{"generated_at":"2026-11-21T12:50:04.869Z","method":"TPIT projects touching a congested element's ERCOT stations (via SSWG bus numbers). Backtest: stations in the market monitor's annual Top 10 (2022-2023; 2021 outcomes predate the TPIT edition's completed list) vs all ERCOT stations, outcome = a touching TPIT project in service (actual or projected) 1-3 years later. TPIT is one current snapshot, so this measures in-service timing, not proposal timing.","backtest":[{"year":2022,"flagged_stations":25,"flagged_with_project":6,"flagged_rate":0.24,"all_stations":5062,"all_with_project":507,"base_rate":0.1,"lift":2.4},{"year":2023,"flagged_stations":29,"flagged_with_project":17,"flagged_rate":0.586,"all_stations":5062,"all_with_project":993,"base_rate":0.196,"lift":3}],"pooled":{"flagged_rate":0.426,"base_rate":0.148,"lift":2.9,"flagged_station_years":54},"summary":{"planned_both_ends":208,"none_public":117,"planned_one_end":157,"in_service_both_ends":22,"in_service_one_end":20},"elements":{"LN:KNAPP:SCRCV:138":{"status":"planned_both_ends","first_top10":2023,"planned":[{"id":"ercot-tpit:102849A","ercot_project":"102849A","title":"Union 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:105063","ercot_project":"105063","title":"Union - Dermott 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"26RPG014","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99479A","ercot_project":"99479A","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87653","ercot_project":"87653","title":"Stoplight (fka Bluff Creek) - Union 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-16","year":2026,"rpg":"26RPG014","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:BRUNI:138/69":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"LN:LAKENASW:SAMATHIS:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"XF:BLESSING:345/138":{"status":"planned_both_ends","first_top10":2025,"planned":[{"id":"ercot-tpit:86857","ercot_project":"86857","title":"Blessing: Install New 345 kV Cap Bank","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:81238","ercot_project":"81238","title":"Zoisite: Construct New 345 kV Station and 345 kV Lines to STP","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:71002","ercot_project":"71002","title":"Tidehaven: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ATBR:MILES:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:55421","ercot_project":"55421","title":"Ballinger to Concho: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"20RPG004","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:GN:PZ:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:70660","ercot_project":"70660","title":"Plaza to Grant Ckt.08I Upgrade","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-08-30","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:73332","ercot_project":"73332","title":"Install Hermann (HER) Distribution Substation","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:111323D","ercot_project":"111323D","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:111323E","ercot_project":"111323E","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FRANKC:SARGNTS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:102867","ercot_project":"102867","title":"Upgrade Sargent to Franklins Camp 2025 RTP","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:89991","ercot_project":"89991","title":"Upgrade Sargent - Bay City","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ESCONDID:GANSO:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:55624","ercot_project":"55624","title":"Escondido to Ganso: Rebuild 138 kV line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-09-21","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:103454","ercot_project":"103454","title":"Viper: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:73895","ercot_project":"73895","title":"Sunglow Substation Addition","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-03-12","projected_isd":"2025-03-28","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:CATSW:MGSES:345":{"status":"planned_one_end","first_top10":2026,"planned":[{"id":"ercot-tpit:99353","ercot_project":"99353","title":"Oak Spring (fka Roscoe, Plowboy) 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81299","ercot_project":"81299","title":"Ranger Camp – Prong Moss 345 kV Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81227","ercot_project":"81227","title":"Cattleman – Gascondades 345 kV Reroute","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81232","ercot_project":"81232","title":"Cattleman – Bitter Creek/Champion Creek 345 kV Reroute","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:72011A","ercot_project":"72011A","title":"Tonkawa - Ranger Camp 345 kV Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ESTLD:MRVLY:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"XF:PUTN:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:55217","ercot_project":"55217","title":"Putnam to Leon: Rebuild 138 kV line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:111350","ercot_project":"111350","title":"Specter: Construct New Switch Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-02-28","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:77041","ercot_project":"77041","title":"Leon Switch - Putnam Transmission Line Overhaul","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-05-21","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"LN:CAPELLA:MERK:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:BLESSING:PAVLOV:138":{"status":"planned_one_end","first_top10":2021,"planned":[{"id":"ercot-tpit:71002","ercot_project":"71002","title":"Tidehaven: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:86857","ercot_project":"86857","title":"Blessing: Install New 345 kV Cap Bank","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:81238","ercot_project":"81238","title":"Zoisite: Construct New 345 kV Station and 345 kV Lines to STP","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:PALOALTO:TITAN_SU:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76082","ercot_project":"76082","title":"Union Carbide: Rebuild 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-08-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:93685","ercot_project":"93685","title":"New Transformer will be added at Titan Substation.","owner":"BPUB","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:93683","ercot_project":"93683","title":"New Transformer will be added at Titan Substation.","owner":"BPUB","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-01","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:73661","ercot_project":"73661","title":"New transformer (T2) at BPUB Palo Alto Substation","owner":"BPUB/BROWNSVILLE PUB","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:NLARSW:PILONCIL:138":{"status":"planned_one_end","first_top10":2021,"planned":[{"id":"ercot-tpit:73100","ercot_project":"73100","title":"Asherton to Piloncillo: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-13","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BCV:PSA:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:90232A","ercot_project":"90232A","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-08-30","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:70665C","ercot_project":"70665C","title":"Danek (DNK) CEHE Substation for Remy Jade - 23INR0339","owner":"CNP","kv":138,"status":"In service","actual_isd":"2026-01-12","projected_isd":"2025-12-31","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"XF:SNDSW:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76654","ercot_project":"76654","title":"Establish Voss Lake 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"25RPG009","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110026","ercot_project":"110026","title":"Upgrade Temple Switch - Voss Lake Switch - Sandow Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"25RPG009","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:87758","ercot_project":"87758","title":"Badger 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-05","projected_isd":"2025-12-15","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:76650","ercot_project":"76650","title":"Establish Walleye Creek 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2026-05-15","projected_isd":"2026-05-15","year":2026,"rpg":"23RPG030","touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"XF:SNDSW:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110026","ercot_project":"110026","title":"Upgrade Temple Switch - Voss Lake Switch - Sandow Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"25RPG009","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:76654","ercot_project":"76654","title":"Establish Voss Lake 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"25RPG009","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:87758","ercot_project":"87758","title":"Badger 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-05","projected_isd":"2025-12-15","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:76650","ercot_project":"76650","title":"Establish Walleye Creek 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2026-05-15","projected_isd":"2026-05-15","year":2026,"rpg":"23RPG030","touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"XF:SGVSW:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:105324","ercot_project":"105324","title":"Mesquite Switch – Seagoville Switch 138kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-16","year":2027,"rpg":"25RPG004","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:71178","ercot_project":"71178","title":"Seagoville-Watermill 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-05-15","year":2026,"rpg":"23RPG033","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ATSO:SONR:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:51001","ercot_project":"51001","title":"Friess Ranch to Sonora: Rebuild 69 kV line","owner":"AEP TNC/AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"19RPG018","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:87648","ercot_project":"87648","title":"Carver to Poblano: Convert 69 kV Line to 138 kV","owner":"AEP TCC/AEP TNC, ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-01-31","year":2031,"rpg":"24RPG009","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:45501","ercot_project":"45501","title":"Eldorado Live Oak to Sonora: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-03-12","projected_isd":"2025-03-12","year":2025,"rpg":"18RPG012","touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:COLLEGE:JUPITER:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110751","ercot_project":"110751","title":"Related_WylieSW_LCP_Upgrades_Jupiter_College_Line","owner":"GPL","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-01","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF:MASN:69/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:59197","ercot_project":"59197","title":"Mason to Mason Switch: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:50900","ercot_project":"50900","title":"Mason to North Brady: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-05-23","projected_isd":"2025-06-25","year":2025,"rpg":"19RPG019","touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"XF:KLNSW:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:104623","ercot_project":"104623","title":"Establish Triple Seven 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:87699","ercot_project":"87699","title":"Belton - Killeen 138 kV Line via Belton Southwest","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:87703","ercot_project":"87703","title":"Belton - Killeen 138 kV Line via Nolanville","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:87711","ercot_project":"87711","title":"Watercrest - Killeen 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:LENSW:PUTN:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:55217","ercot_project":"55217","title":"Putnam to Leon: Rebuild 138 kV line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:111350","ercot_project":"111350","title":"Specter: Construct New Switch Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-02-28","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:77041","ercot_project":"77041","title":"Leon Switch - Putnam Transmission Line Overhaul","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-05-21","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"LN:SALDS:SONTERRA:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:80546D","ercot_project":"80546D","title":"Upgrade the Hutto & Round Rock - Salado 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG018, 25RPG006","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:80546C","ercot_project":"80546C","title":"Upgrade the Hutto & Round Rock - Salado 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG018, 25RPG006","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BIGLAKE:PHBL_TAP:69":{"status":"none_public","first_top10":2024,"planned":[],"in_service":[],"base_rate":0.426},"LN:CEDRVALE:MIVIDA:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76293","ercot_project":"76293","title":"Upgraded Cedvale-MiDiva138KV","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-04-01","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:76232","ercot_project":"76232","title":"Reconductor Mivida-Coachwhip-Fishhook 2045 ACCC","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-01","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:76291","ercot_project":"76291","title":"Upgraded Cedarvale–BoneSpringsTap–Fishhook","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-07-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:77807A","ercot_project":"77807A","title":"Silverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG013","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:OCONNOR:VICTORIA:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:50876","ercot_project":"50876","title":"Victoria to Port Lavaca: Retire 69 kV Line","owner":"AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"21RPG002","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:109729","ercot_project":"109729","title":"O'Connor: Retire Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-02-01","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:99644","ercot_project":"99644","title":"Victoria to Warburton: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-30","year":2028,"rpg":"25RPG021","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:59086","ercot_project":"59086","title":"Corichi to Victoria: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-15","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:76788","ercot_project":"76788","title":"Upgrade Victoria-Rayburn","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-03-01","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"XF:SLKSW:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99241","ercot_project":"99241","title":"Sand Lake 765/345 kV Autotransformer #1","owner":"ONCOR","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-31","year":2030,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:102815","ercot_project":"102815","title":"SandLake - North McCamey Transmission Line Addition","owner":"LCRATSC","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-06-30","year":2026,"rpg":"22RPG010","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:87017","ercot_project":"87017","title":"Riverton - Sandlake 138 kV Line Conversion 345 kV and Riverton - Sandlake 138 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"24RPG010","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:99341","ercot_project":"99341","title":"Horntoad 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-06","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:78046","ercot_project":"78046","title":"Blue Goose (fka Toyah Creek) 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"23RPG013","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:LPLMK:LPLNE:115":{"status":"none_public","first_top10":2022,"planned":[],"in_service":[],"base_rate":0.426},"LN:TMPSE:TMPSW:138":{"status":"planned_both_ends","first_top10":2024,"planned":[{"id":"ercot-tpit:87709","ercot_project":"87709","title":"Belton - Temple 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"24RPG001","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87677","ercot_project":"87677","title":"Rebuild the Fryers Creek - Temple 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-15","year":2027,"rpg":"24RPG001","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110026","ercot_project":"110026","title":"Upgrade Temple Switch - Voss Lake Switch - Sandow Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"25RPG009","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110018B","ercot_project":"110018B","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:76572","ercot_project":"76572","title":"Temple - Temple Pecan 138 kV 2nd Circuit","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF::0/0":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:CONCHO:HARI:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:55421","ercot_project":"55421","title":"Ballinger to Concho: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"20RPG004","touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF:SGVSW:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:105324","ercot_project":"105324","title":"Mesquite Switch – Seagoville Switch 138kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-16","year":2027,"rpg":"25RPG004","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:71178","ercot_project":"71178","title":"Seagoville-Watermill 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-05-15","year":2026,"rpg":"23RPG033","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:TREADWEL:YELWJCKT:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:70710","ercot_project":"70710","title":"Eden to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:65154","ercot_project":"65154","title":"Mason Switch to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":"21RPG014","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:GREENLK:WEAVERRD:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:69489","ercot_project":"69489","title":"Shepley: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:70706","ercot_project":"70706","title":"Tungsten (Carbide): Rebuild 138/69 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-08-31","year":2028,"rpg":"21RPG024","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:LAN_CTY:PAVLOV:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:80576","ercot_project":"80576","title":"Chalmers: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ARGENTA:MATHIS:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:BALLINGE:HUMBLTAP:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:6572","ercot_project":"6572","title":"Ballinger to Eden 69 kV line: Rebuild taps","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:55421","ercot_project":"55421","title":"Ballinger to Concho: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"20RPG004","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:70630","ercot_project":"70630","title":"Ballinger to Santa Anna: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-03-31","year":2029,"rpg":"22RPG028","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:48818","ercot_project":"48818","title":"Ballinger: Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99540","ercot_project":"99540","title":"Anastase: Construct New 138 kV Station","owner":"AEP TNC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-03-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:BALLINGE:CORAZTAP:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:6572","ercot_project":"6572","title":"Ballinger to Eden 69 kV line: Rebuild taps","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:55421","ercot_project":"55421","title":"Ballinger to Concho: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"20RPG004","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:70630","ercot_project":"70630","title":"Ballinger to Santa Anna: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-03-31","year":2029,"rpg":"22RPG028","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:48818","ercot_project":"48818","title":"Ballinger: Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99540","ercot_project":"99540","title":"Anastase: Construct New 138 kV Station","owner":"AEP TNC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-03-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:FRYSW:TMPSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:87677","ercot_project":"87677","title":"Rebuild the Fryers Creek - Temple 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-15","year":2027,"rpg":"24RPG001","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87709","ercot_project":"87709","title":"Belton - Temple 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"24RPG001","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87367","ercot_project":"87367","owner":"BEPC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-28","year":2028,"rpg":"24RPG001","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110026","ercot_project":"110026","title":"Upgrade Temple Switch - Voss Lake Switch - Sandow Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"25RPG009","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110018B","ercot_project":"110018B","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:KATEMCY:MASN:69":{"status":"in_service_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:59197","ercot_project":"59197","title":"Mason to Mason Switch: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:50900","ercot_project":"50900","title":"Mason to North Brady: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-05-23","projected_isd":"2025-06-25","year":2025,"rpg":"19RPG019","touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"LN:CONCHO:SAEM:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:55421","ercot_project":"55421","title":"Ballinger to Concho: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"20RPG004","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF:SLKSW:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:102815","ercot_project":"102815","title":"SandLake - North McCamey Transmission Line Addition","owner":"LCRATSC","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-06-30","year":2026,"rpg":"22RPG010","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87017","ercot_project":"87017","title":"Riverton - Sandlake 138 kV Line Conversion 345 kV and Riverton - Sandlake 138 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"24RPG010","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99341","ercot_project":"99341","title":"Horntoad 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-06","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:78046","ercot_project":"78046","title":"Blue Goose (fka Toyah Creek) 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"23RPG013","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:78044","ercot_project":"78044","title":"Hays Hill (fka Rock Draw) 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":"23RPG013","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BIGTRE:V_DUPSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:73441","ercot_project":"73441","title":"Dupont Switch to Joslin: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":"22RPG040","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:69489","ercot_project":"69489","title":"Shepley: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:69253","ercot_project":"69253","title":"Cangrejo to Dacosta: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":"21RPG002","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:VERN:69/1":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:FORTMA:YELWJCKT:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:70710","ercot_project":"70710","title":"Eden to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:65154","ercot_project":"65154","title":"Mason Switch to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":"21RPG014","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:DOW:OAS:345":{"status":"planned_both_ends","first_top10":2021,"planned":[{"id":"ercot-tpit:75830A","ercot_project":"75830A","title":"New 345kV Savannah (SAV) substation for generator interconnection to Cascade Solar (23INR0091).","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:78455","ercot_project":"78455","title":"Oasis 345kV Substation / SOHO BESS II (25INR0162)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99453N","ercot_project":"99453N","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78468A","ercot_project":"78468A","title":"Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344G","ercot_project":"103344G","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72037A","ercot_project":"72037A","title":"Seabreeze 345kV Substation for Tanglewood Solar (23INR0054)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-05-21","projected_isd":"2025-05-21","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:PHARR:YOUNG:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:93134","ercot_project":"93134","title":"Minnesota: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:STCO:STER:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:80858","ercot_project":"80858","title":"Sterling City: Upgrade 69 kV Relays","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-08-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:98556","ercot_project":"98556","title":"Cedar Hill to Sterling City: Convert to 138 kV","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-30","year":2029,"rpg":"H.B. 5066","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:98559","ercot_project":"98559","title":"Sterling City to Chalk: Convert to 138 kV","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-30","year":2029,"rpg":"H.B. 5066","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:CEDRHILL:SILT:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:72213","ercot_project":"72213","title":"Cedar Hill: Upgrade Relays","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:98556","ercot_project":"98556","title":"Cedar Hill to Sterling City: Convert to 138 kV","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-30","year":2029,"rpg":"H.B. 5066","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:HECKER:MCCAMPBE:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76286","ercot_project":"76286","title":"Hecker to Resnik: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:TMPCR:TMPSW:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110018A","ercot_project":"110018A","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99346","ercot_project":"99346","title":"Rebuild the Temple Pecan Creek Switch - Belfalls/STR 26/4C 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99389","ercot_project":"99389","title":"Rebuild the Paramount - Temple 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-16","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:76660","ercot_project":"76660","title":"Rebuild Temple Switch and install auto #2","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"24RPG001","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110018B","ercot_project":"110018B","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"both stations","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:76578","ercot_project":"76578","title":"Upgrade the Temple Pecan - Temple Elm 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-06-05","projected_isd":"2025-05-15","year":2025,"rpg":"24RPG001","touches":"one station","names_station":true,"same_kv":false}],"base_rate":null},"XF:BALLINGE:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:48818","ercot_project":"48818","title":"Ballinger: Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99540","ercot_project":"99540","title":"Anastase: Construct New 138 kV Station","owner":"AEP TNC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-03-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:6572","ercot_project":"6572","title":"Ballinger to Eden 69 kV line: Rebuild taps","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:55421","ercot_project":"55421","title":"Ballinger to Concho: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"20RPG004","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:70630","ercot_project":"70630","title":"Ballinger to Santa Anna: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-03-31","year":2029,"rpg":"22RPG028","touches":"both stations","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ASHERTON:LIPTON:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:67915","ercot_project":"67915","title":"Asherton to West Batesville: Rebuild 138 kV Line","owner":"AEP TCC/ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-11-30","year":2031,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:76569","ercot_project":"76569","title":"Asherton: Rebuild 138 kV station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-05-30","year":2027,"rpg":"23RPG007","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:76576","ercot_project":"76576","title":"Asherton to Uvalde: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":"23RPG007","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:73100","ercot_project":"73100","title":"Asherton to Piloncillo: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-13","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:104611","ercot_project":"104611","title":"Asherton: Expand 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ARGYL:LWSVH:138":{"status":"planned_one_end","first_top10":2025,"planned":[{"id":"ercot-tpit:110519","ercot_project":"110519","title":"Argyle Switch - Corinth 138 kV Line Section","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":"25RPG042","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110306","ercot_project":"110306","title":"Argyle Switch - Krum Tap Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-04-01","year":2032,"rpg":"25RPG042","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110248","ercot_project":"110248","title":"Argyle Switch - Highlands 138 kV Line and Argyle Switch Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-12-01","year":2032,"rpg":"25RPG042","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BCKSW:CGRSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99479A","ercot_project":"99479A","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:81152","ercot_project":"81152","title":"Buford (fka China Grove) to Tributary 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"26RPG010","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99479B","ercot_project":"99479B","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99479C","ercot_project":"99479C","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99530","ercot_project":"99530","title":"Deep Creek - Snyder - China Grove 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-01","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF:KLNSW:138/1":{"status":"planned_both_ends","first_top10":2022,"planned":[{"id":"ercot-tpit:87699","ercot_project":"87699","title":"Belton - Killeen 138 kV Line via Belton Southwest","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:87703","ercot_project":"87703","title":"Belton - Killeen 138 kV Line via Nolanville","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:87711","ercot_project":"87711","title":"Watercrest - Killeen 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:104623","ercot_project":"104623","title":"Establish Triple Seven 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:GV:HOC:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:109603A","ercot_project":"109603A","title":"HO Clarke to University 69kV to 138kV Conversion.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"26RPG011","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:109610B","ercot_project":"109610B","title":"Missouri City to HO Clarke - Hardening Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:109610A","ercot_project":"109610A","title":"Missouri City to HO Clarke - Hardening Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:109603B","ercot_project":"109603B","title":"HO Clarke to University 69kV to 138kV Conversion.