad","county_to":"Karnes","tier":"Tier 3","rpg":"20RPG014","rpg_completed":"2020-09-11","bod_reviewed":null,"comments":"IN-SERVICE","description":"Coleto Creek - Kenedy SS: Line Rebuild","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:90004","ercot_project":"90004","title":"Juncus: Construct New 69 kV Temporary Tap","owner":"AEP TNC","owner_project":"TP2023074","kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-10","actual_isd":"2025-04-03","cm_new":0,"cm_rebuilt":0,"from":"Juncus","to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect the TEC Snodgrass load to the new Juncus 69 kV temporary tap on the Abilene South to Steamboat 69 kV line"},{"id":"ercot-tpit:4645","ercot_project":"4645","title":"Rebuild of Myra to Spring","owner":"BEPC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-12","actual_isd":"2025-08-01","cm_new":0,"cm_rebuilt":13.9,"from":"Myra","to":"Spring","county_from":"Cooke","county_to":"Cooke","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild of Myra to Spring","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:71879","ercot_project":"71879","title":"Upgrade Metering CT","owner":"CPS/NO","owner_project":"S-0939b","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-22","actual_isd":"2026-01-22","cm_new":0,"cm_rebuilt":0,"from":"5133","to":"5371","county_from":"Guadalupe","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrading the Metering CT for Elm Creek to Skyline Circuit 2. This upgrade will result in a rating increase for this transmission line."},{"id":"ercot-tpit:80508","ercot_project":"80508","title":"Kilby: Construct New 345 kV Station","owner":"ETT","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-27","actual_isd":"2026-01-27","cm_new":0,"cm_rebuilt":0,"from":"Kilby","to":null,"county_from":"Haskell","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Quantum Solar to the new Kilby 345 kV station on the Clear Crossing to Pendulo 345 kV line"},{"id":"ercot-tpit:76350","ercot_project":"76350","title":"Install new TARGA 138kV customer substation as Ckt.86 Jordan to TARGA to CITIES.","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-30","actual_isd":"2026-01-09","cm_new":0,"cm_rebuilt":0,"from":"TARGA","to":"Jordan/CITIES","county_from":"Chambers","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new TARGA 138kV customer substation as Ckt.86 Jordan to TARGA to CITIES."},{"id":"ercot-tpit:69463","ercot_project":"69463","title":"Gulch: Construct new 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-30","actual_isd":"2025-12-31","cm_new":0.1,"cm_rebuilt":0,"from":"Gulch","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Arroyo Solar to the new Gulch 345 kV station on the La Palma to Rio Hondo 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:76194","ercot_project":"76194","title":"Angstrom: Construct New 345 kV Terminal","owner":"AEP TCC","owner_project":"TP2023132","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-30","actual_isd":"2026-01-30","cm_new":0,"cm_rebuilt":0,"from":"Angstrom","to":null,"county_from":"San Patricio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Pintail Pass BESS to the Angstrom 345 kV station"},{"id":"ercot-tpit:72063","ercot_project":"72063","title":"Moody to Stewart Ckt.63 Upgrades P1041","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-31","actual_isd":"2025-10-31","cm_new":0,"cm_rebuilt":3.97,"from":"Stewart","to":"West Galveston","county_from":"Galveston","county_to":"Galveston","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor portions of Ckt.63 Stewart to West Galveston as a Hardening project","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/337244621","name":"Stewart Substation","coordinates":[-94.91068,29.22779]},{"osm_id":"osm:way/336628613","name":"West Galveston Substation","coordinates":[-94.82685,29.29624]}],"endpoint_method":"name + voltage + county","link_note":"mapped connection is 8.4 mi but ERCOT reports 3.97 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:66200D","ercot_project":"66200D","title":"Upgrade Taylor - Holland 69 kV Line","owner":"ONCOR","owner_project":"R6173","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-31","actual_isd":"2026-01-16","cm_new":0,"cm_rebuilt":5.9,"from":"Taylor","to":"Holland","county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":"22RPG036","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the Granger - Taylor 69 kV Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:80572","ercot_project":"80572","title":"Miel: Construct New 138 kV Station","owner":"ETT","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-31","actual_isd":"2026-01-13","cm_new":0,"cm_rebuilt":0,"from":"Miel","to":null,"county_from":"Uvalde","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Nightfall Solar to the new Miel 138 kV station on the Razorback to Uvalde 138 kV line"},{"id":"ercot-tpit:72040B","ercot_project":"72040B","title":"Blueridge to WA Parish Ckt.02A Upgrades (22RPG041)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-01-31","actual_isd":"2025-12-15","cm_new":0,"cm_rebuilt":2.94,"from":"Blueridge","to":"DEWALT","county_from":"Harris","county_to":"Fort Bend","tier":"Tier 4","rpg":"22RPG041","rpg_completed":"2022-12-15","bod_reviewed":"2022-12-15","comments":null,"description":"Upgrade portions of Ckt.02A Blueridge tap to DEWALT (P1048-3) as a Hardening upgrade.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:relation/14672812","name":"Blueridge Substation","coordinates":[-95.49672,29.62858]},{"osm_id":"osm:way/230199859","name":"Dewalt Substation","coordinates":[-95.5637,29.60452]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/293342153","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":4.4,"straight_mi":null},{"id":"ercot-tpit:87905","ercot_project":"87905","title":"Hartring – Upland 138 kV Double Circuit Line","owner":"ONCOR","owner_project":"R8713","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-01-31","actual_isd":"2025-12-10","cm_new":18,"cm_rebuilt":0,"from":"Ringo","to":"LCRA Benedum","county_from":"Upton","county_to":"Reagan","tier":"Tier 2","rpg":"24RPG024","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new Hartring – Upland 138 kV Double Circuit Line","puct_project":"mcpr:oncor-electric-delivery:0pt54649","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:68150","ercot_project":"68150","title":"Abilene South to Estes: Rebuild 138 kV Line","owner":"AEP TNC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-02-28","actual_isd":"2025-12-18","cm_new":0,"cm_rebuilt":18.3,"from":"Abilene South","to":"Estes","county_from":"Taylor","county_to":"Callahan","tier":"Tier 4","rpg":null,"rpg_completed":"2022-03-01","bod_reviewed":"2022-03-01","comments":"IN-SERVICE","description":"Rehab Abilene South to structure 33/7","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/491192993","name":"Abilene South Substation","coordinates":[-99.75122,32.35902]},{"osm_id":"osm:way/516467558","name":"Estes Station","coordinates":[-99.52564,32.36587]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/491192988","layer":"lines-138"},{"osm_id":"osm:way/20742594","layer":"lines-138"},{"osm_id":"osm:way/137024667","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":13.2,"straight_mi":13.2},{"id":"ercot-tpit:87344","ercot_project":"87344","title":"Addicks 345kV to White oak Ckt.71B Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-02-28","actual_isd":"2026-01-25","cm_new":0,"cm_rebuilt":0,"from":"Addicks","to":"White Oak","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.71B Addicks to White Oak to increase thermal limits"},{"id":"ercot-tpit:71926","ercot_project":"71926","title":"Upgrade BURNS to Heidelberg line","owner":"STEC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-03-01","actual_isd":"2026-04-02","cm_new":0,"cm_rebuilt":10,"from":"Burns","to":"Heidelberg","county_from":"Cameron","county_to":"Hidalgo","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade BURNS to Heidelberg line to be 478MVA capable","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/120600269","name":"Burns Substation","coordinates":[-97.73433,26.2191]},{"osm_id":"osm:way/513282682","name":"Heidelberg Substation","coordinates":[-97.88759,26.22847]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/513282673","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":10,"straight_mi":null},{"id":"ercot-tpit:80384","ercot_project":"80384","owner":"BRYN","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-03-01","actual_isd":"2026-03-13","cm_new":0,"cm_rebuilt":12.9,"from":"Gibbons Creek","to":"Greens Pairie","county_from":"Grimes","county_to":"Brazos","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor Gibbons Creek to Greens Prairie Line","terminal_match":{"from":"ambiguous","to":"not_in_osm"}},{"id":"ercot-tpit:78357","ercot_project":"78357","title":"Wilmer 345/138 kV Switch","owner":"ONCOR","owner_project":"M4369 M4371 M4372","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-03-02","actual_isd":"2026-06-30","cm_new":6,"cm_rebuilt":0,"from":"Wilmer","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 1","rpg":"24RPG022","rpg_completed":"2024-07-29","bod_reviewed":null,"comments":null,"description":"Establish Wilmer 345/138 kV Switch","puct_project":"mcpr:oncor-electric-delivery:0pt54656","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:66473","ercot_project":"66473","title":"Mesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4137","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-03-15","actual_isd":"2026-05-31","cm_new":0,"cm_rebuilt":17.5,"from":"Mesquite East","to":"Oates","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the Mesquite East Switch-Oates (GP&L)/Prairie Creek Switch 138 kV Double-Circuit Line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:66188","ercot_project":"66188","title":"Cedar Crest - Dealey - West Levee 138 kV Line","owner":"ONCOR","owner_project":"M4212","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-03-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":4.7,"from":"Ceadr Crest","to":"West Levee","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the existing 138 kV Line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:61404","ercot_project":"61404","title":"Boerne Split-Welfare Transmission Line Upgrade","owner":"LCRATSC","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-03-15","actual_isd":"2026-03-15","cm_new":0,"cm_rebuilt":7.3,"from":"Boerne, Bergheim","to":"Welfare, Kendall","county_from":"Kendall","county_to":"Kendall","tier":"Tier 3","rpg":"22RPG005","rpg_completed":"2022-09-09","bod_reviewed":null,"comments":null,"description":"This project will Increase the reliability of transmission facilities on the T228 Boerne to Welfare 138-kV and T656 Bergheim to Kendall 345-kV 7.3-mile double-circuit transmission line by replacing the aging conductor.","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:87395","ercot_project":"87395","title":"Caldwell Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-03-16","actual_isd":"2026-03-11","cm_new":0,"cm_rebuilt":0,"from":"Caldwell","to":"Caldwell","county_from":"Burleson","county_to":"Burleson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will build a new substation, Caldwell Substation, to manage 12 MW of load in the summer of 2024. This substation will be on the Cooks Point - Lyle Wolz 138-kV transmission line. The new substation will be approximately 5 miles sout"},{"id":"ercot-tpit:87031","ercot_project":"87031","title":"Primavera: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":"TP2024100","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-03-19","actual_isd":"2029-03-19","cm_new":0,"cm_rebuilt":0,"from":"Primavera","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE / Dollars Update","description":"Interconnect Project Lynx Storage to the Primavera 138 kV