{"schema":"grid-atlas-projects/2","generated_at":"2026-11-18T03:48:50.886Z","stats":{"observations":2420,"groups":131,"filings":382,"first_filed":"2020-01-15","last_filed":"2025-06-16","projects_published":101,"verified_actual":35,"verified_estimate":228,"conflicting":27,"unverified":66,"segment_links":1,"schematic_links":2},"rule":"Only figures that pass deterministic checks and an independent re-read are published. Estimates and final actual costs are separate entries. Per-mile values only for line-only costs with miles from the same filing; never for a joint project's share. Costs are never divided among mapped segments.","projects":[{"id":"mcpr:electric-transmission-texas:et1600803","source":"puct_mcpr","name":"Maplewood Interconnection: Add 2nd Circuit to serve Red Barn IPP-Owned Station","utility":"Electric Transmission Texas","ccn":["47603"],"voltage_kv":[345],"location":"Pecos","description":"Add new 345-kV transmission line circuit from the LCRA TSC Bakersfield Station to the point of interconnection at Red Barn","project_number":"ETT-139 ET1600803","status":"Completed","status_label":"Completed 2020-04-24","timeline_steps":[{"step":"Proposed","value":"CCN docket 47603 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2018-04-09"},{"step":"Energized","value":"Energized 2021-01-26 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-04-24 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2018-04-09 (actual)"},{"label":"Energized","value":"2021-01-26"},{"label":"Construction complete","value":"2020-04-24"},{"label":"Percent complete","value":"100% as of 2022-01-20"}],"circuit_miles":1.94,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-21","last_seen":"2022-01-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":2401000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","doc_url":"https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP","file":"ETT 0122m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H2","filed":"2022-01-20","control":"52947","item":25,"raw":"2401000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":2270000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","doc_url":"https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP","file":"ETT 0122m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I2","filed":"2022-01-20","control":"52947","item":25,"raw":"2270000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":1475536.82,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","doc_url":"https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP","file":"ETT 0122m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"J2","filed":"2022-01-20","control":"52947","item":25,"raw":"1475536.82"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Native workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H2; document https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Native workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I2; document https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Native workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", cell J2; document https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP"},{"label":"Summary row: PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", row 2"},{"label":"PUCT docket 47603 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47603&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":1475536.82,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","evidence_label":"PUCT filing, cell J2"},"best_cost":"$1.5M final actual","sort_cost":1475536.82,"energized_label":"2021-01-26"},{"id":"mcpr:electric-transmission-texas:p09082009","source":"puct_mcpr","name":"Heartland-Yellowjacket ETT","utility":"Electric Transmission Texas","ccn":["46234"],"voltage_kv":[138],"location":"Menard/Menard, McCulloch","description":"Heartland to Yellowjacket: Build 18.75 miles of new transmission line to 138-kV standards and operate at 69 kV","project_number":"ETT-120 P09082009","status":"Completed","status_label":"Completed 2019-10-21","timeline_steps":[{"step":"Proposed","value":"CCN docket 46234 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-03-07"},{"step":"Energized","value":"Energized 2020-06-03 (filer-reported)"},{"step":"Completed","value":"Construction complete 2019-10-21 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-03-07 (actual)"},{"label":"Energized","value":"2020-06-03"},{"label":"Construction complete","value":"2019-10-21"},{"label":"Percent complete","value":"100% as of 2022-06-21"}],"circuit_miles":18.5,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-21","last_seen":"2022-06-21","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":19824000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP","file":"ETT 0622m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H3","filed":"2022-06-21","control":"52947","item":177,"raw":"19824000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":19824000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP","file":"ETT 0622m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I3","filed":"2022-06-21","control":"52947","item":177,"raw":"19824000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":19218859,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP","file":"ETT 0622m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"J3","filed":"2022-06-21","control":"52947","item":177,"raw":"19218859"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Native workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H3; document https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Native workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I3; document https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Native workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", cell J3; document https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP"},{"label":"Summary row: PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", row 3"},{"label":"PUCT docket 46234 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=46234&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":19218859,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","evidence_label":"PUCT filing, cell J3"},"best_cost":"$19.2M final actual","sort_cost":19218859,"energized_label":"2020-06-03"},{"id":"mcpr:electric-transmission-texas:p18078001","source":"puct_mcpr","name":"Vera Wind Interconnection","utility":"Electric Transmission Texas","ccn":["48945"],"voltage_kv":[345],"location":"Wilbarger","description":"Construct 3.80 miles of new single-circuit transmission line, except of an approximate 0.7 mile section, from the new ETT Coulomb Substation to the Vera Wind Collector Station.","project_number":"ETT-158 P18078001","status":"Completed","status_label":"Completed 2020-04-10","timeline_steps":[{"step":"Proposed","value":"CCN docket 48945 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-09-23"},{"step":"Energized","value":"Energized 2020-04-27 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-04-10 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-09-23 (actual)"},{"label":"Energized","value":"2020-04-27"},{"label":"Construction complete","value":"2020-04-10"},{"label":"Percent complete","value":"100% as of 2022-06-21"}],"circuit_miles":3.8,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-21","last_seen":"2022-06-21","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":10700000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP","file":"ETT 0622m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H7","filed":"2022-06-21","control":"52947","item":177,"raw":"10700000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":7800000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP","file":"ETT 0622m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I7","filed":"2022-06-21","control":"52947","item":177,"raw":"7800000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":7644765,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP","file":"ETT 0622m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"J7","filed":"2022-06-21","control":"52947","item":177,"raw":"7644765"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Native workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H7; document https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Native workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I7; document https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Native workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", cell J7; document https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP"},{"label":"Summary row: PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", row 7"},{"label":"PUCT docket 48945 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48945&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":7644765,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","evidence_label":"PUCT filing, cell J7"},"best_cost":"$7.6M final actual","sort_cost":7644765,"energized_label":"2020-04-27"},{"id":"mcpr:electric-transmission-texas:p18078017","source":"puct_mcpr","name":"Vera Wind Interconnection","utility":"Electric Transmission Texas","ccn":["48945"],"voltage_kv":[345],"location":"Wilbarger","description":"Coulomb 345-kV Substation: Construct a new three-breaker 345-kV substation to permanently interconnect Vera Wind's 220.4 MW Windfarm.","project_number":"ETT-158 P18078017","status":"Completed","status_label":"Completed 2020-04-24","timeline_steps":[{"step":"Proposed","value":"CCN docket 48945 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-09-23"},{"step":"Energized","value":"Energized 2020-04-27 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-04-24 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-09-23 (actual)"},{"label":"Energized","value":"2020-04-27"},{"label":"Construction complete","value":"2020-04-24"},{"label":"Percent complete","value":"100% as of 2022-06-21"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-21","last_seen":"2022-06-21","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":14000000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP","file":"ETT 0622m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H9","filed":"2022-06-21","control":"52947","item":177,"raw":"14000000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":14000000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP","file":"ETT 0622m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I9","filed":"2022-06-21","control":"52947","item":177,"raw":"14000000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":14610308,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP","file":"ETT 0622m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"J9","filed":"2022-06-21","control":"52947","item":177,"raw":"14610308"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Native workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H9; document https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Native workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I9; document https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Native workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", cell J9; document https://interchange.puc.texas.gov/Documents/52947_177_1216730.ZIP"},{"label":"Summary row: PUCT 52947 item 177, filed 2022-06-21","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","where":"Workbook ETT 0622m.xlsx, sheet \"MonthlyReportForm-ETT\", row 9"},{"label":"PUCT docket 48945 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48945&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":14610308,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=177","evidence_label":"PUCT filing, cell J9"},"best_cost":"$14.6M final actual","sort_cost":14610308,"energized_label":"2020-04-27"},{"id":"mcpr:oncor-electric-delivery:13t80013","source":"puct_mcpr","name":"New Bethel 345 kV Loop Line","utility":"Oncor Electric Delivery","ccn":["44672"],"voltage_kv":[345],"location":"Anderson, Freestone, Navarro and Henderson Counties","description":"This project is to construct the new double-circuit New Bethel 345 kV Line connecting the proposed New Bethel Switching station to a connection along one of four existing 345 kV transmission line segments in the region.","project_number":"13T80013 16T80061","status":"Proposed","status_label":"Proposed (CCN docket open as of 2024-05-07)","timeline_steps":[{"step":"Proposed","value":"CCN docket 44672 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2021-12-31 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2022-12-31"},{"label":"Percent complete","value":"0% as of 2024-05-07"}],"circuit_miles":27,"route_miles":13.5,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2024-05-07","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":26499000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=127","doc_url":"https://interchange.puc.texas.gov/Documents/56006_127_1391352.ZIP","file":"ONC00000324 Errata.xlsx","sheet":"MonthlyReportForm","cell":"H1091","filed":"2024-05-07","control":"56006","item":127,"raw":"26,499,000 (t-line) 7,232,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":981444,"circuit_miles":27,"per_route_mile_usd":1962889,"route_miles":13.5,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":7232000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=127","doc_url":"https://interchange.puc.texas.gov/Documents/56006_127_1391352.ZIP","file":"ONC00000324 Errata.xlsx","sheet":"MonthlyReportForm","cell":"H1091","filed":"2024-05-07","control":"56006","item":127,"raw":"26,499,000 (t-line) 7,232,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 38, filed 2020-02-11","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=38","where":"Native workbook ONC000220.xlsx, sheet \"MonthlyReportForm\", cell H515; document https://interchange.puc.texas.gov/Documents/50421_38_1051789.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 56006 item 127, filed 2024-05-07","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=127","where":"Native workbook ONC00000324 Errata.xlsx, sheet \"MonthlyReportForm\", cell H1091; document https://interchange.puc.texas.gov/Documents/56006_127_1391352.ZIP"},{"label":"Summary row: PUCT 56006 item 127, filed 2024-05-07","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=127","where":"Workbook ONC00000324 Errata.xlsx, sheet \"MonthlyReportForm\", row 1091"},{"label":"PUCT docket 44672 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=44672&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":26499000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":981444,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=127","evidence_label":"PUCT filing, cell H1091"},"best_cost":"$26.5M estimate","sort_cost":26499000,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:16t80079","source":"puct_mcpr","name":"Riverton - Sand Lake 345 kV Line (Operating at 138 kV)","utility":"Oncor Electric Delivery","ccn":["47368"],"voltage_kv":[138],"location":"Reeves, Ward, and Loving Counties","description":"Construct the new double-circuit capable Riverton - Sand Lake 345 kV Line connecting the proposed Riverton Switching Station to the proposed Sand Lake Switching Station. Initially, one circuit will be installed and operated at 138 kV.","project_number":"16T80079 0PT38665 0PT04007 0PT04008 0PT01664 0PT37343 (R8341) (R8340)","status":"Completed","status_label":"Completed 2019-12-30","timeline_steps":[{"step":"Proposed","value":"CCN docket 47368 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-01-17"},{"step":"Energized","value":"Energized 2019-12-30 (filer-reported)"},{"step":"Completed","value":"Construction complete 2019-12-30 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-01-17 (actual)"},{"label":"Energized","value":"2019-12-30"},{"label":"Construction complete","value":"2019-12-30"},{"label":"Percent complete","value":"100% as of 2021-03-12"}],"circuit_miles":39.7,"route_miles":39.7,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2021-03-12","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":47483000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"H685","filed":"2021-03-12","control":"51705","item":70,"raw":"47,483,000 (t-line) 8,750,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1196045,"circuit_miles":39.7,"per_route_mile_usd":1196045,"route_miles":39.7,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":8750000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"H685","filed":"2021-03-12","control":"51705","item":70,"raw":"47,483,000 (t-line) 8,750,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":64718425,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"I685","filed":"2021-03-12","control":"51705","item":70,"raw":"64,718,425 (t-line) 10,584,293 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1630187,"circuit_miles":39.7,"per_route_mile_usd":1630187,"route_miles":39.7,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":10584293,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"I685","filed":"2021-03-12","control":"51705","item":70,"raw":"64,718,425 (t-line) 10,584,293 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 38, filed 2020-02-11","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=38","where":"Native workbook ONC000220.xlsx, sheet \"MonthlyReportForm\", cell H516; document https://interchange.puc.texas.gov/Documents/50421_38_1051789.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 50421 item 80, filed 2020-03-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=80","where":"Native workbook ONC000320.xlsx, sheet \"MonthlyReportForm\", cell J533; document https://interchange.puc.texas.gov/Documents/50421_80_1055558.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 51705 item 70, filed 2021-03-12","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","where":"Native workbook ONC0000221 Errata 3.12.xlsx, sheet \"MonthlyReportForm\", cell H685; document https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 51705 item 70, filed 2021-03-12","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","where":"Native workbook ONC0000221 Errata 3.12.xlsx, sheet \"MonthlyReportForm\", cell I685; document https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP"},{"label":"Summary row: PUCT 51705 item 70, filed 2021-03-12","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","where":"Workbook ONC0000221 Errata 3.12.xlsx, sheet \"MonthlyReportForm\", row 685"},{"label":"PUCT docket 47368 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47368&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/1006279947","name":"Riverton Switching Station","coordinates":[-103.86083,31.80691]},{"osm_id":"osm:way/1006103059","name":"Sand Lake Switching Station","coordinates":[-103.46451,31.5105]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":64718425,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1630187,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","evidence_label":"PUCT filing, cell I685"},"best_cost":"$64.7M estimate","sort_cost":64718425,"energized_label":"2019-12-30"},{"id":"mcpr:oncor-electric-delivery:17t80077","source":"puct_mcpr","name":"Odessa EHV - Riverton and Moss - Riverton 345 kV Line","utility":"Oncor Electric Delivery","ccn":["48095"],"voltage_kv":[345],"location":"Crane, Ector, Loving, Reeves, Ward, and Winkler Counties","description":"This project is to construct the new double-circuit 345 kV line connecting the Odessa EHV Switching Station and the Moss Switching Station to the Riverton Switching Station.","project_number":"17T80077 0PT38181 0PT38182 0PT38179 0PT38178 0PT38426 (97.31%) 19T63008 0PT38517 0PT38518 0PT38372 0PT38838 (R8356) (R8429) (R8351)","status":"Completed","status_label":"Completed 2020-12-20","timeline_steps":[{"step":"Proposed","value":"CCN docket 48095 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-03-06"},{"step":"Energized","value":"Energized 2020-12-20 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-20 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-03-06 (actual)"},{"label":"Energized","value":"2020-12-20"},{"label":"Construction complete","value":"2020-12-20"},{"label":"Percent complete","value":"100% as of 2024-10-15"}],"circuit_miles":216.7,"route_miles":116.3,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2024-10-15","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":199729000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"H1188","filed":"2024-10-15","control":"56006","item":330,"raw":"199,729,000 (t-line) 23,832,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":921684,"circuit_miles":216.7,"per_route_mile_usd":1717360,"route_miles":116.3,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":23832000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"H1188","filed":"2024-10-15","control":"56006","item":330,"raw":"199,729,000 (t-line) 23,832,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":18840070,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"I1188","filed":"2024-10-15","control":"56006","item":330,"raw":"248,571,042 (t-line) 18,840,070 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":248571042,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"I1188","filed":"2024-10-15","control":"56006","item":330,"raw":"248,571,042 (t-line) 18,840,070 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1147074,"circuit_miles":216.7,"per_route_mile_usd":2137326,"route_miles":116.3,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 38, filed 2020-02-11","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=38","where":"Native workbook ONC000220.xlsx, sheet \"MonthlyReportForm\", cell H518; document https://interchange.puc.texas.gov/Documents/50421_38_1051789.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 56006 item 330, filed 2024-10-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","where":"Native workbook ONC00001024.xlsx, sheet \"MonthlyReportForm\", cell H1188; document https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP"},{"label":"Final estimate (construction start) (line facilities only): PUCT 56006 item 330, filed 2024-10-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","where":"Native workbook ONC00001024.xlsx, sheet \"MonthlyReportForm\", cell I1188; document https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP"},{"label":"Summary row: PUCT 56006 item 330, filed 2024-10-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","where":"Workbook ONC00001024.xlsx, sheet \"MonthlyReportForm\", row 1188"},{"label":"PUCT docket 48095 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48095&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":248571042,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1147074,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","evidence_label":"PUCT filing, cell I1188"},"best_cost":"$248.6M estimate","sort_cost":248571042,"energized_label":"2020-12-20"},{"id":"mcpr:oncor-electric-delivery:18t80036","source":"puct_mcpr","name":"Horseshoe Springs - Owl Hills 138 kV Line","utility":"Oncor Electric Delivery","ccn":["48544"],"voltage_kv":[138],"location":"Culberson County","description":"Construct the new single-circuit 138 kV line connecting the Horseshoe Springs Switching Station to Owl Hills Substation.","project_number":"18T80036 0PT04001 0PT38840 0PT04013 0PT38886 18T80020 (Portion) 0PT04138 (50%) (R8383) (R8408)","status":"Completed","status_label":"Completed 2020-02-11","timeline_steps":[{"step":"Proposed","value":"CCN docket 48544 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-10-01"},{"step":"Energized","value":"Energized 2020-02-11 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-02-11 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-10-01 (actual)"},{"label":"Energized","value":"2020-02-11"},{"label":"Construction complete","value":"2020-02-11"},{"label":"Percent complete","value":"100% as of 2021-03-12"}],"circuit_miles":29.9,"route_miles":29.9,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2021-03-12","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":34033000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"H687","filed":"2021-03-12","control":"51705","item":70,"raw":"34,033,000 (t-line) 2,868,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1138227,"circuit_miles":29.9,"per_route_mile_usd":1138227,"route_miles":29.9,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":2868000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"H687","filed":"2021-03-12","control":"51705","item":70,"raw":"34,033,000 (t-line) 2,868,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":40312661,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"I687","filed":"2021-03-12","control":"51705","item":70,"raw":"40,312,661 (t-line) 5,063,031 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1348250,"circuit_miles":29.9,"per_route_mile_usd":1348250,"route_miles":29.9,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":5063031,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"I687","filed":"2021-03-12","control":"51705","item":70,"raw":"40,312,661 (t-line) 5,063,031 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 38, filed 2020-02-11","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=38","where":"Native workbook ONC000220.xlsx, sheet \"MonthlyReportForm\", cell H519; document https://interchange.puc.texas.gov/Documents/50421_38_1051789.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 50421 item 80, filed 2020-03-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=80","where":"Native workbook ONC000320.xlsx, sheet \"MonthlyReportForm\", cell J536; document https://interchange.puc.texas.gov/Documents/50421_80_1055558.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 51705 item 70, filed 2021-03-12","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","where":"Native workbook ONC0000221 Errata 3.12.xlsx, sheet \"MonthlyReportForm\", cell H687; document https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 51705 item 70, filed 2021-03-12","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","where":"Native workbook ONC0000221 Errata 3.12.xlsx, sheet \"MonthlyReportForm\", cell I687; document https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP"},{"label":"Summary row: PUCT 51705 item 70, filed 2021-03-12","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","where":"Workbook ONC0000221 Errata 3.12.xlsx, sheet \"MonthlyReportForm\", row 687"},{"label":"PUCT docket 48544 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48544&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:relation/20407815","name":"Horseshoe Springs Switching Station","coordinates":[-104.22603,31.82794]},{"osm_id":"osm:way/1006279960","name":"Owl Hills Substation","coordinates":[-104.06326,31.98273]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":40312661,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1348250,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","evidence_label":"PUCT filing, cell I687"},"best_cost":"$40.3M estimate","sort_cost":40312661,"energized_label":"2020-02-11"},{"id":"mcpr:oncor-electric-delivery:0pt37302","source":"puct_mcpr","name":"Owl Hills - Tunstill POD 138 kV Line","utility":"Oncor Electric Delivery","ccn":["48582"],"voltage_kv":[138],"location":"Culberson and Reeves Counties","description":"Construct the new single-circuit 138 kV line connecting the proposed Owl Hills Substation to the Tunstill POD.","project_number":"0PT37302 0PT38601 0PT04138 0PT38858 (50%) 0PT37751 (50%) (R8428)","status":"Completed","status_label":"Completed 2020-12-10","timeline_steps":[{"step":"Proposed","value":"CCN docket 48582 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-05-04"},{"step":"Energized","value":"Energized 2020-12-10 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-10 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-05-04 (actual)"},{"label":"Energized","value":"2020-12-10"},{"label":"Construction complete","value":"2020-12-10"},{"label":"Percent complete","value":"100% as of 2023-06-30"}],"circuit_miles":18.7,"route_miles":18.7,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2023-06-30","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":20628000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/54468_176_1307774.ZIP","file":"ONC00000623 Errata 6.30.xlsx","sheet":"MonthlyReportForm","cell":"H964","filed":"2023-06-30","control":"54468","item":176,"raw":"20,628,000 (t-line) 1,847,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1103102,"circuit_miles":18.7,"per_route_mile_usd":1103102,"route_miles":18.7,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":1847000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/54468_176_1307774.ZIP","file":"ONC00000623 Errata 6.30.xlsx","sheet":"MonthlyReportForm","cell":"H964","filed":"2023-06-30","control":"54468","item":176,"raw":"20,628,000 (t-line) 1,847,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":27244439,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/54468_176_1307774.ZIP","file":"ONC00000623 Errata 6.30.xlsx","sheet":"MonthlyReportForm","cell":"I964","filed":"2023-06-30","control":"54468","item":176,"raw":"27,244,439 (t-line) 3,100,331 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1456922,"circuit_miles":18.7,"per_route_mile_usd":1456922,"route_miles":18.7,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":3100331,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/54468_176_1307774.ZIP","file":"ONC00000623 Errata 6.30.xlsx","sheet":"MonthlyReportForm","cell":"I964","filed":"2023-06-30","control":"54468","item":176,"raw":"27,244,439 (t-line) 3,100,331 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 38, filed 2020-02-11","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=38","where":"Native workbook ONC000220.xlsx, sheet \"MonthlyReportForm\", cell H520; document https://interchange.puc.texas.gov/Documents/50421_38_1051789.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 50421 item 80, filed 2020-03-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=80","where":"Native workbook ONC000320.xlsx, sheet \"MonthlyReportForm\", cell J537; document https://interchange.puc.texas.gov/Documents/50421_80_1055558.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 54468 item 176, filed 2023-06-30","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=176","where":"Native workbook ONC00000623 Errata 6.30.xlsx, sheet \"MonthlyReportForm\", cell H964; document https://interchange.puc.texas.gov/Documents/54468_176_1307774.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 54468 item 176, filed 2023-06-30","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=176","where":"Native workbook ONC00000623 Errata 6.30.xlsx, sheet \"MonthlyReportForm\", cell I964; document https://interchange.puc.texas.gov/Documents/54468_176_1307774.ZIP"},{"label":"Summary row: PUCT 54468 item 176, filed 2023-06-30","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=176","where":"Workbook ONC00000623 Errata 6.30.xlsx, sheet \"MonthlyReportForm\", row 964"},{"label":"PUCT docket 48582 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48582&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":27244439,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1456922,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=176","evidence_label":"PUCT filing, cell I964"},"best_cost":"$27.2M estimate","sort_cost":27244439,"energized_label":"2020-12-10"},{"id":"mcpr:oncor-electric-delivery:17t80032","source":"puct_mcpr","name":"Cogdell - Clairemont 138 kV Line","utility":"Oncor Electric Delivery","ccn":["47808"],"voltage_kv":[138],"location":"Kent and Scurry Counties","description":"This project is to construct the new double-circuit 138 kV line connecting the Oncor existing Cogdell Substation to the Brazos Electric existing Clairemont Substation. One circuit will be installed initially.","project_number":"17T80032 0PT04024 0PT38884 (R9027)","status":"Completed","status_label":"Completed 2020-12-30","timeline_steps":[{"step":"Proposed","value":"CCN docket 47808 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-04-17"},{"step":"Energized","value":"Energized 2020-12-30 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-30 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-04-17 (actual)"},{"label":"Energized","value":"2020-12-30"},{"label":"Construction complete","value":"2020-12-30"},{"label":"Percent complete","value":"100% as of 2022-07-15"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-15","last_seen":"2022-07-15","joint_project":true,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":10197500,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"H720","filed":"2022-07-15","control":"52947","item":199,"raw":"10,197,500 (t-line) na (stations) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":18589374,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"I720","filed":"2022-07-15","control":"52947","item":199,"raw":"18,589,374 (t-line) na (station) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (line facilities only): PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Native workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", cell H720; document https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP"},{"label":"Final estimate (construction start) (line facilities only): PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Native workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", cell I720; document https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP"},{"label":"Summary row: PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", row 720"},{"label":"PUCT docket 47808 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47808&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":18589374,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","evidence_label":"PUCT filing, cell I720"},"best_cost":"$18.6M estimate","sort_cost":18589374,"energized_label":"2020-12-30"},{"id":"mcpr:oncor-electric-delivery:0pt39679","source":"puct_mcpr","name":"Clearfork - Dog House 345 kV Line","utility":"Oncor Electric Delivery","ccn":["48861"],"voltage_kv":[345],"location":"Andrews County","description":"Construct the new 345 kV transmission line connecting the existing Clearfork Switchyard to the proposed Dog House Switchyard.","project_number":"0PT39679 0PT39819 0PT38948 (R8482) (R8284)","status":"Completed","status_label":"Completed 2020-06-01","timeline_steps":[{"step":"Proposed","value":"CCN docket 48861 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-10-23"},{"step":"Energized","value":"Energized 2020-06-01 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-06-01 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-10-23 (actual)"},{"label":"Energized","value":"2020-06-01"},{"label":"Construction complete","value":"2020-06-01"},{"label":"Percent complete","value":"100% as of 2021-03-12"}],"circuit_miles":10.3,"route_miles":10.3,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2021-03-12","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":14304695,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"H690","filed":"2021-03-12","control":"51705","item":70,"raw":"14,304,695 (t-line) 6,995,400 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1388805,"circuit_miles":10.3,"per_route_mile_usd":1388805,"route_miles":10.3,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":6995400,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"H690","filed":"2021-03-12","control":"51705","item":70,"raw":"14,304,695 (t-line) 6,995,400 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":14104673,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"I690","filed":"2021-03-12","control":"51705","item":70,"raw":"14,104,673 (t-line) 8,282,514 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1369386,"circuit_miles":10.3,"per_route_mile_usd":1369386,"route_miles":10.3,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":8282514,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","doc_url":"https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP","file":"ONC0000221 Errata 3.12.xlsx","sheet":"MonthlyReportForm","cell":"I690","filed":"2021-03-12","control":"51705","item":70,"raw":"14,104,673 (t-line) 8,282,514 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 38, filed 2020-02-11","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=38","where":"Native workbook ONC000220.xlsx, sheet \"MonthlyReportForm\", cell H522; document https://interchange.puc.texas.gov/Documents/50421_38_1051789.