"source": {
"label": "Utility transmission-project pages, as archived by the Internet Archive Wayback Machine",
"url": "https://web.archive.org/",
"license": "Each page belongs to its utility; facts quoted with a link to the archived copy"
},
"notes": [
"Each row is one official project page or document the utility posted on its own website, read from the newest archived copy.",
"Dates and voltages are as the utility stated them on the date the page was captured; a planned date is a plan, not a fact.",
"Archived copies can be incomplete. Each row links to the archived page so the wording can be checked."
],
"tally": {
"CPS Energy": 44,
"CenterPoint Energy": 3,
"Oncor": 30,
"TNMP": 1
},
"dropped": {
"not a transmission project": 14,
"empty capture": 7
},
"projects": [
{
"utility": "CPS Energy",
"project": "blossom substation",
"archived_url": "https://web.archive.org/web/20211019180420/https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/blossom-substation.html",
"captured": "2021-10-19",
"original_url": "https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/blossom-substation.html",
"kv": [
138
],
"date_text": "Construction of the substation is tentatively scheduled to begin in March 2016 and be completed in June 2017.",
"date": "June 2017",
"dockets": null,
"chars": 29489
},
{
"utility": "CPS Energy",
"project": "braunig to highland hills project",
"archived_url": "https://web.archive.org/web/20241004124425/https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/braunig-to-highland-hills-project.html",
"captured": "2024-10-04",
"original_url": "https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/braunig-to-highland-hills-project.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 6629
},
{
"utility": "CPS Energy",
"project": "braunwillow",
"archived_url": "https://web.archive.org/web/20211019192549/https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/braunwillow.html",
"captured": "2021-10-19",
"original_url": "https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/braunwillow.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 28010
},
{
"utility": "CPS Energy",
"project": "buckeye la heights transmission line rebuild",
"archived_url": "https://web.archive.org/web/20201130105651/https://author.cpsenergy.com/en/about-us/new-infrastructure/buckeye-la-heights-transmission-line-rebuild.html",
"captured": "2020-11-30",
"original_url": "https://author.cpsenergy.com/en/about-us/new-infrastructure/buckeye-la-heights-transmission-line-rebuild.html",
"kv": [
138
],
"date_text": "Construction is scheduled to begin October 12, 2020 and should be completed by May 2021.",
"date": "May 2021",
"dockets": null,
"chars": 94978
},
{
"utility": "CPS Energy",
"project": "bulverde substation",
"archived_url": "https://web.archive.org/web/20170228143649/https://devcms.cpsenergy.com/en/developers-builders/new-infrastructure/bulverde-substation.html",
"captured": "2017-02-28",
"original_url": "https://devcms.cpsenergy.com/en/developers-builders/new-infrastructure/bulverde-substation.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 42128
},
{
"utility": "CPS Energy",
"project": "cagnon road to shepherd and howard road transmission line rebuild project",
"archived_url": "https://web.archive.org/web/20241009031035/https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/cagnon-road-to-shepherd-and-howard-road-transmission-line-rebuild-project.html",
"captured": "2024-10-09",
"original_url": "https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/cagnon-road-to-shepherd-and-howard-road-transmission-line-rebuild-project.html",
"kv": null,
"date_text": null,
"date": null,
"dockets": null,
"chars": 6608
},
{
"utility": "CPS Energy",
"project": "coliseum to kirby transmission line",
"archived_url": "https://web.archive.org/web/20211019175356/https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/coliseum-to-kirby-transmission-line.html",
"captured": "2021-10-19",
"original_url": "https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/coliseum-to-kirby-transmission-line.html",
"kv": [
138
],
"date_text": "The project is scheduled for completion in June 2017.",
"date": "June 2017",
"dockets": null,
"chars": 29435
},
{
"utility": "CPS Energy",
"project": "coliseum to tenth street transmission line",
"archived_url": "https://web.archive.org/web/20190722214355/https://www.cpsenergy.com/es/developers-builders/new-infrastructure/coliseum-to-tenth-street-transmission-line.html",
"captured": "2019-07-22",
"original_url": "https://www.cpsenergy.com/es/developers-builders/new-infrastructure/coliseum-to-tenth-street-transmission-line.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 21344