station"},{"id":"ercot-tpit:99453C","ercot_project":"99453C","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-03-30","actual_isd":"2026-03-03","cm_new":0,"cm_rebuilt":0,"from":"STP","to":"Old Hickory","county_from":"Guadalupe","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.27 STP to Old Hickory (Elm Creek) to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:81274","ercot_project":"81274","title":"Ranger Camp – Cattleman 345 kV Double-Circuit Line","owner":"ONCOR","owner_project":"R8648","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-03-30","actual_isd":"2026-06-01","cm_new":6.8,"cm_rebuilt":0,"from":"Ranger Camp","to":"Cattleman","county_from":"Mitchell","county_to":"Mitchell","tier":"Tier 1","rpg":"23RPG029","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 345 kV double-circuit line from Ranger Camp to Cattleman","puct_project":"mcpr:oncor-electric-delivery:0pt54632","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:65683","ercot_project":"65683","title":"To add Open Sky Station","owner":"LST","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-03-31","actual_isd":"2026-03-23","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"To interconnect GINR 20INR0241"},{"id":"ercot-tpit:90157","ercot_project":"90157","title":"NRG THW GT at TH Wharton 345kV (24INR0482)","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-03-31","actual_isd":"2026-04-03","cm_new":0,"cm_rebuilt":0,"from":"TH Wharton","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install NRG THW GT at TH Wharton 345kV substation. Connect at the same generator lead as 05THWGEN"},{"id":"ercot-tpit:86015","ercot_project":"86015","title":"King Substation - Add 3rd Distribution Transformer","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-03-31","actual_isd":"2026-03-06","cm_new":0,"cm_rebuilt":0,"from":"King","to":"Newport/Jonte","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install the third King distribution transformer. Tap on Ckt.86E to create new Ckt.86E Newport to King tap to Jonte. Updated for 26SSWG base case"},{"id":"ercot-tpit:70880","ercot_project":"70880","title":"Rebuild Carancahua -TinTop","owner":"STEC","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-04-01","actual_isd":"2026-03-13","cm_new":0,"cm_rebuilt":12.93,"from":"Carancahua","to":"Tin Top","county_from":"Matagorda","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Carancahua to TinTop with 795ACSR","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/515869190","name":"Carancahua Substation","coordinates":[-96.31349,28.75761]},{"osm_id":"osm:way/515869187","name":"Tin Top Substation","coordinates":[-96.12542,28.77241]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/515869189","layer":"lines-69"},{"osm_id":"osm:way/515869215","layer":"lines-69"},{"osm_id":"osm:way/515869210","layer":"lines-69"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":12.7,"straight_mi":11.4},{"id":"ercot-tpit:104658A","ercot_project":"104658A","title":"Establish Pathfinder 345 kV Switch","owner":"ONCOR","owner_project":"R6364","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-04-07","actual_isd":"2026-05-14","cm_new":0,"cm_rebuilt":0,"from":"Pathfinder","to":"Pathfinder","county_from":"Freestone","county_to":"Freestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Pathfinder 345 kV Switch"},{"id":"ercot-tpit:70186","ercot_project":"70186","title":"Buchanan CTEC - Kingsland 1 Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-04-07","actual_isd":"2026-04-07","cm_new":0,"cm_rebuilt":6.2,"from":"Buchanan CTEC","to":"Kingsland 1","county_from":"Llano","county_to":"Llano","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will perform an overhaul on the 6.2-mile Buchanan to Kingsland 2 to Kingsland 1 (T291) 69-kV transmission line.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:91911","ercot_project":"91911","title":"Establish Gristmill 345 kV Switch","owner":"ONCOR","owner_project":"R6232","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-04-16","actual_isd":"2026-06-01","cm_new":0,"cm_rebuilt":0,"from":"Gristmill","to":"Gristmill","county_from":"Milam","county_to":"Milam","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Gristmill 345 kV Switch for Yaupon Solar and Storage"},{"id":"ercot-tpit:99744","ercot_project":"99744","title":"Laredo VFT North: 138 kV Breaker Addition","owner":"ETT","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-04-30","actual_isd":"2026-04-30","cm_new":0,"cm_rebuilt":0,"from":"Laredo VFT North","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Install additional 138 kV breaker on the Lobo circuit #1 138 kV terminal at the Laredo VFT North 138 kV station"},{"id":"ercot-tpit:99904","ercot_project":"99904","title":"Install a new 138kV transmission line approximately .1 miles long to connect the generator’s interconnection facilities to Leon Creek Switchyard.","owner":"CPS/NO","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-01","actual_isd":"2026-01-20","cm_new":0.13,"cm_rebuilt":0,"from":"5260","to":"171073","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:91847A","ercot_project":"91847A","title":"Hornsby Load Power Transformer Addition","owner":"LCRATSC","owner_project":"PLC-8186","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-08","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"Honrsby","to":null,"county_from":"Travis","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:89986","ercot_project":"89986","title":"Mule Deer 345 kV Switch","owner":"ONCOR","owner_project":"R3031","kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-14","actual_isd":"2026-06-30","cm_new":0,"cm_rebuilt":0,"from":"Windmill","to":"Wallaby","county_from":"Deaf Smith","county_to":"Deaf Smith","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Mule Deer 345 kV Switch"},{"id":"ercot-tpit:99185","ercot_project":"99185","title":"This involves moving Potranco to a different bus/bay at Cagnon to alleviate the loading on Cagnon auto 3 & 4.","owner":"CPS/NO","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-04-23","cm_new":0,"cm_rebuilt":0,"from":"5346","to":"5055","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Move Potranco - Cagnon from Auto 3 & 4 to Cagnon Auto 1 & 2. This involves moving Potranco to a different bus/bay at Cagnon to alleviate the loading on Cagnon auto 3 & 4."},{"id":"ercot-tpit:70196","ercot_project":"70196","title":"Kingsland 1 - Sandy Creek Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-04-07","cm_new":0,"cm_rebuilt":7.3,"from":"Kingsland 1","to":"Sandy Creek","county_from":"Llano","county_to":"Llano","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will perform an overhaul on the 7.3-mile Kingsland 1 ¿ Sandy Creek (T400) 69-kV transmission line.","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/504555563","name":"Kingsland 1 Substation","coordinates":[-98.45185,30.65335]},{"osm_id":"osm:way/192744655","name":"Sandy Creek Substation","coordinates":[-98.47752,30.56915]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/504555729","layer":"lines-69"},{"osm_id":"osm:way/504555759","layer":"lines-69"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium","mapped_mi":7.3,"straight_mi":6},{"id":"ercot-tpit:70534","ercot_project":"70534","title":"Hueco Springs Substation Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-08","cm_new":0,"cm_rebuilt":0,"from":"Henne","to":"Comal","county_from":"Comal","county_to":"Comal","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"NBU is constructing a new 138-kV substation to serve a new residential development. LCRA TSC will provide transmission service to the new load serving substation on the T235 Henne to Comal."},{"id":"ercot-tpit:78408","ercot_project":"78408","title":"Henne Substation Bus Upgrade","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-10","cm_new":0,"cm_rebuilt":0,"from":"Henne","to":"Henne","county_from":"Comal","county_to":"Comal","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC intends to build a new 138 kV line from Henne to Kohlenberg and accommodate this line at Henne. Henne substation will be converted to a breaker and half configuration to improve reliability and support the project."},{"id":"ercot-tpit:73106","ercot_project":"73106","title":"Lockhart - San Marcos Transmission Line Conversion","owner":"LCRATSC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-13","cm_new":0,"cm_rebuilt":0,"from":"Lockhart","to":"San Marcos","county_from":"Caldwell","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"The five LCRA TSC-owned transmission line sections from Lockhart to San Marcos will be converted to 138-kV (T220 San Marcos to Camp Gary to Robert Brown Jr., T519 Robert Brown Jr. to Clear Fork, and T601 Clear Fork to Lockhart)."},{"id":"ercot-tpit:92561","ercot_project":"92561","title":"LCRATSC_Colton_Elroy_Transmission_Line_Overhaul","owner":"LCRATSC","owner_project":"PLC-6951","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":3.27,"from":"7208","to":"7209","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Overhaul transmission line structures per LCRA TSC standards and current NESC requirements.","terminal_match":{"from":"unnamed","to":"unnamed","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/217282853","name":"Colton Substation","coordinates":[-97.67892,30.13905]},{"osm_id":"osm:way/462642719","name":"Elroy Substation","coordinates":[-97.62434,30.14129]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","osm_matches":[{"osm_id":"osm:way/462642710","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":3.3,"straight_mi":null},{"id":"ercot-tpit:92575","ercot_project":"92575","title":"LCRATSC_Canyon_San_Marcos_Transmission_Line_Upgrade","owner":"LCRATSC","owner_project":"PLC-7656","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-04-20","cm_new":0,"cm_rebuilt":2.8,"from":"7192","to":"7200","county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"unnamed","to":"unnamed","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/364744027","name":"Kyle Substation","coordinates":[-97.88428,29.94987]},{"osm_id":"osm:way/33692087","name":"Canyon Substation","coordinates":[-97.9001,29.91153]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM"},{"id":"ercot-tpit:92598","ercot_project":"92598","title":"Bluebonnet - Wyldwood Transmission Line Overhaul","owner":"LCRATSC","owner_project":"PLC-6949","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-02-27","cm_new":0,"cm_rebuilt":2.43,"from":"7210","to":"7556","county_from":"Bastrop","county_to":"Bastrop","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Overhaul transmission line structures per LCRA TSC standards and current NESC requirements. Replace existing conductor with bundled-Suwannee.","terminal_match":{"from":"unnamed","to":"unnamed"}},{"id":"ercot-tpit:85963","ercot_project":"85963","title":"FPP Yard 2 - Lytton Springs Transmission Line Overhaul","owner":"LCRATSC","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"FPP Yard 2","to":"Lytton Springs","county_from":"Fayette","county_to":"Caldwell","tier":"Tier 4","rpg":"24RPG013","rpg_completed":"2024-05-03","bod_reviewed":null,"comments":null,"description":"LCRA TSC will overhaul FPP Yard #2 - Lytton Springs 345-kV transmission line T255 to ensure structural integrity of the circuit. Engineering will review this transmission circuit for scope including hardware/insulator integrity, structural "},{"id":"ercot-tpit:91549","ercot_project":"91549","title":"Gabriel - Split Transmission Line Upgrade","owner":"LCRATSC","owner_project":"PLC-7996","kv":138,"list":"completed","status_reported":null,"status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":"25RPG006","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will upgrade T223 Gabriel to Georgetown East & T224 Gabriel to Jarrell 138-kV double-circuit transmission line from Gabriel to Split to obtain a higher operational rating. This 1.1-mile transmission line is owned by LCRA TSC. The r"},{"id":"ercot-tpit:71130","ercot_project":"71130","title":"Centerville