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 50421 item 104, filed 2020-04-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=104","where":"Native workbook ONC000420.xlsx, sheet \"MonthlyReportForm\", cell J551; document https://interchange.puc.texas.gov/Documents/50421_104_1060645.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 51705 item 70, filed 2021-03-12","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","where":"Native workbook ONC0000221 Errata 3.12.xlsx, sheet \"MonthlyReportForm\", cell H690; document https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 51705 item 70, filed 2021-03-12","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","where":"Native workbook ONC0000221 Errata 3.12.xlsx, sheet \"MonthlyReportForm\", cell I690; document https://interchange.puc.texas.gov/Documents/51705_70_1116203.ZIP"},{"label":"Summary row: PUCT 51705 item 70, filed 2021-03-12","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","where":"Workbook ONC0000221 Errata 3.12.xlsx, sheet \"MonthlyReportForm\", row 690"},{"label":"PUCT docket 48861 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48861&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":14104673,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1369386,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=70","evidence_label":"PUCT filing, cell I690"},"best_cost":"$14.1M estimate","sort_cost":14104673,"energized_label":"2020-06-01"},{"id":"mcpr:oncor-electric-delivery:na","source":"puct_mcpr","name":"Stiles - Coates 138 kV Line","utility":"Oncor Electric Delivery","ccn":["46726"],"voltage_kv":[138],"location":"Reagan County","description":"Construct the new 138 kV transmission line connecting the existing Stiles station to the proposed Coates station.","project_number":"NA","status":"Proposed","status_label":"Proposed (CCN docket open as of 2024-05-07)","timeline_steps":[{"step":"Proposed","value":"CCN docket 46726 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2021-12-31 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2023-12-31"},{"label":"Percent complete","value":"unavailable"}],"circuit_miles":8,"route_miles":8,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2024-05-07","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":9682000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=127","doc_url":"https://interchange.puc.texas.gov/Documents/56006_127_1391352.ZIP","file":"ONC00000324 Errata.xlsx","sheet":"MonthlyReportForm","cell":"H1093","filed":"2024-05-07","control":"56006","item":127,"raw":"9682000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 56006 item 127, filed 2024-05-07","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=127","where":"Native workbook ONC00000324 Errata.xlsx, sheet \"MonthlyReportForm\", cell H1093; document https://interchange.puc.texas.gov/Documents/56006_127_1391352.ZIP"},{"label":"Summary row: PUCT 56006 item 127, filed 2024-05-07","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=127","where":"Workbook ONC00000324 Errata.xlsx, sheet \"MonthlyReportForm\", row 1093"},{"label":"PUCT docket 46726 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=46726&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":9682000,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=127","evidence_label":"PUCT filing, cell H1093"},"best_cost":"$9.7M estimate","sort_cost":9682000,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt37182","source":"puct_mcpr","name":"Sand Lake - Solstice 345 kV Line","utility":"Oncor Electric Delivery","ccn":["48785"],"voltage_kv":[345],"location":"Pecos, Reeves, and Ward Counties","description":"This project is to construct the new double-circuit 345 kV line connecting the Oncor Sand Lake Switch to the AEP Texas Solstice Switch.","project_number":"0PT37182 0PT40453 0PT38505 0PT38427 (95.57%) 0PT39348 0PT39349 (R8380) (R8420)","status":"Completed","status_label":"Completed 2020-12-28","timeline_steps":[{"step":"Proposed","value":"CCN docket 48785 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-06-21"},{"step":"Energized","value":"Energized 2020-12-28 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-28 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-06-21 (actual)"},{"label":"Energized","value":"2020-12-28"},{"label":"Construction complete","value":"2020-12-28"},{"label":"Percent complete","value":"100% as of 2024-10-15"}],"circuit_miles":89,"route_miles":44.5,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2024-10-15","joint_project":true,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":49110000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"H1189","filed":"2024-10-15","control":"56006","item":330,"raw":"49,110,000 (t-line) 17,600,000 (stations) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":17600000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"H1189","filed":"2024-10-15","control":"56006","item":330,"raw":"49,110,000 (t-line) 17,600,000 (stations) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":68922778,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"I1189","filed":"2024-10-15","control":"56006","item":330,"raw":"68,922,778 (t-line) 22,523,721 (stations) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":22523721,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"I1189","filed":"2024-10-15","control":"56006","item":330,"raw":"68,922,778 (t-line) 22,523,721 (stations) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 56006 item 330, filed 2024-10-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","where":"Native workbook ONC00001024.xlsx, sheet \"MonthlyReportForm\", cell H1189; document https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 56006 item 330, filed 2024-10-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","where":"Native workbook ONC00001024.xlsx, sheet \"MonthlyReportForm\", cell I1189; document https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP"},{"label":"Summary row: PUCT 56006 item 330, filed 2024-10-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","where":"Workbook ONC00001024.xlsx, sheet \"MonthlyReportForm\", row 1189"},{"label":"PUCT docket 48785 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48785&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/1006103059","name":"Sand Lake Switching Station","coordinates":[-103.46451,31.5105]},{"osm_id":"osm:way/500535889","name":"Solstice Substation","coordinates":[-103.36171,30.94832]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":68922778,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","evidence_label":"PUCT filing, cell I1189"},"best_cost":"$68.9M estimate","sort_cost":68922778,"energized_label":"2020-12-28","osm_matches":[{"osm_id":"osm:way/1006095235","layer":"lines-345plus"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high"},{"id":"mcpr:oncor-electric-delivery:0pt38174","source":"puct_mcpr","name":"Riverton - Kyle Ranch 138 kV Line","utility":"Oncor Electric Delivery","ccn":["49304"],"voltage_kv":[138],"location":"Loving and Reeves Counties","description":"Construct the new single-circuit 138 kV line connecting the Riverton Switch station to the Kyle Ranch Substation.","project_number":"0PT38174 0PT40267 0PT04144 (50%) 0PT38426 (2.69%) 0PT40670 0PT40867 (50%) (R8427)","status":"Completed","status_label":"Completed 2020-12-10","timeline_steps":[{"step":"Proposed","value":"CCN docket 49304 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-06-08"},{"step":"Energized","value":"Energized 2020-12-10 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-10 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-06-08 (actual)"},{"label":"Energized","value":"2020-12-10"},{"label":"Construction complete","value":"2020-12-10"},{"label":"Percent complete","value":"100% as of 2024-09-13"}],"circuit_miles":15.2,"route_miles":15.2,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2024-09-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":3040000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"H1225","filed":"2024-09-13","control":"56006","item":289,"raw":"19,207,000 (t-line) 3,040,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":3301428,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"I1225","filed":"2024-09-13","control":"56006","item":289,"raw":"21,226,008 (t-line) 3,301,428 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"line_only","cost_usd":18920478,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"J1225","filed":"2024-09-13","control":"56006","item":289,"raw":"18,920,478 (t-line) 3,573,910 (station)"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"line facilities only","per_circuit_mile_usd":1244768,"circuit_miles":15.2,"per_route_mile_usd":1244768,"route_miles":15.2,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_actual","cost_scope":"substation_only","cost_usd":3573910,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"J1225","filed":"2024-09-13","control":"56006","item":289,"raw":"18,920,478 (t-line) 3,573,910 (station)"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 38, filed 2020-02-11","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=38","where":"Native workbook ONC000220.xlsx, sheet \"MonthlyReportForm\", cell H527; document https://interchange.puc.texas.gov/Documents/50421_38_1051789.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell H1225; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final estimate (construction start) (line facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell I1225; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final actual cost (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell J1225; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Summary row: PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", row 1225"},{"label":"PUCT docket 49304 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=49304&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/1006279947","name":"Riverton Switching Station","coordinates":[-103.86083,31.80691]},{"osm_id":"osm:way/1006279914","name":"Kyle Ranch Substation","coordinates":[-103.65165,31.93065]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":18920478,"cost_basis_label":"Final actual cost","cost_scope_label":"line facilities only","per_circuit_mile_usd":1244768,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","evidence_label":"PUCT filing, cell J1225"},"best_cost":"$18.9M final actual","sort_cost":18920478,"energized_label":"2020-12-10","osm_matches":[{"osm_id":"osm:way/1006279910","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high"},{"id":"mcpr:oncor-electric-delivery:0pt38573","source":"puct_mcpr","name":"Riverton - Sand Lake 345 kV Line Circuit Addition (Phase 2)","utility":"Oncor Electric Delivery","ccn":["49723"],"voltage_kv":[345,138],"location":"Reeves and Ward Counties","description":"Add the second circuit on the vacant circuit position of the Riverton - Sand Lake 345 kV Line that will be operated at 345 kV.","project_number":"0PT38573 0PT38506 0PT38427 (95.57%) 0PT38426 (2.69%) (R8443)","status":"Completed","status_label":"Completed 2020-12-18","timeline_steps":[{"step":"Proposed","value":"CCN docket 49723 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-06-21"},{"step":"Energized","value":"Energized 2020-12-18 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-18 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-06-21 (actual)"},{"label":"Energized","value":"2020-12-18"},{"label":"Construction complete","value":"2020-12-18"},{"label":"Percent complete","value":"100% as of 2022-07-15"}],"circuit_miles":39.9,"route_miles":39.9,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2022-07-15","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":1185000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"H724","filed":"2022-07-15","control":"52947","item":199,"raw":"29,200,000 (t-line) 1,185,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":1454167,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"I724","filed":"2022-07-15","control":"52947","item":199,"raw":"24,561,647 (t-line) 1,454,167 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Native workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", cell H724; document https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Native workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", cell I724; document https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP"},{"label":"Summary row: PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", row 724"},{"label":"PUCT docket 49723 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=49723&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/1006279947","name":"Riverton Switching Station","coordinates":[-103.86083,31.80691]},{"osm_id":"osm:way/1006103059","name":"Sand Lake Switching Station","coordinates":[-103.46451,31.5105]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":1454167,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","evidence_label":"PUCT filing, cell I724"},"best_cost":"$1.5M estimate","sort_cost":1454167,"energized_label":"2020-12-18","osm_matches":[{"osm_id":"osm:way/1006279934","layer":"lines-345plus"},{"osm_id":"osm:way/1006401423","layer":"lines-345plus"},{"osm_id":"osm:way/1006401424","layer":"lines-345plus"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium"},{"id":"mcpr:oncor-electric-delivery:0pt38176","source":"puct_mcpr","name":"Kyle Ranch - Quarry Field 138 kV Line","utility":"Oncor Electric Delivery","ccn":["49302"],"voltage_kv":[138],"location":"Loving County","description":"Construct the new single-circuit 138 kV line connecting the Kyle Ranch Substation to the Quarry Field Switch station.","project_number":"0PT38176 0PT04087 0PT04144 (50%) 0PT37531 0PT40867 (50%) (R8384) (R8412)","status":"Completed","status_label":"Completed 2020-12-10","timeline_steps":[{"step":"Proposed","value":"CCN docket 49302 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-03-18"},{"step":"Energized","value":"Energized 2020-12-10 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-10 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-03-18 (actual)"},{"label":"Energized","value":"2020-12-10"},{"label":"Construction complete","value":"2020-12-10"},{"label":"Percent complete","value":"100% as of 2022-07-15"}],"circuit_miles":12.4,"route_miles":12.4,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2022-07-15","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":15855000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"H725","filed":"2022-07-15","control":"52947","item":199,"raw":"16,832,000 (t-line) 15,855,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":18959901,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"I725","filed":"2022-07-15","control":"52947","item":199,"raw":"18,959,901 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 38, filed 2020-02-11","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=38","where":"Native workbook ONC000220.xlsx, sheet \"MonthlyReportForm\", cell H530; document https://interchange.puc.texas.gov/Documents/50421_38_1051789.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Native workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", cell H725; document https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Native workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", cell I725; document https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP"},{"label":"Summary row: PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", row 725"},{"label":"PUCT docket 49302 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=49302&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/1006279914","name":"Kyle Ranch Substation","coordinates":[-103.65165,31.93065]},{"osm_id":"osm:way/1006404970","name":"Quarry Field Switching Station","coordinates":[-103.6387,31.78297]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":18959901,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","evidence_label":"PUCT filing, cell I725"},"best_cost":"$19.0M estimate","sort_cost":18959901,"energized_label":"2020-12-10","osm_matches":[{"osm_id":"osm:way/1454524506","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high"},{"id":"mcpr:oncor-electric-delivery:18t65163","source":"puct_mcpr","name":"Sargent Road - Oakland Ave. Tap 138 kV Line","utility":"Oncor Electric Delivery","ccn":["50217"],"voltage_kv":[138],"location":"Dallas County","description":"Construct the new single-circuit 138 kV line connecting Sargent Road Switch to Oakland Avenue Tap installed completely within Oncor fee-owned property.","project_number":"18T65163 0PT38449 0PT04020 0PT04021 (M4268)","status":"Completed","status_label":"Completed 2020-12-11","timeline_steps":[{"step":"Proposed","value":"CCN docket 50217 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-07-10"},{"step":"Energized","value":"Energized 2020-12-11 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-11 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-07-10 (actual)"},{"label":"Energized","value":"2020-12-11"},{"label":"Construction complete","value":"2020-12-11"},{"label":"Percent complete","value":"100% as of 2022-03-15"}],"circuit_miles":2.5,"route_miles":5,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2022-03-15","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":4940000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","doc_url":"https://interchange.puc.texas.gov/Documents/52947_86_1194220.ZIP","file":"ONC0000322.xlsx","sheet":"MonthlyReportForm","cell":"H758","filed":"2022-03-15","control":"52947","item":86,"raw":"4,940,000 (t-line) 1,375,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1976000,"circuit_miles":2.5,"per_route_mile_usd":988000,"route_miles":5,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":1375000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","doc_url":"https://interchange.puc.texas.gov/Documents/52947_86_1194220.ZIP","file":"ONC0000322.xlsx","sheet":"MonthlyReportForm","cell":"H758","filed":"2022-03-15","control":"52947","item":86,"raw":"4,940,000 (t-line) 1,375,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":4460100,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","doc_url":"https://interchange.puc.texas.gov/Documents/52947_86_1194220.ZIP","file":"ONC0000322.xlsx","sheet":"MonthlyReportForm","cell":"I758","filed":"2022-03-15","control":"52947","item":86,"raw":"4,460,100 (t-line) 1,424,358 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1784040,"circuit_miles":2.5,"per_route_mile_usd":892020,"route_miles":5,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":1424358,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","doc_url":"https://interchange.puc.texas.gov/Documents/52947_86_1194220.ZIP","file":"ONC0000322.xlsx","sheet":"MonthlyReportForm","cell":"I758","filed":"2022-03-15","control":"52947","item":86,"raw":"4,460,100 (t-line) 1,424,358 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":4746099,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","doc_url":"https://interchange.puc.texas.gov/Documents/52947_86_1194220.ZIP","file":"ONC0000322.xlsx","sheet":"MonthlyReportForm","cell":"J758","filed":"2022-03-15","control":"52947","item":86,"raw":"4746099"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 38, filed 2020-02-11","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=38","where":"Native workbook ONC000220.xlsx, sheet \"MonthlyReportForm\", cell H531; document https://interchange.puc.texas.gov/Documents/50421_38_1051789.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 52947 item 86, filed 2022-03-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","where":"Native workbook ONC0000322.xlsx, sheet \"MonthlyReportForm\", cell H758; document https://interchange.puc.texas.gov/Documents/52947_86_1194220.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 52947 item 86, filed 2022-03-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","where":"Native workbook ONC0000322.xlsx, sheet \"MonthlyReportForm\", cell I758; document https://interchange.puc.texas.gov/Documents/52947_86_1194220.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 86, filed 2022-03-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","where":"Native workbook ONC0000322.xlsx, sheet \"MonthlyReportForm\", cell J758; document https://interchange.puc.texas.gov/Documents/52947_86_1194220.ZIP"},{"label":"Summary row: PUCT 52947 item 86, filed 2022-03-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","where":"Workbook ONC0000322.xlsx, sheet \"MonthlyReportForm\", row 758"},{"label":"PUCT docket 50217 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=50217&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":4746099,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=86","evidence_label":"PUCT filing, cell J758"},"best_cost":"$4.7M final actual","sort_cost":4746099,"energized_label":"2020-12-11"},{"id":"mcpr:oncor-electric-delivery:0pt39531","source":"puct_mcpr","name":"Bearkat - Longshore 345 kV Line","utility":"Oncor Electric Delivery","ccn":["50410"],"voltage_kv":[345],"location":"Glasscock and Howard Counties","description":"Construct the new single-circuit 345 kV line connecting the WETT Bearkat Switch to the Oncor Longshore Switch.","project_number":"0PT39531 0PT44980 0PT45164 0PT42867 (R9057)","status":"Completed","status_label":"Completed 2023-12-01","timeline_steps":[{"step":"Proposed","value":"CCN docket 50410 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2022-06-10"},{"step":"Energized","value":"Energized 2023-12-01 (filer-reported)"},{"step":"Completed","value":"Construction complete 2023-12-01 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2022-06-10 (actual)"},{"label":"Energized","value":"2023-12-01"},{"label":"Construction complete","value":"2023-12-01"},{"label":"Percent complete","value":"100% as of 2024-10-15"}],"circuit_miles":30.8,"route_miles":30.8,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2024-10-15","joint_project":true,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":29339500,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"H1190","filed":"2024-10-15","control":"56006","item":330,"raw":"29,339,500 (t-line) 1,700,000 (station) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":1700000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"H1190","filed":"2024-10-15","control":"56006","item":330,"raw":"29,339,500 (t-line) 1,700,000 (station) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":34827900,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"I1190","filed":"2024-10-15","control":"56006","item":330,"raw":"34,827,900 (t-line) 1,685,394 (Station) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":1685394,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP","file":"ONC00001024.xlsx","sheet":"MonthlyReportForm","cell":"I1190","filed":"2024-10-15","control":"56006","item":330,"raw":"34,827,900 (t-line) 1,685,394 (Station) (Oncor Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 56006 item 330, filed 2024-10-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","where":"Native workbook ONC00001024.xlsx, sheet \"MonthlyReportForm\", cell H1190; document https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 56006 item 330, filed 2024-10-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","where":"Native workbook ONC00001024.xlsx, sheet \"MonthlyReportForm\", cell I1190; document https://interchange.puc.texas.gov/Documents/56006_330_1435119.ZIP"},{"label":"Summary row: PUCT 56006 item 330, filed 2024-10-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","where":"Workbook ONC00001024.xlsx, sheet \"MonthlyReportForm\", row 1190"},{"label":"PUCT docket 50410 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=50410&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/453310293","name":"Bearkat Substation","coordinates":[-101.5315,31.76605]},{"osm_id":"osm:way/172212648","name":"Longshore Substation","coordinates":[-101.45234,32.1003]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":34827900,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=330","evidence_label":"PUCT filing, cell I1190"},"best_cost":"$34.8M estimate","sort_cost":34827900,"energized_label":"2023-12-01","osm_matches":[{"osm_id":"osm:way/1454776036","layer":"lines-345plus"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high"},{"id":"mcpr:oncor-electric-delivery:0pt41156","source":"puct_mcpr","name":"Johnson Draw POD - Salt Flat Road 138 kV Line","utility":"Oncor Electric Delivery","ccn":["50560"],"voltage_kv":[138],"location":"Midland County","description":"Construct the new single-circuit 138 kV line connecting the Salt Flat Road Switch to the proposed Johnson Draw POD.","project_number":"0PT41156 0PT42396 0PT40679 0PT41331 0PT41511 (R8534)","status":"Completed","status_label":"Completed 2021-06-29","timeline_steps":[{"step":"Proposed","value":"CCN docket 50560 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-11-11"},{"step":"Energized","value":"Energized 2021-06-29 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-06-29 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-11-11 (actual)"},{"label":"Energized","value":"2021-06-29"},{"label":"Construction complete","value":"2021-06-29"},{"label":"Percent complete","value":"100% as of 2022-07-15"}],"circuit_miles":2.8,"route_miles":2.8,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-03-13","last_seen":"2022-07-15","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":5257000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"H726","filed":"2022-07-15","control":"52947","item":199,"raw":"5,257,000 (t-line) 1,461,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1877500,"circuit_miles":2.8,"per_route_mile_usd":1877500,"route_miles":2.8,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":1461000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"H726","filed":"2022-07-15","control":"52947","item":199,"raw":"5,257,000 (t-line) 1,461,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":5257000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"I726","filed":"2022-07-15","control":"52947","item":199,"raw":"5,257,000 (t-line) 1,502,572 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1877500,"circuit_miles":2.8,"per_route_mile_usd":1877500,"route_miles":2.8,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":1502572,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"I726","filed":"2022-07-15","control":"52947","item":199,"raw":"5,257,000 (t-line) 1,502,572 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Native workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", cell H726; document https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Native workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", cell I726; document https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP"},{"label":"Summary row: PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", row 726"},{"label":"PUCT docket 50560 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=50560&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":5257000,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1877500,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","evidence_label":"PUCT filing, cell I726"},"best_cost":"$5.3M estimate","sort_cost":5257000,"energized_label":"2021-06-29"},{"id":"mcpr:oncor-electric-delivery:0pt39835","source":"puct_mcpr","name":"Ogallala - Abernathy 345 kV Line","utility":"Oncor Electric Delivery","ccn":["48625"],"voltage_kv":[345],"location":"Castro, Hale and Swisher Counties","description":"Construct the new single-circuit 345 kV line connecting the existing Ogallala station to the existing Abernathy station. This project is part of the LP&L integration into the ERCOT system.","project_number":"0PT39835 0PT39844 0PT39623 0PT39631 0PT39632 (56.2%) (R3005) (R3002) (R3003)","status":"Completed","status_label":"Completed 2021-06-21","timeline_steps":[{"step":"Proposed","value":"CCN docket 48625 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-01-15"},{"step":"Energized","value":"Energized 2021-06-21 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-06-21 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-01-15 (actual)"},{"label":"Energized","value":"2021-06-21"},{"label":"Construction complete","value":"2021-06-21"},{"label":"Percent complete","value":"100% as of 2024-09-13"}],"circuit_miles":57.9,"route_miles":57.9,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2024-09-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":87876048,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"H1245","filed":"2024-09-13","control":"56006","item":289,"raw":"87,876,048 (t-line) 8,304,600 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1517721,"circuit_miles":57.9,"per_route_mile_usd":1517721,"route_miles":57.9,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":8304600,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"H1245","filed":"2024-09-13","control":"56006","item":289,"raw":"87,876,048 (t-line) 8,304,600 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":88807431,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"I1245","filed":"2024-09-13","control":"56006","item":289,"raw":"88,807,431 (t-line) 9,122,137 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1533807,"circuit_miles":57.9,"per_route_mile_usd":1533807,"route_miles":57.9,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":9122137,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"I1245","filed":"2024-09-13","control":"56006","item":289,"raw":"88,807,431 (t-line) 9,122,137 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"line_only","cost_usd":76692456,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"J1245","filed":"2024-09-13","control":"56006","item":289,"raw":"76,692,456 (t-line) 8,747,484 (station)"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"line facilities only","per_circuit_mile_usd":1324567,"circuit_miles":57.9,"per_route_mile_usd":1324567,"route_miles":57.9,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_actual","cost_scope":"substation_only","cost_usd":8747484,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"J1245","filed":"2024-09-13","control":"56006","item":289,"raw":"76,692,456 (t-line) 8,747,484 (station)"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 12, filed 2020-01-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=12","where":"Native workbook ONC000120.xlsx, sheet \"MonthlyReportForm\", cell H495; document https://interchange.puc.texas.gov/Documents/50421_12_1048281.