{"generated_at":"2026-11-19T12:24:40.453Z","latest_report":"2026-10","first_report":"2018-12","reports_used":95,"source":{"name":"ERCOT Generation Interconnection Status report (PG7-200-ER), monthly","mis":"https://www.ercot.com/misapp/servlets/IceDocListJsonWS?reportTypeId=15933","latest":{"month":"2026-10","doc":"1293955078","name":"GIS_Report_October2026","published":"2026-11-02T15:02:48-06:00","url":"https://www.ercot.com/misdownload/servlets/mirDownload?doclookupId=1293955078","sha256":"d0b05cb6ed7420bdbc7cf45eef6e141e7238a7ef509ea1cb311a9a72a05b4cbf","projects":1766}},"method":"Base rates from ERCOT's own queue history: share of projects (by stage and fuel) approved for synchronization within 36 months of reaching that stage; cohorts limited to those with 36 months of follow-up. Not a forecast of any single project.","stages":{"screening":"Screening study","fis":"Full interconnection study under way","fis_done":"Full study done, no agreement","ia":"Interconnection agreement signed","construction":"Under construction (agreement signed)"},"rates":[{"stage":"screening","fuel":"all","n":325,"built":42,"mw":60243,"mw_built":4706,"p36":0.129,"p36_mw":0.078},{"stage":"screening","fuel":"battery","n":104,"built":22,"mw":12733,"mw_built":1117,"p36":0.212,"p36_mw":0.088},{"stage":"screening","fuel":"gas","n":12,"built":5,"mw":2077,"mw_built":268,"p36":0.417,"p36_mw":0.129},{"stage":"screening","fuel":"other","n":7,"built":0,"mw":349,"mw_built":0,"p36":0,"p36_mw":0},{"stage":"screening","fuel":"solar","n":167,"built":8,"mw":37986,"mw_built":1646,"p36":0.048,"p36_mw":0.043},{"stage":"screening","fuel":"wind","n":35,"built":7,"mw":7098,"mw_built":1676,"p36":0.2,"p36_mw":0.236},{"stage":"fis","fuel":"all","n":1826,"built":164,"mw":341959,"mw_built":25419,"p36":0.09,"p36_mw":0.074},{"stage":"fis","fuel":"battery","n":799,"built":57,"mw":121214,"mw_built":6794,"p36":0.071,"p36_mw":0.056},{"stage":"fis","fuel":"gas","n":83,"built":27,"mw":19138,"mw_built":3845,"p36":0.325,"p36_mw":0.201},{"stage":"fis","fuel":"other","n":26,"built":2,"mw":3854,"mw_built":150,"p36":0.077,"p36_mw":0.039},{"stage":"fis","fuel":"solar","n":749,"built":41,"mw":160555,"mw_built":8424,"p36":0.055,"p36_mw":0.052},{"stage":"fis","fuel":"wind","n":169,"built":37,"mw":37198,"mw_built":6206,"p36":0.219,"p36_mw":0.167},{"stage":"fis_done","fuel":"all","n":394,"built":139,"mw":70294,"mw_built":23535,"p36":0.353,"p36_mw":0.335},{"stage":"fis_done","fuel":"battery","n":115,"built":38,"mw":18022,"mw_built":5303,"p36":0.33,"p36_mw":0.294},{"stage":"fis_done","fuel":"gas","n":30,"built":14,"mw":5102,"mw_built":2251,"p36":0.467,"p36_mw":0.441},{"stage":"fis_done","fuel":"other","n":9,"built":1,"mw":1209,"mw_built":60,"p36":0.111,"p36_mw":0.05},{"stage":"fis_done","fuel":"solar","n":197,"built":62,"mw":41993,"mw_built":13232,"p36":0.315,"p36_mw":0.315},{"stage":"fis_done","fuel":"wind","n":43,"built":24,"mw":3968,"mw_built":2688,"p36":0.558,"p36_mw":0.677},{"stage":"ia","fuel":"all","n":625,"built":394,"mw":106291,"mw_built":59659,"p36":0.63,"p36_mw":0.561},{"stage":"ia","fuel":"battery","n":182,"built":138,"mw":19055,"mw_built":12985,"p36":0.758,"p36_mw":0.681},{"stage":"ia","fuel":"gas","n":50,"built":33,"mw":8280,"mw_built":4116,"p36":0.66,"p36_mw":0.497},{"stage":"ia","fuel":"other","n":4,"built":1,"mw":754,"mw_built":60,"p36":0.25,"p36_mw":0.08},{"stage":"ia","fuel":"solar","n":255,"built":122,"mw":52876,"mw_built":24942,"p36":0.478,"p36_mw":0.472},{"stage":"ia","fuel":"wind","n":134,"built":100,"mw":25327,"mw_built":17554,"p36":0.746,"p36_mw":0.693},{"stage":"construction","fuel":"all","n":1,"built":1,"mw":201,"mw_built":201,"p36":1,"p36_mw":1},{"stage":"construction","fuel":"wind","n":1,"built":1,"mw":201,"mw_built":201,"p36":1,"p36_mw":1}],"summary":{"projects":1643,"mw":426713,"expected_mw":121744,"placed_at_substation":795,"placed_by_name":124,"placed_county_only":711,"unplaced":0,"by_fuel":{"solar":{"projects":546,"mw":136789,"expected_mw":30917},"wind":{"projects":120,"mw":43374,"expected_mw":17880},"gas":{"projects":142,"mw":89795,"expected_mw":35064},"battery":{"projects":823,"mw":152446,"expected_mw":37166},"other":{"projects":12,"mw":4371,"expected_mw":717}},"placed_eia":79,"eia_ambiguous":5},"counties":[{"county":"Pecos","projects":52,"mw":21373,"expected_mw":6174,"by_fuel":{"battery":380,"solar":1611,"gas":1914,"wind":2269}},{"county":"Brazoria","projects":48,"mw":9800,"expected_mw":4260,"by_fuel":{"battery":2878,"solar":512,"wind":489,"gas":381}},{"county":"Wilbarger","projects":20,"mw":8351,"expected_mw":3221,"by_fuel":{"solar":461,"gas":2521,"battery":130,"wind":109}},{"county":"Wharton","projects":34,"mw":7018,"expected_mw":2830,"by_fuel":{"battery":1217,"solar":742,"gas":871}},{"county":"Reeves","projects":24,"mw":8350,"expected_mw":2750,"by_fuel":{"solar":371,"battery":494,"other":22,"gas":1637,"wind":226}},{"county":"Bastrop","projects":12,"mw":4816,"expected_mw":2588,"by_fuel":{"solar":99,"battery":134,"gas":2355}},{"county":"Freestone","projects":23,"mw":7056,"expected_mw":2465,"by_fuel":{"solar":353,"battery":305,"gas":1807}},{"county":"Deaf Smith","projects":11,"mw":6392,"expected_mw":2368,"by_fuel":{"solar":1230,"battery":15,"wind":709,"gas":414}},{"county":"Hill","projects":19,"mw":6879,"expected_mw":2298,"by_fuel":{"battery":643,"solar":331,"wind":7,"gas":1317}},{"county":"Cameron","projects":26,"mw":8343,"expected_mw":2119,"by_fuel":{"solar":92,"battery":490,"wind":66,"other":6,"gas":1465}},{"county":"Borden","projects":17,"mw":5557,"expected_mw":2098,"by_fuel":{"wind":3,"solar":1512,"battery":583}},{"county":"Jack","projects":17,"mw":7978,"expected_mw":2058,"by_fuel":{"wind":353,"battery":641,"solar":236,"gas":828}},{"county":"Leon","projects":12,"mw":5937,"expected_mw":2045,"by_fuel":{"solar":452,"battery":305,"gas":1288}},{"county":"San Patricio","projects":25,"mw":6494,"expected_mw":1924,"by_fuel":{"solar":665,"battery":382,"wind":447,"gas":430}},{"county":"Milam","projects":23,"mw":7149,"expected_mw":1847,"by_fuel":{"solar":547,"battery":605,"gas":695}},{"county":"Fisher","projects":12,"mw":5957,"expected_mw":1683,"by_fuel":{"solar":308,"battery":180,"wind":223,"gas":972}},{"county":"Upton","projects":17,"mw":5436,"expected_mw":1640,"by_fuel":{"solar":304,"wind":273,"battery":774,"gas":289}},{"county":"Caldwell","projects":16,"mw":4519,"expected_mw":1580,"by_fuel":{"battery":59,"solar":10,"gas":1511}},{"county":"Ward","projects":11,"mw":3238,"expected_mw":1571,"by_fuel":{"battery":79,"solar":15,"gas":1477}},{"county":"Anderson","projects":9,"mw":4645,"expected_mw":1556,"by_fuel":{"battery":250,"solar":76,"gas":1230}},{"county":"Matagorda","projects":22,"mw":5272,"expected_mw":1519,"by_fuel":{"solar":482,"battery":565,"other":472}},{"county":"Harris","projects":28,"mw":6361,"expected_mw":1499,"by_fuel":{"gas":326,"battery":1169,"other":4}},{"county":"Victoria","projects":17,"mw":5383,"expected_mw":1463,"by_fuel":{"solar":143,"battery":496,"wind":207,"gas":515,"other":102}},{"county":"Grimes","projects":14,"mw":4438,"expected_mw":1413,"by_fuel":{"solar":221,"battery":621,"other":4,"gas":567}},{"county":"Navarro","projects":23,"mw":3831,"expected_mw":1391,"by_fuel":{"solar":837,"battery":225,"wind":329}},{"county":"Concho","projects":10,"mw":2896,"expected_mw":1304,"by_fuel":{"solar":570,"battery":451,"wind":283}},{"county":"Lamar","projects":17,"mw":4177,"expected_mw":1286,"by_fuel":{"solar":398,"wind":296,"gas":177,"battery":320,"other":95}},{"county":"Zapata","projects":27,"mw":6291,"expected_mw":1258,"by_fuel":{"wind":848,"solar":127,"battery":283}},{"county":"Austin","projects":14,"mw":3729,"expected_mw":1185,"by_fuel":{"solar":111,"battery":181,"gas":893}},{"county":"Guadalupe","projects":13,"mw":3895,"expected_mw":1150,"by_fuel":{"solar":295,"gas":796,"battery":59}},{"county":"Starr","projects":18,"mw":3674,"expected_mw":1143,"by_fuel":{"solar":397,"battery":151,"wind":595}},{"county":"Scurry","projects":14,"mw":4783,"expected_mw":1127,"by_fuel":{"battery":193,"solar":934}},{"county":"Webb","projects":18,"mw":4261,"expected_mw":1110,"by_fuel":{"wind":476,"solar":518,"battery":116}},{"county":"Wilson","projects":15,"mw":3533,"expected_mw":1100,"by_fuel":{"solar":557,"battery":412,"gas":131}},{"county":"Dickens","projects":9,"mw":2317,"expected_mw":1072,"by_fuel":{"solar":441,"battery":413,"wind":218}},{"county":"Glasscock","projects":13,"mw":2929,"expected_mw":1070,"by_fuel":{"battery":330,"solar":252,"wind":368,"gas":120}},{"county":"Robertson","projects":17,"mw":3554,"expected_mw":1053,"by_fuel":{"battery":581,"solar":472}},{"county":"Galveston","projects":9,"mw":2722,"expected_mw":1052,"by_fuel":{"battery":827,"wind":225}},{"county":"Bell","projects":10,"mw":3479,"expected_mw":1043,"by_fuel":{"battery":358,"solar":108,"gas":577}},{"county":"Gray","projects":3,"mw":2121,"expected_mw":1020,"by_fuel":{"solar":336,"wind":684}},{"county":"Bexar","projects":18,"mw":4773,"expected_mw":1015,"by_fuel":{"battery":942,"solar":73}},{"county":"Callahan","projects":6,"mw":3458,"expected_mw":976,"by_fuel":{"solar":222,"battery":30,"gas":724}},{"county":"Mitchell","projects":17,"mw":7498,"expected_mw":973,"by_fuel":{"battery":366,"solar":325,"wind":282}},{"county":"Carson","projects":4,"mw":1618,"expected_mw":958,"by_fuel":{"battery":296,"solar":210,"wind":452}},{"county":"Hidalgo","projects":23,"mw":3512,"expected_mw":946,"by_fuel":{"wind":174,"battery":529,"solar":162,"gas":81}},{"county":"Ellis","projects":25,"mw":5563,"expected_mw":926,"by_fuel":{"gas":292,"battery":437,"other":4,"solar":193}},{"county":"Nueces","projects":12,"mw":2151,"expected_mw":913,"by_fuel":{"solar":319,"battery":475,"gas":115,"other":4}},{"county":"Knox","projects":11,"mw":2491,"expected_mw":898,"by_fuel":{"solar":489,"wind":263,"battery":146}},{"county":"McLennan","projects":17,"mw":3086,"expected_mw":893,"by_fuel":{"solar":406,"battery":334,"gas":88,"wind":65}},{"county":"Jim Hogg","projects":9,"mw":2933,"expected_mw":892,"by_fuel":{"wind":827,"solar":65}},{"county":"Franklin","projects":7,"mw":2374,"expected_mw":888,"by_fuel":{"solar":226,"battery":122,"gas":540}},{"county":"Wheeler","projects":1,"mw":1300,"expected_mw":858,"by_fuel":{"gas":858}},{"county":"Haskell","projects":13,"mw":2830,"expected_mw":829,"by_fuel":{"solar":322,"battery":264,"wind":243}},{"county":"Comanche","projects":10,"mw":2918,"expected_mw":827,"by_fuel":{"solar":159,"battery":668}},{"county":"Jones","projects":15,"mw":3810,"expected_mw":818,"by_fuel":{"solar":475,"battery":343}},{"county":"Houston","projects":8,"mw":1629,"expected_mw":817,"by_fuel":{"solar":328,"battery":489}},{"county":"Nolan","projects":14,"mw":4244,"expected_mw":806,"by_fuel":{"wind":332,"solar":75,"battery":66,"gas":333}},{"county":"Crane","projects":12,"mw":2740,"expected_mw":756,"by_fuel":{"solar":376,"battery":380}},{"county":"Fort Bend","projects":7,"mw":1618,"expected_mw":670,"by_fuel":{"battery":670}},{"county":"Schleicher","projects":10,"mw":1898,"expected_mw":649,"by_fuel":{"battery":316,"solar":214,"wind":119}},{"county":"Baylor","projects":6,"mw":1891,"expected_mw":648,"by_fuel":{"wind":586,"solar":62}},{"county":"Castro","projects":7,"mw":2304,"expected_mw":628,"by_fuel":{"solar":242,"battery":246,"wind":140}},{"county":"Wichita","projects":12,"mw":2448,"expected_mw":617,"by_fuel":{"solar":358,"battery":259}},{"county":"Armstrong","projects":5,"mw":3252,"expected_mw":614,"by_fuel":{"wind":512,"solar":28,"battery":74}},{"county":"Dawson","projects":8,"mw":1611,"expected_mw":594,"by_fuel":{"solar":146,"battery":76,"wind":372}},{"county":"Chambers","projects":2,"mw":868,"expected_mw":590,"by_fuel":{"gas":460,"battery":130}},{"county":"Maverick","projects":7,"mw":1498,"expected_mw":587,"by_fuel":{"battery":343,"solar":244}},{"county":"Crockett","projects":8,"mw":1679,"expected_mw":565,"by_fuel":{"solar":76,"battery":412,"wind":77}},{"county":"Ector","projects":19,"mw":3710,"expected_mw":560,"by_fuel":{"solar":225,"battery":335}},{"county":"Collin","projects":4,"mw":723,"expected_mw":548,"by_fuel":{"battery":548}},{"county":"Hale","projects":5,"mw":2331,"expected_mw":533,"by_fuel":{"battery":44,"solar":28,"gas":461}},{"county":"La Salle","projects":7,"mw":1709,"expected_mw":512,"by_fuel":{"wind":147,"solar":323,"battery":42}},{"county":"Bee","projects":9,"mw":1394,"expected_mw":493,"by_fuel":{"solar":284,"battery":209}},{"county":"Duval","projects":13,"mw":3402,"expected_mw":475,"by_fuel":{"battery":69,"solar":69,"wind":111,"gas":226}},{"county":"Wise","projects":10,"mw":3798,"expected_mw":470,"by_fuel":{"gas":14,"battery":449,"solar":7}},{"county":"Goliad","projects":11,"mw":2110,"expected_mw":470,"by_fuel":{"solar":224,"battery":33,"gas":213}},{"county":"Angelina","projects":4,"mw":1527,"expected_mw":466,"by_fuel":{"battery":76,"gas":390}},{"county":"Grayson","projects":4,"mw":1287,"expected_mw":463,"by_fuel":{"solar":65,"battery":22,"gas":376}},{"county":"Van Zandt","projects":8,"mw":986,"expected_mw":462,"by_fuel":{"solar":130,"battery":332}},{"county":"Limestone","projects":9,"mw":1064,"expected_mw":456,"by_fuel":{"battery":101,"solar":355}},{"county":"Howard","projects":16,"mw":2767,"expected_mw":456,"by_fuel":{"battery":273,"wind":56,"solar":127}},{"county":"Sterling","projects":6,"mw":1256,"expected_mw":448,"by_fuel":{"battery":21,"wind":405,"solar":22}},{"county":"Motley","projects":2,"mw":600,"expected_mw":448,"by_fuel":{"wind":448,"battery":0}},{"county":"Taylor","projects":11,"mw":3254,"expected_mw":444,"by_fuel":{"solar":119,"battery":109,"wind":216}},{"county":"Cherokee","projects":3,"mw":1325,"expected_mw":427,"by_fuel":{"gas":381,"battery":46}},{"county":"Jefferson","projects":1,"mw":1298,"expected_mw":422,"by_fuel":{"gas":422}},{"county":"Colorado","projects":13,"mw":1774,"expected_mw":421,"by_fuel":{"battery":236,"solar":105,"gas":80}},{"county":"Kenedy","projects":4,"mw":1311,"expected_mw":406,"by_fuel":{"solar":233,"wind":114,"battery":59}},{"county":"Kaufman","projects":15,"mw":1875,"expected_mw":394,"by_fuel":{"solar":182,"battery":212,"wind":0}},{"county":"Lampasas","projects":10,"mw":1742,"expected_mw":392,"by_fuel":{"solar":107,"battery":285}},{"county":"King","projects":4,"mw":1312,"expected_mw":391,"by_fuel":{"wind":200,"solar":191}},{"county":"Briscoe","projects":5,"mw":2460,"expected_mw":381,"by_fuel":{"battery":29,"solar":51,"wind":140,"gas":161}},{"county":"Waller","projects":5,"mw":924,"expected_mw":376,"by_fuel":{"battery":205,"solar":171}},{"county":"Fannin","projects":3,"mw":1363,"expected_mw":375,"by_fuel":{"battery":14,"wind":39,"gas":322}},{"county":"Tom Green","projects":13,"mw":3010,"expected_mw":371,"by_fuel":{"wind":217,"solar":71,"battery":83}},{"county":"Johnson","projects":2,"mw":629,"expected_mw":358,"by_fuel":{"solar":204,"battery":154}},{"county":"Foard","projects":5,"mw":1594,"expected_mw":354,"by_fuel":{"battery":234,"solar":54,"wind":66}},{"county":"Erath","projects":3,"mw":665,"expected_mw":342,"by_fuel":{"solar":99,"battery":243}},{"county":"Hunt","projects":9,"mw":1403,"expected_mw":336,"by_fuel":{"solar":76,"battery":192,"gas":68}},{"county":"Brazos","projects":1,"mw":1022,"expected_mw":332,"by_fuel":{"gas":332}},{"county":"Dimmit","projects":11,"mw":1169,"expected_mw":317,"by_fuel":{"battery":269,"solar":48}},{"county":"Swisher","projects":7,"mw":2049,"expected_mw":311,"by_fuel":{"battery":36,"solar":135,"wind":140}},{"county":"Stonewall","projects":2,"mw":664,"expected_mw":308,"by_fuel":{"solar":308}},{"county":"Clay","projects":4,"mw":1867,"expected_mw":307,"by_fuel":{"solar":249,"battery":58}},{"county":"Cooke","projects":4,"mw":768,"expected_mw":307,"by_fuel":{"battery":307}},{"county":"Gillespie","projects":3,"mw":449,"expected_mw":299,"by_fuel":{"battery":227,"solar":72}},{"county":"Madison","projects":4,"mw":814,"expected_mw":299,"by_fuel":{"battery":288,"solar":11}},{"county":"Fayette","projects":4,"mw":1016,"expected_mw":293,"by_fuel":{"battery":197,"solar":96}},{"county":"Andrews","projects":8,"mw":2012,"expected_mw":285,"by_fuel":{"battery":131,"wind":140,"solar":14}},{"county":"Henderson","projects":7,"mw":1393,"expected_mw":283,"by_fuel":{"battery":235,"solar":48}},{"county":"Throckmorton","projects":5,"mw":909,"expected_mw":279,"by_fuel":{"wind":211,"battery":41,"solar":27}},{"county":"Coleman","projects":7,"mw":1747,"expected_mw":271,"by_fuel":{"solar":247,"battery":24}},{"county":"Mills","projects":6,"mw":1107,"expected_mw":271,"by_fuel":{"solar":73,"battery":198}},{"county":"Hutchinson","projects":2,"mw":565,"expected_mw":270,"by_fuel":{"solar":270}},{"county":"Atascosa","projects":17,"mw":2139,"expected_mw":253,"by_fuel":{"solar":129,"battery":124}},{"county":"Reagan","projects":3,"mw":618,"expected_mw":253,"by_fuel":{"battery":22,"wind":231}},{"county":"Hood","projects":3,"mw":560,"expected_mw":251,"by_fuel":{"gas":100,"battery":80,"solar":71}},{"county":"Hopkins","projects":11,"mw":1763,"expected_mw":250,"by_fuel":{"solar":195,"battery":55}},{"county":"Jackson","projects":5,"mw":620,"expected_mw":250,"by_fuel":{"battery":239,"solar":11}},{"county":"Somervell","projects":2,"mw":666,"expected_mw":243,"by_fuel":{"solar":82,"gas":161}},{"county":"Gonzales","projects":7,"mw":1172,"expected_mw":238,"by_fuel":{"solar":148,"battery":25,"wind":65}},{"county":"Lavaca","projects":1,"mw":310,"expected_mw":235,"by_fuel":{"battery":235}},{"county":"Travis","projects":8,"mw":684,"expected_mw":234,"by_fuel":{"battery":234,"solar":0}},{"county":"DeWitt","projects":5,"mw":972,"expected_mw":233,"by_fuel":{"solar":207,"battery":26}},{"county":"Midland","projects":6,"mw":836,"expected_mw":224,"by_fuel":{"battery":182,"solar":6,"gas":36}},{"county":"Young","projects":7,"mw":2204,"expected_mw":219,"by_fuel":{"solar":109,"battery":110}},{"county":"Brown","projects":9,"mw":2104,"expected_mw":212,"by_fuel":{"solar":85,"battery":127}},{"county":"Culberson","projects":4,"mw":1328,"expected_mw":210,"by_fuel":{"solar":48,"wind":162}},{"county":"Kent","projects":7,"mw":1629,"expected_mw":199,"by_fuel":{"solar":181,"battery":18}},{"county":"Willacy","projects":3,"mw":485,"expected_mw":196,"by_fuel":{"wind":189,"battery":7}},{"county":"Crosby","projects":1,"mw":253,"expected_mw":188,"by_fuel":{"wind":188}},{"county":"Runnels","projects":7,"mw":1675,"expected_mw":170,"by_fuel":{"battery":109,"solar":61}},{"county":"Montgomery","projects":1,"mw":217,"expected_mw":165,"by_fuel":{"battery":165}},{"county":"Hardeman","projects":8,"mw":2194,"expected_mw":164,"by_fuel":{"solar":76,"battery":43,"wind":45}},{"county":"Tarrant","projects":4,"mw":792,"expected_mw":160,"by_fuel":{"battery":160}},{"county":"Menard","projects":2,"mw":295,"expected_mw":159,"by_fuel":{"battery":154,"solar":5}},{"county":"Eastland","projects":9,"mw":1349,"expected_mw":157,"by_fuel":{"battery":56,"solar":97,"wind":4}},{"county":"Cottle","projects":6,"mw":1229,"expected_mw":155,"by_fuel":{"wind":110,"solar":22,"battery":23}},{"county":"Nacogdoches","projects":3,"mw":588,"expected_mw":155,"by_fuel":{"solar":148,"battery":7}},{"county":"Karnes","projects":13,"mw":1876,"expected_mw":153,"by_fuel":{"battery":54,"solar":99}},{"county":"Parker","projects":4,"mw":2222,"expected_mw":148,"by_fuel":{"solar":33,"battery":115}},{"county":"Williamson","projects":1,"mw":449,"expected_mw":146,"by_fuel":{"gas":146}},{"county":"Rains","projects":1,"mw":176,"expected_mw":134,"by_fuel":{"battery":134}},{"county":"Rusk","projects":4,"mw":739,"expected_mw":133,"by_fuel":{"battery":36,"solar":97}},{"county":"Kleberg","projects":2,"mw":340,"expected_mw":132,"by_fuel":{"battery":5,"solar":127}},{"county":"McMullen","projects":1,"mw":262,"expected_mw":125,"by_fuel":{"solar":125}},{"county":"Montague","projects":4,"mw":1014,"expected_mw":120,"by_fuel":{"battery":103,"solar":17}},{"county":"Winkler","projects":3,"mw":623,"expected_mw":111,"by_fuel":{"battery":15,"wind":89,"gas":7}},{"county":"Brooks","projects":4,"mw":879,"expected_mw":109,"by_fuel":{"solar":25,"battery":84}},{"county":"Martin","projects":3,"mw":492,"expected_mw":104,"by_fuel":{"battery":104}},{"county":"Kerr","projects":1,"mw":123,"expected_mw":93,"by_fuel":{"battery":93}},{"county":"Childress","projects":3,"mw":270,"expected_mw":88,"by_fuel":{"battery":7,"solar":81}},{"county":"Stephens","projects":2,"mw":153,"expected_mw":88,"by_fuel":{"solar":49,"battery":39}},{"county":"Palo Pinto","projects":2,"mw":209,"expected_mw":84,"by_fuel":{"solar":84}},{"county":"Roberts","projects":1,"mw":251,"expected_mw":81,"by_fuel":{"gas":81}},{"county":"Zavala","projects":4,"mw":610,"expected_mw":75,"by_fuel":{"solar":38,"battery":37}},{"county":"Burnet","projects":3,"mw":271,"expected_mw":74,"by_fuel":{"battery":35,"solar":39}},{"county":"Coke","projects":4,"mw":657,"expected_mw":73,"by_fuel":{"battery":58,"solar":15}},{"county":"Delta","projects":2,"mw":111,"expected_mw":63,"by_fuel":{"battery":26,"solar":37}},{"county":"Medina","projects":7,"mw":956,"expected_mw":63,"by_fuel":{"battery":52,"solar":11}},{"county":"Dallas","projects":9,"mw":867,"expected_mw":60,"by_fuel":{"other":4,"battery":56}},{"county":"Jim Wells","projects":5,"mw":276,"expected_mw":59,"by_fuel":{"battery":51,"solar":8}},{"county":"Calhoun","projects":4,"mw":945,"expected_mw":57,"by_fuel":{"battery":22,"solar":35}},{"county":"Live Oak","projects":4,"mw":582,"expected_mw":56,"by_fuel":{"solar":42,"battery":14}},{"county":"Kinney","projects":9,"mw":945,"expected_mw":55,"by_fuel":{"battery":14,"solar":41}},{"county":"Morris","projects":1,"mw":166,"expected_mw":54,"by_fuel":{"gas":54}},{"county":"Bosque","projects":3,"mw":383,"expected_mw":53,"by_fuel":{"solar":38,"battery":15}},{"county":"Archer","projects":6,"mw":808,"expected_mw":52,"by_fuel":{"battery":35,"solar":17}},{"county":"Frio","projects":4,"mw":804,"expected_mw":50,"by_fuel":{"battery":28,"solar":22}},{"county":"Hays","projects":5,"mw":147,"expected_mw":49,"by_fuel":{"gas":24,"battery":25}},{"county":"Comal","projects":2,"mw":666,"expected_mw":48,"by_fuel":{"battery":48}},{"county":"McCulloch","projects":3,"mw":751,"expected_mw":47,"by_fuel":{"battery":25,"solar":22}},{"county":"Coryell","projects":1,"mw":52,"expected_mw":39,"by_fuel":{"battery":39}},{"county":"Falls","projects":7,"mw":612,"expected_mw":35,"by_fuel":{"solar":31,"battery":4}},{"county":"Kimble","projects":2,"mw":507,"expected_mw":33,"by_fuel":{"battery":22,"solar":11}},{"county":"Loving","projects":2,"mw":244,"expected_mw":28,"by_fuel":{"gas":14,"battery":14}},{"county":"Val Verde","projects":3,"mw":475,"expected_mw":27,"by_fuel":{"solar":20,"battery":7}},{"county":"Shackelford","projects":2,"mw":410,"expected_mw":26,"by_fuel":{"battery":15,"solar":11}},{"county":"Sutton","projects":2,"mw":307,"expected_mw":21,"by_fuel":{"battery":21}},{"county":"Red River","projects":4,"mw":331,"expected_mw":20,"by_fuel":{"solar":11,"battery":9}},{"county":"Lubbock","projects":2,"mw":236,"expected_mw":18,"by_fuel":{"battery":18}},{"county":"Bandera","projects":1,"mw":201,"expected_mw":14,"by_fuel":{"battery":14}},{"county":"Smith","projects":1,"mw":201,"expected_mw":14,"by_fuel":{"battery":14}},{"county":"Brewster","projects":2,"mw":229,"expected_mw":14,"by_fuel":{"solar":7,"battery":7}},{"county":"Denton","projects":1,"mw":201,"expected_mw":14,"by_fuel":{"battery":14}},{"county":"Llano","projects":1,"mw":201,"expected_mw":14,"by_fuel":{"battery":14}},{"county":"Blanco","projects":1,"mw":154,"expected_mw":11,"by_fuel":{"battery":11}},{"county":"Irion","projects":1,"mw":150,"expected_mw":11,"by_fuel":{"battery":11}},{"county":"Burleson","projects":1,"mw":150,"expected_mw":11,"by_fuel":{"battery":11}},{"county":"Rockwall","projects":1,"mw":125,"expected_mw":9,"by_fuel":{"battery":9}},{"county":"Kendall","projects":1,"mw":101,"expected_mw":7,"by_fuel":{"battery":7}},{"county":"Uvalde","projects":2,"mw":42,"expected_mw":2,"by_fuel":{"solar":2,"battery":0}},{"county":"Hamilton","projects":1,"mw":0,"expected_mw":0,"by_fuel":{"battery":0}}],"projects":[{"inr":"16INR0049","name":"Nazareth Solar","fuel":"solar","tech":"PV","mw":203,"county":"Castro","zone":"PANHANDLE","poi":"tap 345kV 23914 Tule Canyon - 23912 Ogallala C2","entity":"TX Nazareth Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-31","ia":"2026-03-05","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-102.03869,34.51974],"method":"ERCOT bus number -> substation","subs":["Ogallala Switching Station"],"codes":["OGALLALA"],"osm":"osm:way/453589277"}},{"inr":"16INR0112","name":"Loma Pinta Wind","fuel":"wind","tech":"WT","mw":197.39,"county":"La Salle","zone":"SOUTH","poi":"5705 Fowlerton 138kV","entity":"Enerverse","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-31","ia":"2017-12-13","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":147,"loc":{"pt":[-99.19643333333333,28.37026666666667],"method":"county centroid (substation not located)","subs":[],"codes":["FOWLRTON"]}},{"inr":"17INR0043","name":"Vaquero 1 Wind","fuel":"wind","tech":"WT","mw":400,"county":"Zapata","zone":"SOUTH","poi":"tap 345kV 8905 N Edinb - 8455 Lon Hill","entity":"Enerverse","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-01-15","ia":null,"cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":88,"loc":{"pt":[-99.33245116279073,26.98322558139536],"method":"county centroid (tap midpoint fell outside the project county)","subs":["North Edinburg Substation","Lon Hill Substation"],"codes":["NEDIN","LON_HILL"]}},{"inr":"18INR0009","name":"Eagle Pines Gas","fuel":"gas","tech":"CC","mw":1173.5,"county":"Cherokee","zone":"NORTH","poi":"tap 345kV 3109 Stryker - 3123 Trinidad","entity":"FGE Power","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-30","ia":null,"cons_start":"2026-01-30","first_seen":"2018-12","months_in_queue":94,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":381,"loc":{"pt":[-96.1046,32.1261],"method":"ERCOT bus number -> substation","subs":["Trinidad Substation"],"codes":["TRSES"],"osm":"osm:relation/6810017"}},{"inr":"18INR0073","name":"Sweetwater 1 repower","fuel":"wind","tech":"WT","mw":3,"county":"Nolan","zone":"WEST","poi":"71050 Bitter Creek 345kV","entity":"Leeward Energy","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-30","ia":"2002-10-23","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-100.3389,32.3606],"method":"EIA plant record: same name and fuel in the same county (EIA plant 56211, \"Sweetwater Wind 1 LLC\", operating)","subs":[],"codes":["BITTCR"],"eia_plant":56211}},{"inr":"19INR0023","name":"Monte Alto 2 Wind","fuel":"wind","tech":"WT","mw":199.2,"county":"Willacy","zone":"COASTAL","poi":"tap 345kV 8318 Rio Hondo - 8383 N Edinburg","entity":"Monte Alto Windpower, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2022-03-22","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":149,"loc":{"pt":[-97.53769230769228,26.451569230769227],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Rio Hondo Substation","North Edinburg Substation"],"codes":["RIOHONDO","NEDIN"]}},{"inr":"19INR0055","name":"Monte Cristo II Wind","fuel":"wind","tech":"WT","mw":233.9,"county":"Hidalgo","zone":"SOUTH","poi":"8574 Pomelo 345kV","entity":"Monte Cristo Windpower II, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2025-12-19","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":174,"loc":{"pt":[-98.47722,26.44489],"method":"ERCOT bus number -> substation","subs":["Pomelo Substation"],"codes":["POMELO"],"osm":"osm:way/629307691"}},{"inr":"19INR0075","name":"Horseshoe Bend Solar","fuel":"solar","tech":"PV","mw":301.1,"county":"Brown","zone":"NORTH","poi":"1444 Brown 345kV","entity":"Clenera","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-02-20","ia":null,"cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-99.05431764705882,31.607452941176476],"method":"county centroid (substation not located)","subs":[],"codes":["BWNSW"]}},{"inr":"19INR0189","name":"SP TX-12B Phase III","fuel":"solar","tech":"PV","mw":40,"county":"Upton","zone":"WEST","poi":"76040 Castillo 138kV","entity":"ConEd Development","stage":"fis","stage_label":"Full interconnection study under way","cod":"2025-12-02","ia":null,"cons_start":null,"first_seen":"2019-03","months_in_queue":91,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-102.30618,31.25374],"method":"ERCOT bus number -> substation","subs":["Castillo Substation"],"codes":["CASTIL"],"osm":"osm:way/579799495"}},{"inr":"20INR0012","name":"Lueders Solar","fuel":"solar","tech":"PV","mw":40,"county":"Haskell","zone":"WEST","poi":"Tap 138kV 6161 Paint Creek - 6200 Ft Phantom","entity":"Innovative Solar 75","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-31","ia":null,"cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-99.58071,33.08003],"method":"ERCOT bus number -> substation","subs":["Paint Creek Substation"],"codes":["PAINTCRE"],"osm":"osm:way/20952215"}},{"inr":"20INR0047","name":"Siete","fuel":"wind","tech":"WT","mw":492.8,"county":"Webb","zone":"SOUTH","poi":"345kV 8718 Triada","entity":"Apex Clean Energy","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-31","ia":"2022-06-30","cons_start":null,"first_seen":"2019-06","months_in_queue":88,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":368,"loc":{"pt":[-99.70685194805196,27.717537662337673],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"20INR0050","name":"Castro Solar","fuel":"solar","tech":"PV","mw":224.67,"county":"Castro","zone":"PANHANDLE","poi":"23912 Ogallala 345kV","entity":"Castro Solar One, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-04-18","ia":"2020-11-30","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":107,"loc":{"pt":[-102.03869,34.51974],"method":"ERCOT bus number -> substation","subs":["Ogallala Switching Station"],"codes":["OGALLALA"],"osm":"osm:way/453589277"}},{"inr":"20INR0086","name":"Arroyo Solar","fuel":"solar","tech":"PV","mw":100,"county":"Cameron","zone":"COASTAL","poi":"345 KV Tap #8318 Rio Hondo - #8317 La Palma","entity":"BT Cantwell Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-22","ia":"2021-09-28","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":48,"loc":{"pt":[-97.628055,26.21203],"method":"tap between two located substations","subs":["Rio Hondo Substation","La Palma 345 kV Substation"],"codes":["RIOHONDO","LA_PALMA"]}},{"inr":"20INR0106","name":"Wang Solar SLF","fuel":"solar","tech":"PV","mw":144.6,"county":"Falls","zone":"NORTH","poi":"tap 345kV 3409 LakeCr1 - 3414 TempSS","entity":"BT Yixin Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-01-31","ia":null,"cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.9549142857143,31.214914285714283],"method":"county centroid (substation not located)","subs":[],"codes":["LCSES","TMPSW"]}},{"inr":"20INR0143","name":"Tri-X Solar 1 SLF","fuel":"solar","tech":"PV","mw":201.5,"county":"Crane","zone":"WEST","poi":"138 kV Soda Lake (#76026)","entity":"Crane I Solar Electric, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-30","ia":"2026-08-21","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-102.31368,31.19334],"method":"ERCOT bus number -> substation","subs":["Soda Lake Substation"],"codes":["SODALA"],"osm":"osm:way/1454962661"}},{"inr":"20INR0162","name":"Diamondback solar","fuel":"solar","tech":"PV","mw":200.5,"county":"Starr","zone":"SOUTH","poi":"80355 Del Sol 345kV","entity":"Diamondback Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-29","ia":"2024-06-14","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-98.70102,26.42668],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69982, \"Diamondback Solar\", planned)","subs":[],"codes":["DELSOL"],"eia_plant":69982}},{"inr":"20INR0238","name":"Voyager Storage","fuel":"battery","tech":"BA","mw":50.14,"county":"Wharton","zone":"SOUTH","poi":"44200 Hillje 345kV","entity":"EDF Renewables Development, Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-08","ia":null,"cons_start":null,"first_seen":"2019-04","months_in_queue":90,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.23649,29.0297],"method":"ERCOT bus number -> substation","subs":["Hillje Substation"],"codes":["HLJ"],"osm":"osm:way/100064466"}},{"inr":"20INR0245","name":"Volunteer Storage","fuel":"battery","tech":"BA","mw":50.6,"county":"Caldwell","zone":"SOUTH","poi":"7216 Lockhart 138kV","entity":"Blackjack Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-10-16","ia":null,"cons_start":null,"first_seen":"2019-01","months_in_queue":93,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-97.66126,29.87081],"method":"ERCOT bus number -> substation","subs":["Lockhart Substation"],"codes":["LOCKHA"],"osm":"osm:way/146793326"}},{"inr":"20INR0246","name":"Ryan Energy Storage","fuel":"battery","tech":"BA","mw":51.6,"county":"Coryell","zone":"NORTH","poi":"37580 TNPancake 69kV","entity":"Ryan Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-12","ia":"2021-02-18","cons_start":null,"first_seen":"2019-01","months_in_queue":93,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":39,"loc":{"pt":[-97.7977,31.53558],"method":"ERCOT bus number -> substation","subs":["Pancake Substation"],"codes":["PCAKETNP"],"osm":"osm:way/508017130"}},{"inr":"20INR0247","name":"Water Valley Wind Energy","fuel":"wind","tech":"WT","mw":180,"county":"Tom Green","zone":"WEST","poi":"345 kV 76009 Twin Buttes to 76090 Divide Double Circuit","entity":"Water Valley Wind Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-15","ia":"2025-03-17","cons_start":null,"first_seen":"2019-01","months_in_queue":93,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":134,"loc":{"pt":[-100.59802,31.5138],"method":"ERCOT bus number -> substation","subs":["Twin Buttes Substation"],"codes":["TWINBU"],"osm":"osm:way/172174900"}},{"inr":"20INR0255","name":"Renegade Project","fuel":"solar","tech":"PV","mw":519.97,"county":"Deaf Smith","zone":"PANHANDLE","poi":"Tap 345kV 23910 Windmill - 23906 AJ Swope","entity":"Renegade Renewable LLC","stage":"construction","stage_label":"Under construction (agreement signed)","cod":"2028-11-01","ia":"2021-01-04","cons_start":"2026-03-01","first_seen":"2019-02","months_in_queue":92,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":249,"loc":{"pt":[-102.17737,35.043445000000006],"method":"tap between two located substations","subs":["Windmill Substation","AJ Swope Substation"],"codes":["WINDMILL","AJ_SWOPE"]}},{"inr":"20INR0286","name":"Wise County Power Repower (CT1, CT2)","fuel":"gas","tech":"CC","mw":21,"county":"Wise","zone":"NORTH","poi":"1421 Willow Creek 345kV","entity":"Wise County Power Company LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-19","ia":"2001-03-19","cons_start":null,"first_seen":"2019-07","months_in_queue":87,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.7086,33.17174],"method":"county centroid (substation not located)","subs":[],"codes":["WCSWS"]}},{"inr":"21INR0006","name":"Giddings Wind","fuel":"wind","tech":"WT","mw":240,"county":"Upton","zone":"WEST","poi":"71212 Upton 138kV","entity":"Pioneer Natural Resources","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-09","ia":null,"cons_start":null,"first_seen":"2020-01","months_in_queue":81,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":53,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"21INR0022","name":"Red Holly Solar","fuel":"solar","tech":"PV","mw":260,"county":"Dawson","zone":"WEST","poi":"tap 345kV 59900 Longdraw - 79641 Farmland","entity":"GreenGo Energy","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-09-30","ia":"2020-10-19","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":124,"loc":{"pt":[-101.63297,32.72112],"method":"ERCOT bus number -> substation","subs":["Long Draw Substation"],"codes":["W_LD_345"],"osm":"osm:way/453310291"}},{"inr":"21INR0029","name":"Red Holly Storage 1","fuel":"battery","tech":"BA","mw":50,"county":"Dawson","zone":"WEST","poi":"tap 345kV 59900 Longdraw - 79641 Farmland","entity":"GreenGo Energy","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-30","ia":"2020-10-19","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":38,"loc":{"pt":[-101.63297,32.72112],"method":"ERCOT bus number -> substation","subs":["Long Draw Substation"],"codes":["W_LD_345"],"osm":"osm:way/453310291"}},{"inr":"21INR0031","name":"Indigo Solar","fuel":"solar","tech":"PV","mw":150,"county":"Fisher","zone":"WEST","poi":"tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2","entity":"Innovative Solar 245, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-17","ia":"2020-09-15","cons_start":null,"first_seen":"2019-05","months_in_queue":89,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":72,"loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"21INR0033","name":"Red Holly Storage","fuel":"battery","tech":"BA","mw":50,"county":"Dawson","zone":"WEST","poi":"tap 345kV 59900 Longdraw - 79641 Farmland","entity":"GreenGo Energy","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-09-30","ia":"2020-10-19","cons_start":null,"first_seen":"2018-12","months_in_queue":94,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":38,"loc":{"pt":[-101.63297,32.72112],"method":"ERCOT bus number -> substation","subs":["Long Draw Substation"],"codes":["W_LD_345"],"osm":"osm:way/453310291"}},{"inr":"21INR0210","name":"Adamstown Solar","fuel":"solar","tech":"PV","mw":250.88,"county":"Wilbarger","zone":"WEST","poi":"tap 345kV 1730 West Krum - 6111 Riley Ckt 2","entity":"Adams Creek Solar Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-31","ia":"2024-12-04","cons_start":null,"first_seen":"2019-05","months_in_queue":89,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":120,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"21INR0220","name":"Maleza Solar","fuel":"solar","tech":"PV","mw":254.94,"county":"Wharton","zone":"SOUTH","poi":"tap Blue – Hillje 345 kv Ckt.#27","entity":"Brush Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2021-01-13","cons_start":null,"first_seen":"2019-03","months_in_queue":91,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":122,"loc":{"pt":[-96.23649,29.0297],"method":"one end of the tapped line, matched by name in the POI","subs":["Hillje Substation"],"codes":[]}},{"inr":"21INR0247","name":"Anson Solar Center, Phase III","fuel":"solar","tech":"PV","mw":200,"county":"Jones","zone":"WEST","poi":"tap 345kV 68000 WShack - 68001 Clayton","entity":"Anson Solar Center 3, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2019-01","months_in_queue":93,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"21INR0258","name":"Mercury Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Hill","zone":"NORTH","poi":"68092 Liberty Station 345kV","entity":"Mercury Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2019-02","months_in_queue":92,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["LIBERTY"]}},{"inr":"21INR0260","name":"Chariot Storage","fuel":"battery","tech":"BA","mw":50,"county":"Limestone","zone":"NORTH","poi":"tap 69kV 99 Ben Hur - 107 Prairie Hill","entity":"Chariot Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-10-16","ia":null,"cons_start":null,"first_seen":"2019-03","months_in_queue":91,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.77497,31.65213],"method":"ERCOT bus number -> substation","subs":["Prairie Hill Substation"],"codes":["PRA"],"osm":"osm:way/461754867"}},{"inr":"21INR0262","name":"Grandfalls Storage SLF","fuel":"battery","tech":"BA","mw":175.6,"county":"Upton","zone":"WEST","poi":"tap 345kV 11028 Odessa - 76000 North McCamey","entity":"King Mountain Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2019-03","months_in_queue":91,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":["ODEHV"]}},{"inr":"21INR0263","name":"Monarch Creek Wind","fuel":"wind","tech":"WT","mw":283.4,"county":"Throckmorton","zone":"WEST","poi":"11419 Coody Crossing Switch 345kV","entity":"MONARCH CREEK WIND, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-17","ia":"2020-08-24","cons_start":null,"first_seen":"2019-08","months_in_queue":86,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":211,"loc":{"pt":[-99.42239,33.1839],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69606, \"Monarch Creek Wind, LLC\", planned)","subs":[],"codes":["CDYSW"],"eia_plant":69606}},{"inr":"21INR0265","name":"Sisters Solar","fuel":"solar","tech":"PV","mw":103.17,"county":"Ector","zone":"WEST","poi":"tapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf Switching Station (Bus# 11010)","entity":"Oberon Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-23","ia":"2025-07-01","cons_start":null,"first_seen":"2019-02","months_in_queue":92,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":49,"loc":{"pt":[-102.9328,31.6018],"method":"one end of the tapped line, matched by name in the POI","subs":["Wolf Switching Station"],"codes":["MOSSW","WLFSW"]}},{"inr":"21INR0294","name":"Mountaineer Solar","fuel":"solar","tech":"PV","mw":329.26,"county":"Brown","zone":"NORTH","poi":"1444 Brown 345 kV","entity":"Mustang Mountaineer Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-01","ia":null,"cons_start":null,"first_seen":"2019-12","months_in_queue":82,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-99.19531,31.53798],"method":"substation matched by name in the POI","subs":["Brown Substation"],"codes":["BWNSW"]}},{"inr":"21INR0341","name":"Space City Solar","fuel":"solar","tech":"PV","mw":366,"county":"Wharton","zone":"SOUTH","poi":"44200 Hillje 345kV","entity":"Apollo Solar Ranch, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-01","ia":"2025-12-11","cons_start":null,"first_seen":"2019-10","months_in_queue":84,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":175,"loc":{"pt":[-96.23649,29.0297],"method":"ERCOT bus number -> substation","subs":["Hillje Substation"],"codes":["HLJ"],"osm":"osm:way/100064466"}},{"inr":"21INR0371","name":"Pecan Prairie South","fuel":"solar","tech":"PV","mw":132.98,"county":"Leon","zone":"NORTH","poi":"CTT Yellow Wolf, bus # 79007","entity":"ConnectGen Operating LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-05-01","ia":"2021-02-21","cons_start":null,"first_seen":"2019-08","months_in_queue":86,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":64,"loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"21INR0391","name":"Grandslam Solar","fuel":"solar","tech":"PV","mw":121.89,"county":"Atascosa","zone":"SOUTH","poi":"5700 Miracle Lake 138kV","entity":"Grandslam Solar, L.L.C.","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-01","ia":"2021-01-29","cons_start":null,"first_seen":"2019-07","months_in_queue":87,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":58,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["MIRACLAK"]}},{"inr":"21INR0421","name":"Armadillo Solar","fuel":"solar","tech":"PV","mw":150.48,"county":"Navarro","zone":"NORTH","poi":"3387 Revolution 138kV","entity":"Armadillo Solar Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-01","ia":"2021-02-02","cons_start":null,"first_seen":"2019-09","months_in_queue":85,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":72,"loc":{"pt":[-96.2027,32.00014],"method":"EIA plant record: same name and fuel in the same county (EIA plant 64349, \"Armadillo Solar Center\", planned)","subs":[],"codes":["REVSW"],"eia_plant":64349}},{"inr":"21INR0428","name":"Pecan Prairie North","fuel":"solar","tech":"PV","mw":324.11,"county":"Leon","zone":"NORTH","poi":"CTT Yellow Wolf, bus # 79007","entity":"CG Leon County II LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-15","ia":"2021-02-26","cons_start":null,"first_seen":"2019-09","months_in_queue":85,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":155,"loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"21INR0444","name":"Long Point Storage","fuel":"battery","tech":"BA","mw":100.62,"county":"Brazoria","zone":"COASTAL","poi":"138 KV  (CEHE Sub) Tap Burke (42410) - Eagle Nest (42430)  ckt 02","entity":"Long Point Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-30","ia":"2023-08-28","cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":76,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["BKE","EGL"]}},{"inr":"21INR0455","name":"Independence Trail Storage","fuel":"battery","tech":"BA","mw":100,"county":"Childress","zone":"PANHANDLE","poi":"60501 Tesla 345kV","entity":"KCE TX 16, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-01","ia":null,"cons_start":null,"first_seen":"2019-11","months_in_queue":83,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-100.08684,34.37339],"method":"ERCOT bus number -> substation","subs":["Tesla Substation"],"codes":["TESLA"],"osm":"osm:way/453794442"}},{"inr":"21INR0456","name":"Maleza Storage","fuel":"battery","tech":"BA","mw":150.83,"county":"Wharton","zone":"SOUTH","poi":"tap Blue – Hillje 345 kv Ckt.#27","entity":"Brush Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.23649,29.0297],"method":"one end of the tapped line, matched by name in the POI","subs":["Hillje Substation"],"codes":[]}},{"inr":"21INR0483","name":"Morrow Lake Storage","fuel":"battery","tech":"BA","mw":201.13,"county":"Frio","zone":"SOUTH","poi":"Morrow Lake Switch 138kV (5896)","entity":"Morrow Lake Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2020-11","months_in_queue":71,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.08318,28.93624],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68084, \"Morrow Lake BESS\", planned)","subs":[],"codes":[],"eia_plant":68084}},{"inr":"21INR0492","name":"Stockyard Grid Batt","fuel":"battery","tech":"BA","mw":150.6,"county":"Tarrant","zone":"NORTH","poi":"2082 Hicks 138kV","entity":"Stockyard Grid, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-14","ia":"2022-10-26","cons_start":null,"first_seen":"2020-02","months_in_queue":80,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-97.38396,32.90414],"method":"ERCOT bus number -> substation","subs":["Hicks Substation"],"codes":["HCKSW"],"osm":"osm:way/454696267"}},{"inr":"21INR0505","name":"Ramsey Storage","fuel":"battery","tech":"BA","mw":500,"county":"Wharton","zone":"SOUTH","poi":"44200 Hillje 345kV","entity":"Hecate Energy Ramsey Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2022-08-11","cons_start":null,"first_seen":"2021-01","months_in_queue":69,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":379,"loc":{"pt":[-96.23649,29.0297],"method":"ERCOT bus number -> substation","subs":["Hillje Substation"],"codes":["HLJ"],"osm":"osm:way/100064466"}},{"inr":"21INR0520","name":"Yellow Viking Solar","fuel":"solar","tech":"PV","mw":171.13,"county":"Somervell","zone":"NORTH","poi":"Tap 345kV 1900 Comanche Peak - 11886 Timberview Switch","entity":"Yellow Viking Development One, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-13","ia":"2022-10-25","cons_start":null,"first_seen":"2020-10","months_in_queue":72,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":82,"loc":{"pt":[-97.62889,32.31664],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67222, \"Yellow Viking Solar\", planned)","subs":[],"codes":["CPSES"],"eia_plant":67222}},{"inr":"21INR0527","name":"Hays Energy Unit 3 Repower","fuel":"gas","tech":"GT","mw":18,"county":"Hays","zone":"SOUTH","poi":"7043 Hays 345kV","entity":"HAYS ENERGY, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2021-02","months_in_queue":68,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-97.99009,29.78303],"method":"ERCOT bus number -> substation","subs":["Hays Energy Station"],"codes":["HAYSEN"],"osm":"osm:way/124968451"}},{"inr":"21INR0534","name":"Midlothian Unit 2 repower","fuel":"gas","tech":"GT","mw":18,"county":"Ellis","zone":"NORTH","poi":"1939 Midlothian ELP 345kV","entity":"MIDLOTHIAN ENERGY, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-03","ia":null,"cons_start":null,"first_seen":"2021-02","months_in_queue":68,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["MDANP"]}},{"inr":"22INR0209","name":"Felix North Solar","fuel":"solar","tech":"PV","mw":177.51,"county":"Wilbarger","zone":"WEST","poi":"6101 Riley 345kV","entity":"Crescent Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-16","ia":"2025-02-21","cons_start":null,"first_seen":"2019-09","months_in_queue":85,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":85,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"22INR0215","name":"TEXAS SOLAR NOVA 3","fuel":"solar","tech":"PV","mw":200.2,"county":"Kent","zone":"WEST","poi":"tap 345kV 11305 Dermott - 59904 Cottonwood","entity":"Texas Solar Nova 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-01-31","ia":null,"cons_start":null,"first_seen":"2019-06","months_in_queue":88,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.942725,33.319255],"method":"tap between two located substations","subs":["Dermott Substation","Cottonwood Substation"],"codes":["DMTSW","W_CW_345"]}},{"inr":"22INR0218","name":"Velociraptor Solar I","fuel":"solar","tech":"PV","mw":241.67,"county":"Ector","zone":"WEST","poi":"#10012 METEOR 5 Substation 345kV","entity":"Velociraptor Solar I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2019-05","months_in_queue":89,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["METSW"]}},{"inr":"22INR0220","name":"Lamkin Solar","fuel":"solar","tech":"PV","mw":103,"county":"Comanche","zone":"NORTH","poi":"tap 69kV 258 Hamilton - 273 Gustine","entity":"Commanche Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-13","ia":"2025-03-06","cons_start":null,"first_seen":"2020-03","months_in_queue":79,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":49,"loc":{"pt":[-98.34432,31.81803],"method":"ERCOT bus number -> substation","subs":["Gustine Substation"],"codes":["GUSTINE"],"osm":"osm:way/508017142"}},{"inr":"22INR0237","name":"Dragan Solar","fuel":"solar","tech":"PV","mw":411,"county":"Comanche","zone":"NORTH","poi":"1440 Comanche 345kV","entity":"Hecate Comanche Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-09-15","ia":null,"cons_start":null,"first_seen":"2019-10","months_in_queue":84,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":23,"loc":{"pt":[-98.52881111111111,31.920833333333334],"method":"county centroid (substation not located)","subs":[],"codes":["CMNSW"]}},{"inr":"22INR0239","name":"Rockefeller Storage","fuel":"battery","tech":"BA","mw":206.8,"county":"Schleicher","zone":"WEST","poi":"76003 Big Hill 345kV","entity":"Mittel Rockefeller Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-01","ia":"2024-09-23","cons_start":null,"first_seen":"2020-07","months_in_queue":75,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":157,"loc":{"pt":[-100.54306,31.04735],"method":"ERCOT bus number -> substation","subs":["Big Hill Substation"],"codes":["BIGHIL"],"osm":"osm:way/339705805"}},{"inr":"22INR0251","name":"Shaula I Solar","fuel":"solar","tech":"PV","mw":205.2,"county":"DeWitt","zone":"SOUTH","poi":"tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1","entity":"Shaula Energy Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-15","ia":"2022-02-16","cons_start":null,"first_seen":"2019-11","months_in_queue":83,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":98,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"22INR0257","name":"Corazon Solar Phase II","fuel":"solar","tech":"PV","mw":203.9,"county":"Webb","zone":"SOUTH","poi":"80219 Lobo 345kV","entity":"BAYWA R.E. SOLAR PROJECTS","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-01","ia":"2020-08-04","cons_start":null,"first_seen":"2019-12","months_in_queue":82,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"22INR0262","name":"Sequoia II Solar","fuel":"solar","tech":"PV","mw":417.47,"county":"Callahan","zone":"WEST","poi":"68051 Reata 345kV","entity":"ENBRIDGE SOLAR SEQUOIA II LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-10","ia":"2023-08-29","cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":200,"loc":{"pt":[-99.17308,32.34108],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69272, \"Enbridge Solar (Sequoia II)\", planned)","subs":[],"codes":["REATA"],"eia_plant":69272}},{"inr":"22INR0267","name":"Shaula II Solar","fuel":"solar","tech":"PV","mw":205.2,"county":"DeWitt","zone":"SOUTH","poi":"tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1","entity":"Shaula Energy Project II, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-15","ia":"2022-04-27","cons_start":null,"first_seen":"2019-12","months_in_queue":82,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":98,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"22INR0281","name":"Pink Solar SLF","fuel":"solar","tech":"PV","mw":152.41,"county":"Hunt","zone":"NORTH","poi":"971 Pruitt 138kV","entity":"Pink Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-07-31","ia":"2022-08-30","cons_start":null,"first_seen":"2020-10","months_in_queue":72,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":73,"loc":{"pt":[-96.04117000000001,32.98473],"method":"county centroid (substation not located)","subs":[],"codes":["PRUITT"]}},{"inr":"22INR0301","name":"Fortuna Wind","fuel":"wind","tech":"WT","mw":295.3,"county":"Jack","zone":"NORTH","poi":"Tap 345kV 1429 Jacksboro -  1730 WKrum","entity":"RWE Renewables Development, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-31","ia":"2024-08-08","cons_start":null,"first_seen":"2021-01","months_in_queue":69,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":220,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["JCKSW","KRWSW"]}},{"inr":"22INR0314","name":"Lan Solar SLF","fuel":"solar","tech":"PV","mw":182.2,"county":"Lamar","zone":"NORTH","poi":"Tap 345kV 1729 Valley South – 1692 Paris Switch","entity":"BR Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-26","ia":null,"cons_start":null,"first_seen":"2021-01","months_in_queue":69,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-95.58098,33.63908],"method":"one end of the tapped line, matched by name in the POI","subs":["Paris Substation"],"codes":["VLYSO","PRSSW"]}},{"inr":"22INR0330","name":"Old Aqueduct Batt","fuel":"battery","tech":"BA","mw":309.2,"county":"Hale","zone":"PANHANDLE","poi":"23920 Blackwater 345kV","entity":"Old Aqueduct LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-01","ia":null,"cons_start":null,"first_seen":"2020-06","months_in_queue":76,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-101.879,34.11878],"method":"county centroid (substation not located)","subs":[],"codes":["BWDSW"]}},{"inr":"22INR0332","name":"Brantley Branch Batt","fuel":"battery","tech":"BA","mw":302.35,"county":"Rusk","zone":"NORTH","poi":"Mt. Enterprise (Bus # 3116) – Martin Lake 345kv Line (Bus # 3100","entity":"Brantley Branch LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-01","ia":null,"cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-94.59736249999999,32.1764125],"method":"county centroid (substation not located)","subs":[],"codes":["ENTPR","MLSES"]}},{"inr":"22INR0342","name":"Matagorda Solar","fuel":"solar","tech":"PV","mw":101,"county":"Matagorda","zone":"COASTAL","poi":"5555 Shropshire 69kV","entity":"Matagorda Solar Farm, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-25","ia":"2022-06-08","cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":48,"loc":{"pt":[-95.83243783783784,28.936727027027025],"method":"county centroid (substation not located)","subs":[],"codes":["SHROPSHI"]}},{"inr":"22INR0347","name":"Crater BESS","fuel":"battery","tech":"BA","mw":310.28,"county":"Howard","zone":"WEST","poi":"Tap 345 kV Rockhound Switch (10062) – Prong Moss Switch (10057) ckt 1","entity":"BRP Crater BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-01","ia":null,"cons_start":null,"first_seen":"2020-05","months_in_queue":77,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":["RCKSW","PRMSW"]}},{"inr":"22INR0350","name":"Sandow Solar","fuel":"solar","tech":"PV","mw":287.18,"county":"Milam","zone":"SOUTH","poi":"tap one 345kV 7040 Austrop - 13429 Sandow line","entity":"Sandow Lakes Ranch Solar I, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2020-06","months_in_queue":76,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":90,"loc":{"pt":[-97.48729,30.2513],"method":"ERCOT bus number -> substation","subs":["Austrop Substation"],"codes":["AUSTRO"],"osm":"osm:way/127245722"}},{"inr":"22INR0357","name":"Loma Pinta Solar","fuel":"solar","tech":"PV","mw":201.11,"county":"La Salle","zone":"SOUTH","poi":"5705 Fowlerton 138kV","entity":"Loma Pinta Wind Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2020-06","months_in_queue":76,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.19643333333333,28.37026666666667],"method":"county centroid (substation not located)","subs":[],"codes":["FOWLRTON"]}},{"inr":"22INR0365","name":"Mensa BESS","fuel":"battery","tech":"BA","mw":308.98,"county":"Pecos","zone":"WEST","poi":"60718 Pecos Valley 138kV","entity":"BRP Mensa BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2020-06","months_in_queue":76,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["PECV"]}},{"inr":"22INR0374","name":"Inertia Solar","fuel":"solar","tech":"PV","mw":202.39,"county":"Haskell","zone":"WEST","poi":"tap 345kV 60515 Clear Crossing - 6104 Smoky Hill","entity":"Inertia Solar Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-31","ia":"2023-05-10","cons_start":null,"first_seen":"2020-10","months_in_queue":72,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"22INR0383","name":"BRP Musca BESS","fuel":"battery","tech":"BA","mw":100.51,"county":"Reagan","zone":"WEST","poi":"60361 Santa Rita 138kV","entity":"BRP Musca BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-101.65608,31.22849],"method":"ERCOT bus number -> substation","subs":["Santa Rita Substation"],"codes":["SANTARIT"],"osm":"osm:way/503429665"}},{"inr":"22INR0385","name":"BRP Pictor BESS","fuel":"battery","tech":"BA","mw":201.07,"county":"Crane","zone":"WEST","poi":"60400 Lynx 138kV","entity":"BRP Pictor BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-102.39351,31.07185],"method":"ERCOT bus number -> substation","subs":["Lynx Substation"],"codes":["LYNX"],"osm":"osm:way/1006095202"}},{"inr":"22INR0386","name":"BRP Octans BESS","fuel":"battery","tech":"BA","mw":129.57,"county":"Pecos","zone":"WEST","poi":"6671 Tombstone 138kV","entity":"BRP OCTANS BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-102.6799,31.00058],"method":"EIA plant record: same name and fuel in the same county (EIA plant 65590, \"Octans\", planned)","subs":[],"codes":[],"eia_plant":65590}},{"inr":"22INR0387","name":"Val Vista Grid BESS 1","fuel":"battery","tech":"BA","mw":209.32,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 345kV 8383 North Edinburg - 80137 Stewart Road","entity":"Val Vista Grid, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-30","ia":"2025-12-31","cons_start":null,"first_seen":"2020-07","months_in_queue":75,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":159,"loc":{"pt":[-98.18922,26.34411],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["North Edinburg Substation"],"codes":["NEDIN","STEWART"]}},{"inr":"22INR0392","name":"Kalina Solar","fuel":"solar","tech":"PV","mw":120,"county":"San Patricio","zone":"COASTAL","poi":"8606 Goddard 345kV","entity":"Aurora Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-31","ia":null,"cons_start":null,"first_seen":"2021-04","months_in_queue":66,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":["GODDARD"]}},{"inr":"22INR0400","name":"Dragan Storage","fuel":"battery","tech":"BA","mw":408.3,"county":"Comanche","zone":"NORTH","poi":"1440 Comanche 345kV","entity":"Hecate Grid Dragan Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-31","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-98.52881111111111,31.920833333333334],"method":"county centroid (substation not located)","subs":[],"codes":["CMNSW"]}},{"inr":"22INR0401","name":"Eval Storage","fuel":"battery","tech":"BA","mw":251.85,"county":"Cameron","zone":"COASTAL","poi":"80229 Cavazos 138kV","entity":"Hecate Grid East Valley Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-04-30","ia":"2022-02-03","cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":191,"loc":{"pt":[-97.59772,26.022],"method":"ERCOT bus number -> substation","subs":["Villa Cavazos Substation"],"codes":["VCAVAZOS"],"osm":"osm:way/513383733"}},{"inr":"22INR0402","name":"Frye Storage","fuel":"battery","tech":"BA","mw":503.85,"county":"Swisher","zone":"PANHANDLE","poi":"new 345kV sub Kress connecting both 23912 Ogallala - 23914 Tule Canyon circuits","entity":"Hecate Energy Frye Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-102.03869,34.51974],"method":"ERCOT bus number -> substation","subs":["Ogallala Switching Station"],"codes":["OGALLALA"],"osm":"osm:way/453589277"}},{"inr":"22INR0423","name":"Quela BESS","fuel":"battery","tech":"BA","mw":301.41,"county":"Bexar","zone":"SOUTH","poi":"Tap 138kV 5110 J.T. Deely - 5294 Martinez","entity":"BRP Quela BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-98.32237,29.4507],"method":"ERCOT bus number -> substation","subs":["Martinez Substation"],"codes":["C5"],"osm":"osm:way/675054239"}},{"inr":"22INR0425","name":"MAKALU SOLAR","fuel":"solar","tech":"PV","mw":50.16,"county":"Hunt","zone":"NORTH","poi":"Tap 138kV 977 Pruitt - 971 Greenville","entity":"Abei Energy Green X LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-24","ia":null,"cons_start":null,"first_seen":"2021-08","months_in_queue":62,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-96.04117000000001,32.98473],"method":"county centroid (substation not located)","subs":[],"codes":["GN_S_I","PRUITT"]}},{"inr":"22INR0426","name":"LUBIO SOLAR","fuel":"solar","tech":"PV","mw":54.71,"county":"Kaufman","zone":"NORTH","poi":"tap 138kV 2727 Crandall - 2724 Kaufman Northwest","entity":"BDPU Solar Lubio LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-20","ia":"2024-11-08","cons_start":null,"first_seen":"2021-06","months_in_queue":64,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":26,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["CRNDL","KFMNW"]}},{"inr":"22INR0427","name":"BRP Kabru BESS","fuel":"battery","tech":"BA","mw":202.45,"county":"Andrews","zone":"WEST","poi":"1159 Andrew North - 11284 Blackbird 138kV","entity":"BRP Kabru BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-102.72318,32.3483],"method":"county centroid (substation not located)","subs":[],"codes":["ANDNR","BLBSW"]}},{"inr":"22INR0437","name":"TORMES SOLAR","fuel":"solar","tech":"PV","mw":356.6,"county":"Navarro","zone":"NORTH","poi":"tap 345kV 1906 Venus - 68091 Navarro","entity":"BDPU SOLAR TORMES LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-31","ia":"2024-04-10","cons_start":null,"first_seen":"2021-07","months_in_queue":63,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":170,"loc":{"pt":[-96.518,31.96399],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Navarro Switching Station"],"codes":["VENSW","NAVARRO"]}},{"inr":"22INR0443","name":"Bowstring BESS","fuel":"battery","tech":"BA","mw":155,"county":"San Patricio","zone":"COASTAL","poi":"138kV 8961 WHITEPT4A - 8418 RINCON4A","entity":"Longbow Energy Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-18","ia":"2025-09-09","cons_start":null,"first_seen":"2021-03","months_in_queue":67,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":117,"loc":{"pt":[-97.32971,27.9868],"method":"ERCOT bus number -> substation","subs":["Rincon Substation"],"codes":["RINCON"],"osm":"osm:way/194687600"}},{"inr":"22INR0454","name":"Wallace Solar","fuel":"solar","tech":"PV","mw":36,"county":"Culberson","zone":"WEST","poi":"Delaware River SW (11112)","entity":"Delaware Ranch Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-05-14","ia":"2022-02-07","cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-104.3148,31.91764],"method":"EIA plant record: same name and fuel in the same county (EIA plant 70093, \"Wallace Solar - (TX)\", planned)","subs":[],"codes":["CWPOD"],"eia_plant":70093}},{"inr":"22INR0455","name":"Blue Sky Sol","fuel":"solar","tech":"PV","mw":101.2,"county":"Crockett","zone":"WEST","poi":"6562 Friends Ranch 138kV","entity":"Blue Sky Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2022-02-01","cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":48,"loc":{"pt":[-101.8672315789474,30.74067763157894],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"22INR0457","name":"Anson BAT","fuel":"battery","tech":"BA","mw":153.55,"county":"Jones","zone":"WEST","poi":"tap 345 kV 68004 Phantom Hill station","entity":"Anson II Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-01","ia":"2024-08-15","cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":116,"loc":{"pt":[-99.84577142857142,32.64467142857143],"method":"county centroid (substation not located)","subs":[],"codes":["PHNTMHL"]}},{"inr":"22INR0462","name":"Old Aqueduct Solar","fuel":"solar","tech":"PV","mw":511.63,"county":"Hale","zone":"PANHANDLE","poi":"23920 Blackwater 345kV","entity":"Old Aqueduct Solar","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2021-07","months_in_queue":63,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-101.879,34.11878],"method":"county centroid (substation not located)","subs":[],"codes":["BWDSW"]}},{"inr":"22INR0469","name":"Harper Energy Storage","fuel":"battery","tech":"BA","mw":82.42,"county":"Cameron","zone":"COASTAL","poi":"Tap 138kV 8314 La Palma - 80229 Villa Cavazos","entity":"VESI 31 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-15","ia":null,"cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-97.62022999999999,26.08429],"method":"tap between two located substations","subs":["La Palma 345 kV Substation","Villa Cavazos Substation"],"codes":["LA_PALMA","VCAVAZOS"]}},{"inr":"22INR0473","name":"TAIN SOLAR","fuel":"solar","tech":"PV","mw":37.54,"county":"Caldwell","zone":"SOUTH","poi":"tap 138kV 7216 Lockhart - 7224 Luling City","entity":"Abei Energy Green VII LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-10-27","ia":null,"cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-97.65782,29.784145],"method":"tap between two substations (bus number + name)","subs":["Lockhart Substation","Luling City Substation"],"codes":["LOCKHA","LULING"]}},{"inr":"22INR0480","name":"Pachanga Wind","fuel":"wind","tech":"WT","mw":300,"county":"Cameron","zone":"COASTAL","poi":"tap 345kV 5966 Palmito - 80137 Stewart Rd","entity":"Pachanga Wind LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-08","ia":null,"cons_start":null,"first_seen":"2021-04","months_in_queue":66,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-94.91068,29.22779],"method":"ERCOT bus number -> substation","subs":["Stewart Substation"],"codes":["STEWART"],"osm":"osm:way/337244621"}},{"inr":"22INR0488","name":"Venture Hill Storage","fuel":"battery","tech":"BA","mw":70.44,"county":"Travis","zone":"SOUTH","poi":"7336 Gilleland Creek 138kV","entity":"KCE TX 24, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-12-01","ia":null,"cons_start":null,"first_seen":"2021-01","months_in_queue":69,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-97.78774375000002,30.467735416666667],"method":"county centroid (substation not located)","subs":[],"codes":["GILLCR"]}},{"inr":"22INR0497","name":"TEXPO","fuel":"gas","tech":"ST","mw":680,"county":"Wilbarger","zone":"WEST","poi":"6101 Riley 345 kV","entity":"Oklaunion Power Station, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-31","ia":null,"cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":221,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"22INR0504","name":"Barton Branch IA","fuel":"battery","tech":"BA","mw":203.62,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 3400 Twin Oak - 39950 TNP One","entity":"Barton Branch IA LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-02","ia":"2025-06-18","cons_start":null,"first_seen":"2021-03","months_in_queue":67,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":154,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"22INR0514","name":"Wang Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Falls","zone":"NORTH","poi":"tap 345kV 3409 LakeCr1 - 3414 TempSS","entity":"BT Yixin Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-01-31","ia":null,"cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.9549142857143,31.214914285714283],"method":"county centroid (substation not located)","subs":[],"codes":["LCSES","TMPSW"]}},{"inr":"22INR0523","name":"Midlothian 4 repower","fuel":"gas","tech":"GT","mw":18,"county":"Ellis","zone":"NORTH","poi":"1940 Midlothian ANP 345kV","entity":"MIDLOTHIAN ENERGY, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-03","ia":null,"cons_start":null,"first_seen":"2021-04","months_in_queue":66,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["MDANP"]}},{"inr":"22INR0541","name":"ALWEST BESS","fuel":"battery","tech":"BA","mw":208.63,"county":"Anderson","zone":"NORTH","poi":"3114 Paltalco 138kV","entity":"Castleman Power","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-19","ia":null,"cons_start":null,"first_seen":"2021-08","months_in_queue":62,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-95.69096842105266,31.784563157894723],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"22INR0543","name":"Midlothian Unit 3 repower","fuel":"gas","tech":"GT","mw":18,"county":"Ellis","zone":"NORTH","poi":"1940 Midlothian ELP 345kV","entity":"MIDLOTHIAN ENERGY, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-03","ia":null,"cons_start":null,"first_seen":"2021-05","months_in_queue":65,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["MDANP"]}},{"inr":"22INR0546","name":"Enchanted Rock NEWPP","fuel":"gas","tech":"IC","mw":30,"county":"Harris","zone":"HOUSTON","poi":"40475 Deusen 138kV","entity":"Generate ER-NG, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-02-28","ia":"2024-04-30","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":20,"loc":{"pt":[-95.19986,29.93375],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69279, \"NEWPP\", operating)","subs":[],"codes":["DSN"],"eia_plant":69279}},{"inr":"22INR0552","name":"Sowers Storage","fuel":"battery","tech":"BA","mw":208.89,"county":"Kaufman","zone":"NORTH","poi":"6894 Rose Hill_RC Sub 138 kV","entity":"Sowers Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-01","ia":"2022-04-22","cons_start":null,"first_seen":"2021-08","months_in_queue":62,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":158,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"22INR0558","name":"Callisto II Energy Center","fuel":"battery","tech":"BA","mw":203.2,"county":"Harris","zone":"HOUSTON","poi":"47150 HO Clarke 138kV","entity":"Callisto II Energy Center LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-17","ia":"2023-12-11","cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":154,"loc":{"pt":[-95.45025,29.64535],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68422, \"Callisto II Energy Center\", planned)","subs":[],"codes":["HOC"],"eia_plant":68422}},{"inr":"22INR0559","name":"Honeycomb Solar SLF","fuel":"solar","tech":"PV","mw":61.4,"county":"Bee","zone":"SOUTH","poi":"69 kV Tynan Substation (#8107)","entity":"Honeycomb Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-12","ia":"2023-05-01","cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-97.7723,28.1832],"method":"ERCOT bus number -> substation","subs":["Tynan Substation"],"codes":["TYNAN"],"osm":"osm:way/489376566"}},{"inr":"22INR0586","name":"Hays Energy Unit 2 Repower","fuel":"gas","tech":"GT","mw":18,"county":"Hays","zone":"SOUTH","poi":"7043 Haysen 345kV","entity":"HAYS ENERGY, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-97.99009,29.78303],"method":"ERCOT bus number -> substation","subs":["Hays Energy Station"],"codes":["HAYSEN"],"osm":"osm:way/124968451"}},{"inr":"22INR0605","name":"Camino Santiago Solar","fuel":"solar","tech":"PV","mw":196.3,"county":"Milam","zone":"SOUTH","poi":"345 kV Herndon Switch Substation (#3804)","entity":"Camino Solar Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-01","ia":"2024-12-06","cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":94,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0006","name":"Sierra Madre Solar","fuel":"solar","tech":"PV","mw":255.15,"county":"Zapata","zone":"SOUTH","poi":"tap 345kV 80307 Del Sol - 80225 Cenizo","entity":"Sierra Madre Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2020-10","months_in_queue":72,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"23INR0008","name":"Harley Hand Solar","fuel":"solar","tech":"PV","mw":505.5,"county":"Nolan","zone":"WEST","poi":"11420 Sweetwater East 345kV","entity":"HECTATE ENERGY HARLEY HAND SOLAR LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-07","ia":null,"cons_start":null,"first_seen":"2019-12","months_in_queue":82,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-100.2164,32.46854],"method":"EIA plant record: same name and fuel in the same county (EIA plant 64234, \"Hecate Energy Harley Hand Solar LLC\", planned)","subs":[],"codes":["SWESW"],"eia_plant":64234}},{"inr":"23INR0009","name":"Shaula III Solar","fuel":"solar","tech":"PV","mw":205.2,"county":"DeWitt","zone":"SOUTH","poi":"tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1","entity":"Shaula Energy Project III, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-15","ia":null,"cons_start":null,"first_seen":"2019-12","months_in_queue":82,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"23INR0015","name":"Scarlet Solar","fuel":"solar","tech":"PV","mw":180,"county":"Castro","zone":"PANHANDLE","poi":"tap 345kV 23912 Ogallala - 23910 Windmill","entity":"Innovative Solar 416, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2025-08-26","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-102.17162,34.64656],"method":"tap between two located substations","subs":["Ogallala Switching Station","Windmill Substation"],"codes":["OGALLALA","WINDMILL"]}},{"inr":"23INR0027","name":"Clear Fork Creek Solar","fuel":"solar","tech":"PV","mw":602.02,"county":"Wilson","zone":"SOUTH","poi":"Tap 345KV 5133 Elm Creek - 5323 Old Hickory","entity":"Clear Fork Creek Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-29","ia":"2021-11-23","cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":288,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":["G6"]}},{"inr":"23INR0029","name":"Cedar Bayou 5 (TEF - Due Diligence)","fuel":"gas","tech":"GT","mw":697,"county":"Chambers","zone":"HOUSTON","poi":"40000 Cedar Bayou 345kV","entity":"NRG Cedar Bayou 5 LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-31","ia":"2022-01-10","cons_start":null,"first_seen":"2020-03","months_in_queue":79,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":460,"loc":{"pt":[-94.92114,29.75113],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68606, \"Cedar Bayou 5\", planned)","subs":[],"codes":["CBY"],"eia_plant":68606}},{"inr":"23INR0045","name":"Caney Creek Solar","fuel":"solar","tech":"PV","mw":121.04,"county":"Van Zandt","zone":"NORTH","poi":"Tap 138kV 6829 Glen Pine - 6833 Explorer","entity":"HEP Aquamarine Holdings LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-21","ia":"2021-12-29","cons_start":null,"first_seen":"2021-02","months_in_queue":68,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":58,"loc":{"pt":[-95.70379999999997,32.62182399999999],"method":"county centroid (substation not located)","subs":[],"codes":["GLNPSSRC","EXPLSSRC"]}},{"inr":"23INR0055","name":"Tabor Solar","fuel":"solar","tech":"PV","mw":506.4,"county":"Hardeman","zone":"WEST","poi":"Tap 345kV 60504 Tesla - 61001 Jim Treece","entity":"Quanah Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-04-16","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-99.76050000000001,34.303775],"method":"tap between two located substations","subs":["Tesla Substation","Jim Treece Substation"],"codes":["TESLA","JIMTREEC"]}},{"inr":"23INR0056","name":"Caliche Mound Solar","fuel":"solar","tech":"PV","mw":407.6,"county":"Deaf Smith","zone":"PANHANDLE","poi":"Mule Deer Switch 23921 (tap 345kV 23906 AJSwope -  23910 Windmill)","entity":"CIG DS1 LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-26","ia":"2023-10-12","cons_start":null,"first_seen":"2020-07","months_in_queue":75,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":195,"loc":{"pt":[-102.17737,35.043445000000006],"method":"tap between two located substations","subs":["AJ Swope Substation","Windmill Substation"],"codes":["AJ_SWOPE","WINDMILL"]}},{"inr":"23INR0057","name":"Duffy Solar","fuel":"solar","tech":"PV","mw":502.46,"county":"Matagorda","zone":"COASTAL","poi":"Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)","entity":"Duffy Project Co LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2023-04-12","cons_start":null,"first_seen":"2021-02","months_in_queue":68,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":240,"loc":{"pt":[-96.05017,28.79956],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["South Texas Project Switchyard"],"codes":["STP","WAP"]}},{"inr":"23INR0058","name":"Erin Solar","fuel":"solar","tech":"PV","mw":208.34,"county":"Wharton","zone":"SOUTH","poi":"44040 Bailey 345 kV","entity":"Erin Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-12-31","ia":"2023-03-22","cons_start":null,"first_seen":"2021-02","months_in_queue":68,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":100,"loc":{"pt":[-95.99215,29.18538],"method":"substation matched by name in the POI","subs":["Bailey Substation"],"codes":["BLY"]}},{"inr":"23INR0059","name":"Briggs Solar","fuel":"solar","tech":"PV","mw":323.7,"county":"Haskell","zone":"WEST","poi":"tap 345kV 60515 Clear Crossing - 60507 Pendulo","entity":"IP Quantum III, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-15","ia":"2025-03-15","cons_start":null,"first_seen":"2021-03","months_in_queue":67,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":155,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"23INR0061","name":"Noria Solar DCC","fuel":"solar","tech":"PV","mw":145,"county":"Nueces","zone":"COASTAL","poi":"85000 Nelson Sharpe 345kV","entity":"Noria Hondo Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-21","ia":"2022-10-12","cons_start":null,"first_seen":"2021-03","months_in_queue":67,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":69,"loc":{"pt":[-97.50795714285712,27.78825873015873],"method":"county centroid (substation not located)","subs":[],"codes":["N_SHARPE"]}},{"inr":"23INR0062","name":"Noria Storage","fuel":"battery","tech":"BA","mw":75,"county":"Nueces","zone":"COASTAL","poi":"85000 Nelson Sharpe 345kV","entity":"Noria Hondo Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-21","ia":"2022-10-12","cons_start":null,"first_seen":"2021-03","months_in_queue":67,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":57,"loc":{"pt":[-97.50795714285712,27.78825873015873],"method":"county centroid (substation not located)","subs":[],"codes":["N_SHARPE"]}},{"inr":"23INR0066","name":"Accalia Point Solar","fuel":"solar","tech":"PV","mw":190.5,"county":"Cameron","zone":"COASTAL","poi":"Tap 345kV 8383 North Edingburg – 79501 Kingfisher","entity":"Accalia Point Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-31","ia":null,"cons_start":null,"first_seen":"2021-02","months_in_queue":68,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-98.18922,26.34411],"method":"ERCOT bus number -> substation","subs":["North Edinburg Substation"],"codes":["NEDIN"],"osm":"osm:way/174789429"}},{"inr":"23INR0071","name":"BRP Volans BESS","fuel":"battery","tech":"BA","mw":206.88,"county":"Winkler","zone":"WEST","poi":"11189 Quarry Field SW -  1074 Wink 138kV","entity":"BRP Volans BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-103.6387,31.78297],"method":"substation matched by name in the POI","subs":["Quarry Field Switching Station"],"codes":["QRYSW","WINKS"]}},{"inr":"23INR0074","name":"BRP Ampato BESS","fuel":"battery","tech":"BA","mw":121.56,"county":"Crane","zone":"WEST","poi":"10002 NS Crane Switch 138kV","entity":"BRP Ampato BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-102.57905833333332,31.29205416666667],"method":"county centroid (substation not located)","subs":[],"codes":["FNDSW"]}},{"inr":"23INR0075","name":"BRP Rhine BESS","fuel":"battery","tech":"BA","mw":206.89,"county":"Ward","zone":"WEST","poi":"Tap 345kV 11188  QUARRYFLD - 11010 WOLF","entity":"BRP Rhine BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-102.9328,31.6018],"method":"one end of the tapped line, matched by name in the POI","subs":["Wolf Switching Station"],"codes":["QRYSW","WLFSW"]}},{"inr":"23INR0077","name":"Cachena Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Wilson","zone":"SOUTH","poi":"Tap 345KV 5133 Elmcreek - 5323 Old Hickory","entity":"Clear Fork Creek Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-04-29","ia":null,"cons_start":null,"first_seen":"2020-08","months_in_queue":74,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":["G6"]}},{"inr":"23INR0080","name":"Soda Lake Solar 2 SLF","fuel":"solar","tech":"PV","mw":201.74,"county":"Crane","zone":"WEST","poi":"138 kV Soda Lake (#76026)","entity":"Crane II Solar Electric, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-30","ia":"2022-03-23","cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-102.31368,31.19334],"method":"ERCOT bus number -> substation","subs":["Soda Lake Substation"],"codes":["SODALA"],"osm":"osm:way/1454962661"}},{"inr":"23INR0086","name":"Hanson Solar","fuel":"solar","tech":"PV","mw":398.83,"county":"Coleman","zone":"WEST","poi":"tap 345kV 1444 Brown - 11406 Central Bluff","entity":"Hanson Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-17","ia":"2023-09-20","cons_start":null,"first_seen":"2021-03","months_in_queue":67,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":191,"loc":{"pt":[-100.15481,32.11719],"method":"one end of the tapped line, matched by name in the POI","subs":["Central Bluff Substation"],"codes":["BWNSW","CBFSW"]}},{"inr":"23INR0087","name":"Kinenos Solar","fuel":"solar","tech":"PV","mw":203.17,"county":"Brooks","zone":"SOUTH","poi":"tap 345kV 8905 North Edinburg - 8455 Lon Hill","entity":"Encino del Sol Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.41181538461538,27.132915384615384],"method":"county centroid (tap midpoint fell outside the project county)","subs":["North Edinburg Substation","Lon Hill Substation"],"codes":["NEDIN","LON_HILL"]}},{"inr":"23INR0088","name":"Nockenut Springs Solar 1","fuel":"solar","tech":"PV","mw":203.17,"county":"Guadalupe","zone":"SOUTH","poi":"tap 345kV 5133 Elm Creek - 5915 STP ckt 1","entity":"Pecan Springs Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-05","ia":"2023-11-17","cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"23INR0089","name":"Donegal Solar","fuel":"solar","tech":"PV","mw":201.57,"county":"Dickens","zone":"PANHANDLE","poi":"59904 Cottonwood 345kV","entity":"HE-Cottonwood Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-11-01","ia":"2022-07-25","cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-100.87665,33.77829],"method":"ERCOT bus number -> substation","subs":["Cottonwood Substation"],"codes":["W_CW_345"],"osm":"osm:way/453589317"}},{"inr":"23INR0090","name":"Iguala Solar","fuel":"solar","tech":"PV","mw":252.37,"county":"Victoria","zone":"SOUTH","poi":"AEP South Texas Project (#5915) to Static (#8676) 345kV line","entity":"Iguala Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-02-01","ia":"2025-07-29","cons_start":null,"first_seen":"2021-06","months_in_queue":64,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":121,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"23INR0091","name":"Cascade Solar","fuel":"solar","tech":"PV","mw":171,"county":"Brazoria","zone":"COASTAL","poi":"43180 SAVANAH 345 kV","entity":"Cascade Solar Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-15","ia":"2023-04-17","cons_start":null,"first_seen":"2021-05","months_in_queue":65,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":82,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0094","name":"BRP Pyxis BESS","fuel":"battery","tech":"BA","mw":206.87,"county":"Ward","zone":"WEST","poi":"tap 138kV 1009 Yucca - 11197 Sand Tank Pod","entity":"BRP Pyxis BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-102.95501,31.58771],"method":"ERCOT bus number -> substation","subs":["Yucca Drive Switching Station"],"codes":["YUCSW"],"osm":"osm:way/803480536"}},{"inr":"23INR0104","name":"BRP Kamet BESS","fuel":"battery","tech":"BA","mw":202.46,"county":"Andrews","zone":"WEST","poi":"Andrews North – McKenzie Draw Switch 138 kV","entity":"BRP Kamet BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-102.72318,32.3483],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0116","name":"Cantaloupe Solar","fuel":"solar","tech":"PV","mw":307,"county":"Reeves","zone":"WEST","poi":"60716 Saragosa 138kV","entity":"Saragosa Del Sol Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2024-04-23","cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":147,"loc":{"pt":[-103.65301,31.04202],"method":"ERCOT bus number -> substation","subs":["Saragosa Substation"],"codes":["SGSA"],"osm":"osm:way/501036527"}},{"inr":"23INR0123","name":"Vaca Storage","fuel":"battery","tech":"BA","mw":101,"county":"Calhoun","zone":"COASTAL","poi":"138kV 8723 Cangrejo","entity":"Long Mount Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.6636911764706,28.409144117647056],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0126","name":"Sigma Storage","fuel":"battery","tech":"BA","mw":408.4,"county":"Harris","zone":"HOUSTON","poi":"40460 Deepwater 138kV","entity":"AES Distributed Energy, Inc","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-01","ia":null,"cons_start":"2028-05-01","first_seen":"2022-02","months_in_queue":56,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["DPW"]}},{"inr":"23INR0127","name":"Beacon Storage","fuel":"battery","tech":"BA","mw":408.7,"county":"Harris","zone":"HOUSTON","poi":"40450 Deepwater 345kV","entity":"AES Distributed Energy, Inc","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-01","ia":null,"cons_start":"2028-05-01","first_seen":"2022-03","months_in_queue":55,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["DPW"]}},{"inr":"23INR0135","name":"Elbus BESS","fuel":"battery","tech":"BA","mw":200.99,"county":"Caldwell","zone":"SOUTH","poi":"9075 Lytton 138kV","entity":"BRP Elbus BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2020-11","months_in_queue":71,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.67431,30.00537],"method":"ERCOT bus number -> substation","subs":["Lytton Springs Substation"],"codes":["LYTTON_S"],"osm":"osm:way/173981611"}},{"inr":"23INR0137","name":"Diran BESS","fuel":"battery","tech":"BA","mw":103,"county":"Wharton","zone":"SOUTH","poi":"43190 South Lane City 138kV","entity":"BRP Diran BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-31","ia":"2025-01-07","cons_start":null,"first_seen":"2020-11","months_in_queue":71,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":78,"loc":{"pt":[-96.01556,29.19494],"method":"ERCOT bus number -> substation","subs":["South Lane City Substation"],"codes":["LC"],"osm":"osm:way/336976542"}},{"inr":"23INR0140","name":"Seine BESS","fuel":"battery","tech":"BA","mw":308.88,"county":"Foard","zone":"WEST","poi":"60500 Edith Clarke 345kV","entity":"BRP Seine BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-01","ia":"2024-12-01","cons_start":null,"first_seen":"2020-11","months_in_queue":71,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":234,"loc":{"pt":[-99.77406,33.94427],"method":"ERCOT bus number -> substation","subs":["Edith Clarke Substation"],"codes":["EDITHCLA"],"osm":"osm:way/256153397"}},{"inr":"23INR0143","name":"Sepik BESS","fuel":"battery","tech":"BA","mw":204.96,"county":"Mitchell","zone":"WEST","poi":"tap 138kV 11342 Loraine South – 10050 Ranger Camp","entity":"BRP Sepik BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-01","ia":null,"cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["RGRSW"]}},{"inr":"23INR0163","name":"Ringtail Ridge Storage","fuel":"battery","tech":"BA","mw":100.57,"county":"Kendall","zone":"SOUTH","poi":"7150 Kendall 138kV","entity":"KCE TX 26, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-23","ia":null,"cons_start":null,"first_seen":"2021-01","months_in_queue":69,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.8867,29.98492],"method":"ERCOT bus number -> substation","subs":["Kendall Substation"],"codes":["KENDAL"],"osm":"osm:way/146741265"}},{"inr":"23INR0164","name":"Steppe Reserve Storage","fuel":"battery","tech":"BA","mw":51.9,"county":"Dimmit","zone":"SOUTH","poi":"8283 Asherton 138 kV","entity":"KCE TX 25, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-01","ia":null,"cons_start":null,"first_seen":"2021-01","months_in_queue":69,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-99.75572,28.44234],"method":"ERCOT bus number -> substation","subs":["Asherton Substation"],"codes":["ASHERTON"],"osm":"osm:relation/6697271"}},{"inr":"23INR0171","name":"Goodalta Solar","fuel":"solar","tech":"PV","mw":221.36,"county":"Navarro","zone":"NORTH","poi":"tap 138kV 3127 Trinidad - 212 Winkler","entity":"GoodAlta Power Center LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-09-20","ia":null,"cons_start":null,"first_seen":"2021-01","months_in_queue":69,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":70,"loc":{"pt":[-96.1046,32.1261],"method":"ERCOT bus number -> substation","subs":["Trinidad Substation"],"codes":["TRSES"],"osm":"osm:relation/6810017"}},{"inr":"23INR0174","name":"Campsey Wind","fuel":"wind","tech":"WT","mw":238.3,"county":"Jack","zone":"NORTH","poi":"tap 345kV 1458 Cobb - 1429 Jacksboro","entity":"RWE Clean Energy Development, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.558,"p36_basis":"24 of 43 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":133,"loc":{"pt":[-98.1068,33.27719],"method":"one end of the tapped line, matched by name in the POI","subs":["Jacksboro Substation"],"codes":["COBSW","JCKSW"]}},{"inr":"23INR0183","name":"Pradera Storage","fuel":"battery","tech":"BA","mw":153.11,"county":"Webb","zone":"SOUTH","poi":"tap 345 kV Lobo 80219 - Fowlerton 5709 ckt #2","entity":"Pradera Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-23","ia":null,"cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"23INR0194","name":"Pequin Energy Storage","fuel":"battery","tech":"BA","mw":103.4,"county":"Brazoria","zone":"COASTAL","poi":"39500 TN West Columbia 138kV","entity":"Pequin Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-09-13","ia":null,"cons_start":null,"first_seen":"2021-06","months_in_queue":64,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["WCOLMAIN"]}},{"inr":"23INR0200","name":"Paradiso BESS","fuel":"battery","tech":"BA","mw":102.3,"county":"Atascosa","zone":"SOUTH","poi":"8203 Pleasanton 138kV","entity":"VESI 13","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-15","ia":"2025-04-18","cons_start":null,"first_seen":"2021-08","months_in_queue":62,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":78,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["PLEASANT"]}},{"inr":"23INR0202","name":"Erath County Solar","fuel":"solar","tech":"PV","mw":207.4,"county":"Erath","zone":"NORTH","poi":"tap 345kV 68020 Romney1E - 68030 KopperlW","entity":"Erath County Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-01-31","ia":"2023-06-01","cons_start":null,"first_seen":"2021-03","months_in_queue":67,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":99,"loc":{"pt":[-98.67393,32.24483],"method":"ERCOT bus number -> substation","subs":["Romney Substation"],"codes":["ROMNEY"],"osm":"osm:way/454919539"}},{"inr":"23INR0207","name":"El Patrimonio Solar","fuel":"solar","tech":"PV","mw":152.32,"county":"Bexar","zone":"SOUTH","poi":"tap 138kV 5429 Trumbo - 5260 Leon Creek","entity":"Heritage Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-29","ia":"2023-12-11","cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":73,"loc":{"pt":[-98.539895,29.280235],"method":"tap between two substations (bus number + name)","subs":["Trumbo Substation","Leon Creek Switchyard"],"codes":["E4","LEON_CRK"]}},{"inr":"23INR0209","name":"Outpost Storage","fuel":"battery","tech":"BA","mw":508.1,"county":"Webb","zone":"SOUTH","poi":"345kv Avanzada7A (80235)","entity":"Hecate Energy Outpost Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-01","ia":null,"cons_start":null,"first_seen":"2021-02","months_in_queue":68,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-99.70685194805196,27.717537662337673],"method":"county centroid (substation not located)","subs":[],"codes":["AVANZADA"]}},{"inr":"23INR0214","name":"Harley Hand Storage","fuel":"battery","tech":"BA","mw":503.4,"county":"Nolan","zone":"WEST","poi":"11420 Sweetwater East 345kV","entity":"Hecate Energy Harley Hand Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-07","ia":null,"cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-100.45700000000001,32.34828],"method":"county centroid (substation not located)","subs":[],"codes":["SWESW"]}},{"inr":"23INR0215","name":"Big River Solar","fuel":"solar","tech":"PV","mw":104.35,"county":"Zapata","zone":"SOUTH","poi":"tap 138kV 8299 Zapata - 8957 Lopeno4A","entity":"Rio Grande River Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2021-05","months_in_queue":65,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-99.171595,26.810225],"method":"tap between two located substations","subs":["Zapata Substation","Lopeno Substation"],"codes":["ZAPATA","LOPENO"]}},{"inr":"23INR0216","name":"Venus Mill Storage","fuel":"battery","tech":"BA","mw":100.8,"county":"Ellis","zone":"NORTH","poi":"138 kV Tap #442 Rail Port - #1905 Griffith","entity":"AIH Texas Acquisitions, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-12-24","cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":76,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["RAILPORT"]}},{"inr":"23INR0222","name":"Sunbelt Solar","fuel":"solar","tech":"PV","mw":81.5,"county":"Kaufman","zone":"NORTH","poi":"tap 138kV 6902 Talty - 6801 Patton","entity":"Rose Hill Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-12-31","ia":null,"cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["TALTY_RC","PATN_RC"]}},{"inr":"23INR0224","name":"Morning Glory Solar","fuel":"solar","tech":"PV","mw":122.4,"county":"Tom Green","zone":"WEST","poi":"tap 345kV 7077 Amos Creek - 76009 Twin Buttes","entity":"Armadillo Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-30","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-100.59802,31.5138],"method":"ERCOT bus number -> substation","subs":["Twin Buttes Substation"],"codes":["TWINBU"],"osm":"osm:way/172174900"}},{"inr":"23INR0227","name":"Maleza Solar II","fuel":"solar","tech":"PV","mw":254.94,"county":"Wharton","zone":"SOUTH","poi":"tap Blue – Hillje 345 kv Ckt.