Switch - Lake Hubbard Switch 138 kV Double-Circuit Line","owner":"ONCOR","owner_project":"M4126","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":13.6,"from":"Lake Hubbard","to":"Centerville","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the existing 138 kV Double-Circuit Line","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/30741837","name":"Lake Hubbard Station","coordinates":[-96.5477,32.83698]},{"osm_id":"osm:way/346527373","name":"Centerville Substation","coordinates":[-96.63459,32.87083]}],"endpoint_method":"name + voltage + county"},{"id":"ercot-tpit:76652","ercot_project":"76652","title":"Line Termination at Cypress Waters","owner":"ONCOR","owner_project":"M5344","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"Cypress Waters","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Vineyard Switch – Hackberry Switch 138 kV Line Termination at Cypress Waters 138 kV Switch"},{"id":"ercot-tpit:88035","ercot_project":"88035","title":"Pastores 138 kV Switch","owner":"ONCOR","owner_project":"R8817","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"McDonald Road","to":"Catclaw/Mudstone","county_from":"Glasscock","county_to":"Glasscock","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct a new 138 kV Switch"},{"id":"ercot-tpit:91534A","ercot_project":"91534A","title":"Establish Glaze Lake 138 kV Switch","owner":"ONCOR","owner_project":"R6345","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-06-30","cm_new":19.6,"cm_rebuilt":0,"from":"Glaze Lake 138 kV Switch","to":"Glaze Lake 138 kV Switch","county_from":"Leon","county_to":"Leon","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Glaze Lake 138 kV Switch","puct_project":"mcpr:oncor-electric-delivery:0pt54652","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:92646","ercot_project":"92646","title":"Saddlewood 138 kV Switch","owner":"ONCOR","owner_project":"M3242","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"Saddlewood","to":null,"county_from":"Hunt","county_to":"Hunt","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Saddlewood 138 kV Switch"},{"id":"ercot-tpit:92680","ercot_project":"92680","title":"Stainback 345 kV Switch","owner":"ONCOR","owner_project":"M4383","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"Stainback 345 kV Switch","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Stainback 345 kV Switch"},{"id":"ercot-tpit:92845","ercot_project":"92845","title":"Watermill to Reindeer 138 kV Line","owner":"ONCOR","owner_project":"M4430","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":2.6,"from":"Watermill Switch","to":"Reindeer","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Watermill to Reindeer 138 kV Line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:92870","ercot_project":"92870","title":"Bradberry Switch 138 kV Capacitors (Skybox Lancaster)","owner":"ONCOR","owner_project":"M4431","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-07-30","cm_new":0,"cm_rebuilt":0,"from":"Bradberry Switch","to":"Bradberry Switch","county_from":"Dallas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Bradberry Switch 138 kV Capacitors (Skybox Lancaster)"},{"id":"ercot-tpit:82810C","ercot_project":"82810C","title":"Olympus 138 kV Switch","owner":"ONCOR","owner_project":"R6330","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2025-05-08","cm_new":0,"cm_rebuilt":0,"from":"Olympus","to":"Gaia","county_from":"Navarro","county_to":"Navarro","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish POI for Gaia Solar"},{"id":"ercot-tpit:76650","ercot_project":"76650","title":"Establish Walleye Creek 345/138 kV Switch","owner":"ONCOR","owner_project":"R6243","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":null,"cm_rebuilt":4.5,"from":"Walleye Creek","to":"Walleye Creek","county_from":"Milam","county_to":"Milam","tier":"Tier 3","rpg":"23RPG030","rpg_completed":"2023-10-25","bod_reviewed":null,"comments":null,"description":"Establish Walleye Creek 345/138 kV Switch","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:69552D","ercot_project":"69552D","title":"Teal 345/138 kV Switch connected to LCRA POI (Limmer)","owner":"ONCOR","owner_project":"R6165","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2025-05-30","cm_new":0,"cm_rebuilt":0,"from":"Teal","to":"Teal","county_from":"Williamson","county_to":"Williamson","tier":"Tier 3","rpg":"22RPG027","rpg_completed":"2022-09-15","bod_reviewed":null,"comments":null,"description":"Teal 345 kV Switch, Autotransformers, and 345 kV Tie Lines to Limmer (LCRA)"},{"id":"ercot-tpit:80921","ercot_project":"80921","title":"Downtown Kyle Substation Addition","owner":"PEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"DOWNTOWN KYLE 70503","to":null,"county_from":"Hays","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Models the addition of a planned substation in Kyle area."},{"id":"ercot-tpit:67093","ercot_project":"67093","title":"New 138 kV station cut-in between Garfield and Hi-Cross","owner":"AEN","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-15","actual_isd":"2026-05-14","cm_new":0.43,"cm_rebuilt":0,"from":"9143","to":"9071, 9147","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New 138 kV Easton Park Substation cut-in on CKT963 from Garfield to Hi-Cross substation to serve BBEC Load","terminal_match":{"from":"unnamed","to":"multi_or_missing","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/173298395","name":"Garfield Substation","coordinates":[-97.54535,30.14264]},{"osm_id":"osm:way/339106915","name":"Hi Cross Substation","coordinates":[-97.76911,30.1862]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","link_note":"mapped connection is 13.7 mi but ERCOT reports 0.43 circuit miles (probably partial work on a longer line); segment not linked"},{"id":"ercot-tpit:71903","ercot_project":"71903","title":"Establish Launch Pad 138 kV Switch","owner":"ONCOR","owner_project":"R6156","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-16","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"Launch Pad","to":"Launch Pad","county_from":"McLennan","county_to":"McLennan","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Launch Pad 138 kV Switch"},{"id":"ercot-tpit:80466","ercot_project":"80466","title":"Oleander: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-16","actual_isd":"2025-12-19","cm_new":0,"cm_rebuilt":0,"from":"Oleander","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect Citrus Flatts BESS to the Oleander 138 kV station"},{"id":"ercot-tpit:64581A","ercot_project":"64581A","title":"New 138kV Waterfowl substation","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-30","actual_isd":"2026-05-20","cm_new":0,"cm_rebuilt":0,"from":"COPPER","to":"Jones Creek","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"21RPG009","rpg_completed":"2021-06-16","bod_reviewed":null,"comments":null,"description":"Reconfigure existing Ckt.02F (move Seadoc/Seaway onto other circuit) resulting in Ckt.36 COPPER to Booster tap to Jones Creek."},{"id":"ercot-tpit:61552","ercot_project":"61552","title":"Matador to Turkey: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":"1873","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-30","actual_isd":"2026-05-30","cm_new":0,"cm_rebuilt":26.9,"from":"Matador","to":"Turkey","county_from":"Motley","county_to":"Hall","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Rebuild 69 kV line from Matador to Turkey","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:70898","ercot_project":"70898","title":"Flomot Tap: Rebuild 69 kV Line","owner":"AEP TNC","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-30","actual_isd":"2026-05-30","cm_new":0,"cm_rebuilt":7.06,"from":"Flomot Tap","to":"Flomot","county_from":"Motley","county_to":"Motley","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE / Dollars update","description":"Rehab Flomot Tap 69 kV Line","terminal_match":{"from":"matched","to":"matched"}},{"id":"ercot-tpit:64581B","ercot_project":"64581B","title":"New 138kV Waterfowl substation","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-30","actual_isd":"2026-05-20","cm_new":0,"cm_rebuilt":0,"from":"Jones Creek","to":"Waterfowl","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"21RPG009","rpg_completed":"2021-06-16","bod_reviewed":null,"comments":null,"description":"Install new CEHE-owned 138kV Waterfowl (WTR) substation. Reconfigure existing Ckt.02F and install new conductor to create new Ckt.54A Jones Creek to Waterfowl"},{"id":"ercot-tpit:64581C","ercot_project":"64581C","title":"New 138kV Waterfowl substation","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-30","actual_isd":"2026-05-20","cm_new":0,"cm_rebuilt":0,"from":"Jones Creek","to":"Waterfowl","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"21RPG009","rpg_completed":"2021-06-16","bod_reviewed":null,"comments":null,"description":"Install new CEHE-owned 138kV Waterfowl (WTR) substation. Convert customer-owned Seadoc substation to loop service. Reconfigure existing Ckt.02F and reconnect Seadoc/Seaway to create new Ckt.02F Jones creek to Seadoc loop to Seaway tap to Wa"},{"id":"ercot-tpit:64581D","ercot_project":"64581D","title":"New 138kV Waterfowl substation","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-30","actual_isd":"2026-05-20","cm_new":0,"cm_rebuilt":0,"from":"Waterfowl","to":"Franklins Camp","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":"21RPG009","rpg_completed":"2021-06-16","bod_reviewed":null,"comments":null,"description":"Install new CEHE-owned 138kV Waterfowl (WTR) substation. Remove existing Seaway Switchrack. Reconfigure existing Ckt.02F to create new Ckt.02L Waterfowl to Franklins Camp."},{"id":"ercot-tpit:59959","ercot_project":"59959","title":"New Hickory 345kV Switchyard","owner":"CPS/NO","owner_project":"T-0303; S-0940","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-30","actual_isd":"2026-05-16","cm_new":0,"cm_rebuilt":0,"from":"5323","to":"5133, 5915","county_from":"Jackson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Build a new New Hickory 345 switchyard to connect New Hickory Solar plant. This new Switchyard will loop into the existing Elm Creek to STP circuit 2 transmission line."},{"id":"ercot-tpit:71004A","ercot_project":"71004A","title":"Julia CEHE-Owned Sub for Melaza Solar (21INR0220)","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"Julia","to":"Hillje/Blue","county_from":"Wharton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new Julia (JUL) CEHE substation for generator interconnection to Maleza Solar. Loop Ckt.72 into Julia substation to create new Ckt.72 Hillje to Julia to Blue"},{"id":"ercot-tpit:75835D","ercot_project":"75835D","title":"Upgrade Ckt.66B Stone Lake to Tomball to increase thermal limits. Install 40 MVAR cap bank at Hockley substation and tapped on Ckt.66B Hockley to Stone Lake.","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2025-12-10","cm_new":0,"cm_rebuilt":0,"from":"Stone Lake","to":"Tomball","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG012","rpg_completed":"2023-05-26","bod_reviewed":"2023-05-26","comments":null,"description":"Upgrade equipment to increase thermal limits. Phase Two of overall approved upgrades"},{"id":"ercot-tpit:90130","ercot_project":"90130","title":"Install (2) new 100 MVA distribution transformers at Orchard substation.","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-05-13","cm_new":0,"cm_rebuilt":0,"from":"Orchard","to":"Beasly /MARICK","county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install two(2) new 100 MVA distribution transformers at Orchard substation."},{"id":"ercot-tpit:78427A","ercot_project":"78427A","title":"Bohemian (BOH) 138kV CEHE Substation for Destiny Storage (24INR0397)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-02-07","cm_new":0,"cm_rebuilt":0,"from":"Rhapsody","to":"Crosby/ Eastgate","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new CEHE 138kV Bohemian (BOH) substation for generator interconnection to Destiny Storage. Loop Ckt.66K into substation to create new Ckt.66 Crosby to Bohemian to Eastgate."