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"26RPG011","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:73578D","ercot_project":"73578D","title":"Heights 138kV Loop Conversion","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:68205","ercot_project":"68205","title":"GENRAL to Garden Villas Rebuild","owner":"CNP","kv":69,"status":"In service","actual_isd":"2025-09-11","projected_isd":"2026-12-30","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:73578J","ercot_project":"73578J","title":"Heights 138kV Loop Conversion","owner":"CNP","kv":69,"status":"In service","actual_isd":"2025-05-08","projected_isd":"2025-05-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:71106","ercot_project":"71106","title":"Dunlavy to HO Clarke Ckt.40A Partial Reconductor","owner":"CNP","kv":69,"status":"In service","actual_isd":"2026-07-09","projected_isd":"2026-08-30","year":2026,"rpg":"22RPG019","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87389","ercot_project":"87389","title":"Friendswood Energy GENCO GT (24INR0456)","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-07-25","projected_isd":"2025-07-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:AZTECA:HEC:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:55550","ercot_project":"55550","title":"Brushline: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-07-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FLGRV:HWPOD:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99141","ercot_project":"99141","title":"Rebuild Flower Grove - Vincent 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-31","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99413","ercot_project":"99413","title":"Establish Pivot 138/69 kV Switch","owner":"ONCOR","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"24RPG015","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ORNGROV:SNDIEGS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:90000","ercot_project":"90000","title":"Upgrade San Diego - Orange Grove SW","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:111459","ercot_project":"111459","title":"Upgrade Driscoll - San Diego","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:102871","ercot_project":"102871","title":"Add Fort Bobcat load serving station and Tline to STEC Orange Grove","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-01","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:71954","ercot_project":"71954","title":"Adds new Talitha substation and short line from Talitha to Orange Grove 138","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-04-01","projected_isd":"2025-04-01","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:76214","ercot_project":"76214","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-11-24","projected_isd":"2026-01-09","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"XF:VERN:138/1":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:TMPCR:TMPSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110018B","ercot_project":"110018B","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:76572","ercot_project":"76572","title":"Temple - Temple Pecan 138 kV 2nd Circuit","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:110018A","ercot_project":"110018A","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:87677","ercot_project":"87677","title":"Rebuild the Fryers Creek - Temple 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-15","year":2027,"rpg":"24RPG001","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:87709","ercot_project":"87709","title":"Belton - Temple 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"24RPG001","touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76578","ercot_project":"76578","title":"Upgrade the Temple Pecan - Temple Elm 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-06-05","projected_isd":"2025-05-15","year":2025,"rpg":"24RPG001","touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:MENPHTAP:YELWJCKT:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:70710","ercot_project":"70710","title":"Eden to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:65154","ercot_project":"65154","title":"Mason Switch to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":"21RPG014","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF:RAYBURN:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76818","ercot_project":"76818","title":"Upgrade Rayburn Auto Station","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-07-01","year":2029,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:90022","ercot_project":"90022","title":"Upgrade Sam Rayburn to Aloe","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:76788","ercot_project":"76788","title":"Upgrade Victoria-Rayburn","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-03-01","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:102865","ercot_project":"102865","title":"Add Moursund load serving station","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:82829","ercot_project":"82829","title":"New Furhman Substation","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-08-04","projected_isd":"2025-07-24","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:HARGROVE:TWINBU:138":{"status":"planned_one_end","first_top10":2024,"planned":[{"id":"ercot-tpit:107120","ercot_project":"107120","title":"Pastor Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-11","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:107136","ercot_project":"107136","title":"LCRATSC Duff Ranch Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:107132","ercot_project":"107132","title":"Water Valley Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-04","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:COTULAS:HOLANDS:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:BLESSING:PALACIOS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:71002","ercot_project":"71002","title":"Tidehaven: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:86857","ercot_project":"86857","title":"Blessing: Install New 345 kV Cap Bank","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:81238","ercot_project":"81238","title":"Zoisite: Construct New 345 kV Station and 345 kV Lines to STP","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ASHERTON:CATARINA:138":{"status":"planned_both_ends","first_top10":2023,"planned":[{"id":"ercot-tpit:73100","ercot_project":"73100","title":"Asherton to Piloncillo: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-13","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:76569","ercot_project":"76569","title":"Asherton: Rebuild 138 kV station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-05-30","year":2027,"rpg":"23RPG007","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:76576","ercot_project":"76576","title":"Asherton to Uvalde: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":"23RPG007","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:104611","ercot_project":"104611","title":"Asherton: Expand 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:67915","ercot_project":"67915","title":"Asherton to West Batesville: Rebuild 138 kV Line","owner":"AEP TCC/ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-11-30","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:MLSES:SHBSW:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:105829A","ercot_project":"105829A","title":"Establish New Martin Lake 765/345 kV Switch","owner":"ONCOR","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG025","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:109870","ercot_project":"109870","title":"Construct Elkton - Shamburger 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-05-15","year":2031,"rpg":"25RPG043","touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:91455","ercot_project":"91455","title":"Establish Dorsett 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-08","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:DILLEYSW:69/1":{"status":"planned_both_ends","first_top10":2024,"planned":[{"id":"ercot-tpit:80317","ercot_project":"80317","title":"Dilley Switch to Pearsall: Convert to 138 kV, Reroute from Dilley to Dilley Switch, Rebuild Dilley to Dilley Switch 69 kV, and Double Circuit Dilley Switch to Pearsall with Dilley to Dilley Switch","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-15","year":2028,"rpg":"23RPG024","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:SPUR:138/69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:CARANCUA:PALACIOS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:71002","ercot_project":"71002","title":"Tidehaven: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:DILLEYSW:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:80317","ercot_project":"80317","title":"Dilley Switch to Pearsall: Convert to 138 kV, Reroute from Dilley to Dilley Switch, Rebuild Dilley to Dilley Switch 69 kV, and Double Circuit Dilley Switch to Pearsall with Dilley to Dilley Switch","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-15","year":2028,"rpg":"23RPG024","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:KEYSB:MPPOI:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:81034","ercot_project":"81034","title":"Lamesa - Willow Valley 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"25RPG019","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HECKER:RESNIK:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76286","ercot_project":"76286","title":"Hecker to Resnik: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:69467","ercot_project":"69467","title":"Dupont to Resnik: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2025-05-15","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:BISON:STRS:69":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"LN:ESKSW:TRNT:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:99359","ercot_project":"99359","title":"Sweetwater Creek POI - Eskota 69 kV line and convert to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG040","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99357","ercot_project":"99357","title":"Add Permian Basin Reliability Plan Upgrade ID L25D and L25E.","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-09-01","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:99361","ercot_project":"99361","title":"Permian Basin Reliability Plan Upgrade ID L25C","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:BG:GT:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:90232H","ercot_project":"90232H","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:73578G","ercot_project":"73578G","title":"Heights 138kV Loop Conversion","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-05-08","projected_isd":"2025-05-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:EL_CAMPO:RICEBI:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:90055","ercot_project":"90055","title":"Ursidae: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:70796","ercot_project":"70796","title":"El Campo to Corichi: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99913","ercot_project":"99913","title":"Eagle Lake - El Campo Transmission Line Overhaul","owner":"LCRATSC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:MAT:WAP:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:75780A","ercot_project":"75780A","title":"Loop new Elmaton substation into Ckt.39A to create new Ckt.39 STP to Elmaton to WA Parish. Install generator lead from Elmaton (ELM) substation to DUFFY (DUF) / Duffy BESS (26INR0250)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:75780B","ercot_project":"75780B","title":"Loop new Elmaton substation into Ckt.39A to create new Ckt.39 STP to Elmaton to WA Parish. Install generator lead from Elmaton (ELM) substation to DUFFY (DUF) / Duffy BESS (26INR0250)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344G","ercot_project":"103344G","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344E","ercot_project":"103344E","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344F","ercot_project":"103344F","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76624","ercot_project":"76624","title":"WA Parish 345kV Substation Expansion for Crowned Heron Storage (24INR0405)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-10-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78471","ercot_project":"78471","title":"WA Parish 345kV Substation Expansion for Bypass Storage (23INR0336)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-10-30","projected_isd":"2025-11-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:73371F","ercot_project":"73371F","title":"BP24 Sub Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-06-05","projected_isd":"2025-01-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BRAND:ENCRT:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:JUNG_SLR:MCFSW:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:WAP:WLF:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:110068B","ercot_project":"110068B","title":"This models the new CEHE Raider Substation and upgrades required for a proposed load addition","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344G","ercot_project":"103344G","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344E","ercot_project":"103344E","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344F","ercot_project":"103344F","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344H","ercot_project":"103344H","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76624","ercot_project":"76624","title":"WA Parish 345kV Substation Expansion for Crowned Heron Storage (24INR0405)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-10-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78471","ercot_project":"78471","title":"WA Parish 345kV Substation Expansion for Bypass Storage (23INR0336)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-10-30","projected_isd":"2025-11-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:73371F","ercot_project":"73371F","title":"BP24 Sub Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-06-05","projected_isd":"2025-01-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:JUNORTH:KMJC:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:103259","ercot_project":"103259","title":"Llano: Build new 69 kV Station","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:SN:STR:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:85987A","ercot_project":"85987A","title":"Upgrade Ckt.26 STRATT to SINTEK to increase thermal limits. Upgrade Ckt.26F Velasco to CAMDEN to increase thermal limits.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":"24RPG012","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:72044C","ercot_project":"72044C","title":"Clute 138kV Switching Station","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-03-30","year":2028,"rpg":"22RPG038","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:90242A","ercot_project":"90242A","title":"Clute to Velasco Ckt.82 Upgrades RPG","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":"24RPG012","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109575I","ercot_project":"109575I","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":"26RPG012","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109575D","ercot_project":"109575D","title":"Upgrade ckt26 from Angleton to CAMDEN and ckt82 from Angleton to Oyster Creek to increase thermal limits.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":"26RPG012","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72037A","ercot_project":"72037A","title":"Seabreeze 345kV Substation for Tanglewood Solar (23INR0054)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-05-21","projected_isd":"2025-05-21","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BLESSING:MIDFIELD:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:86857","ercot_project":"86857","title":"Blessing: Install New 345 kV Cap Bank","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:81238","ercot_project":"81238","title":"Zoisite: Construct New 345 kV Station and 345 kV Lines to STP","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:71002","ercot_project":"71002","title":"Tidehaven: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:FVLSW:SAMSW:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:78369","ercot_project":"78369","title":"Rebuild Sam Switch - Venus Switch 345 kV DCKT","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG017","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:87792","ercot_project":"87792","title":"Establish the Bynum 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110053","ercot_project":"110053","title":"Rebuild TradingHouse - Sam 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-12-15","year":2031,"rpg":"25RPG043","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:105744","ercot_project":"105744","title":"Desoto Switch – Sam Switch Switch (Lonestar) 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG004","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:75786","ercot_project":"75786","title":"This project will create a POI Bus (station) named Skydancer to interconnect 23INR0295","owner":"LST","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:102401","ercot_project":"102401","title":"LST_SamSwitch_Resiliency_(GTC)_Project","owner":"LST","kv":345,"status":"In service","actual_isd":"2026-06-10","projected_isd":"2026-06-01","year":2026,"rpg":"25RPG031","touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:FTST:SOLSTICE:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:91853","ercot_project":"91853","title":"Fort Stockton Plant to Solstice: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"H.B. 5066","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:98561","ercot_project":"98561","title":"Solstice to Hayter Tap: Rebuild 138 kV Line Double Circuit","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"H.B. 5066","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:80907","ercot_project":"80907","title":"Fort Stockton Plant: Rebuild 138/69 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":"25RPG032","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:86829","ercot_project":"86829","title":"Fort Stockton Plant to Lynx: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"23RPG008","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:98595","ercot_project":"98595","title":"Solstice to Howard: Construct New 765 kV Single Circuit Line","owner":"AEP TNC","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2030-10-30","year":2030,"rpg":"H.B. 5066","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:COKESTRE:RUSTHILL:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:CUERO:THOMASTN:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:69473","ercot_project":"69473","title":"Jaguar: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2026-04-16","projected_isd":"2026-06-11","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:SHBSW:345/138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:109870","ercot_project":"109870","title":"Construct Elkton - Shamburger 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-05-15","year":2031,"rpg":"25RPG043","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:105829A","ercot_project":"105829A","title":"Establish New Martin Lake 765/345 kV Switch","owner":"ONCOR","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG025","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ARROZ:EL_CAMPO:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:90055","ercot_project":"90055","title":"Ursidae: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:70796","ercot_project":"70796","title":"El Campo to Corichi: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99913","ercot_project":"99913","title":"Eagle Lake - El Campo Transmission Line Overhaul","owner":"LCRATSC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:REDCREEK:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:63635","ercot_project":"63635","title":"Tribute: Build 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:70712","ercot_project":"70712","title":"SAPS to Red Creek: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":"26RPG003","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:107120","ercot_project":"107120","title":"Pastor Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-11","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:103822","ercot_project":"103822","title":"Red Creek: Expand 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-08-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:109841","ercot_project":"109841","title":"Red Creek: Expand 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-06-30","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:73408","ercot_project":"73408","title":"Odysseus: Build new 345 kV station","owner":"AEP TNC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-08","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"LN:THW:ZEN:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:69902B","ercot_project":"69902B","title":"New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar.","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453U","ercot_project":"99453U","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:102771A","ercot_project":"102771A","title":"Aquila (AQU) CEHE-Owned 345kV Substation for TALON (TAL) / Eagle Claw Energy Storage (27INR0085)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-10-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99791A","ercot_project":"99791A","title":"Additional Facility Ratings Methodology Phase 2 (FRM2) Substation Upgrades.","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109769B","ercot_project":"109769B","title":"This models upgrades related to the Willow Phase 3 Load addition","owner":"CNP","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":"26RPG023","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:69902A","ercot_project":"69902A","title":"New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar.","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-05-07","projected_isd":"2025-05-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453D","ercot_project":"99453D","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"In service","actual_isd":"2026-02-16","projected_isd":"2026-05-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:75938","ercot_project":"75938","title":"Expand Zenith substation with addition of 35kV Distribution Facilities. Tap TR1 on Ckt.09J to create new Ckt.09J Zenith to Zenith TR1 tap to Fry Road tap. Tap TR2 on Ckt.76A to create new Ckt.76A Zenith to Zenith TR2 tap to Fry Road tap.","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-03-05","projected_isd":"2025-10-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:99399","ercot_project":"99399","title":"TH Wharton CB2 Cap Bank","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-09-30","projected_isd":"2026-08-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:GREGORY:RINCON:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:70675","ercot_project":"70675","title":"Aransas Pass to Rincon: Rebuild 69 kV Line","owner":"AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-14","year":2028,"rpg":"24RPG035","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87019","ercot_project":"87019","title":"Rincon: Upgrade 138 kV Bus","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:104084","ercot_project":"104084","title":"Rincon to Tungsten: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-30","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:103450","ercot_project":"103450","title":"Bodkin: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:BI:WAP:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:90232D","ercot_project":"90232D","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-08-30","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344G","ercot_project":"103344G","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344E","ercot_project":"103344E","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344F","ercot_project":"103344F","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344H","ercot_project":"103344H","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76624","ercot_project":"76624","title":"WA Parish 345kV Substation Expansion for Crowned Heron Storage (24INR0405)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-10-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78471","ercot_project":"78471","title":"WA Parish 345kV Substation Expansion for Bypass Storage (23INR0336)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-10-30","projected_isd":"2025-11-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78485F","ercot_project":"78485F","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2026-08-13","projected_isd":"2026-08-30","year":2026,"rpg":"23RPG025","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:73371F","ercot_project":"73371F","title":"BP24 Sub Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-06-05","projected_isd":"2025-01-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:73371B","ercot_project":"73371B","title":"BP24 Sub Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2026-06-23","projected_isd":"2026-06-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:ANARN:NVKSW:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:HAN1:HUBRD:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110010","ercot_project":"110010","title":"Rebuild the Revolution Switch - Ash Creek Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG041, 25RPG043","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ATHNS:TRNDD:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:66289C","ercot_project":"66289C","title":"Tyler to Athens 138 kV line Conversion","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-15","year":2026,"rpg":"22RPG015","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:66289B","ercot_project":"66289B","title":"Tyler to Athens 138 kV line Conversion","owner":"ONCOR","kv":69,"status":"In service","actual_isd":"2025-12-15","projected_isd":"2025-12-15","year":2025,"rpg":"22RPG015","touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:ARANSASP:GREGORY:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:70675","ercot_project":"70675","title":"Aransas Pass to Rincon: Rebuild 69 kV Line","owner":"AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-14","year":2028,"rpg":"24RPG035","touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CRDSW:OLNEY:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:HUMBLTAP:NOVICTAP:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:MV_RIOHO:RIOHONDO:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:6687","ercot_project":"6687","title":"Rebuild Rio Hondo to East Rio Hondo","owner":"STEC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:104463","ercot_project":"104463","title":"Wren: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:105912","ercot_project":"105912","title":"Ciruela: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:71930","ercot_project":"71930","title":"Upgrade RIOHONDO to BURNS line","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-07-01","projected_isd":"2025-05-01","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:69463","ercot_project":"69463","title":"Gulch: Construct new 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:DOW:SEB:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:75830A","ercot_project":"75830A","title":"New 345kV Savannah (SAV) substation for generator interconnection to Cascade Solar (23INR0091).","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453N","ercot_project":"99453N","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78468A","ercot_project":"78468A","title":"Pradera (PRD) CEHE-Owned 345kV Substation for Austin Bayou Solar (25INR0102)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72037A","ercot_project":"72037A","title":"Seabreeze 345kV Substation for Tanglewood Solar (23INR0054)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-05-21","projected_isd":"2025-05-21","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:72037B","ercot_project":"72037B","title":"Seabreeze 345kV Substation for Tanglewood Solar (23INR0054)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-05-21","projected_isd":"2025-05-21","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:HHSTH:KLNSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:87699","ercot_project":"87699","title":"Belton - Killeen 138 kV Line via Belton Southwest","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:87703","ercot_project":"87703","title":"Belton - Killeen 138 kV Line via Nolanville","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG001","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87711","ercot_project":"87711","title":"Watercrest - Killeen 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG001","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:104623","ercot_project":"104623","title":"Establish Triple Seven 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:GRSES:GRVSW:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110288","ercot_project":"110288","title":"Graham Plant Switch - Garvey Road Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-12-01","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110294","ercot_project":"110294","title":"Bowman Switch - Garvey Road Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-06-01","year":2031,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110298","ercot_project":"110298","title":"Graham Plant Switch - Rice Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2032-06-01","year":2032,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:82806","ercot_project":"82806","title":"Establish Long Hollow 345 kV Switch (POI for Pinnington Solar)","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-06-30","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:86633","ercot_project":"86633","title":"Dusty Road 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-04","projected_isd":"2025-12-04","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:FLTSW:PRSSW:138":{"status":"in_service_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:109952","ercot_project":"109952","title":"Commerce Switch - Paris Switch 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":"25RPG040, 25RPG042","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:92852B","ercot_project":"92852B","title":"Monticello_Paris_Line_Upgrade","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG026","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:110290","ercot_project":"110290","title":"Paris Switch - Valley South Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-04-01","year":2032,"rpg":"25RPG040","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:91060","ercot_project":"91060","title":"Establish Flying Tiger 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-04-17","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"XF:SCSES:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:111798","ercot_project":"111798","title":"Establish Wingate 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:105829A","ercot_project":"105829A","title":"Establish New Martin Lake 765/345 kV Switch","owner":"ONCOR","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG025","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:SNYDR:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99479C","ercot_project":"99479C","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99479D","ercot_project":"99479D","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:I_DUPP1:I_DUPSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:90016","ercot_project":"90016","title":"Dupont Switch to Dupont PP1 Circuit 1: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:76286","ercot_project":"76286","title":"Hecker to Resnik: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:69467","ercot_project":"69467","title":"Dupont to Resnik: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2025-05-15","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:PLYAM:TYPRK:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110679","ercot_project":"110679","title":"Cedar Hill Switch - Sherry Switch 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2032-06-15","year":2032,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110667","ercot_project":"110667","title":"Grand Prairie 138 kV Capacitor","owner":"ONCOR","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FALFUR:RACHAL:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:73061","ercot_project":"73061","title":"Falfurrias to King Ranch: 138 kV Line Rebuild","owner":"AEP TCC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2027-05-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:104082","ercot_project":"104082","title":"Alice to Falfurrias: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":"25RPG045","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:80824","ercot_project":"80824","title":"Zenaida: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FBRSW:THSES:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110053","ercot_project":"110053","title":"Rebuild TradingHouse - Sam 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-12-15","year":2031,"rpg":"25RPG043","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99542","ercot_project":"99542","title":"Establish Axtell 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110170","ercot_project":"110170","title":"Rebuild Possum Trot - Lake Hall Switch - Tradinghouse Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-05-15","year":2031,"rpg":"25RPG043","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110223","ercot_project":"110223","title":"LST_Liberty_Area_Transmission_Projects_BZ_LLI","owner":"LST","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-12-31","year":2031,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78361B","ercot_project":"78361B","title":"Lake Creek - Rattlesnake Road 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-16","year":2026,"rpg":"23RPG022","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:DOW:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99453N","ercot_project":"99453N","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:75830A","ercot_project":"75830A","title":"New 345kV Savannah (SAV) substation for generator interconnection to Cascade Solar (23INR0091).","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72037A","ercot_project":"72037A","title":"Seabreeze 345kV Substation for Tanglewood Solar (23INR0054)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-05-21","projected_isd":"2025-05-21","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:CRSTLSW:TURTLCRK:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:76576","ercot_project":"76576","title":"Asherton to Uvalde: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":"23RPG007","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:FORSW:RYSSW:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:5526","ercot_project":"5526","title":"Three Creek 345/138 kV Switch (fka Forney)","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG021","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110268","ercot_project":"110268","title":"Lavon 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-01","year":2028,"rpg":"25RPG040","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99066","ercot_project":"99066","title":"Royse Switch – Farmersville Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109824","ercot_project":"109824","title":"Monticello Switch - Allen Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2033-05-15","year":2033,"rpg":"25RPG040, 25RPG042","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:89889","ercot_project":"89889","title":"Three Creek 138 kV Capacitor Bank","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-16","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:WAP:WLY:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:89922","ercot_project":"89922","title":"Whaley 345kV Substation Expansion for ROSE/Rock Rose Energy BESS (26INR0201)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-19","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344G","ercot_project":"103344G","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344E","ercot_project":"103344E","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344F","ercot_project":"103344F","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344H","ercot_project":"103344H","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76624","ercot_project":"76624","title":"WA Parish 345kV Substation Expansion for Crowned Heron Storage (24INR0405)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-10-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78471","ercot_project":"78471","title":"WA Parish 345kV Substation Expansion for Bypass Storage (23INR0336)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-10-30","projected_isd":"2025-11-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:73371F","ercot_project":"73371F","title":"BP24 Sub Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-06-05","projected_isd":"2025-01-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BATESVL:S_BATES:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:112129","ercot_project":"112129","title":"Upgrade N.Batesville - S. Batesville - Batesville Sw","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:112127","ercot_project":"112127","title":"Upgrade Batesville - Crystal City SW as part of Crystal City SW to Downie upgrade","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FSHSW:WFALS:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110815","ercot_project":"110815","title":"Fisher Road - Wichita Falls 138 kV Line Upgrade","owner":"ONCOR","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-08-15","year":2030,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:90061","ercot_project":"90061","title":"Poisson: Construct New 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-17","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:105012","ercot_project":"105012","title":"Lomond_Switch_345kV","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:FMRVL:RYSSW:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99066","ercot_project":"99066","title":"Royse