#27","entity":"Brush Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2021-05","months_in_queue":65,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.23649,29.0297],"method":"one end of the tapped line, matched by name in the POI","subs":["Hillje Substation"],"codes":[]}},{"inr":"23INR0228","name":"Hiru Solar","fuel":"solar","tech":"PV","mw":603.7,"county":"Clay","zone":"WEST","poi":"Tap 345kV 6111 Riley - 1730 West Krum ckt 1","entity":"Hecate Energy Hazel LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-01","ia":null,"cons_start":null,"first_seen":"2021-08","months_in_queue":62,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-98.228005,33.70497],"method":"tap between two substations (bus number + name)","subs":["Riley Substation","West Krum Substation"],"codes":["RILEY","KRWSW"]}},{"inr":"23INR0229","name":"CH Solterra LLC","fuel":"solar","tech":"PV","mw":143,"county":"Hopkins","zone":"NORTH","poi":"Tap 138kV 11796 White Oak POI - 11797 Brinker POI","entity":"CH Solterra LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-05-31","ia":null,"cons_start":null,"first_seen":"2021-03","months_in_queue":67,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-95.5872457142857,33.27730285714285],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0231","name":"Hoke Solar","fuel":"solar","tech":"PV","mw":95.29,"county":"Gonzales","zone":"SOUTH","poi":"tap 138kV 7595 Deer Creek - 7621 Nixon","entity":"Hoke Solar Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-05","ia":"2022-04-25","cons_start":null,"first_seen":"2021-04","months_in_queue":66,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":46,"loc":{"pt":[-97.452375,29.522058333333334],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0232","name":"Hoke Storage","fuel":"battery","tech":"BA","mw":33.17,"county":"Gonzales","zone":"SOUTH","poi":"tap 138kV 7595 Deer Creek - 7621 Nixon","entity":"Hoke Solar Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-05","ia":"2022-04-25","cons_start":null,"first_seen":"2021-04","months_in_queue":66,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":25,"loc":{"pt":[-97.452375,29.522058333333334],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0233","name":"Earthwise Solar","fuel":"solar","tech":"PV","mw":370.5,"county":"Hardeman","zone":"WEST","poi":"Tap 345kV 60504 Tesla - 61001 Jim Treece","entity":"Quanah Solar 2","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":20,"loc":{"pt":[-99.76050000000001,34.303775],"method":"tap between two located substations","subs":["Tesla Substation","Jim Treece Substation"],"codes":["TESLA","JIMTREEC"]}},{"inr":"23INR0235","name":"Hoyte Solar","fuel":"solar","tech":"PV","mw":206.75,"county":"Milam","zone":"SOUTH","poi":"(3707) Cannon Switch 138kV","entity":"Milano Solar LLC","stage":"construction","stage_label":"Under construction (agreement signed)","cod":"2027-08-17","ia":"2022-10-14","cons_start":"2025-08-11","first_seen":"2021-04","months_in_queue":66,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":99,"loc":{"pt":[-96.77352,30.7225],"method":"EIA plant record: same name and fuel in the same county (EIA plant 70514, \"Hoyte Solar\", planned)","subs":[],"codes":["CANSW"],"eia_plant":70514}},{"inr":"23INR0237","name":"Big River BESS","fuel":"battery","tech":"BA","mw":51.26,"county":"Zapata","zone":"SOUTH","poi":"tap 138kV 8299 Zapata - 8957 Lopeno4A","entity":"Rio Grande River Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2021-05","months_in_queue":65,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-99.171595,26.810225],"method":"tap between two located substations","subs":["Zapata Substation","Lopeno Substation"],"codes":["ZAPATA","LOPENO"]}},{"inr":"23INR0244","name":"Tiger Solar","fuel":"solar","tech":"PV","mw":250.9,"county":"Jones","zone":"WEST","poi":"68004 PHANTOM HILL 345KV","entity":"Vaca Del Sol, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-26","ia":"2024-10-30","cons_start":null,"first_seen":"2021-04","months_in_queue":66,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":120,"loc":{"pt":[-99.88089,32.79692],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67357, \"Tiger Solar\", planned)","subs":[],"codes":["PHNTMHL"],"eia_plant":67357}},{"inr":"23INR0248","name":"Limewood Storage","fuel":"battery","tech":"BA","mw":50,"county":"Bell","zone":"NORTH","poi":"3420 Temple Pecan Creek 138kV","entity":"Limewood Bell Renewables LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-29","ia":"2023-02-22","cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":38,"loc":{"pt":[-97.5635916666667,31.034500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["TMPCR"]}},{"inr":"23INR0273","name":"Poco Trail Solar","fuel":"solar","tech":"PV","mw":438.75,"county":"Wilbarger","zone":"WEST","poi":"Tap 345kV 6101 Riley - 1422 Bowman\nByrd Road Switch","entity":"Eastern Trail Solar Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-02","ia":null,"cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":24,"loc":{"pt":[-99.14533,34.08526],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Riley Substation"],"codes":["RILEY","BOMSW"]}},{"inr":"23INR0278","name":"Tucana BESS","fuel":"battery","tech":"BA","mw":201.3,"county":"Andrews","zone":"WEST","poi":"1157 Andrews County South 138kV","entity":"BRP Tucana BESS LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-03-01","ia":null,"cons_start":null,"first_seen":"2021-06","months_in_queue":64,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-102.72318,32.3483],"method":"county centroid (substation not located)","subs":[],"codes":["ACSSW"]}},{"inr":"23INR0279","name":"Trivor BESS","fuel":"battery","tech":"BA","mw":205.46,"county":"Andrews","zone":"WEST","poi":"1272 Fullerton 138kV","entity":"BRP Trivor BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-01","ia":null,"cons_start":null,"first_seen":"2021-06","months_in_queue":64,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-102.72318,32.3483],"method":"county centroid (substation not located)","subs":[],"codes":["FLRSW"]}},{"inr":"23INR0283","name":"Kota Battery","fuel":"battery","tech":"BA","mw":200.8,"county":"Carson","zone":"PANHANDLE","poi":"23900 Alibates 345kV","entity":"Kota Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-31","ia":null,"cons_start":null,"first_seen":"2021-06","months_in_queue":64,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-101.35964,35.25496],"method":"ERCOT bus number -> substation","subs":["Alibates Substation"],"codes":["ALIBATES"],"osm":"osm:way/453589128"}},{"inr":"23INR0284","name":"Las Moras Battery","fuel":"battery","tech":"BA","mw":101,"county":"Kinney","zone":"SOUTH","poi":"8252 Brackett 138kV","entity":"Las Moras Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2021-06","months_in_queue":64,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-100.39235,29.32463],"method":"ERCOT bus number -> substation","subs":["Brackettville Substation"],"codes":["BRACKETT"],"osm":"osm:way/343343392"}},{"inr":"23INR0289","name":"Skull Creek Solar","fuel":"solar","tech":"PV","mw":136.98,"county":"Anderson","zone":"NORTH","poi":"Tap 138kV 3281 Tennessee Colony - 3499 Blackfoot\nMassey Lake Switch in TSP’s Pin Oak Switch - Long Lake Substation","entity":"Skull Creek Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-30","ia":"2024-05-20","cons_start":null,"first_seen":"2021-12","months_in_queue":58,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":65,"loc":{"pt":[-95.69096842105266,31.784563157894723],"method":"county centroid (substation not located)","subs":[],"codes":["TNSCL"]}},{"inr":"23INR0290","name":"Zeya BESS","fuel":"battery","tech":"BA","mw":255.33,"county":"Galveston","zone":"HOUSTON","poi":"38740 Heights 138kV","entity":"BRP Zeya BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-01","ia":"2023-01-20","cons_start":null,"first_seen":"2021-06","months_in_queue":64,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":194,"loc":{"pt":[-94.94793,29.38876],"method":"EIA plant record: same name and fuel in the same county (EIA plant 65880, \"Zeya\", planned)","subs":[],"codes":["HEIGHTTN"],"eia_plant":65880}},{"inr":"23INR0308","name":"Fowler Ranch Storage","fuel":"battery","tech":"BA","mw":26.07,"county":"Crane","zone":"WEST","poi":"76025 Castle Mountain 138kV","entity":"Crane BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-09-30","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-102.57905833333332,31.29205416666667],"method":"county centroid (substation not located)","subs":[],"codes":["CASTMO"]}},{"inr":"23INR0310","name":"Dunkel BESS","fuel":"battery","tech":"BA","mw":226.4,"county":"Lubbock","zone":"PANHANDLE","poi":"59156 Yellow House Canyon 115kV","entity":"Momentum Energy Storage Partners","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-02","ia":null,"cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":16,"loc":{"pt":[-101.87356,33.652860000000004],"method":"county centroid (substation not located)","subs":[],"codes":["LPLYH"]}},{"inr":"23INR0312","name":"Hofbrau BESS","fuel":"battery","tech":"BA","mw":180.72,"county":"Tom Green","zone":"WEST","poi":"6442 Redcreek 138kV","entity":"Momentum Hofbrau LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-100.70273333333331,31.513308333333338],"method":"county centroid (substation not located)","subs":[],"codes":["REDCREEK"]}},{"inr":"23INR0318","name":"Marcelina Storage","fuel":"battery","tech":"BA","mw":203.21,"county":"Wilson","zone":"SOUTH","poi":"Tap 345 kV 5133 Elm Creek - 5901 San Miguel","entity":"Marcelina Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2026-12-18","ia":null,"cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-98.23708500000001,29.085655000000003],"method":"tap between two substations matched by name","subs":["Elm Creek Substation","San Miguel Switchyard"],"codes":["SANMIGL"]}},{"inr":"23INR0324","name":"Lumberjack Storage","fuel":"battery","tech":"BA","mw":50.94,"county":"Cherokee","zone":"NORTH","poi":"138 kV Tap 3110 Stryker Creek -  3147 Troup","entity":"EDP Renewables North America LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-11-01","ia":"2024-03-20","cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":39,"loc":{"pt":[-95.17689583333332,31.742091666666674],"method":"county centroid (substation not located)","subs":[],"codes":["SCSES","TROUP"]}},{"inr":"23INR0330","name":"BRP Snowdon BESS","fuel":"battery","tech":"BA","mw":410.94,"county":"Briscoe","zone":"PANHANDLE","poi":"23914 Tule Canyon Substation 345kV","entity":"BRP SNOWDON BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-101.26115999999999,34.48664],"method":"county centroid (substation not located)","subs":[],"codes":["TULECNYN"]}},{"inr":"23INR0331","name":"Orange Grove BESS","fuel":"battery","tech":"BA","mw":61.39,"county":"Jim Wells","zone":"SOUTH","poi":"5660 Orange Grove Switching Station 138 kV","entity":"Talitha Energy Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-30","ia":"2022-11-30","cons_start":null,"first_seen":"2021-07","months_in_queue":63,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":47,"loc":{"pt":[-97.96141,27.91895],"method":"ERCOT bus number -> substation","subs":["Orange Grove Switching Station"],"codes":["ORNGROV"],"osm":"osm:way/489453644"}},{"inr":"23INR0334","name":"Liberty Senate Energy Storage 1","fuel":"battery","tech":"BA","mw":207.4,"county":"Jack","zone":"NORTH","poi":"1445 Burwick 345kV","entity":"Senate Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-10-27","ia":null,"cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["BURSW"]}},{"inr":"23INR0342","name":"Brizo BESS","fuel":"battery","tech":"BA","mw":144.22,"county":"Victoria","zone":"SOUTH","poi":"138 kV Loop 463 Substation (#5680)","entity":"BRP Brizo BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-01","ia":"2025-03-27","cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":109,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["L_463S"]}},{"inr":"23INR0349","name":"Tokio Solar","fuel":"solar","tech":"PV","mw":170.45,"county":"McLennan","zone":"NORTH","poi":"Tap 138kV 3592 Waco Atco - 170 Cotton Belt","entity":"Gransolar Texas Eight, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-25","ia":"2023-11-06","cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":81,"loc":{"pt":[-97.31751,31.42791],"method":"ERCOT bus number -> substation","subs":["Cotton Belt Substation"],"codes":["COTONBLT"],"osm":"osm:way/461754522"}},{"inr":"23INR0354","name":"Bordertown BESS","fuel":"battery","tech":"BA","mw":100,"county":"Starr","zone":"SOUTH","poi":"8796 Roma 138kV","entity":"Bordertown BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-01","ia":"2022-10-12","cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":76,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["ROMA"]}},{"inr":"23INR0359","name":"Crios BESS","fuel":"battery","tech":"BA","mw":205.46,"county":"Comanche","zone":"NORTH","poi":"Tap 138 kV 1649 HASSE_P8 - 1684 SABANA_8","entity":"BRP Crios BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-01","ia":null,"cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.52881111111111,31.920833333333334],"method":"county centroid (substation not located)","subs":[],"codes":["SBANA"]}},{"inr":"23INR0361","name":"Third Coast BESS","fuel":"battery","tech":"BA","mw":102.82,"county":"Jackson","zone":"SOUTH","poi":"8125 Lolita substation 138kV","entity":"Third Coast BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-15","ia":"2023-05-17","cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":78,"loc":{"pt":[-96.5574,28.85317],"method":"ERCOT bus number -> substation","subs":["Lolita Substation"],"codes":["LOLITA"],"osm":"osm:way/174252113"}},{"inr":"23INR0367","name":"Fewell Solar","fuel":"solar","tech":"PV","mw":203.5,"county":"Limestone","zone":"NORTH","poi":"Tap 138kV 3597 Groesbeck - 3634 Groesbeck Main","entity":"Fewell Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-15","ia":"2023-08-18","cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-96.54102,31.52119],"method":"one end of the tapped line, matched by name in the POI","subs":["Groesbeck Main Substation"],"codes":["GRSBK","GRSMN"]}},{"inr":"23INR0368","name":"Rocking X Solar","fuel":"solar","tech":"PV","mw":602.2,"county":"Parker","zone":"NORTH","poi":"Tap the 345 kV Parker Switch (bus#1436) – Comanche Peak SES (bus#1900) Double-Circuit line, Circuit 1.","entity":"7100 Tin Top LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-09-20","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-97.67631,32.80625],"method":"ERCOT bus number -> substation","subs":["Parker Substation"],"codes":["PKRSW"],"osm":"osm:way/171435008"}},{"inr":"23INR0376","name":"Cascade Storage","fuel":"battery","tech":"BA","mw":250,"county":"Brazoria","zone":"COASTAL","poi":"345kV Oasis (43035) – Seabreeze circuit 27","entity":"Oyster Creek LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-95.30817,29.45627],"method":"ERCOT bus number -> substation","subs":["Oasis Substation"],"codes":["OAS"],"osm":"osm:way/174317157"}},{"inr":"23INR0382","name":"Outer Loop BESS","fuel":"battery","tech":"BA","mw":201.2,"county":"Harris","zone":"HOUSTON","poi":"40700 Greens Bayou 345kV","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-06","ia":null,"cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["GBY"]}},{"inr":"23INR0392","name":"Honeycomb Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Bee","zone":"SOUTH","poi":"69 kV Tynan Substation (#8107)","entity":"Honeycomb BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-05-28","ia":"2023-05-01","cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.7723,28.1832],"method":"ERCOT bus number -> substation","subs":["Tynan Substation"],"codes":["TYNAN"],"osm":"osm:way/489376566"}},{"inr":"23INR0409","name":"Sunbelt Storage","fuel":"battery","tech":"BA","mw":52,"county":"Kaufman","zone":"NORTH","poi":"Tap 138kV 6902 Talty - 6894 Rose Hill","entity":"Rose Hill Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-12-31","ia":null,"cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["TALTY_RC"]}},{"inr":"23INR0421","name":"Bee Branch IA","fuel":"battery","tech":"BA","mw":203.75,"county":"Robertson","zone":"NORTH","poi":"Tap TNP ONE 39950 and Twin Oak 3400","entity":"Bee Branch IA LLCBee Branch IA LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-01","ia":"2026-03-13","cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":154,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"23INR0425","name":"Coneflower Storage Project","fuel":"battery","tech":"BA","mw":170.85,"county":"Chambers","zone":"HOUSTON","poi":"40855 JORDON 138 kV","entity":"Coneflower Storage Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-28","ia":"2024-03-25","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":130,"loc":{"pt":[-94.9254,29.8547],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69110, \"Coneflower Storage Project LLC\", planned)","subs":[],"codes":["JOR"],"eia_plant":69110}},{"inr":"23INR0439","name":"Lumen Farm Solar SLF","fuel":"solar","tech":"PV","mw":201.04,"county":"Anderson","zone":"NORTH","poi":"Tap 138kV 3325 Blackburn Switch – 3272 Palestine","entity":"Neches Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2022-01","months_in_queue":57,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-95.69096842105266,31.784563157894723],"method":"county centroid (substation not located)","subs":[],"codes":["BLASW","PLSTN"]}},{"inr":"23INR0441","name":"Bug Tussle Wind Project","fuel":"wind","tech":"WT","mw":396.8,"county":"Lamar","zone":"NORTH","poi":"Tap 1729 Valley South and 1692 Paris","entity":"Bug Tussle Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-18","ia":"2024-07-10","cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":296,"loc":{"pt":[-95.58098,33.63908],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Paris Substation"],"codes":["VLYSO","PRSSW"]}},{"inr":"23INR0455","name":"Bessie Storage","fuel":"battery","tech":"BA","mw":210.8,"county":"Starr","zone":"SOUTH","poi":"Charly Egner Substation Tap 345kV 80355 Del Sol - 80368 LV4 Bridge","entity":"Bessie Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-28","ia":null,"cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["DELSOL"]}},{"inr":"23INR0456","name":"Bronze Quinta Storage","fuel":"battery","tech":"BA","mw":103.51,"county":"Hidalgo","zone":"SOUTH","poi":"S_MCALLN 8371 (S. McAllen 138kV Substation)","entity":"KCE TX 28, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-01","ia":null,"cons_start":null,"first_seen":"2022-01","months_in_queue":57,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.20945806451613,26.20444516129033],"method":"county centroid (substation not located)","subs":[],"codes":["S_MCALLN"]}},{"inr":"23INR0462","name":"Palladium Storage","fuel":"battery","tech":"BA","mw":156.33,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 138 kV 8656 Luna - 8033 Pantera","entity":"Palladium Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.20945806451613,26.20444516129033],"method":"county centroid (substation not located)","subs":[],"codes":["LUNA","PANTERA"]}},{"inr":"23INR0464","name":"Sloan Storage","fuel":"battery","tech":"BA","mw":200.9,"county":"Henderson","zone":"NORTH","poi":"3179 Pauline 138kV","entity":"Sloan Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-03-27","ia":null,"cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.05013599999998,32.21809599999999],"method":"county centroid (substation not located)","subs":[],"codes":["PAULN"]}},{"inr":"23INR0466","name":"Shoshana Storage","fuel":"battery","tech":"BA","mw":221,"county":"Matagorda","zone":"COASTAL","poi":"Tap STP – Refuge ckt 27","entity":"Shoshana Storage Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-30","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":16,"loc":{"pt":[-95.83243783783784,28.936727027027025],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0467","name":"Lavender Storage Project","fuel":"battery","tech":"BA","mw":231.9,"county":"Bexar","zone":"SOUTH","poi":"Tap 138kV Deely (bus 5110) - Laredo (bus 5255)","entity":"Lavender Storage Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-09-13","ia":"2025-06-23","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":176,"loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["CALAVERS","K3"]}},{"inr":"23INR0468","name":"Petunia Storage Project","fuel":"battery","tech":"BA","mw":231.86,"county":"Milam","zone":"SOUTH","poi":"138kV Tap 3675 Rogers - 3485 Tin Roof Pod","entity":"Petunia Storage Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":16,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["ROGRS","TINPD"]}},{"inr":"23INR0469","name":"Big Elm Storage","fuel":"battery","tech":"BA","mw":120,"county":"Bell","zone":"NORTH","poi":"3404 Belfalls 345kV","entity":"Big Elm Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-15","ia":"2024-05-10","cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":91,"loc":{"pt":[-97.5635916666667,31.034500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["BLFSW"]}},{"inr":"23INR0471","name":"Ophelia Solar","fuel":"solar","tech":"PV","mw":110.5,"county":"Ector","zone":"WEST","poi":"Tap 138 kV Raceway Switch #18663 - Shin Oak POD #11128","entity":"Ophelia Solar","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-19","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["RWYSW","SOPOD"]}},{"inr":"23INR0473","name":"Sepanta Solar","fuel":"solar","tech":"PV","mw":218,"county":"Nolan","zone":"WEST","poi":"10198 ESKOTA_9 138kV\n\n (PSS/E BUS #10198, Station Name: ESKOTA_8, kV: 138 kV)\nProperty is adjacent (West) to the Oncor Sweetwater Eskota Switch #10198.  POI would simply be on the other side of the fence of the switch.","entity":"BREG - Belgian Renewable Energy Group","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-18","ia":null,"cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-100.45700000000001,32.34828],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0474","name":"AP Greenport","fuel":"battery","tech":"BA","mw":100.45,"county":"Travis","zone":"SOUTH","poi":"Austrop – Lost Pines 345 kV transmission line (Bus #7040 – 9041)","entity":"AP Greenport","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-11-19","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-97.48729,30.2513],"method":"ERCOT bus number -> substation","subs":["Austrop Substation"],"codes":["AUSTRO"],"osm":"osm:way/127245722"}},{"inr":"23INR0478","name":"Rhoda Storage","fuel":"battery","tech":"BA","mw":141.23,"county":"Milam","zone":"SOUTH","poi":"Tap 138kV 32 Robertson - 64  Milano","entity":"Milam Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-01","ia":"2025-12-31","cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":107,"loc":{"pt":[-96.86353,30.76358],"method":"one end of the tapped line, matched by name in the POI","subs":["Milano Substation"],"codes":[]}},{"inr":"23INR0479","name":"Taormina Storage","fuel":"battery","tech":"BA","mw":231.86,"county":"Bexar","zone":"SOUTH","poi":"Tap 138kV VH Braunig (5025) to Valley Road 138kV (5465)","entity":"Taormina Storage Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-05-26","ia":"2025-04-14","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":176,"loc":{"pt":[-98.38268,29.25803],"method":"ERCOT bus number -> substation","subs":["Braunig Switchyard"],"codes":["BRAUNIG"],"osm":"osm:way/319115059"}},{"inr":"23INR0480","name":"Camellia Storage","fuel":"battery","tech":"BA","mw":90.76,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 138 kV 8358\nNORTH MERCEDES -\n8327 HARLINGEN 138 kV","entity":"Camellia Storage Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-97.91185,26.23058],"method":"ERCOT bus number -> substation","subs":["North Mercedes Substation"],"codes":["N_MERCED"],"osm":"osm:way/513282723"}},{"inr":"23INR0485","name":"Hacienda Storage","fuel":"battery","tech":"BA","mw":205.8,"county":"Galveston","zone":"HOUSTON","poi":"38745 Attwater 138kV","entity":"Galveston Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-94.88558831168828,29.4265025974026],"method":"county centroid (substation not located)","subs":[],"codes":["ATTWATER"]}},{"inr":"23INR0486","name":"Lamar Unit 1 Repower","fuel":"gas","tech":"CC","mw":66,"county":"Lamar","zone":"NORTH","poi":"1692 Paris Switch Station 345kV","entity":"La Frontera Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-18","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["PRSSW"]}},{"inr":"23INR0487","name":"Brightside Solar Alt POI","fuel":"solar","tech":"PV","mw":50,"county":"Live Oak","zone":"SOUTH","poi":"8156 Charter Substation 138kV","entity":"Brightside Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-08-14","ia":"2020-06-11","cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":24,"loc":{"pt":[-98.03055384615384,28.31636923076923],"method":"county centroid (substation not located)","subs":[],"codes":["CHARTER"]}},{"inr":"23INR0495","name":"Cartwheel BESS 2","fuel":"battery","tech":"BA","mw":156.91,"county":"Hopkins","zone":"NORTH","poi":"Tap 345kV 1697 Sulphur Springs Switch –  2464 Cash Switch","entity":"RWE Renewables","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-15","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-95.5872457142857,33.27730285714285],"method":"county centroid (substation not located)","subs":[],"codes":["SSPSW","CSHSW"]}},{"inr":"23INR0502","name":"Adelite Storage","fuel":"battery","tech":"BA","mw":231.88,"county":"Milam","zone":"SOUTH","poi":"Tap 138kV Thorndale North (bus #3659) – Rookie Switch (bus #3701)","entity":"Adelite Storage Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-20","ia":"2024-08-27","cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":176,"loc":{"pt":[-97.2105,30.62238],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69004, \"Adelite Storage Project LLC\", planned)","subs":[],"codes":["THRDN","ROKSW"],"eia_plant":69004}},{"inr":"23INR0503","name":"Ardesia Storage","fuel":"battery","tech":"BA","mw":100,"county":"Caldwell","zone":"SOUTH","poi":"Tap 138kV 7325 Mendoza - 7216 Lockhart","entity":"Ardesia Storage Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-29","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-97.664435,29.937170000000002],"method":"tap between two located substations","subs":["Mendoza Substation","Lockhart Substation"],"codes":["MENDOZ","LOCKHA"]}},{"inr":"23INR0561","name":"Cascabel Wind 2","fuel":"wind","tech":"WT","mw":197.75,"county":"Zapata","zone":"SOUTH","poi":"345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307).","entity":"Vaquero Wind Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-01","ia":"2025-05-23","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":148,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"23INR0637","name":"Goodnight Wind II","fuel":"wind","tech":"WT","mw":261.1,"county":"Armstrong","zone":"PANHANDLE","poi":"tap 345kV 23900 Alibates - 23914 Tule Canyon CKT2","entity":"FGE Goodnight II, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-06","ia":"2019-08-18","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":195,"loc":{"pt":[-101.35964,35.25496],"method":"ERCOT bus number -> substation","subs":["Alibates Substation"],"codes":["ALIBATES"],"osm":"osm:way/453589128"}},{"inr":"23INR0794","name":"Invictus Energy Storage","fuel":"battery","tech":"BA","mw":140.53,"county":"Coleman","zone":"WEST","poi":"6390 FIREROCK4A 138kV","entity":"GSA Land Holdings","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-99.50518541666666,31.51291458333333],"method":"county centroid (substation not located)","subs":[],"codes":["FIREROCK"]}},{"inr":"24INR0003","name":"Stem Solar","fuel":"solar","tech":"PV","mw":200,"county":"Swisher","zone":"PANHANDLE","poi":"tap 345kV 23914 Tule Canyon - 23912 Ogallala","entity":"Innovative Solar 134, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2025-08-26","ia":null,"cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-102.03869,34.51974],"method":"ERCOT bus number -> substation","subs":["Ogallala Switching Station"],"codes":["OGALLALA"],"osm":"osm:way/453589277"}},{"inr":"24INR0007","name":"Nockenut Springs Solar 2","fuel":"solar","tech":"PV","mw":203.26,"county":"Guadalupe","zone":"SOUTH","poi":"tap 345kV 5133 Elm Creek - 5915 STP ckt 1","entity":"Pecan Springs Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-05","ia":"2023-11-17","cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"24INR0011","name":"Pinnington Storage","fuel":"battery","tech":"BA","mw":502.67,"county":"Jack","zone":"NORTH","poi":"tap both 345kV 1430 Graham - 1436 Parker 345kV lines","entity":"Hecate Energy Longhorn Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-20","ia":null,"cons_start":null,"first_seen":"2020-12","months_in_queue":70,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-97.67631,32.80625],"method":"ERCOT bus number -> substation","subs":["Parker Substation"],"codes":["PKRSW"],"osm":"osm:way/171435008"}},{"inr":"24INR0020","name":"Percy Farm Solar","fuel":"solar","tech":"PV","mw":198.63,"county":"Matagorda","zone":"COASTAL","poi":"Tap 345kV 8123 Blessing - 5915 STP","entity":"Percy Farm Solar 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-31","ia":null,"cons_start":null,"first_seen":"2021-07","months_in_queue":63,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.120485,28.843035],"method":"tap between two located substations","subs":["Blessing Substation","South Texas Project Switchyard"],"codes":["BLESSING","STP"]}},{"inr":"24INR0038","name":"Jaguar Solar","fuel":"solar","tech":"PV","mw":300.87,"county":"McLennan","zone":"NORTH","poi":"Tap 345kV 13405 Tradinghouse SES - 68090 Sam Switch","entity":"PP Jaguar Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-01","ia":"2022-09-12","cons_start":null,"first_seen":"2021-07","months_in_queue":63,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":144,"loc":{"pt":[-97.01809,31.8977],"method":"one end of the tapped line, matched by name in the POI","subs":["Sam Switching Station"],"codes":["THSES","SAMSW"]}},{"inr":"24INR0041","name":"Rock N' Roll Solar SLF","fuel":"solar","tech":"PV","mw":151.97,"county":"Brazoria","zone":"COASTAL","poi":"tap 138kV 44600 Rosharon - 44531 Winmil","entity":"Rock N’ Roll Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-08-30","ia":null,"cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-95.42966,29.35371],"method":"ERCOT bus number -> substation","subs":["Rosharon Substation"],"codes":["RZ"],"osm":"osm:way/339232125"}},{"inr":"24INR0058","name":"Briggs Storage","fuel":"battery","tech":"BA","mw":336,"county":"Haskell","zone":"WEST","poi":"tap 345kV 60515 Clear Crossing - 60507 Pendulo","entity":"IP Quantum III, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-15","ia":"2025-03-15","cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":255,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"24INR0059","name":"Cuchillas Solar","fuel":"solar","tech":"PV","mw":305.6,"county":"Webb","zone":"SOUTH","poi":"80219 Lobo 345kV","entity":"Gransolar Texas Two, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-15","ia":"2023-06-20","cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":146,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"24INR0065","name":"Keys Hollow Solar Phase II SLF","fuel":"solar","tech":"PV","mw":200.85,"county":"Goliad","zone":"SOUTH","poi":"345kV Tap 8164 Coleto Creek - 8673  RAPTOR7A","entity":"Keys Hollow Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-10","ia":"2024-10-29","cons_start":null,"first_seen":"2021-07","months_in_queue":63,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-97.21284,28.71689],"method":"ERCOT bus number -> substation","subs":["Coleto Creek Substation"],"codes":["COLETO"],"osm":"osm:way/174682092"}},{"inr":"24INR0066","name":"Keys Hollow Storage Phase II SLF","fuel":"battery","tech":"BA","mw":0,"county":"Goliad","zone":"SOUTH","poi":"345kV Tap 8164 Coleto Creek - 8673  RAPTOR7A","entity":"Keys Hollow Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-10","ia":"2024-10-29","cons_start":null,"first_seen":"2022-01","months_in_queue":57,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.21284,28.71689],"method":"ERCOT bus number -> substation","subs":["Coleto Creek Substation"],"codes":["COLETO"],"osm":"osm:way/174682092"}},{"inr":"24INR0067","name":"KEYS HOLLOW SOLAR SLF","fuel":"solar","tech":"PV","mw":200.85,"county":"Goliad","zone":"SOUTH","poi":"TAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673","entity":"Keys Hollow Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-10","ia":"2024-10-29","cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-97.21284,28.71689],"method":"ERCOT bus number -> substation","subs":["Coleto Creek Substation"],"codes":["COLETO"],"osm":"osm:way/174682092"}},{"inr":"24INR0068","name":"KEYS HOLLOW STORAGE SLF","fuel":"battery","tech":"BA","mw":0,"county":"Goliad","zone":"SOUTH","poi":"TAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673","entity":"Keys Hollow Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-10","ia":"2024-10-29","cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.21284,28.71689],"method":"ERCOT bus number -> substation","subs":["Coleto Creek Substation"],"codes":["COLETO"],"osm":"osm:way/174682092"}},{"inr":"24INR0069","name":"Triple B Solar Alt#2","fuel":"solar","tech":"PV","mw":150,"county":"Lampasas","zone":"NORTH","poi":"Tap 138kV 7066 Adamsville - 7064 Lampasas","entity":"Triple B Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-98.171525,31.15714],"method":"tap between two located substations","subs":["Adamsville Substation","Lampasas Substation"],"codes":["ADAMSV","LAMPAS"]}},{"inr":"24INR0075","name":"Blue Bird Solar","fuel":"solar","tech":"PV","mw":425.97,"county":"Johnson","zone":"NORTH","poi":"tap 345kV 1880 Rocky Creek - 1898 Mitchell Bend Switch","entity":"Gigawatt Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-15","ia":"2024-01-18","cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":204,"loc":{"pt":[-97.48704615384615,32.26763076923077],"method":"county centroid (substation not located)","subs":[],"codes":["RKCRK","MBDSW"]}},{"inr":"24INR0077","name":"Quarter Ranch Solar","fuel":"solar","tech":"PV","mw":154.12,"county":"Zapata","zone":"SOUTH","poi":"80223 Cenizo Substation 345kV","entity":"Gransolar Texas Three LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-15","ia":null,"cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-99.33245116279073,26.98322558139536],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0081","name":"SANJAC BESS","fuel":"battery","tech":"BA","mw":202.37,"county":"Harris","zone":"HOUSTON","poi":"40270 Riverside 138kV","entity":"Castleman Power","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-04-04","ia":null,"cons_start":null,"first_seen":"2021-07","months_in_queue":63,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["RVR"]}},{"inr":"24INR0086","name":"Pisgah Ridge Solar 2","fuel":"solar","tech":"PV","mw":101.89,"county":"Navarro","zone":"NORTH","poi":"Tap 345kV 68091 Navarro - 46020 Limestone","entity":"Pisgah Ridge Solar 2, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.518,31.96399],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Navarro Switching Station"],"codes":["NAVARRO","LEG"]}},{"inr":"24INR0087","name":"Pisgah Ridge Storage 3","fuel":"battery","tech":"BA","mw":101.36,"county":"Navarro","zone":"NORTH","poi":"Tap 345kV 68091 Navarro - 46020 Limestone","entity":"Pisgah Ridge 3, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.518,31.96399],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Navarro Switching Station"],"codes":["NAVARRO","LEG"]}},{"inr":"24INR0094","name":"Dovetail Solar 1","fuel":"solar","tech":"PV","mw":666.1,"county":"Jack","zone":"NORTH","poi":"Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing Ckt 2","entity":"Hecate Energy Dovetail Solar 1 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-12","ia":null,"cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Clear Crossing Substation","Willow Creek Substation"],"codes":["WCSWS","CLEARCRO"]}},{"inr":"24INR0095","name":"Dovetail Solar 2","fuel":"solar","tech":"PV","mw":666.1,"county":"Jack","zone":"NORTH","poi":"Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing","entity":"Hecate Energy Dovetail Solar 2 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-20","ia":null,"cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Clear Crossing Substation","Willow Creek Substation"],"codes":["WCSWS","CLEARCRO"]}},{"inr":"24INR0097","name":"Dovetail Solar 3","fuel":"solar","tech":"PV","mw":666.1,"county":"Jack","zone":"NORTH","poi":"Tap 345kV 1421 Willow Creek – 11523 THOMPRIC","entity":"Hecate Energy Dovetail Solar Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-20","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["WCSWS","TOMSW"]}},{"inr":"24INR0098","name":"Dovetail Storage","fuel":"battery","tech":"BA","mw":508.7,"county":"Jack","zone":"NORTH","poi":"Tap 345 KV 1421 Willow Creek-60515 Clear Crossing CKT#2","entity":"Hecate Energy Dovetail Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-12","ia":null,"cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"24INR0102","name":"Val Vista Grid BESS 2","fuel":"battery","tech":"BA","mw":210.56,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 345kV 8383 North Edinburg - 80137 Stewart Road","entity":"Val Vista Grid, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-30","ia":"2025-12-31","cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":160,"loc":{"pt":[-98.18922,26.34411],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["North Edinburg Substation"],"codes":["NEDIN","STEWART"]}},{"inr":"24INR0104","name":"Braswell Solar","fuel":"solar","tech":"PV","mw":42.6,"county":"McLennan","zone":"NORTH","poi":"Tap 69kV 147 Lorena - 3580 Eddy Substation (Will be converted to 138kV line before 3/14/25 per TSP)","entity":"Gransolar Texas Nine, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-15","ia":null,"cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-97.21786,31.34904],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67772, \"Braswell Solar\", planned)","subs":[],"codes":[],"eia_plant":67772}},{"inr":"24INR0106","name":"Payne Battlecreek","fuel":"solar","tech":"PV","mw":84.99,"county":"Hill","zone":"NORTH","poi":"tap 138kV 213 Haney - 3515 Hubbard","entity":"Gransolar Texas Ten, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-25","ia":"2024-02-23","cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":41,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["HAN1","HUBRD"]}},{"inr":"24INR0108","name":"Louisa Energy Storage","fuel":"battery","tech":"BA","mw":102.77,"county":"Bexar","zone":"SOUTH","poi":"138 kV Helotes (#5200)","entity":"VESI 49 LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-12","ia":"2025-02-27","cons_start":null,"first_seen":"2021-12","months_in_queue":58,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":78,"loc":{"pt":[-98.68187,29.54818],"method":"ERCOT bus number -> substation","subs":["Helotes Substation"],"codes":["H3"],"osm":"osm:way/97043744"}},{"inr":"24INR0117","name":"Utley Solar","fuel":"solar","tech":"PV","mw":221.78,"county":"Freestone","zone":"NORTH","poi":"Tap 345kV 3381 Big Brown Switch - 3391 Jewett","entity":"Palmera Solar Development, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-11","ia":"2025-12-18","cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":106,"loc":{"pt":[-96.13342,31.37105],"method":"ERCOT bus number -> substation","subs":["Jewett Substation"],"codes":["JEWET"],"osm":"osm:way/99932982"}},{"inr":"24INR0118","name":"Possum Kingdom Solar","fuel":"solar","tech":"PV","mw":262.22,"county":"Jack","zone":"NORTH","poi":"Tap 345kV 1421 Willow Creek Switch – 11523 Thomas Price","entity":"PK Solar, LLC","stage":"construction","stage_label":"Under construction (agreement signed)","cod":"2028-06-21","ia":"2025-07-25","cons_start":"2025-05-01","first_seen":"2022-05","months_in_queue":53,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":125,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["WCSWS","TOMSW"]}},{"inr":"24INR0120","name":"Eytcheson Ranches Solar","fuel":"solar","tech":"PV","mw":76.42,"county":"Navarro","zone":"NORTH","poi":"Tap 69kV 186 Navarro Mills – 107 Prairie Hill","entity":"Gransolar Texas Fourteen, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-01","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.77497,31.65213],"method":"ERCOT bus number -> substation","subs":["Prairie Hill Substation"],"codes":["PRA"],"osm":"osm:way/461754867"}},{"inr":"24INR0124","name":"High Noon Solar","fuel":"solar","tech":"PV","mw":182,"county":"Hill","zone":"NORTH","poi":"Tap 138kV 445 Yates - 444 Covington","entity":"High Noon Solar Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-15","ia":"2024-05-03","cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":87,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["YATES","COV"]}},{"inr":"24INR0125","name":"Grasshopper Solar","fuel":"solar","tech":"PV","mw":407.68,"county":"Haskell","zone":"WEST","poi":"Smoky Hill Sub (Bus #6104) 345kV","entity":"Grasshopper Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-01","ia":null,"cons_start":null,"first_seen":"2021-09","months_in_queue":61,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-99.7829,33.22218],"method":"county centroid (substation not located)","subs":[],"codes":["SMOKYHIL"]}},{"inr":"24INR0126","name":"High Noon Storage","fuel":"battery","tech":"BA","mw":94,"county":"Hill","zone":"NORTH","poi":"Tap 138kV 445 Yates - 444 Covington","entity":"High Noon Solar Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-09","ia":"2024-05-08","cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":71,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["YATES","COV"]}},{"inr":"24INR0127","name":"Naduah Solar","fuel":"solar","tech":"PV","mw":77.6,"county":"Limestone","zone":"NORTH","poi":"Tap 69kV Ben Hur (99) - Prairie Hill (107)","entity":"Gransolar Texas Fifteen, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-15","ia":null,"cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.77497,31.65213],"method":"ERCOT bus number -> substation","subs":["Prairie Hill Substation"],"codes":["PRA"],"osm":"osm:way/461754867"}},{"inr":"24INR0131","name":"Zelus BESS","fuel":"battery","tech":"BA","mw":201.03,"county":"Zapata","zone":"SOUTH","poi":"the 138 kV Zapata Substation (#8299; AEP)","entity":"BRP Zelus BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2021-12","months_in_queue":58,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.23371,26.93283],"method":"ERCOT bus number -> substation","subs":["Zapata Substation"],"codes":["ZAPATA"],"osm":"osm:way/21399591"}},{"inr":"24INR0134","name":"BRP Hemera BESS","fuel":"battery","tech":"BA","mw":206.96,"county":"Deaf Smith","zone":"PANHANDLE","poi":"345 kV Deaf Smith Substation (#23908, Oncor)","entity":"BRP Hemera BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2021-12","months_in_queue":58,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-102.69286000000002,34.9217],"method":"county centroid (substation not located)","subs":[],"codes":["DEAFSMIT"]}},{"inr":"24INR0135","name":"BRP Mekong BESS","fuel":"battery","tech":"BA","mw":409.88,"county":"Robertson","zone":"NORTH","poi":"Tap 345 kV line from Twin Oak Switch (#3400) to TPN One Plant Switchyard (#39950)","entity":"BRP Mekong BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2021-12","months_in_queue":58,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"24INR0136","name":"Eagle Springs Storage","fuel":"battery","tech":"BA","mw":33.94,"county":"Delta","zone":"NORTH","poi":"Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line","entity":"Eagle Springs BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-12","ia":"2024-04-17","cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":26,"loc":{"pt":[-95.59247777777776,33.382372222222216],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0137","name":"Eagle Springs Solar","fuel":"solar","tech":"PV","mw":77.21,"county":"Delta","zone":"NORTH","poi":"Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line","entity":"Eagle Springs Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-12","ia":"2024-04-17","cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-95.57444,33.43326],"method":"EIA plant record: same name and fuel in the same county (EIA plant 66341, \"Eagle Springs Hybrid\", planned)","subs":[],"codes":[],"eia_plant":66341}},{"inr":"24INR0142","name":"De Los Santos","fuel":"battery","tech":"BA","mw":200.97,"county":"Maverick","zone":"SOUTH","poi":"78016 Sunglow Substation 138kV","entity":"BRP De Los Santos BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.45602340425532,28.661644680851072],"method":"county centroid (substation not located)","subs":[],"codes":["SUNGLO"]}},{"inr":"24INR0145","name":"Calpine Guadalupe Peakers","fuel":"gas","tech":"GT","mw":450,"county":"Guadalupe","zone":"SOUTH","poi":"7044 Marion 345kV","entity":"Guadalupe Peaking Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-30","ia":null,"cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":146,"loc":{"pt":[-98.14876,29.62083],"method":"ERCOT bus number -> substation","subs":["Marion Substation"],"codes":["MARION"],"osm":"osm:way/174246028"}},{"inr":"24INR0150","name":"Lupinus Solar 1","fuel":"solar","tech":"PV","mw":162.31,"county":"Franklin","zone":"NORTH","poi":"Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES","entity":"Lupinus Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-13","ia":"2025-06-26","cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":78,"loc":{"pt":[-95.25692,30.30339],"method":"EIA plant record: same name and fuel in the same county (EIA plant 66895, \"Lupinus Solar 1, LLC\", planned)","subs":[],"codes":["WDDSW","MNSES"],"eia_plant":66895}},{"inr":"24INR0153","name":"Lupinus Storage 1","fuel":"battery","tech":"BA","mw":84.01,"county":"Franklin","zone":"NORTH","poi":"Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES","entity":"Lupinus Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-09-13","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-95.21255333333333,33.22530666666667],"method":"county centroid (substation not located)","subs":[],"codes":["WDDSW","MNSES"]}},{"inr":"24INR0154","name":"Lupinus Solar 2","fuel":"solar","tech":"PV","mw":242.31,"county":"Franklin","zone":"NORTH","poi":"Hagansport Switch (old Monticello Tap bus# 1794)","entity":"Lupinus Solar 2, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-03","ia":"2025-03-04","cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":116,"loc":{"pt":[-95.25692,30.30339],"method":"EIA plant record: same name and fuel in the same county (EIA plant 66896, \"Lupinus Solar 2, LLC\", planned)","subs":[],"codes":["MNTTP"],"eia_plant":66896}},{"inr":"24INR0155","name":"Lupinus Storage 2","fuel":"battery","tech":"BA","mw":124.55,"county":"Franklin","zone":"NORTH","poi":"Hagansport Switch (old Monticello Tap bus# 1794)","entity":"Lupinus Solar 2, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-03","ia":"2025-03-04","cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":94,"loc":{"pt":[-95.21255333333333,33.22530666666667],"method":"county centroid (substation not located)","subs":[],"codes":["MNTTP"]}},{"inr":"24INR0156","name":"Moonstone Solar Project","fuel":"solar","tech":"PV","mw":174.97,"county":"Wilson","zone":"SOUTH","poi":"Tap 138kV Eagle Creek (5132) to Floresville (5155)","entity":"Moon Stone Solar Farm, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-31","ia":"2025-02-17","cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":84,"loc":{"pt":[-98.15424,29.14118],"method":"ERCOT bus number -> substation","subs":["Floresville Substation"],"codes":["C3"],"osm":"osm:way/230619874"}},{"inr":"24INR0157","name":"Merope BESS","fuel":"battery","tech":"BA","mw":412.16,"county":"Comanche","zone":"NORTH","poi":"345 kV Corn Trail Switch Substation (#11441)","entity":"BRP Merope BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-01","ia":null,"cons_start":null,"first_seen":"2021-12","months_in_queue":58,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-98.66365,31.81883],"method":"substation matched by name in the POI","subs":["Corn Trail Switching Station"],"codes":["CTLSW"]}},{"inr":"24INR0160","name":"Huisache Solar","fuel":"solar","tech":"PV","mw":125.59,"county":"Wilson","zone":"SOUTH","poi":"Tapping the Elm Creek to Shaula circuit 1","entity":"Huisache Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-30","ia":"2025-08-12","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":60,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0161","name":"Miranda Solar Project","fuel":"solar","tech":"PV","mw":261.67,"county":"McMullen","zone":"SOUTH","poi":"Tap 345kV 5709 Fowlerton - 5901 San Miguel Ckt 1","entity":"Miranda Solar Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-06","ia":"2024-07-16","cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":125,"loc":{"pt":[-98.47431,28.70401],"method":"one end of the tapped line, matched by name in the POI","subs":["San Miguel Switchyard"],"codes":["FOWLRTON","SANMIGL"]}},{"inr":"24INR0167","name":"SunRoper","fuel":"solar","tech":"PV","mw":265.1,"county":"Wharton","zone":"SOUTH","poi":"tap138kV #43190 South Lane City to #42985 Dyann  CKT#60","entity":"SunRoper LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-01","ia":"2025-07-10","cons_start":null,"first_seen":"2021-11","months_in_queue":59,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":127,"loc":{"pt":[-96.042945,29.242085],"method":"tap between two substations (bus number + name)","subs":["South Lane City Substation","Dyann Substation"],"codes":["LC","DYN"]}},{"inr":"24INR0168","name":"Tejano Storage","fuel":"battery","tech":"BA","mw":152.31,"county":"Victoria","zone":"SOUTH","poi":"Tap 138kV 8125 Lolita - 8172 Victoria","entity":"Tejano Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.78395,28.819935],"method":"tap between two located substations","subs":["Lolita Substation","Victoria Switching Station"],"codes":["LOLITA","VICTORIA"]}},{"inr":"24INR0169","name":"Yaupon Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Milam","zone":"SOUTH","poi":"to Tap 345 kV Gibson Switch (3706) – TNP One (39950)","entity":"Yaupon Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2023-09-28","cons_start":null,"first_seen":"2022-01","months_in_queue":57,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"24INR0172","name":"Smith Lake Solar DC","fuel":"solar","tech":"PV","mw":402,"county":"Grimes","zone":"NORTH","poi":"TAP 345 KV  44645 SINGLETON - 44900 ZENITH Ckt #99","entity":"Smith Lake Solar","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-29","ia":"2025-12-30","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":192,"loc":{"pt":[-95.87524,30.285690000000002],"method":"tap between two substations (bus number + name)","subs":["Singleton Substation","Zenith Substation"],"codes":["SNG","ZEN"]}},{"inr":"24INR0174","name":"Solar Star North Herty Storage","fuel":"battery","tech":"BA","mw":125.9,"county":"Angelina","zone":"NORTH","poi":"3307 Redland Switch 138 kV","entity":"Solar Star North Herty Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-06","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-94.64201866666667,31.276913333333336],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0178","name":"Cumulus Grid BESS","fuel":"battery","tech":"BA","mw":210.74,"county":"Ellis","zone":"NORTH","poi":"1906 Venus Switch Substation 345kV","entity":"Cumulus Grid, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-01","ia":"2025-06-03","cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":160,"loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"24INR0182","name":"DeSpain Solar Project","fuel":"solar","tech":"PV","mw":236.17,"county":"Kinney","zone":"SOUTH","poi":"7425 Odlaw Switch 138kV","entity":"Gransolar Texas Thirteen LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-11","ia":null,"cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-100.2098,29.28226],"method":"EIA plant record: same name and fuel in the same county (EIA plant 66421, \"Despain Solar\", planned)","subs":[],"codes":["ODLASW"],"eia_plant":66421}},{"inr":"24INR0184","name":"Slate Solar Project","fuel":"solar","tech":"PV","mw":104.89,"county":"Zapata","zone":"SOUTH","poi":"Tap 138kV 8646 Rio Bravo - 8985 San Ygancio","entity":"Ignis TX Solar Three LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-01-15","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-99.41952,27.31383],"method":"ERCOT bus number -> substation","subs":["Rio Brava Substation"],"codes":["RIO_BRAV"],"osm":"osm:way/451971721"}},{"inr":"24INR0186","name":"Rowdy Creek Solar","fuel":"solar","tech":"PV","mw":351.78,"county":"Lamar","zone":"NORTH","poi":"Woodfin Switch (#1465) 345kV","entity":"Rowdy Creek Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-29","ia":"2025-05-02","cons_start":null,"first_seen":"2022-01","months_in_queue":57,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":168,"loc":{"pt":[-95.6458,33.75694],"method":"EIA plant record: same name and fuel in the same county (EIA plant 65854, \"Rowdy Creek Solar and BESS\", planned)","subs":[],"codes":[],"eia_plant":65854}},{"inr":"24INR0188","name":"Tehuacana Creek Solar","fuel":"solar","tech":"PV","mw":505.43,"county":"Navarro","zone":"NORTH","poi":"Tap 345kV 3381 Big Brown – 68091 Navarro circuit","entity":"Tehuacana Creek Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-05-18","ia":"2024-11-25","cons_start":null,"first_seen":"2021-12","months_in_queue":58,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":242,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"24INR0198","name":"Two Forks BESS","fuel":"battery","tech":"BA","mw":309.8,"county":"Cooke","zone":"NORTH","poi":"684 SPRING 138kV","entity":"Two Forks LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-01","ia":"2024-05-03","cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":235,"loc":{"pt":[-97.19572000000001,33.82535636363637],"method":"county centroid (substation not located)","subs":[],"codes":["SPR"]}},{"inr":"24INR0200","name":"White Tail Solar","fuel":"solar","tech":"PV","mw":226.8,"county":"Deaf Smith","zone":"PANHANDLE","poi":"Tap 345kV Windmill (23910) – AJ Swope (23906)","entity":"Mule Deer Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-29","ia":null,"cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-102.17737,35.043445000000006],"method":"tap between two located substations","subs":["Windmill Substation","AJ Swope Substation"],"codes":["WINDMILL","AJ_SWOPE"]}},{"inr":"24INR0201","name":"Short Creek Solar","fuel":"solar","tech":"PV","mw":627.81,"county":"Wichita","zone":"WEST","poi":"Tap 345kV 6101 Riley - 1425 Fisher Road Switch Ckt 1","entity":"Wichita Solar I, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-17","ia":"2024-10-02","cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":300,"loc":{"pt":[-98.787385,33.985879999999995],"method":"tap between two substations (bus number + name)","subs":["Riley Substation","Fisher Road Substation"],"codes":["RILEY","FSHSW"]}},{"inr":"24INR0205","name":"Wensowitch Solar","fuel":"solar","tech":"PV","mw":146.08,"county":"Navarro","zone":"NORTH","poi":"Tapping 138 kV line Telico (192) to Montfort Switch (3454)","entity":"Greenalia Solar Power Wensowitch LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-17","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":46,"loc":{"pt":[-96.37123,32.30026],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67567, \"Wensowitch Solar Park\", planned)","subs":[],"codes":["TLC","MTFSW"],"eia_plant":67567}},{"inr":"24INR0206","name":"Glasgow Solar","fuel":"solar","tech":"PV","mw":203.5,"county":"Navarro","zone":"NORTH","poi":"Tap 345kV #2466 Big Onion  - #68091 Navarro","entity":"Glasgow Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-16","ia":"2023-11-08","cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"24INR0207","name":"Glasgow Storage","fuel":"battery","tech":"BA","mw":101,"county":"Navarro","zone":"NORTH","poi":"Tap 345kV #2466 Big Onion  - #68091 Navarro","entity":"Glasgow Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-16","ia":"2023-11-08","cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":77,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"24INR0234","name":"Rock N' Roll Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Brazoria","zone":"COASTAL","poi":"tap 138kV 44600 Rosharon - 44531 Winmil","entity":"Rock N’ Roll Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-01","ia":null,"cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.42966,29.35371],"method":"ERCOT bus number -> substation","subs":["Rosharon Substation"],"codes":["RZ"],"osm":"osm:way/339232125"}},{"inr":"24INR0235","name":"Rock N' Roll Storage Two","fuel":"battery","tech":"BA","mw":206,"county":"Brazoria","zone":"COASTAL","poi":"tap 138kV 44600 Rosharon - 44531 Winmil","entity":"Rock N’ Roll Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-08-30","ia":null,"cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-95.42966,29.35371],"method":"ERCOT bus number -> substation","subs":["Rosharon Substation"],"codes":["RZ"],"osm":"osm:way/339232125"}},{"inr":"24INR0238","name":"Appaloosa Run BESS","fuel":"battery","tech":"BA","mw":103,"county":"Upton","zone":"WEST","poi":"New Palouse 138kV (#60278)","entity":"APPALOOSA RUN STORAGE, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-08-30","ia":null,"cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0239","name":"Trojan BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Cooke","zone":"NORTH","poi":"11735 Cedar Elm Switch 345kV","entity":"Trojan BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.19572000000001,33.82535636363637],"method":"county centroid (substation not located)","subs":[],"codes":["CDESW"]}},{"inr":"24INR0256","name":"Kennedy Solar","fuel":"solar","tech":"PV","mw":101.5,"county":"Navarro","zone":"NORTH","poi":"Tap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro","entity":"Kennedy Bypass Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"24INR0258","name":"Zeissel Solar","fuel":"solar","tech":"PV","mw":451.52,"county":"Knox","zone":"WEST","poi":"#60094 Joule 345kV","entity":"ZSS Power, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2024-02-24","cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":216,"loc":{"pt":[-99.66815882352941,33.776994117647064],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0262","name":"Lan Battery SLF","fuel":"battery","tech":"BA","mw":0,"county":"Lamar","zone":"NORTH","poi":"Tap 345kV 1729 Valley South – 1692 Paris Switch","entity":"BR Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-26","ia":null,"cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.58098,33.63908],"method":"one end of the tapped line, matched by name in the POI","subs":["Paris Substation"],"codes":["VLYSO","PRSSW"]}},{"inr":"24INR0269","name":"Bar Candela Solar SLF","fuel":"solar","tech":"PV","mw":200.3,"county":"Freestone","zone":"NORTH","poi":"Long Lake Sub (Bus 3280) – Long Lake Tap Switch (Bus 3279)","entity":"Bar Candela Solar Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-05-16","ia":"2025-05-06","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-95.98603142857144,31.80864857142857],"method":"county centroid (substation not located)","subs":[],"codes":["LNGLK"]}},{"inr":"24INR0271","name":"Bar Candela Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Freestone","zone":"NORTH","poi":"Long Lake Sub (Bus 3280) – Long Lake Tap Switch (Bus 3279)","entity":"Bar Candela Storage Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-05-16","ia":"2025-05-06","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.98603142857144,31.80864857142857],"method":"county centroid (substation not located)","subs":[],"codes":["LNGLK"]}},{"inr":"24INR0274","name":"Bufflehead BESS","fuel":"battery","tech":"BA","mw":153.77,"county":"Collin","zone":"NORTH","poi":"2475 Lavon Switch 138kV","entity":"Boxcar Energy Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-15","ia":"2024-04-10","cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":117,"loc":{"pt":[-96.55485714285714,33.20755714285714],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0275","name":"Picadillo BESS","fuel":"battery","tech":"BA","mw":100.83,"county":"Martin","zone":"WEST","poi":"23837 Buffalo 138kV","entity":"Black Mountain Energy Storage II","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-15","ia":"2024-01-23","cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":76,"loc":{"pt":[-101.86787,32.10745],"method":"ERCOT bus number -> substation","subs":["Buffalo Substation"],"codes":["BUFFALO"],"osm":"osm:way/457051863"}},{"inr":"24INR0281","name":"Red Egret BESS","fuel":"battery","tech":"BA","mw":310.58,"county":"Galveston","zone":"HOUSTON","poi":"38820 FREEWAY PARK 138KV","entity":"Red Egret LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-11-17","ia":"2023-06-07","cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":235,"loc":{"pt":[-95.0049,29.4229],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69364, \"Red Egret\", planned)","subs":[],"codes":["FRWYPARK"],"eia_plant":69364}},{"inr":"24INR0282","name":"Royal River BESS","fuel":"battery","tech":"BA","mw":310.7,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 42110 Angleton - 43381 West Columbia","entity":"Royal River LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-28","ia":"2023-12-15","cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":236,"loc":{"pt":[-95.5432,29.19178],"method":"tap between two located substations","subs":["Angleton Substation","West Columbia Substation"],"codes":["AE","WC"]}},{"inr":"24INR0287","name":"Rockridge Solar","fuel":"solar","tech":"PV","mw":211.2,"county":"Guadalupe","zone":"SOUTH","poi":"7225 Hickory Forest 138kV","entity":"Magnolia Solar Development, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-27","ia":"2025-03-14","cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":101,"loc":{"pt":[-97.96439333333332,29.63050666666667],"method":"county centroid (substation not located)","subs":[],"codes":["HICKFO"]}},{"inr":"24INR0289","name":"Ratcliff Solar","fuel":"solar","tech":"PV","mw":85.74,"county":"Freestone","zone":"NORTH","poi":"Tap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake","entity":"Greenalia Solar Power Ratcliff","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-07","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-95.81602,30.21706],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67563, \"Ratcliff Solar Park\", planned)","subs":[],"codes":["LNGLK"],"eia_plant":67563}},{"inr":"24INR0291","name":"Rubicon Alpha Wind","fuel":"wind","tech":"WT","mw":222.6,"county":"Haskell","zone":"WEST","poi":"60507 pendulo7A 345kV","entity":"Throckmorton Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-31","ia":"2024-05-08","cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":166,"loc":{"pt":[-99.7829,33.22218],"method":"county centroid (substation not located)","subs":[],"codes":["PENDULO"]}},{"inr":"24INR0298","name":"Leighton Solar","fuel":"solar","tech":"PV","mw":181,"county":"Limestone","zone":"NORTH","poi":"98 Fernleaf 138 kV","entity":"Lavender Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-09","ia":"2024-05-28","cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":87,"loc":{"pt":[-96.5691375,31.5494375],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0308","name":"Forts Trail Solar","fuel":"solar","tech":"PV","mw":200.81,"county":"Taylor","zone":"WEST","poi":"11406 Central Bluff Switch 345kV","entity":"JC Central Bluff, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-02","ia":null,"cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.94226,32.258],"method":"county centroid (substation not located)","subs":[],"codes":["CBFSW"]}},{"inr":"24INR0319","name":"Burro Loco Energy Storage","fuel":"battery","tech":"BA","mw":25.14,"county":"Cameron","zone":"COASTAL","poi":"8626 Resaca 69kV","entity":"VESI","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-15","ia":null,"cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":["RESACA"]}},{"inr":"24INR0326","name":"Blarney Solar","fuel":"solar","tech":"PV","mw":81.46,"county":"Hopkins","zone":"NORTH","poi":"138 kV Ridgeway Switch","entity":"Blarney Solar Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-01","ia":"2024-04-22","cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":39,"loc":{"pt":[-95.5872457142857,33.27730285714285],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0331","name":"Chisme Storage","fuel":"battery","tech":"BA","mw":150.7,"county":"Brown","zone":"NORTH","poi":"Tap 345 kV 1444 BROWN SWITCH - 3424 BUCKHORN SWITCH","entity":"Blue Heron Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-07-01","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":50,"loc":{"pt":[-99.19531,31.53798],"method":"one end of the tapped line, matched by name in the POI","subs":["Brown Substation"],"codes":["BWNSW","BUCSW"]}},{"inr":"24INR0333","name":"Chisme Solar","fuel":"solar","tech":"PV","mw":147,"county":"Brown","zone":"NORTH","poi":"Tap 345 kV 1444 BROWN SWITCH - 3424 BUCKHORN SWITCH","entity":"Blue Heron Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-07-01","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":46,"loc":{"pt":[-99.19531,31.53798],"method":"one end of the tapped line, matched by name in the POI","subs":["Brown Substation"],"codes":["BWNSW","BUCSW"]}},{"inr":"24INR0337","name":"Eldora Solar","fuel":"solar","tech":"PV","mw":200.94,"county":"Matagorda","zone":"COASTAL","poi":"Tap 345 kV 5915 South Texas Project – 44200 Hillje Ckt 1","entity":"Eldora Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-02","ia":"2023-11-15","cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-96.14332999999999,28.91463],"method":"tap between two located substations","subs":["South Texas Project Switchyard","Hillje Substation"],"codes":["STP","HLJ"]}},{"inr":"24INR0338","name":"Eldora BESS","fuel":"battery","tech":"BA","mw":201.31,"county":"Matagorda","zone":"COASTAL","poi":"345 kV South Texas Project (Bus# 5915) – Hillje (Bus# 44200) Transmission Line Ckt 1","entity":"Eldora Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-02","ia":"2023-11-15","cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":153,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"24INR0339","name":"Mystic Springs Renewable Energy Solar SLF","fuel":"solar","tech":"PV","mw":258.83,"county":"Kaufman","zone":"NORTH","poi":"Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)","entity":"Mystic Spring Renewable Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-31","ia":"2025-10-30","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":124,"loc":{"pt":[-96.35069,32.96911],"method":"one end of the tapped line, matched by name in the POI","subs":["Royse Substation"],"codes":["RYSSW","POESW"]}},{"inr":"24INR0340","name":"Mystic Springs Renewable Energy Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Kaufman","zone":"NORTH","poi":"Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)","entity":"Mystic Spring Renewable Energy LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-03-31","ia":null,"cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.35069,32.96911],"method":"one end of the tapped line, matched by name in the POI","subs":["Royse Substation"],"codes":["RYSSW","POESW"]}},{"inr":"24INR0341","name":"Forts Trail BESS","fuel":"battery","tech":"BA","mw":208.82,"county":"Taylor","zone":"WEST","poi":"11406 Central Bluff Switch 345kV","entity":"JC Central Bluff, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-02","ia":null,"cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.94226,32.258],"method":"county centroid (substation not located)","subs":[],"codes":["CBFSW"]}},{"inr":"24INR0355","name":"Anatole Renewable Energy Storage","fuel":"battery","tech":"BA","mw":207.82,"county":"Henderson","zone":"NORTH","poi":"(Bus# 6951) Eustace Southeast 138kV Substation (owned by Rayburn Electric Cooperative)","entity":"Anatole Renewable Energy LLC","stage":"construction","stage_label":"Under construction (agreement signed)","cod":"2028-06-30","ia":"2024-05-10","cons_start":"2026-06-01","first_seen":"2022-12","months_in_queue":46,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":158,"loc":{"pt":[-96.05013599999998,32.21809599999999],"method":"county centroid (substation not located)","subs":[],"codes":["EUSTSERC"]}},{"inr":"24INR0356","name":"Cibeles Solar","fuel":"solar","tech":"PV","mw":252.3,"county":"McLennan","zone":"NORTH","poi":"3379 Tiger Creek Switch (TIGERCREEK_5) 345 kV Substation","entity":"Elawan Cibeles Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-15","ia":"2025-02-25","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":121,"loc":{"pt":[-97.3018,31.5209],"method":"county centroid (substation not located)","subs":[],"codes":["TCRSW"]}},{"inr":"24INR0372","name":"GIGA AUSTIN SOLAR","fuel":"solar","tech":"PV","mw":-53.3,"county":"Travis","zone":"SOUTH","poi":"7047 HORNSBY Substation 138kV","entity":"GIGA TEXAS ENERGY LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-27","ia":null,"cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.61386,30.23198],"method":"ERCOT bus number -> substation","subs":["Hornsby Substation"],"codes":["HORNSB"],"osm":"osm:way/1217222649"}},{"inr":"24INR0375","name":"Possum Kingdom BESS","fuel":"battery","tech":"BA","mw":200.86,"county":"Jack","zone":"NORTH","poi":"Tap 345kV 1421 Willow Creek – 11523 Thomas Price","entity":"PK Solar, LLC","stage":"construction","stage_label":"Under construction (agreement signed)","cod":"2028-10-29","ia":"2025-07-30","cons_start":"2025-05-01","first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["WCSWS","TOMSW"]}},{"inr":"24INR0376","name":"Huisache BESS","fuel":"battery","tech":"BA","mw":100.67,"county":"Wilson","zone":"SOUTH","poi":"Tapping the Elm Creek to Shaula circuit 1","entity":"Huisache Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-30","ia":"2025-08-12","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":76,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0378","name":"Solara BESS 1","fuel":"battery","tech":"BA","mw":150,"county":"Jones","zone":"WEST","poi":"60387 Hendrick 138kV","entity":"CED Development Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-30","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.84577142857142,32.64467142857143],"method":"county centroid (substation not located)","subs":[],"codes":["HENDRICK"]}},{"inr":"24INR0379","name":"Solara BESS 2","fuel":"battery","tech":"BA","mw":150,"county":"Jones","zone":"WEST","poi":"60387 Hendrick 138kV","entity":"CED Development Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-30","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.84577142857142,32.64467142857143],"method":"county centroid (substation not located)","subs":[],"codes":["HENDRICK"]}},{"inr":"24INR0383","name":"Soda Lake BESS 2 SLF","fuel":"battery","tech":"BA","mw":205.35,"county":"Crane","zone":"WEST","poi":"138 kV Soda Lake (#76026)","entity":"Crane II Solar Electric, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-30","ia":"2026-08-21","cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":156,"loc":{"pt":[-102.31368,31.19334],"method":"ERCOT bus number -> substation","subs":["Soda Lake Substation"],"codes":["SODALA"],"osm":"osm:way/1454962661"}},{"inr":"24INR0386","name":"Black & Gold Energy Storage","fuel":"battery","tech":"BA","mw":203.8,"county":"Menard","zone":"WEST","poi":"6364 Yellow Jacket Sub 138kV","entity":"Black & Gold Energy Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-30","ia":"2024-08-14","cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":154,"loc":{"pt":[-99.78479,30.93165],"method":"ERCOT bus number -> substation","subs":["Yellowjacket Substation"],"codes":["YELWJCKT"],"osm":"osm:way/192667620"}},{"inr":"24INR0387","name":"PaleAle BESS","fuel":"battery","tech":"BA","mw":75.38,"county":"Hays","zone":"SOUTH","poi":"Tap 138 kV Bus 7506 L_CEDAVA8_1Y - Bus 7507 L_FRIEND8_1Y","entity":"Momentum Energy Storage Partners,LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-04-15","ia":null,"cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":25,"loc":{"pt":[-97.95747857142858,29.940900000000003],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0391","name":"Kennedy Storage","fuel":"battery","tech":"BA","mw":25.3,"county":"Navarro","zone":"NORTH","poi":"Tap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro","entity":"Kennedy Bypass Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"24INR0392","name":"Riverwalk BESS","fuel":"battery","tech":"BA","mw":120,"county":"Bexar","zone":"SOUTH","poi":"5294 Martinez Substation 138kV","entity":"RWE Solar Developement, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2026-08-18","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":91,"loc":{"pt":[-98.32237,29.4507],"method":"ERCOT bus number -> substation","subs":["Martinez Substation"],"codes":["C5"],"osm":"osm:way/675054239"}},{"inr":"24INR0393","name":"ELECTRODE BESS","fuel":"battery","tech":"BA","mw":150,"county":"Upton","zone":"WEST","poi":"76040 Castillo 138kV","entity":"CED Development Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-102.30618,31.25374],"method":"ERCOT bus number -> substation","subs":["Castillo Substation"],"codes":["CASTIL"],"osm":"osm:way/579799495"}},{"inr":"24INR0394","name":"CATHODE BESS","fuel":"battery","tech":"BA","mw":150,"county":"Upton","zone":"WEST","poi":"76635 King Mountain 138kV","entity":"CED Development Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":["KINGMO"]}},{"inr":"24INR0404","name":"Tres Rios Ranch Solar","fuel":"solar","tech":"PV","mw":508,"county":"Upton","zone":"WEST","poi":"76008 Twelvemile 345kV","entity":"LectricWind LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-12-30","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":243,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":["TWELVE"]}},{"inr":"24INR0407","name":"Mercury Solar III","fuel":"solar","tech":"PV","mw":203.5,"county":"Hill","zone":"NORTH","poi":"68092 Liberty Station 345kV","entity":"Mercury Solar","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-04-01","ia":"2025-12-12","cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["LIBERTY"]}},{"inr":"24INR0410","name":"NRG Greens Bayou 6 (TEF-Due Diligence)","fuel":"gas","tech":"GT","mw":445,"county":"Harris","zone":"HOUSTON","poi":"Position 1/0 PSSE 40710, Greens Bayou Substation, 138 kV","entity":"NRG Greens Bayou 6 LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-01","ia":"2025-02-07","cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":294,"loc":{"pt":[-95.21786,29.82122],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69691, \"Greens Bayou 6\", planned)","subs":[],"codes":["GBY"],"eia_plant":69691}},{"inr":"24INR0412","name":"Camino Ranch Solar SLF","fuel":"solar","tech":"PV","mw":296.42,"county":"Houston","zone":"NORTH","poi":"Tap to Jim English (#3351) – Flat Branch (#3345) 138kV","entity":"Camino Ranch Solar Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-09","ia":"2025-12-31","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":142,"loc":{"pt":[-95.530215625,31.298589062499996],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0413","name":"Furay Battery Energy Storage System","fuel":"battery","tech":"BA","mw":304,"county":"Harris","zone":"HOUSTON","poi":"Tap 138kV 45660 Jonte substation – 46332 Scenic Woods\n\nTapping both radial lines.","entity":"Blue Topaz 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["JON"]}},{"inr":"24INR0419","name":"High Plains Storage","fuel":"battery","tech":"BA","mw":157.7,"county":"Harris","zone":"HOUSTON","poi":"45880 Hockley 138kV","entity":"ROBP Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-30","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-95.8461,30.02128],"method":"ERCOT bus number -> substation","subs":["Hockley Substation"],"codes":["HK"],"osm":"osm:way/128704003"}},{"inr":"24INR0420","name":"Camino Ranch Storage SLF","fuel":"battery","tech":"BA","mw":298.06,"county":"Houston","zone":"NORTH","poi":"Tap to Jim English (#3351) – Flat Branch (#3345) 138kV","entity":"Camino Solar Ranch, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-09","ia":"2025-12-31","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":226,"loc":{"pt":[-95.530215625,31.298589062499996],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0422","name":"Hollow Branch Creek Solar","fuel":"solar","tech":"PV","mw":460,"county":"Leon","zone":"NORTH","poi":"Tap 345kV 3390 Jewett - 44645 Singleton","entity":"Hollow Branch Creek Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2024-10-22","cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":220,"loc":{"pt":[-96.13342,31.37105],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Jewett Substation"],"codes":["JEWET","SNG"]}},{"inr":"24INR0424","name":"Cascabel Wind 1","fuel":"wind","tech":"WT","mw":197.75,"county":"Zapata","zone":"SOUTH","poi":"345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307)","entity":"Vaquero Wind Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-01","ia":"2025-05-23","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":148,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"24INR0425","name":"Two Brothers ESS","fuel":"battery","tech":"BA","mw":154.65,"county":"Victoria","zone":"SOUTH","poi":"8911 BLKBYU4A 138kV","entity":"BRP Blue Topaz 2, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-29","ia":"2024-04-22","cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":117,"loc":{"pt":[-96.91966,28.6424],"method":"ERCOT bus number -> substation","subs":["Black Bayou Substation"],"codes":["BLCBAYU4"],"osm":"osm:way/337681592"}},{"inr":"24INR0440","name":"Starling Solar","fuel":"solar","tech":"PV","mw":144.6,"county":"Gonzales","zone":"SOUTH","poi":"138-kV Birdhouse (7255)\nStarling Solar Phase II is a an addition of 42.24MW to the 23INR0035 (solar) filed in 2020. 23INR0181 (storage) was filed in 2021.","entity":"Starling Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-28","ia":"2026-02-17","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":69,"loc":{"pt":[-97.452375,29.522058333333334],"method":"county centroid (substation not located)","subs":[],"codes":["BIRDHO","SLAKE","GRPVN"]}},{"inr":"24INR0442","name":"Midnight Sun Energy Storage","fuel":"battery","tech":"BA","mw":523.86,"county":"Crockett","zone":"WEST","poi":"6601 Rio Pecos 138kV","entity":"Midnight Sun Energy Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-29","ia":"2025-07-14","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":397,"loc":{"pt":[-102.36507,31.08486],"method":"ERCOT bus number -> substation","subs":["Rio Pecos Substation"],"codes":["RIOPECOS"],"osm":"osm:way/436567314"}},{"inr":"24INR0444","name":"Hiru Storage","fuel":"battery","tech":"BA","mw":503.6,"county":"Clay","zone":"WEST","poi":"Tap 345kV 6111 Riley - 1730 West Krum ckt 1","entity":"Hecate Energy Hazel LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-01","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-98.228005,33.70497],"method":"tap between two substations (bus number + name)","subs":["Riley Substation","West Krum Substation"],"codes":["RILEY","KRWSW"]}},{"inr":"24INR0445","name":"PSE Flores TX Storage","fuel":"battery","tech":"BA","mw":200,"county":"Starr","zone":"SOUTH","poi":"TAP 138KV 8793 RIO GRANDE CITY - 8798 LAGRULLA","entity":"PureSky Development Inc","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["RIO_GRAN","L_GRULLA"]}},{"inr":"24INR0446","name":"PSE Gongora Hill TX Storage","fuel":"battery","tech":"BA","mw":200,"county":"Starr","zone":"SOUTH","poi":"Tap 138kV 8796 Roma – 7870 Escobares","entity":"PureSky Development Inc","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["ROMA","ESCOBA"]}},{"inr":"24INR0447","name":"PSE Chihuahua TX Storage","fuel":"battery","tech":"BA","mw":200,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 138kV 8392 Bates – 8394 Liston","entity":"PureSky Development Inc","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-98.48658,26.316205],"method":"tap between two located substations","subs":["Bates Substation","Liston Substation"],"codes":["BATES","LISTON"]}},{"inr":"24INR0448","name":"PSE Minnesota TX Storage","fuel":"battery","tech":"BA","mw":94,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 138kV 8372 North Pharr – 8906 North Alamo","entity":"PureSky Development Inc","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.11341,26.23099],"method":"one end of the tapped line, matched by name in the POI","subs":["North Alamo Substation"],"codes":["PHARR","N_ALAMO"]}},{"inr":"24INR0449","name":"PSE Richardson TX Storage","fuel":"battery","tech":"BA","mw":100,"county":"Hidalgo","zone":"SOUTH","poi":"TAP 138KV 8374 SOUTH EAST EDINBURG - 8029 CLOSNER","entity":"PureSky Development Inc.","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-98.20945806451613,26.20444516129033],"method":"county centroid (substation not located)","subs":[],"codes":["SE_EDINB","CLOSNER"]}},{"inr":"24INR0450","name":"Lumen Farm BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Anderson","zone":"NORTH","poi":"Tap 138kV 3325 Blackburn Switch – 3272 Palestine","entity":"Neches Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.69096842105266,31.784563157894723],"method":"county centroid (substation not located)","subs":[],"codes":["BLASW","PLSTN"]}},{"inr":"24INR0452","name":"Longfellow Solar I","fuel":"solar","tech":"PV","mw":185.2,"county":"Pecos","zone":"WEST","poi":"38431 TNCENTRY1_1 138 KV","entity":"CENTURY GAS PROCESSING, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2025-04-15","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":89,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNCENTRY"]}},{"inr":"24INR0453","name":"Longfellow BESS I","fuel":"battery","tech":"BA","mw":54.99,"county":"Pecos","zone":"WEST","poi":"38432 TNCENTRY1_1 138 KV","entity":"CENTURY GAS PROCESSING, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-30","ia":"2025-04-15","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":42,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNCENTRY"]}},{"inr":"24INR0454","name":"Longfellow Solar II","fuel":"solar","tech":"PV","mw":197.8,"county":"Pecos","zone":"WEST","poi":"38432 TNCENTRY2_1 138 KV","entity":"CENTURY GAS PROCESSING, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2025-04-15","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":95,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNCENTRY"]}},{"inr":"24INR0455","name":"Longfellow BESS II","fuel":"battery","tech":"BA","mw":105.75,"county":"Pecos","zone":"WEST","poi":"38432 TNCENTRY2_1 138 KV","entity":"CENTURY GAS PROCESSING, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-30","ia":"2025-04-15","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":80,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNCENTRY"]}},{"inr":"24INR0461","name":"Augie BESS","fuel":"battery","tech":"BA","mw":200.81,"county":"Waller","zone":"HOUSTON","poi":"46560 Waller 138kV","entity":"BRP Blue Topaz 5, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-12-17","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-96.07973999999999,30.02432461538461],"method":"county centroid (substation not located)","subs":[],"codes":["WL"]}},{"inr":"24INR0472","name":"Amador Storage","fuel":"battery","tech":"BA","mw":102.41,"county":"Van Zandt","zone":"NORTH","poi":"6833 Explorer Switching Station 138kV","entity":"BT Amador Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-08","ia":"2023-11-02","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":78,"loc":{"pt":[-96.0321,32.47935],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69520, \"Amador BESS\", planned)","subs":[],"codes":["EXPLSSRC"],"eia_plant":69520}},{"inr":"24INR0485","name":"Rutile BESS","fuel":"battery","tech":"BA","mw":100.65,"county":"Runnels","zone":"WEST","poi":"Tap 138kV 6340 BALLINGER - 60399 WEISS","entity":"Rutile BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-31","ia":"2025-07-17","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":76,"loc":{"pt":[-99.94456,31.74117],"method":"ERCOT bus number -> substation","subs":["Ballinger Substation"],"codes":["BALLINGE"],"osm":"osm:way/119137383"}},{"inr":"24INR0488","name":"Forts Trail BESS 2","fuel":"battery","tech":"BA","mw":205.54,"county":"Taylor","zone":"WEST","poi":"11406 Central Bluff Switch 345 kV","entity":"JC Central Bluff, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-02","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-100.15481,32.11719],"method":"substation matched by name in the POI","subs":["Central Bluff Substation"],"codes":["CBFSW"]}},{"inr":"24INR0494","name":"Hana Springs BESS","fuel":"battery","tech":"BA","mw":100.8,"county":"Lampasas","zone":"NORTH","poi":"7064 LAMPASAS 138KV","entity":"Black Mountain Energy Storage II LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-15","ia":null,"cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.18371,31.08451],"method":"ERCOT bus number -> substation","subs":["Lampasas Substation"],"codes":["LAMPAS"],"osm":"osm:way/504849091"}},{"inr":"24INR0496","name":"Indigo Storage","fuel":"battery","tech":"BA","mw":60,"county":"Fisher","zone":"WEST","poi":"tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2","entity":"Innovative Solar 245, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-17","ia":"2026-03-27","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":45,"loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"24INR0500","name":"Claire BESS","fuel":"battery","tech":"BA","mw":406.01,"county":"Harris","zone":"HOUSTON","poi":"40011 Cedar Bayou 138kV","entity":"BRP Blue Topaz 3, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-17","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-94.95018,29.7579],"method":"ERCOT bus number -> substation","subs":["Cedar Bayou Substation"],"codes":["CD"],"osm":"osm:way/336068038"}},{"inr":"24INR0505","name":"Corralitos Wind 1","fuel":"wind","tech":"WT","mw":196.1,"county":"Zapata","zone":"SOUTH","poi":"Tap 345kV 80225 CENIZO7C - 80307 DELSOL7C (New ETT Tiempo Substation)","entity":"Vaquero Wind Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-01","ia":"2025-06-19","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":146,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"24INR0506","name":"Corralitos Wind 2","fuel":"wind","tech":"WT","mw":195.4,"county":"Zapata","zone":"SOUTH","poi":"Tap 345kV 80225 CENIZO7C - 80307 DELSOL7C (New ETT Tiempo Substation)","entity":"Vaquero Wind Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-06-19","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":146,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"24INR0508","name":"White Oak King Wind","fuel":"wind","tech":"WT","mw":606.5,"county":"King","zone":"WEST","poi":"345 kV Gauss ( Bus # 60701)","entity":"KSK Wind Farm 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-08-31","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":133,"loc":{"pt":[-99.66155,33.47894],"method":"ERCOT bus number -> substation","subs":["Gauss Substation"],"codes":["GAUSS"],"osm":"osm:way/454066871"}},{"inr":"24INR0514","name":"Rogers Draw BESS","fuel":"battery","tech":"BA","mw":148.61,"county":"Gillespie","zone":"SOUTH","poi":"7751 Headwaters substation 138kV","entity":"ROGERS DRAW ENERGY STORAGE, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-07-31","ia":"2024-02-28","cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":113,"loc":{"pt":[-99.01772000000001,30.35456],"method":"county centroid (substation not located)","subs":[],"codes":["HEADWA"]}},{"inr":"24INR0516","name":"French Riviera Storage","fuel":"battery","tech":"BA","mw":75,"county":"Kleberg","zone":"COASTAL","poi":"5646 Riviera Substation 69kV","entity":"Arana Creek Battery Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-01","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-97.62489827586208,27.370975862068967],"method":"county centroid (substation not located)","subs":[],"codes":["RVIERAS"]}},{"inr":"24INR0519","name":"Roost Energy Storage","fuel":"battery","tech":"BA","mw":102.36,"county":"Scurry","zone":"WEST","poi":"the Knapp Sub (bus# 1310) – Union Switch (bus# 18555)","entity":"Bluff Creek Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-101.05238,32.69158],"method":"ERCOT bus number -> substation","subs":["Knapp Substation"],"codes":["KNAPP"],"osm":"osm:way/467959303"}},{"inr":"24INR0528","name":"Blanquilla BESS","fuel":"battery","tech":"BA","mw":200.78,"county":"Nueces","zone":"COASTAL","poi":"Tap 138kV 8452 LON_HILL4A - 8441 NUECES_B4A","entity":"Blanquilla BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-19","ia":"2024-09-05","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-97.51697999999999,27.83236],"method":"tap between two located substations","subs":["Lon Hill Substation","Nueces Bay Substation"],"codes":["LON_HILL","NUECES_B"]}},{"inr":"24INR0530","name":"Southside Energy","fuel":"battery","tech":"BA","mw":101.2,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 42960 Mustang Bayou - 42100 HUDSON ckt 4","entity":"Southside Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.20371,29.36273],"method":"ERCOT bus number -> substation","subs":["Mustang Bayou Substation"],"codes":["MU"],"osm":"osm:way/338305192"}},{"inr":"24INR0532","name":"Timber Cove Solar SLF","fuel":"solar","tech":"PV","mw":100.5,"county":"Freestone","zone":"NORTH","poi":"Tap 138 kV 212 Winkler - 3510 Pin Oak","entity":"Freestone Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-06-01","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.15247,31.87059],"method":"EIA plant record: same name and fuel in the same county (EIA plant 66922, \"Timber Cove Solar\", planned)","subs":[],"codes":["WINKLER","POKSW"],"eia_plant":66922}},{"inr":"24INR0534","name":"Lyford Energy","fuel":"battery","tech":"BA","mw":101.2,"county":"Willacy","zone":"COASTAL","poi":"5745 E Raymondville 138kV","entity":"Lyford Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-97.53769230769228,26.451569230769227],"method":"county centroid (substation not located)","subs":[],"codes":["MV_ERAY2"]}},{"inr":"24INR0538","name":"FLIFER Solar I","fuel":"solar","tech":"PV","mw":84,"county":"Ward","zone":"WEST","poi":"Tap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197)","entity":"FLIFER LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-04-15","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-102.95501,31.58771],"method":"ERCOT bus number -> substation","subs":["Yucca Drive Switching Station"],"codes":["YUCSW"],"osm":"osm:way/803480536"}},{"inr":"24INR0541","name":"Kinney County Energy","fuel":"battery","tech":"BA","mw":101.2,"county":"Kinney","zone":"SOUTH","poi":"Tap 138kV 8252 Brackett4A - 78255  L_PINTCR8_1Y","entity":"Kinney County Energy,  LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-100.39235,29.32463],"method":"ERCOT bus number -> substation","subs":["Brackettville Substation"],"codes":["BRACKETT"],"osm":"osm:way/343343392"}},{"inr":"24INR0543","name":"Thomas Cameron BESS","fuel":"battery","tech":"BA","mw":205.5,"county":"Lampasas","zone":"NORTH","poi":"Tap 345kV 3424 BUCKHORN SWITCH - 3422 KILLEEN SWITCH","entity":"Thomas Cameron BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-04-28","ia":"2024-10-30","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":156,"loc":{"pt":[-97.72294,31.03918],"method":"one end of the tapped line, matched by name in the POI","subs":["Killeen Substation"],"codes":["BUCSW","KLNSW"]}},{"inr":"24INR0544","name":"Wetzel BESS","fuel":"battery","tech":"BA","mw":185.57,"county":"Brown","zone":"NORTH","poi":"Tap 138kV 1654 Zephyr – 1655 Brownwood Switch","entity":"Brown ESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-09","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-99.05431764705882,31.607452941176476],"method":"county centroid (substation not located)","subs":[],"codes":["BRNSW"]}},{"inr":"24INR0555","name":"Shaula I BESS","fuel":"battery","tech":"BA","mw":205.77,"county":"DeWitt","zone":"SOUTH","poi":"5380 Shaula 345kV","entity":"Shaula Energy Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-97.39235000000001,28.9501125],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0567","name":"Wolf Hollow III","fuel":"gas","tech":"GT","mw":306.32,"county":"Hood","zone":"NORTH","poi":"1877 Mitchell Bend 345KV","entity":"Wolf Hollow II Power LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-05-31","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":100,"loc":{"pt":[-97.88045714285714,32.43618571428571],"method":"county centroid (substation not located)","subs":[],"codes":["MBDSW"]}},{"inr":"24INR0569","name":"Hadrian Energy Storage","fuel":"battery","tech":"BA","mw":101.2,"county":"Wharton","zone":"SOUTH","poi":"Line Tap 138kV #43012 NEWGLF60T3_8 - #43190 S_LANE_B138","entity":"Hadrian Energy Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-96.01556,29.19494],"method":"ERCOT bus number -> substation","subs":["South Lane City Substation"],"codes":["LC"],"osm":"osm:way/336976542"}},{"inr":"24INR0570","name":"Marcus Energy Storage","fuel":"battery","tech":"BA","mw":201.04,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 39500 West Columbia Main - 110505 Sweeny Co-Gen LP Ckt 1","entity":"Marcus Energy Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["WCOLMAIN","SCLPCOGN"]}},{"inr":"24INR0572","name":"Megacharge BESS","fuel":"battery","tech":"BA","mw":110,"county":"Cameron","zone":"COASTAL","poi":"8320 WEST HARLINGEN 69kV","entity":"SMT Harlingen III LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":["W_HARLIN"]}},{"inr":"24INR0576","name":"Boling Generation (TEF-Due Diligience)","fuel":"gas","tech":"GT","mw":400,"county":"Wharton","zone":"SOUTH","poi":"43340 Gulftie 138kV","entity":"Boling Generation","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-12-16","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.467,"p36_basis":"14 of 30 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":187,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["GLF"]}},{"inr":"24INR0617","name":"Serrano Storage","fuel":"battery","tech":"BA","mw":185.59,"county":"Maverick","zone":"SOUTH","poi":"8267 GANSO Substation 138kV","entity":"Maverick ESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-100.5487,28.83791],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67556, \"Serrano BESS\", planned)","subs":[],"codes":[],"eia_plant":67556}},{"inr":"24INR0763","name":"Team Ranch Storage","fuel":"battery","tech":"BA","mw":307.2,"county":"Tarrant","zone":"NORTH","poi":"1869 Benbrook Switch 345kV","entity":"BAF Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-03-01","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-97.34302,32.72868],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0002","name":"Barcelona TxHSR TPSS HN-4","fuel":"other","tech":"OT","mw":50,"county":"Harris","zone":"HOUSTON","poi":"tap 138kV 45885 HocklyC - 46220 Peters","entity":"Texas Central Rail Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-15","ia":null,"cons_start":null,"first_seen":"2019-08","months_in_queue":86,"p36":0.077,"p36_basis":"2 of 26 other projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.2006,29.84771],"method":"one end of the tapped line, matched by name in the POI","subs":["Peters Substation"],"codes":["PT"]}},{"inr":"25INR0005","name":"Tokyo TxHSR TPSS EW-1","fuel":"other","tech":"OT","mw":50,"county":"Ellis","zone":"NORTH","poi":"tap 138kV 2241 Ennis W - 2321 Waxahachie","entity":"Texas Central Rail Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-15","ia":null,"cons_start":null,"first_seen":"2019-08","months_in_queue":86,"p36":0.077,"p36_basis":"2 of 26 other projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["ENWSW","WXHCH"]}},{"inr":"25INR0006","name":"Atlanta TxHSR TPSS DS-1","fuel":"other","tech":"OT","mw":50,"county":"Dallas","zone":"NORTH","poi":"tap 138kV 2429 Watermill E - 3083 Wilmer","entity":"Texas Central Rail Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-15","ia":null,"cons_start":null,"first_seen":"2019-08","months_in_queue":86,"p36":0.077,"p36_basis":"2 of 26 other projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.686,32.582],"method":"one end of the tapped line, matched by name in the POI","subs":["Wilmer Substation"],"codes":[]}},{"inr":"25INR0008","name":"BasRanch (TEF - Due Diligence)","fuel":"gas","tech":"CC","mw":1350,"county":"Ward","zone":"WEST","poi":"tap 345kV Riverton Switch - Sand Lake Switch","entity":"CPV Basin Ranch, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-01","ia":"2025-07-16","cons_start":null,"first_seen":"2021-10","months_in_queue":60,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":891,"loc":{"pt":[-103.46451,31.5105],"method":"one end of the tapped line, matched by name in the POI","subs":["Sand Lake Switching Station"],"codes":[]}},{"inr":"25INR0010","name":"Nockenut Springs Solar 3","fuel":"solar","tech":"PV","mw":201.4,"county":"Gonzales","zone":"SOUTH","poi":"tap 345kV 5133 Elm Creek - 5915 STP ckt 1","entity":"Pecan Springs Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-05","ia":null,"cons_start":null,"first_seen":"2020-09","months_in_queue":73,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"25INR0018","name":"Yellow Cat Wind","fuel":"wind","tech":"WT","mw":262,"county":"Navarro","zone":"NORTH","poi":"Tap 345kV 1906 Venus - 68091 Navarro","entity":"Yellow Cat Wind LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-26","ia":"2024-07-09","cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":195,"loc":{"pt":[-96.518,31.96399],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Navarro Switching Station"],"codes":["VENSW","NAVARRO"]}},{"inr":"25INR0021","name":"Findley Solar","fuel":"solar","tech":"PV","mw":50.34,"county":"Limestone","zone":"NORTH","poi":"Tap 69kV #107 Prairie Hill - #99 Ben Hur","entity":"Adon Texas Sixteen LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-01","ia":null,"cons_start":null,"first_seen":"2022-05","months_in_queue":53,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-96.77497,31.65213],"method":"ERCOT bus number -> substation","subs":["Prairie Hill Substation"],"codes":["PRA"],"osm":"osm:way/461754867"}},{"inr":"25INR0029","name":"Whistle Solar","fuel":"solar","tech":"PV","mw":56.3,"county":"Navarro","zone":"NORTH","poi":"Tap 138kV 213 Haney – 3478 Navarro","entity":"Gransolar Texas Nineteen, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-15","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-96.518,31.96399],"method":"one end of the tapped line, matched by name in the POI","subs":["Navarro Switching Station"],"codes":["HAN1","NVARO"]}},{"inr":"25INR0039","name":"Borderland ESC","fuel":"battery","tech":"BA","mw":200,"county":"Hidalgo","zone":"SOUTH","poi":"tap 138kV 8380 NEDIN4A – 8632 NMCALLEN4C","entity":"FRESH AIR ENERGY II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-30","ia":null,"cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.18922,26.34411],"method":"ERCOT bus number -> substation","subs":["North Edinburg Substation"],"codes":["NEDIN"],"osm":"osm:way/174789429"}},{"inr":"25INR0040","name":"McMEXICO STORAGE","fuel":"battery","tech":"BA","mw":201.9,"county":"Hidalgo","zone":"SOUTH","poi":"8644 Trade Zone 138kV","entity":"FRESH AIR ENERGY II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-30","ia":null,"cons_start":null,"first_seen":"2022-02","months_in_queue":56,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.20945806451613,26.20444516129033],"method":"county centroid (substation not located)","subs":[],"codes":["TRADEZON"]}},{"inr":"25INR0045","name":"Smith Lake Storage DC","fuel":"battery","tech":"BA","mw":65,"county":"Grimes","zone":"NORTH","poi":"Tap 345kV 44645 Singleton - 44900 Zenith Ckt #99","entity":"Smith