},
{
"utility": "CPS Energy",
"project": "comal street substation",
"archived_url": "https://web.archive.org/web/20190720103642/https://www.cpsenergy.com/es/developers-builders/new-infrastructure/comal-street-substation.html",
"captured": "2019-07-20",
"original_url": "https://www.cpsenergy.com/es/developers-builders/new-infrastructure/comal-street-substation.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 21337
},
{
"utility": "CPS Energy",
"project": "eastside switchyard project",
"archived_url": "https://web.archive.org/web/20260711082401/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/eastside-switchyard-project.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/eastside-switchyard-project.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 6727
},
{
"utility": "CPS Energy",
"project": "five points to westside transmission project",
"archived_url": "https://web.archive.org/web/20211019173840/https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/five-points-to-westside-transmission-project.html",
"captured": "2021-10-19",
"original_url": "https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/five-points-to-westside-transmission-project.html",
"kv": [
138
],
"date_text": "The project is scheduled for completion in June 2017.",
"date": "June 2017",
"dockets": null,
"chars": 29150
},
{
"utility": "CPS Energy",
"project": "fosterroad substation",
"archived_url": "https://web.archive.org/web/20260711075407/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/fosterroad-substation.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/fosterroad-substation.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 6185
},
{
"utility": "CPS Energy",
"project": "grandview to coliseum transmission line",
"archived_url": "https://web.archive.org/web/20211018085419/https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/grandview-to-coliseum-transmission-line-.html",
"captured": "2021-10-18",
"original_url": "https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/grandview-to-coliseum-transmission-line-.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 30021
},
{
"utility": "CPS Energy",
"project": "harlandale to sommers transmission rebuild",
"archived_url": "https://web.archive.org/web/20190823011329/https://blog.cpsenergy.com/en/about-us/new-infrastructure/harlandale-to-sommers-transmission-rebuild.html",
"captured": "2019-08-23",
"original_url": "https://blog.cpsenergy.com/en/about-us/new-infrastructure/harlandale-to-sommers-transmission-rebuild.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 59654
},
{
"utility": "CPS Energy",
"project": "howard road to leon creek",
"archived_url": "https://web.archive.org/web/20260711075137/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/howard-road-to-leon-creek.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/howard-road-to-leon-creek.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 7003
},
{
"utility": "CPS Energy",
"project": "howard road to leon creek1 phase 1",
"archived_url": "https://web.archive.org/web/20260711091416/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/howard-road-to-leon-creek1-phase-1.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/howard-road-to-leon-creek1-phase-1.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 6507
},
{
"utility": "CPS Energy",
"project": "howard solstice transmission",
"archived_url": "https://web.archive.org/web/20260305143215/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/howard-solstice-transmission.html",
"captured": "2026-03-05",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/howard-solstice-transmission.html",
"kv": [
765
],
"date_text": null,
"date": null,
"dockets": [
"59336"
],
"chars": 8807
},
{
"utility": "CPS Energy",
"project": "howard switching station transmission line",
"archived_url": "https://web.archive.org/web/20260711081808/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/howard-switching-station-transmission-line.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/howard-switching-station-transmission-line.html",
"kv": null,
"date_text": null,
"date": null,
"dockets": null,
"chars": 6435
},
{
"utility": "CPS Energy",
"project": "howard to san miguel transmission",
"archived_url": "https://web.archive.org/web/20260711084354/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/Howard-to-San-Miguel-Transmission.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/Howard-to-San-Miguel-Transmission.html",
"kv": null,
"date_text": null,
"date": null,
"dockets": [
"57115"
],
"chars": 10597
},
{
"utility": "CPS Energy",