Switch – Farmersville Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:105747","ercot_project":"105747","title":"Farmersville Switch – Saltillo Switch 345kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG004","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110268","ercot_project":"110268","title":"Lavon 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-01","year":2028,"rpg":"25RPG040","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109824","ercot_project":"109824","title":"Monticello Switch - Allen Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2033-05-15","year":2033,"rpg":"25RPG040, 25RPG042","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:92687","ercot_project":"92687","title":"Burkett 138 kV POD","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-06-11","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:KAMEYS:PLCEDOS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:75989","ercot_project":"75989","title":"Rebuild Vanderbilt -Pt Lavaca","owner":"STEC","kv":69,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:FLTCK:138/138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"XF:LCSES:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:78361A","ercot_project":"78361A","title":"Lake Creek - Rattlesnake Road 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG022","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:78361B","ercot_project":"78361B","title":"Lake Creek - Rattlesnake Road 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-16","year":2026,"rpg":"23RPG022","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:66210","ercot_project":"66210","title":"Upgrade and convert Lake Creek - Marlin 69 kV Line to 138 kV","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-12-01","projected_isd":"2025-09-15","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"LN:BUTLER:GIDEON:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99924","ercot_project":"99924","title":"Pine Path Substation Addition","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:92565","ercot_project":"92565","title":"Sim_Gideon_Winchester_Transmission_Line_Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:91487","ercot_project":"91487","title":"Austrop - Sim Gideon Transmission Line Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:103301","ercot_project":"103301","title":"LCRATSC Paige - Sim Gideon Transmission Line Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:109786","ercot_project":"109786","title":"LCRATSC Sim Gideon Substation Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:73123","ercot_project":"73123","title":"Sim Gideon - Swiftex Transmission Line Upgrade","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2025-12-31","year":2025,"rpg":"24RPG014","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:71956","ercot_project":"71956","title":"Elgin Switch Substation Upgrade","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-04-24","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:LA_PALMA:VCAVAZOS:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:91896","ercot_project":"91896","title":"La Palma to Military Highway: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:80579","ercot_project":"80579","title":"La Palma to Progresso: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-15","year":2030,"rpg":"23RPG005","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:69471","ercot_project":"69471","title":"Villa Cavazos: Construct New 138 kV Terminal","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-08-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:91883","ercot_project":"91883","title":"La Palma to Stillman: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:90043","ercot_project":"90043","title":"Candela: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:69463","ercot_project":"69463","title":"Gulch: Construct new 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:ENSSO:ENWSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:105316","ercot_project":"105316","title":"Ennis West Switch – Sterrett Switch 138kV Line Upgrade","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"25RPG004","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:71156","ercot_project":"71156","title":"Ennis West Switch-Waxahachie Switch 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HARLNSW:OLEANDER:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:80466","ercot_project":"80466","title":"Oleander: Construct New 138 kV Terminal","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2025-12-19","projected_isd":"2026-05-16","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:DOWNIES:MOORE:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:112131","ercot_project":"112131","title":"Upgrade N.Batesville - Leona - Uvalde Sw - Uvalde Sub - Downie","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:55873","ercot_project":"55873","title":"Upgrade Moore to Hondo Creek 138 kV line","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-09-24","projected_isd":"2025-12-01","year":2025,"rpg":"19RPG021","touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:ROBY:ROTN:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:73055","ercot_project":"73055","title":"Hamlin to Roby: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-31","year":2028,"rpg":"23RPG002","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:SNDSW:WCRSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76654","ercot_project":"76654","title":"Establish Voss Lake 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"25RPG009","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:110036","ercot_project":"110036","title":"Construct the Voss Lake - Walleye Creek 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110026","ercot_project":"110026","title":"Upgrade Temple Switch - Voss Lake Switch - Sandow Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"25RPG009","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76650","ercot_project":"76650","title":"Establish Walleye Creek 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2026-05-15","projected_isd":"2026-05-15","year":2026,"rpg":"23RPG030","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:87758","ercot_project":"87758","title":"Badger 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-05","projected_isd":"2025-12-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"XF:BALLINGE:69/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:6572","ercot_project":"6572","title":"Ballinger to Eden 69 kV line: Rebuild taps","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:55421","ercot_project":"55421","title":"Ballinger to Concho: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"20RPG004","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:70630","ercot_project":"70630","title":"Ballinger to Santa Anna: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-03-31","year":2029,"rpg":"22RPG028","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:48818","ercot_project":"48818","title":"Ballinger: Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:99540","ercot_project":"99540","title":"Anastase: Construct New 138 kV Station","owner":"AEP TNC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-03-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:LA_PALMA:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:90043","ercot_project":"90043","title":"Candela: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110834","ercot_project":"110834","title":"Ad-Hoc TPIT: Arrow - System Upgrades","owner":"SLU","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-05-01","year":2031,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:64858","ercot_project":"64858","title":"La Palma Expansion","owner":"AEP TCC/SLU","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-16","year":2026,"rpg":"21RPG017","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:91883","ercot_project":"91883","title":"La Palma to Stillman: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:91896","ercot_project":"91896","title":"La Palma to Military Highway: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:69463","ercot_project":"69463","title":"Gulch: Construct new 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-30","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:LPLBR:LPLRR:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:CANYON:ROHR:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99827A","ercot_project":"99827A","title":"LCRATSC_Canyon-Gofort_Transmission_Line_Overhaul","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99827B","ercot_project":"99827B","title":"LCRATSC_Canyon-Gofort_Transmission_Line_Overhaul","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:92575","ercot_project":"92575","title":"LCRATSC_Canyon_San_Marcos_Transmission_Line_Upgrade","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2026-04-20","projected_isd":"2026-05-15","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"XF:TMPSW:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99383","ercot_project":"99383","title":"Establish Paramount 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99389","ercot_project":"99389","title":"Rebuild the Paramount - Temple 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-16","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110018A","ercot_project":"110018A","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110030","ercot_project":"110030","title":"Establish Lorraine 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110034","ercot_project":"110034","title":"Establish Bob White 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-15","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FREER:SAN_DIEG:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:104388","ercot_project":"104388","title":"Government Wells: Capacitor Bank Installation","owner":"AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:PALOUSE:WOLFCAMP:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:93163","ercot_project":"93163","title":"Diablo: Construct New Distribution Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CAGNON:HOWARD:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:75255D","ercot_project":"75255D","title":"San Antonio South Reliability RPG Project","owner":"CPS/NO","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-01","year":2027,"rpg":"22RPG048","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:75255E","ercot_project":"75255E","title":"San Antonio South Reliability RPG Project","owner":"CPS/NO","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-01","year":2027,"rpg":"22RPG048","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110923","ercot_project":"110923","title":"Castroville_345KVSwitchingStation_Changes","owner":"CPS","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-06-01","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110689","ercot_project":"110689","title":"Rebuild Howard to AVR","owner":"CPS/NO","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:88049","ercot_project":"88049","title":"24RPG004: Omicron Reliability Project : Loop in Cagnon to Howard into Omicron","owner":"CPS/NO","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-01","year":2028,"rpg":"24RPG004","touches":"both stations","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:67992C","ercot_project":"67992C","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","kv":345,"status":"In service","actual_isd":"2025-04-07","projected_isd":"2025-05-29","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:67992A","ercot_project":"67992A","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","kv":138,"status":"In service","actual_isd":"2025-04-07","projected_isd":"2025-05-29","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99185","ercot_project":"99185","title":"This involves moving Potranco to a different bus/bay at Cagnon to alleviate the loading on Cagnon auto 3 & 4.","owner":"CPS/NO","kv":138,"status":"In service","actual_isd":"2026-04-23","projected_isd":"2026-05-15","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:73364","ercot_project":"73364","title":"New Omicron 138kV Substation","owner":"CPS/NO","kv":138,"status":"In service","actual_isd":"2025-10-30","projected_isd":"2025-10-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"XF:PAUL:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:61550","ercot_project":"61550","title":"East Munday to Lake Pauline: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":"20RPG018","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:104018","ercot_project":"104018","title":"Lake Pauline to Quanah: Convert to 138 kV","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-11-30","year":2030,"rpg":"25RPG018","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:98593","ercot_project":"98593","title":"Quanah: Rebuild 69 kV Station","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:MURRAY:PAINTCRE:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:91843","ercot_project":"91843","title":"East Munday: Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-30","year":2028,"rpg":"25RPG002","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HCKSW:PKRSW:345":{"status":"planned_both_ends","first_top10":2026,"planned":[{"id":"ercot-tpit:105326","ercot_project":"105326","title":"Parker Switch – Hicks Switch 345kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:105008","ercot_project":"105008","title":"Wingjet_Switch_138kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:REDCREEK:TWINBU:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:107120","ercot_project":"107120","title":"Pastor Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-11","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:103822","ercot_project":"103822","title":"Red Creek: Expand 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-08-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109841","ercot_project":"109841","title":"Red Creek: Expand 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-06-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:107136","ercot_project":"107136","title":"LCRATSC Duff Ranch Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:107132","ercot_project":"107132","title":"Water Valley Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-04","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:73408","ercot_project":"73408","title":"Odysseus: Build new 345 kV station","owner":"AEP TNC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-08","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:BCKSW:KNAPP:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99479A","ercot_project":"99479A","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:102849A","ercot_project":"102849A","title":"Union 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87653","ercot_project":"87653","title":"Stoplight (fka Bluff Creek) - Union 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-16","year":2026,"rpg":"26RPG014","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:JUNCTION:KMJC:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:103259","ercot_project":"103259","title":"Llano: Build new 69 kV Station","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:MORRIS:NUECES_B:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:73067","ercot_project":"73067","title":"Marina: Construct New Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:87328","ercot_project":"87328","title":"Sunstone: Construct New 138 kV Station","owner":"AEP TCC/ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:93242","ercot_project":"93242","title":"Saxet Substation Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-20","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:86043","ercot_project":"86043","title":"Saxet Substation Addition Phase 2","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-06-06","projected_isd":"2025-06-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:DOWNIES:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:112131","ercot_project":"112131","title":"Upgrade N.Batesville - Leona - Uvalde Sw - Uvalde Sub - Downie","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:BANQUETE:CALALS:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:102869","ercot_project":"102869","title":"Upgrade Calallen to Driscoll","owner":"STEC","kv":69,"status":"Conceptual","actual_isd":null,"projected_isd":"2032-05-01","year":2032,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:LPLCO:LPLMK:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:KLNSW:SALSW:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:87707","ercot_project":"87707","title":"Salado 345/138 kV Autotransformer #1 and #2","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG001","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99387","ercot_project":"99387","title":"Rebuild the Paramount - Salado 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-16","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110122","ercot_project":"110122","title":"LCRATSC Gabriel Salado Transmission Line Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-12-15","year":2031,"rpg":"25RPG009","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:104623","ercot_project":"104623","title":"Establish Triple Seven 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99383","ercot_project":"99383","title":"Establish Paramount 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:KDL:RNS:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99453G","ercot_project":"99453G","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-10-31","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453F","ercot_project":"99453F","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-10-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HLJ:STP:345":{"status":"planned_both_ends","first_top10":2022,"planned":[{"id":"ercot-tpit:99453X","ercot_project":"99453X","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-30","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453W","ercot_project":"99453W","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:78495","ercot_project":"78495","title":"Hillje 345kV Substation Expansion for Space City Solar - Generator Interconnection (21INR0341)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:72059","ercot_project":"72059","title":"Hillje 345kV Substation Expansion for Ramsey Storage - Generator Interconnection to FLATLA (FLA) (21INR0505)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110168","ercot_project":"110168","title":"AEN_Holman_Hillje_ckt_3123_reconductor","owner":"AEN","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-15","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:64069","ercot_project":"64069","title":"Charger Solar Interconnection","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-07-08","projected_isd":"2025-07-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453C","ercot_project":"99453C","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"In service","actual_isd":"2026-03-03","projected_isd":"2026-03-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:59959","ercot_project":"59959","title":"New Hickory 345kV Switchyard","owner":"CPS/NO","kv":345,"status":"In service","actual_isd":"2026-05-16","projected_isd":"2026-05-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453A","ercot_project":"99453A","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"In service","actual_isd":"2026-02-25","projected_isd":"2026-05-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:71004A","ercot_project":"71004A","title":"Julia CEHE-Owned Sub for Melaza Solar (21INR0220)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2026-05-15","projected_isd":"2026-05-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:MULBERRY:138/138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:90065","ercot_project":"90065","title":"Abilene Northwest to Mulberry Creek: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:73032","ercot_project":"73032","title":"Mulberry Creek: Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":"25RPG034","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:104026","ercot_project":"104026","title":"Morado (Abilene Northwest): Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"25RPG036","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:109743","ercot_project":"109743","title":"Mulberry Creek: Expand 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:98599","ercot_project":"98599","title":"Bluff Creek to Mulberry Creek: Rebuild 345 kV Line as a Double Circuit","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"H.B. 5066","touches":"both stations","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:66569","ercot_project":"66569","title":"Rebuild and reconfigure the existing Mulberry Creek 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-15","projected_isd":"2025-05-15","year":2025,"rpg":"21RPG021","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:48816","ercot_project":"48816","title":"Mulberry Creek: Rebuild 345 kV station","owner":"AEP TNC","kv":345,"status":"In service","actual_isd":"2025-06-30","projected_isd":"2025-06-25","year":2025,"rpg":"21RPG021","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:77122","ercot_project":"77122","title":"Mulberry Creek: Construct New 345 kV Terminal","owner":"AEP TNC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2025-11-30","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false}],"base_rate":null},"XF:BERGHE:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:91392","ercot_project":"91392","title":"Bergheim_Autotransformer_Upgrade","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"24RPG038","touches":"both stations","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:61392","ercot_project":"61392","title":"Bergheim - Fair Oaks Transmission Line Upgrade","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-03-12","projected_isd":"2025-03-12","year":2025,"rpg":"22RPG005","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:61234","ercot_project":"61234","title":"Antler - Bergheim Transmission Line Upgrade","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-02-24","projected_isd":"2025-04-01","year":2025,"rpg":"22RPG005","touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"LN:MID:PK:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:MIDW:OZONA:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:55470","ercot_project":"55470","title":"Bison to Lightyear: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:49556","ercot_project":"49556","title":"Ozona: Rebuild 69 kV station","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-01-31","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99749","ercot_project":"99749","title":"Friend Ranch to Illinois #4: Convert to 138 kV","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-30","year":2029,"rpg":"H.B. 5066","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:109839","ercot_project":"109839","title":"Lightyear: Construct New 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-29","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:TYGND:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:66289C","ercot_project":"66289C","title":"Tyler to Athens 138 kV line Conversion","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-15","year":2026,"rpg":"22RPG015","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HEARTLAN:KATEMCY:69":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:50900","ercot_project":"50900","title":"Mason to North Brady: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-05-23","projected_isd":"2025-06-25","year":2025,"rpg":"19RPG019","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:ELTORSS:INEZS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76777","ercot_project":"76777","title":"Rebuild Nursery-El Toro","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-01","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CROSSOVE:PALOUSE:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:93163","ercot_project":"93163","title":"Diablo: Construct New Distribution Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:GBY:LYD:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:87637A","ercot_project":"87637A","title":"Install (2) new 100 MVA distribution transformers at Liberty substation to serve customer load.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87637B","ercot_project":"87637B","title":"Install (2) new 100 MVA distribution transformers at Liberty substation to serve customer load.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453B","ercot_project":"99453B","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-03-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:67422F","ercot_project":"67422F","title":"Greens Bayou to Clinton 138kV Conversion","owner":"CNP","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:TMPSW:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:87677","ercot_project":"87677","title":"Rebuild the Fryers Creek - Temple 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-15","year":2027,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:87709","ercot_project":"87709","title":"Belton - Temple 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:87367","ercot_project":"87367","owner":"BEPC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-28","year":2028,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110026","ercot_project":"110026","title":"Upgrade Temple Switch - Voss Lake Switch - Sandow Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"25RPG009","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110018B","ercot_project":"110018B","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:OR:138/138":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:90130","ercot_project":"90130","title":"Install (2) new 100 MVA distribution transformers at Orchard substation.","owner":"CNP","kv":138,"status":"In service","actual_isd":"2026-05-13","projected_isd":"2026-05-31","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"LN:FTST:LEONCRK:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:80907","ercot_project":"80907","title":"Fort Stockton Plant: Rebuild 138/69 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":"25RPG032","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:86829","ercot_project":"86829","title":"Fort Stockton Plant to Lynx: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"23RPG008","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:91853","ercot_project":"91853","title":"Fort Stockton Plant to Solstice: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"H.B. 5066","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:77805","ercot_project":"77805","title":"TNMP Pecos County RPG: Leon Creek to Coyanosa 138kV Double Ckt","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-01","year":2027,"rpg":"23RPG023","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:105600","ercot_project":"105600","title":"MODELS HALITE","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:MILHWY:SILASRAY:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"XF:CORONA:138/69":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:91402","ercot_project":"91402","title":"Buchanan_Burnet_TL_Overhaul","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2026-06-25","projected_isd":"2026-06-30","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:GILLCR:MCNEIL_:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:100178","ercot_project":"100178","title":"HarrisBranch_McNeil_Transmission_Line_Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:73570","ercot_project":"73570","title":"Steger Substation Addition","owner":"LCRATSC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:69345","ercot_project":"69345","title":"Limmer Substation Addition","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-05-01","projected_isd":"2025-05-01","year":2025,"rpg":"22RPG027","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:MAGRUDER:VICTORIA:138":{"status":"planned_one_end","first_top10":2025,"planned":[{"id":"ercot-tpit:99644","ercot_project":"99644","title":"Victoria to Warburton: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-30","year":2028,"rpg":"25RPG021","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:59086","ercot_project":"59086","title":"Corichi to Victoria: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-15","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:76788","ercot_project":"76788","title":"Upgrade Victoria-Rayburn","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-03-01","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:109729","ercot_project":"109729","title":"O'Connor: Retire Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-02-01","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:69489","ercot_project":"69489","title":"Shepley: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BURLESON:HICROSS:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:67093","ercot_project":"67093","title":"New 138 kV station cut-in between Garfield and Hi-Cross","owner":"AEN","kv":138,"status":"In service","actual_isd":"2026-05-14","projected_isd":"2026-05-15","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:ESKSW:LONGWRTH:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:99359","ercot_project":"99359","title":"Sweetwater Creek POI - Eskota 69 kV line and convert to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"24RPG040","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99357","ercot_project":"99357","title":"Add Permian Basin Reliability Plan Upgrade ID L25D and L25E.","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-09-01","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:99361","ercot_project":"99361","title":"Permian Basin Reliability Plan Upgrade ID L25C","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ABINDUST:MULBERRY:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:73032","ercot_project":"73032","title":"Mulberry Creek: Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":"25RPG034","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:90065","ercot_project":"90065","title":"Abilene Northwest to Mulberry Creek: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:104026","ercot_project":"104026","title":"Morado (Abilene Northwest): Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"25RPG036","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:90063","ercot_project":"90063","title":"Elm Creek to Mulberry Creek: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:109743","ercot_project":"109743","title":"Mulberry Creek: Expand 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:66569","ercot_project":"66569","title":"Rebuild and reconfigure the existing Mulberry Creek 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-15","projected_isd":"2025-05-15","year":2025,"rpg":"21RPG021","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:48816","ercot_project":"48816","title":"Mulberry Creek: Rebuild 345 kV station","owner":"AEP TNC","kv":345,"status":"In service","actual_isd":"2025-06-30","projected_isd":"2025-06-25","year":2025,"rpg":"21RPG021","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:77122","ercot_project":"77122","title":"Mulberry Creek: Construct New 345 kV Terminal","owner":"AEP TNC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2025-11-30","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"base_rate":null},"LN:BROOKTAP:JOSLIN:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:73441","ercot_project":"73441","title":"Dupont Switch to Joslin: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":"22RPG040","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:72479","ercot_project":"72479","title":"Cobia: Build new 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:69277","ercot_project":"69277","title":"Cangrejo to Carbide: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"21RPG002","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:69253","ercot_project":"69253","title":"Cangrejo to Dacosta: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":"21RPG002","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:UVALDE:W_BATESV:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:57910","ercot_project":"57910","title":"Uvalde to West Batesville: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-11-30","year":2031,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:76580","ercot_project":"76580","title":"Poblano: Build new 138 kV station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":"23RPG007","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:76576","ercot_project":"76576","title":"Asherton to Uvalde: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":"23RPG007","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:87648","ercot_project":"87648","title":"Carver to Poblano: Convert 69 kV Line to 138 kV","owner":"AEP TCC/AEP TNC, ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-01-31","year":2031,"rpg":"24RPG009","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:67915","ercot_project":"67915","title":"Asherton to West Batesville: Rebuild 138 kV Line","owner":"AEP TCC/ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-11-30","year":2031,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:80572","ercot_project":"80572","title":"Miel: Construct New 138 kV Station","owner":"ETT","kv":138,"status":"In service","actual_isd":"2026-01-13","projected_isd":"2026-01-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:ORNGROV:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:102871","ercot_project":"102871","title":"Add Fort Bobcat load serving station and Tline to STEC Orange Grove","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-01","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:90000","ercot_project":"90000","title":"Upgrade San Diego - Orange Grove SW","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:71954","ercot_project":"71954","title":"Adds new Talitha substation and short line from Talitha to Orange Grove 138","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-04-01","projected_isd":"2025-04-01","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:76214","ercot_project":"76214","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-11-24","projected_isd":"2026-01-09","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"XF:BOW:138/69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:GRDSW:NACPW:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:NICOLE:TENNYSON:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:98574","ercot_project":"98574","title":"Cedar Hill to Oak Creek: Rebuild 138 kV Line","owner":"AEP TNC/AEP TNC/ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-30","year":2029,"rpg":"H.B. 5066","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72942","ercot_project":"72942","title":"Bluff Creek: 138 kV Station Work","owner":"AEP TNC","kv":138,"status":"In service","actual_isd":"2026-04-30","projected_isd":"2026-06-11","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:HL:PSA:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:90232A","ercot_project":"90232A","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-08-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:70665C","ercot_project":"70665C","title":"Danek (DNK) CEHE Substation for Remy Jade - 23INR0339","owner":"CNP","kv":138,"status":"In service","actual_isd":"2026-01-12","projected_isd":"2025-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:HARLNSW:138/69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:CLCTY:PLOWB:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110494","ercot_project":"110494","title":"Oak Spring Switch - Colorado City Switch 69 kV Line","owner":"ONCOR","kv":69,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-12-01","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99357","ercot_project":"99357","title":"Add Permian Basin Reliability Plan Upgrade ID L25D and L25E.","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-09-01","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:99361","ercot_project":"99361","title":"Permian Basin Reliability Plan Upgrade ID L25C","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:72007","ercot_project":"72007","title":"Ranger Camp 345/138/69 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-04-16","projected_isd":"2025-05-15","year":2025,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:MAGPLANT:NORTHLAN:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:14TPIT0038","ercot_project":"14TPIT0038","title":"Northland to Mag Plant Circuit 979 Upgrade","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:86323","ercot_project":"86323","title":"AEN_MagnesiumPlant_Northland_Ckt_979_RECONDUCTOR","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2033-06-01","year":2033,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:16TPIT0007","ercot_project":"16TPIT0007","title":"McNeil to MagPlant Ckt 977 Upgrade","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-06-01","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:86321","ercot_project":"86321","title":"AEN_Lakeshore_Northland_Ckt_916_Reconductor","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2033-06-01","year":2033,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:6253","ercot_project":"6253","title":"AEN_New_Kramer_Lane_Substation","owner":"AEN","kv":138,"status":"In service","actual_isd":"2025-09-04","projected_isd":"2025-09-04","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:FT:SOE:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:86013","ercot_project":"86013","title":"Fairmont Distribution Reconfigurations with 4th Transformer","owner":"CNP","kv":138,"status":"In service","actual_isd":"2026-07-31","projected_isd":"2026-09-30","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:MADDUX:TREADWEL:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:HARLIN_1:HARLNSW:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:REBECCA:TWILIGHT:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:BAKESW:CEDACA:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:102877","ercot_project":"102877","title":"Upgrade Bakersfield to Schneeman Draw","owner":"STEC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:102788","ercot_project":"102788","title":"Overland_Substation_Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:80870","ercot_project":"80870","title":"Bakersfield Dynamic Reactive Substation Upgrade","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"23RPG027","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:92274","ercot_project":"92274","title":"Whitebaker 345kV - Part of Upgrade L13 2024 Permian Basin Study","owner":"TNMP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:102795","ercot_project":"102795","title":"Bakersfield_NevillRoad_NorthMcCamey_Transmission_Line_Upgrade","owner":"GPL","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-15","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:6719B","ercot_project":"6719B","title":"Twelvemile Substation Addition","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-06-17","projected_isd":"2025-05-30","year":2025,"rpg":"21RPG001","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:6719A","ercot_project":"6719A","title":"Twelvemile Substation Addition","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-06-17","projected_isd":"2025-05-30","year":2025,"rpg":"21RPG001","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:MADDUX:SAPOWER:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:70712","ercot_project":"70712","title":"SAPS to Red Creek: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":"26RPG003","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:VERTREES:WESLAU:138":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:73359","ercot_project":"73359","title":"Vertrees: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2026-05-19","projected_isd":"2026-06-11","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"LN:GRMES:GRSES:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:110298","ercot_project":"110298","title":"Graham Plant Switch - Rice Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2032-06-01","year":2032,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110288","ercot_project":"110288","title":"Graham Plant Switch - Garvey Road Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-12-01","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:82806","ercot_project":"82806","title":"Establish Long Hollow 345 kV Switch (POI for Pinnington Solar)","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-06-30","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:86633","ercot_project":"86633","title":"Dusty Road 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-04","projected_isd":"2025-12-04","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:NEVILLSW:NORTMC:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:102795","ercot_project":"102795","title":"Bakersfield_NevillRoad_NorthMcCamey_Transmission_Line_Upgrade","owner":"GPL","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-15","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109708","ercot_project":"109708","title":"LCRA North McCamey Switch Station: Cap Bank Retirement","owner":"AEP TCC/LCRA","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-06-27","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:TRCNR:WTRML:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:105757","ercot_project":"105757","title":"Watermill Switch - Tri Corner Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG004","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:105886","ercot_project":"105886","title":"East Watermill 765 kV Switch","owner":"ONCOR","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-16","year":2030,"rpg":"25RPG025","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:5526","ercot_project":"5526","title":"Three Creek 345/138 kV Switch (fka Forney)","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG021","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:105755","ercot_project":"105755","title":"Trinidad Switch – Tri Corner 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG004","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:105332","ercot_project":"105332","title":"Watermill Switch – Stainback Switch 345kV Double-Circuit Line Upgrade","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"25RPG004","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:78357","ercot_project":"78357","title":"Wilmer 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2026-06-30","projected_isd":"2026-03-02","year":2026,"rpg":"24RPG022","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:92680","ercot_project":"92680","title":"Stainback 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2026-05-15","projected_isd":"2026-05-15","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:HAINE_DR:OLEANDER:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:80466","ercot_project":"80466","title":"Oleander: Construct New 138 kV Terminal","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2025-12-19","projected_isd":"2026-05-16","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:MDO:PHR:345":{"status":"planned_both_ends","first_top10":2026,"planned":[{"id":"ercot-tpit:90232B","ercot_project":"90232B","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-02-28","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344A","ercot_project":"103344A","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344B","ercot_project":"103344B","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344C","ercot_project":"103344C","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344D","ercot_project":"103344D","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BITTCR:MGSES:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:81232","ercot_project":"81232","title":"Cattleman – Bitter Creek/Champion Creek 345 kV Reroute","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"23RPG029","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99353","ercot_project":"99353","title":"Oak Spring (fka Roscoe, Plowboy) 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:93088A","ercot_project":"93088A","title":"Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV Double-Circuit Line Rebuild 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:93088B","ercot_project":"93088B","title":"Cattleman - Champion Creek/Bitter Creek - Sweetwater East 345-kV Double-Circuit Line Rebuild 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:81299","ercot_project":"81299","title":"Ranger Camp – Prong Moss 345 kV Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72007","ercot_project":"72007","title":"Ranger Camp 345/138/69 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-04-16","projected_isd":"2025-05-15","year":2025,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:76705","ercot_project":"76705","title":"Prairieland 345/138 kV Switch and 138 kV Line","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-09-30","year":2025,"rpg":"24RPG006","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:72009","ercot_project":"72009","title":"Cattleman 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-11-15","projected_isd":"2025-12-15","year":2025,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:ODESA:ODNTH:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:81175","ercot_project":"81175","title":"Salt Flat Road 138 kV Switch and Salt Flat Road - Barr Ranch - Reiter 138 kV Second Circuit","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-12-15","projected_isd":"2025-12-15","year":2025,"rpg":"25RPG007","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:ASPM:CONA:69":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:72880","ercot_project":"72880","title":"Sisseton: Build 69 kV station","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:67921","ercot_project":"67921","title":"Sisseton: Build 69 kV tap","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"XF:BANDER:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:85953","ercot_project":"85953","title":"Camp Wood - Leakey Transmission Line Conversion","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"24RPG009","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72500","ercot_project":"72500","title":"Rio Lago - New 138kV Substation","owner":"BEC","kv":138,"status":"In service","actual_isd":"2025-03-21","projected_isd":"2025-03-17","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:LFKSW:NCSTP:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:111798","ercot_project":"111798","title":"Establish Wingate 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:5475","ercot_project":"5475","title":"Lufkin Switch - Redland Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-15","projected_isd":"2025-12-15","year":2025,"rpg":"20RPG019","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BBSES:JEWET:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99622","ercot_project":"99622","title":"Establish Pin Oak 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"25RPG004","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:111258B","ercot_project":"111258B","title":"Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:111258A","ercot_project":"111258A","title":"Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99620","ercot_project":"99620","title":"Rebuild Pin Oak Switch - Jewett Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110381","ercot_project":"110381","title":"Jewett Switch - Greene Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2033-05-15","year":2033,"rpg":"25RPG042","touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:82808","ercot_project":"82808","title":"Stranger 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-15","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:GN:TC:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:70660","ercot_project":"70660","title":"Plaza to Grant Ckt.08I Upgrade","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-08-30","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:73332","ercot_project":"73332","title":"Install Hermann (HER) Distribution Substation","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:111323D","ercot_project":"111323D","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:GARZA:138/1":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:AMOTP:CGRSW:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:81152","ercot_project":"81152","title":"Buford (fka China Grove) to Tributary 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"26RPG010","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99479B","ercot_project":"99479B","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99479C","ercot_project":"99479C","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99530","ercot_project":"99530","title":"Deep Creek - Snyder - China Grove 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-01","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99479A","ercot_project":"99479A","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"XF:THW:13/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:69902B","ercot_project":"69902B","title":"New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar.","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:99453U","ercot_project":"99453U","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:109769B","ercot_project":"109769B","title":"This models upgrades related to the Willow Phase 3 Load addition","owner":"CNP","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":"26RPG023","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:99453D","ercot_project":"99453D","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"In service","actual_isd":"2026-02-16","projected_isd":"2026-05-31","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:99399","ercot_project":"99399","title":"TH Wharton CB2 Cap Bank","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-09-30","projected_isd":"2026-08-30","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"LN:BRNSW:GOLDTH:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:SMR:SMRTP:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:AUSTIN:AUSTPL:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:CELANEBI:N_SHARPE:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:102885","ercot_project":"102885","title":"Blu Lacy: Construct New 765/345 kV Station","owner":"AEP TCC","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2032-01-30","year":2032,"rpg":"25RPG025","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:81686","ercot_project":"81686","title":"Chalcedony: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-03-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:CEDRVALE:PECOS:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:77807A","ercot_project":"77807A","title":"Silverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG013","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:76293","ercot_project":"76293","title":"Upgraded Cedvale-MiDiva138KV","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-04-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:76291","ercot_project":"76291","title":"Upgraded Cedarvale–BoneSpringsTap–Fishhook","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-07-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:65663","ercot_project":"65663","title":"Double Ckt Line M138-K","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-12-31","year":2032,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CLCRK:LENSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:55217","ercot_project":"55217","title":"Putnam to Leon: Rebuild 138 kV line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:77041","ercot_project":"77041","title":"Leon Switch - Putnam Transmission Line Overhaul","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-05-21","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:APACHE:CADDOTN:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:60504","ercot_project":"60504","title":"Rebuild Caddo-Apache with bundled 795 ACSS","owner":"TNMP","kv":138,"status":"future","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:60502","ercot_project":"60502","title":"Rebuild Apache-Amoco with bundled 795 ACSS","owner":"TNMP","kv":138,"status":"future","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FRONTERA:S_MISSIN:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:103456","ercot_project":"103456","title":"Frontera to Key Switch: Rebuild/Re-conductor 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-29","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99794","ercot_project":"99794","title":"Frontera: 138 kV Breaker Replacement","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:66101","ercot_project":"66101","title":"Del Sol to Frontera: Build New 345 kV Double Circuit Line","owner":"AEP TCC/ETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":"21RPG017","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:110834","ercot_project":"110834","title":"Ad-Hoc TPIT: Arrow - System Upgrades","owner":"SLU","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-05-01","year":2031,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:KOCH_UP:138/69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:CELANEBI:KLEBERG:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:DT:PK:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:64499","ercot_project":"64499","title":"Hyde Park to Downtown Ckt.32A Upgrades","owner":"CNP","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-02-28","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:LBRPD:SSPSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:104655","ercot_project":"104655","title":"Establish Gamblin 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109824","ercot_project":"109824","title":"Monticello Switch - Allen Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2033-05-15","year":2033,"rpg":"25RPG040, 25RPG042","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:90353","ercot_project":"90353","title":"Establish Sandy Ranch 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-06-06","projected_isd":"2025-06-20","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:CARLBDTP:SAGC:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:FBRSW:SAMSW:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110053","ercot_project":"110053","title":"Rebuild TradingHouse - Sam 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-12-15","year":2031,"rpg":"25RPG043","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:87792","ercot_project":"87792","title":"Establish the Bynum 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78369","ercot_project":"78369","title":"Rebuild Sam Switch - Venus Switch 345 kV DCKT","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG017","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:105744","ercot_project":"105744","title":"Desoto Switch – Sam Switch Switch (Lonestar) 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG004","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:75786","ercot_project":"75786","title":"This project will create a POI Bus (station) named Skydancer to interconnect 23INR0295","owner":"LST","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:102401","ercot_project":"102401","title":"LST_SamSwitch_Resiliency_(GTC)_Project","owner":"LST","kv":345,"status":"In service","actual_isd":"2026-06-10","projected_isd":"2026-06-01","year":2026,"rpg":"25RPG031","touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:BLESSING:LOLITA:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:80852","ercot_project":"80852","title":"Lolita: Construct New 138 kV Terminal","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:71002","ercot_project":"71002","title":"Tidehaven: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:86857","ercot_project":"86857","title":"Blessing: Install New 345 kV Cap Bank","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:81238","ercot_project":"81238","title":"Zoisite: Construct New 345 kV Station and 345 kV Lines to STP","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:DKEC:JATN:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:VANBLT69:VANBLTSS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:75989","ercot_project":"75989","title":"Rebuild Vanderbilt -Pt Lavaca","owner":"STEC","kv":69,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:82829","ercot_project":"82829","title":"New Furhman Substation","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-08-04","projected_isd":"2025-07-24","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:E_HARRIS:LA_PALMA:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:90043","ercot_project":"90043","title":"Candela: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:110834","ercot_project":"110834","title":"Ad-Hoc TPIT: Arrow - System Upgrades","owner":"SLU","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-05-01","year":2031,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:64858","ercot_project":"64858","title":"La Palma Expansion","owner":"AEP TCC/SLU","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-16","year":2026,"rpg":"21RPG017","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:91883","ercot_project":"91883","title":"La Palma to Stillman: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:91896","ercot_project":"91896","title":"La Palma to Military Highway: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:69463","ercot_project":"69463","title":"Gulch: Construct new 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BATESVL:CRSTLSW:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:112127","ercot_project":"112127","title":"Upgrade Batesville - Crystal City SW as part of Crystal City SW to Downie upgrade","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:112129","ercot_project":"112129","title":"Upgrade N.Batesville - S. Batesville - Batesville Sw","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CGRSW:CLCTY:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:110494","ercot_project":"110494","title":"Oak Spring Switch - Colorado City Switch 69 kV Line","owner":"ONCOR","kv":69,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-12-01","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:81152","ercot_project":"81152","title":"Buford (fka China Grove) to Tributary 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"26RPG010","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99479B","ercot_project":"99479B","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99479C","ercot_project":"99479C","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99530","ercot_project":"99530","title":"Deep Creek - Snyder - China Grove 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-01","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:72007","ercot_project":"72007","title":"Ranger Camp 345/138/69 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-04-16","projected_isd":"2025-05-15","year":2025,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:CARIZOS:WCRYSTS:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:CHIEBR:GEORGE:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99919","ercot_project":"99919","title":"Georgetown Power Transformer Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:85973","ercot_project":"85973","title":"Georgetown - Rivery Transmission Line Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:109790","ercot_project":"109790","title":"LCRATSC Gabriel Rivery Transmission Line Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:70922","ercot_project":"70922","title":"Chief Brady - Georgetown Transmission Line Upgrade","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-04-18","projected_isd":"2025-04-18","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"LN:LEON_CRK:V4_TAP:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:109924","ercot_project":"109924","title":"Install a new 138kV switchyard to connect new El Patrimonio Solar PV Generation. The switchyard will be looped into the existing 138 kV Leon Creek to Trumbo transmission line.","owner":"CPS/NO","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:88041","ercot_project":"88041","title":"24RPG004: Omicron Reliability Project: Rebuild Leon Creek to Pearsal","owner":"CPS/NO","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-05-01","year":2027,"rpg":"24RPG004","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:109986","ercot_project":"109986","title":"Rebuild the existing Leon Creek to Palo Alto 138-kV transmission line","owner":"CPS/NO","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-01-31","year":2032,"rpg":"25RPG013 and 25RPG017","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:75255F","ercot_project":"75255F","title":"San Antonio South Reliability RPG Project","owner":"CPS/NO","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":"22RPG048","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:75255C","ercot_project":"75255C","title":"San Antonio South Reliability RPG Project","owner":"CPS/NO","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":"22RPG048","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:99904","ercot_project":"99904","title":"Install a new 138kV transmission line approximately .1 miles long to connect the generator’s interconnection facilities to Leon Creek Switchyard.","owner":"CPS/NO","kv":138,"status":"In service","actual_isd":"2026-01-20","projected_isd":"2026-05-01","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:BENWH_RC:KELAM_SL:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:OAKC:PERSHING:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:98574","ercot_project":"98574","title":"Cedar Hill to Oak Creek: Rebuild 138 kV Line","owner":"AEP TNC/AEP TNC/ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-30","year":2029,"rpg":"H.B. 5066","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BTHOT:RTRSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:93466","ercot_project":"93466","title":"Rebuild Odessa EHV - Reiter 138 kV Double Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81418","ercot_project":"81418","title":"Reiter to Yarbrough 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"25RPG008","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81410","ercot_project":"81410","title":"Oncor_FW_81410_Averitt Synchronous Condenser","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-08-13","year":2026,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:71182","ercot_project":"71182","title":"Reiter 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-01","year":2026,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:71187","ercot_project":"71187","title":"Reiter - Tesoro 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:81175","ercot_project":"81175","title":"Salt Flat Road 138 kV Switch and Salt Flat Road - Barr Ranch - Reiter 138 kV Second Circuit","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-12-15","projected_isd":"2025-12-15","year":2025,"rpg":"25RPG007","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:LAN_CTY:138/138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:80576","ercot_project":"80576","title":"Chalmers: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:JAGUAR:THOMASTN:138":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:69473","ercot_project":"69473","title":"Jaguar: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2026-04-16","projected_isd":"2026-06-11","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"LN:TARBUSH:TNFXTAIL:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:82298A","ercot_project":"82298A","title":"PMCR for Adding TNMP Woodhouse New Station","owner":"TNMP","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-01","year":2026,"rpg":"23RTP023","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:76348","ercot_project":"76348","title":"Reconductor Foxtail-PIGCreek-1926ACSS-138KV","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:DPCRK:SACRC:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:105060","ercot_project":"105060","title":"Union - Deep Creek 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"26RPG014","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:102849B","ercot_project":"102849B","title":"Union 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99407","ercot_project":"99407","title":"Sun - Sacroc - Union 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99369","ercot_project":"99369","title":"Union (fka Sun) - Golden Switch - Dermott 138 kV line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99479C","ercot_project":"99479C","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:GBY:WV:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:67422F","ercot_project":"67422F","title":"Greens Bayou to Clinton 138kV Conversion","owner":"CNP","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453B","ercot_project":"99453B","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-03-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:87637A","ercot_project":"87637A","title":"Install (2) new 100 MVA distribution transformers at Liberty substation to serve customer load.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:87637B","ercot_project":"87637B","title":"Install (2) new 100 MVA distribution transformers at Liberty substation to serve customer load.