Lake Solar","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-28","ia":"2025-12-30","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":49,"loc":{"pt":[-95.87524,30.285690000000002],"method":"tap between two substations (bus number + name)","subs":["Singleton Substation","Zenith Substation"],"codes":["SNG","ZEN"]}},{"inr":"25INR0046","name":"Blue Skies BESS","fuel":"battery","tech":"BA","mw":306.26,"county":"Hill","zone":"NORTH","poi":"68090 SAM SW 345kV","entity":"ACTX BESS Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-01","ia":"2024-06-20","cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":232,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["SAMSW"]}},{"inr":"25INR0052","name":"SanPat Solar II","fuel":"solar","tech":"PV","mw":256.23,"county":"San Patricio","zone":"COASTAL","poi":"Tap 345kV 8249 Angstrom – 8659 Naismith","entity":"CGRP 04, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-22","ia":"2023-10-18","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":122,"loc":{"pt":[-97.43837,28.04431],"method":"ERCOT bus number -> substation","subs":["Angstrom Substation"],"codes":["ANGSTROM"],"osm":"osm:way/1089997597"}},{"inr":"25INR0060","name":"Argenta Solar","fuel":"solar","tech":"PV","mw":310,"county":"Bee","zone":"SOUTH","poi":"Tap 345kV 8689 Tango - 8606 Goddard","entity":"Charter Oak Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2024-04-05","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":148,"loc":{"pt":[-97.6662,28.507738709677415],"method":"county centroid (substation not located)","subs":[],"codes":["TANGO","GODDARD"]}},{"inr":"25INR0061","name":"Argenta Storage","fuel":"battery","tech":"BA","mw":192,"county":"Bee","zone":"SOUTH","poi":"Tap 345kV 8689 Tango - 8606 Goddard","entity":"Charter Oak Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2024-04-05","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":146,"loc":{"pt":[-97.6662,28.507738709677415],"method":"county centroid (substation not located)","subs":[],"codes":["TANGO","GODDARD"]}},{"inr":"25INR0071","name":"Albatross BESS","fuel":"battery","tech":"BA","mw":50.4,"county":"McLennan","zone":"NORTH","poi":"From Bus #165 Windsor Switch To Bus #161 McGregor","entity":"Albatross Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-30","ia":"2026-09-02","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":38,"loc":{"pt":[-97.30093,31.50776],"method":"ERCOT bus number -> substation","subs":["Windsor Substation"],"codes":["WINDSRSW"],"osm":"osm:way/461754705"}},{"inr":"25INR0076","name":"Violet Storage","fuel":"battery","tech":"BA","mw":151,"county":"Nueces","zone":"COASTAL","poi":"McKenzie Road (8858) 138 kV Substation","entity":"VIOLET STORAGE","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2022-04","months_in_queue":54,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-97.57149,27.80573],"method":"ERCOT bus number -> substation","subs":["McKenzie Substation"],"codes":["MCKENZIE"],"osm":"osm:way/174705983"}},{"inr":"25INR0080","name":"Meitner Solar","fuel":"solar","tech":"PV","mw":702.64,"county":"Gray","zone":"PANHANDLE","poi":"345 kV Gray (Bus# 79000)","entity":"IP Meitner, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-08","ia":"2024-01-31","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":336,"loc":{"pt":[-100.81993,35.40778],"method":"substation matched by name in the POI","subs":["Gray Substation"],"codes":["CTT_GRAY"]}},{"inr":"25INR0081","name":"SanPat Solar I","fuel":"solar","tech":"PV","mw":308.88,"county":"San Patricio","zone":"COASTAL","poi":"Tap 345kV 8249 Angstrom – 8659 Naismith","entity":"Padre Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-08","ia":"2023-10-18","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":148,"loc":{"pt":[-97.43837,28.04431],"method":"ERCOT bus number -> substation","subs":["Angstrom Substation"],"codes":["ANGSTROM"],"osm":"osm:way/1089997597"}},{"inr":"25INR0082","name":"Reis Solar","fuel":"solar","tech":"PV","mw":105.48,"county":"Atascosa","zone":"SOUTH","poi":"Tapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Miguel Gen","entity":"Greenalia Solar Power Reis LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-08-03","ia":null,"cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-98.45369,28.65276],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67564, \"Reis Solar Park\", planned)","subs":[],"codes":["CHOKCNYN","SANMIGL"],"eia_plant":67564}},{"inr":"25INR0097","name":"Soleil Solar","fuel":"solar","tech":"PV","mw":451.69,"county":"Clay","zone":"WEST","poi":"Tap 345 kV 1730 Krum West Switch - 6111 Riley ckt 2","entity":"Soleil Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-28","ia":"2025-05-09","cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":216,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"25INR0100","name":"Goldeneye BESS","fuel":"battery","tech":"BA","mw":201.6,"county":"Bell","zone":"NORTH","poi":"3423 KILLEEN Switch 138 KV","entity":"Black Mountain Energy Storage II","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-15","ia":"2024-02-26","cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":153,"loc":{"pt":[-97.5635916666667,31.034500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["KLNSW"]}},{"inr":"25INR0101","name":"Drake BESS","fuel":"battery","tech":"BA","mw":257.3,"county":"Collin","zone":"NORTH","poi":"#833 Wylie Switch 138kV","entity":"Mallard Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-01-29","ia":"2024-04-30","cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":195,"loc":{"pt":[-96.55485714285714,33.20755714285714],"method":"county centroid (substation not located)","subs":[],"codes":["WYLIESW"]}},{"inr":"25INR0102","name":"Austin Bayou Solar","fuel":"solar","tech":"PV","mw":502.48,"county":"Brazoria","zone":"COASTAL","poi":"Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27","entity":"Austin Bayou Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-01","ia":"2023-11-15","cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":240,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["SEB"]}},{"inr":"25INR0103","name":"Elio BESS","fuel":"battery","tech":"BA","mw":205.28,"county":"Brazoria","zone":"COASTAL","poi":"138 kV Weinbrenner Station (Bus #42990)","entity":"Elio Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2024-09-15","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":156,"loc":{"pt":[-95.68546,29.24768],"method":"EIA plant record: same name and fuel in the same county (EIA plant 65850, \"Elio Energy LLC\", planned)","subs":[],"codes":["WEI"],"eia_plant":65850}},{"inr":"25INR0112","name":"August Draw Solar","fuel":"solar","tech":"PV","mw":250,"county":"Reeves","zone":"WEST","poi":"Tap 138kV 60207 Verhalen – 60808 Hoefs Road","entity":"August Draw Solar Holdings, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-27","ia":"2025-09-12","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":120,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["VERH","HOEFSROA"]}},{"inr":"25INR0122","name":"Vial BESS","fuel":"battery","tech":"BA","mw":135.18,"county":"Hill","zone":"NORTH","poi":"Chatt(234) - Pecan Street (3352) 138kV","entity":"Gransolar Texas Eleven LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-15","ia":"2025-08-04","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":102,"loc":{"pt":[-97.06248,31.95377],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67784, \"Vial BESS\", planned)","subs":[],"codes":["CHATT"],"eia_plant":67784}},{"inr":"25INR0129","name":"Demeter Solar","fuel":"solar","tech":"PV","mw":88,"county":"Caldwell","zone":"SOUTH","poi":"Tap 138kV 7224 LULING - 7216 LOCKHART","entity":"Demeter Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-97.66126,29.87081],"method":"ERCOT bus number -> substation","subs":["Lockhart Substation"],"codes":["LOCKHA"],"osm":"osm:way/146793326"}},{"inr":"25INR0130","name":"Demeter Storage","fuel":"battery","tech":"BA","mw":65,"county":"Caldwell","zone":"SOUTH","poi":"Tap 138kV 7224 LULING - 7216 Lockhart","entity":"Demeter Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-97.66126,29.87081],"method":"ERCOT bus number -> substation","subs":["Lockhart Substation"],"codes":["LOCKHA"],"osm":"osm:way/146793326"}},{"inr":"25INR0131","name":"SOSA Storage","fuel":"battery","tech":"BA","mw":154.63,"county":"Madison","zone":"NORTH","poi":"Tap 138kV 25 North Zulch - 47 Hilltop Lakes","entity":"Sosa Energy Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-20","ia":"2023-12-05","cons_start":null,"first_seen":"2022-07","months_in_queue":51,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":117,"loc":{"pt":[-96.22218,31.08004],"method":"one end of the tapped line, matched by name in the POI","subs":["Hilltop Lakes Substation"],"codes":[]}},{"inr":"25INR0133","name":"Rose Quartz BESS","fuel":"battery","tech":"BA","mw":101.41,"county":"Dimmit","zone":"SOUTH","poi":"Tap 138kV 8283 Asherton - 8613 Bigwells","entity":"Rose Quartz BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-01","ia":"2026-07-28","cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":77,"loc":{"pt":[-99.64578,28.503835000000002],"method":"tap between two located substations","subs":["Asherton Substation","Big Wells Substation"],"codes":["ASHERTON","BIG_WELL"]}},{"inr":"25INR0135","name":"Hayrick BESS","fuel":"battery","tech":"BA","mw":113.9,"county":"Coke","zone":"WEST","poi":"6351 Nicole 138kV","entity":"Gransolar Texas Five LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-03-15","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":38,"loc":{"pt":[-100.29036,32.02332],"method":"ERCOT bus number -> substation","subs":["Nicole Switching Station"],"codes":["NICOLE"],"osm":"osm:way/491192845"}},{"inr":"25INR0138","name":"Champaign BESS","fuel":"battery","tech":"BA","mw":201.13,"county":"Glasscock","zone":"WEST","poi":"Tap 138kV Shaw POD (18664) – Desert Wind Sub (11283)\nnew station Potterson Lake Switch","entity":"Champaign BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-31","ia":"2025-07-31","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-101.7384,31.87157],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67917, \"Champaign BESS, LLC\", planned)","subs":[],"codes":["SHWPD"],"eia_plant":67917}},{"inr":"25INR0139","name":"Dolce BESS","fuel":"battery","tech":"BA","mw":100.65,"county":"Mitchell","zone":"WEST","poi":"Tap 138kV 1189 BARBER_LK1_8 - 19520 CHINAGRVX2_8","entity":"Dolce BESS, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-01-31","ia":null,"cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-100.9018,32.48406],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67919, \"Dolce BESS, LLC\", planned)","subs":[],"codes":["BRBSW"],"eia_plant":67919}},{"inr":"25INR0140","name":"Seragio BESS","fuel":"battery","tech":"BA","mw":201.13,"county":"Ector","zone":"WEST","poi":"11140 ECTRCNTYN_8 138kV","entity":"Seragio BESS, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0142","name":"Sagewood BESS","fuel":"battery","tech":"BA","mw":100.57,"county":"Glasscock","zone":"WEST","poi":"tap McDonald Road Switch (1333) – Pastores Switch (10121) ckt 1","entity":"Sagewood BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-31","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-101.27561,32.08625],"method":"ERCOT bus number -> substation","subs":["McDonald Road Substation"],"codes":["MCDLD"],"osm":"osm:way/354601987"}},{"inr":"25INR0143","name":"Ariji BESS","fuel":"battery","tech":"BA","mw":100.32,"county":"Howard","zone":"WEST","poi":"Tap 138kV 1394 GTTYVTAP_8 - 1322 BIGSPRIG_8","entity":"Ariji BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-31","ia":"2025-08-01","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":76,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":["BSPSW"]}},{"inr":"25INR0144","name":"Jasper BESS","fuel":"battery","tech":"BA","mw":201.13,"county":"Midland","zone":"WEST","poi":"Tap 138kV 71230 Pleasant Farms - 1236 Pegasus South","entity":"Jasper BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-11","ia":"2026-07-27","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-102.22506,31.66289],"method":"one end of the tapped line, matched by name in the POI","subs":["Pegasus South Substation"],"codes":["PLEAFA"]}},{"inr":"25INR0146","name":"Blue Heron BESS","fuel":"battery","tech":"BA","mw":201.13,"county":"Reeves","zone":"WEST","poi":"Tap 138kV MANSON (1094) - Riverton (11083)","entity":"Blue Heron BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-11","ia":"2026-07-27","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-103.86083,31.80691],"method":"ERCOT bus number -> substation","subs":["Riverton Switching Station"],"codes":["RVRSW"],"osm":"osm:way/1006279947"}},{"inr":"25INR0154","name":"Nymphaea Solar","fuel":"solar","tech":"PV","mw":120.9,"county":"Wichita","zone":"WEST","poi":"Tap 345kV 1730 Krum West Swtich - 6111 Riley7B","entity":"Nymphaea Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2026-05-18","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":58,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"25INR0155","name":"Nymphaea Storage","fuel":"battery","tech":"BA","mw":61,"county":"Wichita","zone":"WEST","poi":"Tap 345kV 1730 Krum West Swtich - 6111 Riley7B","entity":"Nymphaea Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2026-05-18","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":46,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"25INR0164","name":"Star Dairy Solar","fuel":"solar","tech":"PV","mw":115.61,"county":"Lamar","zone":"NORTH","poi":"Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5","entity":"Star Dairy Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-12","ia":"2024-12-09","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":55,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["PRSSW","WDDSW"]}},{"inr":"25INR0165","name":"Timberlakes Solar","fuel":"solar","tech":"PV","mw":200.71,"county":"Dickens","zone":"PANHANDLE","poi":"59904 Cottonwood 345kV","entity":"Donegalsol","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-15","ia":null,"cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.87665,33.77829],"method":"ERCOT bus number -> substation","subs":["Cottonwood Substation"],"codes":["W_CW_345"],"osm":"osm:way/453589317"}},{"inr":"25INR0169","name":"Piedra BESS","fuel":"battery","tech":"BA","mw":103.65,"county":"Freestone","zone":"NORTH","poi":"Tap 345-kV line Navarro (68091) – Limestone (46020)","entity":"Piedra Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-01","ia":"2024-07-02","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":79,"loc":{"pt":[-96.38253,31.69417],"method":"tap between two substations (bus number + name)","subs":["Navarro Switching Station","Limestone Station"],"codes":["NAVARRO","LEG"]}},{"inr":"25INR0170","name":"Pinewood Solar","fuel":"solar","tech":"PV","mw":150.68,"county":"Brazoria","zone":"COASTAL","poi":"43020 Seabreeze 345kV","entity":"Brazoria Solar II, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-29","ia":"2025-05-08","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":72,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["SEB"]}},{"inr":"25INR0172","name":"Wolf Spring Solar","fuel":"solar","tech":"PV","mw":195.8,"county":"Dickens","zone":"PANHANDLE","poi":"Tap 345kV 59904 Cotton Wood - 23922 White River Ckt 1","entity":"Wolf Spring Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-25","ia":"2024-08-14","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":94,"loc":{"pt":[-100.87665,33.77829],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Cottonwood Substation"],"codes":["W_CW_345","WHIT_RVR"]}},{"inr":"25INR0173","name":"Wolf Spring Storage","fuel":"battery","tech":"BA","mw":202.7,"county":"Dickens","zone":"PANHANDLE","poi":"Tap 345kV 59904 Cotton Wood - 23922 White River Ckt 1","entity":"Wolf Spring Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-25","ia":"2024-08-14","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":154,"loc":{"pt":[-100.87665,33.77829],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Cottonwood Substation"],"codes":["W_CW_345","WHIT_RVR"]}},{"inr":"25INR0174","name":"Concho Pearl Solar","fuel":"solar","tech":"PV","mw":171.9,"county":"Concho","zone":"WEST","poi":"Tap 345kV 76009 Twin Buttes - 7077 Amos Creek","entity":"Concho Pearl Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-09","ia":"2024-07-22","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":82,"loc":{"pt":[-100.59802,31.5138],"method":"ERCOT bus number -> substation","subs":["Twin Buttes Substation"],"codes":["TWINBU"],"osm":"osm:way/172174900"}},{"inr":"25INR0175","name":"Concho Pearl Storage","fuel":"battery","tech":"BA","mw":162.4,"county":"Concho","zone":"WEST","poi":"Tap 345kV 76009 Twin Buttes - 7077 Amos Creek","entity":"Concho Pearl Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-09","ia":"2024-07-22","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":123,"loc":{"pt":[-100.59802,31.5138],"method":"ERCOT bus number -> substation","subs":["Twin Buttes Substation"],"codes":["TWINBU"],"osm":"osm:way/172174900"}},{"inr":"25INR0176","name":"Masava Storage","fuel":"battery","tech":"BA","mw":257.04,"county":"Madison","zone":"NORTH","poi":"tap 345 kV 46020 Limestone Plant - 967 Gibbons Creek ckt 18","entity":"Savannah Oaks Solar Project, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2022-08","months_in_queue":50,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-96.08152,30.62254],"method":"one end of the tapped line, matched by name in the POI","subs":["Gibbons Creek Station"],"codes":["LEG","GIBCRK"]}},{"inr":"25INR0177","name":"Triangle Ranch Alpha","fuel":"wind","tech":"WT","mw":301.74,"county":"Cottle","zone":"WEST","poi":"Edith Clark 345 kV (#60500)","entity":"Triangle Ranch Wind","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-99.77406,33.94427],"method":"ERCOT bus number -> substation","subs":["Edith Clarke Substation"],"codes":["EDITHCLA"],"osm":"osm:way/256153397"}},{"inr":"25INR0178","name":"Triangle Ranch Bravo","fuel":"wind","tech":"WT","mw":200.22,"county":"Cottle","zone":"WEST","poi":"Edith Clark 345 kV (#60500)","entity":"Triangle Ranch Wind","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":44,"loc":{"pt":[-99.77406,33.94427],"method":"ERCOT bus number -> substation","subs":["Edith Clarke Substation"],"codes":["EDITHCLA"],"osm":"osm:way/256153397"}},{"inr":"25INR0184","name":"Legato BESS","fuel":"battery","tech":"BA","mw":202.65,"county":"Wise","zone":"NORTH","poi":"138kV #608 Crafton Substation - #620 Bowie Substation","entity":"Legato Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-04-24","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-97.7086,33.17174],"method":"county centroid (substation not located)","subs":[],"codes":["CRAFTON","BOW"]}},{"inr":"25INR0186","name":"Moonlight Sonata BESS","fuel":"battery","tech":"BA","mw":201.08,"county":"Colorado","zone":"SOUTH","poi":"Altair (78118) – Nada (78103) 138KV","entity":"Samsung Solar Energy 2, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.4722870967742,29.67036451612903],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0189","name":"Staccato BESS","fuel":"battery","tech":"BA","mw":201.8,"county":"Fayette","zone":"SOUTH","poi":"138kV WARDA #7312.","entity":"Staccato Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-05-28","ia":"2024-08-27","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":153,"loc":{"pt":[-96.92086,30.05032],"method":"ERCOT bus number -> substation","subs":["Warda Substation"],"codes":["WARDA"],"osm":"osm:way/511133298"}},{"inr":"25INR0190","name":"Fortissimo BESS","fuel":"battery","tech":"BA","mw":202.65,"county":"Montague","zone":"NORTH","poi":"741 Dyemound 138kV","entity":"Fortissimo BESS, LCC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-04-24","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-97.73604827586205,33.865875862068975],"method":"county centroid (substation not located)","subs":[],"codes":["DYEMOUND"]}},{"inr":"25INR0192","name":"Palmvalley Storage","fuel":"battery","tech":"BA","mw":100,"county":"Hidalgo","zone":"SOUTH","poi":"Frontera (#8980)","entity":"Palm Valley BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-05-01","ia":null,"cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.39713,26.21789],"method":"ERCOT bus number -> substation","subs":["Frontera Substation"],"codes":["FRONTERA"],"osm":"osm:way/512644995"}},{"inr":"25INR0193","name":"Nockenut Springs Solar 4","fuel":"solar","tech":"PV","mw":201.15,"county":"Gonzales","zone":"SOUTH","poi":"The 345 kV Elm Creek - South Texas Project Line (Bus #5133 - #5915)","entity":"Pecan Springs Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-05","ia":null,"cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"25INR0196","name":"Inadale Solar","fuel":"solar","tech":"PV","mw":281.03,"county":"Scurry","zone":"WEST","poi":"Tap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2","entity":"Inadale Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-03-02","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":89,"loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"25INR0197","name":"Inadale BESS","fuel":"battery","tech":"BA","mw":287.16,"county":"Scurry","zone":"WEST","poi":"Tap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2","entity":"Inadale BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-02","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":20,"loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"25INR0199","name":"Bonham Solar SLF","fuel":"solar","tech":"PV","mw":138.4,"county":"Limestone","zone":"NORTH","poi":"TAP 138 kV MEXIA_2_1_8 3632 - GROES_SE1_8 3634","entity":"J&J Solar Ranch LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-06","ia":"2024-08-07","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-96.4864,31.68297],"method":"ERCOT bus number -> substation","subs":["Mexia Substation"],"codes":["MEXIA"],"osm":"osm:way/461754670"}},{"inr":"25INR0202","name":"East West BESS","fuel":"battery","tech":"BA","mw":122.6,"county":"Kerr","zone":"SOUTH","poi":"7750 LCRA MOUNTAIN HOME SUB","entity":"East West Energy Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-17","ia":"2024-07-12","cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":93,"loc":{"pt":[-99.43638333333331,30.070600000000002],"method":"county centroid (substation not located)","subs":[],"codes":["MOUNHO"]}},{"inr":"25INR0204","name":"Cedar Range Solar","fuel":"solar","tech":"PV","mw":150.64,"county":"Hopkins","zone":"NORTH","poi":"“Sweet Tea” 345 kV switchyard that taps the Allen Switch – Stouts Creek 345 kV Line","entity":"Cedar Range, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-17","ia":"2025-07-02","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":72,"loc":{"pt":[-95.82701,33.05748],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68901, \"Cedar Range Solar\", planned)","subs":[],"codes":[],"eia_plant":68901}},{"inr":"25INR0207","name":"Shadow Ranch Solar","fuel":"solar","tech":"PV","mw":807.61,"county":"Upton","zone":"WEST","poi":"842 King Mountain 345kV","entity":"LectricWind LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":44,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":["KINGMTSW"]}},{"inr":"25INR0214","name":"Burgos Solar","fuel":"solar","tech":"PV","mw":105.52,"county":"Milam","zone":"SOUTH","poi":"3701 Rookie Switch 138 kV","entity":"Twin Oaks Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-11-22","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["ROKSW"]}},{"inr":"25INR0216","name":"Blue Sky Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Crockett","zone":"WEST","poi":"138 kV Friend Ranch (Bus# 6562)","entity":"UKA North America, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2022-10","months_in_queue":48,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-101.1431,30.70803],"method":"substation matched by name in the POI","subs":["Friend Ranch Substation"],"codes":[]}},{"inr":"25INR0225","name":"Lucy Solar","fuel":"solar","tech":"PV","mw":352.21,"county":"Concho","zone":"WEST","poi":"Tap 345kV 7077 Amos Creek - 6444 San Angelo Red Creek and 7077 Amos Creek - 76009 Twin Buttes","entity":"Concho County Solar 1 LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-30","ia":"2024-05-29","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":168,"loc":{"pt":[-99.99328,31.47235],"method":"EIA plant record: same name and fuel in the same county (EIA plant 70200, \"Lucy Solar\", planned)","subs":[],"codes":["AMOSCR","REDCREEK","TWINBU"],"eia_plant":70200}},{"inr":"25INR0229","name":"OCI Cobb Creek Solar","fuel":"solar","tech":"PV","mw":203.1,"county":"Hill","zone":"NORTH","poi":"tap 345kV 1907 Venus - 68090 Sam Sw","entity":"Hillsboro Solar Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2024-07-24","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-97.045405,32.170855],"method":"tap between two substations (bus number + name)","subs":["Venus Substation","Sam Switching Station"],"codes":["VENSW","SAMSW"]}},{"inr":"25INR0230","name":"Great Rock BESS","fuel":"battery","tech":"BA","mw":300.9,"county":"Leon","zone":"NORTH","poi":"Tap 345kV 46020 Limestone - 967 Gibbon Creek Ckt 18","entity":"Great Rock Storage LLC","stage":"construction","stage_label":"Under construction (agreement signed)","cod":"2027-12-20","ia":"2024-08-23","cons_start":"2026-10-20","first_seen":"2022-10","months_in_queue":48,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":228,"loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":["LEG","GIBCRK"]}},{"inr":"25INR0232","name":"Isaac Solar","fuel":"solar","tech":"PV","mw":50.73,"county":"Matagorda","zone":"COASTAL","poi":"8114 Conoco 138kV","entity":"Industrial Bravo Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-04-15","ia":"2023-10-18","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":24,"loc":{"pt":[-95.93868,28.78429],"method":"ERCOT bus number -> substation","subs":["Conoco Substation"],"codes":["CONOCO"],"osm":"osm:way/515869172"}},{"inr":"25INR0233","name":"OCI Cobb Creek ESS","fuel":"battery","tech":"BA","mw":201.6,"county":"Hill","zone":"NORTH","poi":"tap 345kV 1907 Venus - 68090 Sam Sw","entity":"Hillsboro Solar Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2024-07-24","cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":153,"loc":{"pt":[-97.045405,32.170855],"method":"tap between two substations (bus number + name)","subs":["Venus Substation","Sam Switching Station"],"codes":["VENSW","SAMSW"]}},{"inr":"25INR0235","name":"Austin Bayou Storage I","fuel":"battery","tech":"BA","mw":150.68,"county":"Brazoria","zone":"COASTAL","poi":"Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27","entity":"Austin Bayou Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-01","ia":"2025-02-14","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["SEB"]}},{"inr":"25INR0236","name":"Austin Bayou Storage II","fuel":"battery","tech":"BA","mw":156.6,"county":"Brazoria","zone":"COASTAL","poi":"Tap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345 kV Line","entity":"Austin Bayou Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-01","ia":"2025-02-14","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":119,"loc":{"pt":[-95.30817,29.45627],"method":"ERCOT bus number -> substation","subs":["Oasis Substation"],"codes":["OAS"],"osm":"osm:way/174317157"}},{"inr":"25INR0237","name":"Austin Bayou Storage III","fuel":"battery","tech":"BA","mw":156.6,"county":"Brazoria","zone":"COASTAL","poi":"Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27","entity":"Austin Bayou Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-01","ia":"2025-02-14","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":119,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["SEB"]}},{"inr":"25INR0241","name":"Halcon Storage","fuel":"battery","tech":"BA","mw":132.65,"county":"Starr","zone":"SOUTH","poi":"Tap 138kV 8957 Central Lopeno - 80106 Falcon Dam","entity":"TX BESS A LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-15","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-99.10948,26.68762],"method":"ERCOT bus number -> substation","subs":["Lopeno Substation"],"codes":["LOPENO"],"osm":"osm:way/453123230"}},{"inr":"25INR0247","name":"Bluebonnet Prairie Wind","fuel":"wind","tech":"WT","mw":180,"county":"Navarro","zone":"NORTH","poi":"Tap 138kV 200 CHATFIELD - 3789 TRINPLAINS_8","entity":"Bluebonnet Prairie Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-15","ia":"2025-07-03","cons_start":"2027-08-01","first_seen":"2022-11","months_in_queue":47,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":134,"loc":{"pt":[-96.30097,32.14386],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68082, \"Bluebonnet Prairie Wind\", planned)","subs":[],"codes":["CHATFELD"],"eia_plant":68082}},{"inr":"25INR0248","name":"Strawberry Acres Storage","fuel":"battery","tech":"BA","mw":156.73,"county":"Wilson","zone":"SOUTH","poi":"5132 Eagle Creek Substation 138kV","entity":"Strawberry Acres Energy Center, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":52,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":["G3"]}},{"inr":"25INR0253","name":"Whiskey BESS","fuel":"battery","tech":"BA","mw":153.72,"county":"Van Zandt","zone":"NORTH","poi":"6828 Canton Tap 138 kV","entity":"Whiskey BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-31","ia":"2025-03-28","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":117,"loc":{"pt":[-95.70379999999997,32.62182399999999],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0262","name":"Shepard Energy Storage","fuel":"battery","tech":"BA","mw":256.79,"county":"Galveston","zone":"HOUSTON","poi":"# 38900 Hidden Lakes - # 42015 PHR 138 KV","entity":"Shepard Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2024-01-17","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":195,"loc":{"pt":[-94.98257,29.48783],"method":"ERCOT bus number -> substation","subs":["P. H. Robinson Switching Station"],"codes":["PHR"],"osm":"osm:way/53759711"}},{"inr":"25INR0266","name":"East Blackland Battery Storage SLF","fuel":"battery","tech":"BA","mw":75,"county":"Travis","zone":"SOUTH","poi":"7337 Kimbro 138kV","entity":"DERIVA ENERGY STORAGE, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-27","ia":null,"cons_start":null,"first_seen":"2022-11","months_in_queue":47,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-97.78774375000002,30.467735416666667],"method":"county centroid (substation not located)","subs":[],"codes":["KIMBRO"]}},{"inr":"25INR0270","name":"Harryoung Solar","fuel":"solar","tech":"PV","mw":190.01,"county":"Cameron","zone":"COASTAL","poi":"Tap 8319 Rio Hondo - SOUTH SANTA ROSA: 8359, 138kV","entity":"Gransolar Texas Four LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-15","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-97.61337,26.27748],"method":"ERCOT bus number -> substation","subs":["Rio Hondo Substation"],"codes":["RIOHONDO"],"osm":"osm:way/174719027"}},{"inr":"25INR0271","name":"City Breeze BESS","fuel":"battery","tech":"BA","mw":143.1,"county":"Matagorda","zone":"COASTAL","poi":"8111 MAGILL4A 138KV","entity":"City Breeze BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-18","ia":"2024-05-15","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":108,"loc":{"pt":[-95.96933,29.01235],"method":"ERCOT bus number -> substation","subs":["Magill Substation"],"codes":["MAGILL"],"osm":"osm:way/515910318"}},{"inr":"25INR0280","name":"Nockenut Springs Solar 5","fuel":"solar","tech":"PV","mw":201.15,"county":"Gonzales","zone":"SOUTH","poi":"Tap 345 kV 5133 Elm Creek - 5915 South Texas Project","entity":"Pecan Springs Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-05","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"25INR0281","name":"Cosper Solar","fuel":"solar","tech":"PV","mw":148.16,"county":"Bell","zone":"NORTH","poi":"Tap 138kV 115 Ding Dong - 3630 Copperas Cove Tu","entity":"Gransolar Texas Twenty LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-11-12","ia":"2025-07-31","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":71,"loc":{"pt":[-97.79588,30.99423],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67773, \"Cosper Solar\", planned)","subs":[],"codes":["CPRCV"],"eia_plant":67773}},{"inr":"25INR0282","name":"Hornet Solar II SLF","fuel":"solar","tech":"PV","mw":201.49,"county":"Swisher","zone":"PANHANDLE","poi":"Ozark Trail Switch 345kV substation (Bus #23901)","entity":"Hornet Solar II LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-31","ia":"2024-08-21","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-101.9699,34.48341],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67985, \"Hornet Solar II (TX) (Hybrid)\", planned)","subs":[],"codes":["OZTSW"],"eia_plant":67985}},{"inr":"25INR0283","name":"Hornet Storage II SLF","fuel":"battery","tech":"BA","mw":0,"county":"Swisher","zone":"PANHANDLE","poi":"Ozark Trail Switch 345kV substation (Bus # 23901)","entity":"Hornet Storage II LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-31","ia":"2024-08-21","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-101.78763999999998,34.57384],"method":"county centroid (substation not located)","subs":[],"codes":["OZTSW"]}},{"inr":"25INR0286","name":"Savannah Oaks Solar","fuel":"solar","tech":"PV","mw":201.19,"county":"Madison","zone":"NORTH","poi":"Tap 345kV 46020 Limestone Plant - 967 Gibbons Creek","entity":"Savannah Oaks Solar Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.08152,30.62254],"method":"one end of the tapped line, matched by name in the POI","subs":["Gibbons Creek Station"],"codes":["LEG","GIBCRK"]}},{"inr":"25INR0287","name":"Hide Town Energy Storage","fuel":"battery","tech":"BA","mw":102.76,"county":"Scurry","zone":"WEST","poi":"18555 Union Switch 138 kV","entity":"Hide Town Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-11","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-100.98097142857144,32.83984285714286],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0288","name":"Buffalo Prairie Storage","fuel":"battery","tech":"BA","mw":308.03,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 975 Jack Creek - 3400 Twin Oak","entity":"Buffalo Meadow Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-96.55465409836069,30.983037704918026],"method":"county centroid (substation not located)","subs":[],"codes":["JK_CK","TOKSW"]}},{"inr":"25INR0293","name":"TOCE BESS 1","fuel":"battery","tech":"BA","mw":205.2,"county":"Wharton","zone":"SOUTH","poi":"138 kV Danevang Switching Station (Bus# 5546)","entity":"TOCE BESS 1, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2024-12-30","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":156,"loc":{"pt":[-96.21518,29.07802],"method":"substation matched by name in the POI","subs":["Danevang Substation"],"codes":["DANEVA"]}},{"inr":"25INR0297","name":"RIVERBEND SOLAR SLF","fuel":"solar","tech":"PV","mw":301.6,"county":"Falls","zone":"NORTH","poi":"TAP 345 KV  LINE  FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (#3412) SUBSTATIONS","entity":"Riverbend Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-96.9549142857143,31.214914285714283],"method":"county centroid (substation not located)","subs":[],"codes":["THSES","TMPCR"]}},{"inr":"25INR0301","name":"Van Zandt Energy Storage","fuel":"battery","tech":"BA","mw":256,"county":"Ector","zone":"WEST","poi":"1027 Odessa EHV Switch 138 kV","entity":"Rocky Mountain Energy Holdings, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-05-15","ia":"2025-03-03","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":194,"loc":{"pt":[-102.32794,31.83513],"method":"substation matched by name in the POI","subs":["Odessa EHV Substation"],"codes":["ODEHV"]}},{"inr":"25INR0304","name":"Flying Kite Solar","fuel":"solar","tech":"PV","mw":80.38,"county":"Zavala","zone":"SOUTH","poi":"Tap the 138 kV La Pryor (#8008) - Poblano (#8009)","entity":"FLYING KITE SOLAR LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-30","ia":"2024-10-02","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":38,"loc":{"pt":[-99.83258000000001,28.822879999999998],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0306","name":"Red Top Solar I","fuel":"solar","tech":"PV","mw":200.59,"county":"Young","zone":"WEST","poi":"Tap 138kV 1431 Graham SES - Short Grass 11525","entity":"Cat Red Top Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-20","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":63,"loc":{"pt":[-98.74132,33.22008],"method":"county centroid (substation not located)","subs":[],"codes":["GRSES","SGRAS"]}},{"inr":"25INR0310","name":"IEP Blackhawk","fuel":"battery","tech":"BA","mw":100,"county":"Galveston","zone":"HOUSTON","poi":"38740 Heights Substation 138kV","entity":"IEP Texas Verde II, llc","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-12-01","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-94.88558831168828,29.4265025974026],"method":"county centroid (substation not located)","subs":[],"codes":["HEIGHTTN"]}},{"inr":"25INR0311","name":"RIVERBEND STORAGE SLF","fuel":"battery","tech":"BA","mw":0,"county":"Falls","zone":"NORTH","poi":"TAP 345 KV LINE FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (#3412) SUBSTATIONS","entity":"Riverbend Renewables, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.9549142857143,31.214914285714283],"method":"county centroid (substation not located)","subs":[],"codes":["THSES","TMPCR"]}},{"inr":"25INR0319","name":"Northington Solar","fuel":"solar","tech":"PV","mw":125.9,"county":"Wharton","zone":"SOUTH","poi":"The 138 kV El Campo (#8102) - Pulsar (#8192) Line; AEP.","entity":"Northington Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-14","ia":"2024-10-02","cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":60,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["EL_CAMPO"]}},{"inr":"25INR0321","name":"El Molino Solar SLF","fuel":"solar","tech":"PV","mw":201.32,"county":"Webb","zone":"SOUTH","poi":"Tap 138kV 80439 LaQuinta - 8297 Bruni 8297","entity":"El Molino Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-01","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.00664,27.48747],"method":"ERCOT bus number -> substation","subs":["La Quinta Substation"],"codes":["LAQUINTA"],"osm":"osm:way/21318419"}},{"inr":"25INR0322","name":"El Molino Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Webb","zone":"SOUTH","poi":"Tap 138kV 80439 LaQuinta - 8297 Bruni 8297","entity":"El Molino Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-01","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-99.00664,27.48747],"method":"ERCOT bus number -> substation","subs":["La Quinta Substation"],"codes":["LAQUINTA"],"osm":"osm:way/21318419"}},{"inr":"25INR0331","name":"Buffalo Meadow Solar","fuel":"solar","tech":"PV","mw":251.27,"county":"Robertson","zone":"NORTH","poi":"Tap Jack Creek (975) - Twin Oak (3400) 345kV line","entity":"Buffalo Meadow Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-28","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.25887,30.85889],"method":"one end of the tapped line, matched by name in the POI","subs":["Jack Creek Substation"],"codes":["JK_CK","TOKSW"]}},{"inr":"25INR0334","name":"Star Dairy Storage","fuel":"battery","tech":"BA","mw":205.24,"county":"Lamar","zone":"NORTH","poi":"Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5","entity":"Star Dairy Storage","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-12","ia":"2024-12-09","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":156,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["PRSSW","WDDSW"]}},{"inr":"25INR0337","name":"Butcherbird Solar","fuel":"solar","tech":"PV","mw":116,"county":"Bell","zone":"NORTH","poi":"Tap 138 kV - Bell County #133 to Bartlett Switch #114","entity":"Butcherbird Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-01-31","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-97.39354,31.01004],"method":"ERCOT bus number -> substation","subs":["Bell County Switching Station"],"codes":["BELCNTY"],"osm":"osm:way/174019719"}},{"inr":"25INR0338","name":"Les Energy Storage","fuel":"battery","tech":"BA","mw":205.13,"county":"Howard","zone":"WEST","poi":"Tap 138 kV 1326 Stanton East – 11324 Leatherwood Pod","entity":"Rocky Mountain Energy Development, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-04-30","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":68,"loc":{"pt":[-101.75795,32.15871],"method":"ERCOT bus number -> substation","subs":["Stanton East Substation"],"codes":["STASW"],"osm":"osm:way/458321326"}},{"inr":"25INR0339","name":"Fort Concho Energy storage","fuel":"battery","tech":"BA","mw":251.15,"county":"Tom Green","zone":"WEST","poi":"Tap 138 kV #76320 Schkade -  #76011 Twin Buttes Line; LCRA","entity":"Rocky Mountain Energy Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-100.56486000000001,31.459155],"method":"tap between two located substations","subs":["Schkade Substation","Twin Buttes Substation"],"codes":["SCHKAD","TWINBU"]}},{"inr":"25INR0346","name":"Cado Storage","fuel":"battery","tech":"BA","mw":205.51,"county":"Bexar","zone":"SOUTH","poi":"Tap 138 kV Line from Braunig East (#5030) to Highland Hills (#5205) Ckt. 1","entity":"Cado Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2030-06-08","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":68,"loc":{"pt":[-98.39588499999999,29.30847],"method":"tap between two located substations","subs":["Braunig Switchyard","Highland Hills Substation"],"codes":["BRAUNIG","P2"]}},{"inr":"25INR0353","name":"Marshall Spring Solar","fuel":"solar","tech":"PV","mw":150,"county":"Gillespie","zone":"SOUTH","poi":"New POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.","entity":"Marshall Springs Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-20","ia":"2025-12-26","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":72,"loc":{"pt":[-98.37128,30.55555],"method":"ERCOT bus number -> substation","subs":["Ferguson Substation"],"codes":["FERGUS"],"osm":"osm:way/192736943"}},{"inr":"25INR0354","name":"Marshall Spring Storage","fuel":"battery","tech":"BA","mw":150,"county":"Gillespie","zone":"SOUTH","poi":"New POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.","entity":"Marshall Springs Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-20","ia":"2025-12-26","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-98.37128,30.55555],"method":"ERCOT bus number -> substation","subs":["Ferguson Substation"],"codes":["FERGUS"],"osm":"osm:way/192736943"}},{"inr":"25INR0368","name":"Echols Grove Solar","fuel":"solar","tech":"PV","mw":200.95,"county":"Lamar","zone":"NORTH","poi":"Tap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770)","entity":"Echols Grove, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-30","ia":"2024-07-06","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-95.45837,33.61647],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68902, \"Echols Grove Solar\", planned)","subs":[],"codes":["HWKSW"],"eia_plant":68902}},{"inr":"25INR0370","name":"Willis Storage","fuel":"battery","tech":"BA","mw":176.13,"county":"Rains","zone":"NORTH","poi":"tap 138kV Emory North 3171 to Liberty POD 1723","entity":"Majewski Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-31","ia":"2025-04-07","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":134,"loc":{"pt":[-95.74785,32.87041],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68176, \"Willis Storage\", planned)","subs":[],"codes":["LBRPD"],"eia_plant":68176}},{"inr":"25INR0371","name":"McMurtre Storage","fuel":"battery","tech":"BA","mw":177.6,"county":"Hunt","zone":"NORTH","poi":"tap 138kV 1819 Commerce South - 1815 Cumby Tap","entity":"BT McMurtre Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-01","ia":"2025-09-17","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":135,"loc":{"pt":[-95.80922,33.17966],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68171, \"Mcmurtre Storage\", planned)","subs":[],"codes":["COMSO","CMBTP"],"eia_plant":68171}},{"inr":"25INR0372","name":"Elan BESS","fuel":"battery","tech":"BA","mw":202.65,"county":"Fort Bend","zone":"HOUSTON","poi":"42380 Needville 138kV","entity":"Elan BESS, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2026-12-31","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-95.8873545454545,29.500803030303036],"method":"county centroid (substation not located)","subs":[],"codes":["NV"]}},{"inr":"25INR0375","name":"NavBoot BESS","fuel":"battery","tech":"BA","mw":303.7,"county":"Nueces","zone":"COASTAL","poi":"8858 MCKENZIE4A 138kV","entity":"Navboot BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-07-11","ia":"2025-10-20","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":230,"loc":{"pt":[-97.57149,27.80573],"method":"ERCOT bus number -> substation","subs":["McKenzie Substation"],"codes":["MCKENZIE"],"osm":"osm:way/174705983"}},{"inr":"25INR0376","name":"Hawkins BESS","fuel":"battery","tech":"BA","mw":150.43,"county":"Hidalgo","zone":"SOUTH","poi":"85005 ELGATO4A 138 kV","entity":"BRP BLUE TOPAZ 7, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-16","ia":null,"cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.09778,26.16769],"method":"ERCOT bus number -> substation","subs":["El Gato Substation"],"codes":["ELGATO"],"osm":"osm:way/513155541"}},{"inr":"25INR0377","name":"Proteus Vernon Solar SLF","fuel":"solar","tech":"PV","mw":75,"county":"Wilbarger","zone":"WEST","poi":"6060 Vernon 138kV","entity":"Vernon Solar and Storage LLC (a Delaware LLC)","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-18","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-99.21494339622639,34.2828603773585],"method":"county centroid (substation not located)","subs":[],"codes":["VERN"]}},{"inr":"25INR0378","name":"Second Division Storage","fuel":"battery","tech":"BA","mw":0,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380) Ckt 60 Line","entity":"Mound Creek Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2025-12-31","ia":null,"cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.65756,29.15679],"method":"ERCOT bus number -> substation","subs":["West Columbia Substation"],"codes":["WC"],"osm":"osm:way/336964607"}},{"inr":"25INR0379","name":"Starr Storage","fuel":"battery","tech":"BA","mw":0,"county":"Starr","zone":"SOUTH","poi":"8795 Roma 138kV","entity":"Falcon Lake Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-29","ia":null,"cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["ROMA_SW"]}},{"inr":"25INR0382","name":"HappyDogSolar","fuel":"solar","tech":"PV","mw":85.54,"county":"Milam","zone":"SOUTH","poi":"Tap 345kV 3704 Hog Creek Switch – 3687 Bell County East Switch","entity":"Rosula Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-04","ia":"2024-12-16","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":41,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["HOGSW","BCESW"]}},{"inr":"25INR0384","name":"Zorro BESS","fuel":"battery","tech":"BA","mw":153.69,"county":"Van Zandt","zone":"NORTH","poi":"138 kV Ben Wheeler (Bus# 6852)","entity":"ZORRO BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-31","ia":"2025-03-28","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":116,"loc":{"pt":[-95.70379999999997,32.62182399999999],"method":"county centroid (substation not located)","subs":[],"codes":["BENWH_RC"]}},{"inr":"25INR0391","name":"Purple Sage BESS 1","fuel":"battery","tech":"BA","mw":156,"county":"Collin","zone":"NORTH","poi":"Anna 345 kV Bus# 2373.","entity":"Purple Sage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-12","ia":"2024-10-11","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":118,"loc":{"pt":[-96.63926,33.31798],"method":"substation matched by name in the POI","subs":["Anna Substation"],"codes":["ANASW"]}},{"inr":"25INR0392","name":"Purple Sage BESS 2","fuel":"battery","tech":"BA","mw":156,"county":"Collin","zone":"NORTH","poi":"Anna 345 kV Bus# 2373","entity":"Purple Sage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-12","ia":"2024-10-11","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":118,"loc":{"pt":[-96.63926,33.31798],"method":"substation matched by name in the POI","subs":["Anna Substation"],"codes":["ANASW"]}},{"inr":"25INR0394","name":"Orchard Ray BESS","fuel":"battery","tech":"BA","mw":51.85,"county":"Bee","zone":"SOUTH","poi":"8590 Tuleta 138kV","entity":"Pettus BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-05-01","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-97.78854,28.59823],"method":"ERCOT bus number -> substation","subs":["Tuleta Substation"],"codes":["TULETA"],"osm":"osm:way/489376746"}},{"inr":"25INR0395","name":"Hinkell BESS","fuel":"battery","tech":"BA","mw":78.05,"county":"La Salle","zone":"SOUTH","poi":"8612 Reveille 138kV","entity":"Reveille BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-07-01","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-99.25811,28.41476],"method":"ERCOT bus number -> substation","subs":["Reveille Substation"],"codes":["REVEILLE"],"osm":"osm:way/451971499"}},{"inr":"25INR0396","name":"Stewart Grady BESS","fuel":"battery","tech":"BA","mw":150.5,"county":"Martin","zone":"WEST","poi":"Tap 138kV 11368 Expanse Switch – 23841 Sale Ranch","entity":"Grady BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-17","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-101.89967,32.20767],"method":"ERCOT bus number -> substation","subs":["Sale Ranch Substation"],"codes":["SLSRANCH"],"osm":"osm:way/457051860"}},{"inr":"25INR0400","name":"Maldives Solar","fuel":"solar","tech":"PV","mw":181.3,"county":"Scurry","zone":"WEST","poi":"Galvani 345 kV station (Bus #59912)","entity":"Maldives Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-25","ia":"2023-12-01","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":87,"loc":{"pt":[-100.98097142857144,32.83984285714286],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0401","name":"WOE Gyp King Wind","fuel":"wind","tech":"WT","mw":304.29,"county":"King","zone":"WEST","poi":"Tap 138kV 33798 GYP_18 – 6088 BENJ4A","entity":"KSK Wind Farm 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-08-31","ia":null,"cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-99.80097,33.58458],"method":"ERCOT bus number -> substation","subs":["Benjamin Substation"],"codes":["BENJAMIN"],"osm":"osm:way/518902999"}},{"inr":"25INR0402","name":"Driet BESS","fuel":"battery","tech":"BA","mw":150.52,"county":"Colorado","zone":"SOUTH","poi":"7254 WEIMAR8 138kV","entity":"Driet BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-20","ia":"2025-12-23","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-96.78365,29.68367],"method":"ERCOT bus number -> substation","subs":["Weimar Substation"],"codes":["WEIMAR"],"osm":"osm:way/510838997"}},{"inr":"25INR0405","name":"Pledgor BESS","fuel":"battery","tech":"BA","mw":100.33,"county":"Matagorda","zone":"COASTAL","poi":"Tap Gulftie (43340) – Pledger (43120) circuit 60","entity":"Pledgor BESS","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-04-06","ia":null,"cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-95.9116,29.18848],"method":"ERCOT bus number -> substation","subs":["Pledger Substation"],"codes":["PG"],"osm":"osm:way/336976543"}},{"inr":"25INR0414","name":"Rogers Creek BESS","fuel":"battery","tech":"BA","mw":100.33,"county":"Cherokee","zone":"NORTH","poi":"Tap 138 KV DailVille (3160) - Neches Pump (3296)","entity":"Dialville BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-17","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.17689583333332,31.742091666666674],"method":"county centroid (substation not located)","subs":[],"codes":["DIALV","NECSP"]}},{"inr":"25INR0416","name":"Proteus Vernon Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Wilbarger","zone":"WEST","poi":"6060 Vernon 138kV","entity":"Vernon Solar and Storage LLC (a Delaware LLC)","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-18","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-99.21494339622639,34.2828603773585],"method":"county centroid (substation not located)","subs":[],"codes":["VERN"]}},{"inr":"25INR0417","name":"Mesa View Storage","fuel":"battery","tech":"BA","mw":254.88,"county":"Upton","zone":"WEST","poi":"Tap 345 kV KINGMTSW (#842) to NORTMC (#76000)","entity":"Mesa View Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-15","ia":"2024-09-09","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":193,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":["KINGMTSW"]}},{"inr":"25INR0420","name":"Houston BESS","fuel":"battery","tech":"BA","mw":227.9,"county":"Harris","zone":"HOUSTON","poi":"Tap 138 kV LAUDER (#46002) - RITTENHOUSE (#46282) ckt 95","entity":"SMT Houston","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-01-01","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":75,"loc":{"pt":[-95.35048,29.887439999999998],"method":"tap between two located substations","subs":["Lauder Substation","Rittenhouse Substation"],"codes":["LA","RU"]}},{"inr":"25INR0421","name":"Aldrin 138 BESS","fuel":"battery","tech":"BA","mw":207,"county":"Brazoria","zone":"COASTAL","poi":"(Bus: 39015) North Alvin TNMP 138kV","entity":"Aldrin Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-01","ia":"2024-04-18","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":157,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["TNNALVIN"]}},{"inr":"25INR0422","name":"Waterloo Solar 1","fuel":"solar","tech":"PV","mw":201.3,"county":"Bastrop","zone":"SOUTH","poi":"Tap 345-kV 7040 Austrop to 7042 Zorn","entity":"Waterloo Solar I, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-01","ia":"2024-09-04","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-97.3476625,30.150325000000002],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Austrop Substation","Zorn Substation"],"codes":["AUSTRO","ZORN"]}},{"inr":"25INR0425","name":"Aldrin 345 BESS","fuel":"battery","tech":"BA","mw":362,"county":"Brazoria","zone":"COASTAL","poi":"(Bus: 43030) Meadow 345kV substation","entity":"Aldrin Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-01","ia":"2024-06-15","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":274,"loc":{"pt":[-95.25798,29.46024],"method":"ERCOT bus number -> substation","subs":["Meadow Substation"],"codes":["MDO"],"osm":"osm:way/583408103"}},{"inr":"25INR0430","name":"Hackberry Creek Solar","fuel":"solar","tech":"PV","mw":175.51,"county":"Mitchell","zone":"WEST","poi":"tap 345kV 10053 Cattleman Switch  - 1058 Longshore Switch","entity":"Hackberry Creek Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-01","ia":"2025-12-02","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":84,"loc":{"pt":[-101.45234,32.1003],"method":"ERCOT bus number -> substation","subs":["Longshore Substation"],"codes":["LNGSW"],"osm":"osm:way/172212648"}},{"inr":"25INR0432","name":"Brotherton Storage","fuel":"battery","tech":"BA","mw":176.13,"county":"Anderson","zone":"NORTH","poi":"6937 Tucker Sub 138kV","entity":"BT Brotherton Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-05-01","ia":"2024-08-06","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":134,"loc":{"pt":[-95.73988,31.68791],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68165, \"Brotherton Storage\", planned)","subs":[],"codes":["TCKER_RC"],"eia_plant":68165}},{"inr":"25INR0434","name":"Bluegill BESS","fuel":"battery","tech":"BA","mw":251,"county":"Harris","zone":"HOUSTON","poi":"Tap 138 kV 40130 Atascocita - 40690 East Gate","entity":"Bluegill BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-31","ia":null,"cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-95.09703,30.0049],"method":"ERCOT bus number -> substation","subs":["Atascocita Substation"],"codes":["AT"],"osm":"osm:way/336061354"}},{"inr":"25INR0439","name":"Stephens Ranch Wind Repower","fuel":"wind","tech":"WT","mw":12.4,"county":"Borden","zone":"WEST","poi":"59900 Long Draw 345 kV","entity":"Stephens Ranch Wind Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-01","ia":null,"cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-101.63297,32.72112],"method":"ERCOT bus number -> substation","subs":["Long Draw Substation"],"codes":["W_LD_345"],"osm":"osm:way/453310291"}},{"inr":"25INR0440","name":"Bronc Rodeo Solar Project","fuel":"solar","tech":"PV","mw":105.7,"county":"Falls","zone":"NORTH","poi":"Tap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385)","entity":"Energiekontor US Texas SP 16 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.9549142857143,31.214914285714283],"method":"county centroid (substation not located)","subs":[],"codes":["TMPCR","COWSW"]}},{"inr":"25INR0441","name":"Dios BESS","fuel":"battery","tech":"BA","mw":201.08,"county":"Jackson","zone":"SOUTH","poi":"8117 GANADO138kV","entity":"Dios BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-04-03","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-96.5051,29.013],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67918, \"Dios BESS, LLC\", planned)","subs":[],"codes":["GANADO"],"eia_plant":67918}},{"inr":"25INR0442","name":"Happy Dog Storage","fuel":"battery","tech":"BA","mw":104.52,"county":"Milam","zone":"SOUTH","poi":"Tap 345kV 3704 Hog Creek Switch – 3687 Bell County East Switch","entity":"Rosula Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-04","ia":"2024-12-16","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":79,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["HOGSW","BCESW"]}},{"inr":"25INR0446","name":"Guitar BESS","fuel":"battery","tech":"BA","mw":204.79,"county":"Callahan","zone":"WEST","poi":"Tap 138kV 6275 ABEAST4A - 6670 PUTN4C","entity":"Guitar BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.19403,32.38369],"method":"ERCOT bus number -> substation","subs":["Putnam Switching Station"],"codes":["PUTN"],"osm":"osm:way/518641237"}},{"inr":"25INR0447","name":"Waterloo BESS 1","fuel":"battery","tech":"BA","mw":120,"county":"Bastrop","zone":"SOUTH","poi":"Tap 345-kV 7040 Austrop to 7042 Zorn","entity":"Waterloo BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-15","ia":"2024-09-04","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":91,"loc":{"pt":[-97.3476625,30.150325000000002],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Austrop Substation","Zorn Substation"],"codes":["AUSTRO","ZORN"]}},{"inr":"25INR0451","name":"Tres Rios Ranch BESS","fuel":"battery","tech":"BA","mw":290,"county":"Upton","zone":"WEST","poi":"76008 Twelvemile 345kV","entity":"LectricWind LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-12-30","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":220,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":["TWELVE"]}},{"inr":"25INR0458","name":"Surfside Energy Storage","fuel":"battery","tech":"BA","mw":50.34,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 42110 Angleton – 43150 Riwood ckt 82","entity":"Rocky Mountain Energy Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-95.38816,29.141264999999997],"method":"tap between two substations (bus number + name)","subs":["Angleton Substation","Riwood Substation"],"codes":["AE","RIC"]}},{"inr":"25INR0460","name":"Acker BESS","fuel":"battery","tech":"BA","mw":301.04,"county":"Castro","zone":"PANHANDLE","poi":"23912 Ogallala 345 kV","entity":"Ogallala BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-04-17","ia":"2025-04-21","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":228,"loc":{"pt":[-102.03869,34.51974],"method":"ERCOT bus number -> substation","subs":["Ogallala Switching Station"],"codes":["OGALLALA"],"osm":"osm:way/453589277"}},{"inr":"25INR0473","name":"Crowded Star I BESS","fuel":"battery","tech":"BA","mw":202.69,"county":"Jones","zone":"WEST","poi":"68014 Open Sky","entity":"Jones City Solar II, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-09","ia":"2025-12-01","cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":154,"loc":{"pt":[-99.84577142857142,32.64467142857143],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0474","name":"Solheim Solar","fuel":"solar","tech":"PV","mw":108.68,"county":"Bosque","zone":"NORTH","poi":"Meridian (Bus# 315) - Glen Rose (Bus #319) 69 kV","entity":"Solheim Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-11-01","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":34,"loc":{"pt":[-97.48227073170735,31.983534146341466],"method":"county centroid (substation not located)","subs":[],"codes":["GLENROSE","MERIDIAN"]}},{"inr":"25INR0480","name":"Bell Creek BESS","fuel":"battery","tech":"BA","mw":200.9,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 39500 West Colombia - 39703 FM524","entity":"BELL CREEK BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-30","ia":"2024-11-14","cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-95.73493,29.06443],"method":"ERCOT bus number -> substation","subs":["FM 524 Substation"],"codes":["FM524"],"osm":"osm:way/583058250"}},{"inr":"25INR0482","name":"Vault Solar","fuel":"solar","tech":"PV","mw":108.5,"county":"Palo Pinto","zone":"NORTH","poi":"Tap #331 Rwmiller - #320 Jaybird 138kV","entity":"PPM THR Solar","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2026-06-30","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":52,"loc":{"pt":[-98.38665714285715,32.779971428571436],"method":"county centroid (substation not located)","subs":[],"codes":["MIL","JAYBIRD"]}},{"inr":"25INR0489","name":"Ranchero BESS","fuel":"battery","tech":"BA","mw":150,"county":"Crockett","zone":"WEST","poi":"7053 Noelke 345 kV","entity":"Ranchero Battery Facility, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-30","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-101.8672315789474,30.74067763157894],"method":"county centroid (substation not located)","subs":[],"codes":["NOELKE"]}},{"inr":"25INR0491","name":"Tarim BESS","fuel":"battery","tech":"BA","mw":201,"county":"Karnes","zone":"SOUTH","poi":"5727 Pawnee Switching Substation 138kV","entity":"BRP Tarim BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.02393,28.73986],"method":"ERCOT bus number -> substation","subs":["Pawnee Substation"],"codes":["PAWNEE"],"osm":"osm:way/174560152"}},{"inr":"25INR0494","name":"Willow Beach Wind","fuel":"wind","tech":"WT","mw":202.33,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138 kV Bus# 42100 HUD_8 – Bus# 42960 MUSTNG_S04_8 138kV CKT# 4","entity":"Capital Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-01","ia":"2025-06-16","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":151,"loc":{"pt":[-95.20371,29.36273],"method":"ERCOT bus number -> substation","subs":["Mustang Bayou Substation"],"codes":["MU"],"osm":"osm:way/338305192"}},{"inr":"25INR0501","name":"Longday Solar SLF","fuel":"solar","tech":"PV","mw":200.8,"county":"Kinney","zone":"SOUTH","poi":"Tap138 kV 8252 Brackettville - 8260 Escondido","entity":"Longday Solar","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-15","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.39235,29.32463],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Brackettville Substation"],"codes":["BRACKETT","ESCONDID"]}},{"inr":"25INR0502","name":"Longday BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Kinney","zone":"SOUTH","poi":"Tap 138 kV 8252 Brackettville - 8260 Escondido","entity":"Longday Solar","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-15","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-100.39235,29.32463],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Brackettville Substation"],"codes":["BRACKETT","ESCONDID"]}},{"inr":"25INR0504","name":"Lazy Frog Solar SLF","fuel":"solar","tech":"PV","mw":100.4,"county":"Franklin","zone":"NORTH","poi":"11688 Thorn Tree Switch 345kV","entity":"Lazy Frog Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-04-17","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":32,"loc":{"pt":[-95.21255333333333,33.22530666666667],"method":"county centroid (substation not located)","subs":[],"codes":["TTRSW"]}},{"inr":"25INR0505","name":"Mud Cat Solar","fuel":"solar","tech":"PV","mw":100.5,"county":"Lamar","zone":"NORTH","poi":"Tap 138KV 11768 Hawk Hollow – 1768 Deport","entity":"Mud Cat Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-18","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["HWKSW","DPREA"]}},{"inr":"25INR0506","name":"Lazy Frog Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Franklin","zone":"NORTH","poi":"11688 Thorn Tree Switch 345kV","entity":"Lazy Frog Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-04-17","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.21255333333333,33.22530666666667],"method":"county centroid (substation not located)","subs":[],"codes":["TTRSW"]}},{"inr":"25INR0507","name":"Mud Cat Storage","fuel":"battery","tech":"BA","mw":0,"county":"Lamar","zone":"NORTH","poi":"11768 Hawk Hollow – 1768 Deport 138kV","entity":"Mud Cat Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-18","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["HWKSW","DPREA"]}},{"inr":"25INR0512","name":"Monument Hill Solar","fuel":"solar","tech":"PV","mw":200,"county":"Fayette","zone":"SOUTH","poi":"Tap 345kV 7055 Fayette - 9074 Lytton Springs","entity":"RWE Solar Development, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-30","ia":"2025-12-22","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-97.67431,30.00537],"method":"ERCOT bus number -> substation","subs":["Lytton Springs Substation"],"codes":["LYTTON_S"],"osm":"osm:way/173981611"}},{"inr":"25INR0513","name":"Kahla Storage","fuel":"battery","tech":"BA","mw":200.9,"county":"Leon","zone":"NORTH","poi":"Tap 345kV 46020 Limestone 967 Gibbons Creek Circuit 50","entity":"BT Kahla Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-29","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.26071,31.32571],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68168, \"Kahla Storage\", planned)","subs":[],"codes":["LEG","GIBCRK"],"eia_plant":68168}},{"inr":"25INR0515","name":"Fagus Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Childress","zone":"PANHANDLE","poi":"60501 Tesla 345kV","entity":"Greenalia Energy Storage MISAE II LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-09-01","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-100.08684,34.37339],"method":"ERCOT bus number -> substation","subs":["Tesla Substation"],"codes":["TESLA"],"osm":"osm:way/453794442"}},{"inr":"25INR0528","name":"Indigo Storage 2","fuel":"battery","tech":"BA","mw":60,"county":"Fisher","zone":"WEST","poi":"tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2","entity":"Innovative Solar 245, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-17","ia":"2026-03-27","cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":45,"loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"25INR0529","name":"Indigo Storage 3","fuel":"battery","tech":"BA","mw":60,"county":"Fisher","zone":"WEST","poi":"tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2","entity":"Innovative Solar 245, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-17","ia":"2026-03-27","cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":45,"loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"25INR0530","name":"Indigo Storage 4","fuel":"battery","tech":"BA","mw":60,"county":"Fisher","zone":"WEST","poi":"tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2","entity":"Innovative Solar 245, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-17","ia":"2026-03-27","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":45,"loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"25INR0542","name":"Hynes Bay Energy Storage","fuel":"battery","tech":"BA","mw":101.2,"county":"Wharton","zone":"SOUTH","poi":"Tap 138kV 5546 DANEVANG SW - 8121 BLESSING","entity":"Hynes Bay Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.1908,28.88651],"method":"ERCOT bus number -> substation","subs":["Blessing Substation"],"codes":["BLESSING"],"osm":"osm:way/174401034"}},{"inr":"25INR0545","name":"Blue Creek Energy Storage","fuel":"battery","tech":"BA","mw":101.2,"county":"Wharton","zone":"SOUTH","poi":"Tap 138kV 42985 DYANN_POI8 - 43190 S_LANE_B138 Ckt 60","entity":"Blue Creek Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.01556,29.19494],"method":"ERCOT bus number -> substation","subs":["South Lane City Substation"],"codes":["LC"],"osm":"osm:way/336976542"}},{"inr":"25INR0546","name":"VISOL 1 SOLAR","fuel":"solar","tech":"PV","mw":94.78,"county":"Val Verde","zone":"WEST","poi":"Tap 138kV 8683 Comstock - 60389 Corral","entity":"VISOL 1 SOLAR, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-101.13946,29.74746],"method":"ERCOT bus number -> substation","subs":["Comstock Substation"],"codes":["COMSTOCK"],"osm":"osm:way/344841821"}},{"inr":"25INR0547","name":"Indigo solar 2","fuel":"solar","tech":"PV","mw":180,"county":"Fisher","zone":"WEST","poi":"Tap 345KV 68001 Clayton 345KV -68000 WShack Ckt 2","entity":"Indigo Solar 2","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-07-15","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"25INR0550","name":"Friendswood Energy Storage","fuel":"battery","tech":"BA","mw":105.08,"county":"Brazoria","zone":"COASTAL","poi":"TAP 138kV 39010 HASTINGS - 38980 FRIENDSWOOD","entity":"Friendswood Energy Storage LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-03-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":35,"loc":{"pt":[-95.25257,29.48324],"method":"ERCOT bus number -> substation","subs":["Hastings Substation"],"codes":["HASTINGS"],"osm":"osm:way/338758521"}},{"inr":"25INR0552","name":"HarryoungBESS","fuel":"battery","tech":"BA","mw":190.01,"county":"Cameron","zone":"COASTAL","poi":"8319 Rio Hondo sub 138kV","entity":"Gransolar Texas Four LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-15","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-97.61337,26.27748],"method":"ERCOT bus number -> substation","subs":["Rio Hondo Substation"],"codes":["RIOHONDO"],"osm":"osm:way/174719027"}},{"inr":"25INR0554","name":"Dan Kearney BESS","fuel":"battery","tech":"BA","mw":204.38,"county":"Brazoria","zone":"COASTAL","poi":"39703 TNFM524 138kV","entity":"Dan Kearney BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-02-28","ia":"2024-10-18","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":155,"loc":{"pt":[-95.73493,29.06443],"method":"ERCOT bus number -> substation","subs":["FM 524 Substation"],"codes":["FM524"],"osm":"osm:way/583058250"}},{"inr":"25INR0557","name":"McCamey's Castle Battery","fuel":"battery","tech":"BA","mw":409.6,"county":"Upton","zone":"WEST","poi":"76597 Robbins Switch 138 kV","entity":"Castle Storage, LLC","stage":"construction","stage_label":"Under construction (agreement signed)","cod":"2028-03-30","ia":"2025-03-20","cons_start":"2026-05-28","first_seen":"2023-10","months_in_queue":36,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":310,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":["ROBBSW"]}},{"inr":"25INR0566","name":"Copano Bay Energy Storage","fuel":"battery","tech":"BA","mw":201.04,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 42980 Nash - 44010 WA Parish Ckt 2","entity":"Copano Bay Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-95.59391,29.24353],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Nash Substation"],"codes":["NSH","WAP"]}},{"inr":"25INR0579","name":"Albatross BESS 2","fuel":"battery","tech":"BA","mw":159.6,"county":"McLennan","zone":"NORTH","poi":"Tap 138kV 165 Windsor Switch - 161 McGregor","entity":"Albatross Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-30","ia":"2026-09-02","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":121,"loc":{"pt":[-97.363345,31.47492],"method":"tap between two substations (bus number + name)","subs":["Windsor Substation","McGregor Substation"],"codes":["WINDSRSW","MCGREGOR"]}},{"inr":"25INR0582","name":"Maleza Storage II","fuel":"battery","tech":"BA","mw":256.1,"county":"Wharton","zone":"SOUTH","poi":"44220 Julia 345kV","entity":"Brush Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["JUL"]}},{"inr":"25INR0586","name":"Zeus Armstrong Solar","fuel":"solar","tech":"PV","mw":503.56,"county":"Armstrong","zone":"PANHANDLE","poi":"Tap 345KV  23900 AlLIBATES -23914 TULECNYN","entity":"Armstrong Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-17","ia":null,"cons_start":"2026-01-01","first_seen":"2024-08","months_in_queue":26,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-101.35964,35.25496],"method":"ERCOT bus number -> substation","subs":["Alibates Substation"],"codes":["ALIBATES"],"osm":"osm:way/453589128"}},{"inr":"25INR0587","name":"Zeus Armstrong BESS","fuel":"battery","tech":"BA","mw":1043.08,"county":"Armstrong","zone":"PANHANDLE","poi":"Tap 345KV 23900 ALIBATES - 23914 TULECNYN CKT1 & CKT2","entity":"Armstrong BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-17","ia":null,"cons_start":"2026-01-01","first_seen":"2024-09","months_in_queue":25,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":74,"loc":{"pt":[-101.35964,35.25496],"method":"ERCOT bus number -> substation","subs":["Alibates Substation"],"codes":["ALIBATES"],"osm":"osm:way/453589128"}},{"inr":"25INR0588","name":"Zeus Mitchell Solar","fuel":"solar","tech":"PV","mw":804.71,"county":"Mitchell","zone":"WEST","poi":"Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02","entity":"Mitchell Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-17","ia":null,"cons_start":"2025-02-18","first_seen":"2025-06","months_in_queue":16,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":44,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["RGRSW","PRMSW"]}},{"inr":"25INR0589","name":"Zeus Mitchell BESS","fuel":"battery","tech":"BA","mw":1042.94,"county":"Mitchell","zone":"WEST","poi":"Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02","entity":"Mitchell BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-17","ia":null,"cons_start":"2025-02-18","first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":74,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["RGRSW","PRMSW"]}},{"inr":"25INR0590","name":"Zeus Rusk Solar","fuel":"solar","tech":"PV","mw":26.8,"county":"Rusk","zone":"NORTH","poi":"Tap 345kV 3109 Stryker to 3100 Martin Lake","entity":"Rusk Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-02","ia":null,"cons_start":"2026-12-01","first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":1,"loc":{"pt":[-94.57465,32.25699],"method":"one end of the tapped line, matched by name in the POI","subs":["Martin Lake Substation"],"codes":["SCSES","MLSES"]}},{"inr":"25INR0591","name":"Zeus Rusk BESS","fuel":"battery","tech":"BA","mw":208.8,"county":"Rusk","zone":"NORTH","poi":"Tap 345kV 3109 Stryker to 3100 Martin Lake","entity":"Rusk BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-02","ia":null,"cons_start":"2026-12-01","first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-94.57465,32.25699],"method":"one end of the tapped line, matched by name in the POI","subs":["Martin Lake Substation"],"codes":["SCSES","MLSES"]}},{"inr":"25INR0606","name":"Proteus Thornton Ranch Solar SLF","fuel":"solar","tech":"PV","mw":180,"county":"Ward","zone":"WEST","poi":"37990 TNSTAGHORN1 138kV","entity":"Thornton Ranch Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-20","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-103.2332804347826,31.441910869565223],"method":"county centroid (substation not located)","subs":[],"codes":["STAGHORN"]}},{"inr":"25INR0607","name":"Proteus Thornton Ranch Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Ward","zone":"WEST","poi":"37990 TNSTAGHORN1 138kV","entity":"Thornton Ranch Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-11-20","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-103.2332804347826,31.441910869565223],"method":"county centroid (substation not located)","subs":[],"codes":["STAGHORN"]}},{"inr":"25INR0608","name":"Proteus London-Leigh Solar SLF","fuel":"solar","tech":"PV","mw":600,"county":"Glasscock","zone":"WEST","poi":"345kV Bernoulli (bus # 59907)","entity":"London Leigh Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-101.57186,31.912620000000004],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0609","name":"Proteus London-Leigh Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Glasscock","zone":"WEST","poi":"Bernoulli (bus # 59907)","entity":"London Leigh Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-101.46643,31.79914],"method":"substation matched by name in the POI","subs":["Bernoulli Substation"],"codes":[]}},{"inr":"25INR0610","name":"Adam Bryant BESS","fuel":"battery","tech":"BA","mw":99.52,"county":"Medina","zone":"SOUTH","poi":"Tap 138kV 5225 HONDO – 5819 HONDO CREEK","entity":"Adam Bryant BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.08438,29.27239],"method":"ERCOT bus number -> substation","subs":["Hondo Creek Substation"],"codes":["HONDOCK"],"osm":"osm:way/320099403"}},{"inr":"25INR0611","name":"Odessa Energy Storage","fuel":"battery","tech":"BA","mw":202.8,"county":"Howard","zone":"WEST","poi":"1058 LONGSHORE 345kV","entity":"Odessa Energy Storage LLC,","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-01","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-101.45234,32.1003],"method":"ERCOT bus number -> substation","subs":["Longshore Substation"],"codes":["LNGSW"],"osm":"osm:way/172212648"}},{"inr":"25INR0616","name":"Bobcat Bluff Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Archer","zone":"WEST","poi":"1475 Windthorst 138 kV","entity":"Cub Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-17","ia":"2026-01-12","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.74091999999999,33.65954000000001],"method":"county centroid (substation not located)","subs":[],"codes":["WNDSW"]}},{"inr":"25INR0621","name":"Anagram Solar","fuel":"solar","tech":"PV","mw":130.56,"county":"Live Oak","zone":"SOUTH","poi":"8156 Charter 138 kV","entity":"Anagram Solar","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.03055384615384,28.31636923076923],"method":"county centroid (substation not located)","subs":[],"codes":["CHARTER"]}},{"inr":"25INR0622","name":"Turkey Creek Solar SLF","fuel":"solar","tech":"PV","mw":180.9,"county":"Kinney","zone":"SOUTH","poi":"7425 ODLASW 138kV","entity":"Greenray Solar Corporation","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-01","ia":null,"cons_start":"2026-04-01","first_seen":"2024-10","months_in_queue":24,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-100.69976785714287,29.25625357142857],"method":"county centroid (substation not located)","subs":[],"codes":["ODLASW"]}},{"inr":"25INR0623","name":"Turkey Creek Battery Energy Storage System SLF","fuel":"battery","tech":"BA","mw":0,"county":"Kinney","zone":"SOUTH","poi":"7425 ODLASW 138 kV","entity":"Greenray Solar Corporation","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-01","ia":null,"cons_start":"2026-04-01","first_seen":"2024-10","months_in_queue":24,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-100.69976785714287,29.25625357142857],"method":"county centroid (substation not located)","subs":[],"codes":["ODLASW"]}},{"inr":"25INR0628","name":"Wichita Falls Energy Storage","fuel":"battery","tech":"BA","mw":202,"county":"Archer","zone":"WEST","poi":"Tap 345kV 1422 Bowman - 1458 Cobb Switch","entity":"Wichita Falls Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-01","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.60077,33.8106],"method":"ERCOT bus number -> substation","subs":["Bowman Substation"],"codes":["BOMSW"],"osm":"osm:way/171410587"}},{"inr":"25INR0629","name":"Midland Energy Storage","fuel":"battery","tech":"BA","mw":204.7,"county":"Howard","zone":"WEST","poi":"Tap 345kV 10057 Prong Moss Switch - 10062 Rockhound Switch CKT 1","entity":"Midland Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-09","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":["PRMSW","RCKSW"]}},{"inr":"25INR0632","name":"Jenna Eco-Electric Solar","fuel":"solar","tech":"PV","mw":576.3,"county":"Fisher","zone":"WEST","poi":"Tap 345 kV 1048 Tonkawa Switch - 1430 Graham SES","entity":"Clean Energy Holdings, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":182,"loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"25INR0653","name":"Southfork Energy Storage","fuel":"battery","tech":"BA","mw":306.4,"county":"Kimble","zone":"SOUTH","poi":"tap 345kV 60709 Oersted - 60616 Edison\nCKT 1","entity":"Southfork Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-30","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-99.57615,30.33311],"method":"one end of the tapped line, matched by name in the POI","subs":["Edison Substation"],"codes":[]}},{"inr":"25INR0656","name":"Gilleys Energy Storage","fuel":"battery","tech":"BA","mw":306.4,"county":"Wise","zone":"NORTH","poi":"Tap 345 kV 1730 West Krum - 6111 Riley CKT 2","entity":"Gilleys Energy Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-04-21","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":101,"loc":{"pt":[-97.7086,33.17174],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Riley Substation","West Krum Substation"],"codes":["KRWSW","RILEY"]}},{"inr":"25INR0657","name":"O'Bannion Energy Storage","fuel":"battery","tech":"BA","mw":306.4,"county":"Jack","zone":"NORTH","poi":"1506 Long Hollow Switch 345 kV","entity":"O'Bannion Energy Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-21","ia":"2025-12-05","cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":232,"loc":{"pt":[-98.339,33.041],"method":"EIA plant record: same name and fuel in the same county (EIA plant 70367, \"O'Bannion Energy Storage\", planned)","subs":[],"codes":["LONSW"],"eia_plant":70367}},{"inr":"25INR0660","name":"Wooderson Energy Storage","fuel":"battery","tech":"BA","mw":306.4,"county":"Jack","zone":"NORTH","poi":"Tap 345 kV 11418 TECUMSEH- 1421 Willow Creek","entity":"Wooderson Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-20","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["TECSW","WCSWS"]}},{"inr":"25INR0661","name":"McCrae Energy Storage","fuel":"battery","tech":"BA","mw":306.35,"county":"Erath","zone":"NORTH","poi":"Tap 345 kV 1900 COMCHPKW_5 - 1440 COMCHESS1_5","entity":"McCrae Energy Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-25","ia":"2025-12-30","cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":232,"loc":{"pt":[-98.27123999999999,32.199329999999996],"method":"county centroid (substation not located)","subs":[],"codes":["CPSES","CMNSW"]}},{"inr":"25INR0666","name":"GIBSON BRANCH BESS","fuel":"battery","tech":"BA","mw":142.9,"county":"Lampasas","zone":"NORTH","poi":"7064 Lampasas Substation 138kV","entity":"Gibson Branch BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-15","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-98.18371,31.08451],"method":"ERCOT bus number -> substation","subs":["Lampasas Substation"],"codes":["LAMPAS"],"osm":"osm:way/504849091"}},{"inr":"25INR0688","name":"Giga Texas Data Center","fuel":"battery","tech":"BA","mw":133,"county":"Travis","zone":"SOUTH","poi":"HORNSBY Substation POIB# 7047 \n\nSite will be connected behind the meter at Medium Voltage  24.9 kV with non export controls\n\nGSU TRANSFORMER\n80/106/133MVA\n345kV DELTA PRIMARY\n24.9kV WYE-G SECONDARY\nZ=XX%, 65DEG C RISE","entity":"Giga Texas Energy, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-13","ia":"2025-04-30","cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":101,"loc":{"pt":[-97.61386,30.23198],"method":"ERCOT bus number -> substation","subs":["Hornsby Substation"],"codes":["HORNSB"],"osm":"osm:way/1217222649"}},{"inr":"25INR0693","name":"Leon BESS","fuel":"battery","tech":"BA","mw":153.7,"county":"Leon","zone":"NORTH","poi":"Tab 138kv 3355  Grapeland_Magnolia - 3357 Pleasant_Springs.","entity":"Leon BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-02-16","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":["PLSSP"]}},{"inr":"25INR0694","name":"Hays Energy Unit 1 Repower","fuel":"gas","tech":"GT","mw":18,"county":"Hays","zone":"SOUTH","poi":"7043 Hays Energy 345kV","entity":"HAYS ENERGY, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-97.99009,29.78303],"method":"ERCOT bus number -> substation","subs":["Hays Energy Station"],"codes":["HAYSEN"],"osm":"osm:way/124968451"}},{"inr":"25INR0695","name":"Hays Energy Unit 4 Repower","fuel":"gas","tech":"GT","mw":18,"county":"Hays","zone":"SOUTH","poi":"7043 Hays Energy 345kV","entity":"HAYS ENERGY, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-97.99009,29.78303],"method":"ERCOT bus number -> substation","subs":["Hays Energy Station"],"codes":["HAYSEN"],"osm":"osm:way/124968451"}},{"inr":"25INR0853","name":"Tango Lily BESS","fuel":"battery","tech":"BA","mw":200.95,"county":"Tom Green","zone":"WEST","poi":"Tap 138kV 60008 TRIBUTE4A - 6442 REDCREEK4A","entity":"Lightsource Renewable Energy Development LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-22","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.70273333333331,31.513308333333338],"method":"county centroid (substation not located)","subs":[],"codes":["TRIBUTE","REDCREEK"]}},{"inr":"26INR0001","name":"Turin TxHSR TPSS HN-6","fuel":"other","tech":"OT","mw":50,"county":"Grimes","zone":"NORTH","poi":"8 Crutchfield 138kV","entity":"Texas Central Rail Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-15","ia":null,"cons_start":null,"first_seen":"2019-10","months_in_queue":84,"p36":0.077,"p36_basis":"2 of 26 other projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.09855476190472,30.48254523809524],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0004","name":"GRIMES SOLAR","fuel":"solar","tech":"PV","mw":153.45,"county":"Grimes","zone":"NORTH","poi":"40600 Roans Prairie 345kV","entity":"CG Grimes County LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-02-15","ia":null,"cons_start":null,"first_seen":"2022-03","months_in_queue":55,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.09855476190472,30.48254523809524],"method":"county centroid (substation not located)","subs":[],"codes":["RNS"]}},{"inr":"26INR0008","name":"Puerto Del Sol 1","fuel":"solar","tech":"PV","mw":213.8,"county":"Cameron","zone":"COASTAL","poi":"Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1","entity":"PUERTO DEL SOL, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-12-31","ia":null,"cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-97.37989,25.98456],"method":"ERCOT bus number -> substation","subs":["Palmito Substation"],"codes":["PALMITO"],"osm":"osm:way/487061712"}},{"inr":"26INR0019","name":"HyFuels Green Lake Solar","fuel":"solar","tech":"PV","mw":347,"county":"Calhoun","zone":"COASTAL","poi":"Dokmai 138kV Substation (bus #80090)","entity":"HyFuels Green Lake Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":19,"loc":{"pt":[-96.6636911764706,28.409144117647056],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0021","name":"Crossroads Wind","fuel":"wind","tech":"WT","mw":277.38,"county":"Victoria","zone":"SOUTH","poi":"80090 Dokmai 138 KV","entity":"HyFuels Green Lake Wind LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-28","ia":"2024-07-24","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":207,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0024","name":"Becerra Creek Storage 1","fuel":"battery","tech":"BA","mw":125.62,"county":"Webb","zone":"SOUTH","poi":"345 kV Cenizo Substation (#80220)","entity":"Bordas Renewable Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"26INR0033","name":"Fairway Storage","fuel":"battery","tech":"BA","mw":120.3,"county":"Freestone","zone":"NORTH","poi":"Tap 138kV 3503 FAIRWPOD_8 - 196 FAIRFIELD","entity":"Fairway Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-24","ia":"2025-08-11","cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":91,"loc":{"pt":[-95.98603142857144,31.80864857142857],"method":"county centroid (substation not located)","subs":[],"codes":["FRFWS","FFD"]}},{"inr":"26INR0034","name":"Bracero Pecan Storage","fuel":"battery","tech":"BA","mw":238.21,"county":"Reeves","zone":"WEST","poi":"60716 SARAGOSA 138kV","entity":"Bracero Pecan Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-01","ia":"2024-06-27","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":181,"loc":{"pt":[-103.65301,31.04202],"method":"ERCOT bus number -> substation","subs":["Saragosa Substation"],"codes":["SGSA"],"osm":"osm:way/501036527"}},{"inr":"26INR0045","name":"LUND STORAGE CENTER 1","fuel":"battery","tech":"BA","mw":407.55,"county":"Bastrop","zone":"SOUTH","poi":"TAP 138 KV LINE AND CREATE NEW BUS BETWEEN\nKIMBRO (7337) AND ELGIN SWITCH (3650)","entity":"Lund Storage Center 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-31","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-97.3405,30.33466],"method":"one end of the tapped line, matched by name in the POI","subs":["Elgin Substation"],"codes":["KIMBRO"]}},{"inr":"26INR0068","name":"Charro Creek Solar 1 SLF","fuel":"solar","tech":"PV","mw":203,"county":"Karnes","zone":"SOUTH","poi":"Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A","entity":"Charro Creek Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.02393,28.73986],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Pawnee Substation"],"codes":["PAWNEE","COLETO"]}},{"inr":"26INR0069","name":"Charro Creek Storage 1 SLF","fuel":"battery","tech":"BA","mw":0,"county":"Karnes","zone":"SOUTH","poi":"Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A","entity":"Charro Creek Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.02393,28.73986],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Pawnee Substation"],"codes":["PAWNEE","COLETO"]}},{"inr":"26INR0070","name":"Charro Creek Solar 2 SLF","fuel":"solar","tech":"PV","mw":203,"county":"Karnes","zone":"SOUTH","poi":"Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A","entity":"Charro Creek Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.02393,28.73986],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Pawnee Substation"],"codes":["PAWNEE","COLETO"]}},{"inr":"26INR0071","name":"Charro Creek Storage 2 SLF","fuel":"battery","tech":"BA","mw":0,"county":"Karnes","zone":"SOUTH","poi":"Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A","entity":"Charro Creek Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.02393,28.73986],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Pawnee Substation"],"codes":["PAWNEE","COLETO"]}},{"inr":"26INR0072","name":"Charro Creek Solar 3 SLF","fuel":"solar","tech":"PV","mw":203,"county":"Karnes","zone":"SOUTH","poi":"Tap on PAWNEESW5 (#5725) - COLETO7A (#8164) Line","entity":"Charro Creek Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.02393,28.73986],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Pawnee Substation"],"codes":["PAWNEE","COLETO"]}},{"inr":"26INR0073","name":"Charro Creek Storage 3 SLF","fuel":"battery","tech":"BA","mw":0,"county":"Karnes","zone":"SOUTH","poi":"Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A","entity":"Charro Creek Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2023-02","months_in_queue":44,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.02393,28.73986],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Pawnee Substation"],"codes":["PAWNEE","COLETO"]}},{"inr":"26INR0074","name":"Anila Solar","fuel":"solar","tech":"PV","mw":200.8,"county":"Wilson","zone":"SOUTH","poi":"Tap 345kV 5133 Elm Creek - 5901 San Miguel Gen Ckt 1","entity":"Alina Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-30","ia":"2025-03-06","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL"]}},{"inr":"26INR0077","name":"Anila BESS","fuel":"battery","tech":"BA","mw":209,"county":"Wilson","zone":"SOUTH","poi":"Tap of 345 kV Elm Creek (Bus# 5133) - San Miguel Gen (Bus# 5901) Transmission Line Ckt 1","entity":"Alina Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-30","ia":"2025-03-06","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":158,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL"]}},{"inr":"26INR0082","name":"Amerada Solar","fuel":"solar","tech":"PV","mw":301.57,"county":"Freestone","zone":"NORTH","poi":"Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5","entity":"Amerada Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-30","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-96.11341,31.89026],"method":"ERCOT bus number -> substation","subs":["Richland Chambers Substation"],"codes":["RCHBR"],"osm":"osm:way/172583750"}},{"inr":"26INR0083","name":"Zeppelin Energy Storage","fuel":"battery","tech":"BA","mw":163.93,"county":"Tom Green","zone":"WEST","poi":"6464 San Angelo North","entity":"ZEPPELIN ENERGY STORAGE LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-100.43521,31.49401],"method":"ERCOT bus number -> substation","subs":["San Angelo North Substation"],"codes":["SANORTH"],"osm":"osm:way/346161474"}},{"inr":"26INR0084","name":"Amerada Storage","fuel":"battery","tech":"BA","mw":150.78,"county":"Freestone","zone":"NORTH","poi":"Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5","entity":"Amerada Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-21","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.11341,31.89026],"method":"ERCOT bus number -> substation","subs":["Richland Chambers Substation"],"codes":["RCHBR"],"osm":"osm:way/172583750"}},{"inr":"26INR0086","name":"Solarville Solar SLF","fuel":"solar","tech":"PV","mw":402.86,"county":"Kaufman","zone":"NORTH","poi":"Tap 345kV  #3123 Trinidad Switch – #2432 Tri Corner.","entity":"Ville Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Trinidad Substation","Tri-Corner Substation"],"codes":["TRSES","TRCNR"]}},{"inr":"26INR0088","name":"La Salle Solar","fuel":"solar","tech":"PV","mw":512.6,"county":"La Salle","zone":"SOUTH","poi":"Tap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709)\n(Cuernos 345 kV New Station)","entity":"La Salle Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-13","ia":"2025-11-03","cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":245,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"26INR0089","name":"Crescent C BESS","fuel":"battery","tech":"BA","mw":508.34,"county":"La Salle","zone":"SOUTH","poi":"Tap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709) CKT#2","entity":"OCI La Salle ESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-02-12","ia":null,"cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"26INR0098","name":"Douie Solar","fuel":"solar","tech":"PV","mw":221.2,"county":"Freestone","zone":"NORTH","poi":"Tap 138 kV 3501 Sea way Teague - 3394 Jewett","entity":"Buffalo Spring Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-18","ia":"2026-03-08","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":106,"loc":{"pt":[-96.13342,31.37105],"method":"ERCOT bus number -> substation","subs":["Jewett Substation"],"codes":["JEWET"],"osm":"osm:way/99932982"}},{"inr":"26INR0107","name":"Freedom Falcon BESS","fuel":"battery","tech":"BA","mw":501.9,"county":"Zapata","zone":"SOUTH","poi":"Tap 345kV #80224 Tiempo - #80227 Rapido","entity":"Falcon BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-11","ia":null,"cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-99.33245116279073,26.98322558139536],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0110","name":"Western Flats Solar","fuel":"solar","tech":"PV","mw":410.2,"county":"Crane","zone":"WEST","poi":"Tap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane.","entity":"Hecate Energy Point Mountain Solar Facility 1 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-01","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":23,"loc":{"pt":[-102.57905833333332,31.29205416666667],"method":"county centroid (substation not located)","subs":[],"codes":["KINGMO"]}},{"inr":"26INR0111","name":"Graphic Packaging Gas","fuel":"gas","tech":"GT","mw":43.36,"county":"McLennan","zone":"NORTH","poi":"Tap 138kV 3446 Peppervine Switch - 3544 Castleman Substation","entity":"Graphic Packaging International","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-04","ia":"2026-07-30","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-97.3018,31.5209],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0112","name":"Lemma Solar","fuel":"solar","tech":"PV","mw":100.61,"county":"Knox","zone":"WEST","poi":"6088 Benjamin AEP 138kV","entity":"Greening USA Corp.