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell H1245; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell I1245; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final actual cost (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell J1245; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Summary row: PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", row 1245"},{"label":"PUCT docket 48625 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48625&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":76692456,"cost_basis_label":"Final actual cost","cost_scope_label":"line facilities only","per_circuit_mile_usd":1324567,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","evidence_label":"PUCT filing, cell J1245"},"best_cost":"$76.7M final actual","sort_cost":76692456,"energized_label":"2021-06-21"},{"id":"mcpr:oncor-electric-delivery:0pt39896","source":"puct_mcpr","name":"Abernathy - Wadsworth 345 kV Line","utility":"Oncor Electric Delivery","ccn":["48668"],"voltage_kv":[345],"location":"Hale and Lubbock Counties","description":"Construct the new single-circuit 345 kV line connecting the existing Abernathy station to the existing Wadsworth station. This project is part of the LP&L integration into the ERCOT system.","project_number":"0PT39896 0PT40341 0PT39625 0PT41983 0PT39632 (25.7%) 0PT39633 (55.3%) 0PT40608 0PT44515 0PT44516 (R3008) (R3003) (R3001)","status":"Completed","status_label":"Completed 2021-05-12","timeline_steps":[{"step":"Proposed","value":"CCN docket 48668 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-01-15"},{"step":"Energized","value":"Energized 2021-05-12 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-05-12 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-01-15 (actual)"},{"label":"Energized","value":"2021-05-12"},{"label":"Construction complete","value":"2021-05-12"},{"label":"Percent complete","value":"100% as of 2024-09-13"}],"circuit_miles":32.9,"route_miles":32.9,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2024-09-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":9403700,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"H1246","filed":"2024-09-13","control":"56006","item":289,"raw":"56,736,759 (t-line) 9,403,700 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":9635269,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"I1246","filed":"2024-09-13","control":"56006","item":289,"raw":"56,702,358 (t-line) 9,635,269 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"substation_only","cost_usd":8844081,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"J1246","filed":"2024-09-13","control":"56006","item":289,"raw":"229,917 (t-line) 8,844,081 (stations)"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 12, filed 2020-01-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=12","where":"Native workbook ONC000120.xlsx, sheet \"MonthlyReportForm\", cell H497; document https://interchange.puc.texas.gov/Documents/50421_12_1048281.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell H1246; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell I1246; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final actual cost (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell J1246; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Summary row: PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", row 1246"},{"label":"PUCT docket 48668 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48668&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":8844081,"cost_basis_label":"Final actual cost","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","evidence_label":"PUCT filing, cell J1246"},"best_cost":"$8.8M final actual","sort_cost":8844081,"energized_label":"2021-05-12"},{"id":"mcpr:oncor-electric-delivery:0pt39846","source":"puct_mcpr","name":"Abernathy - North - North Loop 345/115 kV Line","utility":"Oncor Electric Delivery","ccn":["49151"],"voltage_kv":[345,115],"location":"Hale and Lubbock Counties","description":"Construct the new transmission line connecting the existing Abernathy station to the northern portion of LP&L's planned 115 kV loop line, routed through one of three options for the proposed North station. Depending on which North station is used, this line will be either a single-circuit 345 kV line or a combination of single-circuit 345 kV and double-circuit 115 kV line. This project is part of the LP&L integration into the ERCOT system.","project_number":"0PT39846 0PT41891 0PT39637 0PT39968 0PT39636 0PT41986 0PT39632 (18.1%) 0PT44518 0PT44519 (R3007) (R3011) (R3003)","status":"Completed","status_label":"Completed 2021-05-16","timeline_steps":[{"step":"Proposed","value":"CCN docket 49151 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-12-21"},{"step":"Energized","value":"Energized 2021-05-16 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-05-16 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-12-21 (actual)"},{"label":"Energized","value":"2021-05-16"},{"label":"Construction complete","value":"2021-05-16"},{"label":"Percent complete","value":"100% as of 2024-09-13"}],"circuit_miles":34.3,"route_miles":24.6,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2024-09-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":33367000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"H1249","filed":"2024-09-13","control":"56006","item":289,"raw":"39,782,000 (t-line) 33,367,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":20274578,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"I1249","filed":"2024-09-13","control":"56006","item":289,"raw":"44,361,677 (t-line) 20,274,578 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"substation_only","cost_usd":9023503,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"J1249","filed":"2024-09-13","control":"56006","item":289,"raw":"273,291 (t-line) 9,023,503 (stations)"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 50421 item 12, filed 2020-01-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=12","where":"Native workbook ONC000120.xlsx, sheet \"MonthlyReportForm\", cell H502; document https://interchange.puc.texas.gov/Documents/50421_12_1048281.ZIP"},{"label":"CCN application estimate (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell H1249; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell I1249; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final actual cost (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell J1249; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Summary row: PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", row 1249"},{"label":"PUCT docket 49151 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=49151&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":9023503,"cost_basis_label":"Final actual cost","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","evidence_label":"PUCT filing, cell J1249"},"best_cost":"$9.0M final actual","sort_cost":9023503,"energized_label":"2021-05-16"},{"id":"mcpr:lcra-transmission-services-corporation:1010656","source":"puct_mcpr","name":"Blumenthal TL Addition (CCN)","utility":"LCRA Transmission Services Corporation","ccn":["43599"],"voltage_kv":[138],"location":"Gillespie, Kendall, Blanco","description":"Construct a new 138-kV transmission line connecting the new Blumenthal (CTEC) Substation to a tap point on the Kendall - Mountain Top 138-kV transmission line (T342).","project_number":"1010656","status":"Completed","status_label":"Completed 2018-05-18","timeline_steps":[{"step":"Proposed","value":"CCN docket 43599 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2017-10-02"},{"step":"Energized","value":"Energized 2018-05-18 (filer-reported)"},{"step":"Completed","value":"Construction complete 2018-05-18 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2017-10-02 (actual)"},{"label":"Energized","value":"2018-05-18"},{"label":"Construction complete","value":"2018-05-18"},{"label":"Percent complete","value":"100% as of 2021-07-15"}],"circuit_miles":14.4,"route_miles":14.4,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-01-15","last_seen":"2021-07-15","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":28450000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/51705_181_1139474.ZIP","file":"LCRATSC0721.xlsx","sheet":"MCPR July 2021","cell":"I2","filed":"2021-07-15","control":"51705","item":181,"raw":"28450000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":26803375,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/51705_181_1139474.ZIP","file":"LCRATSC0721.xlsx","sheet":"MCPR July 2021","cell":"J2","filed":"2021-07-15","control":"51705","item":181,"raw":"26803375"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 50421 item 169, filed 2020-06-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=50421&itemNumber=169","where":"Native workbook LCRATSC0620.xlsx, sheet \"MCPR June 2020\", cell J2; document https://interchange.puc.texas.gov/Documents/50421_169_1070856.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 51705 item 181, filed 2021-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","where":"Native workbook LCRATSC0721.xlsx, sheet \"MCPR July 2021\", cell I2; document https://interchange.puc.texas.gov/Documents/51705_181_1139474.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 51705 item 181, filed 2021-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","where":"Native workbook LCRATSC0721.xlsx, sheet \"MCPR July 2021\", cell J2; document https://interchange.puc.texas.gov/Documents/51705_181_1139474.ZIP"},{"label":"Summary row: PUCT 51705 item 181, filed 2021-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","where":"Workbook LCRATSC0721.xlsx, sheet \"MCPR July 2021\", row 2"},{"label":"PUCT docket 43599 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=43599&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":26803375,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","evidence_label":"PUCT filing, cell J2"},"best_cost":"$26.8M final actual","sort_cost":26803375,"energized_label":"2018-05-18"},{"id":"mcpr:lcra-transmission-services-corporation:1015208","source":"puct_mcpr","name":"Zorn - Marion TL Addition (CCN)","utility":"LCRA Transmission Services Corporation","ccn":["45601"],"voltage_kv":[345],"location":"Guadalupe","description":"Construct a new 345-kV transmission line to provide a transmission point of interconnection between Central Texas and San Antonio area.","project_number":"1015208","status":"Completed","status_label":"Completed 2019-05-30","timeline_steps":[{"step":"Proposed","value":"CCN docket 45601 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2018-06-01"},{"step":"Energized","value":"Energized 2019-05-30 (filer-reported)"},{"step":"Completed","value":"Construction complete 2019-05-30 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2018-06-01 (actual)"},{"label":"Energized","value":"2019-05-30"},{"label":"Construction complete","value":"2019-05-30"},{"label":"Percent complete","value":"100% as of 2021-07-15"}],"circuit_miles":20.33,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-15","last_seen":"2021-07-15","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":83331014,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/51705_181_1139474.ZIP","file":"LCRATSC0721.xlsx","sheet":"MCPR July 2021","cell":"I3","filed":"2021-07-15","control":"51705","item":181,"raw":"83331014"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":48633288,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/51705_181_1139474.ZIP","file":"LCRATSC0721.xlsx","sheet":"MCPR July 2021","cell":"J3","filed":"2021-07-15","control":"51705","item":181,"raw":"48633288"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"Final estimate (construction start) (whole project as reported): PUCT 51705 item 181, filed 2021-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","where":"Native workbook LCRATSC0721.xlsx, sheet \"MCPR July 2021\", cell I3; document https://interchange.puc.texas.gov/Documents/51705_181_1139474.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 51705 item 181, filed 2021-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","where":"Native workbook LCRATSC0721.xlsx, sheet \"MCPR July 2021\", cell J3; document https://interchange.puc.texas.gov/Documents/51705_181_1139474.ZIP"},{"label":"Summary row: PUCT 51705 item 181, filed 2021-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","where":"Workbook LCRATSC0721.xlsx, sheet \"MCPR July 2021\", row 3"},{"label":"PUCT docket 45601 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=45601&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":48633288,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=51705&itemNumber=181","evidence_label":"PUCT filing, cell J3"},"best_cost":"$48.6M final actual","sort_cost":48633288,"energized_label":"2019-05-30"},{"id":"mcpr:lcra-transmission-services-corporation:1014352","source":"puct_mcpr","name":"Leander - Round Rock TL Addition (CCN)","utility":"LCRA Transmission Services Corporation","ccn":["45866"],"voltage_kv":[138],"location":"Williamson","description":"Construct a new 138-kV transmission line to provide a transmission point of interconnection to two load-serving substations","project_number":"1014352","status":"Completed","status_label":"Completed 2020-06-04","timeline_steps":[{"step":"Proposed","value":"CCN docket 45866 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-01-02"},{"step":"Energized","value":"Energized 2020-06-04 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-06-04 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-01-02 (actual)"},{"label":"Energized","value":"2020-06-04"},{"label":"Construction complete","value":"2020-06-04"},{"label":"Percent complete","value":"100% as of 2022-05-16"}],"circuit_miles":14.22,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-15","last_seen":"2022-05-16","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":108291635,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=142","doc_url":"https://interchange.puc.texas.gov/Documents/52947_142_1208863.ZIP","file":"LCRATSC0522.xlsx","sheet":"LCRA TSC MCPR May 2022","cell":"I3","filed":"2022-05-16","control":"52947","item":142,"raw":"108291635"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":74479900,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=142","doc_url":"https://interchange.puc.texas.gov/Documents/52947_142_1208863.ZIP","file":"LCRATSC0522.xlsx","sheet":"LCRA TSC MCPR May 2022","cell":"H3","filed":"2022-05-16","control":"52947","item":142,"raw":"74479900"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":111914911,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=142","doc_url":"https://interchange.puc.texas.gov/Documents/52947_142_1208863.ZIP","file":"LCRATSC0522.xlsx","sheet":"LCRA TSC MCPR May 2022","cell":"J3","filed":"2022-05-16","control":"52947","item":142,"raw":"111914911"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 142, filed 2022-05-16","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=142","where":"Native workbook LCRATSC0522.xlsx, sheet \"LCRA TSC MCPR May 2022\", cell I3; document https://interchange.puc.texas.gov/Documents/52947_142_1208863.ZIP"},{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 142, filed 2022-05-16","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=142","where":"Native workbook LCRATSC0522.xlsx, sheet \"LCRA TSC MCPR May 2022\", cell H3; document https://interchange.puc.texas.gov/Documents/52947_142_1208863.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 142, filed 2022-05-16","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=142","where":"Native workbook LCRATSC0522.xlsx, sheet \"LCRA TSC MCPR May 2022\", cell J3; document https://interchange.puc.texas.gov/Documents/52947_142_1208863.ZIP"},{"label":"Summary row: PUCT 52947 item 142, filed 2022-05-16","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=142","where":"Workbook LCRATSC0522.xlsx, sheet \"LCRA TSC MCPR May 2022\", row 3"},{"label":"PUCT docket 45866 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=45866&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":111914911,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=142","evidence_label":"PUCT filing, cell J3"},"best_cost":"$111.9M final actual","sort_cost":111914911,"energized_label":"2020-06-04"},{"id":"mcpr:lcra-transmission-services-corporation:1017394","source":"puct_mcpr","name":"Mountain Home TL Addition (CCN)","utility":"LCRA Transmission Services Corporation","ccn":["49523"],"voltage_kv":[138],"location":"Kerr, Gillespie","description":"Construct a new 138-kV transmission line to provide a transmission point of interconnection to a new load-serving substation","project_number":"1017394","status":"Completed","status_label":"Completed 2022-12-27","timeline_steps":[{"step":"Proposed","value":"CCN docket 49523 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2021-08-27"},{"step":"Completed","value":"Construction complete 2022-12-27 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2021-08-27 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2022-12-27"},{"label":"Percent complete","value":"100% as of 2023-10-16"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-15","last_seen":"2023-10-16","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":60551000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=293","doc_url":"https://interchange.puc.texas.gov/Documents/54468_293_1338182.ZIP","file":"LCRATSC1023.xlsx","sheet":"LCRA TSC MCPR Oct. 2023","cell":"I2","filed":"2023-10-16","control":"54468","item":293,"raw":"60551000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":76487609,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=293","doc_url":"https://interchange.puc.texas.gov/Documents/54468_293_1338182.ZIP","file":"LCRATSC1023.xlsx","sheet":"LCRA TSC MCPR Oct. 2023","cell":"J2","filed":"2023-10-16","control":"54468","item":293,"raw":"76487609"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 293, filed 2023-10-16","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=293","where":"Native workbook LCRATSC1023.xlsx, sheet \"LCRA TSC MCPR Oct. 2023\", cell I2; document https://interchange.puc.texas.gov/Documents/54468_293_1338182.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 293, filed 2023-10-16","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=293","where":"Native workbook LCRATSC1023.xlsx, sheet \"LCRA TSC MCPR Oct. 2023\", cell J2; document https://interchange.puc.texas.gov/Documents/54468_293_1338182.ZIP"},{"label":"Summary row: PUCT 54468 item 293, filed 2023-10-16","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=293","where":"Workbook LCRATSC1023.xlsx, sheet \"LCRA TSC MCPR Oct. 2023\", row 2"},{"label":"PUCT docket 49523 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=49523&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":76487609,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=293","evidence_label":"PUCT filing, cell J2"},"best_cost":"$76.5M final actual","sort_cost":76487609,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:42633615","source":"puct_mcpr","name":"Tuleta to Coleto Creek 138-kV Dbl Ckt Line","utility":"AEP Texas","ccn":["44837"],"voltage_kv":[138],"location":"Goliad Bee","description":"Construct new 48 mile 138-kV Double-Circuit capable transmission line from Tuleta to the New Euler Station to the Coleto Creek Substation.","project_number":"42633615","status":"Energized","status_label":"Energized 2019-09-27","timeline_steps":[{"step":"Proposed","value":"CCN docket 44837 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2017-11-06"},{"step":"Energized","value":"Energized 2019-09-27 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2017-11-06 (actual)"},{"label":"Energized","value":"2019-09-27"},{"label":"Construction complete","value":"Not publicly verified"},{"label":"Percent complete","value":"100% as of 2022-02-18"}],"circuit_miles":48,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-21","last_seen":"2022-02-18","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":62625000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=52","doc_url":"https://interchange.puc.texas.gov/Documents/52947_52_1188682.ZIP","file":"AEPTX (central division) 0222m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H9","filed":"2022-02-18","control":"52947","item":52,"raw":"62625000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":54546000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=52","doc_url":"https://interchange.puc.texas.gov/Documents/52947_52_1188682.ZIP","file":"AEPTX (central division) 0222m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I9","filed":"2022-02-18","control":"52947","item":52,"raw":"54546000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":45661985.24,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=52","doc_url":"https://interchange.puc.texas.gov/Documents/52947_52_1188682.ZIP","file":"AEPTX (central division) 0222m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"J9","filed":"2022-02-18","control":"52947","item":52,"raw":"45661985.24"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 52, filed 2022-02-18","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=52","where":"Native workbook AEPTX (central division) 0222m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H9; document https://interchange.puc.texas.gov/Documents/52947_52_1188682.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 52, filed 2022-02-18","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=52","where":"Native workbook AEPTX (central division) 0222m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I9; document https://interchange.puc.texas.gov/Documents/52947_52_1188682.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 52, filed 2022-02-18","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=52","where":"Native workbook AEPTX (central division) 0222m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell J9; document https://interchange.puc.texas.gov/Documents/52947_52_1188682.ZIP"},{"label":"Summary row: PUCT 52947 item 52, filed 2022-02-18","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=52","where":"Workbook AEPTX (central division) 0222m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 9"},{"label":"PUCT docket 44837 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=44837&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/489376746","name":"Tuleta Substation","coordinates":[-97.78854,28.59823]},{"osm_id":"osm:way/174682092","name":"Coleto Creek Substation","coordinates":[-97.21284,28.71689]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":45661985.24,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=52","evidence_label":"PUCT filing, cell J9"},"best_cost":"$45.7M final actual","sort_cost":45661985.24,"energized_label":"2019-09-27"},{"id":"mcpr:aep-texas:42907629","source":"puct_mcpr","name":"Stewart Rd. 345-kV Station: Expansion","utility":"AEP Texas","ccn":["47603"],"voltage_kv":[345],"location":"Hidalgo/Hidalgo","description":"Expand the Stewart Road 138-kV Station with two 345-kV autotransformers. Relocate the last spans of Stewart Rd.-Weslaco unit 138-kV line to make room for tie-lines to autotransformers. Install two spans of 138-kV to the new 345-kV yard.","project_number":"42907629 (P15177004) (P15177013)","status":"Completed","status_label":"Completed 2021-10-31","timeline_steps":[{"step":"Proposed","value":"CCN docket 47603 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-06-04"},{"step":"Energized","value":"Energized 2021-10-18 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-10-31 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-06-04 (actual)"},{"label":"Energized","value":"2021-10-18"},{"label":"Construction complete","value":"2021-10-31"},{"label":"Percent complete","value":"100% as of 2023-12-20"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-04-20","last_seen":"2023-12-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":27945000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","doc_url":"https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP","file":"AEPTX (central division) 1223m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H3","filed":"2023-12-20","control":"54468","item":355,"raw":"27945000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":34282826,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","doc_url":"https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP","file":"AEPTX (central division) 1223m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I3","filed":"2023-12-20","control":"54468","item":355,"raw":"34282826"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":35679489,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","doc_url":"https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP","file":"AEPTX (central division) 1223m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"J3","filed":"2023-12-20","control":"54468","item":355,"raw":"35679489"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 355, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","where":"Native workbook AEPTX (central division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H3; document https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 355, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","where":"Native workbook AEPTX (central division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I3; document https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 355, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","where":"Native workbook AEPTX (central division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell J3; document https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP"},{"label":"Summary row: PUCT 54468 item 355, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","where":"Workbook AEPTX (central division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 3"},{"label":"PUCT docket 47603 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47603&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":35679489,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","evidence_label":"PUCT filing, cell J3"},"best_cost":"$35.7M final actual","sort_cost":35679489,"energized_label":"2021-10-18"},{"id":"mcpr:aep-texas:42762075","source":"puct_mcpr","name":"Heartland - Yellowjacket TNC","utility":"AEP Texas","ccn":["46234"],"voltage_kv":[69],"location":"Brady/McCulloch, Menard","description":"Heartland to Yellowjacket: Build 18.75 miles of new transmission line to 138-kV standard and operate at 69 kV.","project_number":"42762075","status":"Completed","status_label":"Completed 2019-10-21","timeline_steps":[{"step":"Proposed","value":"CCN docket 46234 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-03-07"},{"step":"Energized","value":"Energized 2020-06-03 (filer-reported)"},{"step":"Completed","value":"Construction complete 2019-10-21 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-03-07 (actual)"},{"label":"Energized","value":"2020-06-03"},{"label":"Construction complete","value":"2019-10-21"},{"label":"Percent complete","value":"100% as of 2023-11-20"}],"circuit_miles":18.75,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-21","last_seen":"2023-11-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":19824000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H21","filed":"2023-11-20","control":"54468","item":330,"raw":"19824000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":19824000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"I21","filed":"2023-11-20","control":"54468","item":330,"raw":"19824000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":14639806.6,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"J21","filed":"2023-11-20","control":"54468","item":330,"raw":"14639806.6"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H21; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell I21; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell J21; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Summary row: PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 21"},{"label":"PUCT docket 46234 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=46234&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":14639806.6,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","evidence_label":"PUCT filing, cell J21"},"best_cost":"$14.6M final actual","sort_cost":14639806.6,"energized_label":"2020-06-03"},{"id":"mcpr:aep-texas:42968468","source":"puct_mcpr","name":"Tardis - Benjamin Tap 138-kV Line","utility":"AEP Texas","ccn":["48633"],"voltage_kv":[138],"location":"Knox","description":"Construct approximately 1.74 miles of new 138-kV transmission line.","project_number":"42968468","status":"Completed","status_label":"Completed 2019-07-15","timeline_steps":[{"step":"Proposed","value":"CCN docket 48633 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2019-04-15"},{"step":"Energized","value":"Energized 2019-12-20 (filer-reported)"},{"step":"Completed","value":"Construction complete 2019-07-15 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2019-04-15 (actual)"},{"label":"Energized","value":"2019-12-20"},{"label":"Construction complete","value":"2019-07-15"},{"label":"Percent complete","value":"100% as of 2023-12-20"}],"circuit_miles":1.74,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-21","last_seen":"2023-12-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":3264000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=356","doc_url":"https://interchange.puc.texas.gov/Documents/54468_356_1354633.ZIP","file":"AEPTX (north division) 1223m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H3","filed":"2023-12-20","control":"54468","item":356,"raw":"3264000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":9047594,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=356","doc_url":"https://interchange.puc.texas.gov/Documents/54468_356_1354633.ZIP","file":"AEPTX (north division) 1223m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"I3","filed":"2023-12-20","control":"54468","item":356,"raw":"9047594"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":8863553.68,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=356","doc_url":"https://interchange.puc.texas.gov/Documents/54468_356_1354633.ZIP","file":"AEPTX (north division) 1223m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"J3","filed":"2023-12-20","control":"54468","item":356,"raw":"8863553.68"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 356, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=356","where":"Native workbook AEPTX (north division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H3; document https://interchange.puc.texas.gov/Documents/54468_356_1354633.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 356, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=356","where":"Native workbook AEPTX (north division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell I3; document https://interchange.puc.texas.gov/Documents/54468_356_1354633.