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:CG:138/138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:BOMSW:PRKWY:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:110178","ercot_project":"110178","title":"Bowman 345 kV Switch Capacitor Bank","owner":"ONCOR","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2029-12-15","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:110294","ercot_project":"110294","title":"Bowman Switch - Garvey Road Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-06-01","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:104832","ercot_project":"104832","title":"Oncor_MW_104832_CarolinaStorage_Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:105012","ercot_project":"105012","title":"Lomond_Switch_345kV","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ABNTHWST:CALLAHAN:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:104026","ercot_project":"104026","title":"Morado (Abilene Northwest): Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"25RPG036","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:90065","ercot_project":"90065","title":"Abilene Northwest to Mulberry Creek: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:73032","ercot_project":"73032","title":"Mulberry Creek: Rebuild 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":"25RPG034","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:FLCNS:345/138":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:78374","ercot_project":"78374","title":"Rockhound 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-02-14","projected_isd":"2025-03-01","year":2025,"rpg":"24RPG002","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:72007","ercot_project":"72007","title":"Ranger Camp 345/138/69 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-04-16","projected_isd":"2025-05-15","year":2025,"rpg":"23RPG029","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:81270","ercot_project":"81270","title":"Construct the new Prong Moss 345 kV switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2025-12-30","year":2025,"rpg":"23RPG029","touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:OLSEN:TURKEYFT:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:LOMA_ALT:PRICE_RD:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:81895","ercot_project":"81895","title":"BPUB Branch Changes","owner":"BPUB","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-23","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:93831","ercot_project":"93831","title":"New substation to replace Loma Alta","owner":"BPUB","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-02","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:93679","ercot_project":"93679","title":"New BPUB substation","owner":"BPUB","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-25","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:NCARBIDE:PV_TAP:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:70706","ercot_project":"70706","title":"Tungsten (Carbide): Rebuild 138/69 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-08-31","year":2028,"rpg":"21RPG024","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:69277","ercot_project":"69277","title":"Cangrejo to Carbide: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"21RPG002","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:69489","ercot_project":"69489","title":"Shepley: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:GLNHT:STERT:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:105316","ercot_project":"105316","title":"Ennis West Switch – Sterrett Switch 138kV Line Upgrade","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"25RPG004","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:105330","ercot_project":"105330","title":"Sterrett Switch – MidlothianTXI 138kV_Line_Upgrade","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CTECBU:SANDMO:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:71952","ercot_project":"71952","title":"LCRA TSC Bluffton to Buchanan Transmission Line Overhaul","owner":"LCRATSC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2026-06-30","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:70186","ercot_project":"70186","title":"Buchanan CTEC - Kingsland 1 Transmission Line Overhaul","owner":"LCRATSC","kv":69,"status":"In service","actual_isd":"2026-04-07","projected_isd":"2026-04-07","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:BRKTP:CADDO:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:BNDVS:OLINGR:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:100459","ercot_project":"100459","title":"Establish Token 138 kV POD","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-12-15","projected_isd":"2025-12-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:LA_PALMA:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:91883","ercot_project":"91883","title":"La Palma to Stillman: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:91896","ercot_project":"91896","title":"La Palma to Military Highway: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:80579","ercot_project":"80579","title":"La Palma to Progresso: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-15","year":2030,"rpg":"23RPG005","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:90043","ercot_project":"90043","title":"Candela: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:110834","ercot_project":"110834","title":"Ad-Hoc TPIT: Arrow - System Upgrades","owner":"SLU","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-05-01","year":2031,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:69463","ercot_project":"69463","title":"Gulch: Construct new 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-30","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"LN:OAKGRVRC:OKGTP:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:91463","ercot_project":"91463","title":"New Station tapping Oak Grove to Rand 138kV line.","owner":"RCEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:JAGUAR:MAGRUDER:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:69473","ercot_project":"69473","title":"Jaguar: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2026-04-16","projected_isd":"2026-06-11","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:DANSBY:GOODLAND:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:99105A","ercot_project":"99105A","title":"BRYN_99105_RIVERSIDE","owner":"BRYN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-10-01","year":2029,"rpg":"25RPG001","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:70307A","ercot_project":"70307A","title":"BRYN_Standard_PMCR_Dansby_Rebuild_fix","owner":"BRYN","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:80424","ercot_project":"80424","owner":"BRYN","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:BELCNTY:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:87697","ercot_project":"87697","title":"Bell County - Poage - Seaton 69 kV Line Conversion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-15","year":2027,"rpg":"24RPG001","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87673","ercot_project":"87673","title":"Rebuild the Salado - Bell County 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG001","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87675","ercot_project":"87675","title":"Rebuild the Bell County - Fryers Creek 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG001","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:75524","ercot_project":"75524","title":"This converts Bell County to Gabriel to 138 KV","owner":"BEPC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-18","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87695","ercot_project":"87695","title":"Hartrick 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-16","year":2027,"rpg":"24RPG001","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BLASW:COFESSRC:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:91135","ercot_project":"91135","title":"Add the Frankston station which taps the Coffee to Blackburn line","owner":"RCEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-01","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:104506","ercot_project":"104506","title":"Establish Kilough 138 kV POD","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:CGRSW:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:81152","ercot_project":"81152","title":"Buford (fka China Grove) to Tributary 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"26RPG010","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99479B","ercot_project":"99479B","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99479C","ercot_project":"99479C","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99530","ercot_project":"99530","title":"Deep Creek - Snyder - China Grove 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-01","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99479A","ercot_project":"99479A","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:GRAHM:OLNEY:69":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:72958","ercot_project":"72958","title":"Graham to Graham Switch 69 kV Line Rebuild","owner":"ONCOR","kv":69,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2025-12-15","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:ARGYL:KRMSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:110519","ercot_project":"110519","title":"Argyle Switch - Corinth 138 kV Line Section","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":"25RPG042","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110306","ercot_project":"110306","title":"Argyle Switch - Krum Tap Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-04-01","year":2032,"rpg":"25RPG042","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110248","ercot_project":"110248","title":"Argyle Switch - Highlands 138 kV Line and Argyle Switch Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-12-01","year":2032,"rpg":"25RPG042","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:MV_VALV4:WESLACO:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:71928","ercot_project":"71928","title":"Upgrade Heidelberg to AEP Weslaco line","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-01","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF:ASHERTON:138/138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76569","ercot_project":"76569","title":"Asherton: Rebuild 138 kV station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-05-30","year":2027,"rpg":"23RPG007","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:76576","ercot_project":"76576","title":"Asherton to Uvalde: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":"23RPG007","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:73100","ercot_project":"73100","title":"Asherton to Piloncillo: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-13","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:104611","ercot_project":"104611","title":"Asherton: Expand 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:67915","ercot_project":"67915","title":"Asherton to West Batesville: Rebuild 138 kV Line","owner":"AEP TCC/ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-11-30","year":2031,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF:TYGND:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:66289C","ercot_project":"66289C","title":"Tyler to Athens 138 kV line Conversion","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-15","year":2026,"rpg":"22RPG015","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:KEN:TEN:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:91586","ercot_project":"91586","owner":"BEPC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-07-05","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:102765","ercot_project":"102765","title":"BEPC_TPIT102765_Mahogany","owner":"BEPC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-09-06","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HEC:NEDIN:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:104151","ercot_project":"104151","title":"North Edinburg to North McAllen: Rebuild 138 kV line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-01-30","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:55550","ercot_project":"55550","title":"Brushline: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-07-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:98737","ercot_project":"98737","title":"Agrios: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:110832","ercot_project":"110832","title":"Ad Hoc TPIT: Arrow Load Serving Station","owner":"SLU","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-09-29","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:49564","ercot_project":"49564","title":"Mantle: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:50878","ercot_project":"50878","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-11-24","projected_isd":"2025-09-30","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:76214","ercot_project":"76214","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-11-24","projected_isd":"2026-01-09","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:66447","ercot_project":"66447","title":"Reforzar: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-05-16","projected_isd":"2025-05-16","year":2025,"rpg":"21RPG017","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:76574","ercot_project":"76574","title":"TexasAg Wind Interconnection","owner":"ETT","kv":345,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:105347","ercot_project":"105347","title":"Adding back in Sharyland Kingfisher Station with a Planned ISD 05/31/2026","owner":"SLU","kv":345,"status":"In service","actual_isd":"2026-06-30","projected_isd":"2026-06-30","year":2026,"rpg":"21RPG017","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:NEVADA:WYLIESW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110753","ercot_project":"110753","title":"Related_WylieSW_LCP_Upgrades_Nevada_WylieSW_Line","owner":"GPL","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-01","year":2029,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ALVIN:TNNALVIN:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:103257","ercot_project":"103257","title":"Models TNMP Galveston RPG study","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:103801","ercot_project":"103801","title":"Models YELLOWJACKET","owner":"TNMP","kv":138,"status":"planned","actual_isd":null,"projected_isd":"2026-04-01","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BUTTER:WHITES:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ARROZ:LANCTYPM:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:TCOSW:TNSKA:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:68700","ercot_project":"68700","title":"Bonham - Toco Switch 69 kV Line Rebuild","owner":"ONCOR","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:91060","ercot_project":"91060","title":"Establish Flying Tiger 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-04-17","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:SJO:WOLFRIDG:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:110943D","ercot_project":"110943D","title":"Cooke County Resiliency Project","owner":"BEPC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-09-01","year":2031,"rpg":"26RPG007","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110943C","ercot_project":"110943C","title":"Cooke County Resiliency Project","owner":"BEPC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":"26RPG007","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ASPM:SPUR:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:72880","ercot_project":"72880","title":"Sisseton: Build 69 kV station","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:67921","ercot_project":"67921","title":"Sisseton: Build 69 kV tap","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"XF:FORSW:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:5526","ercot_project":"5526","title":"Three Creek 345/138 kV Switch (fka Forney)","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG021","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:89889","ercot_project":"89889","title":"Three Creek 138 kV Capacitor Bank","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-16","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:CRD:345/138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:91615","ercot_project":"91615","owner":"BEPC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-09-01","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:80334","ercot_project":"80334","owner":"BEPC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-01-05","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:SCSES:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:105829A","ercot_project":"105829A","title":"Establish New Martin Lake 765/345 kV Switch","owner":"ONCOR","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG025","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:111798","ercot_project":"111798","title":"Establish Wingate 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:MATADOR:PADR:69":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:61552","ercot_project":"61552","title":"Matador to Turkey: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2026-05-30","projected_isd":"2026-05-30","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:ESTES:SOLANUM:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:NEVADA:SABNCRKT:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:110753","ercot_project":"110753","title":"Related_WylieSW_LCP_Upgrades_Nevada_WylieSW_Line","owner":"GPL","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-01","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CALAVERS:HOWARD:345":{"status":"in_service_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110689","ercot_project":"110689","title":"Rebuild Howard to AVR","owner":"CPS/NO","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:84902","ercot_project":"84902","title":"23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit","owner":"CPS/CPS, STEC","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":"23RPG032","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110921","ercot_project":"110921","title":"Add Reactive Support at Spruce","owner":"CPS","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:84898","ercot_project":"84898","title":"New Eastside Switching Station","owner":"CPS","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-01-31","year":2030,"rpg":"23RPG032: San Antonio South Reli","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87693","ercot_project":"87693","title":"Rebuild Spruce to Eastside Double Circuit","owner":"CPS","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-01-31","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:67992C","ercot_project":"67992C","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","kv":345,"status":"In service","actual_isd":"2025-04-07","projected_isd":"2025-05-29","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:67992A","ercot_project":"67992A","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","kv":138,"status":"In service","actual_isd":"2025-04-07","projected_isd":"2025-05-29","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:79683","ercot_project":"79683","title":"Add Branch between Padua and Sommers","owner":"CPS","kv":138,"status":"In service","actual_isd":"2025-02-18","projected_isd":"2025-02-18","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:PRKRW:TYPRK:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110679","ercot_project":"110679","title":"Cedar Hill Switch - Sherry Switch 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2032-06-15","year":2032,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110669","ercot_project":"110669","title":"Park Row 138 kV Capacitor","owner":"ONCOR","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:LAPRYOR:UVALDE:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76576","ercot_project":"76576","title":"Asherton to Uvalde: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":"23RPG007","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:57910","ercot_project":"57910","title":"Uvalde to West Batesville: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-11-30","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:76580","ercot_project":"76580","title":"Poblano: Build new 138 kV station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":"23RPG007","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:87648","ercot_project":"87648","title":"Carver to Poblano: Convert 69 kV Line to 138 kV","owner":"AEP TCC/AEP TNC, ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-01-31","year":2031,"rpg":"24RPG009","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:80572","ercot_project":"80572","title":"Miel: Construct New 138 kV Station","owner":"ETT","kv":138,"status":"In service","actual_isd":"2026-01-13","projected_isd":"2026-01-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:HAINE_DR:LA_PALMA:138":{"status":"planned_one_end","first_top10":2021,"planned":[{"id":"ercot-tpit:91883","ercot_project":"91883","title":"La Palma to Stillman: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:91896","ercot_project":"91896","title":"La Palma to Military Highway: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:80579","ercot_project":"80579","title":"La Palma to Progresso: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-15","year":2030,"rpg":"23RPG005","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:90043","ercot_project":"90043","title":"Candela: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:110834","ercot_project":"110834","title":"Ad-Hoc TPIT: Arrow - System Upgrades","owner":"SLU","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-05-01","year":2031,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:69463","ercot_project":"69463","title":"Gulch: Construct new 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BNK:GRBY:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:102672A","ercot_project":"102672A","title":"BEPC_TIER3_MillerRPG","owner":"BEPC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-09-03","year":2029,"rpg":"26RPG002","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:WHITE_PT:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:87019","ercot_project":"87019","title":"Rincon: Upgrade 138 kV Bus","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:103450","ercot_project":"103450","title":"Bodkin: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:109704","ercot_project":"109704","title":"Carnelian: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-01","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:103479","ercot_project":"103479","title":"Taft: Rebuild Distribution Station","owner":"AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-31","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:76194","ercot_project":"76194","title":"Angstrom: Construct New 345 kV Terminal","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2026-01-30","projected_isd":"2026-01-30","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"LN:PUTM:PUTN:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:55217","ercot_project":"55217","title":"Putnam to Leon: Rebuild 138 kV line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:111350","ercot_project":"111350","title":"Specter: Construct New Switch Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-02-28","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:77041","ercot_project":"77041","title":"Leon Switch - Putnam Transmission Line Overhaul","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-05-21","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"base_rate":null},"LN:BNS:RH:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ANGLETON:WCOLLOCL:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:60526","ercot_project":"60526","title":"Rebuild West Columbia Local-Angleton with 795 ACSS","owner":"TNMP","kv":138,"status":"future","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CASL_GAP:CASTIL:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ELMGROVE:MILLWOOD:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:NB:THW:345":{"status":"in_service_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:69902B","ercot_project":"69902B","title":"New 345kV Mission (MSS) substation for generator interconnection to Parliament Solar.","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453U","ercot_project":"99453U","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453E","ercot_project":"99453E","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:102540","ercot_project":"102540","title":"Upgrade Ckt.67B North Belt to DRILCO to increase thermal limits.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:109769B","ercot_project":"109769B","title":"This models upgrades related to the Willow Phase 3 Load addition","owner":"CNP","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":"26RPG023","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:99453D","ercot_project":"99453D","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"In service","actual_isd":"2026-02-16","projected_isd":"2026-05-31","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99399","ercot_project":"99399","title":"TH Wharton CB2 Cap Bank","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-09-30","projected_isd":"2026-08-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"XF:ATKINS:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99117","ercot_project":"99117","title":"BRYN_99117_ATK-TAMU_UPGRADE","owner":"BRYN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-10-01","year":2030,"rpg":"25RPG001","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BIGLAKE:OWLS:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:EU:SF:138":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:73578K","ercot_project":"73578K","title":"Heights 138kV Loop Conversion","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-05-31","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:73578C","ercot_project":"73578C","title":"Heights 138kV Loop Conversion","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-05-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:MATHIS:TYNAN:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:111219","ercot_project":"111219","title":"Tynan: Expand 69 kV Station","owner":"AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2026-06-30","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CORYELCO:PCAKETNP:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:MLKF2:TRSES:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110012","ercot_project":"110012","title":"Rebuild the Trinidad Switch - Mankin Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-15","year":2029,"rpg":"25RPG041, 25RPG043","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99626","ercot_project":"99626","title":"Upgrade Richland Chambers Switch - Trinidad Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:105755","ercot_project":"105755","title":"Trinidad Switch – Tri Corner 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG004","touches":"one station","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:82810A","ercot_project":"82810A","title":"Olympus 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-05-08","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:82810B","ercot_project":"82810B","title":"Olympus 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-05-08","projected_isd":"2025-12-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:FSHSW:RILEY:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:90061","ercot_project":"90061","title":"Poisson: Construct New 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-17","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:90051","ercot_project":"90051","title":"Riley: Construct New 345 kV Terminal","owner":"AEP TNC/ETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:98610","ercot_project":"98610","title":"Riley: Expand 345 kV Station","owner":"ETT/AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:113229","ercot_project":"113229","title":"Oncor_MNW_113229_Cashion_Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109718","ercot_project":"109718","title":"Ferranti: Construct New 345 kV Station","owner":"AEP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-03-30","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FB:RS:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:109573","ercot_project":"109573","title":"Upgrade Ckt.60A Fort Bend to Rosenberg to increase thermal limits.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99009C","ercot_project":"99009C","title":"138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"25RPG010","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99009D","ercot_project":"99009D","title":"138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":"25RPG010","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:109652C","ercot_project":"109652C","title":"Flewellen 4th Distribution Transformer Addition and associated upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BELDTAP:BRONCO:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ALMC:PAIS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:50898","ercot_project":"50898","title":"Alamito Creek to Paisano to Alpine: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2031-12-31","year":2031,"rpg":"20RPG017","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:52464","ercot_project":"52464","title":"Alamito Creek to Ft. Davis: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-03-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:98561","ercot_project":"98561","title":"Solstice to Hayter Tap: Rebuild 138 kV Line Double Circuit","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"H.B. 5066","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:BLFSW:TMPCR:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99346","ercot_project":"99346","title":"Rebuild the Temple Pecan Creek Switch - Belfalls/STR 26/4C 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:110154","ercot_project":"110154","title":"Rebuild Possum Trot Switch - Belfalls-STR 26-4C 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-15","year":2030,"rpg":"25RPG043","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:110018A","ercot_project":"110018A","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:78361B","ercot_project":"78361B","title":"Lake Creek - Rattlesnake Road 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-16","year":2026,"rpg":"23RPG022","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110018B","ercot_project":"110018B","title":"Rebuild the Temple - Temple Pecan Creek Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG009","touches":"one station","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:76578","ercot_project":"76578","title":"Upgrade the Temple Pecan - Temple Elm 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-06-05","projected_isd":"2025-05-15","year":2025,"rpg":"24RPG001","touches":"one station","names_station":true,"same_kv":false}],"base_rate":null},"XF:MARSFO:138/1":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:62068","ercot_project":"62068","title":"Lakeway - Marble Falls Transmission Line Storm Hardening","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-05-16","projected_isd":"2025-05-16","year":2025,"rpg":"22RPG031","touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:COKESTRE:REDCREEK:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:63635","ercot_project":"63635","title":"Tribute: Build 138 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:70712","ercot_project":"70712","title":"SAPS to Red Creek: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":"26RPG003","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:107120","ercot_project":"107120","title":"Pastor Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-11","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:103822","ercot_project":"103822","title":"Red Creek: Expand 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-08-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:109841","ercot_project":"109841","title":"Red Creek: Expand 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-06-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:73408","ercot_project":"73408","title":"Odysseus: Build new 345 kV station","owner":"AEP TNC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-08","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:LKVPD:LLTSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:111794","ercot_project":"111794","title":"Establish Iron Crest 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:87477","ercot_project":"87477","owner":"RCEC","kv":138,"status":"In service","actual_isd":"2025-04-01","projected_isd":"2025-12-16","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:LCSES:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:78361A","ercot_project":"78361A","title":"Lake Creek - Rattlesnake Road 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG022","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:78361B","ercot_project":"78361B","title":"Lake Creek - Rattlesnake Road 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-16","year":2026,"rpg":"23RPG022","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:66210","ercot_project":"66210","title":"Upgrade and convert Lake Creek - Marlin 69 kV Line to 138 kV","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-12-01","projected_isd":"2025-09-15","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:LPLMD:LPLNW:115":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:AMISTD:PICACHO:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:111374","ercot_project":"111374","title":"Gliese: Construct New 138 kV Station","owner":"ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-03-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76274","ercot_project":"76274","title":"Hamilton Road: Construct New 138 kV Terminal","owner":"AEP TCC/ETT","kv":138,"status":"In service","actual_isd":"2025-10-29","projected_isd":"2025-10-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:DIESEL:69/13":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:DENTON:POCKRUSC:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"XF:GZ:138/138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ELKTN:TSLVL:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:109870","ercot_project":"109870","title":"Construct Elkton - Shamburger 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-05-15","year":2031,"rpg":"25RPG043","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:109868","ercot_project":"109868","title":"Establish Elkton 345-138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-05-15","year":2031,"rpg":"25RPG043","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:91455","ercot_project":"91455","title":"Establish Dorsett 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-08","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:ESPU:SPUR:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:BEVO:CARIZOS:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:BTHOT:ODESW:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:STAGHORN:WICKETT:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:87429","ercot_project":"87429","title":"Reconductor Wickett to Staghorn 138kV line.","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87431","ercot_project":"87431","title":"Rebuild Wickett to Winkler 69kV line.","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-30","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:87423","ercot_project":"87423","title":"Reconfigure TNMP Pyote 138kV Substation.","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:16TH_ST:TNFS:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:92280","ercot_project":"92280","title":"Alamo St - Bottlebrush 138kV - Upgrade L12 2024 Permian Basin Study","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:MV_WEDN4:NEDIN:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:104151","ercot_project":"104151","title":"North Edinburg to North McAllen: Rebuild 138 kV line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-01-30","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:98737","ercot_project":"98737","title":"Agrios: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:110832","ercot_project":"110832","title":"Ad Hoc TPIT: Arrow Load Serving Station","owner":"SLU","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-09-29","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:49564","ercot_project":"49564","title":"Mantle: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:64858","ercot_project":"64858","title":"La Palma Expansion","owner":"AEP TCC/SLU","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-16","year":2026,"rpg":"21RPG017","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:50878","ercot_project":"50878","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-11-24","projected_isd":"2025-09-30","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:76214","ercot_project":"76214","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-11-24","projected_isd":"2026-01-09","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:66447","ercot_project":"66447","title":"Reforzar: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-05-16","projected_isd":"2025-05-16","year":2025,"rpg":"21RPG017","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:76574","ercot_project":"76574","title":"TexasAg Wind Interconnection","owner":"ETT","kv":345,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:105347","ercot_project":"105347","title":"Adding back in Sharyland Kingfisher Station with a Planned ISD 05/31/2026","owner":"SLU","kv":345,"status":"In service","actual_isd":"2026-06-30","projected_isd":"2026-06-30","year":2026,"rpg":"21RPG017","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:SCTLD:WFSSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110318","ercot_project":"110318","title":"Wichita Falls South Switch - Windthorst Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2032-12-01","year":2032,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HIGHLAS:RAYBURN:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:76818","ercot_project":"76818","title":"Upgrade Rayburn Auto Station","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-07-01","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:90022","ercot_project":"90022","title":"Upgrade Sam Rayburn to Aloe","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:76788","ercot_project":"76788","title":"Upgrade Victoria-Rayburn","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-03-01","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:102865","ercot_project":"102865","title":"Add Moursund load serving station","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:82829","ercot_project":"82829","title":"New Furhman Substation","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-08-04","projected_isd":"2025-07-24","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:CMNSW:MGPSW:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:DIESEL:STEAM:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:CMBTP:CUMBY:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:92646","ercot_project":"92646","title":"Saddlewood 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2026-05-15","projected_isd":"2026-05-15","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:BEVO:DIMMIT:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:HUTTO:RRNES:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110044","ercot_project":"110044","title":"Rebuild Hutto - Round Rock Northeast 138 kV DCKT Line Section","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-15","year":2029,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99271","ercot_project":"99271","title":"Upgrade Hutto 138 kV terminal equipment","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110014","ercot_project":"110014","title":"Install 138 kV Capacitor Bank at Hutto 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:93191","ercot_project":"93191","title":"Bent Tree 138 kV Substation","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109792","ercot_project":"109792","title":"Hutto - Limmer Transmission Line