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-99.80097,33.58458],"method":"ERCOT bus number -> substation","subs":["Benjamin Substation"],"codes":["BENJAMIN"],"osm":"osm:way/518902999"}},{"inr":"26INR0113","name":"Meitner Wind","fuel":"wind","tech":"WT","mw":709,"county":"Gray","zone":"PANHANDLE","poi":"79000 Gray Substation 345kV","entity":"IP Meitner, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-24","ia":"2024-04-19","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":529,"loc":{"pt":[-100.86746,35.44454],"method":"county centroid (substation not located)","subs":[],"codes":["CTT_GRAY"]}},{"inr":"26INR0116","name":"Falcon Zapata Storage 138","fuel":"battery","tech":"BA","mw":200.79,"county":"Zapata","zone":"SOUTH","poi":"Tap 138kV 8299 Zapata - 8957 Lopeno","entity":"Falcon BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-11","ia":"2026-02-03","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-99.171595,26.810225],"method":"tap between two located substations","subs":["Zapata Substation","Lopeno Substation"],"codes":["ZAPATA","LOPENO"]}},{"inr":"26INR0117","name":"Oyster Creek Solar I SLF","fuel":"solar","tech":"PV","mw":0,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 42110 Angleton - 42050 Clute","entity":"Oyster Creek Solar 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-01","ia":null,"cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.42884,29.22677],"method":"ERCOT bus number -> substation","subs":["Angleton Substation"],"codes":["AE"],"osm":"osm:way/244479862"}},{"inr":"26INR0118","name":"Oyster Creek Storage I SLF","fuel":"battery","tech":"BA","mw":0,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 42110 Angleton - 42050 Clute","entity":"Oyster Creek Solar 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-01","ia":null,"cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.42884,29.22677],"method":"ERCOT bus number -> substation","subs":["Angleton Substation"],"codes":["AE"],"osm":"osm:way/244479862"}},{"inr":"26INR0120","name":"Bramble Energy Center","fuel":"battery","tech":"BA","mw":225.1,"county":"Zavala","zone":"SOUTH","poi":"8236 West Batesville 138kV","entity":"Bramble Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-22","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":16,"loc":{"pt":[-99.72318,28.95563],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67767, \"Bramble Energy Center\", planned)","subs":[],"codes":["W_BATESV"],"eia_plant":67767}},{"inr":"26INR0121","name":"Pioneer Hutt Solar (Alternative POI)","fuel":"solar","tech":"PV","mw":116,"county":"Midland","zone":"WEST","poi":"TAP 345kV 11028 Odessa Ehv - 59901 Grelton (West C)","entity":"NextEra Energy Interconnection Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-101.88149,32.1664],"method":"ERCOT bus number -> substation","subs":["Grelton Substation"],"codes":["W_GT_345"],"osm":"osm:way/453310286"}},{"inr":"26INR0130","name":"Elm Flats Solar SLF","fuel":"solar","tech":"PV","mw":125.84,"county":"Navarro","zone":"NORTH","poi":"Tap 138kV 3472 BRIAR_CRK_8 – 3467 POWELL1_8","entity":"Orca Falls Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-11-01","ia":"2025-11-21","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":60,"loc":{"pt":[-96.25031944444444,32.16245277777778],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0131","name":"Elm Flats Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Navarro","zone":"NORTH","poi":"Tap 138kV 3472 BRIAR_CRK_8 – 3467 POWELL1_8","entity":"Orca Falls Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-11-01","ia":"2025-11-21","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.30476,32.11358],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67552, \"Elm Flats Solar\", planned)","subs":[],"codes":[],"eia_plant":67552}},{"inr":"26INR0143","name":"Santa Garcias Solar","fuel":"solar","tech":"PV","mw":265,"county":"Kleberg","zone":"COASTAL","poi":"Tap 138kV 8515 Alazan - 8458 Barney Davis","entity":"Oxy Renewable Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-05-30","ia":"2025-12-31","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":127,"loc":{"pt":[-97.50221,27.55986],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Alazan Substation"],"codes":["ALAZAN","B_DAVIS"]}},{"inr":"26INR0144","name":"Wittig Solar","fuel":"solar","tech":"PV","mw":106.9,"county":"Wharton","zone":"SOUTH","poi":"138 kV Gulftie (#43340) – San Bernard (#43110)","entity":"Greenalia Solar Power Wittig LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-30","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-95.87477,29.24506],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67568, \"Wittig Solar Park\", planned)","subs":[],"codes":["GLF","SAN"],"eia_plant":67568}},{"inr":"26INR0146","name":"DMF Sagerton Solar SLF","fuel":"solar","tech":"PV","mw":125.5,"county":"Haskell","zone":"WEST","poi":"Tap 138kV 6158 Aspermont – 6161 Paint Creek","entity":"Double Mountain Fork LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-15","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.58071,33.08003],"method":"ERCOT bus number -> substation","subs":["Paint Creek Substation"],"codes":["PAINTCRE"],"osm":"osm:way/20952215"}},{"inr":"26INR0147","name":"Seven Springs Solar","fuel":"solar","tech":"PV","mw":145,"county":"Lampasas","zone":"NORTH","poi":"Tap 7061 COPPERAS COVE 7260 Kempner 138kV","entity":"Hancock Springs, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-26","ia":"2025-08-28","cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":69,"loc":{"pt":[-98.05398,31.09134],"method":"ERCOT bus number -> substation","subs":["Kempner Substation"],"codes":["KEMPNE"],"osm":"osm:way/504849106"}},{"inr":"26INR0148","name":"DMF Sagerton Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Haskell","zone":"WEST","poi":"Tap 138kV 6158 Aspermont – 6161 Paint Creek","entity":"Double Mountain Fork LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-15","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-99.58071,33.08003],"method":"ERCOT bus number -> substation","subs":["Paint Creek Substation"],"codes":["PAINTCRE"],"osm":"osm:way/20952215"}},{"inr":"26INR0150","name":"Proving Ground Solar","fuel":"solar","tech":"PV","mw":82.1,"county":"Schleicher","zone":"WEST","poi":"Tap 138 kV Live Oak (6500) - Santiago (6490)","entity":"Lantana Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-100.51324,31.11627],"method":"ERCOT bus number -> substation","subs":["Santiago Substation"],"codes":["SANTIAGO"],"osm":"osm:way/345830312"}},{"inr":"26INR0159","name":"Proving Ground BESS","fuel":"battery","tech":"BA","mw":51.4,"county":"Schleicher","zone":"WEST","poi":"Tap 138kV 6500 Live Oak - 6490 Santiago","entity":"Lantana Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-100.51324,31.11627],"method":"ERCOT bus number -> substation","subs":["Santiago Substation"],"codes":["SANTIAGO"],"osm":"osm:way/345830312"}},{"inr":"26INR0161","name":"Timberline Solar","fuel":"solar","tech":"PV","mw":201,"county":"Nacogdoches","zone":"NORTH","poi":"Tap 345 kV 3119 Nacogdoches SE - 3116 Mt Enterprise","entity":"Timberline Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-05","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-94.58744044943823,31.53967078651684],"method":"county centroid (substation not located)","subs":[],"codes":["NCDSE","ENTPR"]}},{"inr":"26INR0162","name":"Timberline Storage","fuel":"battery","tech":"BA","mw":100.5,"county":"Nacogdoches","zone":"NORTH","poi":"Tap 345 kV 3119 Nacogdoches SE - 3116 Mt Enterprise","entity":"Timberline Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-05","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-94.58744044943823,31.53967078651684],"method":"county centroid (substation not located)","subs":[],"codes":["NCDSE","ENTPR"]}},{"inr":"26INR0171","name":"Lazy U Solar 1","fuel":"solar","tech":"PV","mw":252,"county":"Hardeman","zone":"WEST","poi":"Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A ckt2","entity":"Lazy U Solar 1","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-30","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.87214,34.2655],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68357, \"Lazy U Solar 1\", planned)","subs":[],"codes":["EDITHCLA","TESLA"],"eia_plant":68357}},{"inr":"26INR0172","name":"Lazy U Solar 2","fuel":"solar","tech":"PV","mw":252,"county":"Hardeman","zone":"WEST","poi":"Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A CKT2","entity":"Lazy U Solar 2","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-30","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.87214,34.2655],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68358, \"Lazy U Solar 2\", planned)","subs":[],"codes":["EDITHCLA","TESLA"],"eia_plant":68358}},{"inr":"26INR0173","name":"Juniper Ridge BESS 1","fuel":"battery","tech":"BA","mw":251.5,"county":"Hardeman","zone":"WEST","poi":"Tap EDITHCLA7B [60505] -- TESLA7A [60501] 345kV ckt2","entity":"Lazy U ESS 1","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-30","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-99.69096590909089,34.29610909090909],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Edith Clarke Substation","Tesla Substation"],"codes":["EDITHCLA","TESLA"]}},{"inr":"26INR0174","name":"Juniper Ridge BESS 2","fuel":"battery","tech":"BA","mw":251.5,"county":"Hardeman","zone":"WEST","poi":"Tap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2","entity":"Lazy U ESS 2","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-30","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-99.69096590909089,34.29610909090909],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Edith Clarke Substation","Tesla Substation"],"codes":["EDITHCLA","TESLA"]}},{"inr":"26INR0176","name":"Dionysus Solar","fuel":"solar","tech":"PV","mw":153.26,"county":"Houston","zone":"NORTH","poi":"Tap 138kV 6733 Mustang Prairie - 6732 Latexo","entity":"Dionysus Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-15","ia":"2026-07-31","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":73,"loc":{"pt":[-95.42522,31.36438],"method":"ERCOT bus number -> substation","subs":["Latexo Substation"],"codes":["LATEXO"],"osm":"osm:way/630115172"}},{"inr":"26INR0177","name":"Dionysus Storage","fuel":"battery","tech":"BA","mw":77.28,"county":"Houston","zone":"NORTH","poi":"Tap 138kV 6733 Mustang Prairie - 6732 Latexo","entity":"Dionysus Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-15","ia":"2026-07-31","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":59,"loc":{"pt":[-95.42522,31.36438],"method":"ERCOT bus number -> substation","subs":["Latexo Substation"],"codes":["LATEXO"],"osm":"osm:way/630115172"}},{"inr":"26INR0179","name":"SunShiner ESS","fuel":"battery","tech":"BA","mw":200,"county":"Zavala","zone":"SOUTH","poi":"8008 La Pryor4A","entity":"SunShiner ESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-11","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.83407,28.93712],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68363, \"SunShiner ESS\", planned)","subs":[],"codes":[],"eia_plant":68363}},{"inr":"26INR0180","name":"Cape Rich BESS","fuel":"battery","tech":"BA","mw":150.52,"county":"Navarro","zone":"NORTH","poi":"3387 Revolution Switch 138kV","entity":"Cape Rich BESS","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-04-18","ia":"2025-02-03","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-96.25031944444444,32.16245277777778],"method":"county centroid (substation not located)","subs":[],"codes":["REVSW"]}},{"inr":"26INR0181","name":"Solar Star Frontier BESS","fuel":"battery","tech":"BA","mw":101.02,"county":"Cameron","zone":"COASTAL","poi":"8656 Luna 138kV","entity":"Solar Star Frontier BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-27","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":["LUNA"]}},{"inr":"26INR0184","name":"Arc Energy Storage","fuel":"battery","tech":"BA","mw":204.5,"county":"Lamar","zone":"NORTH","poi":"Tap 138kV 1693 Paris Switch - 11806 ENLOE T8","entity":"Paris Energy Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["PRSSW"]}},{"inr":"26INR0185","name":"Beitel Energy Storage","fuel":"battery","tech":"BA","mw":200.6,"county":"Jack","zone":"NORTH","poi":"579 Jack County 138kV","entity":"Brazos Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-30","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["JACKCNTY"]}},{"inr":"26INR0188","name":"Western Flats Storage","fuel":"battery","tech":"BA","mw":410.7,"county":"Crane","zone":"WEST","poi":"Tap 138 kV 76615 Crane -76635 King Mountain","entity":"Hecate Energy Point Mountain Solar Facility 1 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-102.57905833333332,31.29205416666667],"method":"county centroid (substation not located)","subs":[],"codes":["KINGMO"]}},{"inr":"26INR0189","name":"Skipjack Energy Storage","fuel":"battery","tech":"BA","mw":150.6,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138 42980 Nash - 44010 W A Parish ckt #2","entity":"Skipper Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-28","ia":"2024-08-13","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-95.59391,29.24353],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Nash Substation"],"codes":["NSH","WAP"]}},{"inr":"26INR0194","name":"Motif BESS II","fuel":"battery","tech":"BA","mw":201.13,"county":"Bandera","zone":"SOUTH","poi":"7440 Tarpley 138kV","entity":"Motif Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-19","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.27475,29.66536],"method":"ERCOT bus number -> substation","subs":["Tarpley Substation"],"codes":["TARPLE"],"osm":"osm:way/15402877"}},{"inr":"26INR0200","name":"Vaughn Energy Storage","fuel":"battery","tech":"BA","mw":200.6,"county":"Grimes","zone":"NORTH","poi":"13 Keith 138kV","entity":"Vaughn Battery Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-08-28","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-96.09855476190472,30.48254523809524],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0201","name":"Rock Rose BESS","fuel":"battery","tech":"BA","mw":208.5,"county":"Fort Bend","zone":"HOUSTON","poi":"44070 Whaley 345 kV","entity":"Rock Rose Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-19","ia":"2024-06-15","cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":158,"loc":{"pt":[-95.73535,29.39524],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67249, \"Rock Rose Energy Storage\", planned)","subs":[],"codes":["WLY"],"eia_plant":67249}},{"inr":"26INR0211","name":"Titus Low Carbon Ventures Solar 1","fuel":"solar","tech":"PV","mw":338.04,"county":"San Patricio","zone":"COASTAL","poi":"Tap 345kV 8249 Angstrom - 8624 Grissom","entity":"Vaquero Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-16","ia":"2026-05-26","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":162,"loc":{"pt":[-97.43837,28.04431],"method":"ERCOT bus number -> substation","subs":["Angstrom Substation"],"codes":["ANGSTROM"],"osm":"osm:way/1089997597"}},{"inr":"26INR0215","name":"JackGard BESS","fuel":"battery","tech":"BA","mw":200.59,"county":"Jack","zone":"NORTH","poi":"1429 Jacksboro 345kV","entity":"Jackgard BESS","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-17","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["JCKSW"]}},{"inr":"26INR0218","name":"Fort Chadbourne Cattle BESS","fuel":"battery","tech":"BA","mw":50.23,"county":"Coke","zone":"WEST","poi":"6324 Fort Chadbourne 138 kv","entity":"Fort Chadbourne BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-29","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-100.27452,32.01702],"method":"substation matched by name in the POI","subs":["Fort Chadbourne Substation"],"codes":["FT_CHADB"]}},{"inr":"26INR0219","name":"Mountain Springs BESS","fuel":"battery","tech":"BA","mw":150.52,"county":"Cooke","zone":"NORTH","poi":"704 Mountain Springs 138 kV","entity":"Mountain Springs BESS","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-01","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":50,"loc":{"pt":[-97.19572000000001,33.82535636363637],"method":"county centroid (substation not located)","subs":[],"codes":["MTNSPRGS"]}},{"inr":"26INR0222","name":"GOTHAM BESS","fuel":"battery","tech":"BA","mw":151.2,"county":"Nueces","zone":"COASTAL","poi":"5640 DRISCOLLSUB9 69kV","entity":"AEU BATTERY PROJECT IV LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-03-17","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-97.74095,27.62646],"method":"ERCOT bus number -> substation","subs":["Driscoll Substation"],"codes":["DRSCOLS"],"osm":"osm:way/490190235"}},{"inr":"26INR0226","name":"First Capitol BESS","fuel":"battery","tech":"BA","mw":257.48,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV West Columbia Main (39500) - Sweeny Cogen (110505)","entity":"First Capitol BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-11-30","ia":"2025-05-15","cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":195,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["WCOLMAIN","SCLPCOGN"]}},{"inr":"26INR0228","name":"Santa Monica Solar","fuel":"solar","tech":"PV","mw":105.85,"county":"Navarro","zone":"NORTH","poi":"Tap 345 KV 68091 NAVARRO - 3381 BIGBRNW_5 Ckt 2","entity":"Karol Solar IV","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-09-20","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"26INR0229","name":"Pamplona Solar","fuel":"solar","tech":"PV","mw":42.38,"county":"Austin","zone":"SOUTH","poi":"Tap 138 kV 44740 WALLIS_S65_8  - 44700 GEBHRT_X65B8 Ckt#65","entity":"Karol Solar III","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-10-17","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-96.07624,29.63097],"method":"ERCOT bus number -> substation","subs":["Wallis Substation"],"codes":["WA"],"osm":"osm:way/94434949"}},{"inr":"26INR0230","name":"Titus Sienta Solar","fuel":"solar","tech":"PV","mw":501.93,"county":"Pecos","zone":"WEST","poi":"Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub","entity":"Sol Sienta Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-19","ia":null,"cons_start":"2025-10-01","first_seen":"2023-10","months_in_queue":36,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":158,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0231","name":"Energy City BESS","fuel":"battery","tech":"BA","mw":204.9,"county":"Midland","zone":"WEST","poi":"Tap 138kV AQUEDUCT SUB(#1172) - Mockingbird North Tap(#11299)","entity":"Energy City BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-07","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-102.0827,31.825559999999996],"method":"county centroid (substation not located)","subs":[],"codes":["AQDCT"]}},{"inr":"26INR0238","name":"Clapton Solar","fuel":"solar","tech":"PV","mw":200.99,"county":"Mills","zone":"NORTH","poi":"Tap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch","entity":"Clapton Solar","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-09","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.19531,31.53798],"method":"one end of the tapped line, matched by name in the POI","subs":["Brown Substation"],"codes":["BUCSW","BWNSW"]}},{"inr":"26INR0241","name":"Sol Marina SLF Energy Center","fuel":"solar","tech":"PV","mw":171.09,"county":"Ellis","zone":"NORTH","poi":"Tap 345kV Stainback Switch (bus# 2217) – Big Onion Switch (bus# 2466)","entity":"Sol Marina Energy Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-29","ia":"2025-04-25","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":82,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["STBSW","BIGSW"]}},{"inr":"26INR0243","name":"Caladium BESS","fuel":"battery","tech":"BA","mw":201.28,"county":"Waller","zone":"HOUSTON","poi":"57664 Sunnyside 69kV","entity":"Caladium Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-30","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.05243,29.91458],"method":"ERCOT bus number -> substation","subs":["Sunnyside Substation"],"codes":["SUNNYS"],"osm":"osm:way/582229088"}},{"inr":"26INR0247","name":"Jane Storage Energy Center","fuel":"battery","tech":"BA","mw":240.6,"county":"Martin","zone":"WEST","poi":"59901 Grelton 345 kV","entity":"NMRE Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-11-01","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-101.88149,32.1664],"method":"ERCOT bus number -> substation","subs":["Grelton Substation"],"codes":["W_GT_345"],"osm":"osm:way/453310286"}},{"inr":"26INR0250","name":"Duffy BESS","fuel":"battery","tech":"BA","mw":241.05,"county":"Matagorda","zone":"COASTAL","poi":"Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)","entity":"Duffy Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-31","ia":"2025-07-28","cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":183,"loc":{"pt":[-96.05017,28.79956],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["South Texas Project Switchyard"],"codes":["STP","WAP"]}},{"inr":"26INR0252","name":"Neutron Storage","fuel":"battery","tech":"BA","mw":104.5,"county":"McLennan","zone":"NORTH","poi":"Tap 345kV 13405 Trading House - 68090 Sam Switch","entity":"Elawan Neutron Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-29","ia":"2025-12-05","cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":79,"loc":{"pt":[-97.01809,31.8977],"method":"one end of the tapped line, matched by name in the POI","subs":["Sam Switching Station"],"codes":["THSES","SAMSW"]}},{"inr":"26INR0253","name":"Goldfinch Solar","fuel":"solar","tech":"PV","mw":150.77,"county":"Van Zandt","zone":"NORTH","poi":"Tap Connection Bus 2485 Poetry Switch to 3103 Shamburger Switch","entity":"BT DJ4M Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-31","ia":"2026-09-24","cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":72,"loc":{"pt":[-95.25356,32.41986],"method":"one end of the tapped line, matched by name in the POI","subs":["Shamburger Substation"],"codes":["POESW","SHBSW"]}},{"inr":"26INR0254","name":"Goldfinch Storage","fuel":"battery","tech":"BA","mw":100.44,"county":"Van Zandt","zone":"NORTH","poi":"Tap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch","entity":"BT DJ4M Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-31","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.25356,32.41986],"method":"one end of the tapped line, matched by name in the POI","subs":["Shamburger Substation"],"codes":["POESW"]}},{"inr":"26INR0255","name":"Operation Sunshine","fuel":"solar","tech":"PV","mw":603.2,"county":"Concho","zone":"WEST","poi":"7077 Amos Creek 345kV","entity":"Duck Creek Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-04-01","ia":"2025-08-27","cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":288,"loc":{"pt":[-99.715092,31.492472000000003],"method":"county centroid (substation not located)","subs":[],"codes":["AMOSCR"]}},{"inr":"26INR0256","name":"Camino Ranch Solar 2 SLF","fuel":"solar","tech":"PV","mw":237.21,"county":"Houston","zone":"NORTH","poi":"Tap to Jim English (#3351) – Flat Branch (#3345) 138kV","entity":"Camino Ranch Solar Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-09","ia":"2025-12-31","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":113,"loc":{"pt":[-95.530215625,31.298589062499996],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0257","name":"Camino Ranch Storage 2 SLF","fuel":"battery","tech":"BA","mw":238.45,"county":"Houston","zone":"NORTH","poi":"Tap to Jim English (#3351) – Flat Branch (#3345) 138kV","entity":"Camino Ranch Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-09","ia":"2025-12-31","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":181,"loc":{"pt":[-95.530215625,31.298589062499996],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0259","name":"Cottontail Energy Center","fuel":"battery","tech":"BA","mw":200.85,"county":"Colorado","zone":"SOUTH","poi":"7258 Glidden Substation 138kV","entity":"Cottontail Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-10-19","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.57187,29.69691],"method":"ERCOT bus number -> substation","subs":["Glidden Substation"],"codes":["GLIDDE"],"osm":"osm:way/98019896"}},{"inr":"26INR0260","name":"Evans Creek Energy Storage","fuel":"battery","tech":"BA","mw":102.96,"county":"Val Verde","zone":"WEST","poi":"Comstock 138kV Substation (PSSE Bus #8683)","entity":"Evans Creek Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-01","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-101.13946,29.74746],"method":"ERCOT bus number -> substation","subs":["Comstock Substation"],"codes":["COMSTOCK"],"osm":"osm:way/344841821"}},{"inr":"26INR0261","name":"Bastrop Peaking Generators (TEF-Due Diligence)","fuel":"gas","tech":"GT","mw":1104,"county":"Bastrop","zone":"SOUTH","poi":"7048 L_GARFIE5_1Y 345kV","entity":"MPH Bastrop Peakers, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-07","ia":"2025-12-19","cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":729,"loc":{"pt":[-97.54535,30.14264],"method":"ERCOT bus number -> substation","subs":["Garfield Substation"],"codes":["GARFIE"],"osm":"osm:way/173298395"}},{"inr":"26INR0269","name":"Moccasin Solar","fuel":"solar","tech":"PV","mw":603.59,"county":"Stonewall","zone":"WEST","poi":"Tapping the 345 kV Line from Kirchhoff (Bus# 60707) to Clear Crossing (Bus# 60515)","entity":"Swenson Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-06","ia":"2024-09-04","cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":289,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"26INR0273","name":"Momentum Hazy Jane BESS","fuel":"battery","tech":"BA","mw":125.5,"county":"Ector","zone":"WEST","poi":"Tap 138kV 1102 Judkins - 1110 Edward","entity":"MOMENTUM HAZY JANE, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-02-26","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-102.59715,31.71645],"method":"ERCOT bus number -> substation","subs":["Judkins Substation"],"codes":["JDKNS"],"osm":"osm:way/459878020"}},{"inr":"26INR0280","name":"Pethrus BESS","fuel":"battery","tech":"BA","mw":174.08,"county":"Wichita","zone":"WEST","poi":"Tap Wichita Falls Switch (#1464) – North Star (#1467) 138 kV Line","entity":"Pethrus BESS, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-03-03","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":57,"loc":{"pt":[-98.70719629629629,34.10137777777778],"method":"county centroid (substation not located)","subs":[],"codes":["WFSSW","NSTAR"]}},{"inr":"26INR0287","name":"Firebird BESS","fuel":"battery","tech":"BA","mw":102.65,"county":"Ector","zone":"WEST","poi":"Tap 138kV #1099 Southwestern Portland Tap - #1052 Rexall","entity":"TX BESS 6, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-29","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["RXALL"]}},{"inr":"26INR0290","name":"Cold Creek Solar 2","fuel":"solar","tech":"PV","mw":431.87,"county":"Schleicher","zone":"WEST","poi":"Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)","entity":"Cold Creek Solar and Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-28","ia":"2025-04-23","cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":206,"loc":{"pt":[-100.54306,31.04735],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Big Hill Substation"],"codes":["BIGHIL","TWINBU"]}},{"inr":"26INR0291","name":"Cold Creek Storage 2","fuel":"battery","tech":"BA","mw":171.75,"county":"Schleicher","zone":"WEST","poi":"Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)","entity":"Cold Creek Solar and Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-28","ia":"2025-04-23","cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":130,"loc":{"pt":[-100.54306,31.04735],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Big Hill Substation"],"codes":["BIGHIL","TWINBU"]}},{"inr":"26INR0294","name":"Longleaf Power Station","fuel":"gas","tech":"GT","mw":600,"county":"Angelina","zone":"NORTH","poi":"Redland Substation (# 3321)","entity":"WattBridge Texas Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":195,"loc":{"pt":[-94.64201866666667,31.276913333333336],"method":"county centroid (substation not located)","subs":[],"codes":["REDSW"]}},{"inr":"26INR0295","name":"Trinity Hills BESS SLF","fuel":"battery","tech":"BA","mw":94,"county":"Archer","zone":"WEST","poi":"To the 345 kV Garvey Road Switch (#17002)","entity":"Phoenix Battery Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-24","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.74091999999999,33.65954000000001],"method":"county centroid (substation not located)","subs":[],"codes":["GRVSW"]}},{"inr":"26INR0296","name":"Sherbino II BESS SLF","fuel":"battery","tech":"BA","mw":77.37,"county":"Pecos","zone":"WEST","poi":"38430 TNMP White baker Switching Station 138kV","entity":"Phoenix Battery Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-18","ia":"2024-08-01","cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":59,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNWHTBKR"]}},{"inr":"26INR0297","name":"Buzzi Maryneal Wind Project","fuel":"wind","tech":"WT","mw":18,"county":"Nolan","zone":"WEST","poi":"1413 SWEETCRK-9","entity":"Buzzi Unicem USA","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-01-02","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-100.45700000000001,32.34828],"method":"county centroid (substation not located)","subs":[],"codes":["SKPOI"]}},{"inr":"26INR0300","name":"Whitewright Solar 2","fuel":"solar","tech":"PV","mw":301.69,"county":"Grayson","zone":"NORTH","poi":"Tap 345kV 1729 Valley South – Anna Switch 2373","entity":"SunWR, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-02","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-96.63926,33.31798],"method":"one end of the tapped line, matched by name in the POI","subs":["Anna Substation"],"codes":["VLYSO","ANASW"]}},{"inr":"26INR0301","name":"Bhalu Storage","fuel":"battery","tech":"BA","mw":205.5,"county":"Howard","zone":"WEST","poi":"Tap 138kV Bulldog (#23833) – Elbow (#23834)","entity":"Bhalu Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-21","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-101.47836,32.16885],"method":"ERCOT bus number -> substation","subs":["Elbow Substation"],"codes":["ELBOW"],"osm":"osm:way/456417835"}},{"inr":"26INR0302","name":"Young County Energy Storage","fuel":"battery","tech":"BA","mw":104.5,"county":"Young","zone":"WEST","poi":"TAP 138 KV BUS AND CREAT NEW BUS BETWEEN MURRAY (792) AND GRAHAM SES (1431)\nCOUNTY : YOUNG","entity":"Young County Energy Storage LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-08-01","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":34,"loc":{"pt":[-98.74132,33.22008],"method":"county centroid (substation not located)","subs":[],"codes":["MURRAY","GRSES"]}},{"inr":"26INR0304","name":"JUNIPERUSSS","fuel":"solar","tech":"PV","mw":80.33,"county":"Hopkins","zone":"NORTH","poi":"Tap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621)","entity":"BLUE STONE RENEWABLE XXI LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-09","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-95.5872457142857,33.27730285714285],"method":"county centroid (substation not located)","subs":[],"codes":["CSHSW","SDYSW"]}},{"inr":"26INR0306","name":"Nautilus Heavy Storage","fuel":"battery","tech":"BA","mw":256.24,"county":"San Patricio","zone":"COASTAL","poi":"8422 Dupont 138kV","entity":"Nautilus Heavy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-01-30","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":["I_DUPSW"]}},{"inr":"26INR0311","name":"Senator Aggreko Solar","fuel":"solar","tech":"PV","mw":258.91,"county":"Maverick","zone":"SOUTH","poi":"138 kV Sunglow Substation (#78016)","entity":"Senator Aggreko Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-31","ia":"2025-12-31","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":124,"loc":{"pt":[-100.45602340425532,28.661644680851072],"method":"county centroid (substation not located)","subs":[],"codes":["SUNGLO"]}},{"inr":"26INR0312","name":"Senator Aggreko Storage","fuel":"battery","tech":"BA","mw":147.63,"county":"Maverick","zone":"SOUTH","poi":"138 kV Sunglow Substation (#78016)","entity":"Senator Aggreko Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-31","ia":"2025-12-31","cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":112,"loc":{"pt":[-100.45602340425532,28.661644680851072],"method":"county centroid (substation not located)","subs":[],"codes":["SUNGLO"]}},{"inr":"26INR0313","name":"Edens Solar","fuel":"solar","tech":"PV","mw":70.75,"county":"Hill","zone":"NORTH","poi":"Tap 69kV 3532 Itasca - 3523 Hillsboro","entity":"Hill PV, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-09","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-97.13697,32.01481],"method":"one end of the tapped line, matched by name in the POI","subs":["Hillsboro Substation"],"codes":["ITSCA"]}},{"inr":"26INR0314","name":"Brazos River BESS","fuel":"battery","tech":"BA","mw":180.36,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 39530 West Colombia LOCAL TNP - 39560 ANGLETON TNP","entity":"Brazos River BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-30","ia":"2025-05-24","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":137,"loc":{"pt":[-95.62124,29.15041],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68814, \"Brazos River BESS LLC\", planned)","subs":[],"codes":["WCOLLOCL","ANGLETON"],"eia_plant":68814}},{"inr":"26INR0317","name":"Pinnacle Point Energy Storage","fuel":"battery","tech":"BA","mw":101.3,"county":"Harris","zone":"HOUSTON","poi":"Tap Highlands (Bus # 40812) - HANEY ( BUS # 40790) 138 kV","entity":"GCI Pinnacle Point, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-07-10","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-95.01107999999999,29.8109],"method":"tap between two located substations","subs":["Highlands Substation","Haney Substation"],"codes":["HL","HNY"]}},{"inr":"26INR0318","name":"Sandford Solar","fuel":"solar","tech":"PV","mw":126.18,"county":"Wise","zone":"NORTH","poi":"Tap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429)","entity":"BT Sandford Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-01-30","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.1068,33.27719],"method":"one end of the tapped line, matched by name in the POI","subs":["Jacksboro Substation"],"codes":["BDGSW","JCKSW"]}},{"inr":"26INR0319","name":"Sandford Storage","fuel":"battery","tech":"BA","mw":100.93,"county":"Wise","zone":"NORTH","poi":"Tap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429)","entity":"BT Sandford Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-01-30","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.1068,33.27719],"method":"one end of the tapped line, matched by name in the POI","subs":["Jacksboro Substation"],"codes":["BDGSW","JCKSW"]}},{"inr":"26INR0327","name":"Sleepy Hollow BESS","fuel":"battery","tech":"BA","mw":123.1,"county":"Throckmorton","zone":"WEST","poi":"Tap 138 kV 792 Murray - 6169 Paint Creek","entity":"Sleepy Hollow BESS, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-02-22","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":41,"loc":{"pt":[-99.58071,33.08003],"method":"ERCOT bus number -> substation","subs":["Paint Creek Substation"],"codes":["PAINTCRE"],"osm":"osm:way/20952215"}},{"inr":"26INR0328","name":"Yorktown BESS","fuel":"battery","tech":"BA","mw":150.49,"county":"DeWitt","zone":"SOUTH","poi":"(#78575) LCRA Yorktown 138 kV","entity":"Navitas Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-16","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-97.49862,28.97475],"method":"ERCOT bus number -> substation","subs":["Yorktown Substation"],"codes":["YORKTO"],"osm":"osm:way/511105772"}},{"inr":"26INR0329","name":"Pianissimo BESS II","fuel":"battery","tech":"BA","mw":202,"county":"Wise","zone":"NORTH","poi":"Tap 138kV 685 LEO - 587 GREENWOOD","entity":"Pianissimo Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-101.91185,32.02477],"method":"ERCOT bus number -> substation","subs":["Greenwood Substation"],"codes":["GRENWOOD"],"osm":"osm:way/457051871"}},{"inr":"26INR0330","name":"Alamo City BESS","fuel":"battery","tech":"BA","mw":128.2,"county":"Bexar","zone":"SOUTH","poi":"Tap 138kV 5294 Martinez - 5110 JT Deely","entity":"ALAMO CITY ESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-21","ia":"2025-05-22","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-98.32237,29.4507],"method":"ERCOT bus number -> substation","subs":["Martinez Substation"],"codes":["C5"],"osm":"osm:way/675054239"}},{"inr":"26INR0331","name":"RUSH ESS","fuel":"battery","tech":"BA","mw":201.27,"county":"Bexar","zone":"SOUTH","poi":"Tap 345 kV 5231 HOWARD_5 – 5400 SPRUCE","entity":"OCI Solar Power LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-02-08","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.57196,29.27843],"method":"one end of the tapped line, matched by name in the POI","subs":["Howard Substation"],"codes":["HOWARD","CALAVERS"]}},{"inr":"26INR0340","name":"SOUTHERN SELECT ENERGY STORAGE","fuel":"battery","tech":"BA","mw":204.85,"county":"Galveston","zone":"HOUSTON","poi":"Bus Name: TNHEIGHTS_1\nBus Number: 38740","entity":"SOUTHERN SELECT ENERGY STORAGE LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-05-24","ia":"2025-05-09","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":155,"loc":{"pt":[-94.88558831168828,29.4265025974026],"method":"county centroid (substation not located)","subs":[],"codes":["HEIGHTTN"]}},{"inr":"26INR0341","name":"Megamouth Energy Storage","fuel":"battery","tech":"BA","mw":101.3,"county":"Harris","zone":"HOUSTON","poi":"42750 Mykawa 138 kV","entity":"GCI Megamouth, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2025-11-18","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":77,"loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["MYK"]}},{"inr":"26INR0343","name":"Stinger Energy Storage","fuel":"battery","tech":"BA","mw":200.8,"county":"Harris","zone":"HOUSTON","poi":"Tap Atascocita 138kV Substation (Bus # 40130) - Lake Houston (Bus #40820)","entity":"Stinger Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-01","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-95.09703,30.0049],"method":"ERCOT bus number -> substation","subs":["Atascocita Substation"],"codes":["AT"],"osm":"osm:way/336061354"}},{"inr":"26INR0345","name":"NET Power Demonstration plant","fuel":"gas","tech":"GT","mw":25.5,"county":"Harris","zone":"HOUSTON","poi":"42360 Mirage POI 8 138kV","entity":"NET Power LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-08-21","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.467,"p36_basis":"14 of 30 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-95.05364,29.64597],"method":"ERCOT bus number -> substation","subs":["Mirage Substation"],"codes":["MIRAGE"],"osm":"osm:way/585135019"}},{"inr":"26INR0347","name":"Midfield PV Project SLF","fuel":"solar","tech":"PV","mw":150,"county":"Matagorda","zone":"COASTAL","poi":"Tap 138kV 8121 Blessing - 8125 Lolita","entity":"HQC Solar Holdings 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.1908,28.88651],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Blessing Substation"],"codes":["BLESSING","LOLITA"]}},{"inr":"26INR0355","name":"Pleiades Storage","fuel":"battery","tech":"BA","mw":205.5,"county":"Glasscock","zone":"WEST","poi":"Tap 138kV Einstein 23852 - 10043 St. Lawrence","entity":"Pleiades Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-09-22","ia":null,"cons_start":"2028-05-22","first_seen":"2024-03","months_in_queue":31,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":68,"loc":{"pt":[-101.52061,31.76959],"method":"ERCOT bus number -> substation","subs":["Einstein Substation"],"codes":["EINSTEIN"],"osm":"osm:way/521497612"}},{"inr":"26INR0357","name":"Operation Sunshine Storage","fuel":"battery","tech":"BA","mw":409.8,"county":"Concho","zone":"WEST","poi":"7077 Amos Creek 345kV","entity":"Duck Creek Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-04-01","ia":"2025-08-27","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":311,"loc":{"pt":[-99.715092,31.492472000000003],"method":"county centroid (substation not located)","subs":[],"codes":["AMOSCR"]}},{"inr":"26INR0359","name":"Uva Creek Solar","fuel":"solar","tech":"PV","mw":302.16,"county":"Borden","zone":"WEST","poi":"Muleshoe #59922 345 KV","entity":"Grape Creek Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-25","ia":"2024-10-30","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":144,"loc":{"pt":[-101.5044,32.67976],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68739, \"Uva Creek Solar\", planned)","subs":[],"codes":[],"eia_plant":68739}},{"inr":"26INR0362","name":"Midfield BESS Project SLF","fuel":"battery","tech":"BA","mw":0,"county":"Matagorda","zone":"COASTAL","poi":"Tap 138kV 8121 Blessing - 8125 Lolita","entity":"HQC Solar Holdings 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.1908,28.88651],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Blessing Substation"],"codes":["BLESSING","LOLITA"]}},{"inr":"26INR0363","name":"Saint Charles Energy Storage","fuel":"battery","tech":"BA","mw":202.7,"county":"Houston","zone":"NORTH","poi":"TAP 138kV 3345 FLATBRA_8 - 3351 JIM_ENG_8","entity":"RSN STORAGE 001, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-95.530215625,31.298589062499996],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0364","name":"Pollo Pinto Solar","fuel":"solar","tech":"PV","mw":100.57,"county":"Palo Pinto","zone":"NORTH","poi":"Tap 138kV 331 RWMILLER - 320 JAYBIRD","entity":"TX Palo Pinto SB 6, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-02-24","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":32,"loc":{"pt":[-98.38665714285715,32.779971428571436],"method":"county centroid (substation not located)","subs":[],"codes":["MIL","JAYBIRD"]}},{"inr":"26INR0365","name":"BLACK BEAR SOLAR","fuel":"solar","tech":"PV","mw":102.9,"county":"Crockett","zone":"WEST","poi":"#6564 ILLN4A 138 KV","entity":"ESCONDIDO DRAW RESOURCES, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-101.8672315789474,30.74067763157894],"method":"county centroid (substation not located)","subs":[],"codes":["ILLN"]}},{"inr":"26INR0366","name":"BLACK BEAR BESS","fuel":"battery","tech":"BA","mw":51.2,"county":"Crockett","zone":"WEST","poi":"#6564 ILLN4A 138kV","entity":"ESCONDIDO DRAW RESOURCES, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-101.8672315789474,30.74067763157894],"method":"county centroid (substation not located)","subs":[],"codes":["ILLN"]}},{"inr":"26INR0370","name":"Central Power Station","fuel":"gas","tech":"GT","mw":750,"county":"Grimes","zone":"NORTH","poi":"967 Gibbons Creek 345kV","entity":"Hydra-Gen Energy Unlimited","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-05-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":244,"loc":{"pt":[-96.09855476190472,30.48254523809524],"method":"county centroid (substation not located)","subs":[],"codes":["GIBCRK"]}},{"inr":"26INR0374","name":"Cobra Clean Energy Center","fuel":"battery","tech":"BA","mw":100.4,"county":"Brazoria","zone":"COASTAL","poi":"looped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100)","entity":"Cobra Clean Energy Center LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-10-08","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.20371,29.36273],"method":"ERCOT bus number -> substation","subs":["Mustang Bayou Substation"],"codes":["MU"],"osm":"osm:way/338305192"}},{"inr":"26INR0375","name":"Avalon BESS","fuel":"battery","tech":"BA","mw":522.12,"county":"Fort Bend","zone":"HOUSTON","poi":"Tapping the 345 kV Line from Smithers (Bus# 44650) to Bellaire (Bus# 47000).","entity":"Avalon BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-01","ia":"2024-12-17","cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":396,"loc":{"pt":[-95.4512,29.72463],"method":"ERCOT bus number -> substation","subs":["Bellaire Substation"],"codes":["BI"],"osm":"osm:relation/8286448"}},{"inr":"26INR0376","name":"Blackcat Storage","fuel":"battery","tech":"BA","mw":200.59,"county":"Matagorda","zone":"COASTAL","poi":"138kV Blackcat Substation (#80124)","entity":"Matagorda ESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-95.99499,28.97488],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67558, \"Blackcat BESS\", planned)","subs":[],"codes":["BLACKCAT"],"eia_plant":67558}},{"inr":"26INR0380","name":"Pepper Solar Farm","fuel":"solar","tech":"PV","mw":120.72,"county":"McLennan","zone":"NORTH","poi":"Tap 345kV 3405 THOUSE__5  - 3406 ELM_MOTT_5","entity":"Pepper Solar Farm LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-20","ia":"2025-06-23","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":58,"loc":{"pt":[-97.10018,31.69932],"method":"ERCOT bus number -> substation","subs":["Elm Mott Substation"],"codes":["ELMOT"],"osm":"osm:relation/6820580"}},{"inr":"26INR0385","name":"Nanulak BESS","fuel":"battery","tech":"BA","mw":181.54,"county":"Reeves","zone":"WEST","poi":"38113 TNCOYOTSPG1 138kV","entity":"Nanulak BESS, L.L.C.","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-30","ia":"2025-11-19","cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":138,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["COYOTSPR"]}},{"inr":"26INR0386","name":"Zeus Spade Wind","fuel":"wind","tech":"WT","mw":987.3,"county":"Mitchell","zone":"WEST","poi":"Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek","entity":"Spade Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-20","ia":null,"cons_start":"2026-10-01","first_seen":"2025-04","months_in_queue":18,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":216,"loc":{"pt":[-100.87305,32.136795],"method":"tap between two substations (bus number + name)","subs":["Morgan Creek Substation","Gasconades Creek Substation"],"codes":["MGSES","GASCCR"]}},{"inr":"26INR0387","name":"Zeus Spade BESS","fuel":"battery","tech":"BA","mw":446.3,"county":"Mitchell","zone":"WEST","poi":"Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek","entity":"Spade BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-20","ia":null,"cons_start":"2026-10-01","first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":32,"loc":{"pt":[-100.87305,32.136795],"method":"tap between two substations (bus number + name)","subs":["Morgan Creek Substation","Gasconades Creek Substation"],"codes":["MGSES","GASCCR"]}},{"inr":"26INR0388","name":"Aggie Solar Project SLF","fuel":"solar","tech":"PV","mw":103.7,"county":"Reeves","zone":"WEST","poi":"POI: COYOTE SPRINGS SUBSTATION - 138KV\nBUS NUMBER : 38113\nCOUNTY : REEVES\nPOI LOCATION: 31.396675, -103.6252777","entity":"reNRG TX 8 LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-11-30","ia":"2026-09-30","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":50,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["COYOTSPR","GRO"]}},{"inr":"26INR0389","name":"AGGIE STORAGE PROJECT SLF","fuel":"battery","tech":"BA","mw":0,"county":"Reeves","zone":"WEST","poi":"POI: COYOTE SPRINGS SUBSTATION - 138KV\nBUS NUMBER: 38113\nPOI LOCATION: 31.396675, -103.6252777\nCOUNTY: REEVES","entity":"reNRG TX 8 LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-11-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["COYOTSPR","GRO"]}},{"inr":"26INR0391","name":"Jumping Cactus Storage","fuel":"battery","tech":"BA","mw":125.32,"county":"Duval","zone":"SOUTH","poi":"138 kV Zenaida Bus# 80043","entity":"Dove Wing Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0393","name":"Dove Wing Storage","fuel":"battery","tech":"BA","mw":122.21,"county":"Duval","zone":"SOUTH","poi":"138 kV Zenaida Bus# 80043","entity":"Dove Wing Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0394","name":"Timber Cove Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Freestone","zone":"NORTH","poi":"Tap 138 kV 212 Winkler - 3510 Pin Oak","entity":"Freestone Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-06-01","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.98603142857144,31.80864857142857],"method":"county centroid (substation not located)","subs":[],"codes":["WINKLER","POKSW"]}},{"inr":"26INR0396","name":"Kodiak AGR1","fuel":"other","tech":"OT","mw":132,"county":"Reeves","zone":"WEST","poi":"38113 TNCOYOTSPG1","entity":"Hunt Energy Network, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-08","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.077,"p36_basis":"2 of 26 other projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["COYOTSPR"]}},{"inr":"26INR0402","name":"HILLBORO BESS","fuel":"battery","tech":"BA","mw":130.9,"county":"Hill","zone":"NORTH","poi":"Tap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)","entity":"Abei Energy Green XI LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-05","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["ASHSW","REVSW"]}},{"inr":"26INR0408","name":"Liatris Flexible Gas","fuel":"gas","tech":"GT","mw":204.71,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138 kV (42980) Nash - (44010) WA Parish CKT02","entity":"Stone Creek Peaker LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-02-01","ia":"2025-11-01","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":135,"loc":{"pt":[-95.59391,29.24353],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Nash Substation"],"codes":["NSH","WAP"]}},{"inr":"26INR0409","name":"Lucky 7 Solar","fuel":"solar","tech":"PV","mw":101.35,"county":"Hopkins","zone":"NORTH","poi":"Tap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCH","entity":"Lucky 7 Solar Farm LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-20","ia":"2025-08-13","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":48,"loc":{"pt":[-95.721,33.082],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69687, \"Lucky 7 Solar Farm LLC\", planned)","subs":[],"codes":["SDYSW","CSHSW"],"eia_plant":69687}},{"inr":"26INR0410","name":"Prost ESS","fuel":"battery","tech":"BA","mw":202.7,"county":"Austin","zone":"SOUTH","poi":"Tap 138kV L_PISEK_8_1Y (#7296) - L_WELCOM8_1Y(#7577)","entity":"Prost ESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-08","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.525215,29.976935],"method":"tap between two located substations","subs":["Pisek Substation","Welcome Substation"],"codes":["PISEK","WELCOM"]}},{"inr":"26INR0411","name":"Tex-Bar ESS","fuel":"battery","tech":"BA","mw":201.5,"county":"Madison","zone":"NORTH","poi":"Tap 345kV JEWETT_S5 (#3390) -- SINGLETON (#44645)","entity":"Tex-Bar ESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-09-08","ia":"2025-12-26","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":153,"loc":{"pt":[-96.05335500000001,31.01618],"method":"tap between two located substations","subs":["Jewett Substation","Singleton Substation"],"codes":["JEWET","SNG"]}},{"inr":"26INR0412","name":"BumbleBee Solar","fuel":"solar","tech":"PV","mw":200.86,"county":"Bee","zone":"SOUTH","poi":"Tap 345kV 5725 PawneeSW5 - 8689 Tango","entity":"BumbleBee Solar Farm LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-03-01","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.02393,28.73986],"method":"ERCOT bus number -> substation","subs":["Pawnee Substation"],"codes":["PAWNEE"],"osm":"osm:way/174560152"}},{"inr":"26INR0417","name":"GAMAY ENERGY STORAGE","fuel":"battery","tech":"BA","mw":418.6,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138 kV Line from TNFM524 (39703) to West Columbia Main (39500), in Brazoria County.","entity":"GAMAY ENERGY STORAGE LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-01","ia":"2025-05-27","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":317,"loc":{"pt":[-95.73493,29.06443],"method":"ERCOT bus number -> substation","subs":["FM 524 Substation"],"codes":["FM524"],"osm":"osm:way/583058250"}},{"inr":"26INR0418","name":"TE Smith Storage 2","fuel":"battery","tech":"BA","mw":125.32,"county":"Rockwall","zone":"NORTH","poi":"2478 Royse 345kV","entity":"Smith II Battery Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-07","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-96.42992000000001,32.88122],"method":"county centroid (substation not located)","subs":[],"codes":["RYSSW"]}},{"inr":"26INR0419","name":"Lone Bow Solar","fuel":"solar","tech":"PV","mw":277.46,"county":"Val Verde","zone":"WEST","poi":"Tap 138 kV 8683 Comstock - 60389 Corral","entity":"Greenalia Solar Power Lone Bow LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-15","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-101.13946,29.74746],"method":"ERCOT bus number -> substation","subs":["Comstock Substation"],"codes":["COMSTOCK"],"osm":"osm:way/344841821"}},{"inr":"26INR0420","name":"Whitetail BESS","fuel":"battery","tech":"BA","mw":180,"county":"Mitchell","zone":"WEST","poi":"tap Salt Mine (#23846) to Bulldog (#23833) 138kV","entity":"Hunt Energy Network, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-08","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["SALTMINE","BULLDOG"]}},{"inr":"26INR0422","name":"PowerVault BESS","fuel":"battery","tech":"BA","mw":254.8,"county":"McLennan","zone":"NORTH","poi":"Tap 345kV 3406 Elm Mott - 3405 Tradinghouse Ses","entity":"SMT Elm Mott BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-97.10018,31.69932],"method":"ERCOT bus number -> substation","subs":["Elm Mott Substation"],"codes":["ELMOT"],"osm":"osm:relation/6820580"}},{"inr":"26INR0425","name":"Twinwood Solar 1","fuel":"solar","tech":"PV","mw":358.06,"county":"Waller","zone":"HOUSTON","poi":"Tap 138kV 44750 FULSHR_S25_8 - 44860 TWINWD_S25_8","entity":"Twinwood PV1, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-02-01","ia":"2025-11-07","cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":171,"loc":{"pt":[-96.07973999999999,30.02432461538461],"method":"county centroid (substation not located)","subs":[],"codes":["FUL","TWN"]}},{"inr":"26INR0426","name":"Maderagemela BESS1","fuel":"battery","tech":"BA","mw":153.96,"county":"Waller","zone":"HOUSTON","poi":"Tap 138kV 44750 FULSHR_S25_8 to 44860 TWINWD_S25_8","entity":"Twinwood ES1, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-02-01","ia":"2025-11-07","cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":117,"loc":{"pt":[-96.07973999999999,30.02432461538461],"method":"county centroid (substation not located)","subs":[],"codes":["FUL","TWN"]}},{"inr":"26INR0427","name":"BremRaek BESS","fuel":"battery","tech":"BA","mw":200.6,"county":"Austin","zone":"SOUTH","poi":"7271 LCRA New Bremen 138 kV","entity":"BremRaek BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-15","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.39903,29.91982],"method":"ERCOT bus number -> substation","subs":["New Bremen Substation"],"codes":["NEWBRE"],"osm":"osm:way/101678153"}},{"inr":"26INR0428","name":"Diamond Cowboy Storage","fuel":"battery","tech":"BA","mw":103.5,"county":"San Patricio","zone":"COASTAL","poi":"Tap 345kV 8249 Angstrom - 8624 Grissom","entity":"Diamond B Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-16","ia":"2026-05-26","cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":78,"loc":{"pt":[-97.43837,28.04431],"method":"ERCOT bus number -> substation","subs":["Angstrom Substation"],"codes":["ANGSTROM"],"osm":"osm:way/1089997597"}},{"inr":"26INR0430","name":"Clapton Storage","fuel":"battery","tech":"BA","mw":208.91,"county":"Mills","zone":"NORTH","poi":"Tap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch","entity":"Clapton BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-09","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.19531,31.53798],"method":"one end of the tapped line, matched by name in the POI","subs":["Brown Substation"],"codes":["BUCSW","BWNSW"]}},{"inr":"26INR0431","name":"Big Rooter West Solar","fuel":"solar","tech":"PV","mw":403.2,"county":"Robertson","zone":"NORTH","poi":"39950# TNTNP_ONE_3  345 KV","entity":"Big Rooter West, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-31","ia":"2025-02-18","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":193,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"26INR0432","name":"Big Rooter West Storage","fuel":"battery","tech":"BA","mw":201.08,"county":"Robertson","zone":"NORTH","poi":"39950# TNTNP_ONE_3  345 KV","entity":"Big Rooter West, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"26INR0440","name":"Hamby Solar","fuel":"solar","tech":"PV","mw":205.8,"county":"Jones","zone":"WEST","poi":"6245 ABILENE ROBERTSON PRISON 138 KV","entity":"Abilene GCE LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-27","ia":"2025-12-31","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":98,"loc":{"pt":[-99.84577142857142,32.64467142857143],"method":"county centroid (substation not located)","subs":[],"codes":["ROBERSON"]}},{"inr":"26INR0442","name":"Donna BESS","fuel":"battery","tech":"BA","mw":53.91,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 345 kV 80137 Stewart Road - 8383 North Edinburg","entity":"Donna Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-22","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-98.18922,26.34411],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["North Edinburg Substation"],"codes":["STEWART","NEDIN"]}},{"inr":"26INR0443","name":"Sullivan Solar","fuel":"solar","tech":"PV","mw":170.68,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 138kV 8798 La Grulla - 8355 Goodwin","entity":"Sullivan Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-25","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-98.45157,26.24529],"method":"ERCOT bus number -> substation","subs":["Goodwin Substation"],"codes":["GOODWIN"],"osm":"osm:way/512360947"}},{"inr":"26INR0444","name":"Sullivan BESS","fuel":"battery","tech":"BA","mw":72.19,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 138kV 8798 La Grulla - 8355 Goodwin","entity":"Sullivan Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-25","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-98.45157,26.24529],"method":"ERCOT bus number -> substation","subs":["Goodwin Substation"],"codes":["GOODWIN"],"osm":"osm:way/512360947"}},{"inr":"26INR0445","name":"Sword Solar","fuel":"solar","tech":"PV","mw":137.18,"county":"Starr","zone":"SOUTH","poi":"Tap 138 kV 8394 Liston - 8392 Bates","entity":"Hidalgo Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-22","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-98.57639,26.41136],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Liston Substation"],"codes":["LISTON","BATES"]}},{"inr":"26INR0446","name":"Sword BESS","fuel":"battery","tech":"BA","mw":40.1,"county":"Starr","zone":"SOUTH","poi":"Tap 138 kV 8394 Liston - 8392 Bates","entity":"Hidalgo Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-22","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-98.57639,26.41136],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Liston Substation"],"codes":["LISTON","BATES"]}},{"inr":"26INR0452","name":"Cannibal Draw Solar","fuel":"solar","tech":"PV","mw":149.5,"county":"Glasscock","zone":"WEST","poi":"Sand_Bluff 345 kV (59902)","entity":"Cannibal Draw Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-10","ia":"2025-01-17","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":71,"loc":{"pt":[-101.2732,32.00354],"method":"substation matched by name in the POI","subs":["Sand Bluff Substation"],"codes":[]}},{"inr":"26INR0453","name":"Cannibal Draw Storage","fuel":"battery","tech":"BA","mw":98.6,"county":"Glasscock","zone":"WEST","poi":"Sand_Bluff 345 kV (59902)","entity":"Cannibal Draw Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-04-10","ia":"2025-01-17","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":75,"loc":{"pt":[-101.2732,32.00354],"method":"substation matched by name in the POI","subs":["Sand Bluff Substation"],"codes":[]}},{"inr":"26INR0454","name":"Dove Creek Solar","fuel":"solar","tech":"PV","mw":163.6,"county":"Tom Green","zone":"WEST","poi":"Tap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)","entity":"Dove Creek Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-100.57054,31.280575],"method":"tap between two located substations","subs":["Big Hill Substation","Twin Buttes Substation"],"codes":["BIGHIL","TWINBU"]}},{"inr":"26INR0455","name":"Dove Creek Storage","fuel":"battery","tech":"BA","mw":162.5,"county":"Tom Green","zone":"WEST","poi":"Tap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)","entity":"Dove Creek Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-100.57054,31.280575],"method":"tap between two located substations","subs":["Big Hill Substation","Twin Buttes Substation"],"codes":["BIGHIL","TWINBU"]}},{"inr":"26INR0460","name":"Lightning Ridge Energy Storage","fuel":"battery","tech":"BA","mw":204.7,"county":"Jack","zone":"NORTH","poi":"Tap #1429 Jacksboro Substation 345kV","entity":"Lightning Ridge Storage LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-03-21","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":68,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["JCKSW"]}},{"inr":"26INR0461","name":"Rio Hondo BESS","fuel":"battery","tech":"BA","mw":200.78,"county":"Cameron","zone":"COASTAL","poi":"Tap 138kV #80309 Las Pulgas - #8319 Rio Hondo","entity":"SBESS TX25 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.61337,26.27748],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Rio Hondo Substation"],"codes":["LASPULGA","RIOHONDO"]}},{"inr":"26INR0464","name":"Ceres BESS","fuel":"battery","tech":"BA","mw":202.7,"county":"Hunt","zone":"NORTH","poi":"Tap 138 kV 6883 QUINLAN NORTH SS - 6860 UNION VALLEY SS","entity":"Ceres BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-10","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.04117000000001,32.98473],"method":"county centroid (substation not located)","subs":[],"codes":["UVSS_RC"]}},{"inr":"26INR0465","name":"Lavita BESS","fuel":"battery","tech":"BA","mw":606,"county":"Bell","zone":"NORTH","poi":"Tap 345kV Temple Pecan Creek (3412) - Temple Switch (3414) 345kV ckt 2","entity":"Lavita BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":43,"loc":{"pt":[-97.5635916666667,31.034500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["TMPCR","TMPSW"]}},{"inr":"26INR0466","name":"Symphony BESS","fuel":"battery","tech":"BA","mw":612,"county":"Austin","zone":"SOUTH","poi":"46220 PETERS","entity":"Symphony BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":43,"loc":{"pt":[-96.2006,29.84771],"method":"substation matched by name in the POI","subs":["Peters Substation"],"codes":["PT"]}},{"inr":"26INR0467","name":"Basketflower Storage","fuel":"battery","tech":"BA","mw":92,"county":"Eastland","zone":"NORTH","poi":"Tap 138kV Risingstar (285) - Nimrod (289)","entity":"Basketflower Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":30,"loc":{"pt":[-98.84097142857142,32.25261428571429],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0468","name":"Basketflower Solar","fuel":"solar","tech":"PV","mw":183,"county":"Eastland","zone":"NORTH","poi":"Tap 138kV Risingstar (285) - Nimrod (289)","entity":"Basketflower Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":58,"loc":{"pt":[-98.84097142857142,32.25261428571429],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0469","name":"Roxton Storage","fuel":"battery","tech":"BA","mw":102,"county":"Lamar","zone":"NORTH","poi":"Tap 138 KV Bois Pump (1835) - Brookston (1833)","entity":"Roxton Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-21","ia":"2026-09-03","cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":77,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0470","name":"Roxton Solar","fuel":"solar","tech":"PV","mw":116.8,"county":"Lamar","zone":"NORTH","poi":"Tap 138 KV Bois Pump (1835) - Brookston (1833)","entity":"Roxton Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-21","ia":"2026-09-03","cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":56,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0472","name":"Bologna BESS","fuel":"battery","tech":"BA","mw":202.56,"county":"Wichita","zone":"WEST","poi":"Tap 138kV #1450 Pleasant Valley Switch - #1492 Wichita Falls Riverbend","entity":"MALONEY BESS LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-04-19","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-98.70719629629629,34.10137777777778],"method":"county centroid (substation not located)","subs":[],"codes":["PLVSW","WRBND"]}},{"inr":"26INR0474","name":"Sorghum BESS","fuel":"battery","tech":"BA","mw":208.9,"county":"Wharton","zone":"SOUTH","poi":"#44060 Blue Substation 345kV","entity":"Blue Creek BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-01","ia":"2025-01-08","cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":158,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["BLU"]}},{"inr":"26INR0485","name":"Prospector Energy Storage","fuel":"battery","tech":"BA","mw":204.6,"county":"Howard","zone":"WEST","poi":"Natural Dam 138kV Substation (23836)","entity":"Prospector Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-09-30","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":["NATDAM"]}},{"inr":"26INR0487","name":"Anglin BESS","fuel":"battery","tech":"BA","mw":206,"county":"Tarrant","zone":"NORTH","poi":"1883 EVRSW 138kV","entity":"Fort Worth BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-97.34302,32.72868],"method":"county centroid (substation not located)","subs":[],"codes":["EVRSW"]}},{"inr":"26INR0496","name":"Hardeman BESS","fuel":"battery","tech":"BA","mw":104,"county":"Hardeman","zone":"WEST","poi":"6050 PAUL 138kV","entity":"Quanah BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.69096590909089,34.29610909090909],"method":"county centroid (substation not located)","subs":[],"codes":["PAUL"]}},{"inr":"26INR0497","name":"Rosharon BESS","fuel":"battery","tech":"BA","mw":120,"county":"Brazoria","zone":"COASTAL","poi":"138 kV 42570 Archer (ACH)","entity":"Rosharon BESS LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":40,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["ACH"]}},{"inr":"26INR0498","name":"Buckaroo BESS","fuel":"battery","tech":"BA","mw":120,"county":"Parker","zone":"NORTH","poi":"Tap 138kV BROCK(487) – STHBROCKSW(489)","entity":"Weatherford BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-08","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-97.85690000000001,32.7341],"method":"county centroid (substation not located)","subs":[],"codes":["BRK"]}},{"inr":"26INR0499","name":"Mineral Springs BESS","fuel":"battery","tech":"BA","mw":104,"county":"Burnet","zone":"SOUTH","poi":"7065 DOBVI 138kV","entity":"Burnet County LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-02","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.3321863636364,30.76416818181818],"method":"county centroid (substation not located)","subs":[],"codes":["DOBYVI"]}},{"inr":"26INR0500","name":"Shackleford BESS","fuel":"battery","tech":"BA","mw":206.5,"county":"Shackelford","zone":"WEST","poi":"1442 CFRSW 345kV","entity":"Shackelford County BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-23","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.40562,32.69164],"method":"county centroid (substation not located)","subs":[],"codes":["CFRSW"]}},{"inr":"26INR0501","name":"Rolling Plains BESS","fuel":"battery","tech":"BA","mw":120,"county":"Haskell","zone":"WEST","poi":"6104 SMOKY HILL 345kV","entity":"Haskell County BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-99.7829,33.22218],"method":"county centroid (substation not located)","subs":[],"codes":["SMOKYHIL"]}},{"inr":"26INR0502","name":"Fudge Ranch BESS","fuel":"battery","tech":"BA","mw":104,"county":"Kaufman","zone":"NORTH","poi":"<6902><TALTY_RC><138kV>","entity":"Crandall BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-06-30","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["TALTY_RC"]}},{"inr":"26INR0503","name":"Rex Storage","fuel":"battery","tech":"BA","mw":256.4,"county":"Harris","zone":"HOUSTON","poi":"Tap 138 kV 48096 El Dorado - 43610 Scarsdale CKT 92","entity":"Rex BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-30","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-95.14163,29.56191],"method":"one end of the tapped line, matched by name in the POI","subs":["El Dorado Substation"],"codes":["SCR"]}},{"inr":"26INR0505","name":"Goldhill Energy Storage","fuel":"battery","tech":"BA","mw":200.58,"county":"Victoria","zone":"SOUTH","poi":"Tap 138kV 8154 VISTRON4B – 8189 TUNGSTEN4A","entity":"Goldhill Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.83302,28.57457],"method":"ERCOT bus number -> substation","subs":["Vistron Substation"],"codes":["VISTRON"],"osm":"osm:way/337681591"}},{"inr":"26INR0507","name":"Los Vientos IB Repower","fuel":"wind","tech":"WT","mw":184.8,"county":"Willacy","zone":"COASTAL","poi":"#8319 RIOHONDO 138 kV","entity":"Los Vientos Windpower IB, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":40,"loc":{"pt":[-97.61337,26.27748],"method":"ERCOT bus number -> substation","subs":["Rio Hondo Substation"],"codes":["RIOHONDO"],"osm":"osm:way/174719027"}},{"inr":"26INR0511","name":"Little Star Solar","fuel":"solar","tech":"PV","mw":61.6,"county":"Bastrop","zone":"SOUTH","poi":"#9043 CISTERN 345kV","entity":"RWE Clean Energy Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-97.3476625,30.150325000000002],"method":"county centroid (substation not located)","subs":[],"codes":["CISTERN"]}},{"inr":"26INR0514","name":"Techne BESS","fuel":"battery","tech":"BA","mw":202.7,"county":"Bastrop","zone":"SOUTH","poi":"7560 RED ROCK 138kV","entity":"Techne BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.4521,29.96203],"method":"ERCOT bus number -> substation","subs":["Red Rock Substation"],"codes":["REDROC"],"osm":"osm:way/425964715"}},{"inr":"26INR0515","name":"Rio Grand Valley Element Fuels Power","fuel":"other","tech":"OT","mw":79.63,"county":"Cameron","zone":"COASTAL","poi":"Tap 138kV 59450 Waterport Substation - 5789 Southmost Sub","entity":"Element H2Gen, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-05","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.077,"p36_basis":"2 of 26 other projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-97.41874999999999,25.92084],"method":"tap between two located substations","subs":["Waterport Substation","Southmost Substation"],"codes":["WATERPRT","SOUTHMOS"]}},{"inr":"26INR0519","name":"Sky Global West Houston","fuel":"gas","tech":"IC","mw":324.58,"county":"Austin","zone":"SOUTH","poi":"tap 138kV 44700 Gebhardt - 44740 Wallis circuit 65","entity":"Sky Global Power Two, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-01","ia":"2025-03-25","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":214,"loc":{"pt":[-96.07624,29.63097],"method":"ERCOT bus number -> substation","subs":["Wallis Substation"],"codes":["WA"],"osm":"osm:way/94434949"}},{"inr":"26INR0523","name":"Demeter Storage 2","fuel":"battery","tech":"BA","mw":138,"county":"Caldwell","zone":"SOUTH","poi":"Tap 138kV 7224 LULING - 7216 Lockhart","entity":"Demeter Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-97.66126,29.87081],"method":"ERCOT bus number -> substation","subs":["Lockhart Substation"],"codes":["LOCKHA"],"osm":"osm:way/146793326"}},{"inr":"26INR0524","name":"Fagus Solar Park 3 SLF","fuel":"solar","tech":"PV","mw":169.59,"county":"Childress","zone":"PANHANDLE","poi":"60501 Tesla 345 kV","entity":"Greenalia Solar Power Misae III, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-28","ia":"2019-02-21","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":81,"loc":{"pt":[-100.08684,34.37339],"method":"ERCOT bus number -> substation","subs":["Tesla Substation"],"codes":["TESLA"],"osm":"osm:way/453794442"}},{"inr":"26INR0525","name":"Bypass BESS II","fuel":"battery","tech":"BA","mw":205.86,"county":"Fort Bend","zone":"HOUSTON","poi":"44000 Wa Parish 345 kV","entity":"Bypass BESS II LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-30","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-95.62422,29.48078],"method":"ERCOT bus number -> substation","subs":["W. A. Parish Station (345 kV)"],"codes":["WAP"],"osm":"osm:way/20875804"}},{"inr":"26INR0527","name":"Mandolin Solar SLF","fuel":"solar","tech":"PV","mw":300,"county":"Starr","zone":"SOUTH","poi":"Tap 345kV 80355 Del Sol - 80227 Rapido","entity":"Mandolin Energy Center I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-15","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["DELSOL"]}},{"inr":"26INR0528","name":"Mandolin Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Starr","zone":"SOUTH","poi":"Tap 345kV 80355 Del Sol - 80227 Rapido","entity":"Mandolin Energy Center I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-15","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["DELSOL"]}},{"inr":"26INR0529","name":"Electric E - West Texas Generation","fuel":"gas","tech":"GT","mw":43.64,"county":"Loving","zone":"WEST","poi":"#11166 ENPOD 138kV","entity":"Electric E Power Marketing","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-09","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-103.79167297297296,31.837883783783777],"method":"county centroid (substation not located)","subs":[],"codes":["ENPOD"]}},{"inr":"26INR0530","name":"Longview Wind","fuel":"wind","tech":"WT","mw":352.6,"county":"Dawson","zone":"WEST","poi":"Venturi (Bus #59923)","entity":"Longview Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-01","ia":"2025-12-16","cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":263,"loc":{"pt":[-101.99994000000001,32.78566],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0531","name":"West Munday Wind","fuel":"wind","tech":"WT","mw":351.91,"county":"Knox","zone":"WEST","poi":"Tap 345kV 60703 Gauss7D – 60712 Quasar","entity":"Lake Creek Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-08-31","ia":"2025-07-21","cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":263,"loc":{"pt":[-99.66815882352941,33.776994117647064],"method":"county centroid (substation not located)","subs":[],"codes":["QUASAR"]}},{"inr":"26INR0537","name":"Comanche Creek generating station","fuel":"gas","tech":"IC","mw":107,"county":"Pecos","zone":"WEST","poi":"TNCENTRY1_1 [138 kV] ( 38431)","entity":"Longfellow Power LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":35,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNCENTRY"]}},{"inr":"26INR0545","name":"Knight Airport BESS I","fuel":"battery","tech":"BA","mw":522.46,"county":"Harris","zone":"HOUSTON","poi":"Tap 138kV 48126 Gulfgate - 48199 Knight 06 and 42680 Garden Villas - 42770 Ashville 06","entity":"Airport Storage I LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-10-15","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-95.30727,29.672069999999998],"method":"tap between two located substations","subs":["Gulfgate Substation","Garden Villas Substation"],"codes":["GG","GV"]}},{"inr":"26INR0546","name":"Hobby BESS I","fuel":"battery","tech":"BA","mw":602.56,"county":"Harris","zone":"HOUSTON","poi":"Double Tap 138kV 42680 Garden Villas – 48250 Hall & 42680 Garden Villas – 48013 Chocolate Bayou","entity":"Airport Storage II LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-10-21","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":199,"loc":{"pt":[-95.27732,29.620179999999998],"method":"tap between two located substations","subs":["Garden Villas Substation","Hall Substation"],"codes":["GV","HA"]}},{"inr":"26INR0548","name":"Burnet Bay Storage","fuel":"battery","tech":"BA","mw":207.83,"county":"Harris","zone":"HOUSTON","poi":"tap 138kV 40390 Crosby - 40790 Haney","entity":"TOCE TX BESS 4, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":69,"loc":{"pt":[-95.005285,29.84694],"method":"tap between two located substations","subs":["Crosby Substation","Haney Substation"],"codes":["CS","HNY"]}},{"inr":"26INR0550","name":"Grand Mesa BESS","fuel":"battery","tech":"BA","mw":253.28,"county":"Pecos","zone":"WEST","poi":"76582 MESA VIEW SWITCH 138kV","entity":"PERRY GREEN POWER LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-09-28","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["MEVISW"]}},{"inr":"26INR0551","name":"Hastings Park BESS","fuel":"battery","tech":"BA","mw":256.34,"county":"Brazoria","zone":"COASTAL","poi":"39010 138kV HASTINGS","entity":"Brazos Roots BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-27","ia":"2025-08-13","cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":194,"loc":{"pt":[-95.25257,29.48324],"method":"ERCOT bus number -> substation","subs":["Hastings Substation"],"codes":["HASTINGS"],"osm":"osm:way/338758521"}},{"inr":"26INR0555","name":"Desert Palm BESS","fuel":"battery","tech":"BA","mw":201.3,"county":"Dimmit","zone":"SOUTH","poi":"78280 Bevo Substation 138 kV","entity":"Desert Palm BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-01","ia":"2026-07-24","cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":153,"loc":{"pt":[-99.84011,28.49651],"method":"substation matched by name in the POI","subs":["Bevo Substation"],"codes":[]}},{"inr":"26INR0556","name":"Wintergarden BESS","fuel":"battery","tech":"BA","mw":201.2,"county":"Dimmit","zone":"SOUTH","poi":"8970 Catarina 138 kV","entity":"Wintergarden BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.82644,28.46788],"method":"county centroid (substation not located)","subs":[],"codes":["CATARINA"]}},{"inr":"26INR0559","name":"Georgia-Lynn BESS","fuel":"battery","tech":"BA","mw":108.7,"county":"Victoria","zone":"SOUTH","poi":"80064 CHOCBAYU4A 138 kV","entity":"Georgia Lynn BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-02-20","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["CHOCBAYU"]}},{"inr":"26INR0560","name":"Fort Worth Power Core Bastrop Gas Plant","fuel":"gas","tech":"CC","mw":506.38,"county":"Bastrop","zone":"SOUTH","poi":"Tap 345kV 7042 ZORN - 7040 AUSTROP","entity":"Fort Worth Power Core LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-28","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":165,"loc":{"pt":[-97.3476625,30.150325000000002],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Zorn Substation","Austrop Substation"],"codes":["ZORN","AUSTRO"]}},{"inr":"26INR0573","name":"Cummins BESS","fuel":"battery","tech":"BA","mw":200.89,"county":"Glasscock","zone":"WEST","poi":"1333 MCDONALD 138kV","entity":"RWE Solar Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-101.27561,32.08625],"method":"ERCOT bus number -> substation","subs":["McDonald Road Substation"],"codes":["MCDLD"],"osm":"osm:way/354601987"}},{"inr":"26INR0589","name":"Goat Mountain BESS","fuel":"battery","tech":"BA","mw":201.1,"county":"Sterling","zone":"WEST","poi":"76030-Gasconades Creek 345 kV","entity":"Clearway Energy Group LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.83018,31.93933],"method":"substation matched by name in the POI","subs":["Gasconades Creek Substation"],"codes":["GASCCR"]}},{"inr":"26INR0590","name":"Callisto ID Energy Center","fuel":"battery","tech":"BA","mw":100,"county":"Harris","zone":"HOUSTON","poi":"47170 (H_O_C__B138) 138kV","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["HOC"]}},{"inr":"26INR0597","name":"Electric E - West Texas Generation 2","fuel":"gas","tech":"GT","mw":0,"county":"Midland","zone":"WEST","poi":"#18664 SHAWPD 138kV","entity":"Electric E Power Marketing","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-19","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-102.0827,31.825559999999996],"method":"county centroid (substation not located)","subs":[],"codes":["SHWPD"]}},{"inr":"26INR0599","name":"Coda BESS","fuel":"battery","tech":"BA","mw":202,"county":"San Patricio","zone":"COASTAL","poi":"(#80258) Mayo 138kV","entity":"Coda BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-31","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.4247,27.90948],"method":"ERCOT bus number -> substation","subs":["Mayo Substation"],"codes":["MAYO"],"osm":"osm:way/488507904"}},{"inr":"26INR0600","name":"Crocus Solar","fuel":"solar","tech":"PV","mw":102,"county":"Stephens","zone":"NORTH","poi":"Tap 138 kV Gunsolas Creek Sub (1660) – Breckenridge Tap (1613)","entity":"Crocus Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2026-08-04","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":49,"loc":{"pt":[-98.888,32.77966],"method":"county centroid (substation not located)","subs":[],"codes":["GUNSO"]}},{"inr":"26INR0601","name":"Crocus Storage","fuel":"battery","tech":"BA","mw":51,"county":"Stephens","zone":"NORTH","poi":"Tap 138 kV Gunsolas Creek Sub (1660) – Breckenridge Tap (1613)","entity":"Crocus Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2026-08-04","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":39,"loc":{"pt":[-98.888,32.77966],"method":"county centroid (substation not located)","subs":[],"codes":["GUNSO"]}},{"inr":"26INR0602","name":"Damia Storage","fuel":"battery","tech":"BA","mw":153,"county":"Eastland","zone":"NORTH","poi":"Tap 138kV 6317 Cisco - 3545 MTNBRANCH_8","entity":"Damia Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.84097142857142,32.25261428571429],"method":"county centroid (substation not located)","subs":[],"codes":["CISC","MTBCH"]}},{"inr":"26INR0603","name":"Damia Solar","fuel":"solar","tech":"PV","mw":306,"county":"Eastland","zone":"NORTH","poi":"Tap 138kV 6317 Cisco - 3545 MTNBRANCH_8","entity":"Damia Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-98.84097142857142,32.25261428571429],"method":"county centroid (substation not located)","subs":[],"codes":["CISC","MTBCH"]}},{"inr":"26INR0605","name":"White Bright BESS","fuel":"battery","tech":"BA","mw":313.69,"county":"Grayson","zone":"NORTH","poi":"Tap 345kV 1729 Valley South – Anna Switch 2373","entity":"VLN, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-96.63926,33.31798],"method":"one end of the tapped line, matched by name in the POI","subs":["Anna Substation"],"codes":["VLYSO","ANASW"]}},{"inr":"26INR0609","name":"Scorpius Solar","fuel":"solar","tech":"PV","mw":600,"county":"Milam","zone":"SOUTH","poi":"3377 LTPSW 345KV","entity":"Ben Milam Solar 4","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["LTPSW"]}},{"inr":"26INR0611","name":"Goat Mountain BESS 2","fuel":"battery","tech":"BA","mw":100.7,"county":"Sterling","zone":"WEST","poi":"76030-Gasconades Creek 345 kV","entity":"Clearway Energy Group LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-100.83018,31.93933],"method":"substation matched by name in the POI","subs":["Gasconades Creek Substation"],"codes":["GASCCR"]}},{"inr":"26INR0612","name":"Clay County Yang Storage","fuel":"battery","tech":"BA","mw":307.51,"county":"Clay","zone":"WEST","poi":"1458 Cobb Switching Station 345 kV","entity":"DM-CCY, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-98.13766097560976,34.00781463414634],"method":"county centroid (substation not located)","subs":[],"codes":["COBSW"]}},{"inr":"26INR0613","name":"Wichita County Mawson Storage","fuel":"battery","tech":"BA","mw":153.62,"county":"Wichita","zone":"WEST","poi":"Tap 345kV Fisher Road Switch (#1425) – Riley (#6101) Line","entity":"DM-WCM, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"26INR0614","name":"Bell County Leifester Storage","fuel":"battery","tech":"BA","mw":204.82,"county":"Bell","zone":"NORTH","poi":"Tap 138kV 3428 Killeen South – 13628 Founders Trail Sub","entity":"DM-BCRCML, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-17","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-97.5635916666667,31.034500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["KLNSO","FNDRS"]}},{"inr":"26INR0615","name":"Bell County Morgan Storage","fuel":"battery","tech":"BA","mw":256.27,"county":"Bell","zone":"NORTH","poi":"To Tap 138 kV Trimmier Substation (Bus# 136)","entity":"DM-BCTRM, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-30","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-97.5635916666667,31.034500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["TRIMMIER"]}},{"inr":"26INR0616","name":"Blanco County Behrends Storage","fuel":"battery","tech":"BA","mw":153.62,"county":"Blanco","zone":"SOUTH","poi":"#70482 Blanco Substation 138 kV - currently being upgraded","entity":"DM-BCB, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-30","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.399125,30.299875000000004],"method":"county centroid (substation not located)","subs":[],"codes":["BLANCO"]}},{"inr":"26INR0617","name":"Knox County Moore Storage","fuel":"battery","tech":"BA","mw":77,"county":"Knox","zone":"WEST","poi":"6110 Munday East Substation 138kV","entity":"DM-KCM, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-99.60308,33.45338],"method":"ERCOT bus number -> substation","subs":["East Munday Substation"],"codes":["EASTMUND"],"osm":"osm:way/295396060"}},{"inr":"26INR0618","name":"Taylor County Paul Storage","fuel":"battery","tech":"BA","mw":204.9,"county":"Taylor","zone":"WEST","poi":"6260 Abilene South Substation 138kV","entity":"DM-TCP, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-12-30","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":68,"loc":{"pt":[-99.94226,32.258],"method":"county centroid (substation not located)","subs":[],"codes":["SOUTHABI"]}},{"inr":"26INR0619","name":"Bonham Storage SLF","fuel":"battery","tech":"BA","mw":104.92,"county":"Limestone","zone":"NORTH","poi":"Tap 138kV 3632 Mexia_Main - 3634 Groesbeck_Main","entity":"Jackson Ranch BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-07-01","ia":"2026-10-30","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":80,"loc":{"pt":[-96.51371,31.60208],"method":"tap between two substations (bus number + name)","subs":["Mexia Substation","Groesbeck Main Substation"],"codes":["MEXIA","GRSMN"]}},{"inr":"26INR0621","name":"Juno 3 Solar","fuel":"solar","tech":"PV","mw":600,"county":"Borden","zone":"WEST","poi":"#59916 Buck Canyon 345kV","entity":"Juno Solar 3","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-11-30","ia":"2025-07-01","cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":287,"loc":{"pt":[-101.48386,32.787299999999995],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0622","name":"Buffalo Gap 1 Wind Repower","fuel":"wind","tech":"WT","mw":120.23,"county":"Taylor","zone":"WEST","poi":"6216 Bluff Creek Substation 138kV","entity":"Buffalo Gap Wind Farm, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-01","ia":"2005-02-28","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":90,"loc":{"pt":[-99.94226,32.258],"method":"county centroid (substation not located)","subs":[],"codes":["BLUF_CRK"]}},{"inr":"26INR0625","name":"Buffalo Gap 2 Wind Repower","fuel":"wind","tech":"WT","mw":231.49,"county":"Nolan","zone":"WEST","poi":"6216 Bluff Creek 138 kV","entity":"Buffalo Gap Wind Farm 2, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-01","ia":"2005-02-28","cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":173,"loc":{"pt":[-100.177,32.31822],"method":"EIA plant record: same name and fuel in the same county (EIA plant 56484, \"Buffalo Gap 2 Wind Farm\", operating)","subs":[],"codes":["BLUF_CRK"],"eia_plant":56484}},{"inr":"26INR0626","name":"Buffalo Gap 3 Wind Repower","fuel":"wind","tech":"WT","mw":168.45,"county":"Taylor","zone":"WEST","poi":"6216 Bluff_Creek 138kV","entity":"Buffalo Gap Wind Farm 3, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-01","ia":"2005-02-28","cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":126,"loc":{"pt":[-99.94226,32.258],"method":"county centroid (substation not located)","subs":[],"codes":["BLUF_CRK"]}},{"inr":"26INR0630","name":"Betel Storage I","fuel":"battery","tech":"BA","mw":500,"county":"Milam","zone":"SOUTH","poi":"3377 Little Pond Switch ( LTPSW) 345","entity":"BETEL STORAGE I","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-08-12","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["LTPSW"]}},{"inr":"26INR0632","name":"Dempsey Solar SLF","fuel":"solar","tech":"PV","mw":245.34,"county":"Leon","zone":"NORTH","poi":"Tap 138 KV Ridge (#37)-Robertson (#32) line; BEPC","entity":"Dempsey Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-08","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0633","name":"Betel Storage II","fuel":"battery","tech":"BA","mw":500,"county":"Milam","zone":"SOUTH","poi":"3377 Little Pond 345","entity":"BETEL STORAGE II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-12-17","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["LTPSW"]}},{"inr":"26INR0635","name":"Aquila Solar","fuel":"solar","tech":"PV","mw":520,"county":"Milam","zone":"SOUTH","poi":"3706 Gibson Switch 345kV","entity":"Ben Milam Solar 5","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-15","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["GIBSW"]}},{"inr":"26INR0636","name":"Lyra Storage","fuel":"battery","tech":"BA","mw":500,"county":"Borden","zone":"WEST","poi":"345kV MULESHOE (#59922)","entity":"JUNO BESS I","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-11-12","ia":"2025-08-13","cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":379,"loc":{"pt":[-101.48386,32.787299999999995],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0640","name":"Amberjack2 BESS","fuel":"battery","tech":"BA","mw":180,"county":"Cameron","zone":"COASTAL","poi":"79501 KINGFISHER 345KV","entity":"Hunt Energy Network, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-08","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0647","name":"Wake Wind Energy Repower","fuel":"wind","tech":"WT","mw":252.5,"county":"Crosby","zone":"PANHANDLE","poi":"59904 Cottonwood 345","entity":"WAKE WIND ENERGY","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-04","ia":"2014-02-28","cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":188,"loc":{"pt":[-100.87665,33.77829],"method":"ERCOT bus number -> substation","subs":["Cottonwood Substation"],"codes":["W_CW_345"],"osm":"osm:way/453589317"}},{"inr":"26INR0654","name":"Great Hambino BESS","fuel":"battery","tech":"BA","mw":122.98,"county":"Atascosa","zone":"SOUTH","poi":"#5700 Miracle Lake Substation 138kV","entity":"Atascosa BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-01","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["MIRACLAK"]}},{"inr":"26INR0664","name":"Coleto Creek - Fuel Change Only","fuel":"gas","tech":"ST","mw":655,"county":"Goliad","zone":"SOUTH","poi":"8162 Coleto Creek 138kV","entity":"COLETO CREEK POWER LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2026-12-15","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":213,"loc":{"pt":[-97.21284,28.71689],"method":"ERCOT bus number -> substation","subs":["Coleto Creek Substation"],"codes":["COLETO"],"osm":"osm:way/174682092"}},{"inr":"26INR0685","name":"Campus Capital West Texas Natural Gas Reciprocating Power I","fuel":"gas","tech":"IC","mw":400,"county":"Reeves","zone":"WEST","poi":"38095 TNJACKRBT1 138kV","entity":"August Partners LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-05-01","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":130,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["JACKRABT"]}},{"inr":"26INR0686","name":"Zeus Mitchell BESS II","fuel":"battery","tech":"BA","mw":1042.94,"county":"Mitchell","zone":"WEST","poi":"Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02","entity":"Zeus Mitchell BESS II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-05-01","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":74,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["RGRSW","PRMSW"]}},{"inr":"26INR0700","name":"Key City Battery Storage SLF","fuel":"battery","tech":"BA","mw":1.9,"county":"Taylor","zone":"WEST","poi":"6235 Abilene Mulberry Creek 345","entity":"Key City Battery Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":0,"loc":{"pt":[-99.82251,32.52413],"method":"ERCOT bus number -> substation","subs":["Mulberry Creek Substation"],"codes":["MULBERRY"],"osm":"osm:way/171734088"}},{"inr":"26INR0701","name":"Key City Solar SLF","fuel":"solar","tech":"PV","mw":989.1,"county":"Taylor","zone":"WEST","poi":"6235 Abilene Mulberry Creek 345","entity":"Key City Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":54,"loc":{"pt":[-99.82251,32.52413],"method":"ERCOT bus number -> substation","subs":["Mulberry Creek Substation"],"codes":["MULBERRY"],"osm":"osm:way/171734088"}},{"inr":"26INR0715","name":"Tierra Bonita BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Pecos","zone":"WEST","poi":"860 GIRVINSW 345kV","entity":"Greasewood II BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["GIRVINSW"]}},{"inr":"26INR0718","name":"PHOTON SOLAR REPOWERING","fuel":"solar","tech":"PV","mw":0,"county":"Wharton","zone":"SOUTH","poi":"44880 Waterh_POI_5 345kV","entity":"GulfStar Power, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-17","ia":"2021-02-25","cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["WAT"]}},{"inr":"26INR0724","name":"Monahans Power Gas","fuel":"gas","tech":"IC","mw":18.2,"county":"Ward","zone":"WEST","poi":"Tap #1107 Monahans Tap 2 to #11117 Pecos Trail 138kV","entity":"Liberty Power Innovations LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-16","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-102.89957,31.59422],"method":"one end of the tapped line, matched by name in the POI","subs":["Monahans Substation"],"codes":["PTPOD"]}},{"inr":"26INR0725","name":"PHOTON BESS REPOWERING","fuel":"battery","tech":"BA","mw":305.48,"county":"Wharton","zone":"SOUTH","poi":"44880 Waterh_POI_5 345kV","entity":"GulfStar Power, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-08-17","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":101,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["WAT"]}},{"inr":"26INR0726","name":"Roadrunner Crossing Wind (Uprate)","fuel":"wind","tech":"WT","mw":7.32,"county":"Eastland","zone":"NORTH","poi":"68051 Reata 345kV","entity":"Roadrunner Wind, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-06-30","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.558,"p36_basis":"24 of 43 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-99.10891,32.43742],"method":"EIA plant record: same name and fuel in the same county (EIA plant 66902, \"Roadrunner Wind Farm\", operating)","subs":[],"codes":["REATA"],"eia_plant":66902}},{"inr":"27INR0002","name":"Puerto Del Sol 2","fuel":"solar","tech":"PV","mw":213.8,"county":"Cameron","zone":"COASTAL","poi":"Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1","entity":"PUERTO DEL SOL, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-97.37989,25.98456],"method":"ERCOT bus number -> substation","subs":["Palmito Substation"],"codes":["PALMITO"],"osm":"osm:way/487061712"}},{"inr":"27INR0003","name":"Becerra Creek Storage 2","fuel":"battery","tech":"BA","mw":125.62,"county":"Webb","zone":"SOUTH","poi":"345 kV Cenizo Substation (#80220)","entity":"Bordas Renewable Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2022-09","months_in_queue":49,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"27INR0004","name":"Dundee West Wind","fuel":"wind","tech":"WT","mw":146.49,"county":"Wilbarger","zone":"WEST","poi":"345 kV Riley Substation (#6101); AEP","entity":"Felix 2, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-02-21","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":109,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"27INR0005","name":"Dundee East A Wind","fuel":"wind","tech":"WT","mw":524,"county":"Baylor","zone":"WEST","poi":"345 kV Riley Substation  (#6101); AEP","entity":"Felix 2, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-02-21","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":391,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"27INR0007","name":"Felix East Solar","fuel":"solar","tech":"PV","mw":184.56,"county":"Wilbarger","zone":"WEST","poi":"The 345 kV Riley Substation (#6101); AEP","entity":"Felix 1, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-16","ia":"2025-02-21","cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":88,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"27INR0009","name":"Felix Storage","fuel":"battery","tech":"BA","mw":100.54,"county":"Wilbarger","zone":"WEST","poi":"The 345 kV Riley Substation (#6101); AEP","entity":"Felix 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-07-31","ia":null,"cons_start":null,"first_seen":"2022-12","months_in_queue":46,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"27INR0011","name":"Dundee East B Wind","fuel":"wind","tech":"WT","mw":261.45,"county":"Baylor","zone":"WEST","poi":"345 kV Riley Substation (#6101); AEP","entity":"Felix 2, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-02-21","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":195,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"27INR0012","name":"Felix West Solar","fuel":"solar","tech":"PV","mw":184.96,"county":"Wilbarger","zone":"WEST","poi":"6101 Riley 345 kV","entity":"Felix 1, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-16","ia":"2025-02-21","cons_start":null,"first_seen":"2023-01","months_in_queue":45,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":88,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"27INR0014","name":"Kit Fox Storage","fuel":"battery","tech":"BA","mw":153.6,"county":"Henderson","zone":"NORTH","poi":"Walton Switch (6899) 138KV","entity":"Kit Fox Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.05013599999998,32.21809599999999],"method":"county centroid (substation not located)","subs":[],"codes":["WALTSSRC"]}},{"inr":"27INR0022","name":"Panhandle Flagship Solar 1","fuel":"solar","tech":"PV","mw":439.4,"county":"Carson","zone":"PANHANDLE","poi":"345 kV Railhead Substation (RAILHEAD #79005)","entity":"Panhandle Solar Group Operating Company LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2031-06-30","ia":"2025-08-28","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":210,"loc":{"pt":[-101.15384,35.40223],"method":"ERCOT bus number -> substation","subs":["Railhead Substation"],"codes":["RAILHEAD"],"osm":"osm:way/453794498"}},{"inr":"27INR0023","name":"Panhandle Flagship Solar 2","fuel":"solar","tech":"PV","mw":304.4,"county":"Hutchinson","zone":"PANHANDLE","poi":"345 kV Railhead Substation (RAILHEAD #79005).