},{"id":"ercot-tpit:99453L","ercot_project":"99453L","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-03-24","cm_new":0,"cm_rebuilt":0,"from":"Chambers","to":"Jordan","county_from":"Harris","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.97G Chambers to Jordan to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453V","ercot_project":"99453V","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-05-08","cm_new":0,"cm_rebuilt":0,"from":"Limestone","to":"Navarro","county_from":"Navarro","county_to":"Limestone","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.99 Limestone to Navarro to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453D","ercot_project":"99453D","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-02-16","cm_new":0,"cm_rebuilt":0,"from":"North Belt","to":"TH Wharton","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.97A North Belt to TH Wharton to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:99453A","ercot_project":"99453A","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-02-25","cm_new":0,"cm_rebuilt":0,"from":"STP","to":"Shaula","county_from":"Guadalupe","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Ckt.18 STP to Shaula (Elm Creek) to increase thermal limits as part of FRM2 upgrades."},{"id":"ercot-tpit:63922","ercot_project":"63922","title":"Tiki Island Distribution Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-05-14","cm_new":0,"cm_rebuilt":0,"from":"Tiki Island","to":"LaMarque/West Galveston","county_from":"Galveston","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install double-tap distribution service to Tiki Island. Existing tap will remain on Ckt.63E La Marque to Stewart. Tap Ckt.93C La Marque to West Galveston for the new tap section to Tiki Island."},{"id":"ercot-tpit:87640","ercot_project":"87640","title":"New load customer interconnection RAOULT connecting on ckt 86 between DALTON and BRINE.","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-04-29","cm_new":0,"cm_rebuilt":0,"from":"RAOULT","to":"DALTON/ BRINE","county_from":"Chambers","county_to":"Chambers","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New load customer interconnection RAOULT connecting on ckt 86 between DALTON and BRINE. Expect transmission breakers in ring bus configuration for new RAOULT substation."},{"id":"ercot-tpit:85970A","ercot_project":"85970A","title":"Athena (ATH) 138kV CEHE Station for RAVEN (RVN) / Raven Solar & Storage (24INR0209 & 24INR0210)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-05-04","cm_new":0,"cm_rebuilt":0,"from":"Athena","to":"East Bernard/Wallis","county_from":"Wharton","county_to":"Austin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new Athena CEHE 138kV substation into Ckt.65C East Bernard to Wallis to create new Ckt.65 East Bernard to Athena to Wallis."},{"id":"ercot-tpit:6749","ercot_project":"6749","title":"Rosata: Build 138kV Substation","owner":"AEP TCC","owner_project":"3682","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-05-31","cm_new":0,"cm_rebuilt":0,"from":"Rosata","to":null,"county_from":"Goliad","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Build new Rosata 138 kV POD Switch on the Coleto Creek to Kenedy 138 kV line"},{"id":"ercot-tpit:90336","ercot_project":"90336","title":"DURZNO (DUR) 138kV Customer Substation","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-05-20","cm_new":0.2,"cm_rebuilt":0,"from":"DURAZNO","to":"Jones Creek/ Waterfowl","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new customer-owned 138kV DURZNO (DUR) substation. Loop into Ckt.54 to create new Ckt.54 Jones Creek to DURZNO to Waterfowl.","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:78427B","ercot_project":"78427B","title":"Bohemian (BOH) 138kV CEHE Substation for Destiny Storage (24INR0397)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-05-31","actual_isd":"2026-02-07","cm_new":0,"cm_rebuilt":0,"from":"Rhapsody","to":"BOHEMI","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Bohemian (BOH) substation to Rhapsody / RHAPSO (RHA) / Destiny Storage"},{"id":"ercot-tpit:102401","ercot_project":"102401","title":"LST_SamSwitch_Resiliency_(GTC)_Project","owner":"LST","owner_project":null,"kv":345,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-06-01","actual_isd":"2026-06-10","cm_new":0,"cm_rebuilt":0,"from":"Helix","to":"Navarro","county_from":"Hill","county_to":"Hill","tier":"Tier 3","rpg":"25RPG031","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"This project loops Helix to Navarro Circuit into LST Sam Switch station"},{"id":"ercot-tpit:87146","ercot_project":"87146","title":"GSEC_Tier4_9468_Add_Bull_Sub","owner":"GSEC","owner_project":null,"kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-01","actual_isd":"2026-05-01","cm_new":0,"cm_rebuilt":0,"from":"Claytonville","to":null,"county_from":"Fisher","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Adding new 1400MW load with deposit and agreement.","description":"New Substation Load out of 68001 Claytonville"},{"id":"ercot-tpit:76139","ercot_project":"76139","title":"Juncus: Construct New 69 kV Station","owner":"AEP TNC","owner_project":"TP2023074","kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-11","actual_isd":"2026-07-22","cm_new":0,"cm_rebuilt":0,"from":"Juncus","to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect the TEC Snodgrass load to the new Juncus 69 kV station on the Abilene South to Steamboat 69 kV line"},{"id":"ercot-tpit:69473","ercot_project":"69473","title":"Jaguar: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-11","actual_isd":"2026-04-16","cm_new":0,"cm_rebuilt":0,"from":"Jaguar","to":null,"county_from":"Victoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Construct new distribution station on the McGruder to Thomaston 138 kV line"},{"id":"ercot-tpit:72942","ercot_project":"72942","title":"Bluff Creek: 138 kV Station Work","owner":"AEP TNC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-11","actual_isd":"2026-04-30","cm_new":0,"cm_rebuilt":0,"from":"Bluff Creek","to":null,"county_from":"Taylor","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Replace fourteen (14) 138 kV Breakers and one (1) Circuit Switcher"},{"id":"ercot-tpit:73359","ercot_project":"73359","title":"Vertrees: Construct New Distribution Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-11","actual_isd":"2026-05-19","cm_new":0,"cm_rebuilt":0,"from":"Vertrees","to":null,"county_from":"Hidalgo","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Construct new distribution station on the Stewart Road to Weslaco Unit 138 kV line"},{"id":"ercot-tpit:70900E","ercot_project":"70900E","title":"Roanoke Area Upgrades","owner":"ONCOR","owner_project":"M5281 M5144 M5146 M5148","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-15","actual_isd":"2026-06-30","cm_new":36.8,"cm_rebuilt":0,"from":"Dunham Switch","to":"Ramhorn Switch","county_from":"Tarrant","county_to":"Tarrant","tier":"Tier 1","rpg":"22RPG003","rpg_completed":"2022-03-15","bod_reviewed":"2022-08-15","comments":null,"description":"Ramhorn Hill – Dunham 345 kV Double-Circuit Line","puct_project_possible":"mcpr:oncor-electric-delivery:0pt49068","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:62643","ercot_project":"62643","title":"Rebuild Waco East 138 kV Switch","owner":"ONCOR","owner_project":"R6146","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-06-24","actual_isd":"9999-01-01","cm_new":0,"cm_rebuilt":0,"from":"Waco East","to":"Waco East","county_from":"McLennan","county_to":"McLennan","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild Waco East 138 kV Switch"},{"id":"ercot-tpit:63956","ercot_project":"63956","title":"Clear Crossing: Build 345 kV terminal","owner":"ETT/AEP TNC","owner_project":"1884","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-30","actual_isd":"2026-06-30","cm_new":0,"cm_rebuilt":0,"from":"Clear Crossing","to":"HODL Ranch II","county_from":"Haskell","county_to":"Haskell","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Interconnect HODL Ranch II at Clear Crossing 345 kV station"},{"id":"ercot-tpit:91402","ercot_project":"91402","title":"Buchanan_Burnet_TL_Overhaul","owner":"LCRATSC","owner_project":"PLC-6943","kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-06-30","actual_isd":"2026-06-25","cm_new":0,"cm_rebuilt":11.4,"from":"Buchanan","to":"Burnet","county_from":"Burnet","county_to":"Burnet","tier":"Tier 4","rpg":null,"rpg_completed":"2025-06-25","bod_reviewed":null,"comments":null,"description":"Perform an overhaul on the 11.4 mile T108 Buchanan - Burnet 69-kV (de-energized) transmission line","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:105347","ercot_project":"105347","title":"Adding back in Sharyland Kingfisher Station with a Planned ISD 05/31/2026","owner":"SLU","owner_project":null,"kv":345,"list":"completed","status_reported":"Under Construction","status":"In service","projected_isd":"2026-06-30","actual_isd":"2026-06-30","cm_new":0,"cm_rebuilt":0,"from":"Palmito","to":"Stewart Road","county_from":"Cameron","county_to":"Cameron","tier":"Tier 2","rpg":"21RPG017","rpg_completed":"2021-11-21","bod_reviewed":"2021-12-21","comments":"Original modeling was delayed by other TSP","description":null},{"id":"ercot-tpit:90180B","ercot_project":"90180B","title":"Clodine Reconfiguration for Houston IV BESS (24INR0584)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-30","actual_isd":"2026-04-17","cm_new":0,"cm_rebuilt":0,"from":"Clodine","to":"Roark","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reposition Ckt.25B Clodine to Roark to the existing W670/W710 breaker position."},{"id":"ercot-tpit:48774","ercot_project":"48774","title":"Fincas: Build new 138 kV distribution station","owner":"AEP TCC","owner_project":"3765","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-30","actual_isd":"2026-06-30","cm_new":0,"cm_rebuilt":0,"from":"Fincas","to":null,"county_from":"Webb","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"IN-SERVICE","description":"Construct new distribution station on the University to Wormser 138 kV line"},{"id":"ercot-tpit:73371B","ercot_project":"73371B","title":"BP24 Sub Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-30","actual_isd":"2026-06-23","cm_new":0,"cm_rebuilt":0,"from":"Bellaire","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade Bellaire Auto A5 CTs to increase thermal limits"},{"id":"ercot-tpit:90180A","ercot_project":"90180A","title":"Clodine Reconfiguration for Houston IV BESS (24INR0584)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-06-30","actual_isd":"2026-04-17","cm_new":0,"cm_rebuilt":0,"from":"Clodine","to":"Generator","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one new generator lead at the existing Clodine W670/W680 breaker position for Houston IV BESS."