Upgrade","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-02-01","year":2030,"rpg":"25RPG009","touches":"one station","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:80546A","ercot_project":"80546A","title":"Upgrade the Hutto & Round Rock - Salado 138 kV Line","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2026-01-06","projected_isd":"2025-12-15","year":2026,"rpg":"24RPG018, 25RPG006","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:69345","ercot_project":"69345","title":"Limmer Substation Addition","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-05-01","projected_isd":"2025-05-01","year":2025,"rpg":"22RPG027","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:69552B","ercot_project":"69552B","title":"Teal 345/138 kV Switch connected to LCRA POI (Limmer)","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-30","projected_isd":"2025-05-15","year":2025,"rpg":"22RPG027","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:69552C","ercot_project":"69552C","title":"Teal 345/138 kV Switch connected to LCRA POI (Limmer)","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-30","projected_isd":"2025-08-20","year":2025,"rpg":"22RPG027","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:69552D","ercot_project":"69552D","title":"Teal 345/138 kV Switch connected to LCRA POI (Limmer)","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-30","projected_isd":"2026-05-15","year":2025,"rpg":"22RPG027","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"XF:MARSFO:14/1":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:62068","ercot_project":"62068","title":"Lakeway - Marble Falls Transmission Line Storm Hardening","owner":"LCRATSC","kv":138,"status":"In service","actual_isd":"2025-05-16","projected_isd":"2025-05-16","year":2025,"rpg":"22RPG031","touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"LN:RGRSW:SUNSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:102849A","ercot_project":"102849A","title":"Union 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99284","ercot_project":"99284","title":"Ranger Camp Switch - Barber Lake Switch 138 kV Line (East Circuit, 2nd Circuit)","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99520","ercot_project":"99520","title":"Union (fka Sun) - Ranger Camp 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87861","ercot_project":"87861","title":"Range Rider - Ranger Camp 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81223","ercot_project":"81223","title":"Range Rider 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72007","ercot_project":"72007","title":"Ranger Camp 345/138/69 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-04-16","projected_isd":"2025-05-15","year":2025,"rpg":"23RPG029","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:81270","ercot_project":"81270","title":"Construct the new Prong Moss 345 kV switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2025-12-30","year":2025,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:81274","ercot_project":"81274","title":"Ranger Camp – Cattleman 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2026-06-01","projected_isd":"2026-03-30","year":2026,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BRTSW:JUNPR:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:81358A","ercot_project":"81358A","title":"Grindstone 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-05-15","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:CADDOTN:TXCTY:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:60504","ercot_project":"60504","title":"Rebuild Caddo-Apache with bundled 795 ACSS","owner":"TNMP","kv":138,"status":"future","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BELLS:STNSW:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ONEAL:SHELBY:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:GIRA_TAP:SPUR:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:BLFSW:SDMSW:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110154","ercot_project":"110154","title":"Rebuild Possum Trot Switch - Belfalls-STR 26-4C 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-15","year":2030,"rpg":"25RPG043","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:78361B","ercot_project":"78361B","title":"Lake Creek - Rattlesnake Road 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-16","year":2026,"rpg":"23RPG022","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99346","ercot_project":"99346","title":"Rebuild the Temple Pecan Creek Switch - Belfalls/STR 26/4C 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CROSSOVE:NORTMC:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:109708","ercot_project":"109708","title":"LCRA North McCamey Switch Station: Cap Bank Retirement","owner":"AEP TCC/LCRA","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-06-27","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:93163","ercot_project":"93163","title":"Diablo: Construct New Distribution Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BSPSW:CARBN:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:99266","ercot_project":"99266","title":"Big Spring - Steer 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:99532","ercot_project":"99532","title":"Establish Guthrie 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-11","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:105343","ercot_project":"105343","title":"Big Spring - Tributary Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"26RPG010","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:99243","ercot_project":"99243","title":"Big Spring - Signal Mountain 69 kV Conversion to 138 kV","owner":"ONCOR","status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:GREENCK:STV:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:CGRSW:SNYDR:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99479C","ercot_project":"99479C","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:81152","ercot_project":"81152","title":"Buford (fka China Grove) to Tributary 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"26RPG010","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99479B","ercot_project":"99479B","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99530","ercot_project":"99530","title":"Deep Creek - Snyder - China Grove 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-01","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99479A","ercot_project":"99479A","title":"Snyder - China Grove 69 kV Loop Converstion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:KMJC:SEGOV_T:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:GOODLAND:HRN:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:FALFUR:PREMONT:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:104082","ercot_project":"104082","title":"Alice to Falfurrias: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":"25RPG045","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:73061","ercot_project":"73061","title":"Falfurrias to King Ranch: 138 kV Line Rebuild","owner":"AEP TCC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2027-05-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:80824","ercot_project":"80824","title":"Zenaida: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:BERGHE:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:91392","ercot_project":"91392","title":"Bergheim_Autotransformer_Upgrade","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"24RPG038","touches":"both stations","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:61392","ercot_project":"61392","title":"Bergheim - Fair Oaks Transmission Line Upgrade","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-03-12","projected_isd":"2025-03-12","year":2025,"rpg":"22RPG005","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:61234","ercot_project":"61234","title":"Antler - Bergheim Transmission Line Upgrade","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-02-24","projected_isd":"2025-04-01","year":2025,"rpg":"22RPG005","touches":"both stations","names_station":true,"same_kv":false}],"base_rate":null},"LN:ASPM:RULE:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:59394","ercot_project":"59394","title":"Pointer to Rule: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72880","ercot_project":"72880","title":"Sisseton: Build 69 kV station","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:67921","ercot_project":"67921","title":"Sisseton: Build 69 kV tap","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:ATBR:BRONTE:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ALPINE:BRONCO:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:50898","ercot_project":"50898","title":"Alamito Creek to Paisano to Alpine: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2031-12-31","year":2031,"rpg":"20RPG017","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CLCRK:GTNSW:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:PANCAKE:PCAKETNP:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:EDROY:ODEMSAND:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:103801","ercot_project":"103801","title":"Models YELLOWJACKET","owner":"TNMP","kv":138,"status":"planned","actual_isd":null,"projected_isd":"2026-04-01","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:CAMPWOOD:LEAKEY:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:85953","ercot_project":"85953","title":"Camp Wood - Leakey Transmission Line Conversion","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"24RPG009","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:55617","ercot_project":"55617","title":"Campwood to New Barksdale: Rebuild 69 kV Line","owner":"AEP TCC/ETT","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-10-31","year":2029,"rpg":"24RPG009","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:87648","ercot_project":"87648","title":"Carver to Poblano: Convert 69 kV Line to 138 kV","owner":"AEP TCC/AEP TNC, ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-01-31","year":2031,"rpg":"24RPG009","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:PAP1:PELICAN:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:HAYSEN:ZORN:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:100293","ercot_project":"100293","title":"Zorn_Load_Circuit_Breaker_Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:104639","ercot_project":"104639","title":"LCRA TSC Lytton Springs - Zorn Transmission Line Upgrade","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:107130","ercot_project":"107130","title":"LCRATSC Highline Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-14","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:91312","ercot_project":"91312","title":"LCRATSC Austrop - Garfield Transmission Line Upgrade","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:104635","ercot_project":"104635","title":"LCRATSC Garfield - Lytton Springs Transmission Line Upgrade","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-16","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:61234","ercot_project":"61234","title":"Antler - Bergheim Transmission Line Upgrade","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-02-24","projected_isd":"2025-04-01","year":2025,"rpg":"22RPG005","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:69345","ercot_project":"69345","title":"Limmer Substation Addition","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-05-01","projected_isd":"2025-05-01","year":2025,"rpg":"22RPG027","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:92600A","ercot_project":"92600A","title":"John_Dumas_Circuit_Breaker_Addition","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-12-22","projected_isd":"2025-12-01","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:92600B","ercot_project":"92600B","title":"John_Dumas_Circuit_Breaker_Addition","owner":"LCRATSC","kv":345,"status":"In service","actual_isd":"2025-12-22","projected_isd":"2025-12-01","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:OLINGR:138/69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":0.426},"LN:DELTA:ENLOT:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:109952","ercot_project":"109952","title":"Commerce Switch - Paris Switch 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":"25RPG040, 25RPG042","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ADERHOLD:ELSA:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:55550","ercot_project":"55550","title":"Brushline: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-07-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:IH20:TNCOLIET:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:77803","ercot_project":"77803","title":"Cowpen 138kV station from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG013","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CDCSW:OKCLS:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:66188","ercot_project":"66188","title":"Cedar Crest - Dealey - West Levee 138 kV Line","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2026-05-15","projected_isd":"2026-03-15","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:CMNSW:CMNTP:138":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"LN:BEA:TAV:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:90130","ercot_project":"90130","title":"Install (2) new 100 MVA distribution transformers at Orchard substation.","owner":"CNP","kv":138,"status":"In service","actual_isd":"2026-05-13","projected_isd":"2026-05-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:REDGATE:REDGTSS:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:LNGSW:PRLSW:345":{"status":"planned_both_ends","first_top10":2026,"planned":[{"id":"ercot-tpit:102846","ercot_project":"102846","title":"Longshore 345 kV Switch Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"23RPG034","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:81268","ercot_project":"81268","title":"Longshore – Consavvy 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"23RPG029","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:81236","ercot_project":"81236","title":"Cattleman – Longshore 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"23RPG029","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110819","ercot_project":"110819","title":"Add Quantum 345 kV Switch","owner":"ONCOR","kv":345,"status":"future","actual_isd":null,"projected_isd":"2027-12-09","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81240","ercot_project":"81240","title":"Consavvy – Odessa EHV 345 kV Double Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-15","year":2029,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:MILITARY:OLMITO:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:91896","ercot_project":"91896","title":"La Palma to Military Highway: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":"24RPG008","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:76914","ercot_project":"76914","title":"Ocelot: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-03-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BDGSW:KRWSW:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:113229","ercot_project":"113229","title":"Oncor_MNW_113229_Cashion_Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:104830","ercot_project":"104830","title":"WesternWind_Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-06","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:70900D","ercot_project":"70900D","title":"Roanoke Area Upgrades","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2025-12-14","year":2025,"rpg":"22RPG003","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78363","ercot_project":"78363","title":"Gunter 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2026-03-31","projected_isd":"2025-12-15","year":2026,"rpg":"24RPG025","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:GATEWTP:WORMSER:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:73065","ercot_project":"73065","title":"Magana Hein: Build new 138 kV distribution station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76234","ercot_project":"76234","title":"Wormser Road: Construct New 138 kV Terminal","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2025-09-15","projected_isd":"2025-09-30","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:48774","ercot_project":"48774","title":"Fincas: Build new 138 kV distribution station","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2026-06-30","projected_isd":"2026-06-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:PYOTE:SNDSTONE:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:87423","ercot_project":"87423","title":"Reconfigure TNMP Pyote 138kV Substation.","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ALIQUING:I_DUPSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:76286","ercot_project":"76286","title":"Hecker to Resnik: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:90016","ercot_project":"90016","title":"Dupont Switch to Dupont PP1 Circuit 1: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:69467","ercot_project":"69467","title":"Dupont to Resnik: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2025-05-15","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:IND_PK_D:SHELBY:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"XF:OLN:138/69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:PREST:RENTP:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:PRPTP:PRSSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:109952","ercot_project":"109952","title":"Commerce Switch - Paris Switch 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":"25RPG040, 25RPG042","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:92852B","ercot_project":"92852B","title":"Monticello_Paris_Line_Upgrade","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG026","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:110290","ercot_project":"110290","title":"Paris Switch - Valley South Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-04-01","year":2032,"rpg":"25RPG040","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:91060","ercot_project":"91060","title":"Establish Flying Tiger 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-04-17","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:DEL_MAR:UNIVERSI:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:57906","ercot_project":"57906","title":"Laredo to University: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:45511","ercot_project":"45511","title":"Laredo to Del Mar: 138 kV Line Rebuild","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FREER:LOBO:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:104388","ercot_project":"104388","title":"Government Wells: Capacitor Bank Installation","owner":"AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:76196","ercot_project":"76196","title":"Lobo: 138 kV Breaker Replacement","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:70800","ercot_project":"70800","title":"Triada: Build New 345 kV Station","owner":"ETT/AEP TCC/ETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-25","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:103392","ercot_project":"103392","title":"Cuernos: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:99551","ercot_project":"99551","title":"Chalice: Construct New 345 kV Station","owner":"ETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:76237","ercot_project":"76237","title":"Lobo: Construct New 345 kV Terminal","owner":"ETT/AEP TCC/ETT","kv":345,"status":"In service","actual_isd":"2025-06-01","projected_isd":"2027-12-31","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:68252","ercot_project":"68252","title":"Lobo: Line settings","owner":"ETT","kv":345,"status":"In service","actual_isd":"2025-04-14","projected_isd":"2026-01-09","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:67919","ercot_project":"67919","title":"Avanzada: Construct New 345 kV Station","owner":"ETT","kv":345,"status":"In service","actual_isd":"2025-02-14","projected_isd":"2025-02-14","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"XF:NCARBIDE:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:70706","ercot_project":"70706","title":"Tungsten (Carbide): Rebuild 138/69 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-08-31","year":2028,"rpg":"21RPG024","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:69277","ercot_project":"69277","title":"Cangrejo to Carbide: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"21RPG002","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:69489","ercot_project":"69489","title":"Shepley: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BELDTAP:COCS:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:RAYBURN:SCHRODS:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:76818","ercot_project":"76818","title":"Upgrade Rayburn Auto Station","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-07-01","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:90022","ercot_project":"90022","title":"Upgrade Sam Rayburn to Aloe","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:76788","ercot_project":"76788","title":"Upgrade Victoria-Rayburn","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-03-01","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:102865","ercot_project":"102865","title":"Add Moursund load serving station","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:82829","ercot_project":"82829","title":"New Furhman Substation","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-08-04","projected_isd":"2025-07-24","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:ST_NINO:WORMSER:138":{"status":"in_service_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:73065","ercot_project":"73065","title":"Magana Hein: Build new 138 kV distribution station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:48774","ercot_project":"48774","title":"Fincas: Build new 138 kV distribution station","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2026-06-30","projected_isd":"2026-06-30","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:76234","ercot_project":"76234","title":"Wormser Road: Construct New 138 kV Terminal","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2025-09-15","projected_isd":"2025-09-30","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:PHARMVEC:SE_EDINB:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:JNESBORO:OLSEN:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ALICE:STADIUM:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:104390","ercot_project":"104390","title":"Stadium: Capacitor Bank Installation","owner":"AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:104082","ercot_project":"104082","title":"Alice to Falfurrias: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":"25RPG045","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:PYOTE:STAGHORN:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:87423","ercot_project":"87423","title":"Reconfigure TNMP Pyote 138kV Substation.","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87429","ercot_project":"87429","title":"Reconductor Wickett to Staghorn 138kV line.","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FALCNSW:FALCON:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:DOWNIES:READING:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:112131","ercot_project":"112131","title":"Upgrade N.Batesville - Leona - Uvalde Sw - Uvalde Sub - Downie","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:ADERHOLD:HEC:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:55550","ercot_project":"55550","title":"Brushline: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-07-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:CBY:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:90255B","ercot_project":"90255B","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-30","year":2027,"rpg":"24RPG026","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:90255C","ercot_project":"90255C","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-30","year":2027,"rpg":"24RPG026","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:90255F","ercot_project":"90255F","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-30","year":2028,"rpg":"24RPG026","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:90255G","ercot_project":"90255G","title":"Jordan / Mont Belvieu Area Improvement Project","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-30","year":2028,"rpg":"24RPG026","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99274C","ercot_project":"99274C","title":"Cedar Bayou RPG - Substation Upgrades (25RPG014)","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"25RPG014","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:RIO_GRAN:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:77031","ercot_project":"77031","title":"Las Lomas: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-03-31","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:DMTSW:ECRSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99369","ercot_project":"99369","title":"Union (fka Sun) - Golden Switch - Dermott 138 kV line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:105063","ercot_project":"105063","title":"Union - Dermott 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"26RPG014","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:102849A","ercot_project":"102849A","title":"Union 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:GUNSW:HPPOD:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:99141","ercot_project":"99141","title":"Rebuild Flower Grove - Vincent 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-31","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CANTN:CNTSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:91945","ercot_project":"91945","title":"Establish Alder 138 kV Switch","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"24RPG007","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:COMFOR:RAYBAR:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:100287","ercot_project":"100287","title":"Comfort_Raymond_Barker_Transmission_Line_Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:100289","ercot_project":"100289","title":"CypressCreek_Raymond_Barker_Transmission_Line_Upgrade","owner":"LCRATSC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:FURHMAN:MOURSUND:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:102865","ercot_project":"102865","title":"Add Moursund load serving station","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:82829","ercot_project":"82829","title":"New Furhman Substation","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-08-04","projected_isd":"2025-07-24","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:CRAND:SGVSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:105324","ercot_project":"105324","title":"Mesquite Switch – Seagoville Switch 138kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-16","year":2027,"rpg":"25RPG004","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:71178","ercot_project":"71178","title":"Seagoville-Watermill 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-05-15","year":2026,"rpg":"23RPG033","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ENWSW:TMPTN:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:105316","ercot_project":"105316","title":"Ennis West Switch – Sterrett Switch 138kV Line Upgrade","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"25RPG004","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:71156","ercot_project":"71156","title":"Ennis West Switch-Waxahachie Switch 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:DENTSW:DENT_RD:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:DENT_RD:TERREL_D:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:E3:X2:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110919","ercot_project":"110919","title":"CPS Lylte Tline Rebuilds","owner":"CPS","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-06-01","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:LOBO:345/138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:70800","ercot_project":"70800","title":"Triada: Build New 345 kV Station","owner":"ETT/AEP TCC/ETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-25","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:103392","ercot_project":"103392","title":"Cuernos: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99551","ercot_project":"99551","title":"Chalice: Construct New 345 kV Station","owner":"ETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:76196","ercot_project":"76196","title":"Lobo: 138 kV Breaker Replacement","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:104388","ercot_project":"104388","title":"Government Wells: Capacitor Bank Installation","owner":"AEP TCC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:76237","ercot_project":"76237","title":"Lobo: Construct New 345 kV Terminal","owner":"ETT/AEP TCC/ETT","kv":345,"status":"In service","actual_isd":"2025-06-01","projected_isd":"2027-12-31","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:68252","ercot_project":"68252","title":"Lobo: Line settings","owner":"ETT","kv":345,"status":"In service","actual_isd":"2025-04-14","projected_isd":"2026-01-09","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:67919","ercot_project":"67919","title":"Avanzada: Construct New 345 kV Station","owner":"ETT","kv":345,"status":"In service","actual_isd":"2025-02-14","projected_isd":"2025-02-14","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:BERGSTRO:KINGSBER:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:104328","ercot_project":"104328","title":"New 138 KV BOLM Substation Cut-in on CKT1021 BE to KB","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CROSSTRL:WKN_BKR:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:BRAUNIG:CALAVERS:138":{"status":"in_service_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:109898","ercot_project":"109898","title":"Construct New Alamo City 138kV Substation","owner":"CPS","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-14","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109972","ercot_project":"109972","title":"Construct a new CPS Owned switchyard to connect new Lavender BESS Generation Project","owner":"CPS/NO","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-07-03","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:12TPIT0004","ercot_project":"12TPIT0004","title":"Sulpher Springs - New 138kV Substation","owner":"CPS","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2033-01-31","year":2033,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:45068","ercot_project":"45068","title":"Merida to Harlandale Rebuild","owner":"CPS","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2033-05-31","year":2033,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109950","ercot_project":"109950","title":"Install a new 138kV transmission loop in conjunction with the S-1086 Taormina BESS switchyard project","owner":"CPS/NO","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:67992C","ercot_project":"67992C","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","kv":345,"status":"In service","actual_isd":"2025-04-07","projected_isd":"2025-05-29","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:79683","ercot_project":"79683","title":"Add Branch between Padua and Sommers","owner":"CPS","kv":138,"status":"In service","actual_isd":"2025-02-18","projected_isd":"2025-02-18","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:DECKER:DUNLAP:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:67091","ercot_project":"67091","title":"Second 138 kV transmission Line from DL-DP CKT1034","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:61224","ercot_project":"61224","title":"AEN_Decker_SH_ckt_1008__reconductor","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-15","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110385","ercot_project":"110385","title":"AEN_DL_AU_CKT920_Reconductor","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-15","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:86317","ercot_project":"86317","title":"AEN_DP_OnionCreek_Ckt_924_Reconductor","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-06-01","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:11TPIT0011","ercot_project":"11TPIT0011","title":"East_Village138kV Substation","owner":"AEN","kv":138,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-01","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:FLTSW:TCOSW:138":{"status":"in_service_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:68700","ercot_project":"68700","title":"Bonham - Toco Switch 69 kV Line Rebuild","owner":"ONCOR","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:91060","ercot_project":"91060","title":"Establish Flying Tiger 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-04-17","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:COCS:FTST:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:80907","ercot_project":"80907","title":"Fort Stockton Plant: Rebuild 138/69 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":"25RPG032","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:86829","ercot_project":"86829","title":"Fort Stockton Plant to Lynx: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"23RPG008","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:91853","ercot_project":"91853","title":"Fort Stockton Plant to Solstice: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"H.B. 5066","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:AZ:QNM:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:FTST:TOMBSTNE:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:80907","ercot_project":"80907","title":"Fort Stockton Plant: Rebuild 138/69 kV Station","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":"25RPG032","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:86829","ercot_project":"86829","title":"Fort Stockton Plant to Lynx: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"23RPG008","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:91853","ercot_project":"91853","title":"Fort Stockton Plant to Solstice: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"H.B. 5066","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:PLSTH:PLSTN:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:66202A","ercot_project":"66202A","title":"Upgrade Palestine-Crockett 69 kV Line","owner":"ONCOR","kv":69,"status":"In service","actual_isd":"2025-08-06","projected_isd":"2025-09-15","year":2025,"rpg":"22RPG035","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BUPOI:JKSVL:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:99610","ercot_project":"99610","title":"Upgrade Jacksonville Switch 138/69 kV Auto","owner":"ONCOR","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:DENT_RD:LTV_D:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:FTCHADBT:OAKC:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:98574","ercot_project":"98574","title":"Cedar Hill to Oak Creek: Rebuild 138 kV Line","owner":"AEP TNC/AEP TNC/ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-11-30","year":2029,"rpg":"H.B. 5066","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BRAUNIG:CALAVERS:345":{"status":"in_service_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110689","ercot_project":"110689","title":"Rebuild Howard to