\nStation 2 (27INR0023) connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 (27INR0022 & 27INR0025) connects to POIB via 22.5 mile tie-line","entity":"Panhandle Solar Group Operating Company LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2031-06-30","ia":"2025-08-28","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":146,"loc":{"pt":[-101.15384,35.40223],"method":"ERCOT bus number -> substation","subs":["Railhead Substation"],"codes":["RAILHEAD"],"osm":"osm:way/453794498"}},{"inr":"27INR0024","name":"Panhandle Flagship Solar 3","fuel":"solar","tech":"PV","mw":260.3,"county":"Hutchinson","zone":"PANHANDLE","poi":"345 kV Railhead Substation (RAILHEAD #79005).Station 3 (27INR0024) connects to Station 2 (27INR0023) via a 4.4 mile internal tie line. Station 2 connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 connects to POI","entity":"Panhandle Solar Group Operating Company LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2031-06-30","ia":"2025-08-28","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":124,"loc":{"pt":[-101.15384,35.40223],"method":"ERCOT bus number -> substation","subs":["Railhead Substation"],"codes":["RAILHEAD"],"osm":"osm:way/453794498"}},{"inr":"27INR0025","name":"Panhandle Flagship Storage","fuel":"battery","tech":"BA","mw":371.7,"county":"Carson","zone":"PANHANDLE","poi":"345 kV Railhead Substation (RAILHEAD #79005)","entity":"Panhandle Solar Group Operating Company LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2031-06-30","ia":"2025-08-28","cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":282,"loc":{"pt":[-101.15384,35.40223],"method":"ERCOT bus number -> substation","subs":["Railhead Substation"],"codes":["RAILHEAD"],"osm":"osm:way/453794498"}},{"inr":"27INR0029","name":"Short Creek BESS","fuel":"battery","tech":"BA","mw":155.66,"county":"Wichita","zone":"WEST","poi":"Tap 345kV 6101 Riley - 1425 Fisher Road Switch Ckt 1","entity":"Wichita Solar I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2023-04","months_in_queue":42,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.787385,33.985879999999995],"method":"tap between two substations (bus number + name)","subs":["Riley Substation","Fisher Road Substation"],"codes":["RILEY","FSHSW"]}},{"inr":"27INR0040","name":"Solar Star Rhome Storage","fuel":"battery","tech":"BA","mw":226.24,"county":"Wise","zone":"NORTH","poi":"576 RHOME 138kV","entity":"Solar Star Rhome Storage","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-09-27","ia":null,"cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":75,"loc":{"pt":[-97.7086,33.17174],"method":"county centroid (substation not located)","subs":[],"codes":["RHM"]}},{"inr":"27INR0047","name":"Sunscape Renewable Energy Solar SLF","fuel":"solar","tech":"PV","mw":522.75,"county":"Nueces","zone":"COASTAL","poi":"Bus# 8455 Lon C Hill to Bus# 80078 Reforzar 345 kV Line","entity":"Sunscape Renewable Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-31","ia":"2024-07-18","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":250,"loc":{"pt":[-97.61559,27.84382],"method":"ERCOT bus number -> substation","subs":["Lon Hill Substation"],"codes":["LON_HILL"],"osm":"osm:way/174682093"}},{"inr":"27INR0048","name":"Sunscape Renewable Energy Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Nueces","zone":"COASTAL","poi":"Tap 345kV 8455 Lon C Hill -- 80078 Reforzar","entity":"Sunscape Renewable Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-31","ia":"2024-07-18","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.61559,27.84382],"method":"ERCOT bus number -> substation","subs":["Lon Hill Substation"],"codes":["LON_HILL"],"osm":"osm:way/174682093"}},{"inr":"27INR0049","name":"Darkwood Solar","fuel":"solar","tech":"PV","mw":152.02,"county":"Comanche","zone":"NORTH","poi":"Tap 345KV 1900 Comanche Peak to 1440 Comanche SS","entity":"Mustang Creek Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-20","ia":"2025-11-05","cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":73,"loc":{"pt":[-98.55323,31.86902],"method":"one end of the tapped line, matched by name in the POI","subs":["Comanche Switching Station"],"codes":["CPSES","CMNSW"]}},{"inr":"27INR0050","name":"Darkwood BESS","fuel":"battery","tech":"BA","mw":150.5,"county":"Comanche","zone":"NORTH","poi":"Tap 345KV 1900 Comanche Peak - 1440 Comanche Switch","entity":"Mustang Creek Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2025-11-05","cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-98.55323,31.86902],"method":"one end of the tapped line, matched by name in the POI","subs":["Comanche Switching Station"],"codes":["CPSES","CMNSW"]}},{"inr":"27INR0056","name":"Laurel Wind Energy Center","fuel":"wind","tech":"WT","mw":306.6,"county":"Pecos","zone":"WEST","poi":"Tap Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 2 and\nTap Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 1","entity":"LAUREL ENERGY CENTER, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2024-10-25","cons_start":null,"first_seen":"2023-06","months_in_queue":40,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":229,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"27INR0061","name":"Hecate Energy Orem Wind","fuel":"wind","tech":"WT","mw":1542,"county":"Brazoria","zone":"COASTAL","poi":"42530 Jones Creek 345kV","entity":"Hecate Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":338,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["JCK"]}},{"inr":"27INR0063","name":"Supra Wind","fuel":"wind","tech":"WT","mw":205.86,"county":"Hardeman","zone":"WEST","poi":"Tap #6101 Riley 7A to #60505 Edithcla 7B 345kV","entity":"NextEra Energy Interconnection Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-23","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":45,"loc":{"pt":[-99.69096590909089,34.29610909090909],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Riley Substation","Edith Clarke Substation"],"codes":["RILEY","EDITHCLA"]}},{"inr":"27INR0071","name":"Sandow Lakes Energy Station","fuel":"gas","tech":"GT","mw":1291.6,"county":"Milam","zone":"SOUTH","poi":"#13430 Sandow Switch 138kV","entity":"SL Energy Power Plant I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":420,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["SNDSW"]}},{"inr":"27INR0074","name":"Desert Hill Solar","fuel":"solar","tech":"PV","mw":250.5,"county":"Culberson","zone":"WEST","poi":"Tap 138kV El Capitan (#10179) - Black River (#1096).","entity":"NextEra Energy Interconnection Holdings","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-07-01","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-104.28689,31.83373],"method":"ERCOT bus number -> substation","subs":["Black River Substation"],"codes":["BLKRV"],"osm":"osm:way/501477422"}},{"inr":"27INR0076","name":"Bob Creek Wind","fuel":"wind","tech":"WT","mw":239.47,"county":"Sterling","zone":"WEST","poi":"59902 Sand Bluff 345kV","entity":"NextEra Energy Interconnection Holdings, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2025-06-06","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":179,"loc":{"pt":[-101.2275,31.86881],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68459, \"Bob Creek Wind, LLC\", planned)","subs":[],"codes":[],"eia_plant":68459}},{"inr":"27INR0077","name":"Cuchillas BESS","fuel":"battery","tech":"BA","mw":306.94,"county":"Webb","zone":"SOUTH","poi":"80219 Lobo 345kV","entity":"Gransolar Texas Two","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-15","ia":null,"cons_start":null,"first_seen":"2023-09","months_in_queue":37,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"27INR0082","name":"Orbit Energy Storage","fuel":"battery","tech":"BA","mw":501.94,"county":"Bexar","zone":"SOUTH","poi":"Tap 345 kV Calaveras Power Station (BUS #5400) to VON_ROSE (BUS #5475)","entity":"GCI Orbit Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-06-01","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-98.38268,29.25803],"method":"ERCOT bus number -> substation","subs":["Braunig Switchyard"],"codes":["BRAUNIG"],"osm":"osm:way/319115059"}},{"inr":"27INR0083","name":"Spinner Energy Storage","fuel":"battery","tech":"BA","mw":125.63,"county":"Bee","zone":"SOUTH","poi":"8196 Poesta Substation 138kV","entity":"GCI Wolf Energy Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-07-10","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":41,"loc":{"pt":[-97.6662,28.507738709677415],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0084","name":"Aegle Power","fuel":"gas","tech":"CC","mw":1536.4,"county":"Cameron","zone":"COASTAL","poi":"(#79501) Kingfisher 345 kV","entity":"Aegle Power LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-07-30","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":499,"loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0085","name":"Eagle Claw Energy Center","fuel":"battery","tech":"BA","mw":204.58,"county":"Grimes","zone":"NORTH","poi":"Singleton (Bus #44645) - Zenith (Bus #44900) Circuit #99 345 kV","entity":"Eagle Claw Energy Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-03-31","ia":"2025-09-15","cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":155,"loc":{"pt":[-95.97329,30.66131],"method":"ERCOT bus number -> substation","subs":["Singleton Substation"],"codes":["SNG"],"osm":"osm:way/156059937"}},{"inr":"27INR0091","name":"Oak Tree Energy Storage","fuel":"battery","tech":"BA","mw":310.2,"county":"Lavaca","zone":"SOUTH","poi":"Tap Shaula (#5380) – South Texas (#5915)","entity":"Live Oak Energy Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-09-20","ia":"2026-05-26","cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":235,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"27INR0092","name":"Pecan BESS","fuel":"battery","tech":"BA","mw":157.12,"county":"Leon","zone":"NORTH","poi":"(PSSE BUS# 47) HILTOPLKS8 138kV","entity":"Gransolar Texas Three LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2023-10","months_in_queue":36,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":52,"loc":{"pt":[-96.22328,31.07867],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67774, \"Pecan BESS\", planned)","subs":[],"codes":[],"eia_plant":67774}},{"inr":"27INR0093","name":"Guadalupe Battery Storage Project","fuel":"battery","tech":"BA","mw":210.5,"county":"Guadalupe","zone":"SOUTH","poi":"# 7044 Marion 345kV","entity":"Guadalupe Power Partners, LP","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-30","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.14876,29.62083],"method":"ERCOT bus number -> substation","subs":["Marion Substation"],"codes":["MARION"],"osm":"osm:way/174246028"}},{"inr":"27INR0095","name":"Bulldog Power","fuel":"gas","tech":"GT","mw":311,"county":"Brazoria","zone":"COASTAL","poi":"39703 TNMP FM524 Substation 138kV","entity":"Bulldog Power LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-12-18","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.467,"p36_basis":"14 of 30 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":145,"loc":{"pt":[-95.73493,29.06443],"method":"ERCOT bus number -> substation","subs":["FM 524 Substation"],"codes":["FM524"],"osm":"osm:way/583058250"}},{"inr":"27INR0096","name":"Rubicon Power BESS","fuel":"battery","tech":"BA","mw":301.38,"county":"Brazoria","zone":"COASTAL","poi":"39703 TNMP FM524 138kV","entity":"Rubicon Power LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-95.73493,29.06443],"method":"ERCOT bus number -> substation","subs":["FM 524 Substation"],"codes":["FM524"],"osm":"osm:way/583058250"}},{"inr":"27INR0097","name":"JUNIPERUS BESS","fuel":"battery","tech":"BA","mw":169.6,"county":"Hopkins","zone":"NORTH","poi":"Tap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621)","entity":"BLUE STONE RENEWABLE XXI LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-09","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-95.5872457142857,33.27730285714285],"method":"county centroid (substation not located)","subs":[],"codes":["CSHSW","SDYSW"]}},{"inr":"27INR0102","name":"Cottonseed Energy Storage","fuel":"battery","tech":"BA","mw":207.6,"county":"Wharton","zone":"SOUTH","poi":"South Lane City and PSEE # is 43190","entity":"Cottonseed Energy Storage LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-04-20","ia":null,"cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":69,"loc":{"pt":[-96.01556,29.19494],"method":"ERCOT bus number -> substation","subs":["South Lane City Substation"],"codes":["LC"],"osm":"osm:way/336976542"}},{"inr":"27INR0105","name":"Starlight Solar","fuel":"solar","tech":"PV","mw":130.72,"county":"Mills","zone":"NORTH","poi":"tap the 138 kV Goldthwaite (#7070) – San Saba Switch (#77074)","entity":"Mills Tx Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-05-09","ia":"2025-12-31","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":62,"loc":{"pt":[-98.72821090909093,31.390340000000002],"method":"county centroid (substation not located)","subs":[],"codes":["GOLDTH"]}},{"inr":"27INR0107","name":"Starlight Storage","fuel":"battery","tech":"BA","mw":208.96,"county":"Mills","zone":"NORTH","poi":"Tap 138kV 7070 Goldthwaite – 77074 San Saba Switch","entity":"Mills Tx Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-05-09","ia":"2025-12-31","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":158,"loc":{"pt":[-98.72821090909093,31.390340000000002],"method":"county centroid (substation not located)","subs":[],"codes":["GOLDTH"]}},{"inr":"27INR0108","name":"Paint Rock Wind","fuel":"wind","tech":"WT","mw":379.18,"county":"Concho","zone":"WEST","poi":"Amos Creek (7077) – Bow Wood (76006)","entity":"Paint Rock Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-05-30","ia":"2026-08-24","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":283,"loc":{"pt":[-99.54852,31.46311],"method":"ERCOT bus number -> substation","subs":["Bow Wood Substation"],"codes":["BOWWOO"],"osm":"osm:way/498065703"}},{"inr":"27INR0109","name":"Two Barbaras BESS","fuel":"battery","tech":"BA","mw":217.16,"county":"Montgomery","zone":"HOUSTON","poi":"Tap 138 kV Pinehurst (#46240) – Mill Creek (#44850) Line","entity":"Two Barbaras BESS","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-01-04","ia":"2025-10-01","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":165,"loc":{"pt":[-95.67297,30.16141],"method":"ERCOT bus number -> substation","subs":["Pinehurst Substation"],"codes":["PI"],"osm":"osm:way/127580895"}},{"inr":"27INR0111","name":"Malachite Solar","fuel":"solar","tech":"PV","mw":184.55,"county":"Wharton","zone":"SOUTH","poi":"The 345 kV Hillje (#44200) – Holman (#9073) Line; AEN.","entity":"Malachite Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2032-04-30","ia":"2025-12-26","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":88,"loc":{"pt":[-96.23649,29.0297],"method":"ERCOT bus number -> substation","subs":["Hillje Substation"],"codes":["HLJ"],"osm":"osm:way/100064466"}},{"inr":"27INR0112","name":"Malachite BESS","fuel":"battery","tech":"BA","mw":191.12,"county":"Wharton","zone":"SOUTH","poi":"Tap 345 kV 44200 Hillje – 9073 Holman","entity":"Malachite Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2032-04-30","ia":"2025-12-26","cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":145,"loc":{"pt":[-96.23649,29.0297],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Hillje Substation"],"codes":["HLJ","HOLMAN"]}},{"inr":"27INR0115","name":"Diamante BESS","fuel":"battery","tech":"BA","mw":513.68,"county":"Grimes","zone":"NORTH","poi":"40600 ROANS__POI_5 345kV","entity":"BESS DIAMANTE LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-11-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":170,"loc":{"pt":[-96.09855476190472,30.48254523809524],"method":"county centroid (substation not located)","subs":[],"codes":["RNS"]}},{"inr":"27INR0117","name":"Roble BESS","fuel":"battery","tech":"BA","mw":154.3,"county":"Guadalupe","zone":"SOUTH","poi":"7180 L_ZORN__8_1Y 138kV","entity":"Flexen USA LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-97.96439333333332,29.63050666666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0118","name":"Grapefruit Solar","fuel":"solar","tech":"PV","mw":291.4,"county":"Hidalgo","zone":"SOUTH","poi":"North Edinburg (Bus #8905) - Reforzar (Bus # 80078) 345kV","entity":"Grapefruit Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-12-31","ia":"2025-04-10","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":139,"loc":{"pt":[-98.18922,26.34411],"method":"ERCOT bus number -> substation","subs":["North Edinburg Substation"],"codes":["NEDIN"],"osm":"osm:way/174789429"}},{"inr":"27INR0120","name":"Solar Star Bay City Storage","fuel":"battery","tech":"BA","mw":206.27,"county":"Matagorda","zone":"COASTAL","poi":"Tap 138kV Conoco (#8138) – Black Cat (#80124)","entity":"Solar Star Bay City Storage","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-27","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-95.93868,28.78429],"method":"ERCOT bus number -> substation","subs":["Conoco Substation"],"codes":["CONOCO"],"osm":"osm:way/515869172"}},{"inr":"27INR0124","name":"RedSun Solar","fuel":"solar","tech":"PV","mw":82.55,"county":"Burnet","zone":"SOUTH","poi":"Tap 138kV 7100 Burnet - 7529 Bertram","entity":"Redsun Solar Project LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-28","ia":"2025-09-25","cons_start":null,"first_seen":"2023-11","months_in_queue":35,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":39,"loc":{"pt":[-98.23745,30.75909],"method":"ERCOT bus number -> substation","subs":["Burnet Substation"],"codes":["BURNET"],"osm":"osm:way/504783132"}},{"inr":"27INR0125","name":"RedSun BESS","fuel":"battery","tech":"BA","mw":84.04,"county":"Burnet","zone":"SOUTH","poi":"Existing Line from Substation Name: Burnet (PSSE#7100) to Substation Name: Bertram (PSSE#7520)","entity":"Redsun Solar Project LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-08-28","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-98.23745,30.75909],"method":"ERCOT bus number -> substation","subs":["Burnet Substation"],"codes":["BURNET"],"osm":"osm:way/504783132"}},{"inr":"27INR0126","name":"Corvus Solar","fuel":"solar","tech":"PV","mw":201.5,"county":"Webb","zone":"SOUTH","poi":"Tap 345kV Cenzio (#80219) - Lobo (#80220)","entity":"Corvus Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-11-12","ia":"2025-07-31","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-99.3436,27.453255],"method":"tap between two located substations","subs":["Lobo Substation","Cenizo Substation"],"codes":["LOBO","CENIZO"]}},{"inr":"27INR0127","name":"Bigway Solar I","fuel":"solar","tech":"PV","mw":195.2,"county":"King","zone":"WEST","poi":"Tap 345kV 59904 Cottonwood - 60500 Edith Clarke Ckt #2","entity":"NextEra Energy Interconnection Holdings, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-02-15","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":93,"loc":{"pt":[-100.30843999999999,33.66054],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Cottonwood Substation","Edith Clarke Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"27INR0128","name":"Bigway Solar II","fuel":"solar","tech":"PV","mw":206,"county":"King","zone":"WEST","poi":"Tap 345KV #59904 Cottonwood - #60500 Edith Clarke Ckt #2","entity":"NextEra Energy Interconnection Holdings, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-02-15","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":98,"loc":{"pt":[-100.30843999999999,33.66054],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Cottonwood Substation","Edith Clarke Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"27INR0132","name":"Palo Verde Wind","fuel":"wind","tech":"WT","mw":297.5,"county":"San Patricio","zone":"COASTAL","poi":"Tap 345kV 8624 Grissom – 8455 Lon C Hill","entity":"RWE Clean Energy Development, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-07-22","ia":"2025-12-19","cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":222,"loc":{"pt":[-97.61559,27.84382],"method":"ERCOT bus number -> substation","subs":["Lon Hill Substation"],"codes":["LON_HILL"],"osm":"osm:way/174682093"}},{"inr":"27INR0139","name":"Gatsby Energy Storage","fuel":"battery","tech":"BA","mw":103.36,"county":"Pecos","zone":"WEST","poi":"Fort Lancaster 138 kV Substation (PSSE Bus #76579)","entity":"Gatsby Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-31","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-101.7801,30.66418],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68428, \"Gatsby Energy Storage Project\", planned)","subs":[],"codes":[],"eia_plant":68428}},{"inr":"27INR0140","name":"Kingsmill Wind SLF","fuel":"wind","tech":"WT","mw":606.3,"county":"Carson","zone":"PANHANDLE","poi":"79005 Railhead 345kV","entity":"Kingsmill Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-09-01","ia":"2025-12-18","cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":452,"loc":{"pt":[-101.15384,35.40223],"method":"ERCOT bus number -> substation","subs":["Railhead Substation"],"codes":["RAILHEAD"],"osm":"osm:way/453794498"}},{"inr":"27INR0141","name":"Bluefox Solar 1","fuel":"solar","tech":"PV","mw":402.6,"county":"Matagorda","zone":"COASTAL","poi":"#8754 Zoisite 345kV","entity":"Industrial November Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-31","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-95.83243783783784,28.936727027027025],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0142","name":"UNICORN BESS","fuel":"battery","tech":"BA","mw":278.98,"county":"Fort Bend","zone":"HOUSTON","poi":"Tap 138 kV Wa Parish (#44015) - Crabb River Road Line (#44170) Line; CNP","entity":"Unicorn Energies","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-09-01","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":20,"loc":{"pt":[-95.66137,29.52179],"method":"tap between two located substations","subs":["W. A. Parish Station (345 kV)","Crabb River Road Substation"],"codes":["WAP","CRB"]}},{"inr":"27INR0143","name":"Ogalalla Storage","fuel":"battery","tech":"BA","mw":251.6,"county":"Castro","zone":"PANHANDLE","poi":"23912 OGALLALA_5 345kV","entity":"Hecate Energy Ogalalla Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-15","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-102.03869,34.51974],"method":"ERCOT bus number -> substation","subs":["Ogallala Switching Station"],"codes":["OGALLALA"],"osm":"osm:way/453589277"}},{"inr":"27INR0144","name":"Angel City Solar","fuel":"solar","tech":"PV","mw":221.02,"county":"Goliad","zone":"SOUTH","poi":"Coleto Creek (# 8164) AEP – Pawnee (#5725) STEC, 25.9 miles from Coleto Creek, 28.2 miles from Pawnee Sub. POI co-ordinates: 28.755, -97.583","entity":"Angel City Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-97.21284,28.71689],"method":"ERCOT bus number -> substation","subs":["Coleto Creek Substation"],"codes":["COLETO"],"osm":"osm:way/174682092"}},{"inr":"27INR0145","name":"Steelhead Energy Storage","fuel":"battery","tech":"BA","mw":192.1,"county":"Fannin","zone":"NORTH","poi":"Tap 1593 BONHAM_P8 to Allens Creek 1835 138kV","entity":"GRS BESS TEXAS SEVEN, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.15789,33.6331],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67798, \"Steelhead Energy Storage\", planned)","subs":[],"codes":[],"eia_plant":67798}},{"inr":"27INR0146","name":"Larrea Solar","fuel":"solar","tech":"PV","mw":231.6,"county":"Pecos","zone":"WEST","poi":"Tap 345kV 76002 Bakerfield - 60404 Solstice CKT#1","entity":"Greasewood IV LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-18","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"27INR0147","name":"Paloma Energy Center","fuel":"solar","tech":"PV","mw":193.8,"county":"Colorado","zone":"SOUTH","poi":"Tap 138 kV 57640 Rock Island - 57639 Sheridan","entity":"Harrison Street Development, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-11-18","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":93,"loc":{"pt":[-96.60222999999999,29.523635],"method":"tap between two located substations","subs":["Rock Island Substation","Sheridan Substation"],"codes":["ROCKIS","SHERID"]}},{"inr":"27INR0148","name":"Paloma Energy Center BESS","fuel":"battery","tech":"BA","mw":53.6,"county":"Colorado","zone":"SOUTH","poi":"Tap 138kV 57640 Rock Island - 57639 Sheridan","entity":"Harrison Street Development, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-31","ia":"2025-11-18","cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":41,"loc":{"pt":[-96.60222999999999,29.523635],"method":"tap between two located substations","subs":["Rock Island Substation","Sheridan Substation"],"codes":["ROCKIS","SHERID"]}},{"inr":"27INR0149","name":"Diablo Campo Storage","fuel":"battery","tech":"BA","mw":313.54,"county":"Goliad","zone":"SOUTH","poi":"The Coleto Greek (#8164) to Pawnee Switching Station (#5725) ; LCRA","entity":"Diablo Campo Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-97.21284,28.71689],"method":"ERCOT bus number -> substation","subs":["Coleto Creek Substation"],"codes":["COLETO"],"osm":"osm:way/174682092"}},{"inr":"27INR0150","name":"Cielo Vista Solar","fuel":"solar","tech":"PV","mw":503.34,"county":"Duval","zone":"SOUTH","poi":"Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1","entity":"Cielo Vista Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-30","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL","CRUCE"]}},{"inr":"27INR0151","name":"Coyote Den Storage","fuel":"battery","tech":"BA","mw":156.93,"county":"Karnes","zone":"SOUTH","poi":"The Kenedy Switching Station #2 (#8186) to Rosata POD  (#8153) Line ; AEP","entity":"Coyote Den Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-97.85388571428572,28.81431428571429],"method":"county centroid (substation not located)","subs":[],"codes":["KENEDSW"]}},{"inr":"27INR0152","name":"New Shepherd Solar","fuel":"solar","tech":"PV","mw":150.84,"county":"Karnes","zone":"SOUTH","poi":"the Kenedy Switching Station #2 (#8186) – Rosata POD (#8153) line, AEP.","entity":"New Shepherd Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-30","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-97.85388571428572,28.81431428571429],"method":"county centroid (substation not located)","subs":[],"codes":["KENEDSW"]}},{"inr":"27INR0169","name":"Marcos Solar SLF","fuel":"solar","tech":"PV","mw":216.11,"county":"Victoria","zone":"SOUTH","poi":"To the 138 kV line from EDNA (#8118) to VICTORIA4A (#8172)","entity":"GRS BESS Texas Eight","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-15","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-97.0105,28.7867],"method":"ERCOT bus number -> substation","subs":["Victoria Switching Station"],"codes":["VICTORIA"],"osm":"osm:way/515655402"}},{"inr":"27INR0170","name":"Marcos BESS","fuel":"battery","tech":"BA","mw":115.88,"county":"Victoria","zone":"SOUTH","poi":"To the 138 kV line from EDNA (#8118) to VICTORIA4A (#8172)","entity":"GRS BESS Texas Eight LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-08-15","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-97.0105,28.7867],"method":"ERCOT bus number -> substation","subs":["Victoria Switching Station"],"codes":["VICTORIA"],"osm":"osm:way/515655402"}},{"inr":"27INR0173","name":"Trenno BESS","fuel":"battery","tech":"BA","mw":202.56,"county":"Johnson","zone":"NORTH","poi":"Tap 138kV 2281 Godley - 2888 Carmichael","entity":"JSB1, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-13","ia":"2025-08-18","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":154,"loc":{"pt":[-97.48704615384615,32.26763076923077],"method":"county centroid (substation not located)","subs":[],"codes":["GODLY","CMBSW"]}},{"inr":"27INR0180","name":"Otter BESS","fuel":"battery","tech":"BA","mw":157.12,"county":"Bexar","zone":"SOUTH","poi":"5378 SHEPHERD RD 138kV","entity":"GRS BESS TEXAS TEN, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-15","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["K5"]}},{"inr":"27INR0181","name":"Elk Unit 4","fuel":"gas","tech":"GT","mw":210,"county":"Hale","zone":"PANHANDLE","poi":"141607 AEEC_5","entity":"Golden Spread Electric Cooperative, Inc.","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-28","ia":"2025-12-30","cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":139,"loc":{"pt":[-101.879,34.11878],"method":"county centroid (substation not located)","subs":[],"codes":["AEEC"]}},{"inr":"27INR0186","name":"Silver Dollar Solar","fuel":"solar","tech":"PV","mw":301.9,"county":"Freestone","zone":"NORTH","poi":"Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2","entity":"Silver Dollar Solar Project, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-31","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-96.287725,31.891755],"method":"tap between two substations (bus number + name)","subs":["Navarro Switching Station","Big Brown Station"],"codes":["BBSES","NAVARRO"]}},{"inr":"27INR0187","name":"Silver Dollar Storage","fuel":"battery","tech":"BA","mw":153.1,"county":"Freestone","zone":"NORTH","poi":"Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2","entity":"Silver Dollar Solar Project, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-31","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.287725,31.891755],"method":"tap between two substations (bus number + name)","subs":["Navarro Switching Station","Big Brown Station"],"codes":["BBSES","NAVARRO"]}},{"inr":"27INR0190","name":"Millsing BESS","fuel":"battery","tech":"BA","mw":501.6,"county":"Grimes","zone":"NORTH","poi":"44645 CNP Singleton 345kV","entity":"Millsing BESS","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-10-15","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":166,"loc":{"pt":[-95.97329,30.66131],"method":"ERCOT bus number -> substation","subs":["Singleton Substation"],"codes":["SNG"],"osm":"osm:way/156059937"}},{"inr":"27INR0192","name":"Cedar Draw Solar","fuel":"solar","tech":"PV","mw":451.4,"county":"Scurry","zone":"WEST","poi":"60011 Nebula7A 345kV","entity":"Cedar Draw Solar LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":142,"loc":{"pt":[-100.98097142857144,32.83984285714286],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0193","name":"Cedar Draw BESS","fuel":"battery","tech":"BA","mw":225.7,"county":"Scurry","zone":"WEST","poi":"60011 Nebula7A 345kV","entity":"Cedar Draw Solar LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":74,"loc":{"pt":[-100.98097142857144,32.83984285714286],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0195","name":"CORUSCANT BESS","fuel":"battery","tech":"BA","mw":417.79,"county":"Dickens","zone":"PANHANDLE","poi":"Tap 345kV 59904 COTTONWOOD - 60500 EDITHCLA7A","entity":"AEU Battery Project III LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-04-18","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":30,"loc":{"pt":[-100.87665,33.77829],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Cottonwood Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"27INR0196","name":"Houston County BESS","fuel":"battery","tech":"BA","mw":125.4,"county":"Houston","zone":"NORTH","poi":"Tap ETEC 138kV #6733 Mustang Prairie to #6732 Latexo Sub","entity":"Houston ESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-95.42522,31.36438],"method":"ERCOT bus number -> substation","subs":["Latexo Substation"],"codes":["LATEXO"],"osm":"osm:way/630115172"}},{"inr":"27INR0198","name":"Musgravite Solar","fuel":"solar","tech":"PV","mw":100.6,"county":"Henderson","zone":"NORTH","poi":"Tap 138 kV (6855) Coffee - (6849) New York.","entity":"Solex Ridge, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-11-01","ia":"2025-05-20","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":48,"loc":{"pt":[-96.05013599999998,32.21809599999999],"method":"county centroid (substation not located)","subs":[],"codes":["COFESSRC","NYSS_RC"]}},{"inr":"27INR0202","name":"Shallow Valley Storage","fuel":"battery","tech":"BA","mw":103.39,"county":"Ward","zone":"WEST","poi":"Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub","entity":"Shallow Valley Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-19","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":34,"loc":{"pt":[-103.2332804347826,31.441910869565223],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0203","name":"Dunlay Solar","fuel":"solar","tech":"PV","mw":150.5,"county":"Medina","zone":"SOUTH","poi":"Tap 138kV 5813 PearsonSW - 5225 Hondo","entity":"Medina PV, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-31","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-99.03763000000001,29.304105],"method":"tap between two substations (bus number + name)","subs":["Pearson Substation","Hondo Substation"],"codes":["PEARSON","F3"]}},{"inr":"27INR0205","name":"Donna Solar","fuel":"solar","tech":"PV","mw":168.13,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 345 kV (80137) Stewart Road - (8383) North Edinburg CKT ID#01","entity":"Donna Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-22","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-98.18922,26.34411],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["North Edinburg Substation"],"codes":["STEWART","NEDIN"]}},{"inr":"27INR0206","name":"Chacon Creek","fuel":"battery","tech":"BA","mw":188.95,"county":"Medina","zone":"SOUTH","poi":"(#8962)  LYTLE4A 138KV","entity":"Cattlemen BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-10-31","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-98.84474,29.21666],"method":"ERCOT bus number -> substation","subs":["Lytle Substation"],"codes":["LYTLE2"],"osm":"osm:way/320099415"}},{"inr":"27INR0207","name":"Wander Waters BESS","fuel":"battery","tech":"BA","mw":303.5,"county":"Wilbarger","zone":"WEST","poi":"61001 JIMTREEC7A 345kV","entity":"Wander Waters BESS LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-10-31","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":100,"loc":{"pt":[-99.43416,34.23416],"method":"ERCOT bus number -> substation","subs":["Jim Treece Substation"],"codes":["JIMTREEC"],"osm":"osm:way/454325994"}},{"inr":"27INR0208","name":"Sugarloaf BESS","fuel":"battery","tech":"BA","mw":100.6,"county":"Dimmit","zone":"SOUTH","poi":"(#80481) PILONCIL4 138KV","entity":"Sugarloaf Clean Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-31","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.62643,28.28756],"method":"ERCOT bus number -> substation","subs":["Piloncillo Substation"],"codes":["PILONCIL"],"osm":"osm:relation/6697270"}},{"inr":"27INR0209","name":"Goby Energy Center","fuel":"battery","tech":"BA","mw":200.65,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV line 44390 Karsten -  44721 Thompsons","entity":"Goby Energy Center","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-07","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-95.58638,29.48124],"method":"ERCOT bus number -> substation","subs":["Thompsons Substation"],"codes":["TM"],"osm":"osm:way/339227595"}},{"inr":"27INR0216","name":"Champs Elysees BESS","fuel":"battery","tech":"BA","mw":256.1,"county":"Milam","zone":"SOUTH","poi":"Tap 345 kV 3377 Little Pond Switch - 3704 Hog Creek Switch","entity":"Champs Elysees Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-15","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["LTPSW","HOGSW"]}},{"inr":"27INR0217","name":"Journey Solar","fuel":"solar","tech":"PV","mw":124.7,"county":"Haskell","zone":"WEST","poi":"Tap 138kV Paint Creek 6161 - Aspermont 6158","entity":"Journey Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-09-14","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.903475,33.1098],"method":"tap between two substations (bus number + name)","subs":["Paint Creek Substation","Aspermont Substation"],"codes":["PAINTCRE","ASPM"]}},{"inr":"27INR0218","name":"Themisto Solar","fuel":"solar","tech":"PV","mw":301.2,"county":"Nolan","zone":"WEST","poi":"Tap 345kV Sweetwater East Switch 11420 – Oak Spring Switch 10105","entity":"Themisto Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-30","ia":null,"cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-100.45700000000001,32.34828],"method":"county centroid (substation not located)","subs":[],"codes":["SWESW"]}},{"inr":"27INR0219","name":"Galaxy Solar","fuel":"solar","tech":"PV","mw":177.32,"county":"Ellis","zone":"NORTH","poi":"Stainback Switch (bus #2217) - Elrod Switch (bus #3159)","entity":"Galaxy Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-30","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["STBSW","ELRSW"]}},{"inr":"27INR0220","name":"Galaxy Storage","fuel":"battery","tech":"BA","mw":155,"county":"Ellis","zone":"NORTH","poi":"Stainback Switch (bus #2217) - Elrod Switch (bus #3159)","entity":"Galaxy Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-30","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["STBSW","ELRSW"]}},{"inr":"27INR0222","name":"Fierce River BESS","fuel":"battery","tech":"BA","mw":287.97,"county":"Starr","zone":"SOUTH","poi":"Tapping the 345 kV Line from Del Sol (Bus# 80355) to Frontera (Bus# 80119) ckt 1","entity":"Rio Grande Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-22","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":20,"loc":{"pt":[-98.39713,26.21789],"method":"ERCOT bus number -> substation","subs":["Frontera Substation"],"codes":["FRONTERA"],"osm":"osm:way/512644995"}},{"inr":"27INR0224","name":"Leopard BESS","fuel":"battery","tech":"BA","mw":264.24,"county":"Victoria","zone":"SOUTH","poi":"8721 Beecher 138 kV","entity":"Bobcat Energy Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-02-28","ia":"2025-06-09","cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":200,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["BEECHER"]}},{"inr":"27INR0227","name":"PALO VERDE BESS","fuel":"battery","tech":"BA","mw":150,"county":"San Patricio","zone":"COASTAL","poi":"Tap 345kV 8624 Grissom – 8455 Lon C Hill","entity":"RWE Clean Energy Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-22","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-97.61559,27.84382],"method":"ERCOT bus number -> substation","subs":["Lon Hill Substation"],"codes":["LON_HILL"],"osm":"osm:way/174682093"}},{"inr":"27INR0231","name":"Easy Battery Energy Storage Center","fuel":"battery","tech":"BA","mw":200,"county":"Schleicher","zone":"WEST","poi":"Tap 345 kV 76003 Big Hill to 76005 Schneeman Draw","entity":"Easy Wind Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-15","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.54306,31.04735],"method":"ERCOT bus number -> substation","subs":["Big Hill Substation"],"codes":["BIGHIL"],"osm":"osm:way/339705805"}},{"inr":"27INR0232","name":"Anawa La Solar","fuel":"solar","tech":"PV","mw":93.3,"county":"Hidalgo","zone":"SOUTH","poi":"TAP 138 KV 8394 LISTON - 8392 BATES","entity":"Anawa La Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-30","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-98.48658,26.316205],"method":"tap between two located substations","subs":["Liston Substation","Bates Substation"],"codes":["LISTON","BATES"]}},{"inr":"27INR0233","name":"Anawa La BESS","fuel":"battery","tech":"BA","mw":103.7,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 138KV 8394 Liston- 8392 Bates","entity":"Anawa La Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-30","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-98.48658,26.316205],"method":"tap between two located substations","subs":["Liston Substation","Bates Substation"],"codes":["LISTON","BATES"]}},{"inr":"27INR0234","name":"Lima Solar Project","fuel":"solar","tech":"PV","mw":101.3,"county":"Grayson","zone":"NORTH","poi":"Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV","entity":"Industrial Lima Project, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-03-01","ia":"2026-09-02","cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":48,"loc":{"pt":[-96.68399249999999,33.81213749999999],"method":"county centroid (substation not located)","subs":[],"codes":["HGRSW","VANAL"]}},{"inr":"27INR0236","name":"Atticus Energy Storage","fuel":"battery","tech":"BA","mw":102.98,"county":"Sutton","zone":"WEST","poi":"Tap 69 KV 6570 Bond Road - 6513 Sonora","entity":"Atticus Energy Storage","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-01-26","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-100.62142,30.534545],"method":"tap between two located substations","subs":["Bond Road","Sonora Substation"],"codes":["BONDROAD","SONR"]}},{"inr":"27INR0241","name":"Callan Solar","fuel":"solar","tech":"PV","mw":90.97,"county":"Menard","zone":"WEST","poi":"Tap 69kV 60386 Heartland to 6363 Yellow Jacket","entity":"Menard PV, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-30","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-99.78479,30.93165],"method":"ERCOT bus number -> substation","subs":["Yellowjacket Substation"],"codes":["YELWJCKT"],"osm":"osm:way/192667620"}},{"inr":"27INR0242","name":"Stonewall Solar","fuel":"solar","tech":"PV","mw":60.2,"county":"Stonewall","zone":"WEST","poi":"Tap 69kV #755 BEPC Aspermont - #6156 AEP Aspermont","entity":"Stonewall PV, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-01-15","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":19,"loc":{"pt":[-100.30676000000001,33.22324],"method":"county centroid (substation not located)","subs":[],"codes":["ASPERM9","ASPM"]}},{"inr":"27INR0245","name":"Pez Rojo BESS","fuel":"battery","tech":"BA","mw":217.23,"county":"Harris","zone":"HOUSTON","poi":"Tap 138 kV #40260 Chamon  - #40912 King","entity":"Pez Rojo BESS, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-02-01","ia":"2026-05-01","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":165,"loc":{"pt":[-95.21631,29.91534],"method":"ERCOT bus number -> substation","subs":["King Substation"],"codes":["KG"],"osm":"osm:way/102326939"}},{"inr":"27INR0246","name":"Easy Wind Energy Center","fuel":"wind","tech":"WT","mw":241.13,"county":"Schleicher","zone":"WEST","poi":"Tap 345kV #76003 Big Hill - #76005 Schneeman Draw circuit #1","entity":"Easy Wind Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-15","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":53,"loc":{"pt":[-100.54306,31.04735],"method":"ERCOT bus number -> substation","subs":["Big Hill Substation"],"codes":["BIGHIL"],"osm":"osm:way/339705805"}},{"inr":"27INR0247","name":"Sun Angel ESS","fuel":"battery","tech":"BA","mw":201.54,"county":"Angelina","zone":"NORTH","poi":"Tap 138kV LUFKINE East (#3326) - HERTY TAP (#3318)","entity":"Sun Angel ESS LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-09-21","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-94.68893,31.33298],"method":"ERCOT bus number -> substation","subs":["Lufkin East Substation"],"codes":["LFEST"],"osm":"osm:way/407423152"}},{"inr":"27INR0248","name":"Double A Solar SLF","fuel":"solar","tech":"PV","mw":132.6,"county":"Goliad","zone":"SOUTH","poi":"Tap 69kV 5678 Schroeder - 5675 Big Oak","entity":"Double A Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-97.64189,28.55874],"method":"ERCOT bus number -> substation","subs":["Big Oak Substation"],"codes":["BIGOAK"],"osm":"osm:way/515061680"}},{"inr":"27INR0249","name":"Raghorn Solar SLF","fuel":"solar","tech":"PV","mw":91.9,"county":"Jim Wells","zone":"SOUTH","poi":"Tap 69kV #5654 San Diego - #5658 Orange Grove","entity":"Raghorn Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-97.96141,27.91895],"method":"ERCOT bus number -> substation","subs":["Orange Grove Switching Station"],"codes":["ORNGROV"],"osm":"osm:way/489453644"}},{"inr":"27INR0251","name":"Sayle Solar SLF","fuel":"solar","tech":"PV","mw":122.4,"county":"Jackson","zone":"SOUTH","poi":"Tap 69kV #5522 Edna - #5518 El Toro SW","entity":"Sayle Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.65293125000004,28.82939375],"method":"county centroid (substation not located)","subs":[],"codes":["EDNAS"]}},{"inr":"27INR0252","name":"Parula Energy Center","fuel":"battery","tech":"BA","mw":250.95,"county":"Austin","zone":"SOUTH","poi":"7287 Bellville North 138kV","entity":"Parula Energy Center","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-18","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-96.18297945205482,29.836741095890407],"method":"county centroid (substation not located)","subs":[],"codes":["BELLNO"]}},{"inr":"27INR0253","name":"Old Victory Energy Center","fuel":"battery","tech":"BA","mw":202.5,"county":"Maverick","zone":"SOUTH","poi":"8692 MAVERICK4A 138kV","entity":"Nova Clean Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.55059,28.86676],"method":"ERCOT bus number -> substation","subs":["Maverick Substation"],"codes":["MAVERICK"],"osm":"osm:way/21121944"}},{"inr":"27INR0255","name":"New Minglewood Energy Center","fuel":"battery","tech":"BA","mw":208.3,"county":"Ward","zone":"WEST","poi":"#11098 Sand Lake Switch Station (SANDLAKE_5) 345kV","entity":"Nova Clean Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-29","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-103.46451,31.5105],"method":"ERCOT bus number -> substation","subs":["Sand Lake Switching Station"],"codes":["SLKSW"],"osm":"osm:way/1006103059"}},{"inr":"27INR0257","name":"Double A Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Goliad","zone":"SOUTH","poi":"Tap 69kV 5678 Schroeder - 5675 Big Oak","entity":"Double A Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.64189,28.55874],"method":"ERCOT bus number -> substation","subs":["Big Oak Substation"],"codes":["BIGOAK"],"osm":"osm:way/515061680"}},{"inr":"27INR0259","name":"Raghorn Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Jim Wells","zone":"SOUTH","poi":"Tap 69kV #5654 San Diego - #5658 Orange Grove","entity":"Raghorn Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.96141,27.91895],"method":"ERCOT bus number -> substation","subs":["Orange Grove Switching Station"],"codes":["ORNGROV"],"osm":"osm:way/489453644"}},{"inr":"27INR0260","name":"Sayle Storage SLF","fuel":"battery","tech":"BA","mw":122.3,"county":"Jackson","zone":"SOUTH","poi":"Tap 69kV #5522 Edna - #5518 El Toro SW","entity":"Sayle Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-96.65293125000004,28.82939375],"method":"county centroid (substation not located)","subs":[],"codes":["EDNAS"]}},{"inr":"27INR0261","name":"Tipperary Solar","fuel":"solar","tech":"PV","mw":60.16,"county":"Schleicher","zone":"WEST","poi":"6498 Live Oak AEP 69kV","entity":"Tippsol","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-15","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-100.62328,30.9339],"method":"county centroid (substation not located)","subs":[],"codes":["LVOK"]}},{"inr":"27INR0263","name":"Red Hat Solar","fuel":"solar","tech":"PV","mw":136.06,"county":"Lamar","zone":"NORTH","poi":"Tap the 138 kV line from Hawk Hollow Switch (#11768) to Lamar Blossom Tap (#11770)","entity":"Red Hat Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-08","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["HWKSW"]}},{"inr":"27INR0274","name":"Flying Kite Bess","fuel":"battery","tech":"BA","mw":104.93,"county":"Zavala","zone":"SOUTH","poi":"Tap the 138 kV La Pryor (#8008) - Poblano (#8009)","entity":"Flying Kite BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-30","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.83258000000001,28.822879999999998],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0279","name":"Red Hollow Renewable Energy BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Archer","zone":"WEST","poi":"Tap 345kV 1422 Bowman - 17002 Garvey Road","entity":"Red Hollow Renewable Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-19","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.60077,33.8106],"method":"ERCOT bus number -> substation","subs":["Bowman Substation"],"codes":["BOMSW"],"osm":"osm:way/171410587"}},{"inr":"27INR0285","name":"Rain Lily Storage 1","fuel":"battery","tech":"BA","mw":105.6,"county":"Hood","zone":"NORTH","poi":"Tap 138kV #350 ABBYBEND - #363 HOOD","entity":"Rain Lily Solar One, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-05-31","ia":"2026-09-16","cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":80,"loc":{"pt":[-97.88045714285714,32.43618571428571],"method":"county centroid (substation not located)","subs":[],"codes":["ABBYBEND","HOD"]}},{"inr":"27INR0288","name":"Rain Lily Solar 1","fuel":"solar","tech":"PV","mw":147.76,"county":"Hood","zone":"NORTH","poi":"Tap 138kV #350 ABBYBEND - #363 HOOD","entity":"Rain Lily Solar 1 LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-05-31","ia":"2026-09-16","cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":71,"loc":{"pt":[-97.88045714285714,32.43618571428571],"method":"county centroid (substation not located)","subs":[],"codes":["ABBYBEND","HOD"]}},{"inr":"27INR0290","name":"Drill Baby Drill BESS","fuel":"battery","tech":"BA","mw":204.31,"county":"Midland","zone":"WEST","poi":"23859 SALTFLAT 138KV","entity":"SBESS TX8 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-11","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-101.94092,31.71888],"method":"ERCOT bus number -> substation","subs":["Salt Flat Road Substation"],"codes":["SALTFLAT"],"osm":"osm:way/456830229"}},{"inr":"27INR0291","name":"Nouveau BESS","fuel":"battery","tech":"BA","mw":256.1,"county":"Brown","zone":"NORTH","poi":"1444 Brown Switch - 3348 Russell Gap 345 kV Line","entity":"RamZ BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-15","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-99.19531,31.53798],"method":"substation matched by name in the POI","subs":["Brown Substation"],"codes":["BWNSW","RGPSW"]}},{"inr":"27INR0292","name":"Donelson Solar SLF","fuel":"solar","tech":"PV","mw":75.44,"county":"Red River","zone":"NORTH","poi":"Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR","entity":"Donelson Solar","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-17","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-95.00265507246375,33.65106086956521],"method":"county centroid (substation not located)","subs":[],"codes":["BAGWL"]}},{"inr":"27INR0293","name":"Donelson Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Red River","zone":"NORTH","poi":"Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR","entity":"Donelson Storage","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-17","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.00265507246375,33.65106086956521],"method":"county centroid (substation not located)","subs":[],"codes":["BAGWL"]}},{"inr":"27INR0294","name":"Bernice Energy Storage","fuel":"battery","tech":"BA","mw":402.8,"county":"Bexar","zone":"SOUTH","poi":"5135 ELMENDORF 138kV","entity":"Bernice Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-15","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["D3"]}},{"inr":"27INR0297","name":"Tolivar Power Plant (TEF- Due Diligence)","fuel":"gas","tech":"IC","mw":224.5,"county":"Reeves","zone":"WEST","poi":"Tap 138 KV 38045 IH20-38043 COWPEN","entity":"Pecos Power Plant, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-11","ia":"2025-07-01","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":148,"loc":{"pt":[-103.49085,31.39987],"method":"ERCOT bus number -> substation","subs":["IH 20 Substation"],"codes":["IH20"],"osm":"osm:way/501745942"}},{"inr":"27INR0298","name":"Symank Solar","fuel":"solar","tech":"PV","mw":66.55,"county":"Bosque","zone":"NORTH","poi":"Tap 69 kV 37470 TNOLSEN - 37520 TNSYCAMORE","entity":"BT Symank Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-15","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-97.5643,31.77674],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Olsen Substation"],"codes":["OLSEN","SYCAMORE"]}},{"inr":"27INR0301","name":"Hondo Arroyo Solar","fuel":"solar","tech":"PV","mw":60.4,"county":"Medina","zone":"SOUTH","poi":"Tap 138 kV 5225 Hondo - 5813 Pearson","entity":"Hondo Creek Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-99.03763000000001,29.304105],"method":"tap between two substations (bus number + name)","subs":["Pearson Substation","Hondo Substation"],"codes":["F3","PEARSON"]}},{"inr":"27INR0305","name":"Kurtz Solar SLF","fuel":"solar","tech":"PV","mw":101.9,"county":"Atascosa","zone":"SOUTH","poi":"Tap 69kV #8206 Charlotte - #8607 Jourdanton","entity":"Kurtz Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-31","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-98.55202,28.92427],"method":"ERCOT bus number -> substation","subs":["Jourdanton Substation"],"codes":["JOURDNTN"],"osm":"osm:way/333296844"}},{"inr":"27INR0306","name":"Kurtz Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Atascosa","zone":"SOUTH","poi":"Tap 69kV #8206 Charlotte - #8607 Jourdanton","entity":"Kurtz Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-31","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.55202,28.92427],"method":"ERCOT bus number -> substation","subs":["Jourdanton Substation"],"codes":["JOURDNTN"],"osm":"osm:way/333296844"}},{"inr":"27INR0307","name":"Beaverhead Solar SLF","fuel":"solar","tech":"PV","mw":61.5,"county":"Jim Wells","zone":"SOUTH","poi":"Direct to Sub 69kv #5653 Ben Bolt.","entity":"Beaverhead Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-11","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-98.06892,27.68742],"method":"ERCOT bus number -> substation","subs":["Ben Bolt Substation"],"codes":["BENBOLT"],"osm":"osm:way/490190288"}},{"inr":"27INR0308","name":"Beaverhead Storage SLF","fuel":"battery","tech":"BA","mw":61.5,"county":"Jim Wells","zone":"SOUTH","poi":"Direct to Sub 69kv #5653 Ben Bolt.","entity":"Beaverhead Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-11","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-98.06892,27.68742],"method":"ERCOT bus number -> substation","subs":["Ben Bolt Substation"],"codes":["BENBOLT"],"osm":"osm:way/490190288"}},{"inr":"27INR0309","name":"Tall Saddle Solar","fuel":"solar","tech":"PV","mw":252.3,"county":"Kenedy","zone":"COASTAL","poi":"80076 AJO SUBSTATION 345kV","entity":"Tall Saddle Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-10-15","ia":"2026-10-05","cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":121,"loc":{"pt":[-97.58310769230775,27.04759807692308],"method":"county centroid (substation not located)","subs":[],"codes":["AJO"]}},{"inr":"27INR0310","name":"Tall Saddle Wind","fuel":"wind","tech":"WT","mw":522.8,"county":"Kenedy","zone":"COASTAL","poi":"80076 AJO SUBSTATION 345kV","entity":"Tall Saddle Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-15","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-97.58310769230775,27.04759807692308],"method":"county centroid (substation not located)","subs":[],"codes":["AJO"]}},{"inr":"27INR0312","name":"HILLBORO WIND","fuel":"wind","tech":"WT","mw":33.2,"county":"Hill","zone":"NORTH","poi":"Tap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)","entity":"Abei Energy Green XI LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-05","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["ASHSW","REVSW"]}},{"inr":"27INR0313","name":"Spindletop Solar","fuel":"solar","tech":"PV","mw":286.4,"county":"Nacogdoches","zone":"NORTH","poi":"Tap Stryker [3109] - Lufkin [3117] 345 kV line","entity":"Banita Creek Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-29","ia":"2025-12-29","cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":137,"loc":{"pt":[-94.58744044943823,31.53967078651684],"method":"county centroid (substation not located)","subs":[],"codes":["SCSES","LFKSW"]}},{"inr":"27INR0315","name":"Old Roman Energy Center","fuel":"battery","tech":"BA","mw":207.34,"county":"Reagan","zone":"WEST","poi":"23868 STILES 138 KV","entity":"Nova Clean Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-26","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-101.58615,31.43457],"method":"ERCOT bus number -> substation","subs":["Stiles Substation"],"codes":["STILES"],"osm":"osm:way/456629589"}},{"inr":"27INR0316","name":"Avant Prairie BESS","fuel":"battery","tech":"BA","mw":201.72,"county":"Freestone","zone":"NORTH","poi":"Tap 345kV BIGBRNE (#3380) - JEWETT (#3390) CKT 1","entity":"Avant Prairie ESS LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-96.13342,31.37105],"method":"ERCOT bus number -> substation","subs":["Jewett Substation"],"codes":["JEWET"],"osm":"osm:way/99932982"}},{"inr":"27INR0317","name":"Edgewood BESS 1","fuel":"battery","tech":"BA","mw":102.1,"county":"Van Zandt","zone":"NORTH","poi":"Tap Edgewood 138kV bus(3181) to CANTNSW_8 (3174)","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-01","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.70379999999997,32.62182399999999],"method":"county centroid (substation not located)","subs":[],"codes":["EDGWD","CNTSW"]}},{"inr":"27INR0321","name":"Rock Island Generating (TEF -Due Diligence)","fuel":"gas","tech":"IC","mw":121.8,"county":"Colorado","zone":"SOUTH","poi":"57640 Rock Island 138 kV","entity":"Kerrville Public Utility Board Public Facility Corporation","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-06-01","ia":"2025-03-17","cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":80,"loc":{"pt":[-96.53791,29.55006],"method":"ERCOT bus number -> substation","subs":["Rock Island Substation"],"codes":["ROCKIS"],"osm":"osm:way/520305127"}},{"inr":"27INR0323","name":"Prairie Blossom Storage","fuel":"battery","tech":"BA","mw":122.5,"county":"Howard","zone":"WEST","poi":"Tap 138kV #1322 Big Spring Switch – #1366 Big Spring CRMWD","entity":"Prairie Blossom Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-08","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":["BSPSW","BSCRM"]}},{"inr":"27INR0324","name":"LONE STAR INDUSTRIAL PARK GAS POWER PROJECT","fuel":"gas","tech":"IC","mw":166,"county":"Morris","zone":"NORTH","poi":"1795 Monticello SES 138kV","entity":"LONE STAR INDUSTRIAL PARK, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-11","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":54,"loc":{"pt":[-94.7226,32.9215],"method":"EIA plant record: same name and fuel in the same county (EIA plant 3477, \"Lone Star\", retired)","subs":[],"codes":["MNSES"],"eia_plant":3477}},{"inr":"27INR0325","name":"Calf Creek Storage","fuel":"battery","tech":"BA","mw":103.3,"county":"Howard","zone":"WEST","poi":"Buffalo 138 kV Substation #23837","entity":"Coyote Ridge Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-01","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-101.86787,32.10745],"method":"ERCOT bus number -> substation","subs":["Buffalo Substation"],"codes":["BUFFALO"],"osm":"osm:way/457051863"}},{"inr":"27INR0327","name":"Sunflower Valley Storage","fuel":"battery","tech":"BA","mw":205.7,"county":"Mitchell","zone":"WEST","poi":"1414 Champion Creek Substation 345 kV","entity":"Sunflower Valley Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-17","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["CCRSW"]}},{"inr":"27INR0330","name":"Wild Horse Desert Solar","fuel":"solar","tech":"PV","mw":120,"county":"Dimmit","zone":"SOUTH","poi":"Tap 138kV 8613 Big Well - 8212 Dilley Switch","entity":"Wild Horse Desert Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":38,"loc":{"pt":[-99.53584,28.56533],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Big Wells Substation"],"codes":["BIG_WELL","DILLEYSW"]}},{"inr":"27INR0331","name":"Wild Horse Desert Storage","fuel":"battery","tech":"BA","mw":90.3,"county":"Dimmit","zone":"SOUTH","poi":"Tap 138kV 8613 Big Well - 8212 Dilley Switch","entity":"Wild Horse Desert Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-99.53584,28.56533],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Big Wells Substation"],"codes":["BIG_WELL","DILLEYSW"]}},{"inr":"27INR0332","name":"White Wing Solar","fuel":"solar","tech":"PV","mw":127.4,"county":"Wilbarger","zone":"WEST","poi":"Tap 345 kV (#60504) Tesla - (#6111) Riley","entity":"White Wing Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.14533,34.08526],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Riley Substation"],"codes":["TESLA","RILEY"]}},{"inr":"27INR0333","name":"White Wing Storage","fuel":"battery","tech":"BA","mw":130.4,"county":"Wilbarger","zone":"WEST","poi":"Tap 345 kV (#60504) Tesla - (#6111) Riley","entity":"White Wing Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-99.14533,34.08526],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Riley Substation"],"codes":["TESLA","RILEY"]}},{"inr":"27INR0334","name":"Buffalo Jump Wind","fuel":"wind","tech":"WT","mw":740,"county":"Culberson","zone":"WEST","poi":"1097 Culberson 345 KV","entity":"BOULEVARD ASSOCIATES, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":162,"loc":{"pt":[-104.67212857142856,31.34881428571429],"method":"county centroid (substation not located)","subs":[],"codes":["CULSW"]}},{"inr":"27INR0337","name":"Jalisco Cogen","fuel":"gas","tech":"CC","mw":167.8,"county":"Nueces","zone":"COASTAL","poi":"8475  JAVELINA4A 138 KV","entity":"HEP Power Generation, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-31","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":55,"loc":{"pt":[-97.45704,27.80513],"method":"ERCOT bus number -> substation","subs":["Javelina Substation"],"codes":["JAVELINA"],"osm":"osm:way/488508105"}},{"inr":"27INR0338","name":"Billie Storage","fuel":"battery","tech":"BA","mw":83.75,"county":"Hidalgo","zone":"SOUTH","poi":"Tap 138kV 8357 North Weslaco – 8358 North Mercedes","entity":"Weslaco Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-02","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-97.91185,26.23058],"method":"ERCOT bus number -> substation","subs":["North Mercedes Substation"],"codes":["N_MERCED"],"osm":"osm:way/513282723"}},{"inr":"27INR0348","name":"Johnson Grass Solar","fuel":"solar","tech":"PV","mw":195.8,"county":"Mitchell","zone":"WEST","poi":"Tap 138kV (#11395) Navigation - (#10054) Cattlemen","entity":"Johnson Grass Solar ,LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-19","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["NAVIG"]}},{"inr":"27INR0354","name":"Cebocell BESS","fuel":"battery","tech":"BA","mw":200.87,"county":"Smith","zone":"NORTH","poi":"3137 BlackFork 138 KV","entity":"Cebocell, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-31","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-95.32716470588235,32.47594901960783],"method":"county centroid (substation not located)","subs":[],"codes":["BLKSW"]}},{"inr":"27INR0355","name":"Gardner Draw Solar","fuel":"solar","tech":"PV","mw":309.5,"county":"Glasscock","zone":"WEST","poi":"59902 Sand Bluff 345kV","entity":"RWE Clean Energy Development, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-01","ia":"2025-08-07","cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":148,"loc":{"pt":[-101.57186,31.912620000000004],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0362","name":"Hamlet Solar SLF","fuel":"solar","tech":"PV","mw":201,"county":"Frio","zone":"SOUTH","poi":"Tap 138kV #5895 PEARSALL - #5827 MOORE","entity":"Hamlet Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-04","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.04848,29.07944],"method":"one end of the tapped line, matched by name in the POI","subs":["Moore Substation"],"codes":["PEARSALL","MOORE"]}},{"inr":"27INR0363","name":"Hamlet Storage SLF","fuel":"battery","tech":"BA","mw":201,"county":"Frio","zone":"SOUTH","poi":"Tap 138kV #5895 PEARSALL -#5827 MOORE","entity":"Hamlet Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-04","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.1685,28.912219999999998],"method":"county centroid (substation not located)","subs":[],"codes":["PEARSALL","MOORE"]}},{"inr":"27INR0364","name":"Cashel BESS","fuel":"battery","tech":"BA","mw":150.44,"county":"Schleicher","zone":"WEST","poi":"6500 Live Oak AEP 138kV","entity":"TIPPSOL LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-15","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.62328,30.9339],"method":"county centroid (substation not located)","subs":[],"codes":["LVOK"]}},{"inr":"27INR0365","name":"Comanche BESS","fuel":"battery","tech":"BA","mw":614.4,"county":"Comanche","zone":"NORTH","poi":"#1440 Comanche Switching Station 345kV","entity":"ENERGOS BESS","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-05-07","ia":"2026-03-20","cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":466,"loc":{"pt":[-98.52881111111111,31.920833333333334],"method":"county centroid (substation not located)","subs":[],"codes":["CMNSW"]}},{"inr":"27INR0367","name":"Goat Mountain Wind-Repower","fuel":"wind","tech":"WT","mw":303.2,"county":"Sterling","zone":"WEST","poi":"76030 Gasconades Creek 345kV","entity":"Goat Wind LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-01","ia":"2026-02-20","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":226,"loc":{"pt":[-100.7914,31.95194],"method":"EIA plant record: same name and fuel in the same county (EIA plant 56754, \"Goat Wind LP\", operating)","subs":[],"codes":["GASCCR"],"eia_plant":56754}},{"inr":"27INR0371","name":"Feather Dalea BESS","fuel":"battery","tech":"BA","mw":200,"county":"Glasscock","zone":"WEST","poi":"59902 Sand_Bluff 345kV","entity":"RWE Clean Energy Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-07-02","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-101.57186,31.912620000000004],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0372","name":"Abeja Solar Farm","fuel":"solar","tech":"PV","mw":200.84,"county":"Bee","zone":"SOUTH","poi":"Tap 345kV 8012 PALADIO7A - 8689 TANGO7A","entity":"Abeja Solar Farm LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-07","ia":"2025-12-16","cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-97.84019,28.28824],"method":"EIA plant record: same name and fuel in the same county (EIA plant 68347, \"Abeja Solar Farm\", planned)","subs":[],"codes":["TANGO"],"eia_plant":68347}},{"inr":"27INR0373","name":"Velado Solar SLF","fuel":"solar","tech":"PV","mw":115.2,"county":"Dimmit","zone":"SOUTH","poi":"Tap 138kV 78281 Dimmit - 8274 Conoco Chittam","entity":"Velado Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-14","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-99.87367,28.50919],"method":"ERCOT bus number -> substation","subs":["Dimmit Substation"],"codes":["DIMMIT"],"osm":"osm:way/452115707"}},{"inr":"27INR0374","name":"Velado Storage SLF","fuel":"battery","tech":"BA","mw":115.2,"county":"Dimmit","zone":"SOUTH","poi":"Tap 138kv 78281 Dimmit - 8274 Conoco Chittam.","entity":"Velado Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-14","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-99.87367,28.50919],"method":"ERCOT bus number -> substation","subs":["Dimmit Substation"],"codes":["DIMMIT"],"osm":"osm:way/452115707"}},{"inr":"27INR0379","name":"Scrap Iron Solar","fuel":"solar","tech":"PV","mw":110.77,"county":"Grimes","zone":"NORTH","poi":"Tap 138kV (#9) Bedias - (#25) North Zulch","entity":"Energiekontor US Texas SP 15 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.07382,30.91976],"method":"one end of the tapped line, matched by name in the POI","subs":["North Zulch Substation"],"codes":[]}},{"inr":"27INR0383","name":"Windjammer Windpower","fuel":"wind","tech":"WT","mw":244.06,"county":"Glasscock","zone":"WEST","poi":"tap 345kV 59902 Sand Bluff Wind Farm  - 59907 Bernoulli","entity":"Windjammer Windpower, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2025-12-03","cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":182,"loc":{"pt":[-101.46643,31.79914],"method":"one end of the tapped line, matched by name in the POI","subs":["Bernoulli Substation"],"codes":[]}},{"inr":"27INR0384","name":"Straight Spur Wind","fuel":"wind","tech":"WT","mw":247.4,"county":"Andrews","zone":"WEST","poi":"Tap 345 kV 23876 Clear Fork -11157 Gardenale Switch","entity":"ENGIE IR Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-01","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":54,"loc":{"pt":[-102.72318,32.3483],"method":"county centroid (substation not located)","subs":[],"codes":["GDNSW"]}},{"inr":"27INR0385","name":"Straight Spur Solar","fuel":"solar","tech":"PV","mw":251.8,"county":"Andrews","zone":"WEST","poi":"Tap 345 kV ClearFork (Bus #23876) to Gardenale Switch (Bus #11157)","entity":"ENGIE IR Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-01","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-102.72318,32.3483],"method":"county centroid (substation not located)","subs":[],"codes":["GDNSW"]}},{"inr":"27INR0386","name":"Straight Spur Storage","fuel":"battery","tech":"BA","mw":306.2,"county":"Andrews","zone":"WEST","poi":"Tap 345kV ClearFork( Bus # 23876) to Gardenale Switch (Bus # 11157)","entity":"ENGIE IR Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-01","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-102.72318,32.3483],"method":"county centroid (substation not located)","subs":[],"codes":["GDNSW"]}},{"inr":"27INR0389","name":"Sugaree Solar","fuel":"solar","tech":"PV","mw":251.4,"county":"Maverick","zone":"SOUTH","poi":"138kV Escondido (8260) to Brackettville (8252)","entity":"Sugaree Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-21","ia":"2025-09-29","cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":120,"loc":{"pt":[-100.47445,28.72847],"method":"ERCOT bus number -> substation","subs":["Escondido Substation"],"codes":["ESCONDID"],"osm":"osm:way/21114385"}},{"inr":"27INR0390","name":"Diamond Sage Solar 1","fuel":"solar","tech":"PV","mw":213.96,"county":"Webb","zone":"SOUTH","poi":"tap 345kV 80219 LOBO7A - 5709 FOWLER\nTONSW5 CKT2","entity":"DGC Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"27INR0392","name":"Cernan BESS","fuel":"battery","tech":"BA","mw":10.04,"county":"Wharton","zone":"SOUTH","poi":"Hillje 345kV (#44200)","entity":"Cernan BESS LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-02","ia":"2025-12-30","cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.23649,29.0297],"method":"ERCOT bus number -> substation","subs":["Hillje Substation"],"codes":["HLJ"],"osm":"osm:way/100064466"}},{"inr":"27INR0393","name":"Ferdinand Grid BESS II","fuel":"battery","tech":"BA","mw":208.12,"county":"Bexar","zone":"SOUTH","poi":"5260 Leon Creek 138kV","entity":"Coval Infrastructure DevCo LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["LEON_CRK"]}},{"inr":"27INR0395","name":"Diamond Sage Solar 2","fuel":"solar","tech":"PV","mw":213.96,"county":"Webb","zone":"SOUTH","poi":"Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709)","entity":"DGC Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"27INR0396","name":"Bluewind BESS","fuel":"battery","tech":"BA","mw":246.5,"county":"Atascosa","zone":"SOUTH","poi":"5713 Oaks Substation 138kV","entity":"Bluewind Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-02","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["OAKS9"]}},{"inr":"27INR0398","name":"Bravo BESS","fuel":"battery","tech":"BA","mw":207.38,"county":"Webb","zone":"SOUTH","poi":"Tap 345kV 80220 CENIZO7A - 80224 TIEMPO7A","entity":"Bravo BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-12","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"27INR0399","name":"Resaca Oasis Storage","fuel":"battery","tech":"BA","mw":200.7,"county":"Cameron","zone":"COASTAL","poi":"# 79601 Stillman Substation 138 kV","entity":"Resaca Oasis Storage, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-20","ia":"2025-05-22","cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-97.37263,25.97878],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69120, \"Resaca Oasis Storage\", planned)","subs":[],"codes":["STILLMAN"],"eia_plant":69120}},{"inr":"27INR0400","name":"Reforzar BESS 1","fuel":"battery","tech":"BA","mw":207.6,"county":"Brooks","zone":"SOUTH","poi":"345 kV 80078 Reforzar","entity":"Tempus Power management LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-04-13","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":69,"loc":{"pt":[-98.41181538461538,27.132915384615384],"method":"county centroid (substation not located)","subs":[],"codes":["REFORZAR"]}},{"inr":"27INR0401","name":"Reforzar Bess 2","fuel":"battery","tech":"BA","mw":207.6,"county":"Brooks","zone":"SOUTH","poi":"345 kV 80078 Reforzar","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-13","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.41181538461538,27.132915384615384],"method":"county centroid (substation not located)","subs":[],"codes":["REFORZAR"]}},{"inr":"27INR0409","name":"Baker Branch BESS","fuel":"battery","tech":"BA","mw":287.22,"county":"Lamar","zone":"NORTH","poi":"Pacific Switch  (PACSW)  345 kV Bus 11683","entity":"Mockingbird Storage Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":20,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["PACSW"]}},{"inr":"27INR0412","name":"Spinosa BESS","fuel":"battery","tech":"BA","mw":201.2,"county":"Wichita","zone":"WEST","poi":"Tap 138 kV Wichita Falls Cogen (#1498) – Pleasant Valley Switch (#1450)","entity":"Spinosa Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-08","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.70719629629629,34.10137777777778],"method":"county centroid (substation not located)","subs":[],"codes":["WFCOG","PLVSW"]}},{"inr":"27INR0413","name":"Edgewood BESS 2","fuel":"battery","tech":"BA","mw":102.1,"county":"Van Zandt","zone":"NORTH","poi":"Tap Edgewood 138kV bus(3181) to 3174","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.70379999999997,32.62182399999999],"method":"county centroid (substation not located)","subs":[],"codes":["EDGWD","CNTSW"]}},{"inr":"27INR0414","name":"Diamond Sage BESS 1","fuel":"battery","tech":"BA","mw":103.5,"county":"Webb","zone":"SOUTH","poi":"tap 345kV 80219 LOBO7A - 5709 FOWLERTONSW5 CKT2","entity":"DGC Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"27INR0417","name":"Bluebonnet Trail Solar","fuel":"solar","tech":"PV","mw":150.9,"county":"Ellis","zone":"NORTH","poi":"Tap 345 kV (#2427) WATMLL_W5 - (#2466) BIGONION_5","entity":"Bluebonnet trail solar LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-09-19","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":48,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["WTRML","BIGSW"]}},{"inr":"27INR0418","name":"Pioneer Path Energy Storage 1","fuel":"battery","tech":"BA","mw":102.14,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"27INR0421","name":"M-Bar Solar I","fuel":"solar","tech":"PV","mw":30.21,"county":"Ector","zone":"WEST","poi":"1141 Holt Switch Substation 138kV","entity":"M-Bar Energy I, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-09-18","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["HLTSW"]}},{"inr":"27INR0422","name":"M-Bar BESS I","fuel":"battery","tech":"BA","mw":82.1,"county":"Ector","zone":"WEST","poi":"1141 Holt Switch Substation 138 kV","entity":"M-Bar Energy I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-18","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-102.58421,32.06375],"method":"substation matched by name in the POI","subs":["Holt Switching Station"],"codes":["HLTSW"]}},{"inr":"27INR0423","name":"Pioneer Path Energy Storage 2","fuel":"battery","tech":"BA","mw":102.14,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"27INR0424","name":"Pioneer Path Energy Storage 3","fuel":"battery","tech":"BA","mw":102.14,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"27INR0425","name":"Pioneer Path Energy Storage 4","fuel":"battery","tech":"BA","mw":102.14,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"27INR0426","name":"Prairie Horizon Energy Storage 1","fuel":"battery","tech":"BA","mw":102.14,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"27INR0427","name":"Prairie Horizon Energy Storage 2","fuel":"battery","tech":"BA","mw":102.14,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"27INR0428","name":"Prairie Horizon Energy Storage 3","fuel":"battery","tech":"BA","mw":102.14,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"27INR0429","name":"Prairie Horizon Energy Storage 4","fuel":"battery","tech":"BA","mw":102.14,"county":"Robertson","zone":"NORTH","poi":"Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2","entity":"Tempus Power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"27INR0434","name":"Lyra Solar","fuel":"solar","tech":"PV","mw":600,"county":"Borden","zone":"WEST","poi":"345kV MULESHOE (#59922)","entity":"Juno Solar 4","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-20","ia":"2025-07-01","cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":287,"loc":{"pt":[-101.48386,32.787299999999995],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0435","name":"Clairemont Solar 1","fuel":"solar","tech":"PV","mw":251.75,"county":"Kent","zone":"WEST","poi":"59908 Novaprime 345kV","entity":"Clairemont Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-02-13","ia":"2025-11-24","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":120,"loc":{"pt":[-100.85718333333334,33.181733333333334],"method":"county centroid (substation not located)","subs":[],"codes":["NVAP_345"]}},{"inr":"27INR0436","name":"Coati Energy Storage","fuel":"battery","tech":"BA","mw":202.8,"county":"Harris","zone":"HOUSTON","poi":"Bus # 40830, Humble, 138 kV","entity":"PowerPulse LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-15","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-95.23506,30.00007],"method":"ERCOT bus number -> substation","subs":["Humble Substation"],"codes":["HB"],"osm":"osm:way/129316655"}},{"inr":"27INR0437","name":"Hondo Arroyo Storage","fuel":"battery","tech":"BA","mw":100.7,"county":"Medina","zone":"SOUTH","poi":"Tap 138 kV 5225 Hondo - 5813 Pearson","entity":"Hondo Creek Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.03763000000001,29.304105],"method":"tap between two substations (bus number + name)","subs":["Pearson Substation","Hondo Substation"],"codes":["F3","PEARSON"]}},{"inr":"27INR0438","name":"Wisdom Solar SLF","fuel":"solar","tech":"PV","mw":299.37,"county":"Pecos","zone":"WEST","poi":"Tap 138 kV #38455 HOLIDAY SUB TNP -  #38450 SOAPTREE TNP","entity":"Wisdom Green Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-06","ia":"2026-03-18","cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":143,"loc":{"pt":[-102.39364,31.08306],"method":"ERCOT bus number -> substation","subs":["Soaptree Switching Station"],"codes":["SOAPTREE"],"osm":"osm:way/1006095199"}},{"inr":"27INR0440","name":"Wisdom BESS SLF","fuel":"battery","tech":"BA","mw":102.88,"county":"Pecos","zone":"WEST","poi":"Tap 138 kV #38455 HOLIDAY SUB TNP - 138 kV #38450 SOAPTREE TNP","entity":"Wisdom Green Energy LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-10-06","ia":"2026-03-18","cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":78,"loc":{"pt":[-102.39364,31.08306],"method":"ERCOT bus number -> substation","subs":["Soaptree Switching Station"],"codes":["SOAPTREE"],"osm":"osm:way/1006095199"}},{"inr":"27INR0441","name":"Pavo Creek Storage","fuel":"battery","tech":"BA","mw":154.2,"county":"Milam","zone":"SOUTH","poi":"Tap #3659 Thorndale North - #3701 Rookie Switch 138 kV","entity":"Pavo Creek Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-21","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-97.21109,30.62005],"method":"one end of the tapped line, matched by name in the POI","subs":["Thorndale North Substation"],"codes":["THRDN","ROKSW"]}},{"inr":"27INR0443","name":"Serenity Wind","fuel":"wind","tech":"WT","mw":473,"county":"Armstrong","zone":"PANHANDLE","poi":"23931 MIDPOINT SWITCH 345 kV","entity":"Serenity Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-18","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":104,"loc":{"pt":[-101.41170000000001,34.92172],"method":"county centroid (substation not located)","subs":[],"codes":["MPTSW"]}},{"inr":"27INR0444","name":"Diamond Sage BESS 2","fuel":"battery","tech":"BA","mw":103.5,"county":"Webb","zone":"SOUTH","poi":"Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709)","entity":"DGC Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"27INR0445","name":"Moon Chapel Wind","fuel":"wind","tech":"WT","mw":379.2,"county":"Tom Green","zone":"WEST","poi":"Tap 345kV 76090  Divide  - 76009 Twin Buttes Ckt 1","entity":"Orsted Onshore Development North America, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":83,"loc":{"pt":[-100.6876,31.691654999999997],"method":"tap between two located substations","subs":["Divide Substation","Twin Buttes Substation"],"codes":["DIVIDE","TWINBU"]}},{"inr":"27INR0447","name":"Jay Flat BESS","fuel":"battery","tech":"BA","mw":259.36,"county":"Kent","zone":"WEST","poi":"59908 Novaprime 345kV","entity":"Jay Flat BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-13","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-100.85718333333334,33.181733333333334],"method":"county centroid (substation not located)","subs":[],"codes":["NVAP_345"]}},{"inr":"27INR0449","name":"Gulf Prairie Solar","fuel":"solar","tech":"PV","mw":202.17,"county":"Brazoria","zone":"COASTAL","poi":"(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)","entity":"Gulf Prairie Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-95.42884,29.22677],"method":"ERCOT bus number -> substation","subs":["Angleton Substation"],"codes":["AE"],"osm":"osm:way/244479862"}},{"inr":"27INR0451","name":"Dairyland Storage","fuel":"battery","tech":"BA","mw":301.8,"county":"Hopkins","zone":"NORTH","poi":"To 345 kV Birthright Station (#11684)","entity":"ENGIE IR Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-30","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-95.5872457142857,33.27730285714285],"method":"county centroid (substation not located)","subs":[],"codes":["BIRSW"]}},{"inr":"27INR0452","name":"Moccasin Storage","fuel":"battery","tech":"BA","mw":603.08,"county":"Jones","zone":"WEST","poi":"Tap 345kV #60707 Kirchhoff -  #60515 Clear Crossing CKT-1","entity":"ENGIE IR Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":43,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"27INR0453","name":"Roboman Solar","fuel":"solar","tech":"PV","mw":272.6,"county":"Coke","zone":"WEST","poi":"Tap 345 kV (#76009) Twin Buttes  – (#76090) Divide  Ckt 1","entity":"Roboman Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-100.77718,31.86951],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Divide Substation"],"codes":["TWINBU","DIVIDE"]}},{"inr":"27INR0455","name":"Yellow Leaf Solar","fuel":"solar","tech":"PV","mw":103.19,"county":"Kaufman","zone":"NORTH","poi":"Tap 138kV Crandall (#2727) – Kaufman Northwest (#2724)","entity":"Lightsource Renewable Energy Development LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-25","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["CRNDL","KFMNW"]}},{"inr":"27INR0456","name":"Yellow Leaf BESS","fuel":"battery","tech":"BA","mw":103.1,"county":"Kaufman","zone":"NORTH","poi":"Tap 138kV Crandall (#2727) – Kaufman Northwest (#2724)","entity":"Lightsource Renewable Energy Development LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-25","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["CRNDL","KFMNW"]}},{"inr":"27INR0457","name":"watermelon 1 energy storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Dallas","zone":"NORTH","poi":"Tap on 2427 WATMLL_W5   345.00 - 2432 TRICRN1_5   345.00 345kV line ckt 1.","entity":"Tempus power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["WTRML","TRCNR"]}},{"inr":"27INR0458","name":"watermelon 2 energy storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Dallas","zone":"NORTH","poi":"Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.","entity":"Tempus power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["WTRML","TRCNR"]}},{"inr":"27INR0459","name":"watermelon 3 energy storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Dallas","zone":"NORTH","poi":"Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. 