},{"id":"ercot-tpit:105583","ercot_project":"105583","owner":"DME","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-07-01","actual_isd":"2026-07-01","cm_new":0.83,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Denton","county_to":"Denton","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null,"terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}},{"id":"ercot-tpit:91534B","ercot_project":"91534B","title":"Establish Glaze Lake 138 kV Switch","owner":"ONCOR","owner_project":"R6345","kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-07-01","actual_isd":"2026-05-15","cm_new":0.28,"cm_rebuilt":0,"from":"Glaze Lake 138 kV Switch","to":"Leon Solar","county_from":"Leon","county_to":"Leon","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Glaze Lake 138 kV Switch Gen Tie","puct_project":"mcpr:oncor-electric-delivery:0pt54652","puct_link_method":"owner project code + voltage + shared place name","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:70882","ercot_project":"70882","title":"Rebuild Olivia - Carancahua","owner":"STEC","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-07-01","actual_isd":"2026-07-15","cm_new":0,"cm_rebuilt":8.71,"from":"Olivia SW","to":"Carancahua","county_from":"Jackson","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"rebuild Olivia sw to Carancahua 795 ACSR","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:72582C","ercot_project":"72582C","title":"Nameless to Leander Transmission Line Upgrade","owner":"PEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-07-01","actual_isd":"2026-05-01","cm_new":0,"cm_rebuilt":0,"from":"Hero Way","to":"Nameless","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"1/10/2023: Added information to clarify circuit rating.","description":"Upgrade final span into Nameless, upgrade terminal equipment, and achieve circuit rating of 440 MVA. (Replaces ERCOT Project # 61279C)"},{"id":"ercot-tpit:88867","ercot_project":"88867","title":"Rosita Creek Substation 138-kV T2 Power Transformer Addition. Replacing Committed project 57343","owner":"RGEC","owner_project":null,"kv":138,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-07-24","actual_isd":"2025-09-02","cm_new":0,"cm_rebuilt":0,"from":"Rosita Creek","to":"Rosita Creek","county_from":"Maverick","county_to":"Maverick","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Site construction is complete. T2 ready for hot commissioning pending LCRA approval.","description":"Add second 138/13.09-kV power transformer bay with new 138-kV transmission switch and circuit switcher interconnected at LCRA Switch# 12669. New power transformer capacity will be 15/20/25 MVA. Replaces committed project 57343."},{"id":"ercot-tpit:79462","ercot_project":"79462","title":"Expand HO Clarke substation for Callisto II (22INR0558)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-07-31","actual_isd":"2026-05-15","cm_new":0,"cm_rebuilt":0,"from":"HO Clarke","to":null,"county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand HO Clarke substation for Callisto II (22INR0558)"},{"id":"ercot-tpit:85970B","ercot_project":"85970B","title":"Athena (ATH) 138kV CEHE Station for RAVEN (RVN) / Raven Solar & Storage (24INR0209 & 24INR0210)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-07-31","actual_isd":"2026-05-04","cm_new":0,"cm_rebuilt":0,"from":"Athena","to":"RAVEN","county_from":"Wharton","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from Athena CEHE 138kV substation to RAVEN / Raven Solar & Storage (24INR0209 & 24INR0210)."},{"id":"ercot-tpit:1275","ercot_project":"1275","title":"Hawkins to Gainesville","owner":"BEPC","owner_project":null,"kv":69,"list":"completed","status_reported":"Planned","status":"In service","projected_isd":"2026-08-01","actual_isd":"2026-11-01","cm_new":0,"cm_rebuilt":6.72,"from":"Hawkins","to":"Gainesville","county_from":"Cooke","county_to":"Cooke","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Hawkins to Gainesville","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:86011","ercot_project":"86011","title":"Snug 138kV Substation expansion for Cottonwood Bayou Storage (21INR0443)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-08-30","actual_isd":"2025-05-23","cm_new":0,"cm_rebuilt":0,"from":"Snug","to":null,"county_from":"Brazoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install Cottonwood Bayou Storage (21INR0443) at Snug 138kV substation. Connect at the same generator lead as Cottonwood Bayou Solar."},{"id":"ercot-tpit:78485F","ercot_project":"78485F","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-08-30","actual_isd":"2026-08-13","cm_new":0,"cm_rebuilt":6.41,"from":"Hayes","to":"Britmoore","county_from":"Harris","county_to":"Harris","tier":"Tier 3","rpg":"23RPG025","rpg_completed":"2023-09-28","bod_reviewed":"2023-09-28","comments":null,"description":"Upgrade Ckt.24B Hayes to Britmoore to increase thermal limits.","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:99399","ercot_project":"99399","title":"TH Wharton CB2 Cap Bank","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-08-30","actual_isd":"2025-09-30","cm_new":0,"cm_rebuilt":0,"from":"Velasco","to":"TH Wharton","county_from":"Harris","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Remove 120 MVAR CB1 cap bank from Velasco substation. Install removed CB1 cap bank at TH Wharton substation as replacement for THW CB2."},{"id":"ercot-tpit:71106","ercot_project":"71106","title":"Dunlavy to HO Clarke Ckt.40A Partial Reconductor","owner":"CNP","owner_project":null,"kv":69,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-08-30","actual_isd":"2026-07-09","cm_new":0,"cm_rebuilt":4.41,"from":"Dunlavy","to":"HO Clarke","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":"22RPG019","rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Reconductor portions of Ckt.40A Dunlavy to HO Clarke ahead of future 138kV conversions","terminal_match":{"from":"matched","to":"not_in_osm","via":"ercot_bus_numbers"},"endpoints":[{"osm_id":"osm:way/208626022","name":"Kirby Substation","coordinates":[-95.42289,29.72972]},{"osm_id":"osm:way/233643085","name":"Dunlavy Substation","coordinates":[-95.40186,29.75264]}],"endpoint_method":"ERCOT bus numbers -> ERCOT substation codes -> OSM","osm_matches":[{"osm_id":"osm:way/129365975","layer":"lines-69"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":2.2,"straight_mi":null},{"id":"ercot-tpit:86009","ercot_project":"86009","title":"Expand ADLONG substation for XE Murat Storage (24INR0329)","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-08-30","actual_isd":"2025-03-06","cm_new":0,"cm_rebuilt":0,"from":"Eastgate","to":"ADLONG","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Expand facilities at customer-owned ADLONG substation for XE Murat Storage (24INR0329). Utilize existing generator lead Eastgate to XE Murat Solar."},{"id":"ercot-tpit:69552E","ercot_project":"69552E","title":"Teal 345/138 kV Switch connected to LCRA POI (Limmer)","owner":"ONCOR","owner_project":"R6165","kv":345,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-09-15","actual_isd":"2025-05-30","cm_new":0,"cm_rebuilt":0,"from":"Teal","to":"Teal","county_from":"Williamson","county_to":"Williamson","tier":"Tier 3","rpg":"22RPG027","rpg_completed":"2022-09-15","bod_reviewed":null,"comments":null,"description":"Teal 345 kV Switch, Autotransformers, and 345 kV Tie Lines to Limmer (LCRA)"},{"id":"ercot-tpit:86013","ercot_project":"86013","title":"Fairmont Distribution Reconfigurations with 4th Transformer","owner":"CNP","owner_project":null,"kv":138,"list":"completed","status_reported":"In-Service","status":"In service","projected_isd":"2026-09-30","actual_isd":"2026-07-31","cm_new":0,"cm_rebuilt":0,"from":"Fairmont","to":null,"county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install fourth Fairmont distribution transformer on Ckt.95F to create new Ckt.95F SOUTH to Fairmont TR4 tap to Clear Lake tap to Polaris tap to Kemah tap to PH Robinson 138kV North. Remove Fairmont TR3 from Ckt.95F and onto the Ckt.35A Fair"},{"id":"ercot-tpit:55603","ercot_project":"55603","title":"Big Foot to Pearsall: Rebuild 69 kV line","owner":"AEP TCC","owner_project":"3821","kv":69,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2022-11-30","actual_isd":"2025-05-12","cm_new":0,"cm_rebuilt":14.79,"from":"Big Foot","to":"Pearsall","county_from":"Frio","county_to":"Frio","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Cancelled, incorrectly submitted prior to RPG submission.","description":"Rebuild 69 kV line from Big Foot to Dilley","terminal_match":{"from":"ambiguous","to":"ambiguous"}},{"id":"ercot-tpit:3901","ercot_project":"3901","title":"Lobo to Freer: Rebuild 69 kV line","owner":"AEP","owner_project":"2596","kv":69,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2025-01-07","actual_isd":null,"cm_new":0,"cm_rebuilt":49.8,"from":"Lobo","to":"Freer","county_from":"Webb","county_to":"Duval","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Rebuild Lobo to Freer 69 kV line with 795 ACSS","terminal_match":{"from":"matched","to":"matched"},"endpoints":[{"osm_id":"osm:way/174711657","name":"Lobo Substation","coordinates":[-99.27564,27.57893]},{"osm_id":"osm:way/490190305","name":"Freer Substation","coordinates":[-98.61739,27.84529]}],"endpoint_method":"name + voltage + county","osm_matches":[{"osm_id":"osm:way/451971753","layer":"lines-69"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high","mapped_mi":46.8,"straight_mi":null},{"id":"ercot-tpit:81573","ercot_project":"81573","title":"Oklaunion: Construct New 345 kV Terminal","owner":"AEP TNC/ETT","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2025-03-11","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Oklaunion","to":null,"county_from":"Wilbarger","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Interconnect the Alpha load to the existing Oklaunion 345 kV station"},{"id":"ercot-tpit:61467","ercot_project":"61467","title":"Merrilltown Substation Addition","owner":"AEN","owner_project":null,"kv":138,"list":"cancelled","status_reported":null,"status":"Cancelled","projected_isd":"2025-03-14","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Williamson","county_to":"Williamson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New 138 kV station - Oncor load"},{"id":"ercot-tpit:07TPIT0069","ercot_project":"07TPIT0069","title":"Sterrett - Sardis 138 kV line","owner":"ONCOR","owner_project":"M361-E","kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2025-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":2,"from":"Sterrett","to":"Sardis","county_from":"Ellis","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade existing 138 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:61451","ercot_project":"61451","title":"La Vernia Substation","owner":"GVEC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2025-05-16","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"La Vernia","to":"La Vernia","county_from":"Wilson","county_to":"Wilson","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace T2, 20 MVA with a 40MVA dual high-dual low"},{"id":"ercot-tpit:48854","ercot_project":"48854","title":"Adds Annova and Port South Bus and lines","owner":"STEC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2025-06-01","actual_isd":null,"cm_new":22.1,"cm_rebuilt":0,"from":"Annova LNG","to":"Port South","county_from":"Cameron","county_to":"Cameron","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds Annova and Port South buses, lines to connect Annova to Port South, line from HWY 511 to Port South, and reconnects line from S Carbide to HWY 511 into Port South","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:70943","ercot_project":"70943","title":"Double circuit 138kV tie between Pyote and Coyanosa","owner":"TNMP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2025-06-01","actual_isd":null,"cm_new":15,"cm_rebuilt":0,"from":"Pyote (bus # 38001)","to":"Coyanosa (bus # 38380)","county_from":"Ward","county_to":"Reeves","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Project resubmitted as PMCR ID # 77805","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:64021","ercot_project":"64021","title":"Texana Solar Interconnection","owner":"AEP TCC","owner_project":"TP2020888","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2025-06-24","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"El Campo","to":"Victoria","county_from":"Wharton","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Connect the Texana Solar to the El Campo to Victoria 138 kV line"},{"id":"ercot-tpit:65723","ercot_project":"65723","title":"Riedel: Build New Distribution Station","owner":"AEP TCC/LCRA","owner_project":"3771","kv":138,"list":"cancelled","status_reported":null,"status":"Cancelled","projected_isd":"2025-06-24","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Riedel","to":null,"county_from":"Karnes","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Construct new distribution station on the Magnolia Tap to Nixon 138 kV line"},{"id":"ercot-tpit:69469","ercot_project":"69469","title":"Equinox Solar Project","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":null,"status":"Cancelled","projected_isd":"2025-06-25","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cenizo","to":"Del Sol","county_from":"Starr","county_to":"Starr","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Equinox Solar Project"},{"id":"ercot-tpit:76174","ercot_project":"76174","title":"Origin 138 kV Interconnection","owner":"AEP TNC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2025-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Origin","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Interconnect Callon Petroleum on the Saragosa to Solstice 138 kV line"},{"id":"ercot-tpit:71136","ercot_project":"71136","title":"Waxahachie-Waxahachie OCF 69 kV Line Rebuild","owner":"ONCOR","owner_project":"M4339","kv":69,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2025-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Wilmer","to":"Waxahachie","county_from":"Dallas","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild the existing Waxahachie-Waxahachie OCF 69 kV Line"},{"id":"ercot-tpit:92695","ercot_project":"92695","title":"Switchgrass station and Customer sub","owner":"TNMP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2025-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Reeves","county_to":"Reeves","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Project cancelled by customer."