"project": "hunt lane to pinn road transmission line rebuild project",
"archived_url": "https://web.archive.org/web/20211019181735/https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/hunt-lane-to-pinn-road-transmission-line-rebuild-project.html",
"captured": "2021-10-19",
"original_url": "https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/hunt-lane-to-pinn-road-transmission-line-rebuild-project.html",
"kv": [
138
],
"date_text": "The project is scheduled for completion in June 2017.",
"date": "June 2017",
"dockets": null,
"chars": 29126
},
{
"utility": "CPS Energy",
"project": "hunt lane to pinn road transmission rebuild",
"archived_url": "https://web.archive.org/web/20211202025058/https://author.cpsenergy.com/en/about-us/new-infrastructure/hunt-lane-to-pinn-road-transmission-rebuild.html",
"captured": "2021-12-02",
"original_url": "https://author.cpsenergy.com/en/about-us/new-infrastructure/hunt-lane-to-pinn-road-transmission-rebuild.html",
"kv": [
138
],
"date_text": "Construction is tentatively scheduled to begin November 15, 2021 and should be completed by April 29, 2022.",
"date": "2022",
"dockets": null,
"chars": 31957
},
{
"utility": "CPS Energy",
"project": "ingram substation transmission line",
"archived_url": "https://web.archive.org/web/20260711074817/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/ingram-substation-transmission-line.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/ingram-substation-transmission-line.html",
"kv": null,
"date_text": null,
"date": null,
"dockets": null,
"chars": 6337
},
{
"utility": "CPS Energy",
"project": "legendfalls substation",
"archived_url": "https://web.archive.org/web/20260711082442/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/legendfalls-substation.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/legendfalls-substation.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 8198
},
{
"utility": "CPS Energy",
"project": "martinez substation",
"archived_url": "https://web.archive.org/web/20190824194716/https://qadispatcher.cpsenergy.com/en/about-us/new-infrastructure/martinez-substation.html",
"captured": "2019-08-24",
"original_url": "https://qadispatcher.cpsenergy.com/en/about-us/new-infrastructure/martinez-substation.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 60144
},
{
"utility": "CPS Energy",
"project": "merida to westside trans line rebuild project",
"archived_url": "https://web.archive.org/web/20211019173625/https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/merida-to-westside-trans-line-rebuild-project.html",
"captured": "2021-10-19",
"original_url": "https://newsroomp.cpsenergy.com/en/about-us/new-infrastructure/merida-to-westside-trans-line-rebuild-project.html",
"kv": [
138
],
"date_text": "Scheduled completion date is May 2019.",
"date": "May 2019",
"dockets": null,
"chars": 29359
},
{
"utility": "CPS Energy",
"project": "midtown substation",
"archived_url": "https://web.archive.org/web/20260711084518/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/midtown-substation.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/midtown-substation.html",
"kv": null,
"date_text": null,
"date": null,
"dockets": null,
"chars": 7532
},
{
"utility": "CPS Energy",
"project": "omicron",
"archived_url": "https://web.archive.org/web/20260711081410/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/omicron.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/omicron.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": [
"58276"
],
"chars": 9147
},
{
"utility": "CPS Energy",
"project": "omicron transmission loop project",
"archived_url": "https://web.archive.org/web/20260711081245/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/omicron-transmission-loop-project.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/omicron-transmission-loop-project.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 6010
},
{
"utility": "CPS Energy",
"project": "padua transmission line project",
"archived_url": "https://web.archive.org/web/20241004122735/https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/padua-transmission-line-project.html",
"captured": "2024-10-04",
"original_url": "https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/padua-transmission-line-project.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": [
"54308"
],
"chars": 7890
},
{
"utility": "CPS Energy",
"project": "paloalto transmission project",
"archived_url": "https://web.archive.org/web/20230307215248/https://www.cpsenergy.com/en/about-us/new-infrastructure/paloalto-transmission-project.html",
"captured": "2023-03-07",
"original_url": "https://www.cpsenergy.com/en/about-us/new-infrastructure/paloalto-transmission-project.html",