1.6 miles from 2427 WATMLL_W5","entity":"Tempus power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["WTRML","TRCNR"]}},{"inr":"27INR0460","name":"watermelon 4 energy storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Dallas","zone":"NORTH","poi":"Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.","entity":"Tempus power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["WTRML","TRCNR"]}},{"inr":"27INR0461","name":"Fermata BESS","fuel":"battery","tech":"BA","mw":204,"county":"Hunt","zone":"NORTH","poi":"Tap 345kV 2464# CASHSW_T5 – 2461# ROYSE_N5","entity":"Fermata BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-08","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.04117000000001,32.98473],"method":"county centroid (substation not located)","subs":[],"codes":["CSHSW","RYSSW"]}},{"inr":"27INR0465","name":"Althea Storage","fuel":"battery","tech":"BA","mw":251.3,"county":"Maverick","zone":"SOUTH","poi":"Tap Escondido (8260) - Brackettville (8252)","entity":"Sugaree Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-21","ia":"2025-09-29","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":190,"loc":{"pt":[-100.4334,29.02655],"method":"tap between two located substations","subs":["Escondido Substation","Brackettville Substation"],"codes":["ESCONDID","BRACKETT"]}},{"inr":"27INR0466","name":"Wolfram Storage","fuel":"battery","tech":"BA","mw":206.6,"county":"Calhoun","zone":"COASTAL","poi":"Dokmai 138kV Substation (bus #80090)","entity":"Nova Clean Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-96.6636911764706,28.409144117647056],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0469","name":"Kickstart Energy Storage I","fuel":"battery","tech":"BA","mw":1.44,"county":"Ellis","zone":"NORTH","poi":"Tap 345 kV 1907 Venus Switch - 3383 BYNUM_5","entity":"Kickstart Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":0,"loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"27INR0470","name":"Kickstart Energy Storage II","fuel":"battery","tech":"BA","mw":1.44,"county":"Ellis","zone":"NORTH","poi":"Tap 345 kV 1907 Venus Switch - 3383 BYNUM_5","entity":"Kickstart Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":0,"loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"27INR0471","name":"Kickstart Energy Storage III","fuel":"battery","tech":"BA","mw":1.44,"county":"Ellis","zone":"NORTH","poi":"Tap 345 kV #1906 VENUS_S5  to #68091 NAVARRO","entity":"Kickstart Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":0,"loc":{"pt":[-96.79536,32.204],"method":"tap between two located substations","subs":["Venus Substation","Navarro Switching Station"],"codes":["VENSW","NAVARRO"]}},{"inr":"27INR0472","name":"Kickstart Energy Storage IV","fuel":"battery","tech":"BA","mw":1.44,"county":"Ellis","zone":"NORTH","poi":"Tap 345 kV #1906 VENUS_S5  to #68091 NAVARRO","entity":"Kickstart Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":0,"loc":{"pt":[-96.79536,32.204],"method":"tap between two located substations","subs":["Venus Substation","Navarro Switching Station"],"codes":["VENSW","NAVARRO"]}},{"inr":"27INR0474","name":"Fivemile Wind","fuel":"wind","tech":"WT","mw":282.3,"county":"Dawson","zone":"WEST","poi":"Tap 138kV Lamesa 138kv (10008) to Jim Payne 138kV (18880)","entity":"180 Wind LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-23","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":62,"loc":{"pt":[-101.99994000000001,32.78566],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0478","name":"Metro BESS","fuel":"battery","tech":"BA","mw":200.71,"county":"Caldwell","zone":"SOUTH","poi":"138 kV LYTTON8 (9075)","entity":"Metro BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-07","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.67431,30.00537],"method":"ERCOT bus number -> substation","subs":["Lytton Springs Substation"],"codes":["LYTTON_S"],"osm":"osm:way/173981611"}},{"inr":"27INR0480","name":"Borden Dino Solar","fuel":"solar","tech":"PV","mw":120.47,"county":"Borden","zone":"WEST","poi":"59905 FARADAY 345KV","entity":"Borden Dino Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-101.39576,32.64807],"method":"ERCOT bus number -> substation","subs":["Faraday Substation"],"codes":["W_FD_345"],"osm":"osm:way/453376973"}},{"inr":"27INR0481","name":"Borden Dino BESS","fuel":"battery","tech":"BA","mw":60.26,"county":"Borden","zone":"WEST","poi":"59905 FARADAY 345KV","entity":"Borden Dino Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-101.39576,32.64807],"method":"ERCOT bus number -> substation","subs":["Faraday Substation"],"codes":["W_FD_345"],"osm":"osm:way/453376973"}},{"inr":"27INR0485","name":"Blackland Prairie 1 Energy Storage","fuel":"battery","tech":"BA","mw":100.48,"county":"Travis","zone":"SOUTH","poi":"9328 Austrop 138kV","entity":"Balcones Ridge Resiliency LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-12-01","ia":"2026-04-10","cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":76,"loc":{"pt":[-97.48729,30.2513],"method":"ERCOT bus number -> substation","subs":["Austrop Substation"],"codes":["AUSTRO"],"osm":"osm:way/127245722"}},{"inr":"27INR0486","name":"Blackland Prairie 2 Energy Storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Travis","zone":"SOUTH","poi":"9328 Austrop 138kV","entity":"Balcones Ridge Resiliency II LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-01","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-97.48729,30.2513],"method":"ERCOT bus number -> substation","subs":["Austrop Substation"],"codes":["AUSTRO"],"osm":"osm:way/127245722"}},{"inr":"27INR0487","name":"Blackland Prairie 3 Energy Storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Travis","zone":"SOUTH","poi":"9328 Austrop 138kV","entity":"Balcones Ridge Resiliency II LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-01","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-97.48729,30.2513],"method":"ERCOT bus number -> substation","subs":["Austrop Substation"],"codes":["AUSTRO"],"osm":"osm:way/127245722"}},{"inr":"27INR0488","name":"Dry Creek Solar II","fuel":"solar","tech":"PV","mw":201.28,"county":"Rusk","zone":"NORTH","poi":"Dorsett 345 kV Switching Station(tap 345 kV 3100 Martin Lake - 3105 Elkton)","entity":"Oak Hill Solar II LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-01","ia":"2026-10-28","cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-94.59736249999999,32.1764125],"method":"county centroid (substation not located)","subs":[],"codes":["MLSES","ELKTN"]}},{"inr":"27INR0489","name":"Power Lane II Gas - Alternate","fuel":"gas","tech":"IC","mw":104.39,"county":"Hunt","zone":"NORTH","poi":"Tap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation","entity":"GEUS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-06-01","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":34,"loc":{"pt":[-96.04117000000001,32.98473],"method":"county centroid (substation not located)","subs":[],"codes":["CMEXP"]}},{"inr":"27INR0492","name":"Gulf Gateway Solar One","fuel":"solar","tech":"PV","mw":301.4,"county":"San Patricio","zone":"COASTAL","poi":"Tap 345 kV 8249 Angstrom - 8624 Grissom","entity":"Gulf Gateway Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-97.43837,28.04431],"method":"ERCOT bus number -> substation","subs":["Angstrom Substation"],"codes":["ANGSTROM"],"osm":"osm:way/1089997597"}},{"inr":"27INR0493","name":"Velociraptor BESS I","fuel":"battery","tech":"BA","mw":246,"county":"Ector","zone":"WEST","poi":"10012 METEOR_5 Substation 345kV","entity":"Velociraptor BESS I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["METSW"]}},{"inr":"27INR0494","name":"Obbligato BESS","fuel":"battery","tech":"BA","mw":200.71,"county":"Milam","zone":"SOUTH","poi":"Tap 138kV 120# TALBRTRIDG – 3683# MINERVA1_8","entity":"Obbligato BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-02-28","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.95443,30.74579],"method":"ERCOT bus number -> substation","subs":["Minerva Substation"],"codes":["MNRVA"],"osm":"osm:way/127245540"}},{"inr":"27INR0497","name":"Black Mountain Somervell Gas Combined","fuel":"gas","tech":"CC","mw":495.3,"county":"Somervell","zone":"NORTH","poi":"Dinosaur Switch (#15208)","entity":"Fort Worth Power Core LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-28","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":161,"loc":{"pt":[-97.77151428571429,32.228614285714286],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0498","name":"Infrakey Waco Data Park Gas 2","fuel":"gas","tech":"GT","mw":0,"county":"McLennan","zone":"NORTH","poi":"252 BOSQUESW8 138kV\n(Brazos Connection)","entity":"Infrakey Capital LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.3018,31.5209],"method":"county centroid (substation not located)","subs":[],"codes":["BOSQUESW"]}},{"inr":"27INR0499","name":"Draco Solar","fuel":"solar","tech":"PV","mw":500,"county":"Borden","zone":"WEST","poi":"Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2","entity":"Draco Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-08-19","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-101.514365,32.684595],"method":"tap between two located substations","subs":["Long Draw Substation","Faraday Substation"],"codes":["W_LD_345","W_FD_345"]}},{"inr":"27INR0500","name":"Antila Solar","fuel":"solar","tech":"PV","mw":600,"county":"Borden","zone":"WEST","poi":"#59916 Buck Canyon 345kV","entity":"Antila Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-11-30","ia":"2025-08-13","cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":287,"loc":{"pt":[-101.48386,32.787299999999995],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0501","name":"Mesquite Creek Windpower Repower","fuel":"wind","tech":"WT","mw":214.2,"county":"Dawson","zone":"WEST","poi":"<59900><Long Draw><345>","entity":"Mesquite Creek Wind LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":47,"loc":{"pt":[-101.63297,32.72112],"method":"ERCOT bus number -> substation","subs":["Long Draw Substation"],"codes":["W_LD_345"],"osm":"osm:way/453310291"}},{"inr":"27INR0503","name":"Dog Star Solar I","fuel":"solar","tech":"PV","mw":499.01,"county":"Taylor","zone":"WEST","poi":"Bluff Creek (Bus #60040) to Mulberry Creek (Bus #6235) 345 kV","entity":"Dog Star Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":27,"loc":{"pt":[-99.82251,32.52413],"method":"ERCOT bus number -> substation","subs":["Mulberry Creek Substation"],"codes":["MULBERRY"],"osm":"osm:way/171734088"}},{"inr":"27INR0504","name":"Dog Star Solar II","fuel":"solar","tech":"PV","mw":499.01,"county":"Taylor","zone":"WEST","poi":"Bluff Creek (Bus #60040) to Mulberry Creek (Bus #6235) 345 kV","entity":"Dog Star Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":27,"loc":{"pt":[-99.82251,32.52413],"method":"ERCOT bus number -> substation","subs":["Mulberry Creek Substation"],"codes":["MULBERRY"],"osm":"osm:way/171734088"}},{"inr":"27INR0510","name":"Pecos Wind","fuel":"wind","tech":"WT","mw":193.8,"county":"Pecos","zone":"WEST","poi":"Tap 345 kV 60404 Solstice (SOLSTICE7A) – 76002 Bakersfield (L_BAKERS5_1Y)","entity":"Midnight Energy Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-30","ia":"2026-03-18","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":145,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"27INR0512","name":"Silver Hills Windpower","fuel":"wind","tech":"WT","mw":54.05,"county":"Howard","zone":"WEST","poi":"10066 Prong Moss Switch 138kV","entity":"Silver Hills Windpower, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0524","name":"Portland Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"San Patricio","zone":"COASTAL","poi":"8566 HOT IRON 4A 138 kV\n8569 HOT IRON 4B 138 kV\n\n(2) POIs will be used for this project because there are (2) 138 kV lines supplying the ArcelorMittal plant. Project physical connection will be 13.8 kV bus at ArcelorMittal.","entity":"Convergent Energy Solutions LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-03","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":["ALPHA_VA"]}},{"inr":"27INR0529","name":"Zeus Scurry Solar","fuel":"solar","tech":"PV","mw":503.54,"county":"Scurry","zone":"WEST","poi":"MHOS 345 kV Substation (#59911)","entity":"Scurry Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-01","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-101.00777,32.90667],"method":"ERCOT bus number -> substation","subs":["Mhos Substation"],"codes":["MHOS"],"osm":"osm:way/1454572836"}},{"inr":"27INR0531","name":"Erika BESS","fuel":"battery","tech":"BA","mw":100,"county":"Kaufman","zone":"NORTH","poi":"Tap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)","entity":"Erika Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["ELKTN","TRCNR"]}},{"inr":"27INR0535","name":"Zeus Scurry BESS","fuel":"battery","tech":"BA","mw":1043.07,"county":"Scurry","zone":"WEST","poi":"MHOS 345 kV Substation (#59911)","entity":"Zeus Scurry BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-01","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":74,"loc":{"pt":[-101.00777,32.90667],"method":"ERCOT bus number -> substation","subs":["Mhos Substation"],"codes":["MHOS"],"osm":"osm:way/1454572836"}},{"inr":"27INR0536","name":"Siete Wind","fuel":"wind","tech":"WT","mw":492.8,"county":"Webb","zone":"SOUTH","poi":"345kV 8718 Triada","entity":"Siete Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-03","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":108,"loc":{"pt":[-99.70685194805196,27.717537662337673],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0554","name":"Texas Sun Solar","fuel":"solar","tech":"PV","mw":71.7,"county":"Jackson","zone":"SOUTH","poi":"Cordele Substation ; Bus no. 5524","entity":"Pigg Grounds LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-18","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.55411,29.07803],"method":"ERCOT bus number -> substation","subs":["Cordele Substation"],"codes":["CORDELE"],"osm":"osm:way/515820404"}},{"inr":"27INR0555","name":"Montezuma Storage","fuel":"battery","tech":"BA","mw":183.88,"county":"Colorado","zone":"SOUTH","poi":"L_GLIDDE8_1Y; Bus number - 7258 138KV","entity":"Montezuma Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-10-16","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-96.57187,29.69691],"method":"ERCOT bus number -> substation","subs":["Glidden Substation"],"codes":["GLIDDE"],"osm":"osm:way/98019896"}},{"inr":"27INR0556","name":"Gulf Gateway Storage One","fuel":"battery","tech":"BA","mw":301.4,"county":"San Patricio","zone":"COASTAL","poi":"Tap 345 kV 8249 Angstrom - 8624 Grissom","entity":"Gulf Gateway Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-97.43837,28.04431],"method":"ERCOT bus number -> substation","subs":["Angstrom Substation"],"codes":["ANGSTROM"],"osm":"osm:way/1089997597"}},{"inr":"27INR0557","name":"STP Unit2 High Pressure Turbine Upgrade","fuel":"other","tech":"ST","mw":1336.52,"county":"Matagorda","zone":"COASTAL","poi":"5915 SO_TEX__345A 345 kV","entity":"Constellation South Texas, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-04-23","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.353,"p36_basis":"139 of 394 projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":472,"loc":{"pt":[-96.05017,28.79956],"method":"ERCOT bus number -> substation","subs":["South Texas Project Switchyard"],"codes":["STP"],"osm":"osm:way/39832667"}},{"inr":"27INR0570","name":"Sisters Solar - Phase 2","fuel":"solar","tech":"PV","mw":198.96,"county":"Ector","zone":"WEST","poi":"10009 McGee 345 kV","entity":"Oberon Solar IV, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-23","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0571","name":"Nabla Energy Storage I","fuel":"battery","tech":"BA","mw":750,"county":"Parker","zone":"NORTH","poi":"Double Tap 345kV Parker (1436) - Benbrook (1873 & 1869) DCKT","entity":"Nabla Park LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-17","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":53,"loc":{"pt":[-97.67631,32.80625],"method":"ERCOT bus number -> substation","subs":["Parker Substation"],"codes":["PKRSW"],"osm":"osm:way/171435008"}},{"inr":"27INR0572","name":"Kilby1 Part 1 Small Block Simple Cycle","fuel":"gas","tech":"GT","mw":371,"county":"Reeves","zone":"WEST","poi":"#60404 Solstice Substation 345 kV","entity":"Energy Forge One LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-04","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":121,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"27INR0575","name":"Trailblazer Natural Gas Generation Plant","fuel":"gas","tech":"GT","mw":1026,"county":"Nolan","zone":"WEST","poi":"11420 Sweetwater East Switch 345 kV","entity":"Trailblazer Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-12","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":333,"loc":{"pt":[-100.21691,32.46389],"method":"substation matched by name in the POI","subs":["Sweetwater East Substation"],"codes":["SWESW"]}},{"inr":"27INR0576","name":"Trailblazer BESS","fuel":"battery","tech":"BA","mw":261.97,"county":"Nolan","zone":"WEST","poi":"11420 Sweetwater East Switch 345 kV","entity":"Trailblazer Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-12","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":19,"loc":{"pt":[-100.21691,32.46389],"method":"substation matched by name in the POI","subs":["Sweetwater East Substation"],"codes":["SWESW"]}},{"inr":"27INR0578","name":"Trailblazer Solar","fuel":"solar","tech":"PV","mw":323.02,"county":"Nolan","zone":"WEST","poi":"#11420 Sweetwater East Switch 345 kV","entity":"Trailblazer Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-12","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-100.21691,32.46389],"method":"substation matched by name in the POI","subs":["Sweetwater East Substation"],"codes":["SWESW"]}},{"inr":"27INR0581","name":"Limitless Energy Hub I","fuel":"gas","tech":"CC","mw":1238.25,"county":"Wilbarger","zone":"WEST","poi":"Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B.","entity":"Limitless Energy Hub I LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-01","ia":"2025-12-31","cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":817,"loc":{"pt":[-99.45969500000001,34.014765],"method":"tap between two located substations","subs":["Riley Substation","Edith Clarke Substation"],"codes":["RILEY","EDITHCLA"]}},{"inr":"27INR0582","name":"Limitless Energy Hub II","fuel":"gas","tech":"CC","mw":1238.25,"county":"Wilbarger","zone":"WEST","poi":"Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B.","entity":"Limitless Energy Hub II LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-01","ia":"2025-12-31","cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":817,"loc":{"pt":[-99.45969500000001,34.014765],"method":"tap between two located substations","subs":["Riley Substation","Edith Clarke Substation"],"codes":["RILEY","EDITHCLA"]}},{"inr":"27INR0584","name":"Lytton Springs Solar","fuel":"solar","tech":"PV","mw":55.3,"county":"Caldwell","zone":"SOUTH","poi":"Lytton Springs (#9074) – Fayette Plant (#7055) 345 kV Line","entity":"SMT Lytton Springs LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":3,"loc":{"pt":[-97.67431,30.00537],"method":"ERCOT bus number -> substation","subs":["Lytton Springs Substation"],"codes":["LYTTON_S"],"osm":"osm:way/173981611"}},{"inr":"27INR0585","name":"Lytton Springs BESS","fuel":"battery","tech":"BA","mw":77.36,"county":"Caldwell","zone":"SOUTH","poi":"Lytton Springs (#9074) – Fayette Plant (#7055) 345 kV Line","entity":"SMT Lytton Springs LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-97.67431,30.00537],"method":"ERCOT bus number -> substation","subs":["Lytton Springs Substation"],"codes":["LYTTON_S"],"osm":"osm:way/173981611"}},{"inr":"27INR0593","name":"Pecan Ridge","fuel":"battery","tech":"BA","mw":150.79,"county":"McCulloch","zone":"SOUTH","poi":"60386 HEARTLAN2A 69kV","entity":"Luminous Energy Renewables LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-06-30","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.35111764705881,31.40657352941177],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0606","name":"Big Watt Mustang Power","fuel":"gas","tech":"CC","mw":448.98,"county":"Williamson","zone":"SOUTH","poi":"Tapping the 138 kV line from Taylor (Bus#3658) to Thorndale North (Bus#3659)","entity":"Big Watt Power Mustang LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-15","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":146,"loc":{"pt":[-97.21109,30.62005],"method":"one end of the tapped line, matched by name in the POI","subs":["Thorndale North Substation"],"codes":["TAYLR","THRDN"]}},{"inr":"27INR0607","name":"Prairie Phoenix Wind","fuel":"wind","tech":"WT","mw":297.25,"county":"McLennan","zone":"NORTH","poi":"3403 Lake Hall 345kV","entity":"Prairie Hill Wind Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-24","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":65,"loc":{"pt":[-97.3018,31.5209],"method":"county centroid (substation not located)","subs":[],"codes":["LHLSW"]}},{"inr":"27INR0611","name":"Bodkin BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Brazoria","zone":"COASTAL","poi":"The 138kV Danbury Dab DANBUR_POI_8 (BUS#42875) Station","entity":"Bodkin BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.301,29.292],"method":"EIA plant record: same name and fuel in the same county (EIA plant 70365, \"Bodkin BESS\", planned)","subs":[],"codes":["DAB"],"eia_plant":70365}},{"inr":"27INR0618","name":"Prairie Point Energy Storage I","fuel":"battery","tech":"BA","mw":1000,"county":"Wise","zone":"NORTH","poi":"RAMHORNH 5 - 31875","entity":"Prairie Point LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":71,"loc":{"pt":[-97.7086,33.17174],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0619","name":"Prairie Point Energy Storage II","fuel":"battery","tech":"BA","mw":1000,"county":"Wise","zone":"NORTH","poi":"RAMHORNH 5 - 31875","entity":"Prairie Point LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":71,"loc":{"pt":[-97.7086,33.17174],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0620","name":"st gall IIIA Storage","fuel":"battery","tech":"BA","mw":200.69,"county":"Pecos","zone":"WEST","poi":"38355 LEON_CRK 138kV","entity":"Tempus Power Management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["LEONCRK"]}},{"inr":"27INR0621","name":"st gall IIIB Storage","fuel":"battery","tech":"BA","mw":200.69,"county":"Pecos","zone":"WEST","poi":"38355 LEON_CRK 138kV","entity":"Tempus Power Management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["LEONCRK"]}},{"inr":"27INR0623","name":"Helion Solar","fuel":"solar","tech":"PV","mw":100,"county":"Scurry","zone":"WEST","poi":"59912 GALVANI 345","entity":"Helion Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-10-22","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-100.98097142857144,32.83984285714286],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0624","name":"Helion BESS","fuel":"battery","tech":"BA","mw":100,"county":"Scurry","zone":"WEST","poi":"59912 GALVANI 345","entity":"Helion BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-09-16","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-100.98097142857144,32.83984285714286],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0625","name":"Hornet Energy Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Swisher","zone":"PANHANDLE","poi":"23901 OZARKTRAIL_5 345kV","entity":"Hornet Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-101.78763999999998,34.57384],"method":"county centroid (substation not located)","subs":[],"codes":["OZTSW"]}},{"inr":"27INR0627","name":"Redbird BESS","fuel":"battery","tech":"BA","mw":100,"county":"Fort Bend","zone":"HOUSTON","poi":"44090 Cedar Creek 345kV","entity":"Redbird BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.8873545454545,29.500803030303036],"method":"county centroid (substation not located)","subs":[],"codes":["CCK"]}},{"inr":"27INR0631","name":"Power Lane II - Gas","fuel":"gas","tech":"IC","mw":104.5,"county":"Hunt","zone":"NORTH","poi":"GREENV_IN_8 (977) via (future) GEUS_STM Substation","entity":"GEUS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-08-15","ia":null,"cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":34,"loc":{"pt":[-96.04117000000001,32.98473],"method":"county centroid (substation not located)","subs":[],"codes":["GN_S_I"]}},{"inr":"27INR0636","name":"Myrtle Solar Repower","fuel":"solar","tech":"PV","mw":314.27,"county":"Brazoria","zone":"COASTAL","poi":"42110 Angleton 138kV","entity":"Myrtle Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2027-06-21","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":99,"loc":{"pt":[-95.42884,29.22677],"method":"ERCOT bus number -> substation","subs":["Angleton Substation"],"codes":["AE"],"osm":"osm:way/244479862"}},{"inr":"27INR0646","name":"Files BESS SLF","fuel":"battery","tech":"BA","mw":34,"county":"Hill","zone":"NORTH","poi":"Fort Smith Switch (#3389) 345 kV","entity":"Files BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-11-07","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["FTSSW"]}},{"inr":"27INR0651","name":"Three Canes Gas P1","fuel":"gas","tech":"IC","mw":0,"county":"Freestone","zone":"NORTH","poi":"#3344 Tarantula Switching Station","entity":"CleanAI, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-30","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.98603142857144,31.80864857142857],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"27INR0652","name":"Three Canes Gas P2","fuel":"gas","tech":"IC","mw":0,"county":"Freestone","zone":"NORTH","poi":"Tap on the 345 kV Outlaw Switch (bus #3386) to Limestone Plant Station (bus #46020) Transmission Line","entity":"CleanAI, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-30","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.98603142857144,31.80864857142857],"method":"county centroid (substation not located)","subs":[],"codes":["OUTSW","LEG"]}},{"inr":"27INR0653","name":"Rock House Draw Gas","fuel":"gas","tech":"IC","mw":523,"county":"Pecos","zone":"WEST","poi":"38431 TNCENTRY1_1 138 KV","entity":"Longfellow Power LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-11-29","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":170,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNCENTRY"]}},{"inr":"27INR0655","name":"Lynx Energy Storage_Full","fuel":"other","tech":"SO","mw":50,"county":"Nueces","zone":"COASTAL","poi":"PRIMAVERA 138kV Substation","entity":"Corpus Battery Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-01","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.077,"p36_basis":"2 of 26 other projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-97.50795714285712,27.78825873015873],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0005","name":"Tetris Solar","fuel":"solar","tech":"PV","mw":359,"county":"Zapata","zone":"SOUTH","poi":"TAP 345kV 80307 Del Sol 7C - 80225 Cenizo 7C","entity":"NextEra Energy Interconnection Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":20,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"28INR0008","name":"Oriole Solar","fuel":"solar","tech":"PV","mw":503.91,"county":"Knox","zone":"WEST","poi":"Tap 345kV 6076 Foxtail - 60791 Perigee","entity":"Rolling Plains Solar","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-29","ia":"2025-12-08","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":241,"loc":{"pt":[-99.42079,33.64631],"method":"ERCOT bus number -> substation","subs":["Foxtail Switching Station"],"codes":["FOXTAIL"],"osm":"osm:way/519131266"}},{"inr":"28INR0009","name":"Oriole BES","fuel":"battery","tech":"BA","mw":150.39,"county":"Knox","zone":"WEST","poi":"Tap 345kV 6076 Foxtail - 60791 Perigee","entity":"Rolling Plains Solar","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-29","ia":"2025-12-08","cons_start":null,"first_seen":"2023-05","months_in_queue":41,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-99.42079,33.64631],"method":"ERCOT bus number -> substation","subs":["Foxtail Switching Station"],"codes":["FOXTAIL"],"osm":"osm:way/519131266"}},{"inr":"28INR0013","name":"Cornicello Solar","fuel":"solar","tech":"PV","mw":206,"county":"Limestone","zone":"NORTH","poi":"#68092 Liberty Station 345kV","entity":"NextEra Energy Interconnection Holdings, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-04-01","ia":"2025-12-12","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":98,"loc":{"pt":[-96.5691375,31.5494375],"method":"county centroid (substation not located)","subs":[],"codes":["LIBERTY"]}},{"inr":"28INR0017","name":"Sitges Wind","fuel":"wind","tech":"WT","mw":600,"county":"Motley","zone":"PANHANDLE","poi":"Tap 345kV 59904 Cottonwood–60500 Edith Clarke","entity":"Whistling Flats Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-03-31","ia":"2026-10-12","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":448,"loc":{"pt":[-100.83203999999999,34.12164],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Cottonwood Substation","Edith Clarke Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"28INR0020","name":"Caracara Energy Storage Center","fuel":"battery","tech":"BA","mw":203,"county":"Bexar","zone":"SOUTH","poi":"Tap 138kV 5055 Cagnon - 5346 Potranco","entity":"FRESH AIR ENERGY II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-01","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.687805,29.43115],"method":"tap between two located substations","subs":["Cagnon Road Substation","Potranco Substation"],"codes":["CAGNON","U5"]}},{"inr":"28INR0023","name":"Silverton Solar","fuel":"solar","tech":"PV","mw":410,"county":"Briscoe","zone":"PANHANDLE","poi":"Tap 345kV 23914 Tule Canyon - 79001 Cross_W1","entity":"NextEra Energy Interconnection Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":23,"loc":{"pt":[-101.26115999999999,34.48664],"method":"county centroid (substation not located)","subs":[],"codes":["TULECNYN","CTT_CROS"]}},{"inr":"28INR0029","name":"Old Fiddler Energy Storage","fuel":"battery","tech":"BA","mw":224.55,"county":"Henderson","zone":"NORTH","poi":"3233 Foggle Switch 138 kV","entity":"Old Fiddler Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":16,"loc":{"pt":[-96.05013599999998,32.21809599999999],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0030","name":"Brela BESS LLC","fuel":"battery","tech":"BA","mw":251.3,"county":"Wharton","zone":"SOUTH","poi":"44040 Bailey SW 345 kV","entity":"Brela BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-29","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-95.99215,29.18538],"method":"substation matched by name in the POI","subs":["Bailey Substation"],"codes":["BLY"]}},{"inr":"28INR0037","name":"Bullring Wind 1","fuel":"wind","tech":"WT","mw":303.5,"county":"Starr","zone":"SOUTH","poi":"Tap 345 kV  80355 DelSol7A - 80079 Cruce Ckt 1","entity":"Halcon Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2025-11-03","cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":226,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["DELSOL","CRUCE"]}},{"inr":"28INR0038","name":"Bullring Wind 2","fuel":"wind","tech":"WT","mw":303.8,"county":"Starr","zone":"SOUTH","poi":"Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1","entity":"Halcon Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2025-11-03","cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":227,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["DELSOL","CRUCE"]}},{"inr":"28INR0039","name":"Bullring Wind 3","fuel":"wind","tech":"WT","mw":190.4,"county":"Starr","zone":"SOUTH","poi":"Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1","entity":"Halcon Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2025-11-03","cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":142,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["DELSOL","CRUCE"]}},{"inr":"28INR0048","name":"Findley BESS","fuel":"battery","tech":"BA","mw":51.74,"county":"Limestone","zone":"NORTH","poi":"Tap 69kV #107 Prairie Hill - #99 Ben Hur","entity":"Adon Texas Sixteen LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-01-01","ia":null,"cons_start":null,"first_seen":"2024-01","months_in_queue":33,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-96.77497,31.65213],"method":"ERCOT bus number -> substation","subs":["Prairie Hill Substation"],"codes":["PRA"],"osm":"osm:way/461754867"}},{"inr":"28INR0055","name":"Freestone Battery Storage Project","fuel":"battery","tech":"BA","mw":210.5,"county":"Freestone","zone":"NORTH","poi":"3134 RICHLAND CHAMBERS 345kV (PSS/E Bus Name: RICHLND1_5)","entity":"Freestone Power Generation, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-16","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-96.11341,31.89026],"method":"ERCOT bus number -> substation","subs":["Richland Chambers Substation"],"codes":["RCHBR"],"osm":"osm:way/172583750"}},{"inr":"28INR0057","name":"Windecker","fuel":"wind","tech":"WT","mw":419.7,"county":"Upton","zone":"WEST","poi":"10058 Catclaw Switch 138kV","entity":"Windecker Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-17","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":92,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":["CCLSW"]}},{"inr":"28INR0059","name":"Verily Solar (FKA Cuello De Cuero Solar)","fuel":"solar","tech":"PV","mw":261,"county":"Brooks","zone":"SOUTH","poi":"80078 Reforzar Switch Station 345kV","entity":"Verily Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.41181538461538,27.132915384615384],"method":"county centroid (substation not located)","subs":[],"codes":["REFORZAR"]}},{"inr":"28INR0061","name":"Sunrose Renewable Energy Solar SLF","fuel":"solar","tech":"PV","mw":309.88,"county":"Austin","zone":"SOUTH","poi":"Tap 138kV #44740 WALLIS - #44700 GEBHRT","entity":"Sunrose Renewable Energy LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-07-04","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":98,"loc":{"pt":[-96.07624,29.63097],"method":"ERCOT bus number -> substation","subs":["Wallis Substation"],"codes":["WA"],"osm":"osm:way/94434949"}},{"inr":"28INR0063","name":"Bluefox Solar 2","fuel":"solar","tech":"PV","mw":401.8,"county":"Matagorda","zone":"COASTAL","poi":"#8754 Zoisite 345kV","entity":"Industrial November Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-01-17","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-95.83243783783784,28.936727027027025],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0064","name":"Bluefox Solar 3","fuel":"solar","tech":"PV","mw":201.8,"county":"Matagorda","zone":"COASTAL","poi":"#8754 Zoisite 345kV","entity":"Industrial November Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-18","ia":null,"cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-95.83243783783784,28.936727027027025],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0066","name":"Sunrose Renewable Energy Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Austin","zone":"SOUTH","poi":"Tap 138kV 44740 WALLIS - 44700 GEBHRT","entity":"Sunrose Renewable Energy LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-07-04","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.07624,29.63097],"method":"ERCOT bus number -> substation","subs":["Wallis Substation"],"codes":["WA"],"osm":"osm:way/94434949"}},{"inr":"28INR0067","name":"Indigo Solar 3","fuel":"solar","tech":"PV","mw":800,"county":"Fisher","zone":"WEST","poi":"Tap Line Segment Tankawa  (Bus #1048) to Graham (Bus #1430)","entity":"Indigo solar 3","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-01","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":44,"loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"28INR0068","name":"Alpujarra Solar","fuel":"solar","tech":"PV","mw":112.5,"county":"Wharton","zone":"SOUTH","poi":"5521 GALOW 138 KV","entity":"Greening USA Corp.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-01","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["GALOW"]}},{"inr":"28INR0072","name":"Mirando Valley Wind","fuel":"wind","tech":"WT","mw":478.74,"county":"Jim Hogg","zone":"SOUTH","poi":"Tap 345kV  80220 Cenizo - 80079 Cruce Ckt-1","entity":"ACE DevCo NC LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-06","ia":"2025-12-31","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":357,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"28INR0073","name":"Daystar Solar","fuel":"solar","tech":"PV","mw":150,"county":"Karnes","zone":"SOUTH","poi":"5728 Choate 138kV","entity":"Choate Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-09-15","ia":null,"cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":47,"loc":{"pt":[-97.85388571428572,28.81431428571429],"method":"county centroid (substation not located)","subs":[],"codes":["CHOATE"]}},{"inr":"28INR0074","name":"Massey Storage","fuel":"battery","tech":"BA","mw":102.86,"county":"Harris","zone":"HOUSTON","poi":"Tap 138kV  Chevron_NewSub(#99300) and Cedar Bayou Tap(#48065) circuit 84","entity":"Massey Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-01-03","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":34,"loc":{"pt":[-94.95018,29.7579],"method":"one end of the tapped line, matched by name in the POI","subs":["Cedar Bayou Substation"],"codes":[]}},{"inr":"28INR0075","name":"Wild Paw Storage","fuel":"battery","tech":"BA","mw":301.17,"county":"Henderson","zone":"NORTH","poi":"Tap 345kV 3124 Trinidad - 3130 Forest Grove","entity":"Wild Paw Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-96.026985,32.180405],"method":"tap between two located substations","subs":["Trinidad Substation","Forest Grove Substation"],"codes":["TRSES","FGRSW"]}},{"inr":"28INR0080","name":"Turtle Rock Storage","fuel":"battery","tech":"BA","mw":135.59,"county":"Freestone","zone":"NORTH","poi":"Tap 138 kV 13501 Clayhill - 13681 Reed","entity":"Turtle Rock Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-02","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-95.98603142857144,31.80864857142857],"method":"county centroid (substation not located)","subs":[],"codes":["RDPOI"]}},{"inr":"28INR0086","name":"West Royal Natural Gas (TEF-Due Diligence)","fuel":"gas","tech":"GT","mw":888,"county":"Upton","zone":"WEST","poi":"Tap 345kV 76000 L_NORTMC5_1Y - 18668 ROCKDRAW_5","entity":"Invenergy Energy Transition Development LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":289,"loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0087","name":"North Royal Thermal (TEF- Due Diligence)","fuel":"gas","tech":"GT","mw":479,"county":"Lamar","zone":"NORTH","poi":"Tap 345kV 1695 MOSES_5 - 11699 WOODARD_5","entity":"Invenergy Energy Transition Development LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-08-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":156,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["MNSES","WDDSW"]}},{"inr":"28INR0088","name":"Red Hollow Renewable Energy Solar SLF","fuel":"solar","tech":"PV","mw":308.61,"county":"Archer","zone":"WEST","poi":"Tap 345kV (Bus# 1422) Bowman - (Bus# 17002) Garvey Road","entity":"Red Hollow Renewable Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-19","ia":null,"cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-98.60077,33.8106],"method":"ERCOT bus number -> substation","subs":["Bowman Substation"],"codes":["BOMSW"],"osm":"osm:way/171410587"}},{"inr":"28INR0089","name":"EmberYork","fuel":"gas","tech":"GT","mw":900,"county":"Austin","zone":"SOUTH","poi":"TAP 138kV WALLIS 44740 - GERBHRT 44700","entity":"EmberYork Energy Center","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-01","ia":"2025-12-12","cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":594,"loc":{"pt":[-96.07624,29.63097],"method":"ERCOT bus number -> substation","subs":["Wallis Substation"],"codes":["WA"],"osm":"osm:way/94434949"}},{"inr":"28INR0090","name":"EmberGreen","fuel":"gas","tech":"GT","mw":1036,"county":"Wharton","zone":"SOUTH","poi":"Tap 138kV 48050 Caney - 44150 Hungerford","entity":"EmberGreen Energy Center","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-01-01","ia":"2026-08-04","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":684,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["HUG"]}},{"inr":"28INR0094","name":"Pham BESS","fuel":"battery","tech":"BA","mw":132.98,"county":"Anderson","zone":"NORTH","poi":"Tap 138kV 3281 TENNCLNY_8 - 3499 BLACKFTAP_8","entity":"ASB1, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-18","ia":"2026-07-31","cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":101,"loc":{"pt":[-95.69096842105266,31.784563157894723],"method":"county centroid (substation not located)","subs":[],"codes":["TNSCL"]}},{"inr":"28INR0100","name":"Digital Ranch Gas","fuel":"gas","tech":"IC","mw":378,"county":"Ellis","zone":"NORTH","poi":"Tap Old Country (2255) – Ironwood (2632) 345 kV","entity":"MCV 1 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-15","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":123,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["OLDSW"]}},{"inr":"28INR0101","name":"Vazlon Solar SLF","fuel":"solar","tech":"PV","mw":211.41,"county":"La Salle","zone":"SOUTH","poi":"8619 Encinal - 8627 Lemay Box Bay 138kV line","entity":"VAZLON ENERGY LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-99.35745,28.04668],"method":"ERCOT bus number -> substation","subs":["Encinal Substation"],"codes":["ENCINAL"],"osm":"osm:way/21307123"}},{"inr":"28INR0104","name":"Vazlon BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"La Salle","zone":"SOUTH","poi":"8619 Encinal - 8627 Lemay Box Bay 138kV line","entity":"VAZLON ENERGY LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-99.35745,28.04668],"method":"ERCOT bus number -> substation","subs":["Encinal Substation"],"codes":["ENCINAL"],"osm":"osm:way/21307123"}},{"inr":"28INR0105","name":"Vast Sands Power I (TEF -Due Diligence)","fuel":"gas","tech":"GT","mw":440,"county":"Ward","zone":"WEST","poi":"Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2","entity":"Permian Power I LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-05-01","ia":"2025-10-31","cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":290,"loc":{"pt":[-103.6387,31.78297],"method":"one end of the tapped line, matched by name in the POI","subs":["Quarry Field Switching Station"],"codes":["WLFSW","QRYSW"]}},{"inr":"28INR0108","name":"RAYBURN ENERGY STATION II Gas (TEF-Due Diligence)","fuel":"gas","tech":"GT","mw":570,"county":"Grayson","zone":"NORTH","poi":"Double Tap 138 kV Haggerty (12677) - Progress Park (#12678) & Haggerty - Winding Oaks Switch","entity":"Rayburn Country Electric Cooperative, Inc.","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-02-26","ia":"2025-12-22","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":376,"loc":{"pt":[-96.68399249999999,33.81213749999999],"method":"county centroid (substation not located)","subs":[],"codes":["HGRSW","PPKSW"]}},{"inr":"28INR0109","name":"Vast Sands Power II (TEF-Due Diligence)","fuel":"gas","tech":"GT","mw":440,"county":"Ward","zone":"WEST","poi":"Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2","entity":"Permian Power I LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2025-10-31","cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":290,"loc":{"pt":[-103.6387,31.78297],"method":"one end of the tapped line, matched by name in the POI","subs":["Quarry Field Switching Station"],"codes":["WLFSW","QRYSW"]}},{"inr":"28INR0110","name":"Biggs BESS","fuel":"battery","tech":"BA","mw":200,"county":"McCulloch","zone":"SOUTH","poi":"76006 Bow Wood 345 kV","entity":"Biggs Battery Facility, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-16","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.54852,31.46311],"method":"ERCOT bus number -> substation","subs":["Bow Wood Substation"],"codes":["BOWWOO"],"osm":"osm:way/498065703"}},{"inr":"28INR0111","name":"Biggs Solar","fuel":"solar","tech":"PV","mw":400,"county":"McCulloch","zone":"SOUTH","poi":"#76006 Bow Wood 345 kV","entity":"Biggs Solar Farm, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-16","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-99.54852,31.46311],"method":"ERCOT bus number -> substation","subs":["Bow Wood Substation"],"codes":["BOWWOO"],"osm":"osm:way/498065703"}},{"inr":"28INR0114","name":"Elk Ridge Solar","fuel":"solar","tech":"PV","mw":503,"county":"Pecos","zone":"WEST","poi":"AEP Solstice Substation #60404","entity":"Elk Ridge Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-07-01","ia":"2026-09-22","cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":240,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"28INR0116","name":"Salazar BESS","fuel":"battery","tech":"BA","mw":127.82,"county":"Tarrant","zone":"NORTH","poi":"2068 Rosen Heights 138kV","entity":"Salazar Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-11","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-97.34302,32.72868],"method":"county centroid (substation not located)","subs":[],"codes":["RSNHT"]}},{"inr":"28INR0118","name":"Copperleaf Energy Storage","fuel":"battery","tech":"BA","mw":305.63,"county":"Wichita","zone":"WEST","poi":"Tap 345kV Fisher Road Switch (#1425) – Riley (#6101)","entity":"Copperleaf Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-25","ia":null,"cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"28INR0119","name":"Rabbit Hollow Energy Storage","fuel":"battery","tech":"BA","mw":339.3,"county":"Mitchell","zone":"WEST","poi":"1190 Barber Lake Switch 138kV","entity":"Rabbit Hollow Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":24,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["BRBSW"]}},{"inr":"28INR0121","name":"Jalisco Peaker","fuel":"gas","tech":"GT","mw":183.6,"county":"Nueces","zone":"COASTAL","poi":"8475 JAVELINA4A 138kV","entity":"HEP Power Generation, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-31","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":60,"loc":{"pt":[-97.45704,27.80513],"method":"ERCOT bus number -> substation","subs":["Javelina Substation"],"codes":["JAVELINA"],"osm":"osm:way/488508105"}},{"inr":"28INR0124","name":"Silverbell Storage","fuel":"battery","tech":"BA","mw":130.33,"county":"Red River","zone":"NORTH","poi":"Tap 138kV Rivercrest SES 1780 - Deport REA 1768","entity":"Silverbell Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-95.00265507246375,33.65106086956521],"method":"county centroid (substation not located)","subs":[],"codes":["RCSES","DPREA"]}},{"inr":"28INR0125","name":"Silverbell Solar","fuel":"solar","tech":"PV","mw":125.64,"county":"Red River","zone":"NORTH","poi":"Tap 138kV Rivercrest SES 1780 - Deport REA 1768","entity":"Silverbell Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.00265507246375,33.65106086956521],"method":"county centroid (substation not located)","subs":[],"codes":["RCSES","DPREA"]}},{"inr":"28INR0127","name":"Half Moon Solar","fuel":"solar","tech":"PV","mw":512.5,"county":"Starr","zone":"SOUTH","poi":"#80231 Pronto 345kV","entity":"NextEra Energy Interconnection Holdings, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-07-01","ia":"2025-09-08","cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":245,"loc":{"pt":[-98.62279,26.42378],"method":"ERCOT bus number -> substation","subs":["Pronto Substation"],"codes":["PRONTO"],"osm":"osm:way/1490401399"}},{"inr":"28INR0132","name":"River Boat Solar","fuel":"solar","tech":"PV","mw":502.2,"county":"Mitchell","zone":"WEST","poi":"Tap 345kV 10053 Cattlemen 5 - 76030 Gasconades Creek","entity":"Champion Creek Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-21","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":158,"loc":{"pt":[-100.83018,31.93933],"method":"one end of the tapped line, matched by name in the POI","subs":["Gasconades Creek Substation"],"codes":["GASCCR"]}},{"inr":"28INR0133","name":"River Boat Storage","fuel":"battery","tech":"BA","mw":207.02,"county":"Mitchell","zone":"WEST","poi":"Tap 345kV 10053 Cattlemen 5 - 76030 Gasconades Creek","entity":"Champion Creek Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-21","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":68,"loc":{"pt":[-100.83018,31.93933],"method":"one end of the tapped line, matched by name in the POI","subs":["Gasconades Creek Substation"],"codes":["GASCCR"]}},{"inr":"28INR0148","name":"Sonora High Noon BESS","fuel":"battery","tech":"BA","mw":204.08,"county":"Sutton","zone":"WEST","poi":"60412 CARVER 138kV","entity":"Sonora High Noon, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.6229,30.54014],"method":"county centroid (substation not located)","subs":[],"codes":["CARVER"]}},{"inr":"28INR0149","name":"Fallstone Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Falls","zone":"NORTH","poi":"Tap 69kV 3588 Groesbeck - 3637 Otto Junction","entity":"Fallstone Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-21","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.78134,31.37694],"method":"ERCOT bus number -> substation","subs":["Otto Junction Substation"],"codes":["OTTOJ"],"osm":"osm:way/511461959"}},{"inr":"28INR0150","name":"South Tripoint BESS","fuel":"battery","tech":"BA","mw":204.5,"county":"Fayette","zone":"SOUTH","poi":"7286 L_FAYETT8_1Y 138kV","entity":"South Triangle Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-30","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-96.81552083333332,30.0069],"method":"county centroid (substation not located)","subs":[],"codes":["FAYETT"]}},{"inr":"28INR0151","name":"Chimney Creek Solar","fuel":"solar","tech":"PV","mw":203.88,"county":"Shackelford","zone":"WEST","poi":"Tap 345 kV 68000 West Shackelford – 60515 Clear Crossing Ckt 1","entity":"Chimney Creek Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-30","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"28INR0154","name":"Pamela Heights I","fuel":"battery","tech":"BA","mw":101.65,"county":"Harris","zone":"HOUSTON","poi":"#47150 HOC 138kV","entity":"Pamela heights I Energy Center LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-18","ia":"2025-10-07","cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":77,"loc":{"pt":[-95.45021,29.64535],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69393, \"Pamela Heights I Energy Center\", planned)","subs":[],"codes":["HOC"],"eia_plant":69393}},{"inr":"28INR0155","name":"Coke BESS","fuel":"battery","tech":"BA","mw":220.3,"county":"Coke","zone":"WEST","poi":"76090 Divide Switchyard 345kV","entity":"Coke ESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-10","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":16,"loc":{"pt":[-100.77718,31.86951],"method":"ERCOT bus number -> substation","subs":["Divide Substation"],"codes":["DIVIDE"],"osm":"osm:way/172185176"}},{"inr":"28INR0156","name":"Chimney Rock BESS","fuel":"battery","tech":"BA","mw":156,"county":"Taylor","zone":"WEST","poi":"Tap 138kV 76317 MOORE - 76318 BUTMAN","entity":"Taylor ESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-10","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.07393,32.4494],"method":"ERCOT bus number -> substation","subs":["Butman Substation"],"codes":["BUTMAN"],"osm":"osm:way/491192830"}},{"inr":"28INR0157","name":"Axtell BESS","fuel":"battery","tech":"BA","mw":306.94,"county":"McLennan","zone":"NORTH","poi":"345 kV Tiger Creek Switch (#3379)","entity":"PP Axtell BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-97.3018,31.5209],"method":"county centroid (substation not located)","subs":[],"codes":["TCRSW"]}},{"inr":"28INR0160","name":"Neal Solar","fuel":"solar","tech":"PV","mw":146.6,"county":"Wharton","zone":"SOUTH","poi":"tap of 138kV 8750 Chalmers - 8127 Lane City","entity":"CH Neal Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-03","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["LAN_CTY"]}},{"inr":"28INR0166","name":"Brookesmith Storage","fuel":"battery","tech":"BA","mw":351,"county":"Brown","zone":"NORTH","poi":"Tap Brown Switch #1444 – Russell Gap Switch #3348","entity":"Brookesmith Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-07","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":25,"loc":{"pt":[-99.19531,31.53798],"method":"one end of the tapped line, matched by name in the POI","subs":["Brown Substation"],"codes":["BWNSW","RGPSW"]}},{"inr":"28INR0168","name":"Guajillo Wind","fuel":"wind","tech":"WT","mw":199.9,"county":"Duval","zone":"SOUTH","poi":"Tap 345 kV 80079 Cruce - 5901 San Miguel CKT 01","entity":"Guajillo Wind LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-01","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":44,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["CRUCE","SANMIGL"]}},{"inr":"28INR0169","name":"Sanders Hollow Energy Center","fuel":"wind","tech":"WT","mw":292.6,"county":"Dickens","zone":"PANHANDLE","poi":"Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT 01","entity":"Sanders Hollow Energy Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-23","ia":"2026-06-09","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":218,"loc":{"pt":[-100.87665,33.77829],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Cottonwood Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"28INR0176","name":"Gail Mountain Solar","fuel":"solar","tech":"PV","mw":244.4,"county":"Borden","zone":"WEST","poi":"Muleshoe (Bus #59922) 345 kV","entity":"Gail Mountain Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-25","ia":"2025-12-30","cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":117,"loc":{"pt":[-101.5274,32.71461],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69506, \"Gail Mountain Solar\", planned)","subs":[],"codes":[],"eia_plant":69506}},{"inr":"28INR0177","name":"Sisters Solar II","fuel":"solar","tech":"PV","mw":205.54,"county":"Ector","zone":"WEST","poi":"tap 345kV 11010  Wolf Switching Station - 10012 Meteor","entity":"Oberon Solar III, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-12-15","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":65,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["WLFSW","METSW"]}},{"inr":"28INR0179","name":"Sunburst Solar","fuel":"solar","tech":"PV","mw":301.6,"county":"San Patricio","zone":"COASTAL","poi":"KATOEN (Bus#8579)","entity":"Indigo Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-16","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":["KATOEN"]}},{"inr":"28INR0180","name":"Green Ocelot Solar","fuel":"solar","tech":"PV","mw":357,"county":"Kenedy","zone":"COASTAL","poi":"Tap 345kV 80076 Ajo  - 8601 Cebolla","entity":"Ocelot Solar LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-11-17","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":112,"loc":{"pt":[-97.58310769230775,27.04759807692308],"method":"county centroid (substation not located)","subs":[],"codes":["AJO","CEBOLLA"]}},{"inr":"28INR0181","name":"Sunburst BESS","fuel":"battery","tech":"BA","mw":256.3,"county":"San Patricio","zone":"COASTAL","poi":"KATOEN (Bus#8579)","entity":"Indigo Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-16","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":["KATOEN"]}},{"inr":"28INR0182","name":"Ponferrada Solar","fuel":"solar","tech":"PV","mw":148.87,"county":"Navarro","zone":"NORTH","poi":"Tap 138 KV  3456 CORSWEST1_8 - 3457 CORS_MOBT_8","entity":"Karol Solar VI","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-06","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.25031944444444,32.16245277777778],"method":"county centroid (substation not located)","subs":[],"codes":["CRSWS"]}},{"inr":"28INR0185","name":"San Gabriel Solar","fuel":"solar","tech":"PV","mw":255,"county":"Milam","zone":"SOUTH","poi":"Tap 138 kV 3750 Vosslake - 3749 Buckholts","entity":"San Gabriel Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2026-08-06","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":122,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0186","name":"Saddlehorn Energy Storage","fuel":"battery","tech":"BA","mw":256.8,"county":"Austin","zone":"SOUTH","poi":"Tap 138kV 7287 Bellville North - 7291 Highway 36","entity":"Saddlehorn Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-01","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-96.18297945205482,29.836741095890407],"method":"county centroid (substation not located)","subs":[],"codes":["BELLNO"]}},{"inr":"28INR0188","name":"Ashra Solar SLF","fuel":"solar","tech":"PV","mw":40.25,"county":"Uvalde","zone":"SOUTH","poi":"Tap 69kV bus#5823 UVALDE Switch (UVALDESW9) to bus#5820 UVALDE SUB (UVALDESUB9)","entity":"Ashra Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-14","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-99.83225999999999,29.41034],"method":"county centroid (substation not located)","subs":[],"codes":["UVLDES"]}},{"inr":"28INR0189","name":"Green Ocelot Storage","fuel":"battery","tech":"BA","mw":178.5,"county":"Kenedy","zone":"COASTAL","poi":"Tap 345kV 80076 Ajo 80076 - 8601 Cebolla","entity":"Ocelot Solar LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-11-17","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":59,"loc":{"pt":[-97.58310769230775,27.04759807692308],"method":"county centroid (substation not located)","subs":[],"codes":["AJO","CEBOLLA"]}},{"inr":"28INR0190","name":"Ashra Storage SLF","fuel":"battery","tech":"BA","mw":1.62,"county":"Uvalde","zone":"SOUTH","poi":"Tap 69kV 5823 UVALDE Switch - 5820 UVALDE SUB","entity":"Ashra Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-14","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":0,"loc":{"pt":[-99.83225999999999,29.41034],"method":"county centroid (substation not located)","subs":[],"codes":["UVLDES"]}},{"inr":"28INR0191","name":"San Gabriel Storage","fuel":"battery","tech":"BA","mw":127.5,"county":"Milam","zone":"SOUTH","poi":"Tap 138 kV 3750 Vosslake - 3749 Buckholts","entity":"San Gabriel Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2026-08-06","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":97,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0195","name":"Star Grass Renewable Energy Solar SLF","fuel":"solar","tech":"PV","mw":150,"county":"Eastland","zone":"NORTH","poi":"Tap 138kV 6310 Putnam - 3378 Carbon_8","entity":"Star Grass Renewable Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-14","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-99.19403,32.38369],"method":"ERCOT bus number -> substation","subs":["Putnam Switching Station"],"codes":["PUTN"],"osm":"osm:way/518641237"}},{"inr":"28INR0197","name":"Star Grass Renewable Energy Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Eastland","zone":"NORTH","poi":"Tap 138kV 6310 Putnam - 3378 Carbon_8","entity":"Star Grass Renewable Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-14","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-99.19403,32.38369],"method":"ERCOT bus number -> substation","subs":["Putnam Switching Station"],"codes":["PUTN"],"osm":"osm:way/518641237"}},{"inr":"28INR0198","name":"Winters Glow Solar","fuel":"solar","tech":"PV","mw":301.6,"county":"Runnels","zone":"WEST","poi":"tap 345kV 1444 BROWN SWITCH  - 11406 CENTRAL BLUFF","entity":"Winters Glow Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-17","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-100.15481,32.11719],"method":"one end of the tapped line, matched by name in the POI","subs":["Central Bluff Substation"],"codes":["BWNSW","CBFSW"]}},{"inr":"28INR0199","name":"Winters Glow Storage","fuel":"battery","tech":"BA","mw":155.2,"county":"Runnels","zone":"WEST","poi":"tap 345kV 1444 BROWN SWITCH  - 11406 CENTRAL BLUFF","entity":"Winters Glow Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-17","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.15481,32.11719],"method":"one end of the tapped line, matched by name in the POI","subs":["Central Bluff Substation"],"codes":["BWNSW","CBFSW"]}},{"inr":"28INR0202","name":"Fluvanna Max BESS SLF","fuel":"battery","tech":"BA","mw":51.8,"county":"Scurry","zone":"WEST","poi":"11305 DERMOTT 345 kV","entity":"Fluvanna Max Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-14","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-101.0088,32.86022],"method":"ERCOT bus number -> substation","subs":["Dermott Substation"],"codes":["DMTSW"],"osm":"osm:way/453589361"}},{"inr":"28INR0205","name":"Gypsum Plains Solar","fuel":"solar","tech":"PV","mw":503.12,"county":"Ector","zone":"WEST","poi":"Tap 345kv line Wolf BUS# 11010 - Reiter BUS#18544","entity":"Gypsum Plains Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-21","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["WLFSW","RTRSW"]}},{"inr":"28INR0206","name":"Wagon Timber Solar","fuel":"solar","tech":"PV","mw":172.1,"county":"Knox","zone":"WEST","poi":"6110 Munday East 138kV","entity":"Wagon Timber Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-03","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-99.60308,33.45338],"method":"ERCOT bus number -> substation","subs":["East Munday Substation"],"codes":["EASTMUND"],"osm":"osm:way/295396060"}},{"inr":"28INR0207","name":"Wagon Timber Storage","fuel":"battery","tech":"BA","mw":53.49,"county":"Knox","zone":"WEST","poi":"6110 Munday East 138kV","entity":"Wagon Timber Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-03","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-99.60308,33.45338],"method":"ERCOT bus number -> substation","subs":["East Munday Substation"],"codes":["EASTMUND"],"osm":"osm:way/295396060"}},{"inr":"28INR0208","name":"Strawberry Dunes Solar SLF","fuel":"solar","tech":"PV","mw":101.1,"county":"Atascosa","zone":"SOUTH","poi":"Tap 138kV ROSSVILLESB8 (5718) to OAKSSW8 (5713)","entity":"Strawberry Dunes LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-98.68174,29.16433],"method":"ERCOT bus number -> substation","subs":["Rossville Substation"],"codes":["ROSSVLS"],"osm":"osm:way/319406850"}},{"inr":"28INR0209","name":"Strawberry Dunes BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Atascosa","zone":"SOUTH","poi":"Tap 138kV ROSSVILLESB8 (5718)  to OAKSSW8 (5713)","entity":"Strawberry Dunes LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.68174,29.16433],"method":"ERCOT bus number -> substation","subs":["Rossville Substation"],"codes":["ROSSVLS"],"osm":"osm:way/319406850"}},{"inr":"28INR0212","name":"Badger Solar","fuel":"solar","tech":"PV","mw":280.46,"county":"Upton","zone":"WEST","poi":"Tap 345kV 59903 Bearkat - 76000 L_NORTMC5_1Y","entity":"Greasewood Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-25","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-101.5315,31.76605],"method":"ERCOT bus number -> substation","subs":["Bearkat Substation"],"codes":["W_BK_345"],"osm":"osm:way/453310293"}},{"inr":"28INR0213","name":"Badger BESS","fuel":"battery","tech":"BA","mw":138.57,"county":"Upton","zone":"WEST","poi":"Tap 345kV 59903 Bearkat - 76000 L_NORTMC5_1Y","entity":"Greasewood Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-25","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-101.5315,31.76605],"method":"ERCOT bus number -> substation","subs":["Bearkat Substation"],"codes":["W_BK_345"],"osm":"osm:way/453310293"}},{"inr":"28INR0215","name":"Complex Serenity Wind","fuel":"wind","tech":"WT","mw":971,"county":"Armstrong","zone":"PANHANDLE","poi":"Double tap 345 kV Alibates (bus# 23900) to Tule Canyon (bus# 23914) and Tule Canyon (bus# 23914) to Midpoint Switch (bus# 23931)","entity":"Serenity Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":213,"loc":{"pt":[-101.35961499999999,34.84359499999999],"method":"tap between two substations (bus number + name)","subs":["Alibates Substation","Tule Canyon Substation"],"codes":["ALIBATES","TULECNYN","MPTSW"]}},{"inr":"28INR0217","name":"Gypsum Plains Storage","fuel":"battery","tech":"BA","mw":211.14,"county":"Ector","zone":"WEST","poi":"Tap 345kv 11010 Wolf - 18544 Reiter","entity":"Gypsum Plains Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-21","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["WLFSW","RTRSW"]}},{"inr":"28INR0219","name":"Neptune Gas Generation Plant","fuel":"gas","tech":"IC","mw":113.77,"county":"Reeves","zone":"WEST","poi":"11200 Longpast_T8 138kv","entity":"BPX Production Company","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-03-15","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["LPPOD"]}},{"inr":"28INR0221","name":"Rio Star Energy Storage","fuel":"battery","tech":"BA","mw":142.58,"county":"Wichita","zone":"WEST","poi":"Tap 1464 Wichita Falls South Switch – 1474 Scotland 138 kV","entity":"Rio Star Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-20","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-98.70719629629629,34.10137777777778],"method":"county centroid (substation not located)","subs":[],"codes":["WFSSW","SCTLD"]}},{"inr":"28INR0223","name":"Bayou Creek Solar","fuel":"solar","tech":"PV","mw":256.9,"county":"San Patricio","zone":"COASTAL","poi":"8606 Goddard 345kV","entity":"Bayou Creek Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-25","ia":"2026-06-02","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":123,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":["GODDARD"]}},{"inr":"28INR0226","name":"Pamplona Storage","fuel":"battery","tech":"BA","mw":153.88,"county":"Austin","zone":"SOUTH","poi":"Tap 138 kV 44740 WALLIS_S65_8 - 44700 GEBHRT_X65B8 Ckt#65","entity":"Karol Solar V","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2028-10-17","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":51,"loc":{"pt":[-96.07624,29.63097],"method":"ERCOT bus number -> substation","subs":["Wallis Substation"],"codes":["WA"],"osm":"osm:way/94434949"}},{"inr":"28INR0227","name":"GPlains Solar","fuel":"solar","tech":"PV","mw":151.29,"county":"Ector","zone":"WEST","poi":"Tap 138kV #1013 WOLFSS_8 - #1103 SANDHLTA_8","entity":"Gypsum Plains Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-21","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["WLFSW"]}},{"inr":"28INR0228","name":"GPlains Storage","fuel":"battery","tech":"BA","mw":51.27,"county":"Ector","zone":"WEST","poi":"Tap 138kV WOLFSS_8 (1013) - SANDHLTA_8 (1103)","entity":"Gypsum Plains Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-21","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["WLFSW"]}},{"inr":"28INR0229","name":"Allthorn Solar","fuel":"solar","tech":"PV","mw":231.5,"county":"Duval","zone":"SOUTH","poi":"Tap 138 kV BRUNI4A (#8297) - CRESTONI4A (#8695)","entity":"ALLTHORN SOLAR, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-01-15","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-98.59782,27.36539],"method":"ERCOT bus number -> substation","subs":["Crestonio Substation"],"codes":["CRESTONI"],"osm":"osm:way/511539471"}},{"inr":"28INR0230","name":"Allthorn BESS","fuel":"battery","tech":"BA","mw":205.2,"county":"Duval","zone":"SOUTH","poi":"Tap 138 kV BRUNI44A (#8297) - CRESTONI4A (#8695)","entity":"ALLTHORN SOLAR, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-01-15","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.59782,27.36539],"method":"ERCOT bus number -> substation","subs":["Crestonio Substation"],"codes":["CRESTONI"],"osm":"osm:way/511539471"}},{"inr":"28INR0238","name":"Dempsey Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Leon","zone":"NORTH","poi":"Tap the 138 KV Ridge (#37)-Robertson (#32) line; BEPC","entity":"Dempsey Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-08","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0242","name":"Ciervo Wind","fuel":"wind","tech":"WT","mw":301.5,"county":"Jim Hogg","zone":"SOUTH","poi":"Tap 345 kV 80355 DelSol7A - 80079 Cruce CKT 2","entity":"RWE Clean Energy Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-98.60369130434783,27.220513043478263],"method":"county centroid (substation not located)","subs":[],"codes":["DELSOL","CRUCE"]}},{"inr":"28INR0245","name":"Hittson Creek Solar","fuel":"solar","tech":"PV","mw":402.93,"county":"Callahan","zone":"WEST","poi":"Tapping the two 345 kV Lines: Sam Line Reactor (Bus# 68005) - Reata (Bus# 68051) and Latimer (Bus# 68008) - Reata (Bus# 68051).","entity":"174 Power Global Properties","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-15","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-99.38636,32.51198],"method":"ERCOT bus number -> substation","subs":["Latimer Switchyard"],"codes":["LATIMER"],"osm":"osm:way/1059099069"}},{"inr":"28INR0246","name":"Hittson Creek BESS","fuel":"battery","tech":"BA","mw":205.38,"county":"Callahan","zone":"WEST","poi":"Tapping the two 345 kV Lines: Sam Line Reactor (Bus# 68005) - Reata (Bus# 68051) and Latimer (Bus# 68008) - Reata (Bus# 68051).","entity":"174 Power Global Properties","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-15","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.38636,32.51198],"method":"ERCOT bus number -> substation","subs":["Latimer Switchyard"],"codes":["LATIMER"],"osm":"osm:way/1059099069"}},{"inr":"28INR0247","name":"Eligius BESS","fuel":"battery","tech":"BA","mw":174.66,"county":"Hidalgo","zone":"SOUTH","poi":"tap 138kV Liston (#8394) – JL Bates (#8392) line, AEP","entity":"Eligius Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-28","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-98.48658,26.316205],"method":"tap between two located substations","subs":["Liston Substation","Bates Substation"],"codes":["LISTON","BATES"]}},{"inr":"28INR0250","name":"Mojo Solar","fuel":"solar","tech":"PV","mw":527.94,"county":"Wilson","zone":"SOUTH","poi":"Tap 345 kV 5133 Elm Creek - 5901 San Miguel  CKT 1 & 2","entity":"Power Synergy","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-98.23708500000001,29.085655000000003],"method":"tap between two substations matched by name","subs":["Elm Creek Substation","San Miguel Switchyard"],"codes":["SANMIGL"]}},{"inr":"28INR0255","name":"watermelon 5 energy storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Dallas","zone":"NORTH","poi":"Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.","entity":"Tempus power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["WTRML","TRCNR"]}},{"inr":"28INR0256","name":"watermelon 6 energy storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Dallas","zone":"NORTH","poi":"Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.","entity":"Tempus power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["WTRML","TRCNR"]}},{"inr":"28INR0257","name":"watermelon 7 energy storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Dallas","zone":"NORTH","poi":"Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.","entity":"Tempus power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["WTRML","TRCNR"]}},{"inr":"28INR0258","name":"watermelon 8 energy storage","fuel":"battery","tech":"BA","mw":102.1,"county":"Dallas","zone":"NORTH","poi":"Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.","entity":"Tempus power management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["WTRML","TRCNR"]}},{"inr":"28INR0260","name":"Rio Vista Solar","fuel":"solar","tech":"PV","mw":553.66,"county":"Pecos","zone":"WEST","poi":"Tap 138kV #60393 PigCreek4A – #60385 Solstice4A","entity":"Rio Vista Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-02","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":30,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"28INR0261","name":"Rio Vista Storage","fuel":"battery","tech":"BA","mw":103.37,"county":"Pecos","zone":"WEST","poi":"Tap 138kV #60393 Pigcreek4A – #60385 Solstice4A","entity":"Rio Vista Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-02","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"28INR0265","name":"Agricola BESS","fuel":"battery","tech":"BA","mw":205.2,"county":"Austin","zone":"SOUTH","poi":"Tap 138kV GEBHARDT (#44700) - Wallis (#44740)","entity":"Agricola BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-31","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-96.07624,29.63097],"method":"ERCOT bus number -> substation","subs":["Wallis Substation"],"codes":["WA"],"osm":"osm:way/94434949"}},{"inr":"28INR0267","name":"Soluce Cotton Solar","fuel":"solar","tech":"PV","mw":202.91,"county":"Cottle","zone":"WEST","poi":"Tap 345kV 59904 COTTONWOOD - 60500 EDITH CLARKE","entity":"CTPB1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-08-13","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.325355,33.86128],"method":"tap between two located substations","subs":["Cottonwood Substation","Edith Clarke Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"28INR0268","name":"Soluce Cotton Storage","fuel":"battery","tech":"BA","mw":201.54,"county":"Cottle","zone":"WEST","poi":"Tap 345kV 59904 COTTONWOOD - 60500 EDITH CLARKE","entity":"CTPB1,LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-08-13","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.325355,33.86128],"method":"tap between two located substations","subs":["Cottonwood Substation","Edith Clarke Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"28INR0269","name":"Soluce Bravo Solar","fuel":"solar","tech":"PV","mw":80.82,"county":"Brown","zone":"NORTH","poi":"tap 345kV 1444 BROWN  - 11441 CORN TRAIL SW CKT2","entity":"BNPB1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-17","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-99.05431764705882,31.607452941176476],"method":"county centroid (substation not located)","subs":[],"codes":["BWNSW","CTLSW"]}},{"inr":"28INR0270","name":"Soluce Bravo Storage","fuel":"battery","tech":"BA","mw":302.62,"county":"Brown","zone":"NORTH","poi":"tap 345kV 1444 BROWN  - 11441 CORN TRAIL SW CKT2","entity":"BNPB1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-17","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-99.05431764705882,31.607452941176476],"method":"county centroid (substation not located)","subs":[],"codes":["BWNSW","CTLSW"]}},{"inr":"28INR0271","name":"Three Ranches Solar","fuel":"solar","tech":"PV","mw":125.53,"county":"Brewster","zone":"WEST","poi":"TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch","entity":"Three Ranches Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-103.02451465517245,29.359006896551712],"method":"county centroid (substation not located)","subs":[],"codes":["ALMC","HAYTER"]}},{"inr":"28INR0277","name":"Aurora Energy Storage","fuel":"battery","tech":"BA","mw":306.2,"county":"Lampasas","zone":"NORTH","poi":"Tap 345kV --- KILL_SS_5 (3422) --- BUCK_H_5 (3424)","entity":"Aurora Energy Storage, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-04-20","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.33,"p36_basis":"38 of 115 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":101,"loc":{"pt":[-98.42930624999998,31.152937499999993],"method":"county centroid (substation not located)","subs":[],"codes":["KLNSW","BUCSW"]}},{"inr":"28INR0278","name":"Spur Energy Storage","fuel":"battery","tech":"BA","mw":612.62,"county":"Wise","zone":"NORTH","poi":"Tap 345kV (1429) JACKSBRO_5 - (11736) BIRDDOG_5","entity":"Spur Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-15","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":43,"loc":{"pt":[-97.7086,33.17174],"method":"county centroid (substation not located)","subs":[],"codes":["JCKSW","BDGSW"]}},{"inr":"28INR0280","name":"Live Oak Wind II","fuel":"wind","tech":"WT","mw":302.63,"county":"Schleicher","zone":"WEST","poi":"#76003 Big Hill 345kV","entity":"ENGIE IR Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-29","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-100.54306,31.04735],"method":"ERCOT bus number -> substation","subs":["Big Hill Substation"],"codes":["BIGHIL"],"osm":"osm:way/339705805"}},{"inr":"28INR0286","name":"2 Cedar Wind","fuel":"wind","tech":"WT","mw":180,"county":"Fannin","zone":"NORTH","poi":"Tap 345kV 1729 Valley South – Anna Switch 2373","entity":"SunWR, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-02","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":39,"loc":{"pt":[-96.63926,33.31798],"method":"one end of the tapped line, matched by name in the POI","subs":["Anna Substation"],"codes":["VLYSO","ANASW"]}},{"inr":"28INR0288","name":"Outrider BESS","fuel":"battery","tech":"BA","mw":302,"county":"Dickens","zone":"PANHANDLE","poi":"Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT. Approximately distance from the POI to Cottonwood Substation is 11.13 miles and to Edith Clarke Substation 77.6 miles.","entity":"Sanders Hollow Energy Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-06-26","ia":"2026-06-09","cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":229,"loc":{"pt":[-100.87665,33.77829],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Cottonwood Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"28INR0290","name":"Field Marshal Storage","fuel":"battery","tech":"BA","mw":150.8,"county":"Erath","zone":"NORTH","poi":"Dublin (1636) - Fullhouse (1652) 138kV","entity":"Field Marshal Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-07","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.34747,32.07626],"method":"ERCOT bus number -> substation","subs":["Dublin Substation"],"codes":["DUBLN"],"osm":"osm:relation/7497857"}},{"inr":"28INR0292","name":"Wildflower Storage","fuel":"battery","tech":"BA","mw":359.1,"county":"Navarro","zone":"NORTH","poi":"Drane switch #3295","entity":"Wildflower Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":25,"loc":{"pt":[-96.25031944444444,32.16245277777778],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0294","name":"Infrakey Waco Data Park Gas 1","fuel":"gas","tech":"GT","mw":180,"county":"McLennan","zone":"NORTH","poi":"Tap 345kV 246 BOSQUESW5 – 3406 ELM_MOTT__5","entity":"Infrakey Capital LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":59,"loc":{"pt":[-97.10018,31.69932],"method":"ERCOT bus number -> substation","subs":["Elm Mott Substation"],"codes":["ELMOT"],"osm":"osm:relation/6820580"}},{"inr":"28INR0295","name":"Margay Energy Storage","fuel":"battery","tech":"BA","mw":101.3,"county":"Brazoria","zone":"COASTAL","poi":"Tap 138kV 42750 Mykawa - 48353 Telephone Ckt 06","entity":"PowerPulse LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-04-10","ia":"2025-12-26","cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":77,"loc":{"pt":[-95.2874,29.59913],"method":"one end of the tapped line, matched by name in the POI","subs":["Telephone Substation"],"codes":["MYK"]}},{"inr":"28INR0297","name":"Magnet Solar","fuel":"solar","tech":"PV","mw":503.09,"county":"Borden","zone":"WEST","poi":"Faraday Substation 345kV - Bus #59905","entity":"HyFuels Big Spring Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-09-29","ia":"2025-12-11","cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":240,"loc":{"pt":[-101.39576,32.64807],"method":"ERCOT bus number -> substation","subs":["Faraday Substation"],"codes":["W_FD_345"],"osm":"osm:way/453376973"}},{"inr":"28INR0298","name":"Magnet Storage","fuel":"battery","tech":"BA","mw":426.7,"county":"Borden","zone":"WEST","poi":"Faraday 345 kV Substation (#59905)","entity":"HyFuels Big Spring LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-29","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":30,"loc":{"pt":[-101.39576,32.64807],"method":"ERCOT bus number -> substation","subs":["Faraday Substation"],"codes":["W_FD_345"],"osm":"osm:way/453376973"}},{"inr":"28INR0299","name":"Moon Stone BESS","fuel":"battery","tech":"BA","mw":200.8,"county":"Wilson","zone":"SOUTH","poi":"Tap 138kV Eagle Creek (5132) to Floresville (5155)","entity":"Moon Stone Battery Facility LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.15424,29.14118],"method":"ERCOT bus number -> substation","subs":["Floresville Substation"],"codes":["C3"],"osm":"osm:way/230619874"}},{"inr":"28INR0301","name":"Carpet Tech Solar One","fuel":"solar","tech":"PV","mw":110.7,"county":"Kent","zone":"WEST","poi":"#59911 MHOS 345 kV","entity":"CT Solar One","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-101.00777,32.90667],"method":"ERCOT bus number -> substation","subs":["Mhos Substation"],"codes":["MHOS"],"osm":"osm:way/1454572836"}},{"inr":"28INR0303","name":"Kuy Creek Solar 1 SLF","fuel":"solar","tech":"PV","mw":234.87,"county":"Goliad","zone":"SOUTH","poi":"Tap Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1","entity":"Kuy Creek Solar 1 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-20","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-97.21284,28.71689],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Coleto Creek Substation"],"codes":["COLETO","VICTORIA"]}},{"inr":"28INR0304","name":"Kuy Creek Storage 1 SLF","fuel":"battery","tech":"BA","mw":151.46,"county":"Goliad","zone":"SOUTH","poi":"Tap - Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1","entity":"Kuy Creek Storage 1 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-20","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-97.21284,28.71689],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Coleto Creek Substation"],"codes":["COLETO","VICTORIA"]}},{"inr":"28INR0305","name":"Iron Cowboy Solar","fuel":"solar","tech":"PV","mw":144.59,"county":"San Patricio","zone":"COASTAL","poi":"Bus #8920 Haisley 4A 138 kV","entity":"Vaquero II Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-07-10","ia":"2026-08-10","cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":69,"loc":{"pt":[-97.4936,28.09494],"method":"ERCOT bus number -> substation","subs":["Haisley Substation"],"codes":["HAISLEY"],"osm":"osm:way/514767405"}},{"inr":"28INR0306","name":"Iron Cowboy Storage","fuel":"battery","tech":"BA","mw":63.27,"county":"San Patricio","zone":"COASTAL","poi":"Bus #8920 Haisley 4A 138 kV","entity":"Vaquero II Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-07-10","ia":"2026-08-10","cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":48,"loc":{"pt":[-97.4936,28.09494],"method":"ERCOT bus number -> substation","subs":["Haisley Substation"],"codes":["HAISLEY"],"osm":"osm:way/514767405"}},{"inr":"28INR0307","name":"Prairie Power Wind","fuel":"wind","tech":"WT","mw":302.9,"county":"Mitchell","zone":"WEST","poi":"Tap 345 kV Longshore Switch (Bus# 1058) to Cattleman Switch (Bus# 10053) CKT 4","entity":"Prairie Power Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-17","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-101.45234,32.1003],"method":"ERCOT bus number -> substation","subs":["Longshore Substation"],"codes":["LNGSW"],"osm":"osm:way/172212648"}},{"inr":"28INR0317","name":"Falcon Solar","fuel":"solar","tech":"PV","mw":501.96,"county":"Zapata","zone":"SOUTH","poi":"Tap 345kV #80225 Cenizo7C to #80307 Del Sol7C","entity":"Falcon Energy Project, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"28INR0321","name":"Altair Energy Storage","fuel":"battery","tech":"BA","mw":201.76,"county":"Colorado","zone":"SOUTH","poi":"Tap on 138 kV ALTAIR (bus# 78118) to STAFFORD HILL (bus# 78520)","entity":"Altair Energy Storage","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-31","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.4722870967742,29.67036451612903],"method":"county centroid (substation not located)","subs":[],"codes":["STAFHI"]}},{"inr":"28INR0322","name":"Velociraptor Solar II","fuel":"solar","tech":"PV","mw":241.81,"county":"Ector","zone":"WEST","poi":"Tap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV","entity":"Velociraptor Solar II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-102.9328,31.6018],"method":"one end of the tapped line, matched by name in the POI","subs":["Wolf Switching Station"],"codes":["WLFSW","RTRSW"]}},{"inr":"28INR0323","name":"Velociraptor BESS II","fuel":"battery","tech":"BA","mw":246.12,"county":"Ector","zone":"WEST","poi":"Tap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV","entity":"Velociraptor BESS II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-102.9328,31.6018],"method":"one end of the tapped line, matched by name in the POI","subs":["Wolf Switching Station"],"codes":["WLFSW","RTRSW"]}},{"inr":"28INR0324","name":"Barkley Creek Solar","fuel":"solar","tech":"PV","mw":312.37,"county":"Lampasas","zone":"NORTH","poi":"Tap 345 kV Line from Russel Gap Switch (Bus# 3348) - Killeen Switch (Bus# 3422)","entity":"174 Power Global Properties, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-15","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-97.72294,31.03918],"method":"one end of the tapped line, matched by name in the POI","subs":["Killeen Substation"],"codes":["RGPSW","KLNSW"]}},{"inr":"28INR0325","name":"Cielo Vista Power Gas Plant","fuel":"gas","tech":"IC","mw":343.8,"county":"Duval","zone":"SOUTH","poi":"Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1","entity":"Cielo Vista Power, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-30","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":112,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL","CRUCE"]}},{"inr":"28INR0327","name":"18-BRAVO BESS","fuel":"battery","tech":"BA","mw":407,"county":"Hunt","zone":"NORTH","poi":"138 kV Commerce Switch Substation. Bus no. #1816","entity":"Scout Energy Management, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-02-01","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-96.04117000000001,32.98473],"method":"county centroid (substation not located)","subs":[],"codes":["COMSW"]}},{"inr":"28INR0328","name":"18-ALPHA BESS","fuel":"battery","tech":"BA","mw":307.4,"county":"Cooke","zone":"NORTH","poi":"To the 138 kV Valley View Substation, ( Bus No.691)","entity":"SCOUT ENERGY MANAGEMENT, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-02-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-97.19572000000001,33.82535636363637],"method":"county centroid (substation not located)","subs":[],"codes":["VALYVIEW"]}},{"inr":"28INR0332","name":"Reunion Solar","fuel":"solar","tech":"PV","mw":600.9,"county":"Wilbarger","zone":"WEST","poi":"Tap 345kV #60504 Tesla Road to #6111 Riley","entity":"Reunion Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":33,"loc":{"pt":[-99.14533,34.08526],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Riley Substation"],"codes":["TESLA","RILEY"]}},{"inr":"28INR0333","name":"Reunion Storage","fuel":"battery","tech":"BA","mw":200.3,"county":"Wilbarger","zone":"WEST","poi":"Tap 345kV #60504 Tesla Road to #6111 Riley","entity":"Reunion Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-07-01","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.14533,34.08526],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Riley Substation"],"codes":["TESLA","RILEY"]}},{"inr":"28INR0335","name":"Oak Valley Solar","fuel":"solar","tech":"PV","mw":251.3,"county":"Navarro","zone":"NORTH","poi":"68091 (Navarro) (345)","entity":"Oak Valley Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-28","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"28INR0337","name":"Barrosos Creek Wind 3","fuel":"wind","tech":"WT","mw":197.75,"county":"Zapata","zone":"SOUTH","poi":"#80227 Rapido 345 kV","entity":"Cascabel Wind Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":43,"loc":{"pt":[-99.33245116279073,26.98322558139536],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0338","name":"Barrosos Creek Wind 4","fuel":"wind","tech":"WT","mw":197.75,"county":"Zapata","zone":"SOUTH","poi":"#80227 Rapido 345 kV","entity":"Cascabel Wind Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":43,"loc":{"pt":[-99.33245116279073,26.98322558139536],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0339","name":"Corralitos Wind 3","fuel":"wind","tech":"WT","mw":196.1,"county":"Zapata","zone":"SOUTH","poi":"ETT 345 kV Tiempo #80224 Substation (Tap on 345kV 80225 CENIZO7C - 80307 DELSOL7C)","entity":"Las Crestas Wind Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":43,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"28INR0340","name":"Corralitos Wind 4","fuel":"wind","tech":"WT","mw":195.4,"county":"Zapata","zone":"SOUTH","poi":"ETT 345 kV Tiempo #80224 Substation  (Tap on 345kV 80225 CENIZO7C - 80307 DELSOL7C)","entity":"Las Crestas Wind Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-31","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":43,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"28INR0341","name":"Bastion BESS","fuel":"battery","tech":"BA","mw":154.3,"county":"Matagorda","zone":"COASTAL","poi":"Blessing Substation 138 kV (ID 8121)","entity":"BESS BASTION LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-01","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.1908,28.88651],"method":"ERCOT bus number -> substation","subs":["Blessing Substation"],"codes":["BLESSING"],"osm":"osm:way/174401034"}},{"inr":"28INR0343","name":"Amphion Solar Phase 2","fuel":"solar","tech":"PV","mw":205.9,"county":"Atascosa","zone":"SOUTH","poi":"TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2","entity":"Amphion Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["FOWLRTON","SANMIGL"]}},{"inr":"28INR0344","name":"Amphion Solar Phase 3","fuel":"solar","tech":"PV","mw":115.4,"county":"Atascosa","zone":"SOUTH","poi":"TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2","entity":"Amphion Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-11-15","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["FOWLRTON","SANMIGL"]}},{"inr":"28INR0348","name":"Ringtail Energy Storage","fuel":"battery","tech":"BA","mw":203.8,"county":"Archer","zone":"WEST","poi":"Bus # 1446, Lake Wichita, 138 kV","entity":"PowerPulse LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-15","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.74091999999999,33.65954000000001],"method":"county centroid (substation not located)","subs":[],"codes":["LKWSW"]}},{"inr":"28INR0349","name":"Jaguarundi Energy Storage","fuel":"battery","tech":"BA","mw":152.02,"county":"Nolan","zone":"WEST","poi":"Bus # 1339, Eskota 138kV","entity":"PowerPulse LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-11-10","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.24256,32.49217],"method":"ERCOT bus number -> substation","subs":["Eskota Switching Station"],"codes":["ESKSW"],"osm":"osm:way/137493307"}},{"inr":"28INR0355","name":"Galaxy I Solar","fuel":"solar","tech":"PV","mw":99.42,"county":"Ellis","zone":"NORTH","poi":"Stainback Switch (bus #2217) - Elrod Switch (bus #3159)","entity":"Galaxy Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-30","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["STBSW","ELRSW"]}},{"inr":"28INR0356","name":"Arpeggio BESS","fuel":"battery","tech":"BA","mw":200.71,"county":"Victoria","zone":"SOUTH","poi":"#80064 Chocolate Bayou 138kV","entity":"Arpeggio BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["CHOCBAYU"]}},{"inr":"28INR0358","name":"Cherry Sage Solar 1 SLF","fuel":"solar","tech":"PV","mw":142.51,"county":"Concho","zone":"WEST","poi":"(#60423) TREADWELL  138kV.","entity":"Cherry Sage Solar 1 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-23","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-99.715092,31.492472000000003],"method":"county centroid (substation not located)","subs":[],"codes":["TREADWEL"]}},{"inr":"28INR0363","name":"Finch Storage","fuel":"battery","tech":"BA","mw":201.3,"county":"McLennan","zone":"NORTH","poi":"165 WINDSORSW 138kV","entity":"Finch Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.30093,31.50776],"method":"ERCOT bus number -> substation","subs":["Windsor Substation"],"codes":["WINDSRSW"],"osm":"osm:way/461754705"}},{"inr":"28INR0375","name":"Barranca Wind 1","fuel":"wind","tech":"WT","mw":300.9,"county":"Jim Hogg","zone":"SOUTH","poi":"Tap the 345 kV CENIZO (#80225) - DELSOL (#80307) line","entity":"Barranca Wind Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"28INR0376","name":"Barranca Wind 2","fuel":"wind","tech":"WT","mw":298.6,"county":"Jim Hogg","zone":"SOUTH","poi":"Tap the 345 kV CENIZO7C (#80225) - DELSOL7C (#80307) line.","entity":"Barranca Wind Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":65,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"28INR0377","name":"Wichita Creek Solar","fuel":"solar","tech":"PV","mw":3.43,"county":"Wichita","zone":"WEST","poi":"Tap 345 kV 6111 RILEY - 1730 KRUM WEST Ckt 1","entity":"Wichita Solar II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-15","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":0,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"28INR0378","name":"Wichita Creek Storage","fuel":"battery","tech":"BA","mw":300,"county":"Wichita","zone":"WEST","poi":"Tap 345 kV 6111 RILEY - 1730 KRUM WEST Ckt 1","entity":"Wichita Solar II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-15","ia":null,"cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"28INR0385","name":"Galaxy Solar 2","fuel":"solar","tech":"PV","mw":301.64,"county":"Ellis","zone":"NORTH","poi":"3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127","entity":"Galaxy Solar 2, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-30","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"28INR0386","name":"Sagebrush Wind","fuel":"wind","tech":"WT","mw":200.5,"county":"Nolan","zone":"WEST","poi":"TAP 345KV 11420 SWEETWATER EAST - 11406 CENTRAL BLUFF CKT2","entity":"ACE DevCo NC, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":44,"loc":{"pt":[-100.45700000000001,32.34828],"method":"county centroid (substation not located)","subs":[],"codes":["SWESW","CBFSW"]}},{"inr":"28INR0387","name":"Galaxy Storage 2","fuel":"battery","tech":"BA","mw":201.87,"county":"Ellis","zone":"NORTH","poi":"3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127","entity":"Galaxy Solar 2, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-30","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"28INR0389","name":"Tri-X BESS 1 SLF","fuel":"battery","tech":"BA","mw":205.3,"county":"Crane","zone":"WEST","poi":"138 kV Soda Lake (#76026)","entity":"Crane I Solar Electric, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-10-30","ia":"2026-08-21","cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":156,"loc":{"pt":[-102.31368,31.19334],"method":"ERCOT bus number -> substation","subs":["Soda Lake Substation"],"codes":["SODALA"],"osm":"osm:way/1454962661"}},{"inr":"28INR0390","name":"Horsepower BESS","fuel":"battery","tech":"BA","mw":257.5,"county":"Bexar","zone":"SOUTH","poi":"POI is 138 kV Howard Substation (Bus# 5230) (SSWG bus name: HOWARD), NMMS station code: S1","entity":"Horsepower BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-31","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["HOWARD"]}},{"inr":"28INR0391","name":"Ruedrich BESS","fuel":"battery","tech":"BA","mw":200.58,"county":"Guadalupe","zone":"SOUTH","poi":"LINE TAP OF CIBOLO (7608) AND McQUEENEY (7606)","entity":"Ruedrich BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-09","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.128445,29.583385],"method":"tap between two located substations","subs":["Cibolo Substation","McQueeney Substation"],"codes":["CIBOLO","MCQUEE"]}},{"inr":"28INR0392","name":"Devine Mary BESS","fuel":"battery","tech":"BA","mw":200.58,"county":"Medina","zone":"SOUTH","poi":"5813 PEARSONSW8 138 kV","entity":"Devine Mary BESS","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-21","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.92427,29.26297],"method":"ERCOT bus number -> substation","subs":["Pearson Substation"],"codes":["PEARSON"],"osm":"osm:way/320099410"}},{"inr":"28INR0394","name":"Treehouse Solar","fuel":"solar","tech":"PV","mw":281.77,"county":"Grimes","zone":"NORTH","poi":"Tap the 345 kV Jewett (#3390) - Singleton (#44645) line","entity":"Treehouse Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-13","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-95.97329,30.66131],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Singleton Substation"],"codes":["JEWET","SNG"]}},{"inr":"28INR0395","name":"Treehouse Storage","fuel":"battery","tech":"BA","mw":209.21,"county":"Grimes","zone":"NORTH","poi":"Tap the 345 kV Jewett (#3390) - Singleton (#44645) line, ONCOR","entity":"Treehouse Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-13","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-95.97329,30.66131],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Singleton Substation"],"codes":["JEWET","SNG"]}},{"inr":"28INR0397","name":"Ouroboros Grid BESS 1","fuel":"battery","tech":"BA","mw":200.82,"county":"Cameron","zone":"COASTAL","poi":"POIB: #88337 Chalybe 345 kV  \n(expansion of the #8735 Chalybe 138 kV – to be connected by double circuit line to #79500 Palmito 345 kV)","entity":"Ouroboros Grid BESS Unit 1","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.37989,25.98456],"method":"ERCOT bus number -> substation","subs":["Palmito Substation"],"codes":["PALMITO"],"osm":"osm:way/487061712"}},{"inr":"28INR0398","name":"Ouroboros Grid BESS 2","fuel":"battery","tech":"BA","mw":200.81,"county":"Cameron","zone":"COASTAL","poi":"88337 Chalybe 345 kV","entity":"Ouroboros Grid BESS Unit 2","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0403","name":"Ouroboros Grid BESS 3","fuel":"battery","tech":"BA","mw":200.72,"county":"Cameron","zone":"COASTAL","poi":"88337 Chalybe 345 kV","entity":"Ouroboros Grid BESS Unit 3","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0404","name":"Penelope Solar","fuel":"solar","tech":"PV","mw":97.8,"county":"Hill","zone":"NORTH","poi":"New sub in the 234 Chatt - 3473 Ash Creek 138kV line","entity":"Ash Creek Project LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-24","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["CHATT","ASHSW"]}},{"inr":"28INR0408","name":"Max 4 Wind","fuel":"wind","tech":"WT","mw":352.6,"county":"Haskell","zone":"WEST","poi":"Tap 345 kV Gauss7D (Bus# 60703) to Quasar7A (Bus# 60712) Transmission Line","entity":"Lake Creek Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-08-31","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":77,"loc":{"pt":[-99.7829,33.22218],"method":"county centroid (substation not located)","subs":[],"codes":["QUASAR"]}},{"inr":"28INR0412","name":"Yellow Leaf II BESS","fuel":"battery","tech":"BA","mw":205.74,"county":"Kaufman","zone":"NORTH","poi":"Tap 138kV 2727 CRANDALL1_8 - 2724 KAUFMN_8","entity":"Yellow Leaf Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-25","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["CRNDL","KFMNW"]}},{"inr":"28INR0413","name":"Tolivar Power Plant Phase 2","fuel":"gas","tech":"IC","mw":224.5,"county":"Reeves","zone":"WEST","poi":"Tap 138 KV 38055 Saltdraw-38043 COWPEN","entity":"Pecos Power Plant, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-09-29","ia":"2026-04-14","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":148,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["COWPEN"]}},{"inr":"28INR0415","name":"Alkali Creek Wind","fuel":"wind","tech":"WT","mw":474.4,"county":"Fisher","zone":"WEST","poi":"Tap 345 kV BUS #1048 Tonkawa -\nBUS #11050  Dusty Road","entity":"Alkali Creek Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":104,"loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"28INR0422","name":"Prairie Branch Solar","fuel":"solar","tech":"PV","mw":301.23,"county":"Montague","zone":"NORTH","poi":"Tap 345kV #1730 Krum West - #6111 Riley Ckt 1","entity":"Prairie Branch Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"28INR0423","name":"Prairie Branch BESS","fuel":"battery","tech":"BA","mw":310.17,"county":"Montague","zone":"NORTH","poi":"Tap 345kV #1730 Krum West - #6111 Riley Ckt 1","entity":"Prairie Branch Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-99.14533,34.08526],"method":"ERCOT bus number -> substation","subs":["Riley Substation"],"codes":["RILEY"],"osm":"osm:way/165665538"}},{"inr":"28INR0427","name":"Ouroboros Grid BESS 4","fuel":"battery","tech":"BA","mw":201.14,"county":"Cameron","zone":"COASTAL","poi":"79500 Palmito 345kV","entity":"Ouroboros Grid BESS Unit 4","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.37989,25.98456],"method":"ERCOT bus number -> substation","subs":["Palmito Substation"],"codes":["PALMITO"],"osm":"osm:way/487061712"}},{"inr":"28INR0428","name":"Ouroboros Grid BESS 5","fuel":"battery","tech":"BA","mw":200.96,"county":"Cameron","zone":"COASTAL","poi":"79500 Palmito 345KV","entity":"Ouroboros Grid BESS Unit 5","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.37989,25.98456],"method":"ERCOT bus number -> substation","subs":["Palmito Substation"],"codes":["PALMITO"],"osm":"osm:way/487061712"}},{"inr":"28INR0429","name":"Ouroboros Grid BESS 6","fuel":"battery","tech":"BA","mw":200.94,"county":"Cameron","zone":"COASTAL","poi":"79500 Palmito 345KV","entity":"Ouroboros Grid BESS Unit 6","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.37989,25.98456],"method":"ERCOT bus number -> substation","subs":["Palmito Substation"],"codes":["PALMITO"],"osm":"osm:way/487061712"}},{"inr":"28INR0431","name":"Solarville Wind SLF","fuel":"wind","tech":"WT","mw":0,"county":"Kaufman","zone":"NORTH","poi":"Tap 345 kV (#2432)Tri Corner - (#3105) Elkton","entity":"Ville Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-19","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.53753,32.55366],"method":"one end of the tapped line, matched by name in the POI","subs":["Tri-Corner Substation"],"codes":["TRCNR","ELKTN"]}},{"inr":"28INR0432","name":"Solarville BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Kaufman","zone":"NORTH","poi":"Tap 345 kV (#2432)Tri Corner - (#3105) Elkton","entity":"Ville Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-19","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.53753,32.55366],"method":"one end of the tapped line, matched by name in the POI","subs":["Tri-Corner Substation"],"codes":["TRCNR","ELKTN"]}},{"inr":"28INR0433","name":"Blue Spring Solar","fuel":"solar","tech":"PV","mw":301,"county":"Haskell","zone":"WEST","poi":"#60515 Clear Crossing 345 kV","entity":"Flat Creek Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-28","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"28INR0434","name":"Viento Bravo Wind","fuel":"wind","tech":"WT","mw":366.51,"county":"Jim Hogg","zone":"SOUTH","poi":"Tap 345kV 80220 Cenizo - 80079 Cruce Ckt-1","entity":"Webb Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-06","ia":"2025-12-31","cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":273,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"28INR0437","name":"Barbara BESS","fuel":"battery","tech":"BA","mw":200.51,"county":"Nueces","zone":"COASTAL","poi":"LINE TAP OF WESTSIDE (8485) AND WEIL TRACT (8482) 138 KV TRANSMISSION LINE","entity":"Barbara BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-02","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.50795714285712,27.78825873015873],"method":"county centroid (substation not located)","subs":[],"codes":["WESTSIDE","WEIL_TRC"]}},{"inr":"28INR0438","name":"Moss Rock Storage","fuel":"battery","tech":"BA","mw":157.12,"county":"Mills","zone":"NORTH","poi":"#7070 Goldthwaite 138kV","entity":"Invenergy Storage Development LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.72821090909093,31.390340000000002],"method":"county centroid (substation not located)","subs":[],"codes":["GOLDTH"]}},{"inr":"28INR0442","name":"Zunkerville BESS","fuel":"battery","tech":"BA","mw":206.74,"county":"Karnes","zone":"SOUTH","poi":"345kV BUS #5725 PAWNEE SWITCHING STATION","entity":"Zunkerville Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.02393,28.73986],"method":"ERCOT bus number -> substation","subs":["Pawnee Substation"],"codes":["PAWNEE"],"osm":"osm:way/174560152"}},{"inr":"28INR0443","name":"Zunkerville Solar","fuel":"solar","tech":"PV","mw":200.67,"county":"Karnes","zone":"SOUTH","poi":"#5725 PAWNEE SWITCHING STATION 345kV","entity":"Zunkerville Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.02393,28.73986],"method":"ERCOT bus number -> substation","subs":["Pawnee Substation"],"codes":["PAWNEE"],"osm":"osm:way/174560152"}},{"inr":"28INR0446","name":"Vista Bluff Wind I \"Alternate POI\"","fuel":"wind","tech":"WT","mw":290.4,"county":"Upton","zone":"WEST","poi":"tap 345 kV (76000) North McCamey -  (59903) Bearkat \n(Benedum 345 kV station that LCRA will build part of 24RPG024).","entity":"Vista Bluff Windpower, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":64,"loc":{"pt":[-101.5315,31.76605],"method":"ERCOT bus number -> substation","subs":["Bearkat Substation"],"codes":["W_BK_345"],"osm":"osm:way/453310293"}},{"inr":"28INR0447","name":"Vista Bluff Wind II \"Alternate POI\"","fuel":"wind","tech":"WT","mw":290.4,"county":"Upton","zone":"WEST","poi":"tap 345 kV (76000) North McCamey -  (59903) Bearkat \n(Benedum 345 kV station that LCRA will build part of 24RPG024).","entity":"Vista Bluff Windpower, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":64,"loc":{"pt":[-101.5315,31.76605],"method":"ERCOT bus number -> substation","subs":["Bearkat Substation"],"codes":["W_BK_345"],"osm":"osm:way/453310293"}},{"inr":"28INR0448","name":"Gulf Prairie BESS","fuel":"battery","tech":"BA","mw":207.78,"county":"Brazoria","zone":"COASTAL","poi":"(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)","entity":"Gulf Prairie Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-95.42884,29.22677],"method":"ERCOT bus number -> substation","subs":["Angleton Substation"],"codes":["AE"],"osm":"osm:way/244479862"}},{"inr":"28INR0452","name":"Neal Battery","fuel":"battery","tech":"BA","mw":120.52,"county":"Wharton","zone":"SOUTH","poi":"tap of 138kV 8750 Chalmers - 8127 Lane City","entity":"CH Neal Battery LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-03","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["LAN_CTY"]}},{"inr":"28INR0454","name":"Oakley BESS","fuel":"battery","tech":"BA","mw":200.96,"county":"Denton","zone":"NORTH","poi":"Tap 138 kV 612 BLUHORSE– 684 SPRING","entity":"Oakley BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-08","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.18809,33.41854],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69637, \"Oakley BESS\", planned)","subs":[],"codes":["SPR"],"eia_plant":69637}},{"inr":"28INR0456","name":"Brazos Energy Security","fuel":"gas","tech":"CC","mw":2992,"county":"Fisher","zone":"WEST","poi":"Tap 345 kV (Bus #1048) Tonkawa Switch – (Bus #11050) Dusty Road","entity":"Golden Spread Electric","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-22","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":972,"loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"28INR0457","name":"Kilby1 Part 2 Tier1 BESS","fuel":"battery","tech":"BA","mw":330,"county":"Reeves","zone":"WEST","poi":"#60404 Solstice Substation 345 kV","entity":"Energy Forge One LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-01-21","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":23,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"28INR0459","name":"Kilby1 Part 4 Large Block Simple Cycle","fuel":"gas","tech":"GT","mw":950,"county":"Reeves","zone":"WEST","poi":"#60404 Solstice Substation 345 kV","entity":"Energy Forge One LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-20","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":309,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"28INR0461","name":"Dilley Solar","fuel":"solar","tech":"PV","mw":200.7,"county":"Frio","zone":"SOUTH","poi":"Tap 138 kV 8212 DILLEY SWITCH AEP - 8613 BIG WELLS","entity":"AETS Development Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.53584,28.56533],"method":"ERCOT bus number -> substation","subs":["Big Wells Substation"],"codes":["BIG_WELL"],"osm":"osm:way/20849578"}},{"inr":"28INR0462","name":"Senterfitt Solar","fuel":"solar","tech":"PV","mw":68.39,"county":"Lampasas","zone":"NORTH","poi":"Tap 138 kV 7080 Lometa - 7064 Lampasas","entity":"AETS Development Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-03","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-98.287255,31.14992],"method":"tap between two located substations","subs":["Lometa Substation","Lampasas Substation"],"codes":["LOMETA","LAMPAS"]}},{"inr":"28INR0463","name":"Mutz Solar","fuel":"solar","tech":"PV","mw":72.82,"county":"Atascosa","zone":"SOUTH","poi":"Tap 69 kV 5693 San Miguel Tap - 5698 North Calliham Sub","entity":"AETS Development Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-98.46982,28.70028],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["San Miguel Switchyard"],"codes":["NCALHMS"]}},{"inr":"28INR0464","name":"Grayback Solar","fuel":"solar","tech":"PV","mw":221.81,"county":"Wilbarger","zone":"WEST","poi":"Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B","entity":"Grayback Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-08-01","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":12,"loc":{"pt":[-99.45969500000001,34.014765],"method":"tap between two located substations","subs":["Riley Substation","Edith Clarke Substation"],"codes":["RILEY","EDITHCLA"]}},{"inr":"28INR0465","name":"Valcrest BESS","fuel":"battery","tech":"BA","mw":154.25,"county":"Galveston","zone":"HOUSTON","poi":"tap 138 kV 43500 WEBSTR_B138A - 48403 W_GALV01TP_8","entity":"Flexen USA LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-94.9659,29.41229],"method":"tap between two located substations","subs":["Webster Substation","West Galveston Substation"],"codes":["WEB","GA"]}},{"inr":"28INR0466","name":"Nabla Energy Storage II","fuel":"battery","tech":"BA","mw":750,"county":"Parker","zone":"NORTH","poi":"Double Tap 345kV Parker (1436) - Benbrook (1873 & 1869) DCKT","entity":"Nabla Park LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-17","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":53,"loc":{"pt":[-97.67631,32.80625],"method":"ERCOT bus number -> substation","subs":["Parker Substation"],"codes":["PKRSW"],"osm":"osm:way/171435008"}},{"inr":"28INR0467","name":"Main Horn Solar","fuel":"solar","tech":"PV","mw":100.43,"county":"Navarro","zone":"NORTH","poi":"3387 Revolution 138 KV","entity":"Main Horn Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-17","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.36558,31.9845],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69636, \"Main Horn Solar\", planned)","subs":[],"codes":["REVSW"],"eia_plant":69636}},{"inr":"28INR0468","name":"Glass Mountain Wind 2","fuel":"wind","tech":"WT","mw":519.2,"county":"Reeves","zone":"WEST","poi":"Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5","entity":"Glass Mountain Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-103.41311,31.22941],"method":"tap between two located substations","subs":["Solstice Substation","Sand Lake Switching Station"],"codes":["SOLSTICE","SLKSW"]}},{"inr":"28INR0469","name":"Paintbrush PV1","fuel":"solar","tech":"PV","mw":251.5,"county":"Coleman","zone":"WEST","poi":"Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch","entity":"Renew Development HoldCo LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-15","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.15481,32.11719],"method":"one end of the tapped line, matched by name in the POI","subs":["Central Bluff Substation"],"codes":["BWNSW","BLUF_CRK","CBFSW"]}},{"inr":"28INR0470","name":"Paintbrush PV2","fuel":"solar","tech":"PV","mw":251.5,"county":"Coleman","zone":"WEST","poi":"Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch","entity":"Renew Development HoldCo LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-15","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.15481,32.11719],"method":"one end of the tapped line, matched by name in the POI","subs":["Central Bluff Substation"],"codes":["BWNSW","BLUF_CRK","CBFSW"]}},{"inr":"28INR0472","name":"Seven Angels Energy Storage I","fuel":"battery","tech":"BA","mw":524.4,"county":"Hill","zone":"NORTH","poi":"68090 Sam Switch Bus 345kV","entity":"Seven Angels Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["SAMSW"]}},{"inr":"28INR0473","name":"Seven Angels Energy Storage II","fuel":"battery","tech":"BA","mw":524.4,"county":"Hill","zone":"NORTH","poi":"68090 Sam Switch Bus 345kV","entity":"Seven Angels Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["SAMSW"]}},{"inr":"28INR0474","name":"Mission Station Energy Storage I","fuel":"battery","tech":"BA","mw":375,"county":"Bexar","zone":"SOUTH","poi":"Tap 345kV (Bus #5400) SPRUCE – (Bus #5475) VON_ROSE Ckt 1;","entity":"Mission Station LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-31","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":27,"loc":{"pt":[-98.38268,29.25803],"method":"ERCOT bus number -> substation","subs":["Braunig Switchyard"],"codes":["BRAUNIG"],"osm":"osm:way/319115059"}},{"inr":"28INR0475","name":"Mission Station Energy Storage II","fuel":"battery","tech":"BA","mw":375,"county":"Bexar","zone":"SOUTH","poi":"Tap 345kV (Bus #5400) SPRUCE – (Bus #5231) HOWARD_5 Ckt 1","entity":"Mission Station LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-31","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":27,"loc":{"pt":[-98.57196,29.27843],"method":"one end of the tapped line, matched by name in the POI","subs":["Howard Substation"],"codes":["CALAVERS","HOWARD"]}},{"inr":"28INR0476","name":"Pease River Solar","fuel":"solar","tech":"PV","mw":276.35,"county":"Foard","zone":"WEST","poi":"Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B","entity":"Pease River Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-30","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.77406,33.94427],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Edith Clarke Substation"],"codes":["RILEY","EDITHCLA"]}},{"inr":"28INR0478","name":"Alkali Creek Wind 2","fuel":"wind","tech":"WT","mw":250.3,"county":"Fisher","zone":"WEST","poi":"Tap 345 kV BUS #1048 Tonkawa - BUS #11050 Dusty Road","entity":"Alkali Creek Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-01","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":55,"loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"28INR0482","name":"Falcon II Solar","fuel":"solar","tech":"PV","mw":100.32,"county":"Zapata","zone":"SOUTH","poi":"8004 Revilla 138 kV","entity":"Falcon Energy Project","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-02-16","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-99.33245116279073,26.98322558139536],"method":"county centroid (substation not located)","subs":[],"codes":["REVILLA"]}},{"inr":"28INR0483","name":"Falcon II BESS","fuel":"battery","tech":"BA","mw":103.3,"county":"Zapata","zone":"SOUTH","poi":"8004 Revilla 138 kV","entity":"Falcon Energy Project","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-02-16","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.33245116279073,26.98322558139536],"method":"county centroid (substation not located)","subs":[],"codes":["REVILLA"]}},{"inr":"28INR0484","name":"Pathfinder Energy Storage, LLC","fuel":"battery","tech":"BA","mw":201.16,"county":"San Patricio","zone":"COASTAL","poi":"8437 Rincon 138kV","entity":"Pathfinder Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-28","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.32971,27.9868],"method":"ERCOT bus number -> substation","subs":["Rincon Substation"],"codes":["RINCON"],"osm":"osm:way/194687600"}},{"inr":"28INR0485","name":"Sparta BESS","fuel":"battery","tech":"BA","mw":250.95,"county":"Bee","zone":"SOUTH","poi":"88690 SPTPOI7A 345kV","entity":"Sparta Storage Center","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-97.6662,28.507738709677415],"method":"county centroid (substation not located)","subs":[],"codes":["TANGO"]}},{"inr":"28INR0486","name":"Spectra Solar","fuel":"solar","tech":"PV","mw":1200,"county":"Scurry","zone":"WEST","poi":"59912 Galvani 345KV","entity":"SE DC Devco","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-11-16","ia":"2025-12-29","cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":574,"loc":{"pt":[-100.98097142857144,32.83984285714286],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0490","name":"Vertus Energy Storage 2","fuel":"battery","tech":"BA","mw":204.93,"county":"Galveston","zone":"HOUSTON","poi":"38830 TNMAINLAND1 138 KV","entity":"Vertus Energy Storage 2 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-02-15","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-94.88558831168828,29.4265025974026],"method":"county centroid (substation not located)","subs":[],"codes":["MAINLAND"]}},{"inr":"28INR0494","name":"Wilson Gas Plant","fuel":"gas","tech":"IC","mw":402.88,"county":"Wilson","zone":"SOUTH","poi":"Tap 345 kV 5133 ELMCREEK -  5901 MIGUEL5  CKT 1\nTap 345 kV 5133 ELMCREEK  -  5901 MIGUEL5  CKT 2","entity":"Misae Gas Power","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":131,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL"]}},{"inr":"28INR0495","name":"Old Alma Road Solar","fuel":"solar","tech":"PV","mw":20.06,"county":"Ellis","zone":"NORTH","poi":"2326 ENNS_SE_8 138kV","entity":"Wildcat Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-31","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":1,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["ENSSE"]}},{"inr":"28INR0496","name":"Blue Kite","fuel":"gas","tech":"GT","mw":370.08,"county":"San Patricio","zone":"COASTAL","poi":"<Bus#8956> <WHITEPOINT> <345KV>","entity":"RWE Clean Energy Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-08-29","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":120,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":["WHITE_PT"]}},{"inr":"28INR0497","name":"Cielo Vista Power II","fuel":"gas","tech":"IC","mw":350.38,"county":"Duval","zone":"SOUTH","poi":"TAP 345 kV BUS # 5901 MIGUEL5 - BUS #80280\nCRUCE SM 7A Ckt-1","entity":"Cielo Vista Power II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-30","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":114,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL"]}},{"inr":"28INR0498","name":"Old Aqueduct BESS II","fuel":"battery","tech":"BA","mw":309.2,"county":"Hale","zone":"PANHANDLE","poi":"23920 BLKWTRDR_5 345kV","entity":"Tempus Power Management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-01","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-101.879,34.11878],"method":"county centroid (substation not located)","subs":[],"codes":["BWDSW"]}},{"inr":"28INR0499","name":"Alpha Digital Campus Combined-cycle and Co-located Load","fuel":"gas","tech":"CC","mw":58.26,"county":"Reeves","zone":"WEST","poi":"38044 TNCOWPEN__3 345kV","entity":"PowerBridge LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2027-12-31","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":19,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0503","name":"Rancho Grande Solar","fuel":"solar","tech":"PV","mw":251.58,"county":"Zapata","zone":"SOUTH","poi":"345 kV Tiempo Substation #80224","entity":"Bordas Renewable Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-05-09","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.33245116279073,26.98322558139536],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0504","name":"Sweetwater 5 Repower","fuel":"wind","tech":"WT","mw":79.1,"county":"Nolan","zone":"WEST","poi":"Bitter Creek Substation","entity":"Sweetwater Wind 5 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-01","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-100.35219,32.43782],"method":"substation matched by name in the POI","subs":["Bitter Creek Substation"],"codes":[]}},{"inr":"28INR0508","name":"TempleCloud Gas","fuel":"gas","tech":"IC","mw":1139.69,"county":"Bell","zone":"NORTH","poi":"Tap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT Line","entity":"Kalnin Ventures, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-19","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":370,"loc":{"pt":[-97.3078,31.07902],"method":"one end of the tapped line, matched by name in the POI","subs":["Temple Switching Station"],"codes":["TMPSW"]}},{"inr":"28INR0509","name":"Thunder Bird 2 Gas","fuel":"gas","tech":"CC","mw":1272.8,"county":"Jack","zone":"NORTH","poi":"Tap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (1421) and Jacksbro_5 (1429) to Hendrch_5 (1443)","entity":"BKV Power Ventures Jack, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-09-14","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":414,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["JCKSW","WCSWS"]}},{"inr":"28INR0514","name":"Young Road Solar","fuel":"solar","tech":"PV","mw":101.7,"county":"Baylor","zone":"WEST","poi":"The POI B is TAP 69 KV LINE AND CREATE NEW BUS BETWEENWESTOVER (784) AND LAKE KEMP SWITCH (782) 69 KV SUB STATIONS.","entity":"reNRG TX 5 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-30","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-99.26617999999999,33.6597],"method":"county centroid (substation not located)","subs":[],"codes":["WESTOVER"]}},{"inr":"28INR0515","name":"Turning Basin Solar","fuel":"solar","tech":"PV","mw":290,"county":"Calhoun","zone":"COASTAL","poi":"Tap 69kV (5574) Olivia Switch - (5576) Olivia Sub \nproposed upgrade to 138kV dbl ckt\nProject in Calhoun and Jackson counties.