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 356, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=356","where":"Native workbook AEPTX (north division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell J3; document https://interchange.puc.texas.gov/Documents/54468_356_1354633.ZIP"},{"label":"Summary row: PUCT 54468 item 356, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=356","where":"Workbook AEPTX (north division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 3"},{"label":"PUCT docket 48633 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48633&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":8863553.68,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=356","evidence_label":"PUCT filing, cell J3"},"best_cost":"$8.9M final actual","sort_cost":8863553.68,"energized_label":"2019-12-20"},{"id":"mcpr:aep-texas:42753347","source":"puct_mcpr","name":"Solstice Expansion for 345-kV Station","utility":"AEP Texas","ccn":["48787"],"voltage_kv":[345],"location":"Pecos","description":"Expand Solstice Station to build 345-kV station section in a breaker and a half configuration to add two 345-kV double-circuit transmission line termination, two 345/13-8kV, 675 MVA LTC autotransformers, and cut in the existing 138-kV station. Includes SCADA, equipment house, breakers, all other associated station protection and control equipment.","project_number":"42753347","status":"Completed","status_label":"Completed 2020-12-31","timeline_steps":[{"step":"Proposed","value":"CCN docket 48787 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-01-04"},{"step":"Energized","value":"Energized 2020-12-20 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-31 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-01-04 (actual)"},{"label":"Energized","value":"2020-12-20"},{"label":"Construction complete","value":"2020-12-31"},{"label":"Percent complete","value":"100% as of 2023-11-20"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-03-20","last_seen":"2023-11-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":35457000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H31","filed":"2023-11-20","control":"54468","item":330,"raw":"35457000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":42630708,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"I31","filed":"2023-11-20","control":"54468","item":330,"raw":"42630708"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":48420934.25,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"J31","filed":"2023-11-20","control":"54468","item":330,"raw":"48420934.25"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H31; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell I31; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell J31; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Summary row: PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 31"},{"label":"PUCT docket 48787 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48787&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":48420934.25,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","evidence_label":"PUCT filing, cell J31"},"best_cost":"$48.4M final actual","sort_cost":48420934.25,"energized_label":"2020-12-20"},{"id":"mcpr:aep-texas:42786105","source":"puct_mcpr","name":"Far West Texas Project: Solstice to Bakersfield 345-kV T-Line","utility":"AEP Texas","ccn":["48787"],"voltage_kv":[345],"location":"Pecos","description":"Build approximately 35.51 miles of new 345-kV double-circuit capable transmission line with OPGW from AEP Texas' Solstice 345-kV Substation to LCRA's Brakersfield 345-kV Substation. Only one circuit will be installed at constuction of this Project.","project_number":"42786105","status":"Completed","status_label":"Completed 2020-11-20","timeline_steps":[{"step":"Proposed","value":"CCN docket 48787 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-01-16"},{"step":"Energized","value":"Energized 2020-12-20 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-11-20 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-01-16 (actual)"},{"label":"Energized","value":"2020-12-20"},{"label":"Construction complete","value":"2020-11-20"},{"label":"Percent complete","value":"100% as of 2023-11-20"}],"circuit_miles":35.51,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-01-21","last_seen":"2023-11-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":78593000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H32","filed":"2023-11-20","control":"54468","item":330,"raw":"78593000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":78593000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"I32","filed":"2023-11-20","control":"54468","item":330,"raw":"78593000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":66172239.07,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"J32","filed":"2023-11-20","control":"54468","item":330,"raw":"66172239.07"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H32; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell I32; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell J32; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Summary row: PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 32"},{"label":"PUCT docket 48787 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48787&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":66172239.07,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","evidence_label":"PUCT filing, cell J32"},"best_cost":"$66.2M final actual","sort_cost":66172239.07,"energized_label":"2020-12-20"},{"id":"mcpr:aep-texas:42872920","source":"puct_mcpr","name":"Far West Texas Project: Solstice to Sand Lake 345-kV T-Line","utility":"AEP Texas","ccn":["48785"],"voltage_kv":[345],"location":"Pecos","description":"Build approximately 22.21 miles of new 345-kV double-circuit capable transmission line with OPGW from AEP Texas' Solstice 345-kV Substation to ONCOR's Sand Lake 345-kV Substation. Only one circuit will be installed at constuction of this Project.","project_number":"42872920","status":"Completed","status_label":"Completed 2020-11-20","timeline_steps":[{"step":"Proposed","value":"CCN docket 48785 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-01-16"},{"step":"Energized","value":"Energized 2020-12-16 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-11-20 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-01-16 (actual)"},{"label":"Energized","value":"2020-12-16"},{"label":"Construction complete","value":"2020-11-20"},{"label":"Percent complete","value":"100% as of 2023-11-20"}],"circuit_miles":22.21,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-03-20","last_seen":"2023-11-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":48424462,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H33","filed":"2023-11-20","control":"54468","item":330,"raw":"48424462"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":47992021,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"I33","filed":"2023-11-20","control":"54468","item":330,"raw":"47992021"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":45833379.93,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"J33","filed":"2023-11-20","control":"54468","item":330,"raw":"45833379.93"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H33; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell I33; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell J33; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Summary row: PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 33"},{"label":"PUCT docket 48785 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48785&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":45833379.93,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","evidence_label":"PUCT filing, cell J33"},"best_cost":"$45.8M final actual","sort_cost":45833379.93,"energized_label":"2020-12-16"},{"id":"mcpr:aep-texas:42786055","source":"puct_mcpr","name":"Solstice 345-kV Station: Install 50-MVAR Reactor","utility":"AEP Texas","ccn":["48787"],"voltage_kv":[345],"location":"Pecos","description":"Install one 50-MVAR 345-kV line reactor and associated station equipment at Solstice. Install 345-kV shunt reactor, 3000 amps, 50-kA. Install 345-kV breaker, circuit switcher, motor operated switch. SCADA and other associated equipment","project_number":"42786055 (P17089001)","status":"Completed","status_label":"Completed 2020-12-31","timeline_steps":[{"step":"Proposed","value":"CCN docket 48787 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-05-04"},{"step":"Energized","value":"Energized 2020-12-20 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-31 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-05-04 (actual)"},{"label":"Energized","value":"2020-12-20"},{"label":"Construction complete","value":"2020-12-31"},{"label":"Percent complete","value":"100% as of 2023-11-20"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-03-20","last_seen":"2023-11-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":3000000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H44","filed":"2023-11-20","control":"54468","item":330,"raw":"3000000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":3452738,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"I44","filed":"2023-11-20","control":"54468","item":330,"raw":"3452738"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":2693705.65,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"J44","filed":"2023-11-20","control":"54468","item":330,"raw":"2693705.65"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H44; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell I44; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell J44; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Summary row: PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 44"},{"label":"PUCT docket 48787 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48787&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":2693705.65,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","evidence_label":"PUCT filing, cell J44"},"best_cost":"$2.7M final actual","sort_cost":2693705.65,"energized_label":"2020-12-20"},{"id":"mcpr:aep-texas:42998736","source":"puct_mcpr","name":"Benjamin - Gyp (Brazos) 138-kV Line","utility":"AEP Texas","ccn":["47691"],"voltage_kv":[138],"location":"Benjamin/Knox","description":"Benjamin-Gyp 138-kV: Build 9.00 of new 138-kV transmission line and operate at 138-kV. This is approximately one-half of the Benjamin-Gyp 18 miles of 138-kV transmission line as approved in Joint CCN Application with Brazos Electric Cooperative","project_number":"42998736 (P16042006) (P16042017)","status":"Approved","status_label":"Approved; construction not started as of 2023-04-20","timeline_steps":[{"step":"Proposed","value":"CCN docket 47691 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"}],"timeline":[{"label":"Start date (filer-reported)","value":"2021-08-01 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2021-12-15"},{"label":"Percent complete","value":"0% as of 2023-04-20"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2021-01-25","last_seen":"2023-04-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":10020000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=116","doc_url":"https://interchange.puc.texas.gov/Documents/54468_116_1289387.ZIP","file":"AEPTX (north division) 0423m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H88","filed":"2023-04-20","control":"54468","item":116,"raw":"10020000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":15195943,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=116","doc_url":"https://interchange.puc.texas.gov/Documents/54468_116_1289387.ZIP","file":"AEPTX (north division) 0423m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"I88","filed":"2023-04-20","control":"54468","item":116,"raw":"15195943"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 116, filed 2023-04-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=116","where":"Native workbook AEPTX (north division) 0423m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H88; document https://interchange.puc.texas.gov/Documents/54468_116_1289387.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 116, filed 2023-04-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=116","where":"Native workbook AEPTX (north division) 0423m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell I88; document https://interchange.puc.texas.gov/Documents/54468_116_1289387.ZIP"},{"label":"Summary row: PUCT 54468 item 116, filed 2023-04-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=116","where":"Workbook AEPTX (north division) 0423m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 88"},{"label":"PUCT docket 47691 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47691&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":15195943,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=116","evidence_label":"PUCT filing, cell I88"},"best_cost":"$15.2M estimate","sort_cost":15195943,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt44498","source":"puct_mcpr","name":"Kyle Ranch - Quarry Field 138 kV Line (Modification of route approved in Docket No. 49302)","utility":"Oncor Electric Delivery","ccn":["51737"],"voltage_kv":[138],"location":"Loving County","description":"Construct the new single-circuit 138 kV line connecting the relocated Kyle Ranch Substation to the Quarry Field Switch station.","project_number":"0PT44498 0PT04088 0PT42631 (R8384)","status":"Completed","status_label":"Completed 2022-12-15","timeline_steps":[{"step":"Proposed","value":"CCN docket 51737 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2022-07-20"},{"step":"Energized","value":"Energized 2022-12-15 (filer-reported)"},{"step":"Completed","value":"Construction complete 2022-12-15 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2022-07-20 (actual)"},{"label":"Energized","value":"2022-12-15"},{"label":"Construction complete","value":"2022-12-15"},{"label":"Percent complete","value":"100% as of 2024-09-13"}],"circuit_miles":11.3,"route_miles":11.3,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2021-02-12","last_seen":"2024-09-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":17161000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"H1227","filed":"2024-09-13","control":"56006","item":289,"raw":"17,161,000 (t-line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1518673,"circuit_miles":11.3,"per_route_mile_usd":1518673,"route_miles":11.3,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":22510282,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"I1227","filed":"2024-09-13","control":"56006","item":289,"raw":"22510282"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":17867886,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"J1227","filed":"2024-09-13","control":"56006","item":289,"raw":"17867886"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (line facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell H1227; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell I1227; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell J1227; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Summary row: PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", row 1227"},{"label":"PUCT docket 51737 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=51737&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/1006279914","name":"Kyle Ranch Substation","coordinates":[-103.65165,31.93065]},{"osm_id":"osm:way/1006404970","name":"Quarry Field Switching Station","coordinates":[-103.6387,31.78297]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":17867886,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","evidence_label":"PUCT filing, cell J1227"},"best_cost":"$17.9M final actual","sort_cost":17867886,"energized_label":"2022-12-15","osm_matches":[{"osm_id":"osm:way/1454524506","layer":"lines-138"}],"match_method":"a mapped way connects both terminal substations","match_confidence":"high"},{"id":"mcpr:wind-energy-transmission-texas:bearkat","source":"puct_mcpr","name":"Bearkat Switching Station to Oncor Switching Station Transmission Line Project","utility":"Wind Energy Transmission Texas","ccn":["50410"],"voltage_kv":[345],"location":"Howard and Glasscock Counties","description":"The project is a new single-circuit, 345 kV transmission line connecting WETT's Bearkat Switching Station to Oncor's Longshore Switching Station","project_number":"Bearkat Area Transmission Improvements Project","status":"Approved","status_label":"Approved; construction not started as of 2022-07-14","timeline_steps":[{"step":"Proposed","value":"CCN docket 50410 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"}],"timeline":[{"label":"Start date (filer-reported)","value":"2022-07-11 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2023-04-30 (estimated)"},{"label":"Percent complete","value":"0% as of 2022-07-14"}],"circuit_miles":30.8,"route_miles":30.8,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2020-04-15","last_seen":"2022-07-14","joint_project":true,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":29339500,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","doc_url":"https://interchange.puc.texas.gov/Documents/52947_190_1222160.ZIP","file":"PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx","sheet":"WETT","cell":"H6","filed":"2022-07-14","control":"52947","item":190,"raw":"$ 29,339,500 (t-line) $ 3,500,000 (station) (WETT Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":3500000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","doc_url":"https://interchange.puc.texas.gov/Documents/52947_190_1222160.ZIP","file":"PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx","sheet":"WETT","cell":"H6","filed":"2022-07-14","control":"52947","item":190,"raw":"$ 29,339,500 (t-line) $ 3,500,000 (station) (WETT Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":51761000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","doc_url":"https://interchange.puc.texas.gov/Documents/52947_190_1222160.ZIP","file":"PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx","sheet":"WETT","cell":"I6","filed":"2022-07-14","control":"52947","item":190,"raw":"$51,761,000 (t-line) $6,881,000 (station) (WETT Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":6881000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","doc_url":"https://interchange.puc.texas.gov/Documents/52947_190_1222160.ZIP","file":"PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx","sheet":"WETT","cell":"I6","filed":"2022-07-14","control":"52947","item":190,"raw":"$51,761,000 (t-line) $6,881,000 (station) (WETT Portion)"},"status":"VERIFIED_ESTIMATE","filer_portion":true,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: this is one filer's share of a joint project"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 52947 item 190, filed 2022-07-14","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","where":"Native workbook PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx, sheet \"WETT\", cell H6; document https://interchange.puc.texas.gov/Documents/52947_190_1222160.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 52947 item 190, filed 2022-07-14","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","where":"Native workbook PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx, sheet \"WETT\", cell I6; document https://interchange.puc.texas.gov/Documents/52947_190_1222160.ZIP"},{"label":"Summary row: PUCT 52947 item 190, filed 2022-07-14","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","where":"Workbook PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx, sheet \"WETT\", row 6"},{"label":"PUCT docket 50410 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=50410&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":51761000,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","evidence_label":"PUCT filing, cell I6"},"best_cost":"$51.8M estimate","sort_cost":51761000,"energized_label":"Not publicly verified"},{"id":"mcpr:electric-transmission-texas:p15177001","source":"puct_mcpr","name":"Stewart Rd. 345-kV Hairpin","utility":"Electric Transmission Texas","ccn":["47603"],"voltage_kv":[345],"location":"Hidalgo/Hildago","description":"Construct a double-circuit 345-kV transmission line from the Stewart Rd. Station to the North Edinburg-SU Palmito 345-kV transmission line. Costs include CCN & ROW.","project_number":"ETT-146 P15177001 P15177002 P15177003","status":"Energized","status_label":"Energized 2021-05-19","timeline_steps":[{"step":"Proposed","value":"CCN docket 47603 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-07-06"},{"step":"Energized","value":"Energized 2021-05-19 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-07-06 (actual)"},{"label":"Energized","value":"2021-05-19"},{"label":"Construction complete","value":"2021-05-19"},{"label":"Percent complete","value":"99% as of 2022-08-19"}],"circuit_miles":5,"route_miles":null,"route_miles_basis":null,"first_seen":"2021-03-19","last_seen":"2022-08-19","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":16834000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=238","doc_url":"https://interchange.puc.texas.gov/Documents/52947_238_1232195.ZIP","file":"ETT 0822m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H2","filed":"2022-08-19","control":"52947","item":238,"raw":"16834000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 238, filed 2022-08-19","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=238","where":"Native workbook ETT 0822m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H2; document https://interchange.puc.texas.gov/Documents/52947_238_1232195.ZIP"},{"label":"Summary row: PUCT 52947 item 238, filed 2022-08-19","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=238","where":"Workbook ETT 0822m.xlsx, sheet \"MonthlyReportForm-ETT\", row 2"},{"label":"PUCT docket 47603 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47603&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":16834000,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=238","evidence_label":"PUCT filing, cell H2"},"best_cost":"$16.8M estimate","sort_cost":16834000,"energized_label":"2021-05-19"},{"id":"mcpr:electric-transmission-texas:et1600801","source":"puct_mcpr","name":"Maplewood Interconnection: LCRA Bakersfield 345-kV Station","utility":"Electric Transmission Texas","ccn":["47603"],"voltage_kv":[345],"location":"Pecos","description":"Add one breaker, two switches rated 345-kV, 5000A, 63kA. Install SSO relay on line to IPP. Frequency should be set for 1Hz to 10 Hz range. Intall PMU equipment on line to IPP.","project_number":"ETT-139 ET1600801","status":"Completed","status_label":"Completed 2020-10-30","timeline_steps":[{"step":"Proposed","value":"CCN docket 47603 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-09-29"},{"step":"Energized","value":"Energized 2021-01-26 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-10-30 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-09-29 (actual)"},{"label":"Energized","value":"2021-01-26"},{"label":"Construction complete","value":"2020-10-30"},{"label":"Percent complete","value":"100% as of 2022-01-20"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-05-20","last_seen":"2022-01-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":2206000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","doc_url":"https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP","file":"ETT 0122m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H19","filed":"2022-01-20","control":"52947","item":25,"raw":"2206000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":1349176,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","doc_url":"https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP","file":"ETT 0122m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I19","filed":"2022-01-20","control":"52947","item":25,"raw":"1349176"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":2564624.5,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","doc_url":"https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP","file":"ETT 0122m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"J19","filed":"2022-01-20","control":"52947","item":25,"raw":"2564624.5"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Native workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H19; document https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Native workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I19; document https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Native workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", cell J19; document https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP"},{"label":"Summary row: PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", row 19"},{"label":"PUCT docket 47603 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47603&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":2564624.5,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","evidence_label":"PUCT filing, cell J19"},"best_cost":"$2.6M final actual","sort_cost":2564624.5,"energized_label":"2021-01-26"},{"id":"mcpr:electric-transmission-texas:et1600802","source":"puct_mcpr","name":"Maplewood Interconnection: Red Barn 345-kV Station IPP-Owned Station","utility":"Electric Transmission Texas","ccn":["47603"],"voltage_kv":[345],"location":"Pecos","description":"Add new 345-kV transmission line circuit from the LCRA TSC Bakersfield Station to the point of interconnection at Red Barn","project_number":"ETT-139 ET1600802","status":"Completed","status_label":"Completed 2020-10-30","timeline_steps":[{"step":"Proposed","value":"CCN docket 47603 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-09-29"},{"step":"Energized","value":"Energized 2021-01-26 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-10-30 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-09-29 (actual)"},{"label":"Energized","value":"2021-01-26"},{"label":"Construction complete","value":"2020-10-30"},{"label":"Percent complete","value":"100% as of 2022-01-20"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-05-20","last_seen":"2022-01-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":748000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","doc_url":"https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP","file":"ETT 0122m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H20","filed":"2022-01-20","control":"52947","item":25,"raw":"748000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":747997,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","doc_url":"https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP","file":"ETT 0122m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I20","filed":"2022-01-20","control":"52947","item":25,"raw":"747997"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":241300.29,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","doc_url":"https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP","file":"ETT 0122m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"J20","filed":"2022-01-20","control":"52947","item":25,"raw":"241300.29"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Native workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H20; document https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Native workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I20; document https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Native workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", cell J20; document https://interchange.puc.texas.gov/Documents/52947_25_1181572.ZIP"},{"label":"Summary row: PUCT 52947 item 25, filed 2022-01-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","where":"Workbook ETT 0122m.xlsx, sheet \"MonthlyReportForm-ETT\", row 20"},{"label":"PUCT docket 47603 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47603&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":241300.29,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=25","evidence_label":"PUCT filing, cell J20"},"best_cost":"$0.2M final actual","sort_cost":241300.29,"energized_label":"2021-01-26"},{"id":"mcpr:electric-transmission-texas:p19010002","source":"puct_mcpr","name":"Reloj Del Sol Permanent Interconnection: New 345-kV Transmission Line","utility":"Electric Transmission Texas","ccn":["50690"],"voltage_kv":[345],"location":"Webb","description":"Construct six (6) miles of new single circuit 345-kV Transmission line to connect the Reloj Del Sol Windfarm","project_number":"ETT-161 P19010002","status":"Completed","status_label":"Completed 2020-12-17","timeline_steps":[{"step":"Proposed","value":"CCN docket 50690 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-07-20"},{"step":"Energized","value":"Energized 2020-12-22 (filer-reported)"},{"step":"Completed","value":"Construction complete 2020-12-17 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-07-20 (actual)"},{"label":"Energized","value":"2020-12-22"},{"label":"Construction complete","value":"2020-12-17"},{"label":"Percent complete","value":"100% as of 2022-10-20"}],"circuit_miles":6,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-07-20","last_seen":"2022-10-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":7100000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","doc_url":"https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP","file":"ETT 1022m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H6","filed":"2022-10-20","control":"52947","item":304,"raw":"7100000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":7500000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","doc_url":"https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP","file":"ETT 1022m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I6","filed":"2022-10-20","control":"52947","item":304,"raw":"7500000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":7694985.74,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","doc_url":"https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP","file":"ETT 1022m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"J6","filed":"2022-10-20","control":"52947","item":304,"raw":"7694985.74"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 304, filed 2022-10-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","where":"Native workbook ETT 1022m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H6; document https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 304, filed 2022-10-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","where":"Native workbook ETT 1022m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I6; document https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 304, filed 2022-10-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","where":"Native workbook ETT 1022m.xlsx, sheet \"MonthlyReportForm-ETT\", cell J6; document https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP"},{"label":"Summary row: PUCT 52947 item 304, filed 2022-10-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","where":"Workbook ETT 1022m.xlsx, sheet \"MonthlyReportForm-ETT\", row 6"},{"label":"PUCT docket 50690 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=50690&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":7694985.74,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","evidence_label":"PUCT filing, cell J6"},"best_cost":"$7.7M final actual","sort_cost":7694985.74,"energized_label":"2020-12-22"},{"id":"mcpr:electric-transmission-texas:p19279002","source":"puct_mcpr","name":"Corazon Solar Interconnection: Construct 345-kV T-Line","utility":"Electric Transmission Texas","ccn":["50964"],"voltage_kv":[345],"location":"Webb","description":"Construct 3.90 miles of 345-kV single-circuit transmission line from the existing ETT Lobo 345-kV Station to the Corazon Solar interconnect","project_number":"ETT-170 P19279002","status":"Completed","status_label":"Completed 2021-05-10","timeline_steps":[{"step":"Proposed","value":"CCN docket 50964 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-11-10"},{"step":"Energized","value":"Energized 2021-05-10 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-05-10 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-11-10 (actual)"},{"label":"Energized","value":"2021-05-10"},{"label":"Construction complete","value":"2021-05-10"},{"label":"Percent complete","value":"100% as of 2022-09-20"}],"circuit_miles":3.9,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-10-20","last_seen":"2022-09-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":8029500,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","doc_url":"https://interchange.puc.texas.gov/Documents/52947_266_1239983.ZIP","file":"ETT 0922m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H28","filed":"2022-09-20","control":"52947","item":266,"raw":"8029500"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":8029500,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","doc_url":"https://interchange.puc.texas.gov/Documents/52947_266_1239983.ZIP","file":"ETT 0922m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I28","filed":"2022-09-20","control":"52947","item":266,"raw":"8029500"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":6202140.3,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","doc_url":"https://interchange.puc.texas.gov/Documents/52947_266_1239983.ZIP","file":"ETT 0922m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"J28","filed":"2022-09-20","control":"52947","item":266,"raw":"6202140.3"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 266, filed 2022-09-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","where":"Native workbook ETT 0922m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H28; document https://interchange.puc.texas.gov/Documents/52947_266_1239983.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 266, filed 2022-09-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","where":"Native workbook ETT 0922m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I28; document https://interchange.puc.texas.gov/Documents/52947_266_1239983.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 266, filed 2022-09-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","where":"Native workbook ETT 0922m.xlsx, sheet \"MonthlyReportForm-ETT\", cell J28; document https://interchange.puc.texas.gov/Documents/52947_266_1239983.ZIP"},{"label":"Summary row: PUCT 52947 item 266, filed 2022-09-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","where":"Workbook ETT 0922m.xlsx, sheet \"MonthlyReportForm-ETT\", row 28"},{"label":"PUCT docket 50964 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=50964&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":6202140.3,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","evidence_label":"PUCT filing, cell J28"},"best_cost":"$6.2M final actual","sort_cost":6202140.3,"energized_label":"2021-05-10"},{"id":"mcpr:aep-texas:t10021421","source":"puct_mcpr","name":"Angstrom - SDI 345-kV Transmission Line","utility":"AEP Texas","ccn":["50726"],"voltage_kv":[345],"location":"San Patricio","description":"Construct a new double-circuit 345-kV transmission line from Angstrom 345-kV Station (currently under construction) to the SDI Buffalo 345-kV Station to serve a new SDI steel plant.","project_number":"T10021421 (P18209008)","status":"Completed","status_label":"Completed 2021-02-05","timeline_steps":[{"step":"Proposed","value":"CCN docket 50726 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-08-03"},{"step":"Energized","value":"Energized 2021-02-25 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-02-05 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-08-03 (actual)"},{"label":"Energized","value":"2021-02-25"},{"label":"Construction complete","value":"2021-02-05"},{"label":"Percent complete","value":"100% as of 2023-12-20"}],"circuit_miles":1.72,"route_miles":null,"route_miles_basis":null,"first_seen":"2020-08-20","last_seen":"2023-12-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":4351000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","doc_url":"https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP","file":"AEPTX (central division) 1223m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H4","filed":"2023-12-20","control":"54468","item":355,"raw":"4351000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":4350047,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","doc_url":"https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP","file":"AEPTX (central division) 1223m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I4","filed":"2023-12-20","control":"54468","item":355,"raw":"4350047"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":3112245.62,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","doc_url":"https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP","file":"AEPTX (central division) 1223m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"J4","filed":"2023-12-20","control":"54468","item":355,"raw":"3112245.62"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 355, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","where":"Native workbook AEPTX (central division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H4; document https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 355, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","where":"Native workbook AEPTX (central division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I4; document https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 355, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","where":"Native workbook AEPTX (central division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell J4; document https://interchange.puc.texas.gov/Documents/54468_355_1354629.ZIP"},{"label":"Summary row: PUCT 54468 item 355, filed 2023-12-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","where":"Workbook AEPTX (central division) 1223m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 4"},{"label":"PUCT docket 50726 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=50726&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":3112245.62,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=355","evidence_label":"PUCT filing, cell J4"},"best_cost":"$3.1M final actual","sort_cost":3112245.62,"energized_label":"2021-02-25"},{"id":"mcpr:oncor-electric-delivery:0pt44880","source":"puct_mcpr","name":"Old Country Switch 345 kV Tap Line","utility":"Oncor Electric Delivery","ccn":["52455"],"voltage_kv":[345],"location":"Ellis County","description":"Construct the new single-circuit 345 kV line connecting the proposed Old Country Switch to Oystercatcher Solar's proposed substation.","project_number":"0PT44880 0PT46133 0PT49192 0PT50737 0PT43859 0PT45654 0PT46013 (M4172)","status":"Approved","status_label":"Approved; construction not started as of 2025-06-13","timeline_steps":[{"step":"Proposed","value":"CCN docket 52455 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-11-03 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-05-07 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":4.2,"route_miles":4.2,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2022-02-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":10392000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1379","filed":"2025-06-13","control":"57477","item":181,"raw":"10,392,000 (t-line) 7,825,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":2474286,"circuit_miles":4.2,"per_route_mile_usd":2474286,"route_miles":4.2,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":7825000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1379","filed":"2025-06-13","control":"57477","item":181,"raw":"10,392,000 (t-line) 7,825,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":12738000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"I716","filed":"2022-07-15","control":"52947","item":199,"raw":"12,738,000 (t-line) 7,825,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":3032857,"circuit_miles":4.2,"per_route_mile_usd":3032857,"route_miles":4.2,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":7825000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","doc_url":"https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP","file":"ONC0000722.xlsx","sheet":"MonthlyReportForm","cell":"I716","filed":"2022-07-15","control":"52947","item":199,"raw":"12,738,000 (t-line) 7,825,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1379; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 52947 item 199, filed 2022-07-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","where":"Native workbook ONC0000722.xlsx, sheet \"MonthlyReportForm\", cell I716; document https://interchange.puc.texas.gov/Documents/52947_199_1222657.