},{"id":"ercot-tpit:78627","ercot_project":"78627","title":"RCEC_SherwoodShores_AddCap","owner":"RCEC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2025-10-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:76288","ercot_project":"76288","title":"Hecker to McCampbell: Rebuild 138 kV Line","owner":"AEP TCC","owner_project":"TP2023507","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2025-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Hecker","to":"McCampbell","county_from":"San Patricio","county_to":"San Patricio","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Rebuild the Hecker to McCampbell 138 kV Line"},{"id":"ercot-tpit:76280","ercot_project":"76280","title":"Reforzar: Build new 345 kV station - stage 2","owner":"AEP TCC","owner_project":"TP2022035","kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2026-01-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Reforzar","to":null,"county_from":"Brooks","county_to":null,"tier":"Tier 1","rpg":"21RPG017","rpg_completed":"2021-11-29","bod_reviewed":"2021-12-10","comments":"CANCELLED","description":"Build new 345 kV station on the Lon Hill to North Edinburg 345 kV line"},{"id":"ercot-tpit:81146","ercot_project":"81146","title":"Southmayd 138 kV Switch","owner":"ONCOR","owner_project":"M4338","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2026-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Southmayd","to":null,"county_from":"Grayson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Southmayd 138 kV Switch"},{"id":"ercot-tpit:16TPIT0068","ercot_project":"16TPIT0068","title":"Venus - Chaparral Steel Tap 138 kV Line","owner":"ONCOR","owner_project":"M4113-E","kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":5.5,"from":"Venus","to":"Chaparral Steel Tap","county_from":"Ellis","county_to":"Ellis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade existing line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:16TPIT0064","ercot_project":"16TPIT0064","title":"Simpson Stuart - Lancaster Witt 138 kV Line","owner":"ONCOR","owner_project":"M4112-E","kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":3,"from":"Simpson Stuart","to":"Lancaster Witt","county_from":"Dallas","county_to":"Dallas","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade existing line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:5496","ercot_project":"5496","title":"Forney Switch 345 kV Terminal Equipment","owner":"ONCOR","owner_project":"M3022","kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2026-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Royse","to":null,"county_from":"Rockwall","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade the terminal equipment at Forney 345 kV Switch"},{"id":"ercot-tpit:92865","ercot_project":"92865","title":"Oncor_ME_92865_Kirkland Park 138kV Capacitor Bank","owner":"ONCOR","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2026-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kirkland Park","to":"Kirkland Park","county_from":"Dallas","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install capacitor banks at Kirkland Park"},{"id":"ercot-tpit:99004","ercot_project":"99004","title":"Install 30MVAR cap bank at Fulshear distribution substation.","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Fulshear","to":null,"county_from":"Fort Bend","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:81581","ercot_project":"81581","title":"Riley: Construct New 345 kV Terminal","owner":"AEP TNC/ETT","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Riley","to":null,"county_from":"Wilbarger","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Gamma load to the existing Riley 345 kV station"},{"id":"ercot-tpit:81647","ercot_project":"81647","title":"Dupont Switch to Sardinia: Construct New 138 kV Line","owner":"AEP TCC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-06-30","actual_isd":null,"cm_new":2,"cm_rebuilt":0,"from":"Dupont Switch","to":"Sardinia","county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Epsilon load to the new Sardinia 138 kV station out of the existing Dupont Switch 138 kV station","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:66122","ercot_project":"66122","title":"Tiempo: Build new 345 kV terminal","owner":"ETT","owner_project":"TP2022009","kv":345,"list":"cancelled","status_reported":"Under Construction","status":"Cancelled","projected_isd":"2026-07-15","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Tiempo","to":null,"county_from":"Zapata","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Interconnect Redonda Solar to the Tiempo 345 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:70662","ercot_project":"70662","title":"Cobra: Build new 345 kV station","owner":"AEP TCC","owner_project":"TP2022750","kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2026-10-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Cobra","to":null,"county_from":"Jackson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect Garcitas Solar to the new Cobra 345 kV station on the Radiant to Static 345 kV line"},{"id":"ercot-tpit:70305","ercot_project":"70305","title":"Camp Elizabeth: Build new 69 kV station","owner":"AEP TNC","owner_project":null,"kv":69,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Camp Elizabeth","to":null,"county_from":"Sterling","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Construct new 69 kV box bay station with capacitor bank on the College Hills West to Sterling City 69 kV line"},{"id":"ercot-tpit:73621A","ercot_project":"73621A","title":"Hawkinsville (HAW) CNP-Owned 345kV Substation for Lavaca Bay Solar (23INR0084)","owner":"CNP","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2026-11-30","actual_isd":null,"cm_new":1.4,"cm_rebuilt":0,"from":"Waterhole","to":"BAILEY/Jones Creek","county_from":"Matagorda","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"New 345kV Hawkinsville (HAW) substation for generator interconnection to Lavaca Bay Solar. Loop Ckt.27D into substation to create new Ckt.27 Jones Creek to Hawkinsville to Refuge.","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:73621B","ercot_project":"73621B","title":"Hawkinsville (HAW) CNP-Owned 345kV Substation for Lavaca Bay Solar (23INR0084)","owner":"CNP","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2026-11-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Waterhole","to":"PHOTON","county_from":"Matagorda","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Hawkinsville (HAW) substation to LAVACA / Lavaca Bay Solar."},{"id":"ercot-tpit:72029A","ercot_project":"72029A","title":"Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196)","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ashville","to":"Garden Villas/ Holmes","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new CEHE 138kV substation Ashville (ASH) into Ckt.06F Garden Villas to Holmes to create new Ckt.06 Garden Villas to Ashville to Holmes"},{"id":"ercot-tpit:81825","ercot_project":"81825","title":"Houdini: Construct New 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Houdini","to":null,"county_from":"Matagorda","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Xi load to the new Houdini 345 kV station on the STP to WAP 345 kV line"},{"id":"ercot-tpit:81799","ercot_project":"81799","title":"Four Corners: Construct New 345 kV Station","owner":"AEP TNC/ETT","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Four Corners","to":null,"county_from":"Hardeman","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Nu load to the new Four Corners 345 kV station on the Edith Clarke to Tesla 345 kV line"},{"id":"ercot-tpit:81697","ercot_project":"81697","title":"Amber: Construct New 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Amber","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Kappa load to the new Amber 345 kV station on the Blue Lacy to Reforzar and Blue Lacy to Nelson Sharpe 345 kV lines and add capacitors"},{"id":"ercot-tpit:81657","ercot_project":"81657","title":"Verhalen: Construct New 138 kV Terminal","owner":"AEP TNC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Verhalen","to":null,"county_from":"Reeves","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Eta load to the existing Verhalen 138 kV station"},{"id":"ercot-tpit:72029C","ercot_project":"72029C","title":"Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196)","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ashville","to":"SUNLIT","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ BESS. Utilize same generator lead as Dori BQ Solar."},{"id":"ercot-tpit:72029B","ercot_project":"72029B","title":"Ashville (ASH) 138kV CEHE Station for SUNLIT/Dori BQ Solar (23INR0040) and Dori BQ BESS (24INR0196)","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2026-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Ashville","to":"SUNLIT","county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from CEHE 138kV substation Ashville (ASH) to SUNLIT/Dori BQ Solar. Utilize same generator lead as Dori BQ BESS."},{"id":"ercot-tpit:90045","ercot_project":"90045","title":"Vanhagar to Collier: Construct New 138 kV Line","owner":"AEP TNC","owner_project":"TP2024119","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2027-02-28","actual_isd":null,"cm_new":1.5,"cm_rebuilt":0,"from":"Vanhagar","to":"Collier","county_from":"Reeves","county_to":"Reeves","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the new Collier load station to the new Vanhagar 138 kV station on the Saragosa to Solstice 138 kV line between Hoef's Road and Verhalen","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:78473A","ercot_project":"78473A","title":"Odin (ODI) 138kV CEHE Substation","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Odin","to":"Brazosport/ Booster","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"(In terms of completed Waterfowl substation) Loop new CEHE 138kV substation Odin (ODI) into Ckt.36 to create new Ckt.36 COPPER to Odin to Booster tap to Jones Creek."