AVR","owner":"CPS/NO","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:84902","ercot_project":"84902","title":"23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit","owner":"CPS/CPS, STEC","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":"23RPG032","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110921","ercot_project":"110921","title":"Add Reactive Support at Spruce","owner":"CPS","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:84898","ercot_project":"84898","title":"New Eastside Switching Station","owner":"CPS","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-01-31","year":2030,"rpg":"23RPG032: San Antonio South Reli","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87693","ercot_project":"87693","title":"Rebuild Spruce to Eastside Double Circuit","owner":"CPS","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-01-31","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:67992C","ercot_project":"67992C","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","kv":345,"status":"In service","actual_isd":"2025-04-07","projected_isd":"2025-05-29","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:79683","ercot_project":"79683","title":"Add Branch between Padua and Sommers","owner":"CPS","kv":138,"status":"In service","actual_isd":"2025-02-18","projected_isd":"2025-02-18","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:PRCRK:PRCSW:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:CARVER:LVOK:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:52070","ercot_project":"52070","title":"Carver to Maxwell: Rebuild 138 kV line","owner":"AEP TCC/AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-09-30","year":2028,"rpg":"22RPG042","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:91906","ercot_project":"91906","title":"Carver to Friend Ranch: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"H.B. 5066","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:87648","ercot_project":"87648","title":"Carver to Poblano: Convert 69 kV Line to 138 kV","owner":"AEP TCC/AEP TNC, ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-01-31","year":2031,"rpg":"24RPG009","touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:45501","ercot_project":"45501","title":"Eldorado Live Oak to Sonora: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"In service","actual_isd":"2025-03-12","projected_isd":"2025-03-12","year":2025,"rpg":"18RPG012","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"XF:ALICE:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:104082","ercot_project":"104082","title":"Alice to Falfurrias: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":"25RPG045","touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HDNLAKES:PHR:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:103257","ercot_project":"103257","title":"Models TNMP Galveston RPG study","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:66204","ercot_project":"66204","title":"Rebuild Hidden Lakes-PH Robinson with bundled 795 ACSS","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:100503A","ercot_project":"100503A","title":"Webster Distribution Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:73352A","ercot_project":"73352A","title":"PH Robinson Area 138kV Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:111323G","ercot_project":"111323G","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:73352B","ercot_project":"73352B","title":"PH Robinson Area 138kV Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-01-09","projected_isd":"2024-12-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:FALCNSW:ROMA_SW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:73448","ercot_project":"73448","title":"Roma: Build new 138 kV terminal","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-09-28","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ELCMPOS:NADAS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:78483","ercot_project":"78483","title":"Rebuild Nada to El Campo 69 kV line","owner":"STEC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-09-01","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ALPR:BARL:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:64042","ercot_project":"64042","title":"Barrilla Junction: 69 kV Loop Rebuild","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":"21RPG023","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:PHBL_TAP:STRS:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:CARSON:PILOT:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:86329","ercot_project":"86329","title":"AEN_PilotKnob_CarsonCreek_Ckt_944_RECONDUCTOR","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-15","year":2030,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:61090","ercot_project":"61090","title":"Timbercreek 138kV substation","owner":"AEN","kv":138,"status":"future","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:71408","ercot_project":"71408","title":"Upgrade CKT943 to 3000 amperes","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-06-01","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:REDGATE:138/138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:B4:V2:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:4320","ercot_project":"4320","title":"CPSE_Brooks to Chavaneaux MLSE","owner":"CPS","kv":138,"status":"future","actual_isd":null,"projected_isd":"2030-05-30","year":2030,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:15TPIT0031","ercot_project":"15TPIT0031","title":"Chavaneaux_Chavaneaux Tap Rebuild (Brooks to Chavaneaux ckt)","owner":"CPS","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-31","year":2030,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:110643","ercot_project":"110643","title":"Rebuild Chav to Palo Alto","owner":"CPS/NO","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:4323","ercot_project":"4323","title":"CPSE_Brooks_MLSE","owner":"CPS","kv":138,"status":"In service","actual_isd":"2025-04-10","projected_isd":"2025-04-10","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:LFKSW:LFKTP:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:111798","ercot_project":"111798","title":"Establish Wingate 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:5475","ercot_project":"5475","title":"Lufkin Switch - Redland Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-15","projected_isd":"2025-12-15","year":2025,"rpg":"20RPG019","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:HASTINGS:TNNALVIN:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:103257","ercot_project":"103257","title":"Models TNMP Galveston RPG study","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:LUNA:MVRANGER:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:100054","ercot_project":"100054","title":"Luna to Mesquite: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HTYTP:REDSW:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:5475","ercot_project":"5475","title":"Lufkin Switch - Redland Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-15","projected_isd":"2025-12-15","year":2025,"rpg":"20RPG019","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:LASPULGA:RIOHONDO:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:6687","ercot_project":"6687","title":"Rebuild Rio Hondo to East Rio Hondo","owner":"STEC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:104463","ercot_project":"104463","title":"Wren: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:105912","ercot_project":"105912","title":"Ciruela: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:71930","ercot_project":"71930","title":"Upgrade RIOHONDO to BURNS line","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-07-01","projected_isd":"2025-05-01","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:69463","ercot_project":"69463","title":"Gulch: Construct new 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BM:WD:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:111323F","ercot_project":"111323F","title":"Upgrades related to the Baytown Area Load Addition","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:78485E","ercot_project":"78485E","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-06-03","projected_isd":"2025-05-31","year":2025,"rpg":"23RPG025","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78485B","ercot_project":"78485B","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-06-03","projected_isd":"2025-08-30","year":2025,"rpg":"23RPG025","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78485F","ercot_project":"78485F","title":"Britmoore to Bellaire Ckt.24B Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2026-08-13","projected_isd":"2026-08-30","year":2026,"rpg":"23RPG025","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:SEA:138/69":{"status":"planned_both_ends","first_top10":2026,"planned":[{"id":"ercot-tpit:87697","ercot_project":"87697","title":"Bell County - Poage - Seaton 69 kV Line Conversion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-15","year":2027,"rpg":"24RPG001","touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BELD:BELDTAP:69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:KINGMTSW:QUEEN_BA:345":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:JACKRABT:PECOS:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:65663","ercot_project":"65663","title":"Double Ckt Line M138-K","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-12-31","year":2032,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:77807A","ercot_project":"77807A","title":"Silverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG013","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:OKLTP:PDSES:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:HAN1:REVSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110010","ercot_project":"110010","title":"Rebuild the Revolution Switch - Ash Creek Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"25RPG041, 25RPG043","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CUMBY:CUMBY_RC:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"XF:FRONTERA:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:66101","ercot_project":"66101","title":"Del Sol to Frontera: Build New 345 kV Double Circuit Line","owner":"AEP TCC/ETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":"21RPG017","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:110834","ercot_project":"110834","title":"Ad-Hoc TPIT: Arrow - System Upgrades","owner":"SLU","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-05-01","year":2031,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:103456","ercot_project":"103456","title":"Frontera to Key Switch: Rebuild/Re-conductor 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-29","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:99794","ercot_project":"99794","title":"Frontera: 138 kV Breaker Replacement","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:MCPOI:SANDLAKE:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ONION:PILOT:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:61090","ercot_project":"61090","title":"Timbercreek 138kV substation","owner":"AEN","kv":138,"status":"future","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:86317","ercot_project":"86317","title":"AEN_DP_OnionCreek_Ckt_924_Reconductor","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-06-01","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:86333","ercot_project":"86333","title":"AEN_OnionCreek_StoneyRidge_Ckt_1026_Reconductor","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-06-01","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:86329","ercot_project":"86329","title":"AEN_PilotKnob_CarsonCreek_Ckt_944_RECONDUCTOR","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-15","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:71408","ercot_project":"71408","title":"Upgrade CKT943 to 3000 amperes","owner":"AEN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2030-06-01","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:READING:UVALDE:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:76576","ercot_project":"76576","title":"Asherton to Uvalde: Convert to 138 kV","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":"23RPG007","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:57910","ercot_project":"57910","title":"Uvalde to West Batesville: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-11-30","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:76580","ercot_project":"76580","title":"Poblano: Build new 138 kV station","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":"23RPG007","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:87648","ercot_project":"87648","title":"Carver to Poblano: Convert 69 kV Line to 138 kV","owner":"AEP TCC/AEP TNC, ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-01-31","year":2031,"rpg":"24RPG009","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:80572","ercot_project":"80572","title":"Miel: Construct New 138 kV Station","owner":"ETT","kv":138,"status":"In service","actual_isd":"2026-01-13","projected_isd":"2026-01-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:TYGND:TYSTH:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:66289C","ercot_project":"66289C","title":"Tyler to Athens 138 kV line Conversion","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-15","year":2026,"rpg":"22RPG015","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BUS_PARK:DANSBY:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:80424","ercot_project":"80424","owner":"BRYN","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:70307A","ercot_project":"70307A","title":"BRYN_Standard_PMCR_Dansby_Rebuild_fix","owner":"BRYN","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99105A","ercot_project":"99105A","title":"BRYN_99105_RIVERSIDE","owner":"BRYN","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-10-01","year":2029,"rpg":"25RPG001","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:DA:WC:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:78461A","ercot_project":"78461A","title":"West Columbia to Damon and Needville to Big Creek Ckt.89A Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-30","year":2028,"rpg":"23RPG021","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:98997","ercot_project":"98997","title":"Rebuild/reconductor Ckt.89A West Columbia to Damon and Ckt.89A Damon to Needville to increase thermal limits. Upgrade Ckt.89A West Columbia equipment to increase thermal limits.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"25RPG011","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:79451A","ercot_project":"79451A","title":"Loop new Ancla CEHE 138kV substation into Ckt.04E Angleton to West Columbia to create new Ckt.04 Angleton to Ancla to West Columbia. Install one generator lead from Ancla CEHE 138kV substation to ROYAL / Royal River BESS.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:109640","ercot_project":"109640","title":"Convert existing Needville 138/12kV distribution substation to 138/35kV. Remove existing Big Creek 138/12kV distribution substation to create new Ckt.89B Needville to Pleak.","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:WDPOD:WINKS:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:76696","ercot_project":"76696","title":"Border - Shifting Sands 138 kV Line and add Wink - Shifting Sands 138 kV second circuit","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:78382","ercot_project":"78382","title":"Adds Capacitor Bank at White Dune","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-06-30","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:MAGNS_RC:SIG_SLR:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:FARMLAND:W_LD_345:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110521","ercot_project":"110521","title":"Farmland 345 kV Switch Rebuild and Farmland - Long Draw 345 kV Line","owner":"ONCOR","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2029-12-01","year":2029,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:90964","ercot_project":"90964","title":"Tier 3 project to add second autotransformer at Long Draw","owner":"WETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":"24RPG027","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:112691","ercot_project":"112691","title":"WETT Buck Canyon 345 kV Station for Synchronous Condensers","owner":"WETT","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-03-10","year":2027,"rpg":"24RPG041","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:OB:WAP:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:103344G","ercot_project":"103344G","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344E","ercot_project":"103344E","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344F","ercot_project":"103344F","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344H","ercot_project":"103344H","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453Q","ercot_project":"99453Q","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-10-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76624","ercot_project":"76624","title":"WA Parish 345kV Substation Expansion for Crowned Heron Storage (24INR0405)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-10-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:78471","ercot_project":"78471","title":"WA Parish 345kV Substation Expansion for Bypass Storage (23INR0336)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-10-30","projected_isd":"2025-11-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:73371F","ercot_project":"73371F","title":"BP24 Sub Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-06-05","projected_isd":"2025-01-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BNMNW:BNMSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:68700","ercot_project":"68700","title":"Bonham - Toco Switch 69 kV Line Rebuild","owner":"ONCOR","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:PLSNTOS:POTEETS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:92890","ercot_project":"92890","title":"Add Fresa load serving substation","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-04-01","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:78478","ercot_project":"78478","title":"Rebuild Oaks to Poteet to Pearsall 69 kV line","owner":"STEC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-01","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:RANDADO:ZAPATA:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:104562","ercot_project":"104562","title":"Glint: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-07-01","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:73362","ercot_project":"73362","title":"Uribe: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:LFPTP:LFSTW:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:P_ISABEL:SCARBIDE:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76082","ercot_project":"76082","title":"Union Carbide: Rebuild 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-08-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:77144B","ercot_project":"77144B","title":"Pompano: New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-03-20","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:49550","ercot_project":"49550","title":"Port Isabel: Rebuild As GIS Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-03-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:PEARSALL:POTEETS:69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:78478","ercot_project":"78478","title":"Rebuild Oaks to Poteet to Pearsall 69 kV line","owner":"STEC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-01","year":2026,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:76768","ercot_project":"76768","title":"Upgrade Pearson -Pearsall","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-01","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:92890","ercot_project":"92890","title":"Add Fresa load serving substation","owner":"STEC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-04-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:71319","ercot_project":"71319","title":"Upgrade Pearsall Station","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:76790","ercot_project":"76790","title":"Upgrade Pearsall Auto","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-01","year":2032,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:COMSW:WCITY:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:109952","ercot_project":"109952","title":"Commerce Switch - Paris Switch 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":"25RPG040, 25RPG042","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:NLARSW:PALAFOX:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:90014","ercot_project":"90014","title":"Palafox: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:73059","ercot_project":"73059","title":"Barrera: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-08-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:90790","ercot_project":"90790","title":"Palafox: Construct New 138 kV Temporary Tap","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2025-01-18","projected_isd":"2025-01-18","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:MALCR:PRSSW:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:109952","ercot_project":"109952","title":"Commerce Switch - Paris Switch 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":"25RPG040, 25RPG042","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:92852B","ercot_project":"92852B","title":"Monticello_Paris_Line_Upgrade","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG026","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:110290","ercot_project":"110290","title":"Paris Switch - Valley South Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-04-01","year":2032,"rpg":"25RPG040","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:91060","ercot_project":"91060","title":"Establish Flying Tiger 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-04-17","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:CLKSW:HWKSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:109808","ercot_project":"109808","title":"Rivercrest Switch - Hawk Hallow Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-01","year":2028,"rpg":"25RPG042","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:S_MCALLN:TAYLOR:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:99933","ercot_project":"99933","title":"La Plaza: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:MISAE:TESLA:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:81576","ercot_project":"81576","title":"Tesla: Construct New 345 kV Terminal","owner":"AEP TNC/ETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:100305","ercot_project":"100305","title":"Cross Expansion: Modify existing 345 kV Station","owner":"CTT","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2027-01-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:91774","ercot_project":"91774","title":"Janka: Construct New 345 kV Station","owner":"ETT/AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-29","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110282","ercot_project":"110282","title":"New CTT Celtic Green 345 kV station","owner":"CTT","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-04-17","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99825","ercot_project":"99825","title":"Boiken: Construct New 345 kV Station","owner":"AEP TNC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:49574","ercot_project":"49574","title":"Tesla: Build 345 kV terminal","owner":"ETT","kv":345,"status":"In service","actual_isd":"2025-06-17","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:FURHMAN:VANBLTSS:138":{"status":"in_service_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:102865","ercot_project":"102865","title":"Add Moursund load serving station","owner":"STEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:75989","ercot_project":"75989","title":"Rebuild Vanderbilt -Pt Lavaca","owner":"STEC","kv":69,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:82829","ercot_project":"82829","title":"New Furhman Substation","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-08-04","projected_isd":"2025-07-24","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"XF:TRSES:138/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:110012","ercot_project":"110012","title":"Rebuild the Trinidad Switch - Mankin Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-15","year":2029,"rpg":"25RPG041, 25RPG043","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99626","ercot_project":"99626","title":"Upgrade Richland Chambers Switch - Trinidad Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:105755","ercot_project":"105755","title":"Trinidad Switch – Tri Corner 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG004","touches":"both stations","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:82810A","ercot_project":"82810A","title":"Olympus 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-05-08","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:82810B","ercot_project":"82810B","title":"Olympus 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-05-08","projected_isd":"2025-12-15","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"base_rate":null},"LN:CHISMGRD:HCKSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:105008","ercot_project":"105008","title":"Wingjet_Switch_138kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:105326","ercot_project":"105326","title":"Parker Switch – Hicks Switch 345kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"one station","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:70900D","ercot_project":"70900D","title":"Roanoke Area Upgrades","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2025-12-14","year":2025,"rpg":"22RPG003","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:BONBRAE:HK_GIS:138":{"status":"in_service_both_ends","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:5430K","ercot_project":"5430K","title":"Conversion to 138kV","owner":"DME","kv":138,"status":"In service","actual_isd":"2025-07-01","projected_isd":"2025-07-01","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:70019","ercot_project":"70019","title":"Add 138kV Locust-Hickory line 700MVA","owner":"DME","kv":138,"status":"In service","actual_isd":"2025-06-30","projected_isd":"2025-06-30","year":2025,"rpg":"N/A","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:5430O","ercot_project":"5430O","title":"Conversion to 138kV","owner":"DME","kv":138,"status":"In service","actual_isd":"2025-07-01","projected_isd":"2025-07-01","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:ESCARP:FRIEND:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:72568","ercot_project":"72568","title":"Friendship to Rutherford Storm Hardening","owner":"PEC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-15","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72566","ercot_project":"72566","title":"Cedar Valley to Friendship Storm Hardening","owner":"PEC","kv":138,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-11-30","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:HWKSW:PRSSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:109808","ercot_project":"109808","title":"Rivercrest Switch - Hawk Hallow Switch 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-01","year":2028,"rpg":"25RPG042","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:109952","ercot_project":"109952","title":"Commerce Switch - Paris Switch 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":"25RPG040, 25RPG042","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:92852B","ercot_project":"92852B","title":"Monticello_Paris_Line_Upgrade","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG026","touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:110290","ercot_project":"110290","title":"Paris Switch - Valley South Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-04-01","year":2032,"rpg":"25RPG040","touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:91060","ercot_project":"91060","title":"Establish Flying Tiger 138 kV Switch","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-04-17","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:COMSW:SCATR:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:109952","ercot_project":"109952","title":"Commerce Switch - Paris Switch 138 kV Double-Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":"25RPG040, 25RPG042","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:RVRSW:345/1":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:87021","ercot_project":"87021","title":"Construct Drill Hole – Riverton 345 kV Double-Circuit","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-16","year":2027,"rpg":"24RPG010","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87017","ercot_project":"87017","title":"Riverton - Sandlake 138 kV Line Conversion 345 kV and Riverton - Sandlake 138 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"24RPG010","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:99341","ercot_project":"99341","title":"Horntoad 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-06","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:99241","ercot_project":"99241","title":"Sand Lake 765/345 kV Autotransformer #1","owner":"ONCOR","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-31","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:81060","ercot_project":"81060","title":"Riverton-Border-Quarry Field 138 kV Second Circuit","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-12-01","projected_isd":"2025-12-15","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false}],"base_rate":null},"LN:GATEETP:UNIVERSI:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:57906","ercot_project":"57906","title":"Laredo to University: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF:LARDVFT:138/18":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:WHTNY:WND:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:102762","ercot_project":"102762","title":"BEPC_TPIT102762_Whitney_Itasca","owner":"BEPC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2030-03-01","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:102993","ercot_project":"102993","title":"BEPC_TIER3_WhitneyAutoUpgrade","owner":"BEPC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-10-01","year":2030,"rpg":"25RPG044","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"XF:GN_S_I:138/1":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:LYNX:TOMBSTNE:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:86829","ercot_project":"86829","title":"Fort Stockton Plant to Lynx: Rebuild 138 kV Line","owner":"AEP TNC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-31","year":2028,"rpg":"23RPG008","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:KLPOD:REDSW:138":{"status":"in_service_one_end","first_top10":null,"planned":[],"in_service":[{"id":"ercot-tpit:5475","ercot_project":"5475","title":"Lufkin Switch - Redland Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-15","projected_isd":"2025-12-15","year":2025,"rpg":"20RPG019","touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:ELARA:ELARA_SL:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:JUNCTION:MENPHTAP:69":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:103259","ercot_project":"103259","title":"Llano: Build new 69 kV Station","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CEDRVALE:SLKSW:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:76293","ercot_project":"76293","title":"Upgraded Cedvale-MiDiva138KV","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-04-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:76291","ercot_project":"76291","title":"Upgraded Cedarvale–BoneSpringsTap–Fishhook","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-07-01","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:77807A","ercot_project":"77807A","title":"Silverleaf 138kV station from TNMP submitted Cowpen/Silverleaf RPG","owner":"TNMP","kv":138,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG013","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99241","ercot_project":"99241","title":"Sand Lake 765/345 kV Autotransformer #1","owner":"ONCOR","kv":765,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-31","year":2030,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:102815","ercot_project":"102815","title":"SandLake - North McCamey Transmission Line Addition","owner":"LCRATSC","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-06-30","year":2026,"rpg":"22RPG010","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:CTR:PHR:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:90232B","ercot_project":"90232B","title":"Facility Ratings Methodology (FRM) Upgrades","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-02-28","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344A","ercot_project":"103344A","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:103344B","ercot_project":"103344B","title":"PH Robinson to WA Parish Hardening 25RPG028","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":"25RPG028","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:100503A","ercot_project":"100503A","title":"Webster Distribution Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:73352A","ercot_project":"73352A","title":"PH Robinson Area 138kV Upgrades","owner":"CNP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:73352B","ercot_project":"73352B","title":"PH Robinson Area 138kV Upgrades","owner":"CNP","kv":138,"status":"In service","actual_isd":"2025-01-09","projected_isd":"2024-12-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"XF:SANA:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:70630","ercot_project":"70630","title":"Ballinger to Santa Anna: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2029-03-31","year":2029,"rpg":"22RPG028","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:SILASRAY:138/69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:DIBOL:LFSTW:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"XF:NEDIN:138/138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:104151","ercot_project":"104151","title":"North Edinburg to North McAllen: Rebuild 138 kV line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2031-01-30","year":2031,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:98737","ercot_project":"98737","title":"Agrios: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-04-30","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:110832","ercot_project":"110832","title":"Ad Hoc TPIT: Arrow Load Serving Station","owner":"SLU","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-09-29","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:49564","ercot_project":"49564","title":"Mantle: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:64858","ercot_project":"64858","title":"La Palma Expansion","owner":"AEP TCC/SLU","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-16","year":2026,"rpg":"21RPG017","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:50878","ercot_project":"50878","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-11-24","projected_isd":"2025-09-30","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:76214","ercot_project":"76214","title":"North Edinburg: 345 kV