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1379"},{"label":"PUCT docket 52455 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=52455&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":12738000,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":3032857,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=199","evidence_label":"PUCT filing, cell I716"},"best_cost":"$12.7M estimate","sort_cost":12738000,"energized_label":"Not publicly verified","ercot_projects":["87799"]},{"id":"mcpr:oncor-electric-delivery:0pt45017","source":"puct_mcpr","name":"Ivy League 138 kV Line","utility":"Oncor Electric Delivery","ccn":["53053"],"voltage_kv":[138],"location":"Collin County","description":"Construct the new single-circuit 138 kV line connecting the proposed Ivy League Substation to TNMP's existing Longneck Substation.","project_number":"0PT45017 0PT42342 0PT42455 0PT42146 0PT50566 (M4238)","status":"Completed","status_label":"Completed 2024-04-11","timeline_steps":[{"step":"Proposed","value":"CCN docket 53053 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2023-07-23"},{"step":"Energized","value":"Energized 2024-04-11 (filer-reported)"},{"step":"Completed","value":"Construction complete 2024-04-11 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2023-07-23 (actual)"},{"label":"Energized","value":"2024-04-11"},{"label":"Construction complete","value":"2024-04-11"},{"label":"Percent complete","value":"100% as of 2025-06-13"}],"circuit_miles":2.8,"route_miles":2.8,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2022-02-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":9196000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1380","filed":"2025-06-13","control":"57477","item":181,"raw":"9,196,000 (t-line) 4,325,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":3284286,"circuit_miles":2.8,"per_route_mile_usd":3284286,"route_miles":2.8,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":4325000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1380","filed":"2025-06-13","control":"57477","item":181,"raw":"9,196,000 (t-line) 4,325,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":7481835,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1380","filed":"2025-06-13","control":"57477","item":181,"raw":"7,481,835 (stations) 17,162,573 (Line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":17162573,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1380","filed":"2025-06-13","control":"57477","item":181,"raw":"7,481,835 (stations) 17,162,573 (Line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":6129490,"circuit_miles":2.8,"per_route_mile_usd":6129490,"route_miles":2.8,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1380; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (line facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1380; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1380"},{"label":"PUCT docket 53053 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=53053&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":17162573,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":6129490,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1380"},"best_cost":"$17.2M estimate","sort_cost":17162573,"energized_label":"2024-04-11"},{"id":"mcpr:aep-texas:t10139760","source":"puct_mcpr","name":"Poesta - Three Rivers 138-kV T-Line","utility":"AEP Texas","ccn":["49347"],"voltage_kv":[138,69],"location":"Live Oak, Bee","description":"Rebuild and covert the Three river to Beeville 69-kV line to 138-kV and reterminate into the new Poesta 138-69-kV Substatiion.","project_number":"T10139760 (P14129018) (P14129019)","status":"Construction underway","status_label":"Construction underway (50% complete, 2023-11-20)","timeline_steps":[{"step":"Proposed","value":"CCN docket 49347 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2022-07-11"}],"timeline":[{"label":"Start date (filer-reported)","value":"2022-07-11 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2023-08-25"},{"label":"Percent complete","value":"50% as of 2023-11-20"}],"circuit_miles":29,"route_miles":55.2,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2022-02-18","last_seen":"2023-11-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":36691000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","doc_url":"https://interchange.puc.texas.gov/Documents/54468_329_1347729.ZIP","file":"AEPTX (central division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H126","filed":"2023-11-20","control":"54468","item":329,"raw":"36691000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":45038000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","doc_url":"https://interchange.puc.texas.gov/Documents/54468_329_1347729.ZIP","file":"AEPTX (central division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I126","filed":"2023-11-20","control":"54468","item":329,"raw":"45038000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 329, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","where":"Native workbook AEPTX (central division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H126; document https://interchange.puc.texas.gov/Documents/54468_329_1347729.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 329, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","where":"Native workbook AEPTX (central division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I126; document https://interchange.puc.texas.gov/Documents/54468_329_1347729.ZIP"},{"label":"Summary row: PUCT 54468 item 329, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","where":"Workbook AEPTX (central division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 126"},{"label":"PUCT docket 49347 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=49347&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":45038000,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","evidence_label":"PUCT filing, cell I126"},"best_cost":"$45.0M estimate","sort_cost":45038000,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:t10139739","source":"puct_mcpr","name":"Poesta - Tuleta 138-kV T-Line","utility":"AEP Texas","ccn":["49347"],"voltage_kv":[138],"location":"Bee","description":"Construct a new 138-kV transmission line from the new Poesta 138-69-kV Substation to the Tuleta 138-kV Substation","project_number":"T10139739 (P14129016) (P14129017)","status":"Energized","status_label":"Energized 2024-08-29","timeline_steps":[{"step":"Proposed","value":"CCN docket 49347 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2022-09-19"},{"step":"Energized","value":"Energized 2024-08-29 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2022-09-19 (actual)"},{"label":"Energized","value":"2024-08-29"},{"label":"Construction complete","value":"2023-08-25"},{"label":"Percent complete","value":"99% as of 2025-06-13"}],"circuit_miles":22.5,"route_miles":null,"route_miles_basis":null,"first_seen":"2022-02-18","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":41298000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H12","filed":"2025-06-13","control":"57477","item":176,"raw":"41298000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":60380000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I12","filed":"2025-06-13","control":"57477","item":176,"raw":"60380000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H12; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I12; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 12"},{"label":"PUCT docket 49347 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=49347&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":60380000,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell I12"},"best_cost":"$60.4M estimate","sort_cost":60380000,"energized_label":"2024-08-29"},{"id":"mcpr:aep-texas:t10174509","source":"puct_mcpr","name":"Angstrom-Grissom 345-kV T-Line","utility":"AEP Texas","ccn":["51912"],"voltage_kv":[345],"location":"Bee, Refugio, and San Patricio Counties","description":"Construct a new 345-kV transmission line from the existing Angstrom 345-kV Station to the existing Grissom 345-kV Station.","project_number":"T10174509 (P17032025) (P17032026) (P17032027) (P17032028)","status":"Construction underway","status_label":"Construction underway (85% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 51912 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2023-04-01"}],"timeline":[{"label":"Start date (filer-reported)","value":"2023-04-01 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2024-10-31"},{"label":"Percent complete","value":"85% as of 2025-06-13"}],"circuit_miles":17.6,"route_miles":null,"route_miles_basis":null,"first_seen":"2022-05-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":53266000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H13","filed":"2025-06-13","control":"57477","item":176,"raw":"53266000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":62798702,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I13","filed":"2025-06-13","control":"57477","item":176,"raw":"62798702"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H13; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I13; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 13"},{"label":"PUCT docket 51912 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=51912&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":62798702,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell I13"},"best_cost":"$62.8M estimate","sort_cost":62798702,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:t10174174","source":"puct_mcpr","name":"Angstrom 345-kV Station: Termination for Angstrom-Grissom 345-kV T-Line","utility":"AEP Texas","ccn":["51912"],"voltage_kv":[345],"location":"San Patricio County","description":"Add two line terminals and modify one line terminals for the transmission lines from Grissom, Whitepoint, and Naismith, add relaying, and terminate fiber to Angstrom 345-kV Station","project_number":"T10174174 (P17032009)","status":"Construction underway","status_label":"Construction underway (75% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 51912 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2023-02-25"}],"timeline":[{"label":"Start date (filer-reported)","value":"2023-02-25 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2024-11-15"},{"label":"Percent complete","value":"75% as of 2025-06-13"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2022-05-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":5437000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H14","filed":"2025-06-13","control":"57477","item":176,"raw":"5437000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":7449111,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I14","filed":"2025-06-13","control":"57477","item":176,"raw":"7449111"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H14; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I14; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 14"},{"label":"PUCT docket 51912 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=51912&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":7449111,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell I14"},"best_cost":"$7.4M estimate","sort_cost":7449111,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:t10174230","source":"puct_mcpr","name":"Grissom 345-kV Station: Termination for Angstrom-Grissom 345-kV T-Line","utility":"AEP Texas","ccn":["51912"],"voltage_kv":[345],"location":"Bee County","description":"Add one line terminal and modify one line terminal for the transmission lines from Angstrom and Lon Hill, add relaying, and terminate fiber at Grissom 345-kV Station","project_number":"T10174230 (P17032024) (P17032023)","status":"Construction underway","status_label":"Construction underway (90% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 51912 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2023-03-15"}],"timeline":[{"label":"Start date (filer-reported)","value":"2023-03-15 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2024-06-30"},{"label":"Percent complete","value":"90% as of 2025-06-13"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2022-05-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":5143000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H15","filed":"2025-06-13","control":"57477","item":176,"raw":"5143000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":6779740,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I15","filed":"2025-06-13","control":"57477","item":176,"raw":"6779740"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H15; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I15; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 15"},{"label":"PUCT docket 51912 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=51912&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":6779740,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell I15"},"best_cost":"$6.8M estimate","sort_cost":6779740,"energized_label":"Not publicly verified"},{"id":"mcpr:wind-energy-transmission-texas:edmondson","source":"puct_mcpr","name":"Bernoulli Switching station and 345kV Transmission line to Lacy Creek Collector station","utility":"Wind Energy Transmission Texas","ccn":["52977"],"voltage_kv":[345],"location":"Glasscock County","description":"The project consists of constructing a new 345kV switchinig station and 13.7 miles of new 345kV transmission line","project_number":"Edmondson Ranch","status":"Construction underway","status_label":"Construction underway (55% complete, 2022-07-14)","timeline_steps":[{"step":"Proposed","value":"CCN docket 52977 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2022-01-31"}],"timeline":[{"label":"Start date (filer-reported)","value":"2022-01-31 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2022-10-31 (estimated)"},{"label":"Percent complete","value":"55% as of 2022-07-14"}],"circuit_miles":13.7,"route_miles":13.7,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2022-07-14","last_seen":"2022-07-14","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":14839000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","doc_url":"https://interchange.puc.texas.gov/Documents/52947_190_1222160.ZIP","file":"PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx","sheet":"WETT","cell":"H7","filed":"2022-07-14","control":"52947","item":190,"raw":"$ 14,839,000 (Station) $ 33,804,000 (T-Line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":33804000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","doc_url":"https://interchange.puc.texas.gov/Documents/52947_190_1222160.ZIP","file":"PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx","sheet":"WETT","cell":"H7","filed":"2022-07-14","control":"52947","item":190,"raw":"$ 14,839,000 (Station) $ 33,804,000 (T-Line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":2467445,"circuit_miles":13.7,"per_route_mile_usd":2467445,"route_miles":13.7,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (line facilities only): PUCT 52947 item 190, filed 2022-07-14","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","where":"Native workbook PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx, sheet \"WETT\", cell H7; document https://interchange.puc.texas.gov/Documents/52947_190_1222160.ZIP"},{"label":"Summary row: PUCT 52947 item 190, filed 2022-07-14","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","where":"Workbook PUBLIC - WETT Monthly Construction Progress Report - July 2022 (native file).xlsx, sheet \"WETT\", row 7"},{"label":"PUCT docket 52977 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=52977&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":33804000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":2467445,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=190","evidence_label":"PUCT filing, cell H7"},"best_cost":"$33.8M estimate","sort_cost":33804000,"energized_label":"Not publicly verified"},{"id":"mcpr:electric-transmission-texas:p19067002","source":"puct_mcpr","name":"Misae II Solar Interconnection: Tesla - Fagus 345-kV T-Line","utility":"Electric Transmission Texas","ccn":["50016"],"voltage_kv":[345],"location":"Childress","description":"Construct approximately three (3) miles of new 345-kV transmission line from Tesla 345-kV Station to Misae Solar Park II Fagus 345-kV POI. Install TFC.","project_number":"ETT-162 P19067002 P19067003 P19067004","status":"Construction underway","status_label":"Construction underway (98% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 50016 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2022-10-03"}],"timeline":[{"label":"Start date (filer-reported)","value":"2022-10-03 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2023-05-15"},{"label":"Percent complete","value":"98% as of 2025-06-13"}],"circuit_miles":2.82,"route_miles":null,"route_miles_basis":null,"first_seen":"2022-08-19","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":7671910,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","doc_url":"https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP","file":"ETT 0625m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H6","filed":"2025-06-13","control":"57477","item":178,"raw":"7671910"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":9400000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","doc_url":"https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP","file":"ETT 0625m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I6","filed":"2025-06-13","control":"57477","item":178,"raw":"9400000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Native workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H6; document https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Native workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I6; document https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP"},{"label":"Summary row: PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", row 6"},{"label":"PUCT docket 50016 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=50016&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":9400000,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","evidence_label":"PUCT filing, cell I6"},"best_cost":"$9.4M estimate","sort_cost":9400000,"energized_label":"Not publicly verified"},{"id":"mcpr:lcra-transmission-services-corporation:1017348","source":"puct_mcpr","name":"Cooks Point TL Addition (CCN)","utility":"LCRA Transmission Services Corporation","ccn":["48358"],"voltage_kv":[138],"location":"Burleson","description":"Construct a new 138-kV transmission line to provide a transmission point of interconnection to a new load-serving substation","project_number":"1017348","status":"Completed","status_label":"Completed 2021-06-30","timeline_steps":[{"step":"Proposed","value":"CCN docket 48358 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-07-01"},{"step":"Energized","value":"Energized 2021-06-30 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-06-30 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-07-01 (actual)"},{"label":"Energized","value":"2021-06-30"},{"label":"Construction complete","value":"2021-06-30"},{"label":"Percent complete","value":"100% as of 2023-08-15"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2022-09-15","last_seen":"2023-08-15","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":35712000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=227","doc_url":"https://interchange.puc.texas.gov/Documents/54468_227_1321724.ZIP","file":"LCRATSC_0823.xlsx","sheet":"LCRA TSC MCPR Aug. 2023","cell":"I2","filed":"2023-08-15","control":"54468","item":227,"raw":"35712000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":47028075,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=227","doc_url":"https://interchange.puc.texas.gov/Documents/54468_227_1321724.ZIP","file":"LCRATSC_0823.xlsx","sheet":"LCRA TSC MCPR Aug. 2023","cell":"J2","filed":"2023-08-15","control":"54468","item":227,"raw":"47028075"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 227, filed 2023-08-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=227","where":"Native workbook LCRATSC_0823.xlsx, sheet \"LCRA TSC MCPR Aug. 2023\", cell I2; document https://interchange.puc.texas.gov/Documents/54468_227_1321724.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 227, filed 2023-08-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=227","where":"Native workbook LCRATSC_0823.xlsx, sheet \"LCRA TSC MCPR Aug. 2023\", cell J2; document https://interchange.puc.texas.gov/Documents/54468_227_1321724.ZIP"},{"label":"Summary row: PUCT 54468 item 227, filed 2023-08-15","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=227","where":"Workbook LCRATSC_0823.xlsx, sheet \"LCRA TSC MCPR Aug. 2023\", row 2"},{"label":"PUCT docket 48358 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=48358&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":47028075,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=227","evidence_label":"PUCT filing, cell J2"},"best_cost":"$47.0M final actual","sort_cost":47028075,"energized_label":"2021-06-30"},{"id":"mcpr:aep-texas:t10356892","source":"puct_mcpr","name":"Brackettville - Escondido 138-kV T-Line","utility":"AEP Texas","ccn":["50545"],"voltage_kv":[138],"location":"Brackettville/Kinney, Eagle Pass/Maverick","description":"Construct approximately forty-six (46) miles of new 138-kV transmission line from the Brackettville 138-kV Substation to the Escondido 138-kV Substation.","project_number":"T10356892 (P17041002) (P17041003) (P17041004) (P17041007)","status":"Completed","status_label":"Completed 2024-02-23","timeline_steps":[{"step":"Proposed","value":"CCN docket 50545 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2022-11-10"},{"step":"Energized","value":"Energized 2023-12-21 (filer-reported)"},{"step":"Completed","value":"Construction complete 2024-02-23 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2022-11-10 (actual)"},{"label":"Energized","value":"2023-12-21"},{"label":"Construction complete","value":"2024-02-23"},{"label":"Percent complete","value":"100% as of 2025-06-13"}],"circuit_miles":45.15,"route_miles":null,"route_miles_basis":null,"first_seen":"2022-08-19","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":59041000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H23","filed":"2025-06-13","control":"57477","item":176,"raw":"59041000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":74811842,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I23","filed":"2025-06-13","control":"57477","item":176,"raw":"74811842"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":68642620,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"J23","filed":"2025-06-13","control":"57477","item":176,"raw":"68642620"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H23; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I23; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell J23; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 23"},{"label":"PUCT docket 50545 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=50545&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":68642620,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell J23"},"best_cost":"$68.6M final actual","sort_cost":68642620,"energized_label":"2023-12-21"},{"id":"mcpr:aep-texas:42640431","source":"puct_mcpr","name":"Champlin to Valero East 138-kV T-Line","utility":"AEP Texas","ccn":["54144"],"voltage_kv":[138],"location":"Nueces","description":"Construct a new 138-kV transmission line from the existing AEP Texas Champlin 138-kV Substation to the existing AEP Texas Valero East 138-kV Substation.","project_number":"42640431 (P16067001) (P16067005)","status":"Energized","status_label":"Energized 2023-05-22","timeline_steps":[{"step":"Proposed","value":"CCN docket 54144 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2023-02-20"},{"step":"Energized","value":"Energized 2023-05-22 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2023-02-20 (actual)"},{"label":"Energized","value":"2023-05-22"},{"label":"Construction complete","value":"2023-05-31"},{"label":"Percent complete","value":"99% as of 2023-11-20"}],"circuit_miles":1.52,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-02-20","last_seen":"2023-11-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":5094497,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","doc_url":"https://interchange.puc.texas.gov/Documents/54468_329_1347729.ZIP","file":"AEPTX (central division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H213","filed":"2023-11-20","control":"54468","item":329,"raw":"5094497"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 329, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","where":"Native workbook AEPTX (central division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H213; document https://interchange.puc.texas.gov/Documents/54468_329_1347729.ZIP"},{"label":"Summary row: PUCT 54468 item 329, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","where":"Workbook AEPTX (central division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 213"},{"label":"PUCT docket 54144 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=54144&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":5094497,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=329","evidence_label":"PUCT filing, cell H213"},"best_cost":"$5.1M estimate","sort_cost":5094497,"energized_label":"2023-05-22"},{"id":"mcpr:oncor-electric-delivery:0pt46371","source":"puct_mcpr","name":"Flat Iron Substation – Barr Ranch Switch – Quickriver Tap 138 kV Line","utility":"Oncor Electric Delivery","ccn":["53491"],"voltage_kv":[138],"location":"Midland County","description":"Construct the new single-circuit 138 kV line connecting the planned Flat Iron Substation to the proposed Quickriver Tap. The new line will be routed through a proposed intermediate station called Barr Ranch Switch.","project_number":"0PT46371 0PT46696 0PT46746 0PT46984 0PT46983 0PT46728 0PT46818 0PT47825 (R8574)","status":"Completed","status_label":"Completed 2023-05-30","timeline_steps":[{"step":"Proposed","value":"CCN docket 53491 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2022-10-03"},{"step":"Energized","value":"Energized 2023-05-30 (filer-reported)"},{"step":"Completed","value":"Construction complete 2023-05-30 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2022-10-03 (actual)"},{"label":"Energized","value":"2023-05-30"},{"label":"Construction complete","value":"2023-05-30"},{"label":"Percent complete","value":"100% as of 2024-09-13"}],"circuit_miles":19,"route_miles":19,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2022-05-13","last_seen":"2024-09-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":35106020,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"H1229","filed":"2024-09-13","control":"56006","item":289,"raw":"35,106,020 (t-line) 8,602,965 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1847685,"circuit_miles":19,"per_route_mile_usd":1847685,"route_miles":19,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":8602965,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"H1229","filed":"2024-09-13","control":"56006","item":289,"raw":"35,106,020 (t-line) 8,602,965 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":31803179,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"I1229","filed":"2024-09-13","control":"56006","item":289,"raw":"31,803,179 (LINE) 9,754,393 (STATION)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1673852,"circuit_miles":19,"per_route_mile_usd":1673852,"route_miles":19,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":9754393,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"I1229","filed":"2024-09-13","control":"56006","item":289,"raw":"31,803,179 (LINE) 9,754,393 (STATION)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"line_only","cost_usd":29798019,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"J1229","filed":"2024-09-13","control":"56006","item":289,"raw":"29,798,019 (t-line) 10,217,389 (station)"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"line facilities only","per_circuit_mile_usd":1568317,"circuit_miles":19,"per_route_mile_usd":1568317,"route_miles":19,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_actual","cost_scope":"substation_only","cost_usd":10217389,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","doc_url":"https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP","file":"ONC00000924.xlsx","sheet":"MonthlyReportForm","cell":"J1229","filed":"2024-09-13","control":"56006","item":289,"raw":"29,798,019 (t-line) 10,217,389 (station)"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell H1229; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell I1229; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Final actual cost (substation facilities only): PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Native workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", cell J1229; document https://interchange.puc.texas.gov/Documents/56006_289_1427948.ZIP"},{"label":"Summary row: PUCT 56006 item 289, filed 2024-09-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","where":"Workbook ONC00000924.xlsx, sheet \"MonthlyReportForm\", row 1229"},{"label":"PUCT docket 53491 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=53491&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":29798019,"cost_basis_label":"Final actual cost","cost_scope_label":"line facilities only","per_circuit_mile_usd":1568317,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=56006&itemNumber=289","evidence_label":"PUCT filing, cell J1229"},"best_cost":"$29.8M final actual","sort_cost":29798019,"energized_label":"2023-05-30"},{"id":"mcpr:oncor-electric-delivery:0pt49039","source":"puct_mcpr","name":"Nacogdoches Southeast Switch - Redland Switch 345 kV Line","utility":"Oncor Electric Delivery","ccn":["54524"],"voltage_kv":[345],"location":"Nacogdoches and Angelina Counties","description":"Construct the new 345 kV line in the vacant circuit position on the existing Nacogdoches Southeast Switch - Redland Switch 138 kV transmission line.","project_number":"0PT49039 0PT40468 0PT52385 0PT41070 0PT41164 0PT49515 (R6075)","status":"Completed","status_label":"Completed 2024-12-26","timeline_steps":[{"step":"Proposed","value":"CCN docket 54524 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-05-09"},{"step":"Energized","value":"Energized 2024-12-26 (filer-reported)"},{"step":"Completed","value":"Construction complete 2024-12-26 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-05-09 (actual)"},{"label":"Energized","value":"2024-12-26"},{"label":"Construction complete","value":"2024-12-26"},{"label":"Percent complete","value":"100% as of 2025-06-13"}],"circuit_miles":13.4,"route_miles":13.4,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2023-06-30","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":21502000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1381","filed":"2025-06-13","control":"57477","item":181,"raw":"21,502,000 (t-line) 17,123,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1604627,"circuit_miles":13.4,"per_route_mile_usd":1604627,"route_miles":13.4,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":17123000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1381","filed":"2025-06-13","control":"57477","item":181,"raw":"21,502,000 (t-line) 17,123,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":22178546,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1381","filed":"2025-06-13","control":"57477","item":181,"raw":"22,178,546 (t-line) 34,837,850 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1655115,"circuit_miles":13.4,"per_route_mile_usd":1655115,"route_miles":13.4,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":34837850,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1381","filed":"2025-06-13","control":"57477","item":181,"raw":"22,178,546 (t-line) 34,837,850 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1381; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1381; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1381"},{"label":"PUCT docket 54524 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=54524&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":22178546,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1655115,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1381"},"best_cost":"$22.2M estimate","sort_cost":22178546,"energized_label":"2024-12-26"},{"id":"mcpr:oncor-electric-delivery:0pt49133","source":"puct_mcpr","name":"Keller Wall Price - Keller Magnolia 138 kV Transmission Line and Keller Wall Price - Roanoke 138 kV Rebuild","utility":"Oncor Electric Delivery","ccn":["54733"],"voltage_kv":[138],"location":"Tarrant County","description":"Construct the new 138 kV transmission line connecting the proposed Keller Wall Price Switch to the existing Keller Magnolia Tap; rebuild the existing 138 kV line from the Keller Wall Price Substation to the existing Keller Magnolia Tap.","project_number":"0PT49133 0PT51087 0PT51249 0PT53025 0PT51092 0PT51093 0PT51094 0PT51096 (M5281)","status":"Completed","status_label":"Completed 2024-05-20","timeline_steps":[{"step":"Proposed","value":"CCN docket 54733 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-01-01"},{"step":"Energized","value":"Energized 2024-05-20 (filer-reported)"},{"step":"Completed","value":"Construction complete 2024-05-20 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-01-01 (actual)"},{"label":"Energized","value":"2024-05-20"},{"label":"Construction complete","value":"2024-05-20"},{"label":"Percent complete","value":"100% as of 2025-06-13"}],"circuit_miles":1.2,"route_miles":0.3,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2023-06-30","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":5658000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1382","filed":"2025-06-13","control":"57477","item":181,"raw":"5,658,000 (t-line) 6,360,000(stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":4715000,"circuit_miles":1.2,"per_route_mile_usd":18860000,"route_miles":0.3,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":6360000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1382","filed":"2025-06-13","control":"57477","item":181,"raw":"5,658,000 (t-line) 6,360,000(stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":5575837,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1382","filed":"2025-06-13","control":"57477","item":181,"raw":"5,575,837 (Line) 11,646,557 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":4646531,"circuit_miles":1.2,"per_route_mile_usd":18586123,"route_miles":0.3,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":11646557,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1382","filed":"2025-06-13","control":"57477","item":181,"raw":"5,575,837 (Line) 11,646,557 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1382; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1382; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1382"},{"label":"PUCT docket 54733 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=54733&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/341012471","name":"Keller Wall Price Substation","coordinates":[-97.25655,32.92063]},{"osm_id":"osm:way/1256790958","name":"Keller Magnolia substation","coordinates":[-97.29702,32.93958]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":5575837,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":4646531,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1382"},"best_cost":"$5.6M estimate","sort_cost":5575837,"energized_label":"2024-05-20","osm_matches":[{"osm_id":"osm:way/348181588","layer":"lines-138"},{"osm_id":"osm:way/1256790960","layer":"lines-138"},{"osm_id":"osm:way/1256790959","layer":"lines-138"}],"match_method":"unique shortest mapped corridor between the terminal substations","match_confidence":"medium"},{"id":"mcpr:oncor-electric-delivery:0pt49056","source":"puct_mcpr","name":"Ramhorn Hill - Dunham 345 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["55067"],"voltage_kv":[345],"location":"Denton and Wise Counties","description":"Construct the new double circuit 345 kV transmission line connecting the proposed Ramhorn Hill Switch to the proposed Dunham Switch on triple circuit capable structures to accommodate a future 138 kV circuit.","project_number":"0PT49056 0PT43840 0PT52346 0PT53116 0PT53611 0PT52349 0PT53612 0PT44942 0PT44943 0PT54211 (M5148)","status":"Construction underway","status_label":"Construction underway (7% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55067 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-11-01"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-11-01 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2025-12-15 (estimated)"},{"label":"Percent complete","value":"7% as of 2025-06-13"}],"circuit_miles":41.7,"route_miles":20.84,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2023-06-30","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":176939000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1385","filed":"2025-06-13","control":"57477","item":181,"raw":"176,939,000 (t-line) 74,858,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":4243141,"circuit_miles":41.7,"per_route_mile_usd":8490355,"route_miles":20.84,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":74858000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1385","filed":"2025-06-13","control":"57477","item":181,"raw":"176,939,000 (t-line) 74,858,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":112533751,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1385","filed":"2025-06-13","control":"57477","item":181,"raw":"264,699,472 (Line) 112,533,751 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":264699472,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1385","filed":"2025-06-13","control":"57477","item":181,"raw":"264,699,472 (Line) 112,533,751 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":6347709,"circuit_miles":41.7,"per_route_mile_usd":12701510,"route_miles":20.84,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1385; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (line facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1385; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1385"},{"label":"PUCT docket 55067 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55067&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":264699472,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":6347709,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1385"},"best_cost":"$264.7M estimate","sort_cost":264699472,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:t10177559","source":"puct_mcpr","name":"Angstrom - Naismith 345-kV T-Line","utility":"AEP Texas","ccn":["52656"],"voltage_kv":[345],"location":"San Patricio","description":"Construct a new 345-kV double-circuit transmission line from the existing Angstrom 345-kV Station to the new Naismith Station 345-kV Station.","project_number":"T10177559 (P17032008) (P17032030) (P17032012)","status":"Construction underway","status_label":"Construction underway (99% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 52656 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2023-07-13"}],"timeline":[{"label":"Start date (filer-reported)","value":"2023-07-13 (actual)"},{"label":"Energized","value":"2025-12-14 (estimated)"},{"label":"Construction complete","value":"2024-07-05"},{"label":"Percent complete","value":"99% as of 2025-06-13"}],"circuit_miles":34.84,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-05-19","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":68103000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H61","filed":"2025-06-13","control":"57477","item":176,"raw":"68103000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":72500000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I61","filed":"2025-06-13","control":"57477","item":176,"raw":"72500000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H61; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I61; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 61"},{"label":"PUCT docket 52656 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=52656&ItemMatch=Equal&DocumentType=ALL"}],"osm_matches":[{"osm_id":"osm:way/1448341707","layer":"lines-345plus"}],"match_method":"OSM line name contains both endpoint names and voltage agrees","endpoints":[{"osm_id":"osm:way/1089997597","name":"Angstrom Substation","coordinates":[-97.43837,28.04431]},{"osm_id":"osm:way/1448341706","name":"Naismith Substation","coordinates":[-97.24801,27.93481]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","headline_cost":{"cost_usd":72500000,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell I61"},"best_cost":"$72.5M estimate","sort_cost":72500000,"energized_label":"2025-12-14 (estimated)"},{"id":"mcpr:aep-texas:t10332127","source":"puct_mcpr","name":"Del Sol - Frontera 345-kV T-Line","utility":"AEP Texas","ccn":["55001"],"voltage_kv":[345],"location":"Hidalgo","description":"Construct a new 345-kV transmission line from Frontera 345-kV Station to the ETT Point of Interconnect.","project_number":"T10332127 (P20838007) (P20838008) (P20838009) (P20838010)","status":"Construction underway","status_label":"Construction underway (20% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55001 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2025-01-01"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-01-01 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-09-30 (estimated)"},{"label":"Percent complete","value":"20% as of 2025-06-13"}],"circuit_miles":35.9,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-12-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":91968522,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H103","filed":"2025-06-13","control":"57477","item":176,"raw":"91968522"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":127224703.63,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I103","filed":"2025-06-13","control":"57477","item":176,"raw":"127224703.63"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H103; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I103; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 103"},{"label":"PUCT docket 55001 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55001&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":127224703.63,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell I103"},"best_cost":"$127.2M estimate","sort_cost":127224703.63,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:t10332118","source":"puct_mcpr","name":"Frontera 345-kV Station","utility":"AEP Texas","ccn":["55001"],"voltage_kv":[345],"location":"Hidalgo","description":"Build new 345-kV Station. Add all necessary breakers. Add two auto transformers. Construct two new 138-kV terminals by extending the 138-kV station and adding all necessary breakers, including the bus tie breakers. Terminate del sol lines into the 345-kV station and low side of the auto transformers in the 138-kV station. Terminate fiber. Update relay and protection.","project_number":"T10332118 (P20838006)","status":"Construction underway","status_label":"Construction underway (15% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55001 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-06-01"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-06-01 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-09-30 (estimated)"},{"label":"Percent complete","value":"15% as of 2025-06-13"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-12-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":46194268,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H104","filed":"2025-06-13","control":"57477","item":176,"raw":"46194268"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":62998401.99,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I104","filed":"2025-06-13","control":"57477","item":176,"raw":"62998401.99"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H104; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I104; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 104"},{"label":"PUCT docket 55001 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55001&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":62998401.99,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell I104"},"best_cost":"$63.0M estimate","sort_cost":62998401.99,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:t10488613","source":"puct_mcpr","name":"Resnik - Naismith 138-kV Double Circuit Transmission Line","utility":"AEP Texas","ccn":["53987"],"voltage_kv":[138],"location":"San Patricio","description":"Construct approx 3 miles of double circuit 138-kV transmission line from AEPs Naismith to Resnik Stations. Includes ROW and Fiber","project_number":"T10488613 (P17032018) (P17032016) (P17032014) (P17032021)","status":"Construction underway","status_label":"Construction underway (98% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 53987 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-04-01"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-04-01 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2024-08-01"},{"label":"Percent complete","value":"98% as of 2025-06-13"}],"circuit_miles":6,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-12-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":13762557,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H108","filed":"2025-06-13","control":"57477","item":176,"raw":"13762557"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":19448818,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I108","filed":"2025-06-13","control":"57477","item":176,"raw":"19448818"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H108; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I108; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 108"},{"label":"PUCT docket 53987 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=53987&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/1089933617","name":"Resnik Substation","coordinates":[-97.25848,27.90361]},{"osm_id":"osm:way/1448341706","name":"Naismith Substation","coordinates":[-97.24801,27.93481]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","schematic":{"coordinates":[[-97.25848,27.90361],[-97.24801,27.93481]],"note":"Schematic link between endpoint substations; not the approved route"},"headline_cost":{"cost_usd":19448818,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell I108"},"best_cost":"$19.4M estimate","sort_cost":19448818,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:t10194671","source":"puct_mcpr","name":"Goodlett - Quanah 69-kV T-Line","utility":"AEP Texas","ccn":["52921"],"voltage_kv":[138],"location":"Hardeman","description":"Construct 6.70 miles of new 69-kV transmission line to 138-kV standards to be operated at 69-kV. This is a segment of the exising Childress to Quanah 69-kV transmission line that will be relocated due to gypsum mining operations that have lead to safety and reliability concerns.","project_number":"T10194671 (P18235002) (P18235003) (P18235001)","status":"Energized","status_label":"Energized 2024-10-24","timeline_steps":[{"step":"Proposed","value":"CCN docket 52921 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-06-18"},{"step":"Energized","value":"Energized 2024-10-24 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-06-18 (actual)"},{"label":"Energized","value":"2024-10-24"},{"label":"Construction complete","value":"2024-09-15"},{"label":"Percent complete","value":"99% as of 2025-06-13"}],"circuit_miles":6.7,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-01-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":10634551,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/57477_177_1508082.ZIP","file":"AEPTX (north division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H21","filed":"2025-06-13","control":"57477","item":177,"raw":"10634551"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":12771124,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/57477_177_1508082.ZIP","file":"AEPTX (north division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"I21","filed":"2025-06-13","control":"57477","item":177,"raw":"12771124"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 177, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","where":"Native workbook AEPTX (north division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H21; document https://interchange.puc.texas.gov/Documents/57477_177_1508082.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 177, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","where":"Native workbook AEPTX (north division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell I21; document https://interchange.puc.texas.gov/Documents/57477_177_1508082.ZIP"},{"label":"Summary row: PUCT 57477 item 177, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","where":"Workbook AEPTX (north division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 21"},{"label":"PUCT docket 52921 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=52921&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":12771124,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","evidence_label":"PUCT filing, cell I21"},"best_cost":"$12.8M estimate","sort_cost":12771124,"energized_label":"2024-10-24"},{"id":"mcpr:aep-texas:43003714a","source":"puct_mcpr","name":"Sonora - Rocksprings (Str. 87/6) 69-kV T-Line","utility":"AEP Texas","ccn":["53090"],"voltage_kv":[69],"location":"Sonora/Sutton","description":"Construct a new 2.66 mile single-circuit 69-kV transmission line, designed to 138-kV standards, from the existing Sonora 69-kV Substation to Structure 87/6 along the Sonora to Rocksprings 69-kV transmission line. Will be operated at 69 kV.","project_number":"43003714a (A19027004) (A19027006)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 53090 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-01-15 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2025-03-31"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":2.66,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-01-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":3755557,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","doc_url":"https://interchange.puc.texas.gov/Documents/57477_177_1508082.ZIP","file":"AEPTX (north division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H22","filed":"2025-06-13","control":"57477","item":177,"raw":"3755557"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 177, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","where":"Native workbook AEPTX (north division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H22; document https://interchange.puc.texas.gov/Documents/57477_177_1508082.ZIP"},{"label":"Summary row: PUCT 57477 item 177, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","where":"Workbook AEPTX (north division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 22"},{"label":"PUCT docket 53090 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=53090&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":3755557,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=177","evidence_label":"PUCT filing, cell H22"},"best_cost":"$3.8M estimate","sort_cost":3755557,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:2022032","source":"puct_mcpr","name":"Cruce - Del Sol 345-kV Double-Circuit T-Line","utility":"AEP Texas","ccn":["55151"],"voltage_kv":[345],"location":"Jim Hogg","description":"Construct approximately 29.30 miles of new 345-kV tranmssion line between ETT's POI and the STEC POI that is located approximately 10 miles south of Cruce Station with dual OPGW. Install double circuit BOLD structures with both circuits strung. Studied using 3-954 ACSR.","project_number":"TP-2022032 T10622230 (P22032001) (P22032002) (P22032004)","status":"Construction underway","status_label":"Construction underway (5% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55151 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-04-15"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-04-15 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-12-09 (estimated)"},{"label":"Percent complete","value":"5% as of 2025-06-13"}],"circuit_miles":58.6,"route_miles":null,"route_miles_basis":null,"first_seen":"2024-03-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":107155507,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H136","filed":"2025-06-13","control":"57477","item":176,"raw":"107155507"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H136; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 136"},{"label":"PUCT docket 55151 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55151&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":107155507,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell H136"},"best_cost":"$107.2M estimate","sort_cost":107155507,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:2022033","source":"puct_mcpr","name":"Cruce - Reforzar 345-kV Double-Circuit T-Line","utility":"AEP Texas","ccn":["55397"],"voltage_kv":[345],"location":"Brooks, Duval, Jim Hogg, Jim Wells, Kleberg","description":"Construct approximately 39.26 miles of new 345-kV tranmssion line between the AEP Texas Cruce 345-kV Station and the proposed AEP Texas Reforzar 345-kV Station with dual OPGW. Install double circuit BOLD structures with both circuits strung. Studied using 3-954 ACSR.","project_number":"TP-2022033 T10703159 (P22033001) (P22033002) (P22033003) (P22033004)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55397 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-04-06 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-09-26 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":78.52,"route_miles":null,"route_miles_basis":null,"first_seen":"2024-05-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":150347911,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H144","filed":"2025-06-13","control":"57477","item":176,"raw":"150347911"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H144; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 144"},{"label":"PUCT docket 55397 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55397&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":150347911,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell H144"},"best_cost":"$150.3M estimate","sort_cost":150347911,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt49421","source":"puct_mcpr","name":"North McCamey - Sand Lake 345 kV Line","utility":"Oncor Electric Delivery","ccn":["55121"],"voltage_kv":[345],"location":"Crane, Crockett, Pecos, Reeves, Upton, and Ward Counties","description":"Construct the new double circuit 345 kV line connecting Oncor's existing Sand Lake Station to LCRA's existing North McCamey Station.","project_number":"0PT49421 0PT46128 0PT54337 0PT47652 (R8620)","status":"Construction underway","status_label":"Construction underway (5% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55121 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2025-05-19"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-05-19 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-07-31 (estimated)"},{"label":"Percent complete","value":"5% as of 2025-06-13"}],"circuit_miles":176.06,"route_miles":88.03,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-04-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":159264500,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1383","filed":"2025-06-13","control":"57477","item":181,"raw":"159,264,500 (t-line) 5,534,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":904604,"circuit_miles":176.06,"per_route_mile_usd":1809207,"route_miles":88.03,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":5534000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1383","filed":"2025-06-13","control":"57477","item":181,"raw":"159,264,500 (t-line) 5,534,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":167325235,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1383","filed":"2025-06-13","control":"57477","item":181,"raw":"167,325,235 (Line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":950388,"circuit_miles":176.06,"per_route_mile_usd":1900775,"route_miles":88.03,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1383; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (line facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1383; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1383"},{"label":"PUCT docket 55121 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55121&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":167325235,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":950388,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1383"},"best_cost":"$167.3M estimate","sort_cost":167325235,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt50023","source":"puct_mcpr","name":"Lufkin Switch - Redland Switch 345 kV Line","utility":"Oncor Electric Delivery","ccn":["55172"],"voltage_kv":[345],"location":"Angelina County","description":"Construct the new single circuit 345 kV line connecting the existing Lufkin Switch to the existing Redland Switch on double circuit capable structures to accommodate a future 345 kV circuit.","project_number":"0PT50023 0PT41140 0PT41166 0PT53968 0PT54573 (R6077)","status":"Construction underway","status_label":"Construction underway (2% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55172 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2025-02-24"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-02-24 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-05-31 (estimated)"},{"label":"Percent complete","value":"2% as of 2025-06-13"}],"circuit_miles":7.92,"route_miles":7.92,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-04-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":29250000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1384","filed":"2025-06-13","control":"57477","item":181,"raw":"29,250,000 (t-line) 8,252,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":3693182,"circuit_miles":7.92,"per_route_mile_usd":3693182,"route_miles":7.92,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":8252000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1384","filed":"2025-06-13","control":"57477","item":181,"raw":"29,250,000 (t-line) 8,252,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":34501677,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1384","filed":"2025-06-13","control":"57477","item":181,"raw":"34,501,677 (Line) 9,744,447 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":4356272,"circuit_miles":7.92,"per_route_mile_usd":4356272,"route_miles":7.92,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":9744447,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1384","filed":"2025-06-13","control":"57477","item":181,"raw":"34,501,677 (Line) 9,744,447 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1384; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1384; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1384"},{"label":"PUCT docket 55172 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55172&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":34501677,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":4356272,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1384"},"best_cost":"$34.5M estimate","sort_cost":34501677,"energized_label":"Not publicly verified","ercot_projects":["5475"]},{"id":"mcpr:oncor-electric-delivery:0pt49068","source":"puct_mcpr","name":"Exchange Switch - Keller Magnolia Substation 138 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["55574"],"voltage_kv":[138],"location":"Tarrant County","description":"Construct the new double circuit 138 kV transmission line between the proposed Exchange Switch, the existing Alliance Substation and the existing Keller Magnolia Substation.","project_number":"0PT49068 0PT51089 0PT53097 0PT54710 0PT49510 0PT51097 0PT47814 0PT44941 (100%) (M5281)","status":"Construction underway","status_label":"Construction underway (80% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55574 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-03-19"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-03-19 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2025-12-15 (estimated)"},{"label":"Percent complete","value":"80% as of 2025-06-13"}],"circuit_miles":5.3,"route_miles":2.65,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-04-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":16309000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1386","filed":"2025-06-13","control":"57477","item":181,"raw":"16,309,000 (t-line) 49,693,000(stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":3077170,"circuit_miles":5.3,"per_route_mile_usd":6154340,"route_miles":2.65,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":49693000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1386","filed":"2025-06-13","control":"57477","item":181,"raw":"16,309,000 (t-line) 49,693,000(stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":51540903,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1386","filed":"2025-06-13","control":"57477","item":181,"raw":"18,003,657 (Line) 51,540,903 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":18003657,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1386","filed":"2025-06-13","control":"57477","item":181,"raw":"18,003,657 (Line) 51,540,903 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":3396916,"circuit_miles":5.3,"per_route_mile_usd":6793833,"route_miles":2.65,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1386; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (line facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1386; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1386"},{"label":"PUCT docket 55574 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55574&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":18003657,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":3396916,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1386"},"best_cost":"$18.0M estimate","sort_cost":18003657,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt49135","source":"puct_mcpr","name":"Exchange Switch - Roanoke Switch 138/345 kV Transmission Line Rebuild","utility":"Oncor Electric Delivery","ccn":["55575"],"voltage_kv":[345,138],"location":"Tarrant and Denton Counties","description":"Rebuild the existing double circuit 345 kV transmission line between the proposed Exchange Switch and the existing Roanoke Switch and add a new 138 kV circuit.","project_number":"0PT49135 0PT52792 0PT52354 0PT52355 0PT52010 0PT44941(0%) 0PT54629 (M5144)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55575 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2026-01-01 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-05-31 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":null,"route_miles":3.5,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-04-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":34364000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1387","filed":"2025-06-13","control":"57477","item":181,"raw":"34,364,000 (t-line) 1,100,000(stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":9818286,"route_miles":3.5,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":1100000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1387","filed":"2025-06-13","control":"57477","item":181,"raw":"34,364,000 (t-line) 1,100,000(stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1387; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1387"},{"label":"PUCT docket 55575 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55575&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":34364000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1387"},"best_cost":"$34.4M estimate","sort_cost":34364000,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt52729","source":"puct_mcpr","name":"Peck - Driver 138 kV Line","utility":"Oncor Electric Delivery","ccn":["56220"],"voltage_kv":[138],"location":"Midland County","description":"Construct the new single-circuit 138 kV line connecting the existing Peck Substation to the existing Driver Substation.","project_number":"0PT52729 0PT54477 0PT49407 0PT49352 0PT49528 (R8603)","status":"Completed","status_label":"Completed 2024-12-16","timeline_steps":[{"step":"Proposed","value":"CCN docket 56220 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-08-07"},{"step":"Energized","value":"Energized 2024-12-16 (filer-reported)"},{"step":"Completed","value":"Construction complete 2024-12-16 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-08-07 (actual)"},{"label":"Energized","value":"2024-12-16"},{"label":"Construction complete","value":"2024-12-16"},{"label":"Percent complete","value":"100% as of 2025-06-13"}],"circuit_miles":5.5,"route_miles":5.5,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-04-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":13760000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1388","filed":"2025-06-13","control":"57477","item":181,"raw":"13,760,000 (t-line) 1,721,000(stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":2501818,"circuit_miles":5.5,"per_route_mile_usd":2501818,"route_miles":5.5,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":1721000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1388","filed":"2025-06-13","control":"57477","item":181,"raw":"13,760,000 (t-line) 1,721,000(stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":2072022,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1388","filed":"2025-06-13","control":"57477","item":181,"raw":"14,972,164. (Line) 2,072,022 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1388; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1388; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1388"},{"label":"PUCT