\nPlanned Sub loc  28.695671, -96.469752\nSub shared with a planned co-located green fuels plant of Synergen Point Comfort LLC","entity":"Synergen Solar Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":16,"loc":{"pt":[-96.6636911764706,28.409144117647056],"method":"county centroid (substation not located)","subs":[],"codes":["OLIVIAS"]}},{"inr":"28INR0520","name":"SunRustler Solar","fuel":"solar","tech":"PV","mw":301.49,"county":"Culberson","zone":"WEST","poi":"11082 MAVRKDRW_8 138kV","entity":"SunRustler Solar","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-15","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-104.67212857142856,31.34881428571429],"method":"county centroid (substation not located)","subs":[],"codes":["MVRCK"]}},{"inr":"28INR0524","name":"Anawa La Gas","fuel":"gas","tech":"CC","mw":250,"county":"Hidalgo","zone":"SOUTH","poi":"Liston 138 KV to Bates 138 KV","entity":"Anawa La Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-01-30","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":81,"loc":{"pt":[-98.48658,26.316205],"method":"tap between two substations matched by name","subs":["Liston Substation","Bates Substation"],"codes":[]}},{"inr":"28INR0529","name":"Victory Ellis–BESS","fuel":"battery","tech":"BA","mw":452.99,"county":"Ellis","zone":"NORTH","poi":"Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT","entity":"Victory Ellis, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-28","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":32,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["BIGSW","STBSW","ELRSW"]}},{"inr":"28INR0530","name":"Wickson Creek Gas","fuel":"gas","tech":"GT","mw":1022.08,"county":"Brazos","zone":"NORTH","poi":"Jack Creek Station 345 kV (#975)","entity":"Wickson Creek Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-10-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":332,"loc":{"pt":[-96.25887,30.85889],"method":"substation matched by name in the POI","subs":["Jack Creek Substation"],"codes":["JK_CK"]}},{"inr":"28INR0531","name":"Crape Myrtle Solar","fuel":"solar","tech":"PV","mw":140.69,"county":"Ellis","zone":"NORTH","poi":"Tap 345 kV 2255 OLDCNTRY_5 - 3376 NOTUS_5","entity":"Crape Myrtle Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-15","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["OLDSW","NTSSW"]}},{"inr":"28INR0532","name":"Alpha Power Phase 1","fuel":"gas","tech":"GT","mw":400.1,"county":"Guadalupe","zone":"SOUTH","poi":"345kV 7042 Zorn Substation","entity":"Palomino Alpha, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":130,"loc":{"pt":[-97.94975,29.77265],"method":"ERCOT bus number -> substation","subs":["Zorn Substation"],"codes":["ZORN"],"osm":"osm:way/30891667"}},{"inr":"28INR0535","name":"Daisy Solar","fuel":"solar","tech":"PV","mw":200.92,"county":"Foard","zone":"WEST","poi":"Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B","entity":"Daisy Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-30","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.77406,33.94427],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Edith Clarke Substation"],"codes":["RILEY","EDITHCLA"]}},{"inr":"28INR0546","name":"San Miguel Solar 2","fuel":"solar","tech":"PV","mw":200.8,"county":"Atascosa","zone":"SOUTH","poi":"5902 San Miguel Gen 138 kV Substation.","entity":"San Miguel Electric Cooperative, Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL"]}},{"inr":"28INR0548","name":"San Miguel Solar 1","fuel":"solar","tech":"PV","mw":201.7,"county":"Atascosa","zone":"SOUTH","poi":"5902 San Miguel Gen 138 kV Substation","entity":"San Miguel Electric Cooperative, Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL"]}},{"inr":"28INR0549","name":"San Miguel BESS Storage","fuel":"battery","tech":"BA","mw":50.1,"county":"Atascosa","zone":"SOUTH","poi":"5902 SAN MIGUEL GEN 138 kV Substation","entity":"San Miguel Electric Cooperative, Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL"]}},{"inr":"28INR0553","name":"Malakoff BESS","fuel":"battery","tech":"BA","mw":204.3,"county":"Henderson","zone":"NORTH","poi":"Tap 345kV line between Trinidad SES (3124) and Forest Grove switch (3130)","entity":"Malakoff BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-08-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-96.026985,32.180405],"method":"tap between two located substations","subs":["Trinidad Substation","Forest Grove Substation"],"codes":["TRSES","FGRSW"]}},{"inr":"29INR0003","name":"Aurelius Solar","fuel":"solar","tech":"PV","mw":1124.24,"county":"Deaf Smith","zone":"PANHANDLE","poi":"23908 Deaf Smith station 345 kV","entity":"IP Roman, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2025-10-09","cons_start":null,"first_seen":"2023-07","months_in_queue":39,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":537,"loc":{"pt":[-102.69286000000002,34.9217],"method":"county centroid (substation not located)","subs":[],"codes":["DEAFSMIT"]}},{"inr":"29INR0004","name":"Aurelius Wind","fuel":"wind","tech":"WT","mw":621.6,"county":"Deaf Smith","zone":"PANHANDLE","poi":"23908 Deaf Smith station 345 kV","entity":"IP Roman Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-06-30","ia":"2025-10-09","cons_start":null,"first_seen":"2023-08","months_in_queue":38,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":464,"loc":{"pt":[-102.69286000000002,34.9217],"method":"county centroid (substation not located)","subs":[],"codes":["DEAFSMIT"]}},{"inr":"29INR0009","name":"Aurelius 2 Solar","fuel":"solar","tech":"PV","mw":445.4,"county":"Deaf Smith","zone":"PANHANDLE","poi":"23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).","entity":"IP Roman, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-09-30","ia":"2026-07-10","cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":213,"loc":{"pt":[-102.69286000000002,34.9217],"method":"county centroid (substation not located)","subs":[],"codes":["DEAFSMIT","BRIDGEPR","MRTSP"]}},{"inr":"29INR0010","name":"Aurelius 2 Wind","fuel":"wind","tech":"WT","mw":621.6,"county":"Deaf Smith","zone":"PANHANDLE","poi":"23908 Deaf Smith station 345kV","entity":"IP Roman Wind II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":136,"loc":{"pt":[-102.69286000000002,34.9217],"method":"county centroid (substation not located)","subs":[],"codes":["DEAFSMIT"]}},{"inr":"29INR0011","name":"Aurelius 3 Solar","fuel":"solar","tech":"PV","mw":445.4,"county":"Deaf Smith","zone":"PANHANDLE","poi":"23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).","entity":"IP Roman III, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":24,"loc":{"pt":[-102.69286000000002,34.9217],"method":"county centroid (substation not located)","subs":[],"codes":["DEAFSMIT","BRIDGEPR","MRTSP"]}},{"inr":"29INR0012","name":"Aurelius 3 Wind","fuel":"wind","tech":"WT","mw":497.3,"county":"Deaf Smith","zone":"PANHANDLE","poi":"23908 Deaf Smith station 345kV","entity":"IP Roman III, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":109,"loc":{"pt":[-102.69286000000002,34.9217],"method":"county centroid (substation not located)","subs":[],"codes":["DEAFSMIT"]}},{"inr":"29INR0013","name":"Cattle Drive Solar","fuel":"solar","tech":"PV","mw":307,"county":"Crane","zone":"WEST","poi":"76000 North McCamey 345kV","entity":"Cattle Drive Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2025-12-29","cons_start":null,"first_seen":"2024-06","months_in_queue":28,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":147,"loc":{"pt":[-102.57905833333332,31.29205416666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0015","name":"Funston Solar","fuel":"solar","tech":"PV","mw":351.1,"county":"Jones","zone":"WEST","poi":"tap 345 kV 68000 West Shackelford – 68004 Phantom Hill Circuit 2","entity":"Funston Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-26","ia":"2024-10-23","cons_start":null,"first_seen":"2024-04","months_in_queue":30,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":168,"loc":{"pt":[-99.72019,32.78367],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67359, \"Funston Solar\", planned)","subs":[],"codes":["WSHACK","PHNTMHL"],"eia_plant":67359}},{"inr":"29INR0017","name":"Big Rooter East Solar","fuel":"solar","tech":"PV","mw":554.7,"county":"Robertson","zone":"NORTH","poi":"39950 TNP One Plant 345 kV","entity":"Big Rooter East, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-05-31","ia":"2025-06-01","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":265,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"29INR0018","name":"Big Rooter East Storage","fuel":"battery","tech":"BA","mw":201.03,"county":"Robertson","zone":"NORTH","poi":"39950 TNP One Plant 345 kV","entity":"Big Rooter East, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-12-31","ia":"2025-06-01","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":152,"loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"29INR0019","name":"Infinium Solar","fuel":"solar","tech":"PV","mw":401.6,"county":"Howard","zone":"WEST","poi":"#1058 Longshore Switch - #18548 Prairieland Switch 345kV Ckt 1","entity":"Jackalope Flats Solar, LLC","stage":"fis_done","stage_label":"Full study done, no agreement","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2024-08","months_in_queue":26,"p36":0.315,"p36_basis":"62 of 197 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":127,"loc":{"pt":[-101.45234,32.1003],"method":"ERCOT bus number -> substation","subs":["Longshore Substation"],"codes":["LNGSW"],"osm":"osm:way/172212648"}},{"inr":"29INR0021","name":"Buzios BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Motley","zone":"PANHANDLE","poi":"Tap 345kV 59904 Cottonwood - 23922 White River Ckt 2","entity":"Buzios Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-101.028055,33.91866],"method":"tap between two substations (bus number + name)","subs":["Cottonwood Substation","White River Substation"],"codes":["W_CW_345","WHIT_RVR"]}},{"inr":"29INR0025","name":"Skyrider Wind","fuel":"wind","tech":"WT","mw":370,"county":"Pecos","zone":"WEST","poi":"138kV #38365 TNPINION","entity":"NextEra Energy Interconnection Holdings, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-07-01","ia":"2025-12-23","cons_start":null,"first_seen":"2024-11","months_in_queue":23,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":276,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNPINION"]}},{"inr":"29INR0026","name":"Skeeter Solar","fuel":"solar","tech":"PV","mw":251,"county":"Jones","zone":"WEST","poi":"345 kV SWEETWATER EAST (11420) - LONG CREEK (1435)","entity":"Mesquite Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-30","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.87913,32.546555],"method":"tap between two substations matched by name","subs":["Sweetwater East Substation","Long Creek Substation"],"codes":["SWESW","LNCRK"]}},{"inr":"29INR0030","name":"Commodus Solar","fuel":"solar","tech":"PV","mw":502.1,"county":"Briscoe","zone":"PANHANDLE","poi":"Tap 345kV 23914 Tule Canyon - 23900 Alibates","entity":"IP Blackwell, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-30","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-101.35964,35.25496],"method":"ERCOT bus number -> substation","subs":["Alibates Substation"],"codes":["ALIBATES"],"osm":"osm:way/453589128"}},{"inr":"29INR0031","name":"Commodus Wind","fuel":"wind","tech":"WT","mw":641.4,"county":"Briscoe","zone":"PANHANDLE","poi":"tap 345kV 23914 Tule Canyon - 23900 Alibates","entity":"IP Blackwell, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-30","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":140,"loc":{"pt":[-101.35964,35.25496],"method":"ERCOT bus number -> substation","subs":["Alibates Substation"],"codes":["ALIBATES"],"osm":"osm:way/453589128"}},{"inr":"29INR0032","name":"Commodus 2 Solar","fuel":"solar","tech":"PV","mw":502.1,"county":"Swisher","zone":"PANHANDLE","poi":"Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)","entity":"IP Blackwell II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-30","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-101.35964,35.25496],"method":"ERCOT bus number -> substation","subs":["Alibates Substation"],"codes":["ALIBATES"],"osm":"osm:way/453589128"}},{"inr":"29INR0033","name":"Commodus 2 Wind","fuel":"wind","tech":"WT","mw":641.48,"county":"Swisher","zone":"PANHANDLE","poi":"Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)","entity":"IP Blackwell II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-30","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":140,"loc":{"pt":[-101.35964,35.25496],"method":"ERCOT bus number -> substation","subs":["Alibates Substation"],"codes":["ALIBATES"],"osm":"osm:way/453589128"}},{"inr":"29INR0034","name":"Cavell Solar","fuel":"solar","tech":"PV","mw":502.1,"county":"Castro","zone":"PANHANDLE","poi":"Tap 345kV 23910 Windmill - 23912 Ogallala Ckt 1","entity":"IP Cavell, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-30","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-102.17162,34.64656],"method":"tap between two located substations","subs":["Windmill Substation","Ogallala Switching Station"],"codes":["WINDMILL","OGALLALA"]}},{"inr":"29INR0035","name":"Cavell Wind","fuel":"wind","tech":"WT","mw":641.2,"county":"Castro","zone":"PANHANDLE","poi":"tap 345kV 23910 Windmill - 23912 Ogallala Ckt 1","entity":"IP Cavell, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-30","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":140,"loc":{"pt":[-102.17162,34.64656],"method":"tap between two located substations","subs":["Windmill Substation","Ogallala Switching Station"],"codes":["WINDMILL","OGALLALA"]}},{"inr":"29INR0040","name":"Gusty Windpower","fuel":"wind","tech":"WT","mw":248.9,"county":"Glasscock","zone":"WEST","poi":"Tap 345kV 59903 Bearkat - 1058 Longshore_5; Anemone 345 kV Station","entity":"Gusty Windpower, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-31","ia":"2025-12-02","cons_start":null,"first_seen":"2024-09","months_in_queue":25,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":186,"loc":{"pt":[-101.49192,31.933175],"method":"tap between two located substations","subs":["Bearkat Substation","Longshore Substation"],"codes":["W_BK_345","LNGSW"]}},{"inr":"29INR0041","name":"Homestead Power","fuel":"gas","tech":"GT","mw":260.3,"county":"Austin","zone":"SOUTH","poi":"138 kV New Bremen #7271","entity":"Homestead Power LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-15","ia":null,"cons_start":null,"first_seen":"2024-07","months_in_queue":27,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":85,"loc":{"pt":[-96.39903,29.91982],"method":"ERCOT bus number -> substation","subs":["New Bremen Substation"],"codes":["NEWBRE"],"osm":"osm:way/101678153"}},{"inr":"29INR0042","name":"Slager Lake Wind","fuel":"wind","tech":"WT","mw":310.2,"county":"Reagan","zone":"WEST","poi":"Tap 345kV 59903 Bearkat – 76000 NORTMC5_1Y; Badger 345 kV Station","entity":"NextEra Energy Resources Interconnection Holdings, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-07-01","ia":"2025-12-23","cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":231,"loc":{"pt":[-101.5315,31.76605],"method":"ERCOT bus number -> substation","subs":["Bearkat Substation"],"codes":["W_BK_345"],"osm":"osm:way/453310293"}},{"inr":"29INR0050","name":"Amphion Solar Phase 1","fuel":"solar","tech":"PV","mw":180.6,"county":"Atascosa","zone":"SOUTH","poi":"TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt FOWRTN_SMIGL2","entity":"Amphion Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-01","ia":null,"cons_start":null,"first_seen":"2024-10","months_in_queue":24,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["FOWLRTON","SANMIGL"]}},{"inr":"29INR0056","name":"Palomino Solar","fuel":"solar","tech":"PV","mw":301.2,"county":"Hopkins","zone":"NORTH","poi":"Tap 345kV 1695 Monticello - 1697 Sulphur Springs","entity":"Palomino Renewables","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-95.6174,33.08572],"method":"one end of the tapped line, matched by name in the POI","subs":["Sulphur Springs Switching Station"],"codes":["MNSES","SSPSW"]}},{"inr":"29INR0057","name":"Palomino Storage","fuel":"battery","tech":"BA","mw":155.1,"county":"Hopkins","zone":"NORTH","poi":"Tap 345kV 1695 Monticello - 1697 Sulphur Springs","entity":"Palomino Renewables","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-95.6174,33.08572],"method":"one end of the tapped line, matched by name in the POI","subs":["Sulphur Springs Switching Station"],"codes":["MNSES","SSPSW"]}},{"inr":"29INR0058","name":"Brahman Renewables Solar","fuel":"solar","tech":"PV","mw":100.6,"county":"Milam","zone":"SOUTH","poi":"Tap Voss Lake switch #3751 – Badger Switch #3761 345 kV","entity":"Brahman Renewables","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["BGRSW"]}},{"inr":"29INR0059","name":"Brahman Renewables Storage","fuel":"battery","tech":"BA","mw":206.88,"county":"Milam","zone":"SOUTH","poi":"Tap Voss Lake switch #3751 – Badger Switch #3761 345 kV","entity":"Brahman Renewables","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["BGRSW"]}},{"inr":"29INR0063","name":"Columbine Wind","fuel":"wind","tech":"WT","mw":295,"county":"Gonzales","zone":"SOUTH","poi":"TAP 345KV BUS #5380 SHAULA- BUS #5133 ELM CREEK","entity":"Wilson Wind LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-01","ia":null,"cons_start":null,"first_seen":"2025-02","months_in_queue":20,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":65,"loc":{"pt":[-97.452375,29.522058333333334],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0065","name":"Cash Mills Storage Center","fuel":"battery","tech":"BA","mw":200.66,"county":"Mills","zone":"NORTH","poi":"Tap Line between Evant (bus#7068) and Goldthwaite (Bus# 7070)","entity":"Mills Storage Center","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.369715,31.432335000000002],"method":"tap between two substations (bus number + name)","subs":["Evant Substation","Goldthwaite Substation"],"codes":["EVANT","GOLDTH"]}},{"inr":"29INR0068","name":"Gregory Power Development SLF","fuel":"gas","tech":"CC","mw":469.9,"county":"San Patricio","zone":"COASTAL","poi":"8580 Resnick 138kV","entity":"Gregory Power Partners LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-19","ia":"2026-07-01","cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":310,"loc":{"pt":[-97.25848,27.90361],"method":"ERCOT bus number -> substation","subs":["Resnik Substation"],"codes":["RESNIK"],"osm":"osm:way/1089933617"}},{"inr":"29INR0073","name":"Oasis wind","fuel":"wind","tech":"WT","mw":350,"county":"Crockett","zone":"WEST","poi":"6562 Friend Ranch Station 138kV","entity":"NextEra Energy Interconnection Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-07-01","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":77,"loc":{"pt":[-101.8672315789474,30.74067763157894],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0077","name":"Fluvanna Max Solar SLF","fuel":"solar","tech":"PV","mw":152.7,"county":"Scurry","zone":"WEST","poi":"11305 DERMOTT 345 kV","entity":"Fluvanna Max Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-14","ia":null,"cons_start":null,"first_seen":"2024-12","months_in_queue":22,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-101.0088,32.86022],"method":"ERCOT bus number -> substation","subs":["Dermott Substation"],"codes":["DMTSW"],"osm":"osm:way/453589361"}},{"inr":"29INR0082","name":"Peach Creek Solar","fuel":"solar","tech":"PV","mw":300,"county":"Wharton","zone":"SOUTH","poi":"44040 Bailey 345 kV","entity":"AEUG Peach Creek Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-95.99215,29.18538],"method":"substation matched by name in the POI","subs":["Bailey Substation"],"codes":["BLY"]}},{"inr":"29INR0084","name":"Jolly Rock Storage Center","fuel":"battery","tech":"BA","mw":208.57,"county":"Young","zone":"WEST","poi":"Tap 138kV 1431 GRAHAM Plant Switch - 11525 Short Grass Circuit 1.","entity":"Jolly Rock Storage Center LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-16","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.74132,33.22008],"method":"county centroid (substation not located)","subs":[],"codes":["GRSES","SGRAS"]}},{"inr":"29INR0085","name":"Firefly Fields Solar","fuel":"solar","tech":"PV","mw":100.52,"county":"Colorado","zone":"SOUTH","poi":"Tap 138 kV <57640> <Rock Island> - <7258> <Glidden>","entity":"Firefly Fields Energy Center LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.55489,29.623485],"method":"tap between two located substations","subs":["Rock Island Substation","Glidden Substation"],"codes":["ROCKIS","GLIDDE"]}},{"inr":"29INR0103","name":"Meitner 2 Wind","fuel":"wind","tech":"WT","mw":709.1,"county":"Gray","zone":"PANHANDLE","poi":"79000 Gray Substation 345kV","entity":"IP Meitner, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-06-30","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":155,"loc":{"pt":[-100.86746,35.44454],"method":"county centroid (substation not located)","subs":[],"codes":["CTT_GRAY"]}},{"inr":"29INR0105","name":"Falls County Storage","fuel":"battery","tech":"BA","mw":60,"county":"Falls","zone":"NORTH","poi":"3711 BALSW 345kV","entity":"Aurora Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-96.9549142857143,31.214914285714283],"method":"county centroid (substation not located)","subs":[],"codes":["BALSW"]}},{"inr":"29INR0106","name":"Kalina Storage","fuel":"battery","tech":"BA","mw":104.56,"county":"San Patricio","zone":"COASTAL","poi":"8606 GODDARD 345kV","entity":"Aurora Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":["GODDARD"]}},{"inr":"29INR0107","name":"7L Solar SLF","fuel":"solar","tech":"PV","mw":71.6,"county":"Dimmit","zone":"SOUTH","poi":"Tap 69kV 5870 Brundage - 5868 Big Wells","entity":"7L Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-11-13","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-99.56925,28.54428],"method":"ERCOT bus number -> substation","subs":["Big Wells Substation"],"codes":["BIGWELS"],"osm":"osm:way/452115695"}},{"inr":"29INR0108","name":"7L Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Dimmit","zone":"SOUTH","poi":"Tap 69kV 5870 Brundage - 5868 Big Wells","entity":"7L Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-11-13","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-99.56925,28.54428],"method":"ERCOT bus number -> substation","subs":["Big Wells Substation"],"codes":["BIGWELS"],"osm":"osm:way/452115695"}},{"inr":"29INR0115","name":"Cielo Vista Storage","fuel":"battery","tech":"BA","mw":310.8,"county":"Duval","zone":"SOUTH","poi":"Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1","entity":"Cielo Vista Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-30","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["SANMIGL","CRUCE"]}},{"inr":"29INR0119","name":"Simsboro Storage","fuel":"battery","tech":"BA","mw":301.6,"county":"Freestone","zone":"NORTH","poi":"Tap Outlaw (3386) – Limestone (46020)","entity":"Simsboro Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-95.98603142857144,31.80864857142857],"method":"county centroid (substation not located)","subs":[],"codes":["OUTSW","LEG"]}},{"inr":"29INR0120","name":"MilamStation Power Secured Gas Generation","fuel":"gas","tech":"CC","mw":846,"county":"Milam","zone":"SOUTH","poi":"Little Pond Switch (Bus #3377) – Hog Creek Switch (Bus #3704) 345 kV Line","entity":"LCC-TX8, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-25","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":275,"loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["LTPSW","HOGSW"]}},{"inr":"29INR0123","name":"Firefly Fields Storage","fuel":"battery","tech":"BA","mw":156.52,"county":"Colorado","zone":"SOUTH","poi":"Tap 138 kV 57640 Rock Island to 7258 Glidden","entity":"Firefly Fields Energy Center LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-09-30","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.55489,29.623485],"method":"tap between two located substations","subs":["Rock Island Substation","Glidden Substation"],"codes":["ROCKIS","GLIDDE"]}},{"inr":"29INR0124","name":"Apricot Sun Solar","fuel":"solar","tech":"PV","mw":200.84,"county":"Duval","zone":"SOUTH","poi":"Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1","entity":"Apricot Sun Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["CRUCE","SANMIGL"]}},{"inr":"29INR0125","name":"Apricot Sun Storage","fuel":"battery","tech":"BA","mw":200.84,"county":"Duval","zone":"SOUTH","poi":"Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1","entity":"Apricot Sun Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-30","ia":null,"cons_start":null,"first_seen":"2025-03","months_in_queue":19,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["CRUCE","SANMIGL"]}},{"inr":"29INR0131","name":"Caesar Solar","fuel":"solar","tech":"PV","mw":181.6,"county":"Borden","zone":"WEST","poi":"59916 Buck Canyon 345 kV","entity":"Caesar Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-11-26","ia":"2026-09-15","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":87,"loc":{"pt":[-101.48386,32.787299999999995],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0132","name":"Caesar Storage","fuel":"battery","tech":"BA","mw":205.5,"county":"Borden","zone":"WEST","poi":"59916 Buck Canyon 345 kV","entity":"Caesar Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-11-26","ia":"2026-09-15","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":156,"loc":{"pt":[-101.48386,32.787299999999995],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0139","name":"Trail Ranch Solar 1","fuel":"solar","tech":"PV","mw":301.9,"county":"Concho","zone":"WEST","poi":"Tap 345KV  #6444 Red Creek  - #7077 AMOS Creek","entity":"Aurora Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-99.715092,31.492472000000003],"method":"county centroid (substation not located)","subs":[],"codes":["REDCREEK","AMOSCR"]}},{"inr":"29INR0145","name":"Elysium Energy Center BESS","fuel":"battery","tech":"BA","mw":100,"county":"Fort Bend","zone":"HOUSTON","poi":"44030 Arcola 138 kV","entity":"Adapture Solar Development","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-01-17","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.46653,29.48906],"method":"ERCOT bus number -> substation","subs":["Arcola Substation"],"codes":["AR"],"osm":"osm:way/582800668"}},{"inr":"29INR0146","name":"Estrella Dorada Wind","fuel":"wind","tech":"WT","mw":306,"county":"Duval","zone":"SOUTH","poi":"Tap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2","entity":"Estrella Dorada Wind Farm, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-13","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":67,"loc":{"pt":[-98.57326153846155,27.499500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["CRUCE","SANMIGL"]}},{"inr":"29INR0147","name":"Selenite Springs Solar","fuel":"solar","tech":"PV","mw":253,"county":"Pecos","zone":"WEST","poi":"Tap 138kV 38355 Leon Creek Switching Station - 38308 Woodhouse Switching Station","entity":"Selenite Springs Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-30","ia":"2025-12-24","cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":121,"loc":{"pt":[-103.0571,30.9925],"method":"EIA plant record: same name and fuel in the same county (EIA plant 70047, \"Selenite Springs Solar\", planned)","subs":[],"codes":["LEONCRK","WOODHOUS"],"eia_plant":70047}},{"inr":"29INR0148","name":"Big Field Solar","fuel":"solar","tech":"PV","mw":506.17,"county":"Foard","zone":"WEST","poi":"Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B","entity":"Big Field Solar Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-99.77406,33.94427],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Edith Clarke Substation"],"codes":["RILEY","EDITHCLA"]}},{"inr":"29INR0150","name":"Jewett Energy Center 1 Gas","fuel":"gas","tech":"CC","mw":1274,"county":"Freestone","zone":"NORTH","poi":"Tap #3391 JEWETT_N5 - #46020 LMEST_POI_5 and Tap #3390 JEWETT_S5 - #46020 LMEST_POI_5","entity":"Jewett Energy Center LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-11-01","ia":"2026-07-15","cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":841,"loc":{"pt":[-96.13342,31.37105],"method":"ERCOT bus number -> substation","subs":["Jewett Substation"],"codes":["JEWET"],"osm":"osm:way/99932982"}},{"inr":"29INR0152","name":"Ranger BESS","fuel":"battery","tech":"BA","mw":155.2,"county":"Medina","zone":"SOUTH","poi":"SSWG Bus name: CSTROVILESB8 , Bus# : 5804\nPlanning Bus long name: CSTROVILESB8, 138 kV","entity":"Nova Clean Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-29","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.06987,29.453249999999997],"method":"county centroid (substation not located)","subs":[],"codes":["CASTROS"]}},{"inr":"29INR0154","name":"Las Mujeres Solar","fuel":"solar","tech":"PV","mw":684.33,"county":"Jim Hogg","zone":"SOUTH","poi":"Cruces 7A (Bus #80079)","entity":"Las Mujeres Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":38,"loc":{"pt":[-98.60369130434783,27.220513043478263],"method":"county centroid (substation not located)","subs":[],"codes":["CRUCE"]}},{"inr":"29INR0158","name":"NRG Prairie Energy Center","fuel":"gas","tech":"CC","mw":1253,"county":"Hill","zone":"NORTH","poi":"Tap #1907 Venus Switch – #3389 Fort Smith Switch 345 kV","entity":"NRG Prairie Energy Center LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-31","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":407,"loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"29INR0160","name":"Cazadores Solar","fuel":"solar","tech":"PV","mw":301.62,"county":"Duval","zone":"SOUTH","poi":"Tap 345 kV (80079) CRUCE7A – (5901) MIGUEL5 CKT 2","entity":"OCI Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-10","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-98.50107,27.39225],"method":"EIA plant record: same name and fuel in the same county (EIA plant 69640, \"Cazadores Solar\", planned)","subs":[],"codes":["CRUCE","SANMIGL"],"eia_plant":69640}},{"inr":"29INR0166","name":"LOST PINES GAS RECIP","fuel":"gas","tech":"IC","mw":113.02,"county":"Bastrop","zone":"SOUTH","poi":"(#170174) LOST PINES 345 kV","entity":"LCRA","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2033-06-01","ia":"2025-12-26","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":75,"loc":{"pt":[-97.27279,30.14775],"method":"ERCOT bus number -> substation","subs":["Lost Pines Station"],"codes":["LOSTPI"],"osm":"osm:way/173224882"}},{"inr":"29INR0167","name":"Big Watt Power Austin-1","fuel":"gas","tech":"CC","mw":448.98,"county":"Caldwell","zone":"SOUTH","poi":"Tapping the 345 kV Double circuit Line: Zorn (Bus# 7042) - Lytton Springs (Bus# 9074) and Zorn (Bus# 7042) -  Austrop (Bus# 7040).","entity":"Big Watt Power Austin-1 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-11-15","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":146,"loc":{"pt":[-97.81203,29.88901],"method":"tap between two located substations","subs":["Zorn Substation","Lytton Springs Substation"],"codes":["ZORN","LYTTON_S"]}},{"inr":"29INR0169","name":"Falcon BESS","fuel":"battery","tech":"BA","mw":516.72,"county":"Zapata","zone":"SOUTH","poi":"Tap 345kV #80225 CENIZO to #80307 DEL SOL","entity":"Falcon Energy Project, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"29INR0170","name":"Three Ranches BESS","fuel":"battery","tech":"BA","mw":103.37,"county":"Brewster","zone":"WEST","poi":"TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch","entity":"Three Ranches Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-103.02451465517245,29.359006896551712],"method":"county centroid (substation not located)","subs":[],"codes":["ALMC","HAYTER"]}},{"inr":"29INR0171","name":"Sweetheart Solar","fuel":"solar","tech":"PV","mw":301.14,"county":"Young","zone":"WEST","poi":"Tap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH","entity":"Sweetheart Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-98.74132,33.22008],"method":"county centroid (substation not located)","subs":[],"codes":["GRSES","GRVSW"]}},{"inr":"29INR0172","name":"Sweetheart BESS","fuel":"battery","tech":"BA","mw":310.16,"county":"Young","zone":"WEST","poi":"Tap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH","entity":"Sweetheart Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-98.74132,33.22008],"method":"county centroid (substation not located)","subs":[],"codes":["GRSES","GRVSW"]}},{"inr":"29INR0173","name":"Howard Road BESS","fuel":"battery","tech":"BA","mw":617.63,"county":"Bexar","zone":"SOUTH","poi":"5231 HOWARD RD 345 kV","entity":"Project Fast Flow LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-04-01","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":44,"loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["HOWARD"]}},{"inr":"29INR0174","name":"Palisade BESS","fuel":"battery","tech":"BA","mw":153.5,"county":"Brazoria","zone":"COASTAL","poi":"Hoffman (42810) - Lake Jackson (42880) 138 kV line","entity":"Flexen USA LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-01","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-95.42398,29.05293],"method":"ERCOT bus number -> substation","subs":["Lake Jackson Substation"],"codes":["LJ"],"osm":"osm:way/336976541"}},{"inr":"29INR0175","name":"Black Mountain Hale Gas","fuel":"gas","tech":"CC","mw":990.6,"county":"Hale","zone":"PANHANDLE","poi":"345 kV Blackwater Draw Switch (#23920)","entity":"Fort Worth Power Core LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-16","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-101.879,34.11878],"method":"county centroid (substation not located)","subs":[],"codes":["BWDSW"]}},{"inr":"29INR0176","name":"SCHNEIDER GAS RICE","fuel":"gas","tech":"IC","mw":113.02,"county":"Caldwell","zone":"SOUTH","poi":"Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton Springs","entity":"LCRA","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2032-12-14","ia":"2025-12-19","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":75,"loc":{"pt":[-97.71852,30.011975],"method":"tap between two located substations","subs":["Zorn Substation","Austrop Substation"],"codes":["ZORN","AUSTRO"]}},{"inr":"29INR0177","name":"Rattlesnake Gap Wind SLF","fuel":"wind","tech":"WT","mw":200,"county":"Howard","zone":"WEST","poi":"10119 Tributary Switch 138 kV","entity":"ET Fuels US Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":44,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0178","name":"Rattlesnake Gap Solar SLF","fuel":"solar","tech":"PV","mw":0,"county":"Howard","zone":"WEST","poi":"10119 Tributary Switch 138 kV","entity":"ET Fuels US Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0179","name":"Rattlesnake Gap Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Howard","zone":"WEST","poi":"10119 Tributary Switch 138 kV","entity":"ET Fuels US Inc.","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-01","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0181","name":"Pecos Flats Solar","fuel":"solar","tech":"PV","mw":302.38,"county":"Pecos","zone":"WEST","poi":"60404 SOLSTICE 345 kV","entity":"Glass Mountain Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-20","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"29INR0182","name":"Pecos Flats Solar II","fuel":"solar","tech":"PV","mw":301.5,"county":"Pecos","zone":"WEST","poi":"Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5","entity":"Glass Mountain Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-05","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-103.36171,30.94832],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Solstice Substation"],"codes":["SOLSTICE","SLKSW"]}},{"inr":"29INR0183","name":"Pecos Flats Solar III","fuel":"solar","tech":"PV","mw":301.5,"county":"Pecos","zone":"WEST","poi":"Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5","entity":"Glass Mountain Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-05","ia":null,"cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-103.36171,30.94832],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Solstice Substation"],"codes":["SOLSTICE","SLKSW"]}},{"inr":"29INR0184","name":"Gridline Solar","fuel":"solar","tech":"PV","mw":400,"county":"Crockett","zone":"WEST","poi":"76005 Schneeman Draw LCRA","entity":"Big Lake Ranch LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-101.8672315789474,30.74067763157894],"method":"county centroid (substation not located)","subs":[],"codes":["SCHNDR"]}},{"inr":"29INR0185","name":"Roan Solar Phase 1","fuel":"solar","tech":"PV","mw":205.9,"county":"Sterling","zone":"WEST","poi":"Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV","entity":"Roan Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-30","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.77718,31.86951],"method":"ERCOT bus number -> substation","subs":["Divide Substation"],"codes":["DIVIDE"],"osm":"osm:way/172185176"}},{"inr":"29INR0187","name":"Roan Solar Phase 2","fuel":"solar","tech":"PV","mw":205.9,"county":"Sterling","zone":"WEST","poi":"Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV","entity":"Roan Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-15","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.77718,31.86951],"method":"ERCOT bus number -> substation","subs":["Divide Substation"],"codes":["DIVIDE"],"osm":"osm:way/172185176"}},{"inr":"29INR0188","name":"Star Of Texas Solar","fuel":"solar","tech":"PV","mw":415,"county":"Pecos","zone":"WEST","poi":"60152 Fort Stockton Switch 345kV","entity":"BOULEVARD ASSOCIATES, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2025-08","months_in_queue":14,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":23,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0189","name":"Project Alpha Solar","fuel":"solar","tech":"PV","mw":121.95,"county":"Hopkins","zone":"NORTH","poi":"138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPRINGS","entity":"SGE Alpha Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-24","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.5872457142857,33.27730285714285],"method":"county centroid (substation not located)","subs":[],"codes":["SSPNG"]}},{"inr":"29INR0191","name":"Black Mountain Fannin Gas","fuel":"gas","tech":"CC","mw":990.59,"county":"Fannin","zone":"NORTH","poi":"345 KV #1729 Valley South","entity":"Black Mountain Power LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-26","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-96.37331,33.61372],"method":"substation matched by name in the POI","subs":["Valley South Substation"],"codes":["VLYSO"]}},{"inr":"29INR0192","name":"Spurland Solar I","fuel":"solar","tech":"PV","mw":302.1,"county":"Dickens","zone":"PANHANDLE","poi":"59908 Nova Prime 345 345kV","entity":"Spurland Solar I","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-30","ia":"2026-08-06","cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":144,"loc":{"pt":[-100.83145999999999,33.6596],"method":"county centroid (substation not located)","subs":[],"codes":["NVAP_345"]}},{"inr":"29INR0194","name":"Glass Mountain Wind 1","fuel":"wind","tech":"WT","mw":511.5,"county":"Reeves","zone":"WEST","poi":"Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5","entity":"Glass Mountain Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-31","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":112,"loc":{"pt":[-103.41311,31.22941],"method":"tap between two located substations","subs":["Solstice Substation","Sand Lake Switching Station"],"codes":["SOLSTICE","SLKSW"]}},{"inr":"29INR0195","name":"Spurland Solar II","fuel":"solar","tech":"PV","mw":201.6,"county":"Dickens","zone":"PANHANDLE","poi":"59908 Nova Prime 345 345kV","entity":"Spurland Solar II","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-12-30","ia":"2026-08-06","cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":96,"loc":{"pt":[-100.83145999999999,33.6596],"method":"county centroid (substation not located)","subs":[],"codes":["NVAP_345"]}},{"inr":"29INR0196","name":"Two Step Solar","fuel":"solar","tech":"PV","mw":401.62,"county":"Ellis","zone":"NORTH","poi":"Tap 345kV 1907 Venus - 68091 Navarro","entity":"Two Step Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-17","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-96.79536,32.204],"method":"tap between two located substations","subs":["Venus Substation","Navarro Switching Station"],"codes":["VENSW","NAVARRO"]}},{"inr":"29INR0197","name":"Zora Solar","fuel":"solar","tech":"PV","mw":250.8,"county":"Wharton","zone":"SOUTH","poi":"46650 Athena 138 kV","entity":"Zora Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-15","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["ATH"]}},{"inr":"29INR0198","name":"Velveteen Solar I","fuel":"solar","tech":"PV","mw":502.2,"county":"Baylor","zone":"WEST","poi":"Tap into 6076 FOXTAIL- 6100 OKLAUNION","entity":"Velveteen Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-15","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-99.42079,33.64631],"method":"ERCOT bus number -> substation","subs":["Foxtail Switching Station"],"codes":["FOXTAIL"],"osm":"osm:way/519131266"}},{"inr":"29INR0199","name":"Kilby1 Part 6 Large Block Combined Cycle","fuel":"gas","tech":"GT","mw":1056,"county":"Reeves","zone":"WEST","poi":"#60404 Solstice Substation 345 kV","entity":"Energy Forge One LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-19","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":343,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"29INR0203","name":"Miller Bend Energy Solar","fuel":"solar","tech":"PV","mw":531.84,"county":"Young","zone":"WEST","poi":"Tap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road","entity":"Miller Bend Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-98.74132,33.22008],"method":"county centroid (substation not located)","subs":[],"codes":["GRSES","DRDSW"]}},{"inr":"29INR0204","name":"Miller Bend Energy BESS","fuel":"battery","tech":"BA","mw":547.65,"county":"Young","zone":"WEST","poi":"Tap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road","entity":"Miller Bend Energy , LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":39,"loc":{"pt":[-98.74132,33.22008],"method":"county centroid (substation not located)","subs":[],"codes":["GRSES","DRDSW"]}},{"inr":"29INR0206","name":"Riviera Gas","fuel":"gas","tech":"CC","mw":636.9,"county":"Bell","zone":"NORTH","poi":"Tap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT Line","entity":"BKV-BPP Power","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-14","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":207,"loc":{"pt":[-97.3078,31.07902],"method":"one end of the tapped line, matched by name in the POI","subs":["Temple Switching Station"],"codes":["TMPSW"]}},{"inr":"29INR0207","name":"Alila BESS II","fuel":"battery","tech":"BA","mw":205.71,"county":"San Patricio","zone":"COASTAL","poi":"8249 Angstrom 345kV","entity":"Electra Energy Project, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-01-25","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-97.43837,28.04431],"method":"ERCOT bus number -> substation","subs":["Angstrom Substation"],"codes":["ANGSTROM"],"osm":"osm:way/1089997597"}},{"inr":"29INR0210","name":"Sawtooth Solar","fuel":"solar","tech":"PV","mw":201.36,"county":"Runnels","zone":"WEST","poi":"Tap to the 345kV Odysseus (Bus#60072) to Bluff Creek (Bus #60040) line","entity":"Sawtooth Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-08-01","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.02768,31.78114],"method":"county centroid (substation not located)","subs":[],"codes":["ODYSSEUS","BLUF_CRK"]}},{"inr":"29INR0211","name":"Enfinity Juniper Storage","fuel":"battery","tech":"BA","mw":261.08,"county":"Guadalupe","zone":"SOUTH","poi":"Hickory Forest (7225)","entity":"EG Juniper LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-18","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":19,"loc":{"pt":[-97.86417,29.46838],"method":"substation matched by name in the POI","subs":["Hickory Forest Substation"],"codes":["HICKFO"]}},{"inr":"29INR0212","name":"Rosenix Solar","fuel":"solar","tech":"PV","mw":501.64,"county":"Mitchell","zone":"WEST","poi":"Cattleman (#10053)  – Gasconades (#76030)","entity":"Rosenix Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-20","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["GASCCR"]}},{"inr":"29INR0213","name":"Rosenix Storage","fuel":"battery","tech":"BA","mw":258.26,"county":"Mitchell","zone":"WEST","poi":"Cattleman (#10053)  – Gasconades (#76030)","entity":"Rosenix Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-20","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-100.97372,32.26256],"method":"county centroid (substation not located)","subs":[],"codes":["GASCCR"]}},{"inr":"29INR0214","name":"Amphion Storage","fuel":"battery","tech":"BA","mw":209.5,"county":"Atascosa","zone":"SOUTH","poi":"TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2","entity":"Amphion Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["FOWLRTON","SANMIGL"]}},{"inr":"29INR0217","name":"Kickstart Energy Storage V","fuel":"battery","tech":"BA","mw":999,"county":"Ellis","zone":"NORTH","poi":"345 KV Venus 1906 to Fort Smith 3389","entity":"Kickstart Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":71,"loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"29INR0218","name":"Kickstart Energy Storage VI","fuel":"battery","tech":"BA","mw":1026.2,"county":"Ellis","zone":"NORTH","poi":"345 KV Venus 1907 to Navarro 68091","entity":"Kickstart Infrastructure LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":73,"loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"29INR0219","name":"Cenizo Solar","fuel":"solar","tech":"PV","mw":301.39,"county":"Webb","zone":"SOUTH","poi":"Tap 345 kV 80220 Cenizo - 80079 Cruce Ckt 2","entity":"Cenizo Energy Center LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2029-12-31","ia":"2026-09-28","cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":144,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"29INR0220","name":"Paintbrush PV3","fuel":"solar","tech":"PV","mw":251.5,"county":"Coleman","zone":"WEST","poi":"Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch","entity":"Renew Development HoldCo LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-10-15","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.15481,32.11719],"method":"one end of the tapped line, matched by name in the POI","subs":["Central Bluff Substation"],"codes":["BWNSW","BLUF_CRK","CBFSW"]}},{"inr":"29INR0221","name":"Paintbrush PV4","fuel":"solar","tech":"PV","mw":251.5,"county":"Coleman","zone":"WEST","poi":"Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch","entity":"Renew Development HoldCo LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-10-15","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.15481,32.11719],"method":"one end of the tapped line, matched by name in the POI","subs":["Central Bluff Substation"],"codes":["BWNSW","BLUF_CRK","CBFSW"]}},{"inr":"29INR0222","name":"Paintbrush BESS1","fuel":"battery","tech":"BA","mw":201.31,"county":"Coleman","zone":"WEST","poi":"Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch","entity":"Renew Development HoldCo LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-10-15","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.15481,32.11719],"method":"one end of the tapped line, matched by name in the POI","subs":["Central Bluff Substation"],"codes":["BWNSW","BLUF_CRK","CBFSW"]}},{"inr":"29INR0223","name":"Mandolin Solar II SLF","fuel":"solar","tech":"PV","mw":304.4,"county":"Starr","zone":"SOUTH","poi":"Tap 345kV 80355 Del Sol - 80227 Rapido","entity":"Mandolin Energy Center I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-15","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["DELSOL"]}},{"inr":"29INR0224","name":"Mandolin Solar III SLF","fuel":"solar","tech":"PV","mw":250,"county":"Starr","zone":"SOUTH","poi":"Tap 345kV 80355 Del Sol - 80227 Rapido","entity":"Mandolin Energy Center I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-15","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["DELSOL"]}},{"inr":"29INR0225","name":"Velveteen Solar II","fuel":"solar","tech":"PV","mw":300.9,"county":"Baylor","zone":"WEST","poi":"Tap into 6076 FOXTAIL- 6100 OKLAUNION","entity":"Velveteen Solar II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-15","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-99.42079,33.64631],"method":"ERCOT bus number -> substation","subs":["Foxtail Switching Station"],"codes":["FOXTAIL"],"osm":"osm:way/519131266"}},{"inr":"29INR0226","name":"Velveteen Solar III","fuel":"solar","tech":"PV","mw":200.7,"county":"Baylor","zone":"WEST","poi":"Tap into 6076 FOXTAIL- 6100 OKLAUNION","entity":"Velveteen Solar III, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-15","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.42079,33.64631],"method":"ERCOT bus number -> substation","subs":["Foxtail Switching Station"],"codes":["FOXTAIL"],"osm":"osm:way/519131266"}},{"inr":"29INR0227","name":"San Patricio Energy Center BESS","fuel":"battery","tech":"BA","mw":300.84,"county":"San Patricio","zone":"COASTAL","poi":"8606 Goddard 345kV","entity":"Ferrovial Energy US 1","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":["GODDARD"]}},{"inr":"29INR0229","name":"Brazos Energy Center 1","fuel":"battery","tech":"BA","mw":300.6,"county":"McLennan","zone":"NORTH","poi":"Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>","entity":"Brazos EC 1","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-18","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-97.3018,31.5209],"method":"county centroid (substation not located)","subs":[],"codes":["LHLSW"]}},{"inr":"29INR0230","name":"Brazos Energy Center 2","fuel":"battery","tech":"BA","mw":300.6,"county":"McLennan","zone":"NORTH","poi":"Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>","entity":"Brazos EC 2","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-18","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":21,"loc":{"pt":[-97.3018,31.5209],"method":"county centroid (substation not located)","subs":[],"codes":["LHLSW"]}},{"inr":"29INR0231","name":"Tango Lily Solar","fuel":"solar","tech":"PV","mw":200.95,"county":"Tom Green","zone":"WEST","poi":"Tap 138kV 60008 TRIBUTE4A - 6442 REDCREEK4A","entity":"Lightsource Renewable Energy Development LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-21","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.70273333333331,31.513308333333338],"method":"county centroid (substation not located)","subs":[],"codes":["TRIBUTE","REDCREEK"]}},{"inr":"29INR0232","name":"Soluce Cotton2 Solar","fuel":"solar","tech":"PV","mw":201.43,"county":"Cottle","zone":"WEST","poi":"Tap 345kV 59904 COTTONWOOD - 60500 EDITH CLARKE","entity":"CTPB2, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-09-29","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.325355,33.86128],"method":"tap between two located substations","subs":["Cottonwood Substation","Edith Clarke Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"29INR0233","name":"Soluce Cotton2 Storage","fuel":"battery","tech":"BA","mw":121.33,"county":"Cottle","zone":"WEST","poi":"Tap 345kV 59904 COTTONWOOD - 60500 EDITH CLARKE","entity":"CTPB2, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-09-29","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-100.325355,33.86128],"method":"tap between two located substations","subs":["Cottonwood Substation","Edith Clarke Substation"],"codes":["W_CW_345","EDITHCLA"]}},{"inr":"29INR0234","name":"Project Charlie PV SLF","fuel":"solar","tech":"PV","mw":313.8,"county":"Knox","zone":"WEST","poi":"new substation in 60791 Perigee - 6076 Foxtail 345kV line","entity":"SGE Project Charlie LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-99.42079,33.64631],"method":"ERCOT bus number -> substation","subs":["Foxtail Switching Station"],"codes":["FOXTAIL"],"osm":"osm:way/519131266"}},{"inr":"29INR0235","name":"Project Charlie BESS SLF","fuel":"battery","tech":"BA","mw":64.9,"county":"Knox","zone":"WEST","poi":"tap 345kV 60791 Perigee - 6076 Foxtail","entity":"SGE Project Charlie LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-99.42079,33.64631],"method":"ERCOT bus number -> substation","subs":["Foxtail Switching Station"],"codes":["FOXTAIL"],"osm":"osm:way/519131266"}},{"inr":"29INR0238","name":"Project FluxNet Solar SLF","fuel":"solar","tech":"PV","mw":273.8,"county":"Jones","zone":"WEST","poi":"tap 345kV 60514 Clear Crossing - 11419 Coody Cross","entity":"SGE Project Foxtrot LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"29INR0239","name":"Project FluxNet Battery SLF","fuel":"battery","tech":"BA","mw":60.9,"county":"Jones","zone":"WEST","poi":"tap 345kV 60514 Clear Crossing - 11419 Coody Cross","entity":"SGE Project Foxtrot LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"29INR0240","name":"Project Golf Solar SLF","fuel":"solar","tech":"PV","mw":273.4,"county":"Haskell","zone":"WEST","poi":"tap 345kV 60514 Clear Crossing - 11419 Coody Cross","entity":"SGE Project Golf LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"29INR0241","name":"Project Golf Battery SLF","fuel":"battery","tech":"BA","mw":61.9,"county":"Jones","zone":"WEST","poi":"tap 345kV 60514 Clear Crossing - 11419 Cody Cross","entity":"SGE Project Golf LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"29INR0242","name":"Enfinity Redbud Storage","fuel":"battery","tech":"BA","mw":516.05,"county":"Comal","zone":"SOUTH","poi":"345kV Hays Energy (7043) - 345kV Bergheim (7770)","entity":"EG Redbud LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-18","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":37,"loc":{"pt":[-97.99009,29.78303],"method":"ERCOT bus number -> substation","subs":["Hays Energy Station"],"codes":["HAYSEN"],"osm":"osm:way/124968451"}},{"inr":"29INR0243","name":"Oak Belt Solar","fuel":"solar","tech":"PV","mw":181,"county":"Victoria","zone":"SOUTH","poi":"Tap 138 kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBLTSW8","entity":"Oak Belt Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-31","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":10,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["FURHMAN","VANBLTSS"]}},{"inr":"29INR0244","name":"Oak Belt Storage","fuel":"battery","tech":"BA","mw":209.7,"county":"Victoria","zone":"SOUTH","poi":"Tap 138 kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBLTSW8","entity":"Oak Belt Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-31","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["FURHMAN","VANBLTSS"]}},{"inr":"29INR0245","name":"Texas Deepwater BESS","fuel":"battery","tech":"BA","mw":313.29,"county":"Harris","zone":"HOUSTON","poi":"#40881 Parkes Substation 138 kV","entity":"TDWP Partners LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-05","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["PRK"]}},{"inr":"29INR0248","name":"Blue Energy Center - Phase 1b – Steam","fuel":"gas","tech":"CC","mw":330,"county":"Victoria","zone":"SOUTH","poi":"Tap 345kV 80286 DULCE7A - 8676 STATIC7A","entity":"Brother 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-10-17","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":107,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["STATIC"]}},{"inr":"29INR0249","name":"Lightcycle Energy Storage","fuel":"battery","tech":"BA","mw":409.69,"county":"Fayette","zone":"SOUTH","poi":"9073 HOLMAN 345 kV","entity":"Lightcycle Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-01","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-96.87838,29.79555],"method":"ERCOT bus number -> substation","subs":["Holman Substation"],"codes":["HOLMAN"],"osm":"osm:way/93770408"}},{"inr":"29INR0250","name":"Slash Pine Storage","fuel":"battery","tech":"BA","mw":200,"county":"Kaufman","zone":"NORTH","poi":"1698 Sulphur Springs Switch and 3174 Canton Switch 138 kV","entity":"EG Slash Pine LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-17","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["SSPSW","CNTSW"]}},{"inr":"29INR0251","name":"Sugarberry Solar SLF","fuel":"solar","tech":"PV","mw":125,"county":"Kinney","zone":"SOUTH","poi":"78255 Pinto Creek 138 kV","entity":"EG Sugarberry LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-18","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-100.56177,29.3505],"method":"substation matched by name in the POI","subs":["Pinto Creek Substation"],"codes":["PINTCR"]}},{"inr":"29INR0252","name":"Sugarberry Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Kinney","zone":"SOUTH","poi":"78255 Pinto Creek 138 kV","entity":"EG Sugarberry LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-18","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-100.56177,29.3505],"method":"substation matched by name in the POI","subs":["Pinto Creek Substation"],"codes":["PINTCR"]}},{"inr":"29INR0255","name":"Los Toros Energy Center Solar SLF","fuel":"solar","tech":"PV","mw":401.56,"county":"Dawson","zone":"WEST","poi":"Tap 1167 Mustang_8 to 11206 Dillion_P8 138 kV","entity":"Los Toros Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-31","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-102.37045,32.45299],"method":"one end of the tapped line, matched by name in the POI","subs":["Mustang Substation"],"codes":["MSTNG","DLPOD"]}},{"inr":"29INR0263","name":"Whitethorn Solar Project","fuel":"solar","tech":"PV","mw":163.1,"county":"Pecos","zone":"WEST","poi":"345KV 860 GIRVINSW","entity":"Greasewood III LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-26","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["GIRVINSW"]}},{"inr":"29INR0264","name":"Victory Ellis  – Gas","fuel":"gas","tech":"GT","mw":465.92,"county":"Ellis","zone":"NORTH","poi":"Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT","entity":"Victory Ellis, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-28","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":151,"loc":{"pt":[-96.59171578947367,32.41387368421053],"method":"county centroid (substation not located)","subs":[],"codes":["BIGSW","STBSW","ELRSW"]}},{"inr":"29INR0267","name":"Enfinity White Oak BESS","fuel":"battery","tech":"BA","mw":200,"county":"Borden","zone":"WEST","poi":"Tap 138kV Key (1307) to 138kV Gail (1308)","entity":"EG White Oak LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-17","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-101.48386,32.787299999999995],"method":"county centroid (substation not located)","subs":[],"codes":["KEYSB","MPPOI"]}},{"inr":"29INR0271","name":"Los Toros Energy Center Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Dawson","zone":"WEST","poi":"Tap 1167 Mustang_8 to 11206 Dillion_P8 138 kV","entity":"Los Toros Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-31","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-102.37045,32.45299],"method":"one end of the tapped line, matched by name in the POI","subs":["Mustang Substation"],"codes":["MSTNG","DLPOD"]}},{"inr":"29INR0272","name":"Trail Ranch Solar 2","fuel":"solar","tech":"PV","mw":132.85,"county":"Concho","zone":"WEST","poi":"Tap 345 kV 6444 Red Creek   -7077 Amos Creek","entity":"Aurora Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-99.715092,31.492472000000003],"method":"county centroid (substation not located)","subs":[],"codes":["REDCREEK","AMOSCR"]}},{"inr":"29INR0273","name":"Trail Ranch Storage","fuel":"battery","tech":"BA","mw":240,"county":"Concho","zone":"WEST","poi":"Tap 345 kV 6444 Red Creek   -7077 Amos Creek","entity":"Aurora Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-01","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-99.715092,31.492472000000003],"method":"county centroid (substation not located)","subs":[],"codes":["REDCREEK","AMOSCR"]}},{"inr":"29INR0274","name":"Richardson McClung Ranch Solar","fuel":"solar","tech":"PV","mw":251.95,"county":"Eastland","zone":"NORTH","poi":"33285 Rising Star 138 kV","entity":"Rising Star Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-11-30","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.84097142857142,32.25261428571429],"method":"county centroid (substation not located)","subs":[],"codes":["RISNGSTR"]}},{"inr":"29INR0275","name":"Richardson McClung Ranch BESS","fuel":"battery","tech":"BA","mw":205.49,"county":"Eastland","zone":"NORTH","poi":"33285 Rising Star 138 kV","entity":"Rising Star Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-11-30","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.84097142857142,32.25261428571429],"method":"county centroid (substation not located)","subs":[],"codes":["RISNGSTR"]}},{"inr":"29INR0279","name":"Tierra Loma Solar","fuel":"solar","tech":"PV","mw":250,"county":"Crane","zone":"WEST","poi":"Tap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1","entity":"Tierra Loma Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-01","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-102.57905833333332,31.29205416666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0280","name":"Tierra Loma Storage","fuel":"battery","tech":"BA","mw":200,"county":"Crane","zone":"WEST","poi":"Tap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1","entity":"Tierra Loma Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-01","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-102.57905833333332,31.29205416666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0287","name":"Valentine Energy Center","fuel":"gas","tech":"IC","mw":162.3,"county":"Pecos","zone":"WEST","poi":"60400 Lynx 138kV","entity":"Valentine Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-02-28","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":53,"loc":{"pt":[-102.39351,31.07185],"method":"ERCOT bus number -> substation","subs":["Lynx Substation"],"codes":["LYNX"],"osm":"osm:way/1006095202"}},{"inr":"29INR0291","name":"Enfinity Post Oak Solar SLF","fuel":"solar","tech":"PV","mw":500,"county":"Borden","zone":"WEST","poi":"345kV Muleshoe (59922)","entity":"EG White Oak LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-18","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":28,"loc":{"pt":[-101.48386,32.787299999999995],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0292","name":"Enfinity Post Oak Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Borden","zone":"WEST","poi":"345kV Muleshoe (59922)\nTransmission line","entity":"EG White Oak LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-18","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-101.48386,32.787299999999995],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0293","name":"Pink Storage SLF","fuel":"battery","tech":"BA","mw":0,"county":"Hunt","zone":"NORTH","poi":"971 Pruitt 138kV","entity":"Pink Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-31","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-96.04117000000001,32.98473],"method":"county centroid (substation not located)","subs":[],"codes":["PRUITT"]}},{"inr":"29INR0294","name":"Spurland Solar III","fuel":"solar","tech":"PV","mw":321.85,"county":"Kent","zone":"WEST","poi":"345 kV Nova Prime station (Bus # 59908)","entity":"Spurland Solar III, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-29","ia":null,"cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-100.96018,33.33318],"method":"substation matched by name in the POI","subs":["Nova Prime Substation"],"codes":["NVAP_345"]}},{"inr":"29INR0298","name":"BM Freestone Energy Center","fuel":"gas","tech":"CC","mw":990.6,"county":"Freestone","zone":"NORTH","poi":"Loop Big Brown E to Navarro Ckt 1(PTI#3380-68091) and Big Brown W to Tarantulla Ckt 1 (PTI#3381-3344) at  31.813367° -96.147730°","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-20","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"29INR0305","name":"Flurry Gas 1","fuel":"gas","tech":"CC","mw":109.8,"county":"Midland","zone":"WEST","poi":"Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01","entity":"NET Power Canaveral LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-16","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-102.24626,32.03738],"method":"one end of the tapped line, matched by name in the POI","subs":["Midland County Northwest Substation"],"codes":["MCNSW","MDLNE"]}},{"inr":"29INR0318","name":"Nockenut Springs Storage 1","fuel":"battery","tech":"BA","mw":209.36,"county":"Wilson","zone":"SOUTH","poi":"Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS","entity":"Pecan Springs Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-05","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0319","name":"Nockenut Springs Storage 2","fuel":"battery","tech":"BA","mw":209.38,"county":"Wilson","zone":"SOUTH","poi":"Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS","entity":"Pecan Springs Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-05","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0320","name":"Nockenut Springs Storage 3","fuel":"battery","tech":"BA","mw":209.38,"county":"Wilson","zone":"SOUTH","poi":"Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS","entity":"Pecan Springs Energy, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-06-05","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.08878,29.26277],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0324","name":"Ashtrom Marigold BESS SLF","fuel":"battery","tech":"BA","mw":153.9,"county":"Pecos","zone":"WEST","poi":"860 GIRVINSW 345kV","entity":"Marigold BESS LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-26","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["GIRVINSW"]}},{"inr":"29INR0325","name":"Sweetwater 4 Repower","fuel":"wind","tech":"WT","mw":421.2,"county":"Nolan","zone":"WEST","poi":"<71050> <L_BITTCR5_1Y> <345kV>","entity":"Sweetwater Wind 4 LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-02-01","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":92,"loc":{"pt":[-100.5303,32.3122],"method":"EIA plant record: same name and fuel in the same county (EIA plant 56337, \"Sweetwater Wind 4 LLC\", operating)","subs":[],"codes":["BITTCR"],"eia_plant":56337}},{"inr":"29INR0326","name":"Montgomery Ranch 2 Wind","fuel":"wind","tech":"WT","mw":301.5,"county":"Foard","zone":"WEST","poi":"60059 Penumbra 345-kV","entity":"RWE Clean Energy Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-02","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":66,"loc":{"pt":[-99.68445740740742,33.93709814814814],"method":"county centroid (substation not located)","subs":[],"codes":["PENUMBRA"]}},{"inr":"29INR0328","name":"Moon Chapel Solar","fuel":"solar","tech":"PV","mw":402.01,"county":"Tom Green","zone":"WEST","poi":"Tap 345kV 76090 Divide – 76009 Twin Buttes Ckt 1","entity":"Orsted Onshore Development North America, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-100.6876,31.691654999999997],"method":"tap between two located substations","subs":["Divide Substation","Twin Buttes Substation"],"codes":["DIVIDE","TWINBU"]}},{"inr":"29INR0332","name":"White Star Energy Storage","fuel":"battery","tech":"BA","mw":201.2,"county":"Karnes","zone":"SOUTH","poi":"Milton Substation 78583 L_MILTON8_1Y","entity":"White Star Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.78765,29.05645],"method":"ERCOT bus number -> substation","subs":["Milton Substation"],"codes":["MILTON"],"osm":"osm:way/425756331"}},{"inr":"29INR0333","name":"Tyler Rose Power Plant 1","fuel":"gas","tech":"GT","mw":597.36,"county":"Grimes","zone":"NORTH","poi":"Tap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek","entity":"ProEnergy Services, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-01","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":194,"loc":{"pt":[-96.08152,30.62254],"method":"one end of the tapped line, matched by name in the POI","subs":["Gibbons Creek Station"],"codes":["MSS","GIBCRK"]}},{"inr":"29INR0336","name":"Tyler Rose Power Plant 2","fuel":"gas","tech":"GT","mw":398.24,"county":"Grimes","zone":"NORTH","poi":"Tap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek","entity":"ProEnergy Services, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":129,"loc":{"pt":[-96.08152,30.62254],"method":"one end of the tapped line, matched by name in the POI","subs":["Gibbons Creek Station"],"codes":["MSS","GIBCRK"]}},{"inr":"29INR0340","name":"Bobcat Generating Station","fuel":"gas","tech":"IC","mw":450,"county":"Caldwell","zone":"SOUTH","poi":"Between (7042) ZORN & (9074) LYTTON SPRINGS Substations on ONCOR 345kV.","entity":"Critical Grid Solutions Bobcat, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-11-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":146,"loc":{"pt":[-97.94975,29.77265],"method":"ERCOT bus number -> substation","subs":["Zorn Substation"],"codes":["ZORN"],"osm":"osm:way/30891667"}},{"inr":"29INR0341","name":"Pampa Natural Gas","fuel":"gas","tech":"IC","mw":250.7,"county":"Roberts","zone":"PANHANDLE","poi":"CTT Ghost Town (#79008)","entity":"IP Meitner Gas","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-01-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":81,"loc":{"pt":[-100.86758,35.794320000000006],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0347","name":"Glass Mountain BB Solar 1","fuel":"solar","tech":"PV","mw":302.66,"county":"Pecos","zone":"WEST","poi":"Tap 345kV 60404 Solstice to 38441 Bottlebrush","entity":"Glass Mountain Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"29INR0348","name":"Glass Mountain BB Solar 2","fuel":"solar","tech":"PV","mw":302.66,"county":"Pecos","zone":"WEST","poi":"Tap 345kV 60404 Solstice to 38441 Bottlebrush","entity":"Glass Mountain Solar II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"29INR0349","name":"Glass Mountain BB Solar 5","fuel":"solar","tech":"PV","mw":302.61,"county":"Pecos","zone":"WEST","poi":"Tap 345kV 60404 Solstice to 38441 Bottlebrush","entity":"Glass Mountain Solar V, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"29INR0354","name":"Wolf Bone North Energy Center","fuel":"gas","tech":"CC","mw":1174.4,"county":"Reeves","zone":"WEST","poi":"TNMP Cowpen 345kV Substation POIB 38044 (4 mile transmission line will connect POI at customer substation to POIB in the Cowpen substation)","entity":"NRG Wolf Bone Energy Center LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-02-28","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":382,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0356","name":"Enfinity Cedar","fuel":"battery","tech":"BA","mw":150,"county":"Irion","zone":"WEST","poi":"138kV Newton T.Busby Substation (60356)","entity":"EG Cedar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-07-17","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-101.03850000000001,31.349480000000007],"method":"county centroid (substation not located)","subs":[],"codes":["BUSBY"]}},{"inr":"29INR0357","name":"Glass Mountain BB Solar 3","fuel":"solar","tech":"PV","mw":302.61,"county":"Pecos","zone":"WEST","poi":"Tap 345kV 60404 Solstice to 38441 Bottlebrush","entity":"Glass Mountain Solar III, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"29INR0358","name":"Glass Mountain BB Solar 4","fuel":"solar","tech":"PV","mw":302.61,"county":"Pecos","zone":"WEST","poi":"Tap 345kV 60404 Solstice to 38441 Bottlebrush","entity":"Glass Mountain Solar IV, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-10-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"29INR0360","name":"Trumpet Solar","fuel":"solar","tech":"PV","mw":533,"county":"Reeves","zone":"WEST","poi":"tap 345kV 18723 Drylake_5 – 38125 TNFaulkner3","entity":"NextEra Energy Resources Interconnection Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-07-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":29,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0361","name":"Aurelius 3 Natural Gas","fuel":"gas","tech":"IC","mw":1275,"county":"Deaf Smith","zone":"PANHANDLE","poi":"23908 Deaf Smith station 345 kV","entity":"IP Roman III Gas, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":414,"loc":{"pt":[-102.69286000000002,34.9217],"method":"county centroid (substation not located)","subs":[],"codes":["DEAFSMIT"]}},{"inr":"29INR0363","name":"Alpha Power Phase 2","fuel":"gas","tech":"GT","mw":400.1,"county":"Guadalupe","zone":"SOUTH","poi":"345kV 7042 Zorn Substation","entity":"Palomino Alpha, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":130,"loc":{"pt":[-97.94975,29.77265],"method":"ERCOT bus number -> substation","subs":["Zorn Substation"],"codes":["ZORN"],"osm":"osm:way/30891667"}},{"inr":"29INR0365","name":"Silver Sky Solar","fuel":"solar","tech":"PV","mw":401.9,"county":"Tom Green","zone":"WEST","poi":"6444 Red Creek 345kV","entity":"Lightsource Renewable Energy Development LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-13","ia":null,"cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-100.70273333333331,31.513308333333338],"method":"county centroid (substation not located)","subs":[],"codes":["REDCREEK"]}},{"inr":"29INR0376","name":"Silver Sky BESS","fuel":"battery","tech":"BA","mw":201.1,"county":"Tom Green","zone":"WEST","poi":"6444 Red Creek 345kV","entity":"Lightsource Renewable Energy Development LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-13","ia":null,"cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-100.70273333333331,31.513308333333338],"method":"county centroid (substation not located)","subs":[],"codes":["REDCREEK"]}},{"inr":"29INR0378","name":"Ventures BESS","fuel":"battery","tech":"BA","mw":238,"county":"Matagorda","zone":"COASTAL","poi":"BAY_CITY4A 138 kV (Bus #8113) to BLKCAT4A 138 kV (Bus #80124)","entity":"Gransolar Texas Twelve, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-07-15","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":17,"loc":{"pt":[-95.96933,28.98772],"method":"ERCOT bus number -> substation","subs":["Bay City Substation"],"codes":["BAY_CITY"],"osm":"osm:way/337787970"}},{"inr":"29INR0379","name":"Reid Storage","fuel":"battery","tech":"BA","mw":250.99,"county":"Howard","zone":"WEST","poi":"11332 BRELYN_8 138kV","entity":"Tempus Power Management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-03-01","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":["BRELN"]}},{"inr":"29INR0391","name":"Bryant Storage","fuel":"battery","tech":"BA","mw":200.81,"county":"Howard","zone":"WEST","poi":"11324 LEATHRWD_8 138kV","entity":"Tempus Power Management LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-10","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-101.48746,32.262299999999996],"method":"county centroid (substation not located)","subs":[],"codes":["LWPOD"]}},{"inr":"29INR0393","name":"Lone Tiger Solar","fuel":"solar","tech":"PV","mw":242.8,"county":"Jones","zone":"WEST","poi":"Tap 345 kV Claytonville (#68001) to phantom hill (#68004)","entity":"Origis Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"29INR0394","name":"Buzzer Butte Solar","fuel":"solar","tech":"PV","mw":242.8,"county":"Kent","zone":"WEST","poi":"Tap 345 kV Nova prime (BUS# 59908) to Mhos (BUS# 59911)","entity":"Origis Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-01","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-100.98397499999999,33.119924999999995],"method":"tap between two substations (bus number + name)","subs":["Mhos Substation","Nova Prime Substation"],"codes":["NVAP_345","MHOS"]}},{"inr":"29INR0397","name":"Black Mountain Briscoe Gas","fuel":"gas","tech":"CC","mw":495.32,"county":"Briscoe","zone":"PANHANDLE","poi":"23914, Tule Canyon Substation, 345 kV","entity":"Black Mountain Power LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-28","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":161,"loc":{"pt":[-101.35959,34.43223],"method":"substation matched by name in the POI","subs":["Tule Canyon Substation"],"codes":["TULECNYN"]}},{"inr":"29INR0399","name":"Rugged Prairie Wind","fuel":"wind","tech":"WT","mw":294.14,"county":"Fisher","zone":"WEST","poi":"Tap 345kV BUS #11305 Dermott- BUS #60706 Kirchhef","entity":"Rugged Prairie Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-01","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":64,"loc":{"pt":[-101.0088,32.86022],"method":"ERCOT bus number -> substation","subs":["Dermott Substation"],"codes":["DMTSW"],"osm":"osm:way/453589361"}},{"inr":"29INR0401","name":"Copperas Creek Solar","fuel":"solar","tech":"PV","mw":200.87,"county":"Kimble","zone":"SOUTH","poi":"Tap 345kV 60619 EDISON7C - 60711 ORSTED7D","entity":"Copperas Creek Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-29","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.70328571428571,30.529714285714284],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"29INR0410","name":"Rattler Combined Cycle Energy Center I","fuel":"gas","tech":"CC","mw":990.6,"county":"Cameron","zone":"COASTAL","poi":"345kV 8318 RIOHONDO7A  Substation","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-97.61337,26.27748],"method":"ERCOT bus number -> substation","subs":["Rio Hondo Substation"],"codes":["RIOHONDO"],"osm":"osm:way/174719027"}},{"inr":"29INR0411","name":"Grasshopper BESS","fuel":"battery","tech":"BA","mw":250.94,"county":"Knox","zone":"WEST","poi":"6104 SMOKYHIL7A 345kV","entity":"Grasshopper Storage Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-99.66815882352941,33.776994117647064],"method":"county centroid (substation not located)","subs":[],"codes":["SMOKYHIL"]}},{"inr":"29INR0412","name":"Trail Boss Solar","fuel":"solar","tech":"PV","mw":254,"county":"Comanche","zone":"NORTH","poi":"Tap 138 kV 33273 ODELL - 278 HASSE","entity":"Trail Boss Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-27","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.50404,31.92446],"method":"ERCOT bus number -> substation","subs":["Hasse Substation"],"codes":["HAS"],"osm":"osm:way/507399209"}},{"inr":"29INR0413","name":"Trail Boss BESS","fuel":"battery","tech":"BA","mw":206.92,"county":"Comanche","zone":"NORTH","poi":"Tap 138 kV 33273 ODELL - 278 HASSE","entity":"Trail Boss Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-04-27","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-98.50404,31.92446],"method":"ERCOT bus number -> substation","subs":["Hasse Substation"],"codes":["HAS"],"osm":"osm:way/507399209"}},{"inr":"29INR0415","name":"Rattler Combined Cycle Energy Center II","fuel":"gas","tech":"CC","mw":990.6,"county":"Cameron","zone":"COASTAL","poi":"345kV 8318 RIOHONDO7A Substation","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-97.61337,26.27748],"method":"ERCOT bus number -> substation","subs":["Rio Hondo Substation"],"codes":["RIOHONDO"],"osm":"osm:way/174719027"}},{"inr":"29INR0416","name":"Rattler Combined Cycle Energy Center III","fuel":"gas","tech":"CC","mw":990.6,"county":"Cameron","zone":"COASTAL","poi":"345kV 8318 RIOHONDO7A Substation","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-97.61337,26.27748],"method":"ERCOT bus number -> substation","subs":["Rio Hondo Substation"],"codes":["RIOHONDO"],"osm":"osm:way/174719027"}},{"inr":"29INR0417","name":"Great Rock Energy Center II","fuel":"gas","tech":"CC","mw":990.6,"county":"Leon","zone":"NORTH","poi":"Tap 345kV 79011 IRONHORSE TO 46020 LIMEST_POI_5 Ckt 18 and 345kV 79007 YELLOW WOLF 46020 TO LIMEST_POI_5 Ckt 50","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":["LEG"]}},{"inr":"29INR0418","name":"Great Rock Energy Center III","fuel":"gas","tech":"CC","mw":990.6,"county":"Leon","zone":"NORTH","poi":"Tap 345kV 79011 IRONHORSE TO 46020 LIMEST_POI_5 Ckt 18 and 345kV 79007 YELLOW WOLF 46020 TO LIMEST_POI_5 Ckt 1","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":["LEG"]}},{"inr":"29INR0419","name":"BM Freestone Energy Center II","fuel":"gas","tech":"CC","mw":990.6,"county":"Freestone","zone":"NORTH","poi":"Loop Big Brown E to Navarro Ckt 1(PTI#3380-68091) and Big Brown W to Tarantulla Ckt 1 (PTI#3381-3344) at 31.813367° -96.147730°","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"29INR0420","name":"BM Freestone Energy Center III","fuel":"gas","tech":"CC","mw":990.6,"county":"Freestone","zone":"NORTH","poi":"Loop Big Brown E to Navarro Ckt 1(PTI#3380-68091) and Big Brown W to Tarantulla Ckt 1 (PTI#3381-3344) at 31.813367° -96.147730°","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":322,"loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"30INR0002","name":"Southeast Oklahoma Pumped Storage","fuel":"other","tech":"OT","mw":1232,"county":"Lamar","zone":"NORTH","poi":"1692 Paris Switch 345kV","entity":"Apex Energy Solutions, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-01-01","ia":null,"cons_start":null,"first_seen":"2023-03","months_in_queue":43,"p36":0.077,"p36_basis":"2 of 26 other projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":95,"loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["PRSSW"]}},{"inr":"30INR0003","name":"Hecate Energy Jamaica Wind","fuel":"wind","tech":"WT","mw":1029.39,"county":"Galveston","zone":"HOUSTON","poi":"42000 P. H. Robinson 345kV","entity":"Hecate Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2025-04","months_in_queue":18,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":225,"loc":{"pt":[-94.98257,29.48783],"method":"ERCOT bus number -> substation","subs":["P. H. Robinson Switching Station"],"codes":["PHR"],"osm":"osm:way/53759711"}},{"inr":"30INR0004","name":"Hecate Energy Arkansas Wind","fuel":"wind","tech":"WT","mw":1029.39,"county":"San Patricio","zone":"COASTAL","poi":"8659 Naismith 345kV","entity":"Hecate Energy Gulf Wind LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2024-05","months_in_queue":29,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":225,"loc":{"pt":[-97.53044358974358,27.997017948717946],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"30INR0005","name":"Woodland Energy Storage","fuel":"battery","tech":"BA","mw":207.6,"county":"Bosque","zone":"NORTH","poi":"68040 Kopperl Substation 345kV","entity":"Woodland Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-10-01","ia":null,"cons_start":null,"first_seen":"2023-12","months_in_queue":34,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-97.48227073170735,31.983534146341466],"method":"county centroid (substation not located)","subs":[],"codes":["KOPPERL"]}},{"inr":"30INR0018","name":"Big Canyon Wind","fuel":"wind","tech":"WT","mw":1500,"county":"Pecos","zone":"WEST","poi":"38441 Bottlebrush 345kV","entity":"Longfellow Wind, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-07-01","ia":"2025-12-24","cons_start":null,"first_seen":"2025-01","months_in_queue":21,"p36":0.746,"p36_basis":"100 of 134 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":1119,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"30INR0020","name":"Willow Oak Gas","fuel":"gas","tech":"CC","mw":1298,"county":"Jefferson","zone":"HOUSTON","poi":"40850 Jordan","entity":"Willow Oak Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-06-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":422,"loc":{"pt":[-94.11463392857145,30.000051785714295],"method":"county centroid (substation not located)","subs":[],"codes":["JOR"]}},{"inr":"30INR0031","name":"Caldwell County Energy Center","fuel":"gas","tech":"CC","mw":1500,"county":"Caldwell","zone":"SOUTH","poi":"#7051 Misty Substation 345kV","entity":"Caldwell County Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-30","ia":null,"cons_start":null,"first_seen":"2025-10","months_in_queue":12,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":488,"loc":{"pt":[-97.76035,29.792314705882347],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"30INR0037","name":"Solgen Solar","fuel":"solar","tech":"PV","mw":160.2,"county":"Lampasas","zone":"NORTH","poi":"7066 Adamsville 138kV","entity":"Lampasas Hybrid Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-08-30","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-98.15934,31.22977],"method":"ERCOT bus number -> substation","subs":["Adamsville Substation"],"codes":["ADAMSV"],"osm":"osm:way/191844006"}},{"inr":"30INR0038","name":"Solgen Storage","fuel":"battery","tech":"BA","mw":150.3,"county":"Lampasas","zone":"NORTH","poi":"7066 Adamsville 138kV","entity":"Lampasas Hybrid Energy LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-08-30","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.15934,31.22977],"method":"ERCOT bus number -> substation","subs":["Adamsville Substation"],"codes":["ADAMSV"],"osm":"osm:way/191844006"}},{"inr":"30INR0041","name":"Bell Song Solar","fuel":"solar","tech":"PV","mw":167.6,"county":"Jim Hogg","zone":"SOUTH","poi":"Tap 345 kV #80079 CRUCE7A  - #80355 DELSOL7A  ckt 1","entity":"Bell Song Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-09-15","ia":null,"cons_start":null,"first_seen":"2025-05","months_in_queue":17,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-98.60369130434783,27.220513043478263],"method":"county centroid (substation not located)","subs":[],"codes":["CRUCE","DELSOL"]}},{"inr":"30INR0042","name":"La Morena Energy Center BESS","fuel":"battery","tech":"BA","mw":250,"county":"Zapata","zone":"SOUTH","poi":"Tap 345 kV  80225 CENIZO7C -   80307 DELSOL7C","entity":"Adapture Solar Development","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-07","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":18,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"30INR0043","name":"La Morena Energy Center Solar","fuel":"solar","tech":"PV","mw":250,"county":"Zapata","zone":"SOUTH","poi":"Tap 345 kV (80225) CENIZO7C - (80307) DELSOL7C","entity":"Adapture Solar Development","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-07","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"30INR0045","name":"Radiant Plains Energy Center BESS","fuel":"battery","tech":"BA","mw":100,"county":"Colorado","zone":"SOUTH","poi":"Tap 138-kV Weimar (7254) to Schulenburg (7252)","entity":"Adapture Solar Development","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-27","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.78365,29.68367],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Weimar Substation"],"codes":["WEIMAR","SCHULE"]}},{"inr":"30INR0049","name":"Bell Song Solar 2","fuel":"solar","tech":"PV","mw":167.6,"county":"Jim Hogg","zone":"SOUTH","poi":"Tap 345kV (#80079) CRUCE7A - (#80355) DELSOL7A ckt 1","entity":"Bell Song Solar, LLC 2","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-03-16","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-98.60369130434783,27.220513043478263],"method":"county centroid (substation not located)","subs":[],"codes":["CRUCE","DELSOL"]}},{"inr":"30INR0051","name":"Sim Gideon Combined Cycle","fuel":"gas","tech":"CC","mw":880,"county":"Bastrop","zone":"SOUTH","poi":"(#7310) SIM GIDEON 138 kV","entity":"LCRA","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-12-15","ia":"2025-12-19","cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":581,"loc":{"pt":[-97.2688,30.14611],"method":"ERCOT bus number -> substation","subs":["Sim Gideon Station"],"codes":["GIDEON"],"osm":"osm:way/127247651"}},{"inr":"30INR0052","name":"Lost Pines Power Park","fuel":"gas","tech":"CC","mw":880,"county":"Bastrop","zone":"SOUTH","poi":"(#170174) LOST PINES 345 kV","entity":"LCRA","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2033-06-01","ia":"2025-12-26","cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":581,"loc":{"pt":[-97.27279,30.14775],"method":"ERCOT bus number -> substation","subs":["Lost Pines