"kv": null,
"date_text": null,
"date": null,
"dockets": null,
"chars": 6212
},
{
"utility": "CPS Energy",
"project": "pawnee to tango",
"archived_url": "https://web.archive.org/web/20260711085236/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/pawnee-to-tango.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/pawnee-to-tango.html",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": [
"58253"
],
"chars": 8930
},
{
"utility": "CPS Energy",
"project": "potranco substation",
"archived_url": "https://web.archive.org/web/20190722214711/https://www.cpsenergy.com/es/developers-builders/new-infrastructure/potranco-substation.html",
"captured": "2019-07-22",
"original_url": "https://www.cpsenergy.com/es/developers-builders/new-infrastructure/potranco-substation.html",
"kv": [
138
],
"date_text": "Construction of the substation is tentatively scheduled to begin August 2016 and will be completed by summer 2018.",
"date": "summer 2018",
"dockets": null,
"chars": 21295
},
{
"utility": "CPS Energy",
"project": "rafter phase two transmission line",
"archived_url": "https://web.archive.org/web/20200330201208/https://www.cpsenergy.com/en/about-us/new-infrastructure/rafter-phase-two-transmission-line.html",
"captured": "2020-03-30",
"original_url": "https://www.cpsenergy.com/en/about-us/new-infrastructure/rafter-phase-two-transmission-line.html",
"kv": [
138
],
"date_text": "The scheduled completion date is April 2020.",
"date": "April 2020",
"dockets": null,
"chars": 79030
},
{
"utility": "CPS Energy",
"project": "rafter substation",
"archived_url": "https://web.archive.org/web/20190824211609/https://qadispatcher.cpsenergy.com/en/about-us/new-infrastructure/rafter-substation.html",
"captured": "2019-08-24",
"original_url": "https://qadispatcher.cpsenergy.com/en/about-us/new-infrastructure/rafter-substation.html",
"kv": [
138
],
"date_text": "Construction of the substation is tentatively scheduled to begin in May 2016 and be completed in June 2018.",
"date": "June 2018",
"dockets": null,
"chars": 59618
},
{
"utility": "CPS Energy",
"project": "ranchtown substation",
"archived_url": "https://web.archive.org/web/20190722214212/https://www.cpsenergy.com/es/developers-builders/new-infrastructure/ranchtown-substation.html",
"captured": "2019-07-22",
"original_url": "https://www.cpsenergy.com/es/developers-builders/new-infrastructure/ranchtown-substation.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 21742
},
{
"utility": "CPS Energy",
"project": "ranchtown to talley road",
"archived_url": "https://web.archive.org/web/20260711085650/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/Ranchtown-to-Talley-Road.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/Ranchtown-to-Talley-Road.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": [
"57206"
],
"chars": 10099
},
{
"utility": "CPS Energy",
"project": "sat15 substation transmission line",
"archived_url": "https://web.archive.org/web/20260711083118/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/sat15-substation-transmission-line.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/sat15-substation-transmission-line.html",
"kv": null,
"date_text": null,
"date": null,
"dockets": [
"55728"
],
"chars": 9427
},
{
"utility": "CPS Energy",
"project": "scenic loop project",
"archived_url": "https://web.archive.org/web/20241009025642/https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/scenic-loop-project.html",
"captured": "2024-10-09",
"original_url": "https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/scenic-loop-project.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": [
"51023"
],
"chars": 17619
},
{
"utility": "CPS Energy",
"project": "shepherd substation",
"archived_url": "https://web.archive.org/web/20201021211205/https://httwww.cpsenergy.com/en/about-us/new-infrastructure/shepherd-substation.html",
"captured": "2020-10-21",
"original_url": "https://httwww.cpsenergy.com/en/about-us/new-infrastructure/shepherd-substation.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 97534
},
{
"utility": "CPS Energy",
"project": "south san to leon creek",
"archived_url": "https://web.archive.org/web/20260711082735/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/south-san-to-leon-creek.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/south-san-to-leon-creek.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 6620
},
{
"utility": "CPS Energy",
"project": "spruce to pawnee transmission line",
"archived_url": "https://web.archive.org/web/20260711084545/https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/spruce-to-pawnee-transmission-line.html",
"captured": "2026-07-11",