docket 56220 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=56220&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":2072022,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1388"},"best_cost":"$2.1M estimate","sort_cost":2072022,"energized_label":"2024-12-16"},{"id":"mcpr:oncor-electric-delivery:0pt52165","source":"puct_mcpr","name":"Quartz Sand Sw - Hog Mountain POD 138 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["56396"],"voltage_kv":[138],"location":"Glasscock County","description":"Construct a new single-circuit 138 kV transmission line connecting Quartz Sand Switch to the proposed Hog Mountain POD (XTO) on double-circuit capable structures","project_number":"0PT52165 0PT53477 0PT51299 0PT51460 (R8791)","status":"Construction underway","status_label":"Construction underway (42% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 56396 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-11-21"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-11-21 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2025-09-30 (estimated)"},{"label":"Percent complete","value":"42% as of 2025-06-13"}],"circuit_miles":7.1,"route_miles":7.1,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-04-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":18063000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1389","filed":"2025-06-13","control":"57477","item":181,"raw":"18,063,000 (t-line) 960,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":2544085,"circuit_miles":7.1,"per_route_mile_usd":2544085,"route_miles":7.1,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":960000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1389","filed":"2025-06-13","control":"57477","item":181,"raw":"18,063,000 (t-line) 960,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":14713227,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1389","filed":"2025-06-13","control":"57477","item":181,"raw":"14,713,227 (t-line) 1,341,326 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":2072285,"circuit_miles":7.1,"per_route_mile_usd":2072285,"route_miles":7.1,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":1341326,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1389","filed":"2025-06-13","control":"57477","item":181,"raw":"14,713,227 (t-line) 1,341,326 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1389; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1389; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1389"},{"label":"PUCT docket 56396 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=56396&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":14713227,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":2072285,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1389"},"best_cost":"$14.7M estimate","sort_cost":14713227,"energized_label":"Not publicly verified","ercot_projects":["76686"]},{"id":"mcpr:oncor-electric-delivery:0pt52237","source":"puct_mcpr","name":"Border Tap - Atchison POD 138 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["56523"],"voltage_kv":[138],"location":"Loving County","description":"Construct a new single-circuit 138 kV transmission line connecting the proposed Border Tap to the proposed Atchison POD on double-circuit capable structures","project_number":"0PT52237 0PT53899 0PT51438 0PT51461 (R8698) (R8726)","status":"Construction underway","status_label":"Construction underway (16% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 56523 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2025-02-03"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-02-03 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2025-06-30 (estimated)"},{"label":"Percent complete","value":"16% as of 2025-06-13"}],"circuit_miles":8,"route_miles":8,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-05-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":15606000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1390","filed":"2025-06-13","control":"57477","item":181,"raw":"15,606,000 (t-line) 1,841,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1950750,"circuit_miles":8,"per_route_mile_usd":1950750,"route_miles":8,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":1841000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1390","filed":"2025-06-13","control":"57477","item":181,"raw":"15,606,000 (t-line) 1,841,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":17788151,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1390","filed":"2025-06-13","control":"57477","item":181,"raw":"17,788,151 (Line) 2,787,827 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":2223519,"circuit_miles":8,"per_route_mile_usd":2223519,"route_miles":8,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":2787827,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1390","filed":"2025-06-13","control":"57477","item":181,"raw":"17,788,151 (Line) 2,787,827 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1390; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1390; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1390"},{"label":"PUCT docket 56523 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=56523&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":17788151,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":2223519,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1390"},"best_cost":"$17.8M estimate","sort_cost":17788151,"energized_label":"Not publicly verified","ercot_projects":["76690"]},{"id":"mcpr:oncor-electric-delivery:0pt53566","source":"puct_mcpr","name":"Ranger Camp Switch 345 kV Transmission Tap Line","utility":"Oncor Electric Delivery","ccn":["56597"],"voltage_kv":[345],"location":"Mitchell County","description":"Construct a new double-circuit 345 kV tap line and reterminate the existing Morgan Creek - Falcon Seaboard 345 kV transmission line into Ranger Camp Switch","project_number":"0PT53566 0PT46948 (R3024)","status":"Completed","status_label":"Completed 2025-04-01","timeline_steps":[{"step":"Proposed","value":"CCN docket 56597 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-08-20"},{"step":"Energized","value":"Energized 2025-04-01 (filer-reported)"},{"step":"Completed","value":"Construction complete 2025-04-01 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-08-20 (actual)"},{"label":"Energized","value":"2025-04-01"},{"label":"Construction complete","value":"2025-04-01"},{"label":"Percent complete","value":"100% as of 2025-06-13"}],"circuit_miles":2.8,"route_miles":1.4,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-06-14","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":21819000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1391","filed":"2025-06-13","control":"57477","item":181,"raw":"21,819,000 (t-line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":7792500,"circuit_miles":2.8,"per_route_mile_usd":15585000,"route_miles":1.4,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":14398849,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1391","filed":"2025-06-13","control":"57477","item":181,"raw":"14,398,849 (t-line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":5142446,"circuit_miles":2.8,"per_route_mile_usd":10284892,"route_miles":1.4,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (line facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1391; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (line facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1391; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1391"},{"label":"PUCT docket 56597 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=56597&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":14398849,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":5142446,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1391"},"best_cost":"$14.4M estimate","sort_cost":14398849,"energized_label":"2025-04-01","ercot_projects":["72007"]},{"id":"mcpr:oncor-electric-delivery:0pt54566","source":"puct_mcpr","name":"Reiter Switch - Tesoro Switch 345 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["56799"],"voltage_kv":[345],"location":"Ector and Midland Counties","description":"Construct the new double-circuit 345 kV transmission line connecting Reiter Switch to Tesoro Switch","project_number":"0PT54566 0PT46127 0PT53440 0PT57482 (R8629)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 56799 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2026-06-15 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-12-15 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":8.8,"route_miles":4.4,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-08-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":18115000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1392","filed":"2025-06-13","control":"57477","item":181,"raw":"18,115,000 (t-line) 5,425,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":2058523,"circuit_miles":8.8,"per_route_mile_usd":4117045,"route_miles":4.4,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":5425000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1392","filed":"2025-06-13","control":"57477","item":181,"raw":"18,115,000 (t-line) 5,425,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1392; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1392"},{"label":"PUCT docket 56799 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=56799&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":18115000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":2058523,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1392"},"best_cost":"$18.1M estimate","sort_cost":18115000,"energized_label":"Not publicly verified","ercot_projects":["71182","71187"]},{"id":"mcpr:aep-texas:2022031","source":"puct_mcpr","name":"Cenizo - Cruce 345-kV Double-Circuit T-Line","utility":"AEP Texas","ccn":["55296"],"voltage_kv":[345],"location":"Webb, Zapata, Brooks","description":"Construct approximately 30.14 miles of new 345-kV tranmssion line between the ETT Point of Interconnect (POI) and the AEP Texas Cruce 345-kV Station with dual OPGW. Install double circuit BOLD structures with both circuits strung. Studied using 3-954 ACSR.","project_number":"TP-2022031 T10525770 (P22031001) (P22031002) (P22031003) (P22031004)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55296 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-06-23 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-11-30 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":30.14,"route_miles":null,"route_miles_basis":null,"first_seen":"2024-11-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":100734750,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H209","filed":"2025-06-13","control":"57477","item":176,"raw":"100734750"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H209; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 209"},{"label":"PUCT docket 55296 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55296&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":100734750,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell H209"},"best_cost":"$100.7M estimate","sort_cost":100734750,"energized_label":"Not publicly verified"},{"id":"mcpr:aep-texas:2022034","source":"puct_mcpr","name":"Cruce 345-kV Station: Del Sol Retermination","utility":"AEP Texas","ccn":["55151"],"voltage_kv":[345],"location":"Jim Hogg","description":"Reterminate the AEP Texas Cruce to Del Sol Circuits 1 & 2 345-kV transmission lines into the new Cruce 345-kV Station.","project_number":"TP-2022034 T10537658 (P22034004) (P22034007) (P22034005)","status":"Approved","status_label":"Approved; construction not started as of 2025-06-13","timeline_steps":[{"step":"Proposed","value":"CCN docket 55151 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-01-27 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-09-26 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":0.05,"route_miles":null,"route_miles_basis":null,"first_seen":"2024-12-13","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":2000000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H212","filed":"2025-06-13","control":"57477","item":176,"raw":"2000000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":1449678,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"I212","filed":"2025-06-13","control":"57477","item":176,"raw":"1449678"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H212; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell I212; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 212"},{"label":"PUCT docket 55151 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55151&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":1449678,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell I212"},"best_cost":"$1.4M estimate","sort_cost":1449678,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt54649","source":"puct_mcpr","name":"Hartring Substation - Upland Substation 138 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["57263"],"voltage_kv":[138],"location":"Reagan and Upton Counties","description":"Construct a new double-circuit138 kV transmission line between Oncor’s existing Hartring Substation in Reagan County and Oncor’s Upland Substation in Upton County, Texas","project_number":"0PT54649 0PT52728 0PT54492 0PT51492 0PT59220 0PT55844 0PT57967 (R8713)","status":"Approved","status_label":"Approved; construction not started as of 2025-06-13","timeline_steps":[{"step":"Proposed","value":"CCN docket 57263 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-06-01 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2025-11-30 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":17.6,"route_miles":8.8,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2024-11-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":21861000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1395","filed":"2025-06-13","control":"57477","item":181,"raw":"21,861,000 (t-line) 3,301,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1242102,"circuit_miles":17.6,"per_route_mile_usd":2484205,"route_miles":8.8,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":3301000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1395","filed":"2025-06-13","control":"57477","item":181,"raw":"21,861,000 (t-line) 3,301,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":22731423,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1395","filed":"2025-06-13","control":"57477","item":181,"raw":"22,731,423 (Line) 4,023,503 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1291558,"circuit_miles":17.6,"per_route_mile_usd":2583116,"route_miles":8.8,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"final_estimate","cost_scope":"substation_only","cost_usd":4023503,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1395","filed":"2025-06-13","control":"57477","item":181,"raw":"22,731,423 (Line) 4,023,503 (Station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1395; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1395; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1395"},{"label":"PUCT docket 57263 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=57263&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":22731423,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":1291558,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1395"},"best_cost":"$22.7M estimate","sort_cost":22731423,"energized_label":"Not publicly verified","ercot_projects":["87905"]},{"id":"mcpr:electric-transmission-texas:p20838001","source":"puct_mcpr","name":"Del Sol - Frontera 345-kV T-Line","utility":"Electric Transmission Texas","ccn":["55001"],"voltage_kv":[345],"location":"Hidalgo, Starr","description":"Construct a new 345-kV transmission line from the AEP Texas Point of Interconnect to Del Sol 345-kV Station.","project_number":"ETT-206 P20838001 P20838002 P20838003 P20838004","status":"Construction underway","status_label":"Construction underway (20% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55001 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2025-01-01"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-01-01 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-09-30 (estimated)"},{"label":"Percent complete","value":"20% as of 2025-06-13"}],"circuit_miles":18.1,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-12-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":62277740,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","doc_url":"https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP","file":"ETT 0625m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H10","filed":"2025-06-13","control":"57477","item":178,"raw":"62277740"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":75088402.52,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","doc_url":"https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP","file":"ETT 0625m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I10","filed":"2025-06-13","control":"57477","item":178,"raw":"75088402.52"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Native workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H10; document https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Native workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I10; document https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP"},{"label":"Summary row: PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", row 10"},{"label":"PUCT docket 55001 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55001&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":75088402.52,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","evidence_label":"PUCT filing, cell I10"},"best_cost":"$75.1M estimate","sort_cost":75088402.52,"energized_label":"Not publicly verified"},{"id":"mcpr:electric-transmission-texas:p20838005","source":"puct_mcpr","name":"Del Sol 345-kV Station","utility":"Electric Transmission Texas","ccn":["55001"],"voltage_kv":[345],"location":"Starr","description":"Convert Station to breaker and a half. Add all necessary breakers. Terminate lines to frontera. Terminate fiber. Update relaying and protection.","project_number":"ETT-206 P20838005","status":"Construction underway","status_label":"Construction underway (30% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55001 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-06-01"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-06-01 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-09-30 (estimated)"},{"label":"Percent complete","value":"30% as of 2025-06-13"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-12-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":27393158,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","doc_url":"https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP","file":"ETT 0625m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H11","filed":"2025-06-13","control":"57477","item":178,"raw":"27393158"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":30275827.71,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","doc_url":"https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP","file":"ETT 0625m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I11","filed":"2025-06-13","control":"57477","item":178,"raw":"30275827.71"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Native workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H11; document https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Native workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I11; document https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP"},{"label":"Summary row: PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", row 11"},{"label":"PUCT docket 55001 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55001&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":30275827.71,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","evidence_label":"PUCT filing, cell I11"},"best_cost":"$30.3M estimate","sort_cost":30275827.71,"energized_label":"Not publicly verified"},{"id":"mcpr:electric-transmission-texas:p22032005","source":"puct_mcpr","name":"Cruce - Del Sol 345-kV Double-Circuit T-Line","utility":"Electric Transmission Texas","ccn":["55151"],"voltage_kv":[345],"location":"Jim Hogg, Starr","description":"Construct approximately 29.21 miles of new 345-kV transmssion line between Del Sol Station and the AEP Texas POI that is located approximately 25 miles north-northeast of Del Sol Station with dual OPGW. Install double circuit BOLD structures with both circuits strung. Studied using 3-954 ACSR.","project_number":"ETT-205 P22032005 P22032006 P22032007 P22032008","status":"Construction underway","status_label":"Construction underway (5% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55151 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-04-15"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-04-15 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-12-09 (estimated)"},{"label":"Percent complete","value":"5% as of 2025-06-13"}],"circuit_miles":29.21,"route_miles":null,"route_miles_basis":null,"first_seen":"2024-03-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":112516521,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","doc_url":"https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP","file":"ETT 0625m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H13","filed":"2025-06-13","control":"57477","item":178,"raw":"112516521"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Native workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H13; document https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP"},{"label":"Summary row: PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", row 13"},{"label":"PUCT docket 55151 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55151&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":112516521,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","evidence_label":"PUCT filing, cell H13"},"best_cost":"$112.5M estimate","sort_cost":112516521,"energized_label":"Not publicly verified"},{"id":"mcpr:electric-transmission-texas:p22032009","source":"puct_mcpr","name":"Del Sol 345-kV Station: Terminals","utility":"Electric Transmission Texas","ccn":["55151"],"voltage_kv":[345],"location":"Starr","description":"Construct two terminals at Del Sol 345-kV Station by installing two circuit breakers. Install jumpers to new circuits. Update protection system. Install 2 345-kV 5000A breakers rated for at least 50 KA. Reterminate and relocate the Del Sol to Jackie Howard 345-kV transmission line into Del Sol 345-kV Station. Install Fiber.","project_number":"ETT-205 P22032009 P22032010 P22032011","status":"Construction underway","status_label":"Construction underway (10% complete, 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55151 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2024-04-15"}],"timeline":[{"label":"Start date (filer-reported)","value":"2024-04-15 (actual)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-09-30 (estimated)"},{"label":"Percent complete","value":"10% as of 2025-06-13"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2024-03-20","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":9235126,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","doc_url":"https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP","file":"ETT 0625m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H14","filed":"2025-06-13","control":"57477","item":178,"raw":"9235126"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Native workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H14; document https://interchange.puc.texas.gov/Documents/57477_178_1508084.ZIP"},{"label":"Summary row: PUCT 57477 item 178, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","where":"Workbook ETT 0625m.xlsx, sheet \"MonthlyReportForm-ETT\", row 14"},{"label":"PUCT docket 55151 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55151&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":9235126,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=178","evidence_label":"PUCT filing, cell H14"},"best_cost":"$9.2M estimate","sort_cost":9235126,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt56974","source":"puct_mcpr","name":"Redland Switch – Longleaf POI 345 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["57553"],"voltage_kv":[345],"location":"Angelina County","description":"The Proposed Transmission Line Project is a new 345 kV transmission line to be built on single-circuit monopole structures between Oncor’s existing Redland Switch and the proposed Longleaf POI, both in Angelina County, Texas.","project_number":"0PT56974 0PT54862 0PT55832 0PT55827 (R6404)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 57553 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-09-18 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2027-12-02 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":1.78,"route_miles":1.78,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2025-02-14","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":14875000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1394","filed":"2025-06-13","control":"57477","item":181,"raw":"$14,875,000 (line) $6,934,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":8356742,"circuit_miles":1.78,"per_route_mile_usd":8356742,"route_miles":1.78,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":6934000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1394","filed":"2025-06-13","control":"57477","item":181,"raw":"$14,875,000 (line) $6,934,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1394; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1394"},{"label":"PUCT docket 57553 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=57553&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":14875000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":8356742,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1394"},"best_cost":"$14.9M estimate","sort_cost":14875000,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt54632","source":"puct_mcpr","name":"Ranger Camp Switch - Cattleman Switch 345 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["57519"],"voltage_kv":[345],"location":"Mitchell County","description":"Construct a new double-circuit 345 kV transmission line between Oncor's Ranger Camp Switch and Cattleman Switch in Mitchell County, Texas","project_number":"0PT54632 0PT50572 0PT55819 0PT53077 (R8648)","status":"Approved","status_label":"Approved; construction not started as of 2025-06-13","timeline_steps":[{"step":"Proposed","value":"CCN docket 57519 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-06-16 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2025-12-31 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":8.4,"route_miles":4.2,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2025-02-14","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":28086000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1393","filed":"2025-06-13","control":"57477","item":181,"raw":"28,086,000 (t-line) 4,323,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":3343571,"circuit_miles":8.4,"per_route_mile_usd":6687143,"route_miles":4.2,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":4323000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1393","filed":"2025-06-13","control":"57477","item":181,"raw":"28,086,000 (t-line) 4,323,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"line_only","cost_usd":33455472,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"I1393","filed":"2025-06-13","control":"57477","item":181,"raw":"33,455,472 (Line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":3982794,"circuit_miles":8.4,"per_route_mile_usd":7965589,"route_miles":4.2,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1393; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Final estimate (construction start) (line facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell I1393; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1393"},{"label":"PUCT docket 57519 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=57519&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":33455472,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"line facilities only","per_circuit_mile_usd":3982794,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell I1393"},"best_cost":"$33.5M estimate","sort_cost":33455472,"energized_label":"Not publicly verified","ercot_projects":["81274"]},{"id":"mcpr:oncor-electric-delivery:0pt54658","source":"puct_mcpr","name":"Riverton Switch - Sand Lake Switch 138 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["57633"],"voltage_kv":[138],"location":"Reeves, Ward Counties","description":"Construct a new double-circuit capable 138 kV transmission line between Oncor's existing Riverton Switch in Reeves County and Oncor's existing Sand Lake Switch in Ward County.","project_number":"0PT54658 0PT54735 (R8793)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 57633 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2026-02-01 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-12-31 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":40,"route_miles":40,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2025-02-14","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":70855000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1397","filed":"2025-06-13","control":"57477","item":181,"raw":"70,855,000 (t-line)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1771375,"circuit_miles":40,"per_route_mile_usd":1771375,"route_miles":40,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (line facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1397; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1397"},{"label":"PUCT docket 57633 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=57633&ItemMatch=Equal&DocumentType=ALL"}],"endpoints":[{"osm_id":"osm:way/1006279947","name":"Riverton Switching Station","coordinates":[-103.86083,31.80691]},{"osm_id":"osm:way/1006103059","name":"Sand Lake Switching Station","coordinates":[-103.46451,31.5105]}],"endpoint_method":"each endpoint name matches exactly one OSM substation with an agreeing voltage","schematic":{"coordinates":[[-103.86083,31.80691],[-103.46451,31.5105]],"note":"Schematic link between endpoint substations; not the approved route"},"headline_cost":{"cost_usd":70855000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1771375,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1397"},"best_cost":"$70.9M estimate","sort_cost":70855000,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt54652","source":"puct_mcpr","name":"Glaze Lake Switch 138 kV Loop Transmission Line","utility":"Oncor Electric Delivery","ccn":["57723"],"voltage_kv":[138],"location":"Leon County","description":"Construct a new double-circuit 138 kV loop transmission line between Oncor’s existing Jewett Switch - Crockett Switch Line and the Proposed Glaze Lake Switch and Construct a single-circuit 138 kV transmission line from Proposed Glaze Lake Switch to the proposed Leon Solar POI on double-circuit capable structures","project_number":"0PT54652 0PT56307 0PT54338 0PT51575 0PT56942 0PT52172 (R6345)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 57723 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-09-01 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-04-16 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":20,"route_miles":10,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2025-03-14","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":32168000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1398","filed":"2025-06-13","control":"57477","item":181,"raw":"32,168,000 (t-line) 7,732,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1608400,"circuit_miles":20,"per_route_mile_usd":3216800,"route_miles":10,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":7732000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1398","filed":"2025-06-13","control":"57477","item":181,"raw":"32,168,000 (t-line) 7,732,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1398; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1398"},{"label":"PUCT docket 57723 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=57723&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":32168000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1608400,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1398"},"best_cost":"$32.2M estimate","sort_cost":32168000,"energized_label":"Not publicly verified","ercot_projects":["91534A","91534B"]},{"id":"mcpr:oncor-electric-delivery:0pt54686","source":"puct_mcpr","name":"Wofford POI - Berryville POD 138 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["57698"],"voltage_kv":[138],"location":"Anderson County","description":"Construct a new single-circuit 138 kV transmission line to be built on double-circuit capable structures between Oncor's proposed Wofford POI and Oncor's proposed Berryville POD in Anderson County, TX.","project_number":"0PT54686 0PT51759 0PT52381 0PT55136 (R6332)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 57698 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2027-06-01 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2027-11-30 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":2.12,"route_miles":2.12,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2025-03-14","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":8278000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1399","filed":"2025-06-13","control":"57477","item":181,"raw":"8,278,000 (t-line) 1,251,892 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":3904717,"circuit_miles":2.12,"per_route_mile_usd":3904717,"route_miles":2.12,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":1251892,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1399","filed":"2025-06-13","control":"57477","item":181,"raw":"8,278,000 (t-line) 1,251,892 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1399; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1399"},{"label":"PUCT docket 57698 