},{"id":"ercot-tpit:78473B","ercot_project":"78473B","title":"Odin (ODI) 138kV CEHE Substation","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-04-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Odin","to":"VALHAL","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install one generator lead from CEHE 138kV substation Odin (ODI) to VALHAL (VAL) / Valhalla Solar (26INR0042)"},{"id":"ercot-tpit:76121","ercot_project":"76121","title":"Beeville Capacitor Addition","owner":"STEC","owner_project":null,"kv":69,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-05-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Beeville","to":null,"county_from":null,"county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add second 4.8 MVAR step at Beeville"},{"id":"ercot-tpit:73540","ercot_project":"73540","title":"LCRATSC_Carlson_Substation_Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Carlson","to":null,"county_from":"Travis","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Substation addition to provide Point of Interconnection for Oncor Lund substation addition."},{"id":"ercot-tpit:5525","ercot_project":"5525","title":"Forney - Lake Hubbard 345 kV Line","owner":"ONCOR","owner_project":"M4233","kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":7.5,"from":"Forney","to":"Lake Hubbard","county_from":"Kaufman","county_to":"Dallas","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new 345 kV line","terminal_match":{"from":"matched","to":"not_in_osm"}},{"id":"ercot-tpit:5522","ercot_project":"5522","title":"Lake Hubbard 345/138 kV Switching Station","owner":"ONCOR","owner_project":"M4139","kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lake Hubbard","to":null,"county_from":"Dallas","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Construct new 345/138 kV switching station"},{"id":"ercot-tpit:81556","ercot_project":"81556","title":"Haber: Construct New 345 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-05-30","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Haber","to":null,"county_from":"Victoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Crunch load to the new Haber 345 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:81548","ercot_project":"81548","title":"Haber: Construct New 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-05-31","actual_isd":null,"cm_new":7,"cm_rebuilt":0,"from":"Haber","to":null,"county_from":"Victoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Theta load to the new Haber 345 kV station on the Cobra to Static 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:81553","ercot_project":"81553","title":"Haber: Construct New 345 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-05-31","actual_isd":null,"cm_new":1,"cm_rebuilt":0,"from":"Haber","to":null,"county_from":"Victoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Theta load to the new Haber 345 kV station","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:90020","ercot_project":"90020","title":"Firerock: Install New 138/69 kV Autotransformer","owner":"AEP TNC","owner_project":"TP2022133","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Firerock","to":null,"county_from":"Coleman","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Install new 138/69 kV autotransformer at the Firerock 138/69 kV station"},{"id":"ercot-tpit:87029","ercot_project":"87029","title":"Parana: Construct New 138 kV Station","owner":"AEP TCC","owner_project":"TP2024062","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Parana","to":null,"county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect Portside Energy Center Solar & Storage to the new Parana 138 kV station on the Big Three to Dupont SW 138 kV line"},{"id":"ercot-tpit:69479","ercot_project":"69479","title":"Radiant: Build new 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2027-05-31","actual_isd":null,"cm_new":0.2,"cm_rebuilt":0,"from":"Radiant","to":null,"county_from":"Jackson","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect Lunis Creek Solar to the new Radiant 345 kV station on the Cobra to STP 345 kV line","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:50282","ercot_project":"50282","title":"Adds new Jaguar sub near Twin Pines Switch","owner":"STEC","owner_project":null,"kv":69,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Highlands Sub","to":"Twin Pines Switch","county_from":"Victoria","county_to":"Victoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"AEP is looking at another location to serve the load.","description":"Adds new Jaguar sub between Twin Pines Switch and Highlands Sub. For AEP load."},{"id":"ercot-tpit:81655","ercot_project":"81655","title":"Candela: Construct New 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Candela","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Zeta load to the new Candela 345 kV station"},{"id":"ercot-tpit:81746","ercot_project":"81746","title":"Calabaza: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-06-02","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Calabaza","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Lambda load to the new Calabaza 138 kV station"},{"id":"ercot-tpit:90018","ercot_project":"90018","title":"Sand Crab: Construct New 138 kV Terminal","owner":"AEP TCC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Sand Crab","to":null,"county_from":"Calhoun","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect Canvasback BESS to the Sand Crab 138 kV station"},{"id":"ercot-tpit:89993","ercot_project":"89993","title":"STP to Zoisite: Construct New 345 kV Line","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2027-06-30","actual_isd":null,"cm_new":1.6,"cm_rebuilt":0,"from":"STP","to":"Zoisite","county_from":"Matagorda","county_to":"Matagorda","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the HIF load to the new Zoisite 345 kV station on the STP to Zoisite 345 kV line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:76916","ercot_project":"76916","title":"Snapdragon: Construct New 138 kV Station","owner":"AEP TCC/ETT","owner_project":"TP2023012","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2027-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Snapdragon","to":null,"county_from":"Zapata","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Interconnect Desert Vine Solar to the new Snapdragon 138 kV station on the Revilla to Zapata 138 kV line"},{"id":"ercot-tpit:44870","ercot_project":"44870","title":"Charlotte 69 kV Station","owner":"AEP TCC","owner_project":"3734","kv":69,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2027-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Charlotte","to":"-","county_from":"Atascosa","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Charlotte 69 kV Station: Add Cap Bank"},{"id":"ercot-tpit:75810A","ercot_project":"75810A","title":"Install new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar","owner":"CNP","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Speedway","to":"DOW/Oasis","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 345kV Speedway (SPD) substation for generator interconnection to CRADLE/ Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW."},{"id":"ercot-tpit:75810B","ercot_project":"75810B","title":"Install new 345kV Speedway substation for interconnection to Cradle Solar (23INR0150). Loop Ckt.18B into Speedway substation to create new Ckt.18 Oasis to Speedway to DOW. Install generator lead from Speedway to CRADLE solar","owner":"CNP","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-08-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Speedway","to":"CRADLE","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Speedway (SPD) substation to CRADLE (CDL) customer substation (23INR0150)."},{"id":"ercot-tpit:87899","ercot_project":"87899","title":"Vaso: Construct New 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-08-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Vaso","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Alpha load to the new Vaso 138 kV station on the Cantwell to Citgo North Oak 138 kV line"},{"id":"ercot-tpit:4490","ercot_project":"4490","title":"LaPalma: Add 2nd 345/138 kV autotransformer","owner":"AEP TCC","owner_project":"2904","kv":345,"list":"cancelled","status_reported":null,"status":"Cancelled","projected_isd":"2027-09-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"LaPalma","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Add 345/138 kV autotransformer capacity at LaPalma"},{"id":"ercot-tpit:79456A","ercot_project":"79456A","title":"Install new 345kV Huizache (HUI) substation for generator interconnection to High Chap Solar (25INR0068) & BESS (25INR0072)","owner":"CNP","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Huizache","to":"Speedway/DOW","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install new 345kV Huizache (HUI) substation for generator interconnection to High Chap Solar (25INR0068) & BESS (25INR0072). Loop Ckt.18 into Huizache substation to create new Ckt.18 Speedway to Huizache to DOW."},{"id":"ercot-tpit:79456B","ercot_project":"79456B","title":"Install new 345kV Huizache (HUI) substation for generator interconnection to High Chap Solar (25INR0068) & BESS (25INR0072)","owner":"CNP","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2027-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Huizache","to":"HIGHCH (High Chap)","county_from":"Brazoria","county_to":"Brazoria","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Install generator lead from Huizache (HUI) substation to customer substation HIGHCH (HIC) for generator interconnection to High Chap Solar (25INR0068) & BESS (25INR0072)."},{"id":"ercot-tpit:72457","ercot_project":"72457","title":"AddKiowaToQuinlanLine","owner":"RCEC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2028-01-01","actual_isd":"2025-06-01","cm_new":8,"cm_rebuilt":0,"from":"Kiowa","to":"Quinlan","county_from":"Hunt","county_to":"Hunt","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Add 138kV line from Kiowa to Quinlan","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:99132","ercot_project":"99132","title":"Expand Channelview 138kV substation for Brookview Road BESS (27INR0243)","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Channelview","to":null,"county_from":"Harris","county_to":"Harris","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":null},{"id":"ercot-tpit:99800","ercot_project":"99800","title":"Marconi: Expand 138 kV Station","owner":"AEP TCC","owner_project":"TP2025326","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2028-02-28","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Marconi","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Interconnect Pajarita BESS to the existing Marconi 138 kV station"},{"id":"ercot-tpit:4834","ercot_project":"4834","title":"Cresson - Rocky Creek 138 kV Line","owner":"ONCOR","owner_project":"M5228","kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-15","actual_isd":null,"cm_new":3,"cm_rebuilt":0,"from":"Cresson","to":"Rocky Creek","county_from":"Tarrant","county_to":"Parker","tier":"Tier 2","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Project Deferral","description":"Construct new line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102546E","ercot_project":"102546E","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-30","actual_isd":null,"cm_new":0,"cm_rebuilt":9.03,"from":"Plaza","to":"Gulfgate","county_from":"Chambers","county_to":"Chambers","tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Upgrade Ckt.06L Plaza to Knight to Gulfgate to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102546G","ercot_project":"102546G","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":9.97,"from":"PH Robinson","to":"HUNTER","county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Upgrade Ckt.79F PH Robinson to Seabrook to HANNA to HUNTER in order to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:102546C","ercot_project":"102546C","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lyondell","to":"Channelview","county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Upgrade Ckt.03G Lyondell to Channelview (distribution) to Channelview (ring bus) in order to increase thermal limits."