Reconfigure","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-11-24","projected_isd":"2026-01-09","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:66447","ercot_project":"66447","title":"Reforzar: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-05-16","projected_isd":"2025-05-16","year":2025,"rpg":"21RPG017","touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:76574","ercot_project":"76574","title":"TexasAg Wind Interconnection","owner":"ETT","kv":345,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-06-25","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:105347","ercot_project":"105347","title":"Adding back in Sharyland Kingfisher Station with a Planned ISD 05/31/2026","owner":"SLU","kv":345,"status":"In service","actual_isd":"2026-06-30","projected_isd":"2026-06-30","year":2026,"rpg":"21RPG017","touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"LN:HOLCOMB:PALAFOX:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:73059","ercot_project":"73059","title":"Barrera: Construct New Distribution Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-08-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:90014","ercot_project":"90014","title":"Palafox: Construct New 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:90790","ercot_project":"90790","title":"Palafox: Construct New 138 kV Temporary Tap","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2025-01-18","projected_isd":"2025-01-18","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"base_rate":null},"LN:GUADG:MARION:345":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:110675","ercot_project":"110675","title":"Rebuild Hill Country to Marion Dbl Ckt","owner":"CPS/LCRA","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99922","ercot_project":"99922","title":"Green Valley Substation Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110687","ercot_project":"110687","title":"Rebuild Hill Country to Skyline Dbl Ckt","owner":"CPS/NO","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110254","ercot_project":"110254","owner":"BEPC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-04-07","year":2031,"rpg":"26RPG026","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:66023","ercot_project":"66023","title":"T340 T-Line Upgrade","owner":"NBU","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:PIGCREEK:TNFXTAIL:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:76348","ercot_project":"76348","title":"Reconductor Foxtail-PIGCreek-1926ACSS-138KV","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:110931","ercot_project":"110931","title":"Pig Creek: Install new 138 kV Capacitor Bank","owner":"AEP TNC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-03-02","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:E1:R2:138":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:50647","ercot_project":"50647","title":"CPSE_Merida to Westside MLSE","owner":"CPS","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-01-01","year":2032,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:17TPIT0001","ercot_project":"17TPIT0001","title":"36th St to Merida - 138 kV Transmission Line Rebuild","owner":"CPS","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:45068","ercot_project":"45068","title":"Merida to Harlandale Rebuild","owner":"CPS","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2033-05-31","year":2033,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:109994","ercot_project":"109994","title":"Rebuild the existing Five_pts to Wstside 138-kV transmission line","owner":"CPS/NO","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2032-01-31","year":2032,"rpg":"25RPG013 and 25RPG017","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:DC_ROAD:RAILROAD:138":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:ANGLETON:RT:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:60526","ercot_project":"60526","title":"Rebuild West Columbia Local-Angleton with 795 ACSS","owner":"TNMP","kv":138,"status":"future","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:66366","ercot_project":"66366","title":"Rebuild Brazoria - Retrieve 138kV with bundled 795 ACSS","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BAKESW:NEVILLSW:345":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:102795","ercot_project":"102795","title":"Bakersfield_NevillRoad_NorthMcCamey_Transmission_Line_Upgrade","owner":"GPL","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-15","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:102788","ercot_project":"102788","title":"Overland_Substation_Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:80870","ercot_project":"80870","title":"Bakersfield Dynamic Reactive Substation Upgrade","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"23RPG027","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:92274","ercot_project":"92274","title":"Whitebaker 345kV - Part of Upgrade L13 2024 Permian Basin Study","owner":"TNMP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:102877","ercot_project":"102877","title":"Upgrade Bakersfield to Schneeman Draw","owner":"STEC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"XF:DEC:14/1":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"XF:FM524:138/69":{"status":"none_public","first_top10":null,"planned":[],"in_service":[],"base_rate":null},"LN:JUNO:W_LD_138:138":{"status":"planned_one_end","first_top10":null,"planned":[{"id":"ercot-tpit:90964","ercot_project":"90964","title":"Tier 3 project to add second autotransformer at Long Draw","owner":"WETT","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-10-31","year":2026,"rpg":"24RPG027","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:BNMSW:138/69":{"status":"planned_both_ends","first_top10":null,"planned":[{"id":"ercot-tpit:68700","ercot_project":"68700","title":"Bonham - Toco Switch 69 kV Line Rebuild","owner":"ONCOR","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:HAMILTON:MAVERICK:annual":{"status":"planned_both_ends","first_top10":2021,"planned":[{"id":"ercot-tpit:55626","ercot_project":"55626","title":"Ganso to Hamilton Road: Rebuild 138 kV line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-09-14","year":2028,"rpg":"22RPG044","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:61396","ercot_project":"61396","title":"Hamilton Road to Maxwell: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-11-30","year":2026,"rpg":"20RPG022","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:111374","ercot_project":"111374","title":"Gliese: Construct New 138 kV Station","owner":"ETT","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-03-31","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76274","ercot_project":"76274","title":"Hamilton Road: Construct New 138 kV Terminal","owner":"AEP TCC/ETT","kv":138,"status":"In service","actual_isd":"2025-10-29","projected_isd":"2025-10-31","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"LN:TALLCITY:TELPH_RD:annual":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"LN:LGD:SANTIAGO:annual":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"LN:CALAVERS:PAWNEE:annual":{"status":"planned_both_ends","first_top10":2021,"planned":[{"id":"ercot-tpit:84902","ercot_project":"84902","title":"23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit","owner":"CPS/CPS, STEC","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":"23RPG032","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:100018","ercot_project":"100018","title":"23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit","owner":"CPS/CPS, STEC","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-08","year":2026,"rpg":"23RPG032","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:100020","ercot_project":"100020","title":"23RPG032: San Antonio South Reliability II: Rebuild Spruce to Pawnee into a double circuit","owner":"CPS/CPS, STEC","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":"23RPG032","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:84900","ercot_project":"84900","title":"23RPG032: San Antonio South Reliability II: Rebuild Pawnee to Tango into a double circuit","owner":"CPS/CPS, STEC, AEP","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-04-30","year":2027,"rpg":"23RPG032","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:90008","ercot_project":"90008","title":"Tango to Pawnee: Rebuild 345 kV Line","owner":"AEP TCC/CPS,STEC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-30","year":2027,"rpg":"22RPG048","touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:67992C","ercot_project":"67992C","title":"CPSE_345KV_Howard_Switching_Station,CPSE_Hamilton_to_MedCtr_Upgrade","owner":"CPS/NO","kv":345,"status":"In service","actual_isd":"2025-04-07","projected_isd":"2025-05-29","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:79683","ercot_project":"79683","title":"Add Branch between Padua and Sommers","owner":"CPS","kv":138,"status":"In service","actual_isd":"2025-02-18","projected_isd":"2025-02-18","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:STP:WAP:annual":{"status":"planned_both_ends","first_top10":2021,"planned":[{"id":"ercot-tpit:75780A","ercot_project":"75780A","title":"Loop new Elmaton substation into Ckt.39A to create new Ckt.39 STP to Elmaton to WA Parish. Install generator lead from Elmaton (ELM) substation to DUFFY (DUF) / Duffy BESS (26INR0250)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-31","year":2026,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:73025","ercot_project":"73025","title":"New Shaula 345kV Substation","owner":"CPS/NO","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-01-29","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81238","ercot_project":"81238","title":"Zoisite: Construct New 345 kV Station and 345 kV Lines to STP","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-30","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99726","ercot_project":"99726","title":"Dulce: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-01-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:110665","ercot_project":"110665","title":"Rebuild Elm Creek to STP dbl Ckt","owner":"CPS/NO","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-03-01","year":2030,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:64069","ercot_project":"64069","title":"Charger Solar Interconnection","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-07-08","projected_isd":"2025-07-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453C","ercot_project":"99453C","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"In service","actual_isd":"2026-03-03","projected_isd":"2026-03-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:59959","ercot_project":"59959","title":"New Hickory 345kV Switchyard","owner":"CPS/NO","kv":345,"status":"In service","actual_isd":"2026-05-16","projected_isd":"2026-05-30","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99453A","ercot_project":"99453A","title":"Facility Ratings Methodology Phase 2 (FRM2) Upgrades","owner":"CNP","kv":345,"status":"In service","actual_isd":"2026-02-25","projected_isd":"2026-05-31","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:76624","ercot_project":"76624","title":"WA Parish 345kV Substation Expansion for Crowned Heron Storage (24INR0405)","owner":"CNP","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-10-31","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:FPPYD1:WINCHES:annual":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"LN:CMBSW:DCDAM:annual":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"LN:FLAT_TOP:FLTBES:annual":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"XF:WORSHAM:annual":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"XF:PYOTE:annual":{"status":"planned_both_ends","first_top10":2021,"planned":[{"id":"ercot-tpit:87423","ercot_project":"87423","title":"Reconfigure TNMP Pyote 138kV Substation.","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-31","year":2027,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:DENSW:RHTP2:annual":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"LN:LWSVH:LWSVW:annual":{"status":"none_public","first_top10":2021,"planned":[],"in_service":[],"base_rate":0.426},"XF:SANDCRAB:annual":{"status":"planned_both_ends","first_top10":2021,"planned":[{"id":"ercot-tpit:72479","ercot_project":"72479","title":"Cobia: Build new 138 kV Station","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-31","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false},{"id":"ercot-tpit:69277","ercot_project":"69277","title":"Cangrejo to Carbide: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-11-30","year":2028,"rpg":"21RPG002","touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:MV_BURNS:RIOHONDO:annual":{"status":"in_service_both_ends","first_top10":2022,"planned":[{"id":"ercot-tpit:6687","ercot_project":"6687","title":"Rebuild Rio Hondo to East Rio Hondo","owner":"STEC","kv":138,"status":"Conceptual","actual_isd":null,"projected_isd":"2029-06-01","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:104463","ercot_project":"104463","title":"Wren: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":false},{"id":"ercot-tpit:105912","ercot_project":"105912","title":"Ciruela: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-04-30","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"in_service":[{"id":"ercot-tpit:71930","ercot_project":"71930","title":"Upgrade RIOHONDO to BURNS line","owner":"STEC","kv":138,"status":"In service","actual_isd":"2025-07-01","projected_isd":"2025-05-01","year":2025,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:71926","ercot_project":"71926","title":"Upgrade BURNS to Heidelberg line","owner":"STEC","kv":138,"status":"In service","actual_isd":"2026-04-02","projected_isd":"2026-03-01","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:69463","ercot_project":"69463","title":"Gulch: Construct new 345 kV Station","owner":"AEP TCC","kv":345,"status":"In service","actual_isd":"2025-12-31","projected_isd":"2026-01-30","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":false}],"base_rate":null},"LN:LASPULGA:RAYMND2:annual":{"status":"none_public","first_top10":2022,"planned":[],"in_service":[],"base_rate":0.426},"LN:MAGNO_TN:SEMINOLE:annual":{"status":"planned_both_ends","first_top10":2022,"planned":[{"id":"ercot-tpit:87427","ercot_project":"87427","title":"Rebuild Magnolia to Seminole 138kV line.","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-31","year":2029,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:103257","ercot_project":"103257","title":"Models TNMP Galveston RPG study","owner":"TNMP","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:JEWET:SNG:annual":{"status":"planned_both_ends","first_top10":2022,"planned":[{"id":"ercot-tpit:89939A","ercot_project":"89939A","title":"Install new Skains (SKA) 345kV Substation for generator interconnection to Hollow Branch Creek Solar (24INR0422)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:111258B","ercot_project":"111258B","title":"Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:111258A","ercot_project":"111258A","title":"Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99620","ercot_project":"99620","title":"Rebuild Pin Oak Switch - Jewett Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110381","ercot_project":"110381","title":"Jewett Switch - Greene Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2033-05-15","year":2033,"rpg":"25RPG042","touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:82808","ercot_project":"82808","title":"Stranger 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-15","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:MCNSW:MKNGB:annual":{"status":"planned_one_end","first_top10":2022,"planned":[{"id":"ercot-tpit:81277","ercot_project":"81277","title":"Midland East – Midland County NW 345 kV Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-12-15","year":2030,"rpg":"23RPG029","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:BSPRW:STASW:annual":{"status":"planned_one_end","first_top10":2022,"planned":[{"id":"ercot-tpit:99391B","ercot_project":"99391B","title":"Stanton East - Midland Basin - Spraberry 69 kV Line Conversion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-03-01","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99391C","ercot_project":"99391C","title":"Stanton East - Midland Basin - Spraberry 69 kV Line Conversion to 138 kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-01","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"XF:PRTLAVS:annual":{"status":"planned_both_ends","first_top10":2022,"planned":[{"id":"ercot-tpit:75989","ercot_project":"75989","title":"Rebuild Vanderbilt -Pt Lavaca","owner":"STEC","kv":69,"status":"Conceptual","actual_isd":null,"projected_isd":"2030-05-01","year":2030,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"XF:PUEBLO:annual":{"status":"none_public","first_top10":2022,"planned":[],"in_service":[],"base_rate":0.426},"LN:CATARINA:PILONCIL:annual":{"status":"planned_both_ends","first_top10":2023,"planned":[{"id":"ercot-tpit:73100","ercot_project":"73100","title":"Asherton to Piloncillo: Rebuild 138 kV Line","owner":"AEP TCC","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-01-13","year":2028,"rpg":null,"touches":"both stations","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:MGSES:TKWSW:annual":{"status":"planned_both_ends","first_top10":2023,"planned":[{"id":"ercot-tpit:72011A","ercot_project":"72011A","title":"Tonkawa - Ranger Camp 345 kV Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG029","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:72011B","ercot_project":"72011B","title":"Tonkawa - Ranger Camp 345 kV Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"23RPG029","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:81415","ercot_project":"81415","title":"Hermleigh Synchronous Condenser","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-08-18","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:99353","ercot_project":"99353","title":"Oak Spring (fka Roscoe, Plowboy) 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81299","ercot_project":"81299","title":"Ranger Camp – Prong Moss 345 kV Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:86633","ercot_project":"86633","title":"Dusty Road 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-04","projected_isd":"2025-12-04","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:72007","ercot_project":"72007","title":"Ranger Camp 345/138/69 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-04-16","projected_isd":"2025-05-15","year":2025,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:76705","ercot_project":"76705","title":"Prairieland 345/138 kV Switch and 138 kV Line","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-09-30","year":2025,"rpg":"24RPG006","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:72009","ercot_project":"72009","title":"Cattleman 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-11-15","projected_isd":"2025-12-15","year":2025,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"XF:MDSSW:annual":{"status":"planned_both_ends","first_top10":2023,"planned":[{"id":"ercot-tpit:81240","ercot_project":"81240","title":"Consavvy – Odessa EHV 345 kV Double Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-15","year":2029,"rpg":"23RPG029","touches":"both stations","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:80913","ercot_project":"80913","title":"Sloan 138 kV Switch.","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-05-14","projected_isd":"2025-12-04","year":2025,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"LN:JPPOI:LMESA:annual":{"status":"planned_one_end","first_top10":2023,"planned":[{"id":"ercot-tpit:81034","ercot_project":"81034","title":"Lamesa - Willow Valley 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"25RPG019","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99417","ercot_project":"99417","title":"Establish Lamesa 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-05-15","year":2029,"rpg":"24RPG015","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:99413","ercot_project":"99413","title":"Establish Pivot 138/69 kV Switch","owner":"ONCOR","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"24RPG015","touches":"one station","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:JEWET:SJNSW:annual":{"status":"planned_one_end","first_top10":2023,"planned":[{"id":"ercot-tpit:111258B","ercot_project":"111258B","title":"Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:111258A","ercot_project":"111258A","title":"Newby (NBY) CEHE-Owned 345 kV Substation for DEWEY (DWY) / Jewett Energy Center (29INR0150)","owner":"CNP","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-10-31","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99620","ercot_project":"99620","title":"Rebuild Pin Oak Switch - Jewett Switch 345 kV Double Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110381","ercot_project":"110381","title":"Jewett Switch - Greene Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2033-05-15","year":2033,"rpg":"25RPG042","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110160","ercot_project":"110160","title":"Rebuild Possum Trot - St Johns Switch - Bale Switch - Stranger Switch 345 kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-05-15","year":2031,"rpg":"25RPG043","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:82808","ercot_project":"82808","title":"Stranger 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-05-15","projected_isd":"2025-05-15","year":2025,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:CONCHO:SANW:annual":{"status":"planned_one_end","first_top10":2023,"planned":[{"id":"ercot-tpit:55421","ercot_project":"55421","title":"Ballinger to Concho: Rebuild 69 kV line","owner":"AEP TNC","kv":69,"status":"Under Construction","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":"20RPG004","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:LARDVNTH:LASCRUCE:annual":{"status":"in_service_one_end","first_top10":2023,"planned":[],"in_service":[{"id":"ercot-tpit:76076","ercot_project":"76076","title":"Laredo VFT North to North Laredo Switch: Rebuild 138 kV Line","owner":"AEP TCC/ETT","kv":138,"status":"In service","actual_isd":"2025-08-15","projected_isd":"2025-08-15","year":2025,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"base_rate":null},"XF:LPLBR:annual":{"status":"none_public","first_top10":2023,"planned":[],"in_service":[],"base_rate":0.426},"LN:MGSES:NAVIG:annual":{"status":"in_service_both_ends","first_top10":2023,"planned":[{"id":"ercot-tpit:99353","ercot_project":"99353","title":"Oak Spring (fka Roscoe, Plowboy) 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81299","ercot_project":"81299","title":"Ranger Camp – Prong Moss 345 kV Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-01","year":2027,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81227","ercot_project":"81227","title":"Cattleman – Gascondades 345 kV Reroute","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-06-30","year":2027,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81232","ercot_project":"81232","title":"Cattleman – Bitter Creek/Champion Creek 345 kV Reroute","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:72011A","ercot_project":"72011A","title":"Tonkawa - Ranger Camp 345 kV Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:72009","ercot_project":"72009","title":"Cattleman 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-11-15","projected_isd":"2025-12-15","year":2025,"rpg":"23RPG029","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:72007","ercot_project":"72007","title":"Ranger Camp 345/138/69 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-04-16","projected_isd":"2025-05-15","year":2025,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:76705","ercot_project":"76705","title":"Prairieland 345/138 kV Switch and 138 kV Line","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-09-30","year":2025,"rpg":"24RPG006","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:ODEHV:YARBR:annual":{"status":"in_service_both_ends","first_top10":2024,"planned":[{"id":"ercot-tpit:81240","ercot_project":"81240","title":"Consavvy – Odessa EHV 345 kV Double Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-15","year":2029,"rpg":"23RPG029","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:71182","ercot_project":"71182","title":"Reiter 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-01","year":2026,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:93466","ercot_project":"93466","title":"Rebuild Odessa EHV - Reiter 138 kV Double Circuit Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-12-15","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:81418","ercot_project":"81418","title":"Reiter to Yarbrough 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":"25RPG008","touches":"one station","names_station":true,"same_kv":false}],"in_service":[{"id":"ercot-tpit:81175","ercot_project":"81175","title":"Salt Flat Road 138 kV Switch and Salt Flat Road - Barr Ranch - Reiter 138 kV Second Circuit","owner":"ONCOR","kv":138,"status":"In service","actual_isd":"2025-12-15","projected_isd":"2025-12-15","year":2025,"rpg":"25RPG007","touches":"both stations","names_station":false,"same_kv":false}],"base_rate":null},"LN:BELCNTY:SALSW:annual":{"status":"planned_both_ends","first_top10":2024,"planned":[{"id":"ercot-tpit:87707","ercot_project":"87707","title":"Salado 345/138 kV Autotransformer #1 and #2","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG001","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:99387","ercot_project":"99387","title":"Rebuild the Paramount - Salado 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-16","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110122","ercot_project":"110122","title":"LCRATSC Gabriel Salado Transmission Line Addition","owner":"LCRATSC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-12-15","year":2031,"rpg":"25RPG009","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:87673","ercot_project":"87673","title":"Rebuild the Salado - Bell County 138 kV Line","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG001","touches":"both stations","names_station":true,"same_kv":false},{"id":"ercot-tpit:99383","ercot_project":"99383","title":"Establish Paramount 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:PCTSW:WRPOD:annual":{"status":"planned_one_end","first_top10":2024,"planned":[{"id":"ercot-tpit:98953","ercot_project":"98953","title":"McDonald Road - Polecat Creek 138 kV Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-01","year":2028,"rpg":"25RPG035","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:HEXT:YELWJCKT:annual":{"status":"planned_one_end","first_top10":2024,"planned":[{"id":"ercot-tpit:70710","ercot_project":"70710","title":"Eden to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2027-11-30","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:65154","ercot_project":"65154","title":"Mason Switch to Yellowjacket: Rebuild 69 kV Line","owner":"AEP TNC","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2028-02-28","year":2028,"rpg":"21RPG014","touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:COLETO:ROSATA:annual":{"status":"planned_one_end","first_top10":2024,"planned":[{"id":"ercot-tpit:90031","ercot_project":"90031","title":"LLaves: Construct New 345 kV Station","owner":"AEP TCC","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-10-31","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:6749","ercot_project":"6749","title":"Rosata: Build 138kV Substation","owner":"AEP TCC","kv":138,"status":"In service","actual_isd":"2026-05-31","projected_isd":"2026-05-31","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"base_rate":null},"LN:KOCHTAP:VEALMOOR:annual":{"status":"planned_one_end","first_top10":2025,"planned":[{"id":"ercot-tpit:81305A","ercot_project":"81305A","title":"Expanse - Vealmoor 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-30","year":2026,"rpg":"24RPG029","touches":"one station","names_station":true,"same_kv":false},{"id":"ercot-tpit:81305B","ercot_project":"81305B","title":"Expanse - Vealmoor 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-30","year":2026,"rpg":"24RPG029","touches":"one station","names_station":true,"same_kv":false}],"in_service":[],"base_rate":null},"LN:CONSW:LNGSW:annual":{"status":"planned_both_ends","first_top10":2025,"planned":[{"id":"ercot-tpit:81268","ercot_project":"81268","title":"Longshore – Consavvy 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"23RPG029","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:102846","ercot_project":"102846","title":"Longshore 345 kV Switch Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"23RPG034","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:81236","ercot_project":"81236","title":"Cattleman – Longshore 345 kV Double-Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"23RPG029","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110819","ercot_project":"110819","title":"Add Quantum 345 kV Switch","owner":"ONCOR","kv":345,"status":"future","actual_isd":null,"projected_isd":"2027-12-09","year":2027,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81240","ercot_project":"81240","title":"Consavvy – Odessa EHV 345 kV Double Circuit Line Rebuild","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-15","year":2029,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:76705","ercot_project":"76705","title":"Prairieland 345/138 kV Switch and 138 kV Line","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-12-16","projected_isd":"2025-09-30","year":2025,"rpg":"24RPG006","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:72009","ercot_project":"72009","title":"Cattleman 345/138 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2025-11-15","projected_isd":"2025-12-15","year":2025,"rpg":"23RPG029","touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:BUZSW:KOCHTAP:annual":{"status":"planned_one_end","first_top10":2025,"planned":[{"id":"ercot-tpit:99141","ercot_project":"99141","title":"Rebuild Flower Grove - Vincent 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2029-12-31","year":2029,"rpg":null,"touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81305A","ercot_project":"81305A","title":"Expanse - Vealmoor 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-30","year":2026,"rpg":"24RPG029","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:81305B","ercot_project":"81305B","title":"Expanse - Vealmoor 138 kV Line Rebuild","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2026-09-30","year":2026,"rpg":"24RPG029","touches":"one station","names_station":false,"same_kv":true}],"in_service":[],"base_rate":null},"LN:ITALY:MEXTP:annual":{"status":"planned_one_end","first_top10":2026,"planned":[{"id":"ercot-tpit:66218B","ercot_project":"66218B","title":"Hillsboro - Italy 69 kV Line","owner":"ONCOR","kv":69,"status":"Planned","actual_isd":null,"projected_isd":"2026-12-15","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[],"base_rate":null},"LN:CRDSW:OLNEYTN:annual":{"status":"none_public","first_top10":2026,"planned":[],"in_service":[],"base_rate":0.426},"XF:HCKSW:annual":{"status":"planned_both_ends","first_top10":2026,"planned":[{"id":"ercot-tpit:105326","ercot_project":"105326","title":"Parker Switch – Hicks Switch 345kV Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2028-12-15","year":2028,"rpg":"25RPG004","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:105008","ercot_project":"105008","title":"Wingjet_Switch_138kV","owner":"ONCOR","kv":138,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":false}],"in_service":[],"base_rate":null},"LN:SAMSW:VENSW:annual":{"status":"planned_both_ends","first_top10":2026,"planned":[{"id":"ercot-tpit:78369","ercot_project":"78369","title":"Rebuild Sam Switch - Venus Switch 345 kV DCKT","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":"24RPG017","touches":"both stations","names_station":true,"same_kv":true},{"id":"ercot-tpit:87792","ercot_project":"87792","title":"Establish the Bynum 345 kV Switch","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-15","year":2027,"rpg":null,"touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:109818","ercot_project":"109818","title":"Venus â€“ Old Country Switch 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2030-04-01","year":2030,"rpg":"25RPG040","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110053","ercot_project":"110053","title":"Rebuild TradingHouse - Sam 345 kV DCKT Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2031-12-15","year":2031,"rpg":"25RPG043","touches":"one station","names_station":false,"same_kv":true},{"id":"ercot-tpit:105744","ercot_project":"105744","title":"Desoto Switch – Sam Switch Switch (Lonestar) 345 kV Double-Circuit Line","owner":"ONCOR","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2032-05-15","year":2032,"rpg":"25RPG004","touches":"one station","names_station":false,"same_kv":true}],"in_service":[{"id":"ercot-tpit:102401","ercot_project":"102401","title":"LST_SamSwitch_Resiliency_(GTC)_Project","owner":"LST","kv":345,"status":"In service","actual_isd":"2026-06-10","projected_isd":"2026-06-01","year":2026,"rpg":"25RPG031","touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:87799","ercot_project":"87799","title":"Old Country 345 kV Switch","owner":"ONCOR","kv":345,"status":"In service","actual_isd":"2026-07-31","projected_isd":"2026-10-29","year":2026,"rpg":null,"touches":"one station","names_station":false,"same_kv":true}],"base_rate":null},"LN:CAGNON:HILLCTRY:annual":{"status":"planned_both_ends","first_top10":2026,"planned":[{"id":"ercot-tpit:110263","ercot_project":"110263","title":"A new Helotes 345kV substation will be constructed","owner":"CPS/NO","kv":345,"status":"Under Construction","actual_isd":null,"projected_isd":"2028-05-15","year":2028,"rpg":"25RPG013 and 25RPG017","touches":"both stations","names_station":false,"same_kv":true},{"id":"ercot-tpit:100257","ercot_project":"100257","title":"Hill Country Auto #4 will be replaced Summer 2027 to a 10% impedance auto.","owner":"CPS/NO","kv":345,"status":"Planned","actual_isd":null,"projected_isd":"2027-05-14","year":2027,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110911","ercot_project":"110911","title":"Helotes to Hill Country 2nd Ckt Addition and Rebuild","owner":"CPS","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2028-06-01","year":2028,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110687","ercot_project":"110687","title":"Rebuild Hill Country to Skyline Dbl Ckt","owner":"CPS/NO","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":true},{"id":"ercot-tpit:110675","ercot_project":"110675","title":"Rebuild Hill Country to Marion Dbl Ckt","owner":"CPS/LCRA","kv":345,"status":"Conceptual","actual_isd":null,"projected_isd":"2031-03-01","year":2031,"rpg":null,"touches":"one station","names_station":true,"same_kv":true}],"in_service":[{"id":"ercot-tpit:99185","ercot_project":"99185","title":"This involves moving Potranco to a different bus/bay at Cagnon to alleviate the loading on Cagnon auto 3 & 4.","owner":"CPS/NO","kv":138,"status":"In service","actual_isd":"2026-04-23","projected_isd":"2026-05-15","year":2026,"rpg":null,"touches":"one station","names_station":true,"same_kv":false}],"base_rate":null}}}