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=57698&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":8278000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":3904717,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1399"},"best_cost":"$8.3M estimate","sort_cost":8278000,"energized_label":"Not publicly verified","ercot_projects":["91986"]},{"id":"mcpr:oncor-electric-delivery:0pt56247","source":"puct_mcpr","name":"Drill Hole Switch - El Capitan Switch 345 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["57828"],"voltage_kv":[345],"location":"Culberson County","description":"Construct a new double-circuit 345 kV transmission line between the existing Drill Hole Switch and the planned El Capitan Switch and Construct a new double-circuit 138 kV tie-line station asset to connect the Drill Hole 138 kV and 345 kV switchyards in Culberson County, TX","project_number":"0PT56247 0PT57952 0PT54527 0PT58245 0PT56564 0PT56565 (PB_L5_D)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 57828 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2026-12-01 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2027-12-31 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":42.4,"route_miles":21.2,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2025-04-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":97468000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1400","filed":"2025-06-13","control":"57477","item":181,"raw":"97,468,000 (t-line) 110,493,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":2298774,"circuit_miles":42.4,"per_route_mile_usd":4597547,"route_miles":21.2,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":110493000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1400","filed":"2025-06-13","control":"57477","item":181,"raw":"97,468,000 (t-line) 110,493,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1400; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1400"},{"label":"PUCT docket 57828 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=57828&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":97468000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":2298774,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1400"},"best_cost":"$97.5M estimate","sort_cost":97468000,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt56246","source":"puct_mcpr","name":"Border Switch - Quarry Field Switch 345 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["57837"],"voltage_kv":[345],"location":"Loving County","description":"Construct a new double-circuit 345 kV transmission line between the planned Border Switch and the existing Quarry Field Switch.","project_number":"0PT56246 0PT56566 0PT57941 0PT58374 0PT58375 0PT53838 (PB_L5_D)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 57837 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2027-01-01 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2028-12-31 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":20.4,"route_miles":10.2,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2025-04-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":36109000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1401","filed":"2025-06-13","control":"57477","item":181,"raw":"36,109,000 (t-line) 50,385,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1770049,"circuit_miles":20.4,"per_route_mile_usd":3540098,"route_miles":10.2,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":50385000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1401","filed":"2025-06-13","control":"57477","item":181,"raw":"36,109,000 (t-line) 50,385,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1401; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1401"},{"label":"PUCT docket 57837 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=57837&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":36109000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1770049,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1401"},"best_cost":"$36.1M estimate","sort_cost":36109000,"energized_label":"Not publicly verified"},{"id":"mcpr:oncor-electric-delivery:0pt54656","source":"puct_mcpr","name":"Watermill Switch - Wilmer Switch 345 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["57918"],"voltage_kv":[345],"location":"Dallas County","description":"Rebuild an existing double-circuit 345 kV transmission line and construct a new double-circuit 345 kV transmission line between Oncor’s existing Watermill Switch and Oncor’s proposed Wilmer Switch in Dallas County, Texas.","project_number":"0PT54656 0PT56556 0PT52986 0PT53678 0PT53677 0PT49544 0PT55560 0PT53615 0PT53616 0PT54033 0PT54032 (M4369)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 57918 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-07-31 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-03-02 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":8.8,"route_miles":4.4,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2025-04-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":63300000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1402","filed":"2025-06-13","control":"57477","item":181,"raw":"63,300,000 (t-line) 91,834,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":7193182,"circuit_miles":8.8,"per_route_mile_usd":14386364,"route_miles":4.4,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":91834000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1402","filed":"2025-06-13","control":"57477","item":181,"raw":"63,300,000 (t-line) 91,834,000 (stations)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1402; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1402"},{"label":"PUCT docket 57918 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=57918&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":63300000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":7193182,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1402"},"best_cost":"$63.3M estimate","sort_cost":63300000,"energized_label":"Not publicly verified","ercot_projects":["78357"]},{"id":"mcpr:oncor-electric-delivery:0pt54657","source":"puct_mcpr","name":"Drill Hole Switch - Riverton Switch 345 kV Transmission Line","utility":"Oncor Electric Delivery","ccn":["58007"],"voltage_kv":[345],"location":"Culberson, Reeves Counties","description":"Construct a new double-circuit 345 kV transmission line between Oncor's planned 345 kV switchyard at Drill Hole Switch and Oncor's existing Riverton Switch","project_number":"0PT54657 0PT53469 0PT53831 0PT53835 0PT55983 (R8748)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 58007 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2027-01-01 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2027-12-31 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":45.6,"route_miles":22.8,"route_miles_basis":"existing ROW length + new ROW length, as reported","first_seen":"2025-05-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"line_only","cost_usd":87998000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1403","filed":"2025-06-13","control":"57477","item":181,"raw":"87,998,000 (t-line) 10,549,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1929781,"circuit_miles":45.6,"per_route_mile_usd":3859561,"route_miles":22.8,"per_mile_note":"line facilities cost ÷ miles reported on the same filing's summary row"},{"cost_basis":"ccn_application_estimate","cost_scope":"substation_only","cost_usd":10549000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","doc_url":"https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP","file":"ONC00000625.xlsx","sheet":"MonthlyReportForm","cell":"H1403","filed":"2025-06-13","control":"57477","item":181,"raw":"87,998,000 (t-line) 10,549,000 (station)"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"substation facilities only","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (substation facilities only): PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Native workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", cell H1403; document https://interchange.puc.texas.gov/Documents/57477_181_1508185.ZIP"},{"label":"Summary row: PUCT 57477 item 181, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","where":"Workbook ONC00000625.xlsx, sheet \"MonthlyReportForm\", row 1403"},{"label":"PUCT docket 58007 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=58007&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":87998000,"cost_basis_label":"CCN application estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":1929781,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=181","evidence_label":"PUCT filing, cell H1403"},"best_cost":"$88.0M estimate","sort_cost":87998000,"energized_label":"Not publicly verified","ercot_projects":["87021"]},{"id":"mcpr:aep-texas:42799628","source":"puct_mcpr","name":"Benjamin - Gyp (Brazos) 138-kV Line","utility":"AEP Texas","ccn":["47691"],"voltage_kv":[138],"location":"Benjamin/Knox","description":"Benjamin-Gyp 138-kV: Build 9.00 of new 138-kV transmission line and operate at 138-kV. This is approximately one-half of the Benjamin-Gyp 18 miles of 138-kV transmission line as approved in Joint CCN Application with Brazos Electric Cooperative","project_number":"42799628 (P16042006) (P16042017)","status":"Completed","status_label":"Completed 2021-12-15","timeline_steps":[{"step":"Proposed","value":"CCN docket 47691 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2021-08-01"},{"step":"Energized","value":"Energized 2021-12-21 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-12-15 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2021-08-01 (actual)"},{"label":"Energized","value":"2021-12-21"},{"label":"Construction complete","value":"2021-12-15"},{"label":"Percent complete","value":"100% as of 2023-11-20"}],"circuit_miles":null,"route_miles":null,"route_miles_basis":null,"first_seen":"2023-05-19","last_seen":"2023-11-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":10020000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"H57","filed":"2023-11-20","control":"54468","item":330,"raw":"10020000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":15195943,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"I57","filed":"2023-11-20","control":"54468","item":330,"raw":"15195943"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":8024150.95,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","doc_url":"https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP","file":"AEPTX (north division) 1123m.xlsx","sheet":"MonthlyReportForm-AEPTX North","cell":"J57","filed":"2023-11-20","control":"54468","item":330,"raw":"8024150.95"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell H57; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell I57; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Native workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", cell J57; document https://interchange.puc.texas.gov/Documents/54468_330_1347735.ZIP"},{"label":"Summary row: PUCT 54468 item 330, filed 2023-11-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","where":"Workbook AEPTX (north division) 1123m.xlsx, sheet \"MonthlyReportForm-AEPTX North\", row 57"},{"label":"PUCT docket 47691 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47691&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":8024150.95,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=54468&itemNumber=330","evidence_label":"PUCT filing, cell J57"},"best_cost":"$8.0M final actual","sort_cost":8024150.95,"energized_label":"2021-12-21"},{"id":"mcpr:aep-texas:2022030","source":"puct_mcpr","name":"Ajo - Reforzar 345-kV Double-Circuit T-Line","utility":"AEP Texas","ccn":["55573"],"voltage_kv":[345],"location":"Kenedy","description":"Construct approximately 13.51 miles of new 345-kV tranmssion line between the AEP Texas Reforzar 345-kV Station and the ETT Point of Interconnect (POI) with dual OPGW. Install double circuit BOLD structures with both circuits strung. Studied using 3-954 ACSR.","project_number":"TP-2022030 T10525770 (P22030001) (P22030002) (P22030003) (P22030004)","status":"Proposed","status_label":"Proposed (CCN docket open as of 2025-06-13)","timeline_steps":[{"step":"Proposed","value":"CCN docket 55573 (application date not in this report)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2025-03-24 (estimated)"},{"label":"Energized","value":"Not publicly verified"},{"label":"Construction complete","value":"2026-06-24 (estimated)"},{"label":"Percent complete","value":"0% as of 2025-06-13"}],"circuit_miles":27.02,"route_miles":null,"route_miles_basis":null,"first_seen":"2025-01-15","last_seen":"2025-06-13","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":61792636,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","doc_url":"https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP","file":"AEPTX (central division) 0625m.xlsx","sheet":"MonthlyReportForm-AEPTX Central","cell":"H225","filed":"2025-06-13","control":"57477","item":176,"raw":"61792636"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Native workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", cell H225; document https://interchange.puc.texas.gov/Documents/57477_176_1508073.ZIP"},{"label":"Summary row: PUCT 57477 item 176, filed 2025-06-13","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","where":"Workbook AEPTX (central division) 0625m.xlsx, sheet \"MonthlyReportForm-AEPTX Central\", row 225"},{"label":"PUCT docket 55573 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=55573&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":61792636,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=57477&itemNumber=176","evidence_label":"PUCT filing, cell H225"},"best_cost":"$61.8M estimate","sort_cost":61792636,"energized_label":"Not publicly verified"},{"id":"mcpr:electric-transmission-texas:p15177001","source":"puct_mcpr","name":"Stewart Rd. 345-kV Hairpin","utility":"Electric Transmission Texas","ccn":["47973"],"voltage_kv":[345],"location":"Hidalgo/Hildago","description":"Construct a double-circuit 345-kV transmission line from the Stewart Rd. Station to the North Edinburg-SU Palmito 345-kV transmission line. Costs include CCN & ROW.","project_number":"ETT-146 P15177001 P15177002 P15177003","status":"Completed","status_label":"Completed 2021-05-19","timeline_steps":[{"step":"Proposed","value":"CCN docket 47973 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-07-06"},{"step":"Energized","value":"Energized 2021-05-19 (filer-reported)"},{"step":"Completed","value":"Construction complete 2021-05-19 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-07-06 (actual)"},{"label":"Energized","value":"2021-05-19"},{"label":"Construction complete","value":"2021-05-19"},{"label":"Percent complete","value":"100% as of 2022-10-20"}],"circuit_miles":5,"route_miles":null,"route_miles_basis":null,"first_seen":"2022-10-20","last_seen":"2022-10-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":16834000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","doc_url":"https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP","file":"ETT 1022m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H2","filed":"2022-10-20","control":"52947","item":304,"raw":"16834000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_estimate","cost_scope":"project_all_in","cost_usd":16834000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","doc_url":"https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP","file":"ETT 1022m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"I2","filed":"2022-10-20","control":"52947","item":304,"raw":"16834000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"Final estimate (construction start)","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"},{"cost_basis":"final_actual","cost_scope":"project_all_in","cost_usd":25548239,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","doc_url":"https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP","file":"ETT 1022m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"J2","filed":"2022-10-20","control":"52947","item":304,"raw":"25548239"},"status":"VERIFIED_ACTUAL","filer_portion":false,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 304, filed 2022-10-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","where":"Native workbook ETT 1022m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H2; document https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP"},{"label":"Final estimate (construction start) (whole project as reported): PUCT 52947 item 304, filed 2022-10-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","where":"Native workbook ETT 1022m.xlsx, sheet \"MonthlyReportForm-ETT\", cell I2; document https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP"},{"label":"Final actual cost (whole project as reported): PUCT 52947 item 304, filed 2022-10-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","where":"Native workbook ETT 1022m.xlsx, sheet \"MonthlyReportForm-ETT\", cell J2; document https://interchange.puc.texas.gov/Documents/52947_304_1246969.ZIP"},{"label":"Summary row: PUCT 52947 item 304, filed 2022-10-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","where":"Workbook ETT 1022m.xlsx, sheet \"MonthlyReportForm-ETT\", row 2"},{"label":"PUCT docket 47973 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47973&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":25548239,"cost_basis_label":"Final actual cost","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified final actual","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=304","evidence_label":"PUCT filing, cell J2"},"best_cost":"$25.5M final actual","sort_cost":25548239,"energized_label":"2021-05-19"},{"id":"mcpr:electric-transmission-texas:p15177001","source":"puct_mcpr","name":"Stewart Rd. 345-kV Hairpin","utility":"Electric Transmission Texas","ccn":["47603","47973"],"voltage_kv":[345],"location":"Hidalgo/Hildago","description":"Construct a double-circuit 345-kV transmission line from the Stewart Rd. Station to the North Edinburg-SU Palmito 345-kV transmission line. Costs include CCN & ROW.","project_number":"ETT-146 P15177001 P15177002 P15177003","status":"Energized","status_label":"Energized 2021-05-19","timeline_steps":[{"step":"Proposed","value":"CCN docket 47603, 47973 (application date not in this report)"},{"step":"Approved","value":"CCN granted (route approved); see docket for the order date"},{"step":"Construction underway","value":"Construction start reported 2020-07-06"},{"step":"Energized","value":"Energized 2021-05-19 (filer-reported)"}],"timeline":[{"label":"Start date (filer-reported)","value":"2020-07-06 (actual)"},{"label":"Energized","value":"2021-05-19"},{"label":"Construction complete","value":"2021-05-19"},{"label":"Percent complete","value":"99% as of 2022-09-20"}],"circuit_miles":5,"route_miles":null,"route_miles_basis":null,"first_seen":"2022-09-20","last_seen":"2022-09-20","joint_project":false,"joint_note":null,"costs":[{"cost_basis":"ccn_application_estimate","cost_scope":"project_all_in","cost_usd":16834000,"checks_pass":true,"evidence":{"filing_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","doc_url":"https://interchange.puc.texas.gov/Documents/52947_266_1239983.ZIP","file":"ETT 0922m.xlsx","sheet":"MonthlyReportForm-ETT","cell":"H2","filed":"2022-09-20","control":"52947","item":266,"raw":"16834000"},"status":"VERIFIED_ESTIMATE","filer_portion":false,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"circuit_miles":null,"per_route_mile_usd":null,"route_miles":null,"per_mile_note":"not computed: cost is not line-only"}],"conflicts":[],"evidence":[{"label":"CCN application estimate (whole project as reported): PUCT 52947 item 266, filed 2022-09-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","where":"Native workbook ETT 0922m.xlsx, sheet \"MonthlyReportForm-ETT\", cell H2; document https://interchange.puc.texas.gov/Documents/52947_266_1239983.ZIP"},{"label":"Summary row: PUCT 52947 item 266, filed 2022-09-20","url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","where":"Workbook ETT 0922m.xlsx, sheet \"MonthlyReportForm-ETT\", row 2"},{"label":"PUCT docket 47603 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47603&ItemMatch=Equal&DocumentType=ALL"},{"label":"PUCT docket 47973 (filings)","url":"https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=47973&ItemMatch=Equal&DocumentType=ALL"}],"headline_cost":{"cost_usd":16834000,"cost_basis_label":"CCN application estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/search/documents/?controlNumber=52947&itemNumber=266","evidence_label":"PUCT filing, cell H2"},"best_cost":"$16.8M estimate","sort_cost":16834000,"energized_label":"2021-05-19"},{"id":"puct:59336","source":"puct_order","name":"Howard to Solstice 765-kV transmission line","utility":"AEP Texas Inc.; City of San Antonio, acting by and through the City Public Service Board (CPS Energy)","ccn":["59336"],"voltage_kv":[765],"status":"Approved","status_label":"PUCT order approving route 4 mod 1 filed 2026-09-18. The docket's filing list shows an 'Order extending time to act on motions for rehearing' filed 2026-11-05 (item 2800), so rehearing was still pending at that date. The rehearing order itself was not reviewed in this pilot.","counties_as_written":"Atascosa, Bandera, Bexar, Crockett, Edwards, Kerr, Kinney, Medina, Pecos, Real, Sutton, Terrel, Uvalde, and Val Verde","timeline_steps":[{"step":"Proposed","value":"CCN application filed 2026-03-02 (docket item 57)"},{"step":"Approved","value":"PUCT order filed 2026-09-18; rehearing motions pending as of 2026-11-05"}],"timeline":[{"label":"Expected in service","value":"October 2030 (applicants' energization schedule in the order) (estimated)"}],"route_miles":368.5,"circuit_miles":368.5,"route_miles_basis":"as stated in the cited document","costs":[{"cost_basis":"approved_route_estimate","cost_scope":"line_only","cost_usd":2153288231,"status":"VERIFIED_ESTIMATE","cost_basis_label":"PUCT-approved route estimate","cost_scope_label":"line facilities only","per_route_mile_usd":5843387,"per_circuit_mile_usd":5843387,"route_miles":368.5,"circuit_miles":368.5,"filer_portion":false,"evidence":{"filing_url":"https://interchange.puc.texas.gov/Documents/59336_2741_1684622.PDF#page=22","cell":"page 22"}}],"conflicts":[],"excluded":"Station expansions at Solstice and Howard (FoF 149: approximately $350 million each) are NOT in this figure.","conflict_history":null,"evidence":[{"label":"expected in service: page 8","url":"https://interchange.puc.texas.gov/Documents/59336_2741_1684622.PDF#page=8","quote":"energize the transmission facilities approved by this Order by October 2030"},{"label":"cost usd: page 22","url":"https://interchange.puc.texas.gov/Documents/59336_2741_1684622.PDF#page=22","quote":"80A. Route 4 mod 1 spans 368.50 miles and has an estimated total cost of $2,153,288,231."},{"label":"route miles: page 22","url":"https://interchange.puc.texas.gov/Documents/59336_2741_1684622.PDF#page=22","quote":"Route 4 mod 1 spans 368.50 miles"},{"label":"cost scope: page 31","url":"https://interchange.puc.texas.gov/Documents/59336_2741_1684622.PDF#page=31","quote":"156A. The estimated line cost for route 4 mod 1 is $2.15 billion."},{"label":"cost scope: page 31","url":"https://interchange.puc.texas.gov/Documents/59336_2741_1684622.PDF#page=31","quote":"The estimated cost for the transmission line portion of the proposed transmission facilities is between $2.05 billion and $2.40 billion"},{"label":"circuits: page 37","url":"https://interchange.puc.texas.gov/Documents/59336_2741_1684622.PDF#page=37","quote":"765-kV single-circuit transmission line along route 4 mod 1"}],"headline_cost":{"cost_usd":2153288231,"cost_basis_label":"PUCT-approved route estimate","cost_scope_label":"line facilities only","per_circuit_mile_usd":5843387,"status_text":"Verified estimate","evidence_url":"https://interchange.puc.texas.gov/Documents/59336_2741_1684622.PDF#page=22","evidence_label":"Source, page 22"},"best_cost":"$2153.3M estimate","sort_cost":2153288231,"energized_label":null},{"id":"ercot-rpg:25RPG022","source":"ercot_rpg","name":"Drill Hole to Sand Lake to Solstice 765-kV Line Project","utility":"Oncor Electric Delivery; American Electric Power Service Corporation (AEPSC)","ccn":[],"voltage_kv":[765],"status":"Proposed","status_label":"ERCOT staff recommended Board endorsement (Board meeting Dec 8-9, 2025). The Board vote itself and any PUCT CCN filing were not verified in this pilot.","counties_as_written":null,"timeline_steps":[{"step":"Proposed","value":"ERCOT RPG review; recommended for Board endorsement"}],"timeline":[{"label":"Expected in service","value":"Summer 2030 (estimated)"}],"route_miles":104.4,"circuit_miles":104.4,"route_miles_basis":"as stated in the cited document","costs":[{"cost_basis":"rpg_estimate","cost_scope":"line_plus_substation","cost_usd":742200000,"status":"VERIFIED_ESTIMATE","cost_basis_label":"ERCOT planning estimate","cost_scope_label":"line plus substation","per_route_mile_usd":7109195,"per_circuit_mile_usd":7109195,"route_miles":104.4,"circuit_miles":104.4,"filer_portion":false,"evidence":{"filing_url":"https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf#page=12","cell":"page 12"}}],"conflicts":[],"excluded":null,"conflict_history":null,"evidence":[{"label":"cost usd: page 12","url":"https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf#page=12","quote":"The cost estimate for this recommended project is approximately $742.2 million"},{"label":"route miles: page 12","url":"https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf#page=12","quote":"due to approximately 104.4 miles of new ROW"},{"label":"expected in service: page 12","url":"https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf#page=12","quote":"The expected in-service date (ISD) of this project is Summer 2030"},{"label":"circuits: page 12","url":"https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf#page=12","quote":"Construct a new Drill Hole to Sand Lake 765-kV single-circuit transmission line"}],"headline_cost":{"cost_usd":742200000,"cost_basis_label":"ERCOT planning estimate","cost_scope_label":"line plus substation","per_circuit_mile_usd":7109195,"status_text":"Verified estimate","evidence_url":"https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf#page=12","evidence_label":"Source, page 12"},"best_cost":"$742.2M estimate","sort_cost":742200000,"energized_label":null,"ercot_projects":["103782","102955"]},{"id":"ercot-rpg:25RPG025","source":"ercot_rpg","name":"Texas 765-kV STEP Eastern Backbone Project","utility":"AEP Texas; CPS Energy; Oncor Electric Delivery; CenterPoint Energy Houston Electric","ccn":[],"voltage_kv":[765],"status":"Proposed","status_label":"ERCOT staff recommended Board endorsement (Board meeting Dec 8-9, 2025). The Board vote itself and the PUCT CCN filings were not verified in this pilot.","counties_as_written":null,"timeline_steps":[{"step":"Proposed","value":"ERCOT RPG review; recommended for Board endorsement"}],"timeline":[{"label":"Expected in service","value":"between 2030 and 2032 (estimated)"}],"route_miles":1108.8,"circuit_miles":1108.8,"route_miles_basis":"as stated in the cited document","costs":[{"cost_basis":"rpg_estimate","cost_scope":"line_plus_substation","cost_usd":9384000000,"status":"VERIFIED_ESTIMATE","cost_basis_label":"ERCOT planning estimate","cost_scope_label":"line plus substation","per_route_mile_usd":8463203,"per_circuit_mile_usd":8463203,"route_miles":1108.8,"circuit_miles":1108.8,"filer_portion":false,"evidence":{"filing_url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf#page=17","cell":"page 17"}}],"conflicts":[],"excluded":null,"conflict_history":null,"evidence":[{"label":"cost usd: page 17","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf#page=17","quote":"The cost estimate for this project is approximately $9.384 billion"},{"label":"route miles: page 17","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf#page=17","quote":"due to approximately 1,108.8 miles of new ROW"},{"label":"expected in service: page 17","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf#page=17","quote":"The expected ISD of this project is between 2030 and 2032"},{"label":"circuits: page 5","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf#page=5","quote":"new 765-kV single-circuit"}],"endpoints_hint":null,"headline_cost":{"cost_usd":9384000000,"cost_basis_label":"ERCOT planning estimate","cost_scope_label":"line plus substation","per_circuit_mile_usd":8463203,"status_text":"Verified estimate","evidence_url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf#page=17","evidence_label":"Source, page 17"},"best_cost":"$9384.0M estimate","sort_cost":9384000000,"energized_label":null,"ercot_projects":["105886","105888","112326","112324","103797A","103797C","103797B","103797D","103797E","103797F","103797G","103797I","103809","102901","102885","105829A","105829B","103797H","103797J","112322","112226"]},{"id":"ercot-rpg:26RPG001","source":"ercot_rpg","name":"Euclid 765-kV Substation and Transmission Line Addition","utility":"LCRA Transmission Services Corporation; CenterPoint Energy Houston Electric","ccn":[],"voltage_kv":[765],"status":"Proposed","status_label":"ERCOT staff recommended Board endorsement (Board meeting June 2026). The Board vote itself and any PUCT CCN filing were not verified in this pilot.","counties_as_written":null,"timeline_steps":[{"step":"Proposed","value":"ERCOT RPG review; recommended for Board endorsement"}],"timeline":[{"label":"Expected in service","value":"June 30, 2031 (estimated)"}],"route_miles":131.4,"circuit_miles":131.4,"route_miles_basis":"as stated in the cited document","costs":[{"cost_basis":"rpg_estimate","cost_scope":"line_plus_substation","cost_usd":1831000000,"status":"VERIFIED_ESTIMATE","cost_basis_label":"ERCOT planning estimate","cost_scope_label":"line plus substation","per_route_mile_usd":13934551,"per_circuit_mile_usd":13934551,"route_miles":131.4,"circuit_miles":131.4,"filer_portion":false,"evidence":{"filing_url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf#page=14","cell":"page 14"}}],"conflicts":[],"excluded":null,"conflict_history":null,"evidence":[{"label":"cost usd: page 14","url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf#page=14","quote":"The cost estimate for this project is approximately $1.831 billion"},{"label":"route miles: page 14","url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf#page=14","quote":"131.4 miles of new ROW"},{"label":"expected in service: page 14","url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf#page=14","quote":"The expected ISD of this project is June 30, 2031"},{"label":"circuits: page 14","url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf#page=14","quote":"765-kV single-circuit transmission line from Euclid to Hillje"}],"headline_cost":{"cost_usd":1831000000,"cost_basis_label":"ERCOT planning estimate","cost_scope_label":"line plus substation","per_circuit_mile_usd":13934551,"status_text":"Verified estimate","evidence_url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf#page=14","evidence_label":"Source, page 14"},"best_cost":"$1831.0M estimate","sort_cost":1831000000,"energized_label":null,"ercot_projects":["105648","104732","104118"]},{"id":"ercot-rpg:25RPG004","source":"ercot_rpg","name":"Oncor Southern DFW Load Interconnection and General Grid Strengthening Project (Option 3)","utility":"Oncor Electric Delivery","ccn":[],"voltage_kv":[345],"status":"Proposed","status_label":"ERCOT staff recommended Board endorsement (Board meeting April 20-21, 2026). The Board vote itself was not verified in this pilot.","counties_as_written":null,"timeline_steps":[{"step":"Proposed","value":"ERCOT RPG review; recommended for Board endorsement"}],"timeline":[{"label":"Expected in service","value":"between May 2026 and April 2033 (staged) (estimated)"}],"route_miles":null,"circuit_miles":null,"route_miles_basis":"as stated in the cited document","costs":[{"cost_basis":"rpg_estimate","cost_scope":"project_all_in","cost_usd":2886000000,"status":"VERIFIED_ESTIMATE","cost_basis_label":"ERCOT planning estimate","cost_scope_label":"whole project as reported","per_route_mile_usd":null,"per_circuit_mile_usd":null,"route_miles":null,"circuit_miles":null,"filer_portion":false,"evidence":{"filing_url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf#page=1","cell":"page 1"}}],"conflicts":[],"excluded":null,"conflict_history":"The Board deck posted 2026-04-13 states $2.866 billion on its cover slide (p.1) and $2.886 billion on pp.3, 7, 20, 43 and 51. ERCOT's revised Board issue paper dated 2026-04-15 states only $2.886 billion, and the four priced components on deck p.3 sum to $2,885.86 million. The $2.866 billion cover figure is treated as superseded; it is kept here, not deleted.","evidence":[{"label":"cost usd: page 1","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf#page=1","quote":"recommendation (Option 3), a $2.886 billion, Tier 1 project with the expected in-service"},{"label":"expected in service: page 1","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf#page=1","quote":"dates between May 2026 to April 2033"},{"label":"cost candidates usd: page 1","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf#page=1","quote":"$2.866 billion Oncor Southern DFW"},{"label":"cost candidates usd: page 3","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf#page=3","quote":"The cost estimate for Option 3 ($2.886 billion) includes"}],"endpoints_hint":null,"headline_cost":{"cost_usd":2886000000,"cost_basis_label":"ERCOT planning estimate","cost_scope_label":"whole project as reported","per_circuit_mile_usd":null,"status_text":"Verified estimate","evidence_url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf#page=1","evidence_label":"Source, page 1"},"best_cost":"$2886.0M estimate","sort_cost":2886000000,"energized_label":null,"ercot_projects":["105316","99622","104824","105332","105320","105334","105324","105314","105312","99620","99626","105322","105318","105326","105328","99066","105749","105833","105836","112560","105626","105838","105759","105744","105747","105753","105755","105757"]}]}