},{"id":"ercot-tpit:102546F","ercot_project":"102546F","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":7.19,"from":"Britmoore","to":"Westheimer","county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Upgrade Ckt.73B Britmoore to Woodcreek to Memorial to Westheimer in order to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:102546H","ercot_project":"102546H","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bayway","to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Install (3) 7.2 MVAR distribution cap banks at Bayway substation."},{"id":"ercot-tpit:102546I","ercot_project":"102546I","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Mykawa","to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Install (1) 60 MVAR cap bank at Mykawa substation."},{"id":"ercot-tpit:102546J","ercot_project":"102546J","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Humble","to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Install (1) 60 MVAR switchable cap bank at Humble substation."},{"id":"ercot-tpit:102546K","ercot_project":"102546K","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Treaschwig","to":null,"county_from":null,"county_to":null,"tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Install (2) 14.4 MVAR distribution cap banks at Treaschwig substation."},{"id":"ercot-tpit:102546D","ercot_project":"102546D","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0.97,"from":"Hermann","to":"Grant","county_from":"Harris","county_to":"Harris","tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Upgrade Ckt.08 Hermann to Grant to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"matched"}},{"id":"ercot-tpit:102546B","ercot_project":"102546B","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":3.39,"from":"DALTON","to":"BRINE","county_from":"Chambers","county_to":"Chambers","tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Upgrade Ckt.86 DALTON (to RAOULT) to BRINE to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:102546A","ercot_project":"102546A","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-05-31","actual_isd":null,"cm_new":0,"cm_rebuilt":1.27,"from":"HOPSON","to":"WARVUE","county_from":"Chambers","county_to":"Chambers","tier":"Tier 1","rpg":null,"rpg_completed":"2025-09-12","bod_reviewed":"2025-09-22","comments":null,"description":"Upgrade Ckt.84K HOPSON to WARVUE to increase thermal limits.","terminal_match":{"from":"not_in_osm","to":"ambiguous"}},{"id":"ercot-tpit:81588","ercot_project":"81588","title":"Chalybe: Expand 345 kV Station","owner":"AEP TCC","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-06-01","actual_isd":null,"cm_new":46,"cm_rebuilt":0,"from":"Chalybe","to":null,"county_from":"Cameron","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect the Delta load to the Chalybe 345 kV station on the Chalybe to Kingfisher and Chalybe to Palmito 345 kV lines","terminal_match":{"from":"not_in_osm","to":"multi_or_missing"}},{"id":"ercot-tpit:90012","ercot_project":"90012","title":"Lumos: Construct New 345 kV Station","owner":"AEP TCC","owner_project":"TP2024105","kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2028-06-30","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Lumos","to":null,"county_from":"Refugio","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCEL","description":"Interconnect Ross Solar & Storage to the new Lumos 345 kV station on the Angstrom to Static 345 kV line"},{"id":"ercot-tpit:3818","ercot_project":"3818","title":"Rebuild Calallen to Robstown","owner":"STEC","owner_project":null,"kv":69,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2028-12-01","actual_isd":null,"cm_new":0,"cm_rebuilt":6.26,"from":"Calallen","to":"Robstown","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Rebuild 4-0 ACSR 69 kV to higher rated and 138 kV capable line, as originally recommended in 2013 RTP.","terminal_match":{"from":"matched","to":"ambiguous"}},{"id":"ercot-tpit:87901","ercot_project":"87901","title":"Kallisto: Construct New 138 kV Station","owner":"AEP TCC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Kallisto","to":null,"county_from":"Kleberg","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Interconnect the Beta load to the new Kallisto 138 kV station on the Falfurrias to King Ranch Gas Plant 138 kV line"},{"id":"ercot-tpit:81724","ercot_project":"81724","title":"Calabaza: Construct New 138 kV Station","owner":"AEP TCC/LCRA","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2028-12-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Calabaza","to":null,"county_from":"Nueces","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Interconnect the Omicron load to the new Calabaza 138 kV station on the Gila to Tortuga and Nueces Bay to Saxet 138 kV lines"},{"id":"ercot-tpit:76133","ercot_project":"76133","title":"West Childress: Station Rehab","owner":"AEP TNC","owner_project":"TA2020223","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2029-01-31","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"West Childress","to":null,"county_from":"Childress","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"CANCELLED","description":"Rehab the West Childress station"},{"id":"ercot-tpit:92874","ercot_project":"92874","title":"Bear_Pen 345 kV Switch","owner":"ONCOR","owner_project":"M3063","kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2029-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Bear Pen 345 kV Switch","to":null,"county_from":"Franklin","county_to":"Franklin","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish Bear pen 345 kV Switch"},{"id":"ercot-tpit:86273","ercot_project":"86273","title":"This project got canceled.","owner":"AEN","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"7040","to":"9328","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Autos to be upgraded to 672 MVAs. This project got canceled."},{"id":"ercot-tpit:6930","ercot_project":"6930","title":"New Paloma Substation","owner":"STEC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0.9,"cm_rebuilt":0,"from":"Midstream","to":"Paloma","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Adds new station and short line from Midstream","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:86275","ercot_project":"86275","title":"DUNLAP auto already 672MVA. Delete this redundant project.","owner":"AEN","owner_project":null,"kv":345,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2029-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"9044","to":"9045","county_from":"Travis","county_to":"Travis","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"DUNLAP auto already 672MVA. Delete this redundant project."},{"id":"ercot-tpit:6743","ercot_project":"6743","title":"Magellan Tank Farm: LCRA Interconnect","owner":"AEP TCC/LCRA","owner_project":"3689","kv":138,"list":"cancelled","status_reported":null,"status":"Cancelled","projected_isd":"2029-07-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Navigation","to":"Magellan","county_from":"Nueces","county_to":"Nueces","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":"Cancelled","description":"Add 138kV Tie Line between Navigation 138kV substation and Magellan's 138kV substation. Add Metering at Magellan's Substation."},{"id":"ercot-tpit:65648","ercot_project":"65648","title":"Interconnects Faulkner Data Center","owner":"TNMP","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2029-10-01","actual_isd":null,"cm_new":0.15,"cm_rebuilt":0,"from":"TNMP Faulkner (bus # 38124)","to":"Customer substation (bus # 38125)","county_from":"Reeves","county_to":"Reeves","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Project has been cancelled.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:100165","ercot_project":"100165","title":"Gristmill_Substation_Addition","owner":"LCRATSC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"In-Service","status":"Cancelled","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Hays","county_to":"Hays","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"LCRA TSC will construct a new Gristmill Substation to provide transformation service to a PEC-member load"},{"id":"ercot-tpit:5524","ercot_project":"5524","title":"Royse South 345/138 kV Switching Station","owner":"ONCOR","owner_project":"M4234","kv":345,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2030-05-15","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Royse","to":"Forney","county_from":"Rockwall","county_to":null,"tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Establish new 345/138 kV switching station"},{"id":"ercot-tpit:19TPIT0000","ercot_project":"19TPIT0000","title":"Weser Substation","owner":"GVEC","owner_project":null,"kv":69,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2030-12-17","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Weser","to":null,"county_from":"Goliad","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Replace 5.6 MVA with 69-13.09 kV, 20 MVA transformer"},{"id":"ercot-tpit:5220","ercot_project":"5220","title":"Move Orange Grove load to 138 kV bus","owner":"STEC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2031-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Orange Grove","to":null,"county_from":"Jim Wells","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Move load from the 69 KV to the 138 KV instead of replacing auto. 2015 RTP"},{"id":"ercot-tpit:3822","ercot_project":"3822","title":"San Miguel to Sigmor 138 kV line upgrade","owner":"STEC","owner_project":null,"kv":138,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2031-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":26.3,"from":"San Miguel","to":"Sigmor","county_from":"Atascosa","county_to":"Live Oak","tier":"Tier 3","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Upgrade San Miguel to Sigmor 138 kV line as recommended in 2013 RTP. Will investigate re-conductoring on existing structures with ACCC and other high temperature conductors.","terminal_match":{"from":"ambiguous","to":"matched"}},{"id":"ercot-tpit:13TPIT0124","ercot_project":"13TPIT0124","title":"Airport 69 kV Substation","owner":"STEC","owner_project":null,"kv":69,"list":"cancelled","status_reported":"Conceptual","status":"Cancelled","projected_isd":"2031-06-01","actual_isd":null,"cm_new":0,"cm_rebuilt":0,"from":"Airport","to":null,"county_from":"Victoria","county_to":null,"tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Build new load serving station in the 69 kV line from Lone Tree to Twin Pines Switch."},{"id":"ercot-tpit:15TPIT0004","ercot_project":"15TPIT0004","title":"Converse - New 138kV Substation","owner":"CPS","owner_project":"S-0601","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2032-06-01","actual_isd":null,"cm_new":0.1,"cm_rebuilt":0,"from":"Converse","to":"Martinez-Skyline","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new 138kV substation into future 138kV Martinez to Skyline transmission line","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:12TPIT0009","ercot_project":"12TPIT0009","title":"Masterson Rd - New 138kV Substation","owner":"CPS","owner_project":"S-0538","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2032-06-05","actual_isd":null,"cm_new":8,"cm_rebuilt":0,"from":"Masterson Rd.","to":"Cagnon-Howard","county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"Loop new 138kV substation into the existing 138kV Cagnon to Howard line.","terminal_match":{"from":"not_in_osm","to":"not_in_osm"}},{"id":"ercot-tpit:44963","ercot_project":"44963","title":"USAA Rebuild 138 kV Station","owner":"CPS","owner_project":"T-0285","kv":138,"list":"cancelled","status_reported":"Planned","status":"Cancelled","projected_isd":"2032-07-01","actual_isd":null,"cm_new":0.6,"cm_rebuilt":0,"from":null,"to":null,"county_from":"Bexar","county_to":"Bexar","tier":"Tier 4","rpg":null,"rpg_completed":null,"bod_reviewed":null,"comments":null,"description":"CPSE_USAA 138 kV Substation Rebuild and Line Reconfiguration.","terminal_match":{"from":"multi_or_missing","to":"multi_or_missing"}}]}