Station"],"codes":["LOSTPI"],"osm":"osm:way/173224882"}},{"inr":"30INR0053","name":"MRR Solar","fuel":"solar","tech":"PV","mw":500,"county":"Pecos","zone":"WEST","poi":"Solstice Substation #60384 -AEP","entity":"Antler Peak Solar, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-07-01","ia":"2026-09-15","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":239,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"30INR0054","name":"SCHNEIDER COMBINED CYCLE","fuel":"gas","tech":"CC","mw":880,"county":"Caldwell","zone":"SOUTH","poi":"Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton Springs","entity":"LCRA","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2033-05-10","ia":"2025-12-19","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":581,"loc":{"pt":[-97.71852,30.011975],"method":"tap between two located substations","subs":["Zorn Substation","Austrop Substation"],"codes":["ZORN","AUSTRO"]}},{"inr":"30INR0058","name":"Springfield Solar","fuel":"solar","tech":"PV","mw":400,"county":"Pecos","zone":"WEST","poi":"Tap Leon Creek (#38355) to Woodhouse Station (#38308) 138kV line","entity":"BOULEVARD ASSOCIATES, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2028-08-30","ia":"2025-12-24","cons_start":null,"first_seen":"2025-09","months_in_queue":13,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":191,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["LEONCRK","WOODHOUS"]}},{"inr":"30INR0071","name":"Prairie Ridge (Gas - CC)","fuel":"gas","tech":"CC","mw":1660.4,"county":"Franklin","zone":"NORTH","poi":"Tap 345 kV 11699 Woodard – 1695 Monticello","entity":"Tenaska Power Generation, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-06-01","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":540,"loc":{"pt":[-95.04204,33.0916],"method":"one end of the tapped line, matched by name in the POI","subs":["Monticello substation"],"codes":["WDDSW","MNSES"]}},{"inr":"30INR0073","name":"Bulldog Power II","fuel":"gas","tech":"GT","mw":311,"county":"Brazoria","zone":"COASTAL","poi":"39703 TNMP FM524 Substation 138kV","entity":"Bulldog Power II LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-30","ia":null,"cons_start":null,"first_seen":"2025-12","months_in_queue":10,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":101,"loc":{"pt":[-95.73493,29.06443],"method":"ERCOT bus number -> substation","subs":["FM 524 Substation"],"codes":["FM524"],"osm":"osm:way/583058250"}},{"inr":"30INR0076","name":"Zuma Solar","fuel":"solar","tech":"PV","mw":201.37,"county":"Runnels","zone":"WEST","poi":"Tap 345kV 11263 Fisk Switch  -  11406 Central Bluff Switch","entity":"Zuma Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-09","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-100.15481,32.11719],"method":"one end of the tapped line, matched by name in the POI","subs":["Central Bluff Substation"],"codes":["CBFSW"]}},{"inr":"30INR0077","name":"Moon Hammer","fuel":"gas","tech":"GT","mw":1300,"county":"Wheeler","zone":"PANHANDLE","poi":"tap 345 kV Gray (79000) to Tesla (60501)","entity":"Moon Hammer LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-11-30","ia":"2025-12-19","cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":858,"loc":{"pt":[-100.32404,35.444700000000005],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Tesla Substation","Gray Substation"],"codes":["CTT_GRAY","TESLA"]}},{"inr":"30INR0080","name":"Indigo Quill Gas","fuel":"gas","tech":"GT","mw":370.08,"county":"Glasscock","zone":"WEST","poi":"59902 SAND_BLUFF 345KV","entity":"RWE Clean Energy Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2028-12-29","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":120,"loc":{"pt":[-101.57186,31.912620000000004],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"30INR0083","name":"Gravitas I Solar","fuel":"solar","tech":"PV","mw":1124.75,"county":"Pecos","zone":"WEST","poi":"Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line","entity":"S&S Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":62,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"30INR0084","name":"Gravitas I Natural Gas","fuel":"gas","tech":"IC","mw":1247.04,"county":"Pecos","zone":"WEST","poi":"Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line","entity":"S&S Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":405,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"30INR0085","name":"Gravitas I Wind","fuel":"wind","tech":"WT","mw":636.54,"county":"Pecos","zone":"WEST","poi":"Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line","entity":"S&S Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":139,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"30INR0086","name":"Permian I Wind","fuel":"wind","tech":"WT","mw":636.54,"county":"Pecos","zone":"WEST","poi":"Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit","entity":"S&S Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":139,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"30INR0088","name":"Mistflower Energy Center Solar","fuel":"solar","tech":"PV","mw":401.62,"county":"Runnels","zone":"WEST","poi":"Tap 345kV 60072 ODYSSEUS7A– 60040 BLF_CRK7A","entity":"Mistflower Energy Center LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-100.02768,31.78114],"method":"county centroid (substation not located)","subs":[],"codes":["ODYSSEUS","BLUF_CRK"]}},{"inr":"30INR0089","name":"Mistflower Energy Center Storage","fuel":"battery","tech":"BA","mw":312.85,"county":"Runnels","zone":"WEST","poi":"Tap 345kV 60072 Odysseus – 60040 Bluff Creek","entity":"Mistflower Energy Center LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-01","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-100.02306,32.19651],"method":"one end of the tapped line, matched by name in the POI","subs":["Bluff Creek Substation"],"codes":["ODYSSEUS","BLUF_CRK"]}},{"inr":"30INR0091","name":"BM Great Rock Energy Center","fuel":"gas","tech":"CC","mw":1981.2,"county":"Leon","zone":"NORTH","poi":"Tap <345kV> <967> <GIBN_CREK_5> - <46020> <LIMEST_POI_5> Ckt<18> and  <345kV> <79007> < YELLOW WOLF> - <46020> <LIMEST_POI_5> Ckt<50>","entity":"Black Mountain Energy Storage II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-05-15","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":644,"loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":["GIBCRK","LEG"]}},{"inr":"30INR0092","name":"Wallflower Solar","fuel":"solar","tech":"PV","mw":201.15,"county":"Zapata","zone":"SOUTH","poi":"Tap the 345 kV Cenizo (#80225) - Del Sol (#80307) line.","entity":"Wallflower Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-30","ia":null,"cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"30INR0093","name":"Wallflower Energy Storage","fuel":"battery","tech":"BA","mw":209.16,"county":"Zapata","zone":"SOUTH","poi":"Tap the 345 kV Cenizo (#80225) - Del Sol (#80307) line","entity":"Wallflower Energy Storage","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-30","ia":null,"cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":15,"loc":{"pt":[-99.41156,27.32758],"method":"ERCOT bus number -> substation","subs":["Cenizo Substation"],"codes":["CENIZO"],"osm":"osm:way/451971746"}},{"inr":"30INR0099","name":"Quadspring BESS","fuel":"battery","tech":"BA","mw":200.7,"county":"Loving","zone":"WEST","poi":"138 kV ANDRANCHT_8(#1081) - Loving_8(#1092)","entity":"Quadspring BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-103.40555,31.77594],"method":"ERCOT bus number -> substation","subs":["Loving Substation"],"codes":["LOVNG"],"osm":"osm:way/460073776"}},{"inr":"30INR0100","name":"Pentarise BESS","fuel":"battery","tech":"BA","mw":150.6,"county":"Pecos","zone":"WEST","poi":"138 kV Pig Creek (#60393)","entity":"Pentarise BESS, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["PIGCREEK"]}},{"inr":"30INR0105","name":"The Giant Arc-II","fuel":"gas","tech":"IC","mw":1300,"county":"Pecos","zone":"WEST","poi":"Bus #60404 SOLSTICE CKT 02","entity":"Powering Knowledge, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-24","ia":null,"cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":423,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"30INR0106","name":"Ironwood Energy Center","fuel":"gas","tech":"CC","mw":1485,"county":"Callahan","zone":"WEST","poi":"68051 Reata Station 345kV","entity":"Ironwood Energy Center","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-07-01","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":483,"loc":{"pt":[-99.42508,32.25434],"method":"county centroid (substation not located)","subs":[],"codes":["REATA"]}},{"inr":"30INR0107","name":"Ironwood Energy Center II","fuel":"gas","tech":"CC","mw":742.5,"county":"Callahan","zone":"WEST","poi":"68051 Reata Station 345kV","entity":"Ironwood Energy Center II","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-07-01","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":241,"loc":{"pt":[-99.42508,32.25434],"method":"county centroid (substation not located)","subs":[],"codes":["REATA"]}},{"inr":"30INR0110","name":"Thunder Bird 1 Gas","fuel":"gas","tech":"CC","mw":1272.8,"county":"Jack","zone":"NORTH","poi":"Tap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (1421) and Jacksbro_5 (1429) to Hendrch_5 (1443)","entity":"BKV Power Ventures Jack, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-14","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":414,"loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["JCKSW","WCSWS"]}},{"inr":"30INR0111","name":"Tradition BESS","fuel":"battery","tech":"BA","mw":150.36,"county":"Burleson","zone":"SOUTH","poi":"32878 Greens Prairie 138kV","entity":"Horizon Energy Storage Greenfield Project Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-30","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-96.25776,30.55424],"method":"ERCOT bus number -> substation","subs":["Greens Prairie Substation"],"codes":["GREENS_P"],"osm":"osm:way/342273065"}},{"inr":"30INR0112","name":"Short River BESS","fuel":"battery","tech":"BA","mw":150.36,"county":"Comal","zone":"SOUTH","poi":"7456 LOP3378 138kV","entity":"Horizon Energy Storage Greenfield Project Holdings LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-30","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.41111562499998,29.729581249999995],"method":"county centroid (substation not located)","subs":[],"codes":["LOP337"]}},{"inr":"30INR0113","name":"The Giant Arc I","fuel":"gas","tech":"IC","mw":1300,"county":"Pecos","zone":"WEST","poi":"Bus #60404 SOLSTICE CKT 01","entity":"Powering Knowledge, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-24","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":423,"loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}},{"inr":"30INR0114","name":"Longleaf II Power Station","fuel":"gas","tech":"GT","mw":600,"county":"Angelina","zone":"NORTH","poi":"3321 Redland 345 kV","entity":"WattBridge Texas Holdings, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-07-01","ia":null,"cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":195,"loc":{"pt":[-94.64201866666667,31.276913333333336],"method":"county centroid (substation not located)","subs":[],"codes":["REDSW"]}},{"inr":"30INR0123","name":"Sideoats Solar 1","fuel":"solar","tech":"PV","mw":167.6,"county":"Throckmorton","zone":"WEST","poi":"DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345 kV","entity":"Bush Knob Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-03-31","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-99.26418,33.22188],"method":"county centroid (substation not located)","subs":[],"codes":["DRDSW","GRSES"]}},{"inr":"30INR0124","name":"Sideoats Solar 2","fuel":"solar","tech":"PV","mw":167.6,"county":"Throckmorton","zone":"WEST","poi":"DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV","entity":"Bush Knob Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-03-31","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-99.26418,33.22188],"method":"county centroid (substation not located)","subs":[],"codes":["DRDSW","GRSES"]}},{"inr":"30INR0125","name":"Sideoats Solar 3","fuel":"solar","tech":"PV","mw":167.6,"county":"Throckmorton","zone":"WEST","poi":"DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV","entity":"Bush Knob Solar, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-03-31","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-99.26418,33.22188],"method":"county centroid (substation not located)","subs":[],"codes":["DRDSW","GRSES"]}},{"inr":"30INR0128","name":"Horizon Ridge Wind","fuel":"wind","tech":"WT","mw":406.55,"county":"Winkler","zone":"WEST","poi":"POIB is 131853 NOTSW_1_8 - the Notrees SW Substation - Project includes property in Ector, Andrews, and Winkler counties.","entity":"CPV Horizon Ridge Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-23","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":89,"loc":{"pt":[-103.10102857142859,31.925342857142855],"method":"county centroid (substation not located)","subs":[],"codes":["NOTSW"]}},{"inr":"30INR0131","name":"Pecos Flats Wind I","fuel":"wind","tech":"WT","mw":506.9,"county":"Pecos","zone":"WEST","poi":"Tap Bottlebrush (38441) to White Baker (38435) 345kV Line (TNMP)","entity":"Pecos Flats Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-29","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":111,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"30INR0132","name":"Pecos Flats Wind II","fuel":"wind","tech":"WT","mw":507.9,"county":"Pecos","zone":"WEST","poi":"Tap 345kV 38441 Bottlebrush to 38435 White Baker 345kV line (TNMP)","entity":"Pecos Flats Wind II, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-29","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":111,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"30INR0133","name":"Starfield Energy Storage","fuel":"battery","tech":"BA","mw":122.2,"county":"Wharton","zone":"SOUTH","poi":"Tap 138kV 44150 Hungerford - 44190 East Bernard","entity":"Starfield Energy Storage, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-31","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-96.07025,29.52357],"method":"ERCOT bus number -> substation","subs":["East Bernard Substation"],"codes":["EB"],"osm":"osm:way/95146887"}},{"inr":"30INR0135","name":"Blue Sage Wind","fuel":"wind","tech":"WT","mw":394.54,"county":"Andrews","zone":"WEST","poi":"BUS #11270 - DOGHOUSE_5 - THE DOGHOUSE 345kV SUBSTATION","entity":"CPV Blue Sage Wind, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-23","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.219,"p36_basis":"37 of 169 wind projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":86,"loc":{"pt":[-102.72318,32.3483],"method":"county centroid (substation not located)","subs":[],"codes":["DOGHS"]}},{"inr":"30INR0140","name":"Enfinity Primrose","fuel":"battery","tech":"BA","mw":200,"county":"Montague","zone":"NORTH","poi":"(741) DYEMOUND Substation 138kV","entity":"EG Primrose LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-07-17","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-97.73604827586205,33.865875862068975],"method":"county centroid (substation not located)","subs":[],"codes":["DYEMOUND"]}},{"inr":"30INR0141","name":"Jackrabbit Flats Solar","fuel":"solar","tech":"PV","mw":401.33,"county":"Ector","zone":"WEST","poi":"Tap 345 kV 1185 Midland County NW - 1018 Moss","entity":"Jackrabbit Flats Solar LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-29","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":22,"loc":{"pt":[-102.49554,31.81327],"method":"one end of the tapped line, matched by name in the POI","subs":["Moss Substation"],"codes":["MCNSW","MOSSW"]}},{"inr":"30INR0143","name":"Alpha Power Phase 3","fuel":"gas","tech":"GT","mw":400.1,"county":"Guadalupe","zone":"SOUTH","poi":"345kV 7042 Zorn Substation","entity":"Palomino Alpha, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-12-31","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":130,"loc":{"pt":[-97.94975,29.77265],"method":"ERCOT bus number -> substation","subs":["Zorn Substation"],"codes":["ZORN"],"osm":"osm:way/30891667"}},{"inr":"30INR0146","name":"Hackberry Draw Solar","fuel":"solar","tech":"PV","mw":652.96,"county":"Jones","zone":"WEST","poi":"Tap 345 kV (68000) West Shackleford - (60515) Clear Crossing Ckt 2","entity":"Orsted Onshore Development North America, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-04-30","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":36,"loc":{"pt":[-99.84577142857142,32.64467142857143],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Clear Crossing Substation","West Shackleford Substation"],"codes":["WSHACK","CLEARCRO"]}},{"inr":"30INR0150","name":"Blue Energy Center- Phase 1a - Gas","fuel":"gas","tech":"GT","mw":780,"county":"Victoria","zone":"SOUTH","poi":"Tap 345kV 80286 DULCE7A - 8676 STATIC7A","entity":"Brother 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-05-02","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":254,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["STATIC"]}},{"inr":"30INR0158","name":"Capshaw Solar","fuel":"solar","tech":"PV","mw":450,"county":"Reeves","zone":"WEST","poi":"POIB: Tapping Drylake_5 (#18723) – TNFaulkner3 (#38125) 345 kV","entity":"NextEra Energy Resources Interconnection Holding, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-07-01","ia":null,"cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":25,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"30INR0164","name":"Buzzer Butte 2 Solar","fuel":"solar","tech":"PV","mw":242.8,"county":"Kent","zone":"WEST","poi":"Tap 345 kV Nova prime (BUS# 59908) to Mhos (BUS# 59911)","entity":"Origis Development, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-01","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":13,"loc":{"pt":[-100.98397499999999,33.119924999999995],"method":"tap between two substations (bus number + name)","subs":["Mhos Substation","Nova Prime Substation"],"codes":["NVAP_345","MHOS"]}},{"inr":"30INR0167","name":"Whitehorse BESS","fuel":"battery","tech":"BA","mw":201.18,"county":"Llano","zone":"SOUTH","poi":"Pitsburg Substation - Bus #7120","entity":"Whitehorse Energy Storage LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-19","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.67741,30.76634],"method":"ERCOT bus number -> substation","subs":["Pitsburg Substation"],"codes":["PITSBU"],"osm":"osm:way/504555809"}},{"inr":"30INR0175","name":"Lonestar Sun Solar","fuel":"solar","tech":"PV","mw":200.9,"county":"Live Oak","zone":"SOUTH","poi":"Tap 138kV 85071 Schottky Tap - 84061 Sunniland","entity":"Lonestar Sun Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-30","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":11,"loc":{"pt":[-98.03055384615384,28.31636923076923],"method":"county centroid (substation not located)","subs":[],"codes":["SCHOTTKY","SUNNILAN"]}},{"inr":"30INR0176","name":"Lonestar Dawn Storage","fuel":"battery","tech":"BA","mw":200.57,"county":"Live Oak","zone":"SOUTH","poi":"Tap 138kV 85071 Schottky - 84061 Sunniland","entity":"Lonestar Dawn Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-09-30","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.071,"p36_basis":"57 of 799 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":14,"loc":{"pt":[-98.03055384615384,28.31636923076923],"method":"county centroid (substation not located)","subs":[],"codes":["SCHOTTKY","SUNNILAN"]}},{"inr":"31INR0009","name":"Bell Song Solar 3","fuel":"solar","tech":"PV","mw":167.6,"county":"Jim Hogg","zone":"SOUTH","poi":"Tap 345 kV #80079 CRUCE7A  - #80355 DELSOL7A  ckt 1","entity":"Bell Song Solar, LLC 3","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-08-31","ia":null,"cons_start":null,"first_seen":"2025-06","months_in_queue":16,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":9,"loc":{"pt":[-98.60369130434783,27.220513043478263],"method":"county centroid (substation not located)","subs":[],"codes":["CRUCE","DELSOL"]}},{"inr":"31INR0010","name":"LOST PINES GAS RECIP PHASE 2","fuel":"gas","tech":"IC","mw":113.02,"county":"Bastrop","zone":"SOUTH","poi":"(#170174) LOST PINES 345 kV","entity":"LCRA","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2033-06-01","ia":"2025-12-26","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":75,"loc":{"pt":[-97.27279,30.14775],"method":"ERCOT bus number -> substation","subs":["Lost Pines Station"],"codes":["LOSTPI"],"osm":"osm:way/173224882"}},{"inr":"31INR0011","name":"SIM GIDEON GAS RICE","fuel":"gas","tech":"IC","mw":226.03,"county":"Bastrop","zone":"SOUTH","poi":"(#7310) SIM GIDEON 138 kV","entity":"LCRA","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2031-05-10","ia":"2025-12-19","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":149,"loc":{"pt":[-97.2688,30.14611],"method":"ERCOT bus number -> substation","subs":["Sim Gideon Station"],"codes":["GIDEON"],"osm":"osm:way/127247651"}},{"inr":"31INR0013","name":"SCHNEIDER GAS RICE PHASE 2","fuel":"gas","tech":"IC","mw":113.02,"county":"Caldwell","zone":"SOUTH","poi":"Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton Springs","entity":"LCRA","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2032-12-14","ia":"2025-12-19","cons_start":null,"first_seen":"2025-07","months_in_queue":15,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":75,"loc":{"pt":[-97.71852,30.011975],"method":"tap between two located substations","subs":["Zorn Substation","Austrop Substation"],"codes":["ZORN","AUSTRO"]}},{"inr":"31INR0018","name":"Permian I Solar","fuel":"solar","tech":"PV","mw":1125.73,"county":"Pecos","zone":"WEST","poi":"Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit","entity":"S&S Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":62,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"31INR0019","name":"Permian I Natural Gas","fuel":"gas","tech":"IC","mw":1246.95,"county":"Pecos","zone":"WEST","poi":"Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit","entity":"S&S Renewables, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2030-06-30","ia":null,"cons_start":null,"first_seen":"2026-01","months_in_queue":9,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":405,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"31INR0021","name":"Mule Deer Run Gas II","fuel":"gas","tech":"CC","mw":1263,"county":"Anderson","zone":"NORTH","poi":"#3308 Pin Oak 345KV","entity":"Anderson Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-07-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":410,"loc":{"pt":[-95.69096842105266,31.784563157894723],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"31INR0022","name":"Mule Deer Run Gas III","fuel":"gas","tech":"CC","mw":1263,"county":"Anderson","zone":"NORTH","poi":"#3308 Pin Oak 345KV","entity":"Anderson Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-07-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":410,"loc":{"pt":[-95.69096842105266,31.784563157894723],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"31INR0025","name":"Alpha Power Phase 4","fuel":"gas","tech":"GT","mw":400.1,"county":"Guadalupe","zone":"SOUTH","poi":"345kV 7042 Zorn Substation","entity":"Palomino Alpha, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-12-31","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":130,"loc":{"pt":[-97.94975,29.77265],"method":"ERCOT bus number -> substation","subs":["Zorn Substation"],"codes":["ZORN"],"osm":"osm:way/30891667"}},{"inr":"32INR0002","name":"Radiant Plains Energy Center  Solar","fuel":"solar","tech":"PV","mw":100,"county":"Colorado","zone":"SOUTH","poi":"Tap 138-kV Weimar (7254) to Schulenburg (7252)","entity":"Adapture Solar Development","stage":"fis","stage_label":"Full interconnection study under way","cod":"2029-12-27","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.055,"p36_basis":"41 of 749 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-96.78365,29.68367],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Weimar Substation"],"codes":["WEIMAR","SCHULE"]}},{"inr":"32INR0003","name":"Mule Deer Run Gas","fuel":"gas","tech":"CC","mw":1263,"county":"Anderson","zone":"NORTH","poi":"#3308 Pin Oak 345KV","entity":"Anderson Energy Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2031-07-01","ia":null,"cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":410,"loc":{"pt":[-95.69096842105266,31.784563157894723],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"32INR0006","name":"H&C WILBARGER POWER I","fuel":"gas","tech":"CC","mw":1025.55,"county":"Wilbarger","zone":"WEST","poi":"Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B","entity":"H&C WILBARGER POWER I","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-02-27","ia":null,"cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":333,"loc":{"pt":[-99.45969500000001,34.014765],"method":"tap between two located substations","subs":["Riley Substation","Edith Clarke Substation"],"codes":["RILEY","EDITHCLA"]}},{"inr":"32INR0007","name":"Alpha Power Phase 5","fuel":"gas","tech":"GT","mw":400.1,"county":"Guadalupe","zone":"SOUTH","poi":"345kV 7042 Zorn Substation","entity":"Palomino Alpha, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-12-31","ia":null,"cons_start":null,"first_seen":"2026-07","months_in_queue":3,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":130,"loc":{"pt":[-97.94975,29.77265],"method":"ERCOT bus number -> substation","subs":["Zorn Substation"],"codes":["ZORN"],"osm":"osm:way/30891667"}},{"inr":"32INR0008","name":"H&C WILBARGER POWER II","fuel":"gas","tech":"CC","mw":1025.55,"county":"Wilbarger","zone":"WEST","poi":"Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B","entity":"H&C WILBARGER POWER I","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-02-27","ia":null,"cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":333,"loc":{"pt":[-99.45969500000001,34.014765],"method":"tap between two located substations","subs":["Riley Substation","Edith Clarke Substation"],"codes":["RILEY","EDITHCLA"]}},{"inr":"32INR0009","name":"Blue Energy Center - Phase 2b – Steam","fuel":"gas","tech":"ST","mw":475,"county":"Victoria","zone":"SOUTH","poi":"Tap 345kV 80286 DULCE7A - 8676 STATIC7A","entity":"Sister 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-12-18","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":154,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["STATIC"]}},{"inr":"33INR0005","name":"Bullock Gas","fuel":"gas","tech":"CC","mw":1400,"county":"Hill","zone":"NORTH","poi":"BULLOCK 345 KV STATION (Bus# 68096)","entity":"Bullock Data Center, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-07-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":455,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["BULLOCK"]}},{"inr":"33INR0006","name":"Liberty Thermal Energy Center","fuel":"gas","tech":"CC","mw":1400,"county":"Hill","zone":"NORTH","poi":"LIBERTY 345 KV STATION (Bus# 68092)","entity":"Liberty Data Center I, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2032-07-01","ia":null,"cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.325,"p36_basis":"27 of 83 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":455,"loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["LIBERTY"]}},{"inr":"33INR0007","name":"Blue Energy Center - Phase 3 – Steam Stage 2","fuel":"other","tech":"ST","mw":1320,"county":"Victoria","zone":"SOUTH","poi":"Tap 345kV 80286 DULCE7A - 8676 STATIC7A","entity":"Sister 1, LLC","stage":"fis","stage_label":"Full interconnection study under way","cod":"2033-06-15","ia":null,"cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.077,"p36_basis":"2 of 26 other projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":102,"loc":{"pt":[-96.94593030303032,28.711590909090912],"method":"county centroid (substation not located)","subs":[],"codes":["STATIC"]}},{"inr":"22INR0596","name":"Grizzly Ridge BESS SLF","fuel":"battery","tech":"BA","mw":0,"county":"Hamilton","zone":"NORTH","poi":"Pottsville Switching Substation (Bus# 178)","entity":"Grizzly Ridge Solar LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2030-07-01","ia":"2021-10-18","cons_start":null,"first_seen":"2022-06","months_in_queue":52,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":null,"loc":{"pt":[-98.19077142857144,31.747714285714288],"method":"county centroid (substation not located)","subs":[],"codes":["POTSVIL"]}},{"inr":"23INR0603","name":"Damon BESS 2","fuel":"battery","tech":"BA","mw":9.99,"county":"Brazoria","zone":"COASTAL","poi":"9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. \nStation Name (TDSP Station Code): DA\nLoad/Load Transformer Name: TR2\nPTI BUS number: 42370\nVoltage in kV (Transmission Level): 138 kV","entity":"PR DAMON, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-08-21","ia":"2023-10-06","cons_start":null,"first_seen":"2024-03","months_in_queue":31,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["DA"]}},{"inr":"24INR0645","name":"COYOTE SPRINGS AGR1","fuel":"other","tech":"OT","mw":9.95,"county":"Reeves","zone":"WEST","poi":"Station Name: COYOTSPR\nLoad Name: COYOTE_1\nBus#: 38113\nVoltage: 138 kV\nDAC: COYOTSPR_LD8\nCOYOTSPR/COYOTE_1/38113/COYOTSPR_LD8","entity":"HEN INFRASTRUCTURE, LLC 1","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-06-23","ia":"2023-10-16","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.63,"p36_basis":"394 of 625 projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["COYOTSPR"]}},{"inr":"24INR0646","name":"SADDLEBACK AGR1","fuel":"other","tech":"OT","mw":9.95,"county":"Reeves","zone":"WEST","poi":"SADLBACK/SADLBK_1/38058/SADLBACK_LD8","entity":"HEN INFRASTRUCTURE, LLC 1","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-06-23","ia":"2023-10-16","cons_start":null,"first_seen":"2024-02","months_in_queue":32,"p36":0.63,"p36_basis":"394 of 625 projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":6,"loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["SADLBACK"]}},{"inr":"24INR0712","name":"Byrd Ranch Repower","fuel":"battery","tech":"BA","mw":5.5,"county":"Brazoria","zone":"COASTAL","poi":"39700 SWEENY 138kV","entity":"Byrd Ranch Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-01-22","ia":"2020-12-14","cons_start":null,"first_seen":"2026-03","months_in_queue":7,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":4,"loc":{"pt":[-95.68713,29.05541],"method":"ERCOT bus number -> substation","subs":["Sweeny Substation"],"codes":["SWEENY"],"osm":"osm:way/338876677"}},{"inr":"25INR0601","name":"East Bernard BESS","fuel":"battery","tech":"BA","mw":9.5,"county":"Wharton","zone":"SOUTH","poi":"Station Name: East Bernard\nStation Code: EB\nERCOT Load Name: TR2\nERCOT BUS #: 44190\nVoltage (Transmission level kV): 138\nNode associated with load XFMR: 8045\n\nCNP 5-Digit Code: E_BERN\nShort Code: EB TR2\nFeeder: EB-81\nCNP XFMR #: EB TR2","entity":"Regis East Bernard LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-01-20","ia":"2024-04-29","cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-96.07025,29.52357],"method":"ERCOT bus number -> substation","subs":["East Bernard Substation"],"codes":["EB"],"osm":"osm:way/95146887"}},{"inr":"25INR0602","name":"Hockley BESS","fuel":"battery","tech":"BA","mw":9.99,"county":"Harris","zone":"HOUSTON","poi":"30.021619, -95.846315\nStation Name (Station Code): Hockley (HK)\nLONG CODE: HOCKLY\nShort Code: HK TR5\nERCOT Bus Name: Hockley\nFeeder: HK-91\nERCOT Load Name: TR5\nCNP XFMR #: HK TR5\nERCOT Bus #: 45880\nNode: 0101","entity":"Regis Hockley LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-01","ia":"2024-04-29","cons_start":null,"first_seen":"2026-09","months_in_queue":1,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-95.8461,30.02128],"method":"ERCOT bus number -> substation","subs":["Hockley Substation"],"codes":["HK"],"osm":"osm:way/128704003"}},{"inr":"25INR0604","name":"Pledger BESS","fuel":"battery","tech":"BA","mw":9.5,"county":"Matagorda","zone":"COASTAL","poi":"29.188382, -95.911558\nCNP Pledger Substation\nLONG Name: PLEDGER\nShort Name: PG\nERCOT Bus #: 43120\nERCOT Load Name: TR2\nConnectivity Node: TR2","entity":"Regis Pledger LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-25","ia":"2024-04-29","cons_start":null,"first_seen":"2026-05","months_in_queue":5,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-95.9116,29.18848],"method":"ERCOT bus number -> substation","subs":["Pledger Substation"],"codes":["PG"],"osm":"osm:way/336976543"}},{"inr":"25INR0689","name":"Slaton BESS","fuel":"battery","tech":"BA","mw":9.99,"county":"Lubbock","zone":"PANHANDLE","poi":"Station Name: Slaton Substation  \nStation Code: LPLSL \nBUS #: 59152 \nTransmission Level Voltage: 115 kV \nLoad/Load Transformer: SLT1 \nNode (associated w/ load/load XFMR in NMMS): SL15","entity":"Prairie Dog BESS, LLC","stage":"screening","stage_label":"Screening study","cod":"2027-05-31","ia":null,"cons_start":null,"first_seen":"2026-10","months_in_queue":0,"p36":0.212,"p36_basis":"22 of 104 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":2,"loc":{"pt":[-101.87356,33.652860000000004],"method":"county centroid (substation not located)","subs":[],"codes":["LPLSL"]}},{"inr":"25INR0711","name":"Coyanosa Gas","fuel":"gas","tech":"IC","mw":9.9,"county":"Winkler","zone":"WEST","poi":"Station Name: COYANOSA\nLoad Name: COYAN_2\nTNMP Transformer Name: Xfmr T-2 (25kV)\nBus#: 38380\nTransmission Voltage: 138kV\nNode: 0033","entity":"RPC Merchant, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-05","ia":"2025-03-13","cons_start":null,"first_seen":"2026-02","months_in_queue":8,"p36":0.66,"p36_basis":"33 of 50 gas projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":7,"loc":{"pt":[-103.10102857142859,31.925342857142855],"method":"county centroid (substation not located)","subs":[],"codes":["COYANOSA"]}},{"inr":"25INR0741","name":"Hollywood Solar Repower","fuel":"solar","tech":"PV","mw":9.9,"county":"Wharton","zone":"SOUTH","poi":"44060 BLU 345kV","entity":"RED TAILED HAWK SOLAR LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-30","ia":"2025-10-21","cons_start":null,"first_seen":"2025-11","months_in_queue":11,"p36":0.478,"p36_basis":"122 of 255 solar projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":5,"loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["BLU"]}},{"inr":"25INR0768","name":"Stafford Hill BESS","fuel":"battery","tech":"BA","mw":9.9,"county":"Colorado","zone":"SOUTH","poi":"New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Stafford Hill TSP Station Code: STAFHI Load Name: LOAD1 Bus #: PTI Bus Number: 78520 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01","entity":"Colorado Clean Energy Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-01-02","ia":"2026-05-28","cons_start":null,"first_seen":"2026-06","months_in_queue":4,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.4722870967742,29.67036451612903],"method":"county centroid (substation not located)","subs":[],"codes":["STAFHI"]}},{"inr":"26INR0714","name":"Pavlov BESS2","fuel":"battery","tech":"BA","mw":9.99,"county":"Matagorda","zone":"COASTAL","poi":"New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Pavlov TSP Station Code: PAVLOV Load Name: 138_13_1 Bus #: PTI Bus Number: 8608 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01","entity":"Matagorda Clean Energy Center, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2026-12-25","ia":"2025-06-18","cons_start":null,"first_seen":"2026-04","months_in_queue":6,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.1262,28.99411],"method":"EIA plant record: same name and fuel in the same county (EIA plant 67493, \"Pavlov\", operating)","subs":[],"codes":["PAVLOV"],"eia_plant":67493}},{"inr":"26INR0734","name":"Alamo Street BESS2","fuel":"battery","tech":"BA","mw":9.99,"county":"Pecos","zone":"WEST","poi":"TSP Station Name:\tAlamo Street Sub TNP\nTSP Station Code:\t ALAMO_ST\nLoad Name / Load Transformer Name:\t ALAMO_2\nBus #: PTI Bus Number:\t 38331\nVoltage (Transmission level kV):\t 138\nNode (associated w/ load/load XFMR in NMMS):\t9631","entity":"Momentum Pilsner, LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-03-30","ia":"2023-02-01","cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["ALAMO_ST"]}},{"inr":"26INR0773","name":"Seaway BESS","fuel":"battery","tech":"BA","mw":9.9,"county":"Waller","zone":"HOUSTON","poi":"TSP Substation Name - Seaway\nTSP Substation Code - Seaway\nLoad Name/Load Transformer Name - LOAD_T-4\nBus # / PTI Bus Number: 57670\nVoltage (Transmission level Kv) - 138kV\nNode (associated w/ load/load XFMR in NMMS) - 0009","entity":"Mount Whitney Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-22","ia":"2024-12-11","cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.07973999999999,30.02432461538461],"method":"county centroid (substation not located)","subs":[],"codes":["SEAWAY"]}},{"inr":"26INR0774","name":"Wallis BESS2","fuel":"battery","tech":"BA","mw":9.9,"county":"Austin","zone":"SOUTH","poi":"TSP Substation Name - Wallis \nTSP Substation Code - WA\nLoad Name/Load Transformer Name - TR4\nBus # / PTI Bus Number: 44740\nVoltage (Transmission level kV) - 138 kV\nNode (associated w/ load/load XFMR in NMMS) - TR4","entity":"Denali Energy Storage LLC","stage":"ia","stage_label":"Interconnection agreement signed","cod":"2027-02-22","ia":"2024-12-11","cons_start":null,"first_seen":"2026-08","months_in_queue":2,"p36":0.758,"p36_basis":"138 of 182 battery projects at this stage were approved to synchronize within 36 months (ERCOT GIS 2018-12 to 2026-10)","expected_mw":8,"loc":{"pt":[-96.07624,29.63097],"method":"ERCOT bus number -> substation","subs":["Wallis Substation"],"codes":["WA"],"osm":"osm:way/94434949"}}],"built_recent":[{"inr":"16INR0104","name":"Big Sampson Wind","fuel":"wind","mw":265.4,"county":"Crockett","synced":"2025-06","loc":{"pt":[-101.8672315789474,30.74067763157894],"method":"county centroid (substation not located)","subs":[],"codes":["CEDACA","NOELKE"]}},{"inr":"19INR0002","name":"Grandfalls Solar","fuel":"solar","mw":175.6,"county":"Upton","synced":"2026-07","loc":{"pt":[-102.09783999999999,31.42398],"method":"county centroid (substation not located)","subs":[],"codes":["KINGMTSW"]}},{"inr":"19INR0035","name":"Norton Solar","fuel":"solar","mw":125.54,"county":"Runnels","synced":"2025-08","loc":{"pt":[-100.02768,31.78114],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"19INR0042","name":"Long Point Solar","fuel":"solar","mw":120.7,"county":"Brazoria","synced":"2025-12","loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["BKE","EGL"]}},{"inr":"19INR0054","name":"Monte Cristo 1 Wind","fuel":"wind","mw":234.5,"county":"Hidalgo","synced":"2025-07","loc":{"pt":[-98.33322000000001,26.3945],"method":"tap between two located substations","subs":["Pomelo Substation","North Edinburg Substation"],"codes":["POMELO","NEDIN"]}},{"inr":"19INR0110","name":"Azalea Springs Solar","fuel":"solar","mw":181,"county":"Angelina","synced":"2025-02","loc":{"pt":[-94.64201866666667,31.276913333333336],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"20INR0091","name":"Fagus Solar Park 1 SLF","fuel":"solar","mw":166.42,"county":"Childress","synced":"2025-08","loc":{"pt":[-100.08684,34.37339],"method":"ERCOT bus number -> substation","subs":["Tesla Substation"],"codes":["TESLA"],"osm":"osm:way/453794442"}},{"inr":"20INR0216","name":"Starr Solar Ranch","fuel":"solar","mw":136.73,"county":"Starr","synced":"2024-10","loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["ROMA_SW"]}},{"inr":"21INR0207","name":"Quantum Solar","fuel":"solar","mw":321.66,"county":"Haskell","synced":"2026-04","loc":{"pt":[-99.7829,33.22218],"method":"county centroid (substation not located)","subs":[],"codes":["KILBY"]}},{"inr":"20INR0155","name":"Peyton Creek Wind II","fuel":"wind","mw":241.2,"county":"Matagorda","synced":"2025-02","loc":{"pt":[-95.83243783783784,28.936727027027025],"method":"county centroid (substation not located)","subs":[],"codes":["REF"]}},{"inr":"20INR0222","name":"Tyson Nick Solar","fuel":"solar","mw":90.5,"county":"Lamar","synced":"2025-06","loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["TCOSW"]}},{"inr":"20INR0242","name":"Anson Solar 2","fuel":"solar","mw":200.9,"county":"Jones","synced":"2025-11","loc":{"pt":[-99.84577142857142,32.64467142857143],"method":"county centroid (substation not located)","subs":[],"codes":["PHNTMHL"]}},{"inr":"21INR0240","name":"La Casa Wind","fuel":"wind","mw":148.4,"county":"Stephens","synced":"2025-11","loc":{"pt":[-98.76882,32.37395],"method":"substation matched by name in the POI","subs":["Leon Switching Station"],"codes":[]}},{"inr":"21INR0268","name":"Greyhound Solar","fuel":"solar","mw":335.45,"county":"Ector","synced":"2026-04","loc":{"pt":[-102.49554,31.81327],"method":"one end of the tapped line, matched by name in the POI","subs":["Moss Substation"],"codes":["WLFSW","MOSSW"]}},{"inr":"20INR0203","name":"Pine Forest Solar","fuel":"solar","mw":301.51,"county":"Hopkins","synced":"2025-07","loc":{"pt":[-95.04204,33.0916],"method":"substation matched by name in the POI","subs":["Monticello substation"],"codes":[]}},{"inr":"20INR0208","name":"Signal Solar","fuel":"solar","mw":51.79,"county":"Hunt","synced":"2024-11","loc":{"pt":[-96.04117000000001,32.98473],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"20INR0241","name":"Crowded Star Solar","fuel":"solar","mw":218.79,"county":"Jones","synced":"2026-05","loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"21INR0223","name":"Tulsita Solar","fuel":"solar","mw":256.2,"county":"Goliad","synced":"2024-10","loc":{"pt":[-97.78854,28.59823],"method":"ERCOT bus number -> substation","subs":["Tuleta Substation"],"codes":["TULETA"],"osm":"osm:way/489376746"}},{"inr":"21INR0253","name":"Ulysses Solar","fuel":"solar","mw":151.2,"county":"Coke","synced":"2026-10","loc":{"pt":[-100.5879,31.92896],"method":"county centroid (substation not located)","subs":[],"codes":["ODYSSEUS"]}},{"inr":"22INR0203","name":"Delilah Solar 2","fuel":"solar","mw":317.58,"county":"Lamar","synced":"2025-01","loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["TTRSW"]}},{"inr":"20INR0248","name":"DAMAZO (Second Division) SOLAR","fuel":"solar","mw":100.2,"county":"Brazoria","synced":"2024-10","loc":{"pt":[-95.65756,29.15679],"method":"ERCOT bus number -> substation","subs":["West Columbia Substation"],"codes":["WC"],"osm":"osm:way/336964607"}},{"inr":"21INR0379","name":"Ash Creek Solar","fuel":"solar","mw":417.74,"county":"Hill","synced":"2025-01","loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["SAMSW"]}},{"inr":"21INR0393","name":"Orange Grove Solar","fuel":"solar","mw":130.6,"county":"Jim Wells","synced":"2025-04","loc":{"pt":[-97.96141,27.91895],"method":"ERCOT bus number -> substation","subs":["Orange Grove Switching Station"],"codes":["ORNGROV"],"osm":"osm:way/489453644"}},{"inr":"20INR0236","name":"New Hickory Solar","fuel":"solar","mw":209.15,"county":"Jackson","synced":"2026-09","loc":{"pt":[-96.65293125000004,28.82939375],"method":"county centroid (substation not located)","subs":[],"codes":["G6"]}},{"inr":"21INR0362","name":"Oystercatcher Solar","fuel":"solar","mw":198.43,"county":"Ellis","synced":"2026-10","loc":{"pt":[-96.79536,32.204],"method":"tap between two located substations","subs":["Venus Substation","Navarro Switching Station"],"codes":["VENSW","NAVARRO"]}},{"inr":"23INR0007","name":"Outpost Solar","fuel":"solar","mw":517.3,"county":"Webb","synced":"2025-03","loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"21INR0334","name":"Nightfall Solar","fuel":"solar","mw":180.87,"county":"Uvalde","synced":"2026-10","loc":{"pt":[-99.83225999999999,29.41034],"method":"county centroid (substation not located)","subs":[],"codes":["DRYFRIO","UVALDE"]}},{"inr":"21INR0490","name":"Samson Solar 2","fuel":"solar","mw":203,"county":"Lamar","synced":"2024-10","loc":{"pt":[-95.6126870967742,33.70061612903227],"method":"county centroid (substation not located)","subs":[],"codes":["TTRSW"]}},{"inr":"21INR0359","name":"Hickerson Solar","fuel":"solar","mw":311.1,"county":"Bosque","synced":"2025-08","loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"21INR0368","name":"Eliza Solar","fuel":"solar","mw":151.7,"county":"Kaufman","synced":"2024-10","loc":{"pt":[-95.25356,32.41986],"method":"one end of the tapped line, matched by name in the POI","subs":["Shamburger Substation"],"codes":["RYSSW","SHBSW"]}},{"inr":"23INR0031","name":"Solace Solar","fuel":"solar","mw":321.64,"county":"Haskell","synced":"2026-03","loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"22INR0283","name":"Peregrine Solar","fuel":"solar","mw":301.3,"county":"Goliad","synced":"2024-11","loc":{"pt":[-97.21284,28.71689],"method":"ERCOT bus number -> substation","subs":["Coleto Creek Substation"],"codes":["COLETO"],"osm":"osm:way/174682092"}},{"inr":"22INR0349","name":"Antlia BESS","fuel":"other","mw":72.38,"county":"Val Verde","synced":"2025-03","loc":{"pt":[-100.8144,29.77949],"method":"ERCOT bus number -> substation","subs":["Maxwell"],"codes":["MAXWELL"],"osm":"osm:way/1095751062"}},{"inr":"22INR0270","name":"Millers Branch Solar I","fuel":"solar","mw":200,"county":"Haskell","synced":"2025-08","loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"22INR0353","name":"Carina BESS","fuel":"battery","mw":154.11,"county":"Nueces","synced":"2025-04","loc":{"pt":[-97.50795714285712,27.78825873015873],"method":"county centroid (substation not located)","subs":[],"codes":["CLARK_WD"]}},{"inr":"23INR0044","name":"Parliament Solar","fuel":"solar","mw":484.56,"county":"Waller","synced":"2025-06","loc":{"pt":[-96.08152,30.62254],"method":"one end of the tapped line, matched by name in the POI","subs":["Gibbons Creek Station"],"codes":["ZEN","GIBCRK"]}},{"inr":"23INR0047","name":"Charger Solar","fuel":"solar","mw":397.15,"county":"Refugio","synced":"2026-07","loc":{"pt":[-97.13747368421049,28.30158947368421],"method":"county centroid (tap midpoint fell outside the project county)","subs":["Angstrom Substation","South Texas Project Switchyard"],"codes":["ANGSTROM","STP"]}},{"inr":"21INR0443","name":"Cottonwood Bayou Storage","fuel":"battery","mw":153.03,"county":"Brazoria","synced":"2025-05","loc":{"pt":[-95.25759500000001,29.26607],"method":"tap between two located substations","subs":["Liverpool Substation","Petson Substation"],"codes":["LV","PET"]}},{"inr":"21INR0517","name":"Tidwell Prairie Storage 1","fuel":"battery","mw":204,"county":"Robertson","synced":"2025-08","loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"22INR0368","name":"Padua Grid BESS","fuel":"battery","mw":51.1,"county":"Bexar","synced":"2025-04","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["CALAVERS"]}},{"inr":"22INR0260","name":"Eliza Storage","fuel":"battery","mw":100.4,"county":"Kaufman","synced":"2024-10","loc":{"pt":[-95.25356,32.41986],"method":"one end of the tapped line, matched by name in the POI","subs":["Shamburger Substation"],"codes":["RYSSW","SHBSW"]}},{"inr":"22INR0261","name":"Dorado Solar","fuel":"solar","mw":401.35,"county":"Callahan","synced":"2025-12","loc":{"pt":[-99.42508,32.25434],"method":"county centroid (substation not located)","subs":[],"codes":["REATA"]}},{"inr":"22INR0388","name":"Cachi BESS","fuel":"battery","mw":205.46,"county":"Guadalupe","synced":"2025-04","loc":{"pt":[-97.96439333333332,29.63050666666667],"method":"county centroid (substation not located)","subs":[],"codes":["CLEASP"]}},{"inr":"23INR0079","name":"Chillingham Storage","fuel":"battery","mw":153.93,"county":"Bell","synced":"2025-03","loc":{"pt":[-97.5635916666667,31.034500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["BCESW"]}},{"inr":"23INR0103","name":"Burksol BESS","fuel":"battery","mw":103.27,"county":"Dickens","synced":"2024-12","loc":{"pt":[-100.87665,33.77829],"method":"ERCOT bus number -> substation","subs":["Cottonwood Substation"],"codes":["W_CW_345"],"osm":"osm:way/453589317"}},{"inr":"23INR0111","name":"PHOTON SOLAR 3 SLF","fuel":"solar","mw":109.99,"county":"Wharton","synced":"2024-10","loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["WAT"]}},{"inr":"24INR0010","name":"Pinnington Solar","fuel":"solar","mw":653.7,"county":"Jack","synced":"2025-10","loc":{"pt":[-98.15318571428573,33.2598],"method":"county centroid (substation not located)","subs":[],"codes":["LONSW"]}},{"inr":"22INR0354","name":"XE Murat [Adlong] Solar","fuel":"solar","mw":60.36,"county":"Harris","synced":"2024-11","loc":{"pt":[-95.09703,30.0049],"method":"ERCOT bus number -> substation","subs":["Atascocita Substation"],"codes":["AT"],"osm":"osm:way/336061354"}},{"inr":"23INR0054","name":"Tanglewood Solar","fuel":"solar","mw":250.96,"county":"Brazoria","synced":"2025-08","loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0160","name":"Grimes County Solar","fuel":"solar","mw":211.25,"county":"Grimes","synced":"2025-03","loc":{"pt":[-96.09855476190472,30.48254523809524],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"22INR0356","name":"Jungmann Solar","fuel":"solar","mw":40.21,"county":"Milam","synced":"2024-12","loc":{"pt":[-97.04909,30.89337],"method":"ERCOT bus number -> substation","subs":["Marak Substation"],"codes":["MARAK"],"osm":"osm:way/462426858"}},{"inr":"22INR0422","name":"Ferdinand Grid BESS","fuel":"battery","mw":205.5,"county":"Bexar","synced":"2026-02","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["LEON_CRK"]}},{"inr":"23INR0118","name":"Blevins Solar","fuel":"solar","mw":271.58,"county":"Falls","synced":"2025-03","loc":{"pt":[-96.98573,31.46665],"method":"one end of the tapped line, matched by name in the POI","subs":["Lake Creek Substation"],"codes":["BLFSW","LCSES"]}},{"inr":"23INR0119","name":"Blevins Storage","fuel":"battery","mw":181.33,"county":"Falls","synced":"2025-04","loc":{"pt":[-96.98573,31.46665],"method":"one end of the tapped line, matched by name in the POI","subs":["Lake Creek Substation"],"codes":["BLFSW","LCSES"]}},{"inr":"22INR0274","name":"Crowded Star Solar II","fuel":"solar","mw":189.5,"county":"Jones","synced":"2026-07","loc":{"pt":[-100.5456,32.62806],"method":"ERCOT bus number -> substation","subs":["Claytonville Substation"],"codes":["CLAYTNVL"],"osm":"osm:way/632013150"}},{"inr":"22INR0499","name":"Aquilla Lake 3 Wind","fuel":"wind","mw":297.4,"county":"Hill","synced":"2026-07","loc":{"pt":[-96.518,31.96399],"method":"ERCOT bus number -> substation","subs":["Navarro Switching Station"],"codes":["NAVARRO"],"osm":"osm:way/454919461"}},{"inr":"22INR0503","name":"Tidwell Prairie II Batt","fuel":"battery","mw":203.62,"county":"Robertson","synced":"2026-10","loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"22INR0511","name":"Gransolar Texas One","fuel":"solar","mw":50.8,"county":"Milam","synced":"2024-12","loc":{"pt":[-97.13262,30.59628],"method":"ERCOT bus number -> substation","subs":["Salty Substation"],"codes":["SALTY11"],"osm":"osm:way/509663249"}},{"inr":"24INR0023","name":"Compadre Solar","fuel":"solar","mw":405.7,"county":"Hill","synced":"2024-11","loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"22INR0525","name":"St. Gall II Energy Storage","fuel":"battery","mw":100.24,"county":"Pecos","synced":"2025-07","loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["LEONCRK"]}},{"inr":"22INR0517","name":"Lane City Wind","fuel":"wind","mw":199.5,"county":"Wharton","synced":"2025-07","loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["BLY"]}},{"inr":"23INR0078","name":"Shaw Solar","fuel":"solar","mw":124.65,"county":"Bandera","synced":"2026-07","loc":{"pt":[-99.11157,29.73648],"method":"ERCOT bus number -> substation","subs":["Bandera Substation"],"codes":["BANDER"],"osm":"osm:way/320757401"}},{"inr":"22INR0540","name":"Walstrom BESS","fuel":"battery","mw":205.31,"county":"Austin","synced":"2025-05","loc":{"pt":[-96.18297945205482,29.836741095890407],"method":"county centroid (substation not located)","subs":[],"codes":["PT"]}},{"inr":"23INR0195","name":"Desert Willow BESS","fuel":"battery","mw":154.4,"county":"Ellis","synced":"2025-01","loc":{"pt":[-97.07272,32.44401],"method":"ERCOT bus number -> substation","subs":["Venus Substation"],"codes":["VENSW"],"osm":"osm:way/147127242"}},{"inr":"23INR0287","name":"Avila BESS","fuel":"battery","mw":164.28,"county":"Pecos","synced":"2025-06","loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNAF"]}},{"inr":"23INR0296","name":"Trojan Solar SLF","fuel":"solar","mw":150.59,"county":"Cooke","synced":"2026-01","loc":{"pt":[-97.19572000000001,33.82535636363637],"method":"county centroid (substation not located)","subs":[],"codes":["CDESW"]}},{"inr":"23INR0299","name":"Anole BESS","fuel":"battery","mw":247.1,"county":"Dallas","synced":"2025-04","loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["TRCNR"]}},{"inr":"23INR0300","name":"Holzer Solar","fuel":"solar","mw":17.7,"county":"Midland","synced":"2026-07","loc":{"pt":[-102.0827,31.825559999999996],"method":"county centroid (substation not located)","subs":[],"codes":["SLNSW"]}},{"inr":"22INR0526","name":"Pine Forest BESS","fuel":"battery","mw":200.74,"county":"Hopkins","synced":"2025-07","loc":{"pt":[-96.70021,33.06014],"method":"one end of the tapped line, matched by name in the POI","subs":["Allen Switching Station"],"codes":["MNSES","ALNSW"]}},{"inr":"24INR0039","name":"Jaguar BESS","fuel":"battery","mw":314.25,"county":"McLennan","synced":"2025-05","loc":{"pt":[-97.01809,31.8977],"method":"one end of the tapped line, matched by name in the POI","subs":["Sam Switching Station"],"codes":["THSES","SAMSW"]}},{"inr":"23INR0343","name":"Corazon Storage","fuel":"battery","mw":204.8,"county":"Webb","synced":"2025-06","loc":{"pt":[-99.27564,27.57893],"method":"ERCOT bus number -> substation","subs":["Lobo Substation"],"codes":["LOBO"],"osm":"osm:way/174711657"}},{"inr":"23INR0350","name":"Fort Duncan BESS","fuel":"battery","mw":101.52,"county":"Maverick","synced":"2025-03","loc":{"pt":[-100.45602340425532,28.661644680851072],"method":"county centroid (substation not located)","subs":[],"codes":["ROSICR"]}},{"inr":"24INR0093","name":"Oriana Solar","fuel":"solar","mw":181,"county":"Victoria","synced":"2025-08","loc":{"pt":[-96.64583,28.80585],"method":"one end of the tapped line, matched by name in the POI","subs":["Vanderbilt Substation"],"codes":["RAYBURN","VANBLTSS"]}},{"inr":"22INR0549","name":"Tanzanite Storage","fuel":"battery","mw":265.8,"county":"Henderson","synced":"2025-03","loc":{"pt":[-96.05013599999998,32.21809599999999],"method":"county centroid (substation not located)","subs":[],"codes":["NATHENRC"]}},{"inr":"22INR0554","name":"Platinum Storage","fuel":"battery","mw":309.53,"county":"Fannin","synced":"2025-06","loc":{"pt":[-96.13250750000002,33.76935999999999],"method":"county centroid (substation not located)","subs":[],"codes":["VLYSO"]}},{"inr":"22INR0555","name":"TE Smith Storage","fuel":"battery","mw":125.36,"county":"Rockwall","synced":"2025-12","loc":{"pt":[-96.42992000000001,32.88122],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0219","name":"Dogfish BESS","fuel":"battery","mw":78.2,"county":"Pecos","synced":"2025-03","loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["ALAMO_ST","HOLIDAY"]}},{"inr":"23INR0351","name":"Seven Flags BESS","fuel":"battery","mw":102.7,"county":"Webb","synced":"2025-09","loc":{"pt":[-99.41759,27.45432],"method":"ERCOT bus number -> substation","subs":["Wormser Road Substation"],"codes":["WORMSER"],"osm":"osm:way/451971724"}},{"inr":"23INR0364","name":"Tierra Seca BESS","fuel":"battery","mw":102.7,"county":"Val Verde","synced":"2025-11","loc":{"pt":[-100.84918,29.37382],"method":"ERCOT bus number -> substation","subs":["Hamilton Road Substation"],"codes":["HAMILTON"],"osm":"osm:relation/5129437"}},{"inr":"23INR0249","name":"Limewood Solar","fuel":"solar","mw":204.6,"county":"Bell","synced":"2025-11","loc":{"pt":[-97.5635916666667,31.034500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["TMPCR"]}},{"inr":"23INR0358","name":"Castor BESS","fuel":"battery","mw":205.39,"county":"Brazoria","synced":"2026-02","loc":{"pt":[-95.65012,29.14926],"method":"substation matched by name in the POI","subs":["West Columbia Local Substation"],"codes":["WCOLLOCL"]}},{"inr":"22INR0468","name":"Lower Rio BESS","fuel":"other","mw":60.37,"county":"Hidalgo","synced":"2025-05","loc":{"pt":[-98.05777,26.20821],"method":"ERCOT bus number -> substation","subs":["Sioux Substation"],"codes":["SIOUX"],"osm":"osm:way/513155552"}},{"inr":"23INR0372","name":"Cross Trails Storage","fuel":"battery","mw":58.29,"county":"Scurry","synced":"2025-04","loc":{"pt":[-100.98097142857144,32.83984285714286],"method":"county centroid (substation not located)","subs":[],"codes":["WKN_BKR"]}},{"inr":"24INR0042","name":"Yaupon Solar SLF","fuel":"solar","mw":200.78,"county":"Milam","synced":"2026-08","loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"24INR0044","name":"Millers Branch Solar II","fuel":"solar","mw":178,"county":"Haskell","synced":"2026-03","loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"24INR0166","name":"Stillhouse Solar","fuel":"solar","mw":210.8,"county":"Bell","synced":"2025-07","loc":{"pt":[-97.5635916666667,31.034500000000005],"method":"county centroid (substation not located)","subs":[],"codes":["BCESW","LTPSW"]}},{"inr":"23INR0419","name":"SAHARA BESS (SOHO BESS)","fuel":"battery","mw":204.4,"county":"Brazoria","synced":"2026-02","loc":{"pt":[-95.30817,29.45627],"method":"ERCOT bus number -> substation","subs":["Oasis Substation"],"codes":["OAS"],"osm":"osm:way/174317157"}},{"inr":"24INR0128","name":"Desna BESS","fuel":"battery","mw":205.46,"county":"Brazoria","synced":"2026-03","loc":{"pt":[-95.73493,29.06443],"method":"ERCOT bus number -> substation","subs":["FM 524 Substation"],"codes":["FM524"],"osm":"osm:way/583058250"}},{"inr":"23INR0381","name":"Bexar ESS","fuel":"battery","mw":102.6,"county":"Bexar","synced":"2025-06","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["X5"]}},{"inr":"23INR0401","name":"Headcamp Energy Storage Plant","fuel":"battery","mw":152.88,"county":"Pecos","synced":"2025-09","loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["ALAMO_ST","HOLIDAY"]}},{"inr":"23INR0336","name":"Bypass Battery Storage","fuel":"battery","mw":207.89,"county":"Fort Bend","synced":"2025-11","loc":{"pt":[-95.62422,29.48078],"method":"ERCOT bus number -> substation","subs":["W. A. Parish Station (345 kV)"],"codes":["WAP"],"osm":"osm:way/20875804"}},{"inr":"24INR0031","name":"Stoneridge Solar","fuel":"solar","mw":201.6,"county":"Milam","synced":"2025-04","loc":{"pt":[-97.07689,30.57741],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Sandow Station"],"codes":["SNDSW","AUSTRO"]}},{"inr":"25INR0055","name":"Three W Solar","fuel":"solar","mw":110.89,"county":"Hill","synced":"2026-03","loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["HLSBR","BLANTON"]}},{"inr":"24INR0208","name":"Eastbell Milam Solar II","fuel":"solar","mw":150.6,"county":"Milam","synced":"2024-11","loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"24INR0265","name":"Jarvis BESS","fuel":"battery","mw":308.4,"county":"Brazoria","synced":"2024-11","loc":{"pt":[-95.30817,29.45627],"method":"ERCOT bus number -> substation","subs":["Oasis Substation"],"codes":["OAS"],"osm":"osm:way/174317157"}},{"inr":"24INR0294","name":"Citrus Flatts BESS","fuel":"battery","mw":103.01,"county":"Cameron","synced":"2026-01","loc":{"pt":[-97.66456,26.20666],"method":"ERCOT bus number -> substation","subs":["Oleander Substation"],"codes":["OLEANDER"],"osm":"osm:way/501854961"}},{"inr":"24INR0295","name":"Lucky Bluff BESS SLF","fuel":"battery","mw":100.8,"county":"Erath","synced":"2025-09","loc":{"pt":[-98.34747,32.07626],"method":"ERCOT bus number -> substation","subs":["Dublin Substation"],"codes":["DUBLN"],"osm":"osm:relation/7497857"}},{"inr":"23INR0225","name":"MRG GOODY SOLAR","fuel":"solar","mw":170.82,"county":"Lamar","synced":"2026-03","loc":{"pt":[-95.58098,33.63908],"method":"one end of the tapped line, matched by name in the POI","subs":["Paris Substation"],"codes":["TCOSW","PRSSW"]}},{"inr":"23INR0286","name":"Dry Creek Solar I","fuel":"solar","mw":201.06,"county":"Rusk","synced":"2025-05","loc":{"pt":[-94.59736249999999,32.1764125],"method":"county centroid (substation not located)","subs":[],"codes":["MLSES","ELKTN"]}},{"inr":"24INR0070","name":"Sypert Branch Solar Project","fuel":"solar","mw":261.15,"county":"Milam","synced":"2025-12","loc":{"pt":[-96.79167435897439,30.900261538461535],"method":"county centroid (substation not located)","subs":[],"codes":["BCESW"]}},{"inr":"24INR0302","name":"Pintail Pass BESS","fuel":"battery","mw":207.25,"county":"San Patricio","synced":"2026-03","loc":{"pt":[-97.43837,28.04431],"method":"ERCOT bus number -> substation","subs":["Angstrom Substation"],"codes":["ANGSTROM"],"osm":"osm:way/1089997597"}},{"inr":"22INR0467","name":"Bird Dog Energy Storage","fuel":"battery","mw":60.4,"county":"Live Oak","synced":"2026-08","loc":{"pt":[-98.03055384615384,28.31636923076923],"method":"county centroid (substation not located)","subs":[],"codes":["ARGENTA"]}},{"inr":"23INR0494","name":"Cartwheel BESS 1","fuel":"battery","mw":154.2,"county":"Hopkins","synced":"2025-09","loc":{"pt":[-95.5872457142857,33.27730285714285],"method":"county centroid (substation not located)","subs":[],"codes":["SSPSW","CSHSW"]}},{"inr":"24INR0116","name":"Hart Wind","fuel":"wind","mw":163.4,"county":"Castro","synced":"2025-07","loc":{"pt":[-102.03869,34.51974],"method":"ERCOT bus number -> substation","subs":["Ogallala Switching Station"],"codes":["OGALLALA"],"osm":"osm:way/453589277"}},{"inr":"24INR0138","name":"Midpoint Storage","fuel":"battery","mw":50.9,"county":"Hill","synced":"2025-10","loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["BLUMS","BLANTON"]}},{"inr":"24INR0139","name":"Midpoint Solar","fuel":"solar","mw":98.3,"county":"Hill","synced":"2025-10","loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["BLUMS","BLANTON"]}},{"inr":"24INR0140","name":"Gaia Storage","fuel":"battery","mw":78.81,"county":"Navarro","synced":"2026-01","loc":{"pt":[-96.1046,32.1261],"method":"ERCOT bus number -> substation","subs":["Trinidad Substation"],"codes":["TRSES"],"osm":"osm:relation/6810017"}},{"inr":"24INR0141","name":"Gaia Solar","fuel":"solar","mw":144.02,"county":"Navarro","synced":"2026-01","loc":{"pt":[-96.1046,32.1261],"method":"ERCOT bus number -> substation","subs":["Trinidad Substation"],"codes":["TRSES"],"osm":"osm:relation/6810017"}},{"inr":"24INR0181","name":"Bynum Solar Project","fuel":"solar","mw":56,"county":"Coryell","synced":"2026-02","loc":{"pt":[-97.64214000000001,31.62602],"method":"tap between two located substations","subs":["Olsen Substation","Sycamore Substation"],"codes":["OLSEN","SYCAMORE"]}},{"inr":"24INR0305","name":"MRG Goody Storage","fuel":"battery","mw":52.29,"county":"Lamar","synced":"2026-03","loc":{"pt":[-95.58098,33.63908],"method":"one end of the tapped line, matched by name in the POI","subs":["Paris Substation"],"codes":["TCOSW","PRSSW"]}},{"inr":"24INR0306","name":"Arroyo Storage","fuel":"battery","mw":183.76,"county":"Cameron","synced":"2026-06","loc":{"pt":[-97.628055,26.21203],"method":"tap between two located substations","subs":["Rio Hondo Substation","La Palma 345 kV Substation"],"codes":["RIOHONDO","LA_PALMA"]}},{"inr":"24INR0313","name":"Backbone Creek BESS","fuel":"battery","mw":124.1,"county":"Burnet","synced":"2026-09","loc":{"pt":[-98.26136,30.55228],"method":"ERCOT bus number -> substation","subs":["Starcke Substation"],"codes":["STARCK"],"osm":"osm:way/504607223"}},{"inr":"24INR0315","name":"Black Springs BESS","fuel":"battery","mw":120.68,"county":"Palo Pinto","synced":"2025-09","loc":{"pt":[-98.38665714285715,32.779971428571436],"method":"county centroid (substation not located)","subs":[],"codes":["ORANS"]}},{"inr":"24INR0329","name":"XE Murat [Adlong] Storage","fuel":"battery","mw":60.14,"county":"Harris","synced":"2025-04","loc":{"pt":[-95.09703,30.0049],"method":"ERCOT bus number -> substation","subs":["Atascocita Substation"],"codes":["AT"],"osm":"osm:way/336061354"}},{"inr":"23INR0344","name":"Hermes Solar","fuel":"solar","mw":100.36,"county":"Bell","synced":"2026-04","loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"23INR0506","name":"Beachwood II Power Station","fuel":"gas","mw":102,"county":"Brazoria","synced":"2024-10","loc":{"pt":[-95.42884,29.22677],"method":"ERCOT bus number -> substation","subs":["Angleton Substation"],"codes":["AE"],"osm":"osm:way/244479862"}},{"inr":"24INR0303","name":"Erika Solar","fuel":"solar","mw":200.5,"county":"Kaufman","synced":"2026-08","loc":{"pt":[-96.39716363636363,32.512172727272734],"method":"county centroid (substation not located)","subs":[],"codes":["ELKTN","TRCNR"]}},{"inr":"24INR0365","name":"Hermes Storage","fuel":"battery","mw":100.42,"county":"Bell","synced":"2026-04","loc":{"pt":[-96.69356,31.09127],"method":"ERCOT bus number -> substation","subs":["TNP One Substation"],"codes":["TNP_ONE"],"osm":"osm:way/173222711"}},{"inr":"24INR0405","name":"Crowned Heron BESS","fuel":"battery","mw":154.2,"county":"Fort Bend","synced":"2026-01","loc":{"pt":[-95.62422,29.48078],"method":"ERCOT bus number -> substation","subs":["W. A. Parish Station (345 kV)"],"codes":["WAP"],"osm":"osm:way/20875804"}},{"inr":"23INR0501","name":"Soda Lake BESS 1","fuel":"battery","mw":203.87,"county":"Crane","synced":"2025-11","loc":{"pt":[-102.31368,31.19334],"method":"ERCOT bus number -> substation","subs":["Soda Lake Substation"],"codes":["SODALA"],"osm":"osm:way/1454962661"}},{"inr":"24INR0364","name":"Pitts Dudik II","fuel":"solar","mw":30.23,"county":"Hill","synced":"2026-02","loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["ASHSW"]}},{"inr":"24INR0397","name":"Rhapsody Storage","fuel":"battery","mw":205.57,"county":"Harris","synced":"2026-02","loc":{"pt":[-95.01975,29.87283],"method":"ERCOT bus number -> substation","subs":["Crosby Substation"],"codes":["CS"],"osm":"osm:way/129320299"}},{"inr":"24INR0399","name":"Buzios Solar","fuel":"solar","mw":252,"county":"Motley","synced":"2025-10","loc":{"pt":[-101.028055,33.91866],"method":"tap between two substations (bus number + name)","subs":["Cottonwood Substation","White River Substation"],"codes":["W_CW_345","WHIT_RVR"]}},{"inr":"25INR0105","name":"Diver Solar","fuel":"solar","mw":225.59,"county":"Limestone","synced":"2025-08","loc":{"pt":[-96.13342,31.37105],"method":"ERCOT bus number -> substation","subs":["Jewett Substation"],"codes":["JEWET"],"osm":"osm:way/99932982"}},{"inr":"25INR0162","name":"SAHARA II BESS (SOHO II BESS)","fuel":"battery","mw":204.3,"county":"Brazoria","synced":"2026-02","loc":{"pt":[-95.30817,29.45627],"method":"ERCOT bus number -> substation","subs":["Oasis Substation"],"codes":["OAS"],"osm":"osm:way/174317157"}},{"inr":"26INR0023","name":"Leon Solar Park","fuel":"solar","mw":210.11,"county":"Leon","synced":"2026-06","loc":{"pt":[-95.92881718749999,31.299567187499992],"method":"county centroid (substation not located)","subs":[],"codes":["PLSSP"]}},{"inr":"24INR0210","name":"Raven Storage","fuel":"battery","mw":103.53,"county":"Wharton","synced":"2026-10","loc":{"pt":[-96.073245,29.57727],"method":"tap between two located substations","subs":["Wallis Substation","East Bernard Substation"],"codes":["WA","EB"]}},{"inr":"24INR0421","name":"Swift Air Solar","fuel":"solar","mw":146.5,"county":"Ector","synced":"2025-01","loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":["MOSSW","SOPOD"]}},{"inr":"24INR0436","name":"Carambola BESS","fuel":"battery","mw":100.9,"county":"Hidalgo","synced":"2026-03","loc":{"pt":[-98.20945806451613,26.20444516129033],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0231","name":"Apache Hill BESS","fuel":"battery","mw":201.15,"county":"Hood","synced":"2026-10","loc":{"pt":[-97.88045714285714,32.43618571428571],"method":"county centroid (substation not located)","subs":[],"codes":["HOD"]}},{"inr":"23INR0538","name":"Roadrunner Crossing BESS SLF","fuel":"battery","mw":0,"county":"Eastland","synced":"2025-12","loc":{"pt":[-98.84097142857142,32.25261428571429],"method":"county centroid (substation not located)","subs":[],"codes":["REATA"]}},{"inr":"24INR0482","name":"NRG THW GT 345 (TEF)","fuel":"gas","mw":456,"county":"Harris","synced":"2026-04","loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["THW"]}},{"inr":"24INR0493","name":"Crowned Heron BESS 2","fuel":"battery","mw":154.2,"county":"Fort Bend","synced":"2026-04","loc":{"pt":[-95.62422,29.48078],"method":"ERCOT bus number -> substation","subs":["W. A. Parish Station (345 kV)"],"codes":["WAP"],"osm":"osm:way/20875804"}},{"inr":"25INR0223","name":"TImmerman Power Plant","fuel":"gas","mw":188.4,"county":"Caldwell","synced":"2025-06","loc":{"pt":[-97.61386,30.23198],"method":"ERCOT bus number -> substation","subs":["Hornsby Substation"],"codes":["HORNSB"],"osm":"osm:way/1217222649"}},{"inr":"24INR0460","name":"Evelyn Battery Energy Storage System","fuel":"battery","mw":221.3,"county":"Galveston","synced":"2025-06","loc":{"pt":[-94.88558831168828,29.4265025974026],"method":"county centroid (substation not located)","subs":[],"codes":["HDNLAKES"]}},{"inr":"24INR0477","name":"Barrett Solar","fuel":"solar","mw":125.81,"county":"Rains","synced":"2025-12","loc":{"pt":[-95.82586470588235,32.81474117647059],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0491","name":"Gunnar BESS","fuel":"battery","mw":154.75,"county":"Hidalgo","synced":"2026-09","loc":{"pt":[-98.20945806451613,26.20444516129033],"method":"county centroid (substation not located)","subs":[],"codes":["CLOSNER"]}},{"inr":"25INR0166","name":"Compadre Solar II","fuel":"solar","mw":201.4,"county":"Hill","synced":"2026-07","loc":{"pt":[-97.33231081081081,31.97887297297298],"method":"county centroid (substation not located)","subs":[],"codes":["SAMSW","FTSSW"]}},{"inr":"25INR0168","name":"Piedra Solar","fuel":"solar","mw":281.7,"county":"Freestone","synced":"2026-08","loc":{"pt":[-96.38253,31.69417],"method":"tap between two substations (bus number + name)","subs":["Navarro Switching Station","Limestone Station"],"codes":["NAVARRO","LEG"]}},{"inr":"25INR0300","name":"Wizard BESS","fuel":"battery","mw":150.82,"county":"Galveston","synced":"2025-10","loc":{"pt":[-94.88558831168828,29.4265025974026],"method":"county centroid (substation not located)","subs":[],"codes":["LEAGCITY"]}},{"inr":"25INR0329","name":"Lynx Energy Storage","fuel":"battery","mw":125.3,"county":"Nueces","synced":"2026-04","loc":{"pt":[-97.88623,27.5307],"method":"ERCOT bus number -> substation","subs":["Kingsville Substation"],"codes":["KINGSVIL"],"osm":"osm:way/490190283"}},{"inr":"25INR0389","name":"Stoneridge BESS","fuel":"battery","mw":101.9,"county":"Milam","synced":"2025-07","loc":{"pt":[-97.07689,30.57741],"method":"tap: end substation in the project county (the midpoint fell outside it)","subs":["Sandow Station"],"codes":["SNDSW","AUSTRO"]}},{"inr":"26INR0049","name":"Pin Peaking Energy Center 1 (TEF- Due Diligence)","fuel":"gas","mw":228,"county":"Freestone","synced":"2026-02","loc":{"pt":[-96.11341,31.89026],"method":"ERCOT bus number -> substation","subs":["Richland Chambers Substation"],"codes":["RCHBR"],"osm":"osm:way/172583750"}},{"inr":"26INR0109","name":"Pin Peaking Energy Center 2 (TEF- Due Diligence)","fuel":"gas","mw":228,"county":"Freestone","synced":"2026-02","loc":{"pt":[-96.11341,31.89026],"method":"ERCOT bus number -> substation","subs":["Richland Chambers Substation"],"codes":["RCHBR"],"osm":"osm:way/172583750"}},{"inr":"24INR0456","name":"FRIENDSWOOD ENERGY GENCO","fuel":"gas","mw":143.7,"county":"Harris","synced":"2025-10","loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["HOC"]}},{"inr":"23INR0523","name":"Damon BESS","fuel":"battery","mw":4.98,"county":"Brazoria","synced":"2024-11","loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["DA"]}},{"inr":"24INR0533","name":"Padua Grid BESS Unit 2","fuel":"battery","mw":150.94,"county":"Bexar","synced":"2026-01","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["CALAVERS"]}},{"inr":"24INR0578","name":"Panther Creek 1 Repower","fuel":"wind","mw":11,"county":"Glasscock","synced":"2024-10","loc":{"pt":[-101.45234,32.1003],"method":"ERCOT bus number -> substation","subs":["Longshore Substation"],"codes":["LNGSW"],"osm":"osm:way/172212648"}},{"inr":"24INR0582","name":"Panther Creek 2 Repower","fuel":"wind","mw":8,"county":"Glasscock","synced":"2024-10","loc":{"pt":[-101.45234,32.1003],"method":"ERCOT bus number -> substation","subs":["Longshore Substation"],"codes":["LNGSW"],"osm":"osm:way/172212648"}},{"inr":"24INR0584","name":"Kegans BESS (Houston IV BESS)","fuel":"battery","mw":164.6,"county":"Harris","synced":"2026-06","loc":{"pt":[-95.62072,29.67479],"method":"ERCOT bus number -> substation","subs":["Clodine Substation"],"codes":["CE"],"osm":"osm:way/304890197"}},{"inr":"25INR0467","name":"Bocanova Power","fuel":"other","mw":150.46,"county":"Brazoria","synced":"2025-06","loc":{"pt":[-95.24944,29.43331],"method":"ERCOT bus number -> substation","subs":["Alvin Substation"],"codes":["ALVIN"],"osm":"osm:way/338305186"}},{"inr":"24INR0568","name":"Shamrock Energy Storage (SLF)","fuel":"other","mw":0,"county":"Crockett","synced":"2024-11","loc":{"pt":[-101.8672315789474,30.74067763157894],"method":"county centroid (substation not located)","subs":[],"codes":["SINGTR"]}},{"inr":"24INR0605","name":"TEXAS GULF SULPHUR REPOWER","fuel":"gas","mw":16.1,"county":"Wharton","synced":"2025-02","loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["GLF"]}},{"inr":"23INR0556","name":"IEP Orchard BESS","fuel":"battery","mw":9.99,"county":"Fort Bend","synced":"2024-12","loc":{"pt":[-95.95376,29.53926],"method":"ERCOT bus number -> substation","subs":["Orchard Substation"],"codes":["OR"],"osm":"osm:way/127589338"}},{"inr":"24INR0627","name":"Champion Wind Repower","fuel":"wind","mw":0.31,"county":"Nolan","synced":"2025-01","loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"24INR0630","name":"Andromeda Storage SLF","fuel":"battery","mw":0,"county":"Scurry","synced":"2025-04","loc":{"pt":[-100.98097142857144,32.83984285714286],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0631","name":"Radian Storage SLF","fuel":"battery","mw":0,"county":"Brown","synced":"2025-04","loc":{"pt":[-99.19531,31.53798],"method":"substation matched by name in the POI","subs":["Brown Substation"],"codes":["BWNSW"]}},{"inr":"25INR0492","name":"Blue Summit Energy Storage","fuel":"battery","mw":100,"county":"Wilbarger","synced":"2026-02","loc":{"pt":[-99.43416,34.23416],"method":"ERCOT bus number -> substation","subs":["Jim Treece Substation"],"codes":["JIMTREEC"],"osm":"osm:way/454325994"}},{"inr":"25INR0503","name":"Timmerman Power Plant Phase 2","fuel":"gas","mw":188.4,"county":"Caldwell","synced":"2026-02","loc":{"pt":[-97.76035,29.792314705882347],"method":"county centroid (substation not located)","subs":[],"codes":["JOHNDU"]}},{"inr":"26INR0333","name":"VERTUS ENERGY STORAGE","fuel":"battery","mw":207.3,"county":"Galveston","synced":"2026-01","loc":{"pt":[-94.88558831168828,29.4265025974026],"method":"county centroid (substation not located)","subs":[],"codes":["MAINLAND"]}},{"inr":"24INR0610","name":"Century BESS","fuel":"battery","mw":9.88,"county":"Tarrant","synced":"2024-10","loc":{"pt":[-97.34302,32.72868],"method":"county centroid (substation not located)","subs":[],"codes":["MMILL","SW_MESA","CNTRY"]}},{"inr":"25INR0578","name":"Forest Creek Wind Repower","fuel":"wind","mw":125.1,"county":"Glasscock","synced":"2025-08","loc":{"pt":[-101.27561,32.08625],"method":"ERCOT bus number -> substation","subs":["McDonald Road Substation"],"codes":["MCDLD"],"osm":"osm:way/354601987"}},{"inr":"23INR0499","name":"Laureles BESS","fuel":"battery","mw":9.9,"county":"Cameron","synced":"2025-07","loc":{"pt":[-97.54726,26.1226],"method":"ERCOT bus number -> substation","subs":["Laureles Substation"],"codes":["LAURELES"],"osm":"osm:way/513362345"}},{"inr":"24INR0499","name":"Medina Lake BESS","fuel":"battery","mw":9.8,"county":"Bandera","synced":"2025-04","loc":{"pt":[-99.17188181818182,29.718163636363634],"method":"county centroid (substation not located)","subs":[],"codes":["MEDILA"]}},{"inr":"25INR0531","name":"CPS Energy AvR1CT2 Rotor Replacement","fuel":"gas","mw":23.2,"county":"Bexar","synced":"2024-11","loc":{"pt":[-98.38268,29.25803],"method":"ERCOT bus number -> substation","subs":["Braunig Switchyard"],"codes":["BRAUNIG"],"osm":"osm:way/319115059"}},{"inr":"26INR0309","name":"Solace Storage","fuel":"battery","mw":321.79,"county":"Haskell","synced":"2026-03","loc":{"pt":[-100.6841,32.53094],"method":"ERCOT bus number -> substation","subs":["Tonkawa Substation"],"codes":["TKWSW"],"osm":"osm:way/171793142"}},{"inr":"26INR0310","name":"Quantum Storage","fuel":"battery","mw":321.75,"county":"Haskell","synced":"2026-04","loc":{"pt":[-99.7829,33.22218],"method":"county centroid (substation not located)","subs":[],"codes":["KILBY"]}},{"inr":"22INR0590","name":"Muenster BESS","fuel":"battery","mw":9.9,"county":"Cooke","synced":"2024-11","loc":{"pt":[-97.19572000000001,33.82535636363637],"method":"county centroid (substation not located)","subs":[],"codes":["MUENSTER"]}},{"inr":"24INR0647","name":"OLNEY AGR1","fuel":"other","mw":9.95,"county":"Young","synced":"2025-05","loc":{"pt":[-98.74132,33.22008],"method":"county centroid (substation not located)","subs":[],"codes":["OLNEYTN"]}},{"inr":"26INR0405","name":"Buffalo Creek BESS","fuel":"battery","mw":251.4,"county":"Fort Bend","synced":"2026-02","loc":{"pt":[-95.8873545454545,29.500803030303036],"method":"county centroid (substation not located)","subs":[],"codes":["CCK"]}},{"inr":"26INR0447","name":"Honey Mesquite Wind Farm","fuel":"wind","mw":173.95,"county":"Glasscock","synced":"2026-08","loc":{"pt":[-101.57186,31.912620000000004],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"28INR0024","name":"Padua Grid BESS Unit 3","fuel":"battery","mw":201.35,"county":"Bexar","synced":"2026-06","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["CALAVERS"]}},{"inr":"23INR0500","name":"Fort Mason BESS","fuel":"battery","mw":9.99,"county":"Mason","synced":"2024-11","loc":{"pt":[-99.23177,30.73773],"method":"ERCOT bus number -> substation","subs":["Fort Mason Substation"],"codes":["FORTMA"],"osm":"osm:way/192674614"}},{"inr":"23INR0618","name":"Farmersville West BESS  2","fuel":"battery","mw":9.9,"county":"Collin","synced":"2024-10","loc":{"pt":[-96.55485714285714,33.20755714285714],"method":"county centroid (substation not located)","subs":[],"codes":["FRMRSVLW"]}},{"inr":"23INR0807","name":"Mayberry II BESS","fuel":"battery","mw":9.95,"county":"Hidalgo","synced":"2024-11","loc":{"pt":[-98.32144,26.18801],"method":"ERCOT bus number -> substation","subs":["Mayberry Substation"],"codes":["MAYBERRY"],"osm":"osm:way/512936565"}},{"inr":"23INR0529","name":"Torrecillas BESS","fuel":"battery","mw":9.9,"county":"Webb","synced":"2025-07","loc":{"pt":[-99.70685194805196,27.717537662337673],"method":"county centroid (substation not located)","subs":[],"codes":["TORR"]}},{"inr":"23INR0619","name":"Junction North BESS","fuel":"battery","mw":9.9,"county":"Kimble","synced":"2024-10","loc":{"pt":[-99.70328571428571,30.529714285714284],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"24INR0545","name":"Spencer BESS","fuel":"battery","mw":9.9,"county":"Harris","synced":"2025-06","loc":{"pt":[-95.19077,29.65784],"method":"ERCOT bus number -> substation","subs":["Spencer Substation"],"codes":["SP"],"osm":"osm:way/52071276"}},{"inr":"24INR0546","name":"Crosby BESS","fuel":"battery","mw":9.9,"county":"Harris","synced":"2025-01","loc":{"pt":[-95.01975,29.87283],"method":"ERCOT bus number -> substation","subs":["Crosby Substation"],"codes":["CS"],"osm":"osm:way/129320299"}},{"inr":"24INR0547","name":"Angleton BESS","fuel":"battery","mw":9.9,"county":"Brazoria","synced":"2025-01","loc":{"pt":[-95.42884,29.22677],"method":"ERCOT bus number -> substation","subs":["Angleton Substation"],"codes":["AE"],"osm":"osm:way/244479862"}},{"inr":"24INR0591","name":"Citrus City BESS","fuel":"battery","mw":9.9,"county":"Hidalgo","synced":"2025-03","loc":{"pt":[-98.35134,26.32108],"method":"ERCOT bus number -> substation","subs":["Citrus City Substation"],"codes":["CITRUSCY"],"osm":"osm:way/512042596"}},{"inr":"24INR0592","name":"Rio Grande City BESS 2","fuel":"battery","mw":9.9,"county":"Starr","synced":"2025-04","loc":{"pt":[-98.88057209302325,26.41047441860465],"method":"county centroid (substation not located)","subs":[],"codes":["RIO_GRAN"]}},{"inr":"24INR0660","name":"Liggett Switch BESS","fuel":"battery","mw":9.88,"county":"Dallas","synced":"2024-10","loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["LIGSW"]}},{"inr":"25INR0672","name":"Fagus Solar Park 2 SLF","fuel":"solar","mw":166.57,"county":"Childress","synced":"2025-07","loc":{"pt":[-100.08684,34.37339],"method":"ERCOT bus number -> substation","subs":["Tesla Substation"],"codes":["TESLA"],"osm":"osm:way/453794442"}},{"inr":"24INR0593","name":"Falfur BESS","fuel":"other","mw":9.8,"county":"Brooks","synced":"2025-02","loc":{"pt":[-98.14209,27.24233],"method":"ERCOT bus number -> substation","subs":["Falfurrias Substation"],"codes":["FALFUR"],"osm":"osm:way/511539470"}},{"inr":"24INR0659","name":"Empire Central BESS","fuel":"battery","mw":9.95,"county":"Dallas","synced":"2025-08","loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["EMPCT"]}},{"inr":"24INR0662","name":"Prairie Creek BESS","fuel":"battery","mw":9.95,"county":"Dallas","synced":"2025-07","loc":{"pt":[-96.8297,32.72304],"method":"county centroid (substation not located)","subs":[],"codes":["PRCRK"]}},{"inr":"24INR0759","name":"Tynan BESS1","fuel":"battery","mw":9.9,"county":"Bee","synced":"2025-02","loc":{"pt":[-97.6662,28.507738709677415],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"25INR0642","name":"Crockett BESS1","fuel":"battery","mw":9.95,"county":"Harris","synced":"2024-10","loc":{"pt":[-95.38012,29.77723],"method":"ERCOT bus number -> substation","subs":["Crockett Substation"],"codes":["CR"],"osm":"osm:way/282078353"}},{"inr":"24INR0596","name":"Hearn Road BESS","fuel":"other","mw":9.9,"county":"Nueces","synced":"2025-03","loc":{"pt":[-97.50795714285712,27.78825873015873],"method":"county centroid (substation not located)","subs":[],"codes":["HEARN_RD"]}},{"inr":"24INR0597","name":"Pirate BESS","fuel":"battery","mw":9.8,"county":"San Patricio","synced":"2025-01","loc":{"pt":[-98.4166,29.46347],"method":"ERCOT bus number -> substation","subs":["Holbrook Substation"],"codes":["Y1"],"osm":"osm:way/109019556"}},{"inr":"24INR0599","name":"Mustang Bayou BESS","fuel":"battery","mw":9.99,"county":"Brazoria","synced":"2025-05","loc":{"pt":[-95.20371,29.36273],"method":"ERCOT bus number -> substation","subs":["Mustang Bayou Substation"],"codes":["MU"],"osm":"osm:way/338305192"}},{"inr":"25INR0493","name":"PHOTON SOLAR 1 2 SLF","fuel":"solar","mw":235.66,"county":"Wharton","synced":"2024-10","loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["WAT"]}},{"inr":"25INR0673","name":"PHOTON SOLAR 4 SLF","fuel":"solar","mw":105.98,"county":"Wharton","synced":"2024-11","loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["WAT"]}},{"inr":"25INR0691","name":"PHOTON BESS2 SLF","fuel":"battery","mw":152.74,"county":"Wharton","synced":"2024-11","loc":{"pt":[-96.07051428571428,29.422259999999998],"method":"county centroid (substation not located)","subs":[],"codes":["WAT"]}},{"inr":"23INR0552","name":"Milton BESS","fuel":"battery","mw":9.9,"county":"Karnes","synced":"2025-04","loc":{"pt":[-97.78765,29.05645],"method":"ERCOT bus number -> substation","subs":["Milton Substation"],"codes":["MILTON"],"osm":"osm:way/425756331"}},{"inr":"24INR0560","name":"Pearsall BESS","fuel":"battery","mw":9.95,"county":"Frio","synced":"2024-12","loc":{"pt":[-99.1685,28.912219999999998],"method":"county centroid (substation not located)","subs":[],"codes":["PEARSALL"]}},{"inr":"24INR0594","name":"Hidden Valley BESS","fuel":"battery","mw":9.9,"county":"Harris","synced":"2025-11","loc":{"pt":[-95.42301,29.9112],"method":"ERCOT bus number -> substation","subs":["Hidden Valley Substation"],"codes":["HV"],"osm":"osm:way/338341256"}},{"inr":"24INR0595","name":"Gears BESS","fuel":"battery","mw":9.9,"county":"Harris","synced":"2025-07","loc":{"pt":[-95.44007,29.96472],"method":"ERCOT bus number -> substation","subs":["Gears Substation"],"codes":["GZ"],"osm":"osm:way/338295742"}},{"inr":"25INR0706","name":"Bocanova Power II","fuel":"battery","mw":150.46,"county":"Brazoria","synced":"2026-06","loc":{"pt":[-95.24944,29.43331],"method":"ERCOT bus number -> substation","subs":["Alvin Substation"],"codes":["ALVIN"],"osm":"osm:way/338305186"}},{"inr":"24INR0628","name":"Palmview BESS","fuel":"battery","mw":9.9,"county":"Hidalgo","synced":"2025-12","loc":{"pt":[-98.3664,26.23519],"method":"ERCOT bus number -> substation","subs":["Palmview Substation"],"codes":["PALMVIEW"],"osm":"osm:way/512644974"}},{"inr":"24INR0638","name":"Cotulla BESS 1","fuel":"battery","mw":9.9,"county":"La Salle","synced":"2025-08","loc":{"pt":[-99.255,28.44817],"method":"ERCOT bus number -> substation","subs":["Cotulla Substation"],"codes":["COTULLA"],"osm":"osm:way/20845821"}},{"inr":"24INR0642","name":"SE Edinburg BESS","fuel":"battery","mw":9.9,"county":"Hidalgo","synced":"2025-12","loc":{"pt":[-98.20945806451613,26.20444516129033],"method":"county centroid (substation not located)","subs":[],"codes":["AIRP","SE_EDINB"]}},{"inr":"25INR0701","name":"Abilene Elmcreek BESS","fuel":"battery","mw":9.9,"county":"Taylor","synced":"2025-12","loc":{"pt":[-99.94226,32.258],"method":"county centroid (substation not located)","subs":[],"codes":["ELMCRK"]}},{"inr":"25INR0702","name":"Abilene Industrial Park BESS","fuel":"battery","mw":9.9,"county":"Taylor","synced":"2025-12","loc":{"pt":[-99.94226,32.258],"method":"county centroid (substation not located)","subs":[],"codes":["ABINDUST"]}},{"inr":"25INR0715","name":"Poteet BESS","fuel":"battery","mw":9.95,"county":"Atascosa","synced":"2025-09","loc":{"pt":[-98.51171428571429,28.81537142857143],"method":"county centroid (substation not located)","subs":[],"codes":["POTEETS"]}},{"inr":"25INR0592","name":"Carrizo Springs BESS","fuel":"battery","mw":9.99,"county":"Dimmit","synced":"2025-07","loc":{"pt":[-99.82644,28.46788],"method":"county centroid (substation not located)","subs":[],"codes":["CARRIZO"]}},{"inr":"25INR0593","name":"Escondido BESS","fuel":"battery","mw":9.99,"county":"Maverick","synced":"2026-05","loc":{"pt":[-100.47445,28.72847],"method":"ERCOT bus number -> substation","subs":["Escondido Substation"],"codes":["ESCONDID"],"osm":"osm:way/21114385"}},{"inr":"25INR0594","name":"Goodwin BESS","fuel":"battery","mw":9.99,"county":"Hidalgo","synced":"2025-07","loc":{"pt":[-98.45157,26.24529],"method":"ERCOT bus number -> substation","subs":["Goodwin Substation"],"codes":["GOODWIN"],"osm":"osm:way/512360947"}},{"inr":"26INR0521","name":"Millers Branch Solar III","fuel":"solar","mw":133,"county":"Haskell","synced":"2026-07","loc":{"pt":[-99.60549,33.00137],"method":"ERCOT bus number -> substation","subs":["Clear Crossing Substation"],"codes":["CLEARCRO"],"osm":"osm:way/453376936"}},{"inr":"22INR0608","name":"Wharton BESS","fuel":"battery","mw":9.96,"county":"Wharton","synced":"2025-10","loc":{"pt":[-96.10764,29.31363],"method":"ERCOT bus number -> substation","subs":["Wharton Substation"],"codes":["WR"],"osm":"osm:way/99952197"}},{"inr":"25INR0597","name":"Lyssy BESS","fuel":"battery","mw":9.9,"county":"Wilson","synced":"2025-08","loc":{"pt":[-98.12005,28.8944],"method":"ERCOT bus number -> substation","subs":["Lyssy Substation"],"codes":["LYSSY"],"osm":"osm:way/489376760"}},{"inr":"25INR0647","name":"Lantana BESS","fuel":"battery","mw":9.99,"county":"Nueces","synced":"2025-11","loc":{"pt":[-97.50795714285712,27.78825873015873],"method":"county centroid (substation not located)","subs":[],"codes":["LANTANA"]}},{"inr":"25INR0648","name":"East Harrison BESS","fuel":"battery","mw":9.99,"county":"Cameron","synced":"2025-12","loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":["E_HARRIS"]}},{"inr":"25INR0649","name":"Olmito BESS","fuel":"battery","mw":9.99,"county":"Cameron","synced":"2025-07","loc":{"pt":[-97.51982,26.00153],"method":"ERCOT bus number -> substation","subs":["Olmito Substation"],"codes":["OLMITO"],"osm":"osm:way/513362297"}},{"inr":"25INR0665","name":"CPS Rio Nogales CT201 Rotor Replacement","fuel":"gas","mw":3.1,"county":"Guadalupe","synced":"2025-04","loc":{"pt":[-97.97493,29.59311],"method":"ERCOT bus number -> substation","subs":["Rio Nogales Switchyard"],"codes":["RIONOG"],"osm":"osm:way/174198532"}},{"inr":"25INR0655","name":"Elm Street BESS","fuel":"battery","mw":9.9,"county":"Reeves","synced":"2026-05","loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["ELM_ST"]}},{"inr":"25INR0696","name":"BESS Stadium","fuel":"battery","mw":9.9,"county":"Jim Wells","synced":"2025-11","loc":{"pt":[-98.05384,27.74608],"method":"ERCOT bus number -> substation","subs":["Stadium Substation"],"codes":["STADIUM"],"osm":"osm:way/490190299"}},{"inr":"25INR0697","name":"MESQUITE BESS","fuel":"battery","mw":9.9,"county":"Cameron","synced":"2025-12","loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":["MESQUITE"]}},{"inr":"26INR0512","name":"County Road BESS","fuel":"battery","mw":9.9,"county":"Reeves","synced":"2026-04","loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["CNTYRDS"]}},{"inr":"26INR0669","name":"Greyhound Solar - Phase E","fuel":"solar","mw":150.71,"county":"Ector","synced":"2025-09","loc":{"pt":[-102.49554,31.81327],"method":"one end of the tapped line, matched by name in the POI","subs":["Moss Substation"],"codes":["WLFSW","MOSSW"]}},{"inr":"26INR0670","name":"Greyhound Solar - Phase F","fuel":"solar","mw":101.6,"county":"Ector","synced":"2025-09","loc":{"pt":[-102.49554,31.81327],"method":"one end of the tapped line, matched by name in the POI","subs":["Moss Substation"],"codes":["WLFSW","MOSSW"]}},{"inr":"25INR0650","name":"Buda BESS","fuel":"battery","mw":9.9,"county":"Hays","synced":"2026-06","loc":{"pt":[-97.85113,30.0754],"method":"ERCOT bus number -> substation","subs":["Buda Substation"],"codes":["BUDA"],"osm":"osm:way/508455310"}},{"inr":"26INR0520","name":"Highway 6 BESS","fuel":"battery","mw":9.9,"county":"Brazos","synced":"2026-04","loc":{"pt":[-96.27738352941172,30.570391764705885],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"23INR0790","name":"DAMON BESS3","fuel":"battery","mw":9.96,"county":"Brazoria","synced":"2026-03","loc":{"pt":[-95.52754935064935,29.196114285714263],"method":"county centroid (substation not located)","subs":[],"codes":["DA"]}},{"inr":"25INR0747","name":"Knapp BESS","fuel":"battery","mw":9.95,"county":"Scurry","synced":"2025-11","loc":{"pt":[-101.05238,32.69158],"method":"ERCOT bus number -> substation","subs":["Knapp Substation"],"codes":["KNAPP"],"osm":"osm:way/467959303"}},{"inr":"25INR0777","name":"V4 Palo Alto DGR","fuel":"other","mw":33,"county":"Bexar","synced":"2025-08","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0666","name":"P2 HIGHLAND HILLS DGR","fuel":"other","mw":66,"county":"Bexar","synced":"2025-08","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0674","name":"X1 MEDINA BASE DGR","fuel":"other","mw":29,"county":"Bexar","synced":"2025-08","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0675","name":"A4 Pearsall DGR","fuel":"other","mw":58,"county":"Bexar","synced":"2025-08","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0676","name":"Q1 Valley Road DGR","fuel":"other","mw":29,"county":"Bexar","synced":"2025-09","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0683","name":"Z0 BECK ROAD DGR","fuel":"other","mw":60,"county":"Bexar","synced":"2025-10","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0684","name":"Z5 Southton DGR","fuel":"other","mw":29,"county":"Bexar","synced":"2025-08","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0694","name":"V2 Brooks Field DGR","fuel":"other","mw":76.5,"county":"Bexar","synced":"2025-10","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0574","name":"Apple BESS","fuel":"battery","mw":9.9,"county":"Ector","synced":"2026-10","loc":{"pt":[-102.59428,31.91234],"method":"county centroid (substation not located)","subs":[],"codes":[]}},{"inr":"26INR0682","name":"North Edinburg BESS 1","fuel":"battery","mw":9.99,"county":"Hidalgo","synced":"2026-08","loc":{"pt":[-98.18922,26.34411],"method":"ERCOT bus number -> substation","subs":["North Edinburg Substation"],"codes":["NEDIN"],"osm":"osm:way/174789429"}},{"inr":"26INR0691","name":"Harlingen #1 BESS 1","fuel":"battery","mw":9.99,"county":"Cameron","synced":"2026-08","loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":["HARLIN_1"]}},{"inr":"25INR0809","name":"Jaguar BESS_1","fuel":"battery","mw":157.1,"county":"McLennan","synced":"2025-07","loc":{"pt":[-97.01809,31.8977],"method":"one end of the tapped line, matched by name in the POI","subs":["Sam Switching Station"],"codes":["THSES","SAMSW"]}},{"inr":"25INR0742","name":"Gears BESS2","fuel":"battery","mw":9.95,"county":"Harris","synced":"2025-11","loc":{"pt":[-95.44007,29.96472],"method":"ERCOT bus number -> substation","subs":["Gears Substation"],"codes":["GZ"],"osm":"osm:way/338295742"}},{"inr":"25INR0743","name":"BERRY BESS1","fuel":"battery","mw":9.95,"county":"Harris","synced":"2025-11","loc":{"pt":[-95.3537,29.83947],"method":"ERCOT bus number -> substation","subs":["Berry Substation"],"codes":["BY"],"osm":"osm:way/147292999"}},{"inr":"25INR0763","name":"Alamo Street BESS","fuel":"battery","mw":9.99,"county":"Pecos","synced":"2026-01","loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["ALAMO_ST"]}},{"inr":"25INR0764","name":"Downtown BESS","fuel":"battery","mw":9.99,"county":"Pecos","synced":"2025-12","loc":{"pt":[-102.35819750000002,31.02573],"method":"county centroid (substation not located)","subs":[],"codes":["TNFS"]}},{"inr":"25INR0765","name":"Elm Street BESS2","fuel":"battery","mw":9.99,"county":"Reeves","synced":"2025-12","loc":{"pt":[-103.60777428571429,31.63211571428573],"method":"county centroid (substation not located)","subs":[],"codes":["ELM_ST","MEDIOCRK"]}},{"inr":"23INR0548","name":"Leakey BESS","fuel":"battery","mw":9.9,"county":"Real","synced":"2026-07","loc":{"pt":[-99.76192,29.68108],"method":"ERCOT bus number -> substation","subs":["Leakey Substation"],"codes":["LEAKEY"],"osm":"osm:way/15398679"}},{"inr":"24INR0501","name":"Utopia BESS","fuel":"battery","mw":9.8,"county":"Bandera","synced":"2026-02","loc":{"pt":[-99.52178,29.6462],"method":"ERCOT bus number -> substation","subs":["Utopia Substation"],"codes":["UTOPIA"],"osm":"osm:way/15390411"}},{"inr":"24INR0502","name":"Medina City BESS","fuel":"battery","mw":9.99,"county":"Bandera","synced":"2026-07","loc":{"pt":[-99.17188181818182,29.718163636363634],"method":"county centroid (substation not located)","subs":[],"codes":["MEDINA1"]}},{"inr":"25INR0710","name":"Cedarvale Gas","fuel":"gas","mw":9.9,"county":"Ward","synced":"2026-02","loc":{"pt":[-97.85946,30.23382],"method":"ERCOT bus number -> substation","subs":["Oak Hill Substation"],"codes":["OAKHILL"],"osm":"osm:way/337714282"}},{"inr":"25INR0766","name":"Mesquite BESS2","fuel":"battery","mw":9.99,"county":"Cameron","synced":"2025-12","loc":{"pt":[-97.43100813953488,26.094651162790697],"method":"county centroid (substation not located)","subs":[],"codes":["MESQUITE"]}},{"inr":"26INR0699","name":"Meadow Park BESS","fuel":"battery","mw":9.95,"county":"Tarrant","synced":"2026-02","loc":{"pt":[-97.34302,32.72868],"method":"county centroid (substation not located)","subs":[],"codes":["MDWPK"]}},{"inr":"25INR0717","name":"Beck_Road BESS1","fuel":"battery","mw":9.99,"county":"Bexar","synced":"2025-12","loc":{"pt":[-98.41908541666668,29.63247916666667],"method":"county centroid (substation not located)","subs":[],"codes":["Z0"]}},{"inr":"25INR0718","name":"Pyote Gas","fuel":"gas","mw":9.9,"county":"Ward","synced":"2026-04","loc":{"pt":[-103.09776,31.45077],"method":"ERCOT bus number -> substation","subs":["Pyote Substation"],"codes":["PYOTE"],"osm":"osm:way/501745920"}},{"inr":"24INR0481","name":"Little York BESS","fuel":"battery","mw":9.96,"county":"Harris","synced":"2026-06","loc":{"pt":[-95.30343333333333,29.84087666666665],"method":"county centroid (substation not located)","subs":[],"codes":["LK"]}},{"inr":"26INR0698","name":"Staghorn Gas","fuel":"gas","mw":9.99,"county":"Ward","synced":"2026-09","loc":{"pt":[-103.2332804347826,31.441910869565223],"method":"county centroid (substation not located)","subs":[],"codes":["STAGHORN"]}},{"inr":"26INR0702","name":"Bexar Martinez BESS","fuel":"battery","mw":9.99,"county":"Bexar","synced":"2026-10","loc":{"pt":[-98.32237,29.4507],"method":"ERCOT bus number -> substation","subs":["Martinez Substation"],"codes":["C5"],"osm":"osm:way/675054239"}},{"inr":"25INR0769","name":"Kleimann BESS","fuel":"battery","mw":9.9,"county":"Colorado","synced":"2026-10","loc":{"pt":[-96.4722870967742,29.67036451612903],"method":"county centroid (substation not located)","subs":[],"codes":["KLEIMA"]}},{"inr":"26INR0736","name":"Hovey Solar 2","fuel":"solar","mw":8.05,"county":"Pecos","synced":"2026-06","loc":{"pt":[-103.36171,30.94832],"method":"ERCOT bus number -> substation","subs":["Solstice Substation"],"codes":["SOLSTICE"],"osm":"osm:way/500535889"}}]}