"original_url": "https://www.cpsenergy.com/content/corporate/en/about-us/new-infrastructure/spruce-to-pawnee-transmission-line.html",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": [
"57849"
],
"chars": 8378
},
{
"utility": "CPS Energy",
"project": "tezel substation",
"archived_url": "https://web.archive.org/web/20241009040051/https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/tezel-substation.html",
"captured": "2024-10-09",
"original_url": "https://awsqacms.cpsenergy.com/en/about-us/new-infrastructure/tezel-substation.html",
"kv": null,
"date_text": "Due to weather delays, substation construction and energization is now anticipated to be completed by the end of 2024.",
"date": "end of 2024",
"dockets": null,
"chars": 8830
},
{
"utility": "CPS Energy",
"project": "toyota to braunig transmission line",
"archived_url": "https://web.archive.org/web/20190722214507/https://www.cpsenergy.com/es/developers-builders/new-infrastructure/toyota-to-braunig-transmission-line.html",
"captured": "2019-07-22",
"original_url": "https://www.cpsenergy.com/es/developers-builders/new-infrastructure/toyota-to-braunig-transmission-line.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 21509
},
{
"utility": "CPS Energy",
"project": "trumbo substation",
"archived_url": "https://web.archive.org/web/20190720103605/https://www.cpsenergy.com/es/developers-builders/new-infrastructure/trumbo-substation.html",
"captured": "2019-07-20",
"original_url": "https://www.cpsenergy.com/es/developers-builders/new-infrastructure/trumbo-substation.html",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 20942
},
{
"utility": "CenterPoint Energy",
"project": "baileyjonescreektransmission",
"archived_url": "https://web.archive.org/web/20240730095903/https://www.centerpointenergy.com/en-us/Corp/Documents/BaileyJonesCreekTransmission/Attachment-7-Summary-of-Cost-Estimates.pdf",
"captured": "2024-07-30",
"original_url": "https://www.centerpointenergy.com/en-us/Corp/Documents/BaileyJonesCreekTransmission/Attachment-7-Summary-of-Cost-Estimates.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 7449
},
{
"utility": "CenterPoint Energy",
"project": "oyster creek transmission project",
"archived_url": "https://web.archive.org/web/20170205023220/http://wswww.centerpointenergy.com/en-us/Corp/Documents/Oyster%20Creek%20Transmission%20Project/NoticeApprovedRouteNotDirectlyImpactedLandownersOysterCreekFINAL2015.pdf",
"captured": "2017-02-05",
"original_url": "http://wswww.centerpointenergy.com/en-us/Corp/Documents/Oyster%20Creek%20Transmission%20Project/NoticeApprovedRouteNotDirectlyImpactedLandownersOysterCreekFINAL2015.pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": [
"41749"
],
"chars": 1771
},
{
"utility": "CenterPoint Energy",
"project": "zenith franz transmission project",
"archived_url": "https://web.archive.org/web/20170205061055/http://wswww.centerpointenergy.com/en-us/Corp/Documents/Zenith-Franz%20Transmission%20Project/ZenithFranzProjectSchedule5-18-15.pdf",
"captured": "2017-02-05",
"original_url": "http://wswww.centerpointenergy.com/en-us/Corp/Documents/Zenith-Franz%20Transmission%20Project/ZenithFranzProjectSchedule5-18-15.pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 658
},
{
"utility": "Oncor",
"project": "barr ranch   quickriver",
"archived_url": "https://web.archive.org/web/20220713201309/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/barr-ranch---quickriver/OnePager%20FI-BR-QR%20138%20kV.pdf",
"captured": "2022-07-13",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/barr-ranch---quickriver/OnePager%20FI-BR-QR%20138%20kV.pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 4262
},
{
"utility": "Oncor",
"project": "bearkat longshore 345 kv",
"archived_url": "https://web.archive.org/web/20220713201317/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/bearkat-longshore-345-kv/Public%20Meeting%20Notice.pdf",
"captured": "2022-07-13",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/bearkat-longshore-345-kv/Public%20Meeting%20Notice.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 2358
},
{
"utility": "Oncor",
"project": "bell county east   big hill 765",
"archived_url": "https://web.archive.org/web/20260421044833/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/bell-county-east---big-hill-765-/updated-materials/Bell%20County%20East%20-%20Big%20Hill%20-%20Public%20Meeting%20Material_outdated%20watermark.pdf",
"captured": "2026-04-21",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/bell-county-east---big-hill-765-/updated-materials/Bell%20County%20East%20-%20Big%20Hill%20-%20Public%20Meeting%20Material_outdated%20watermark.pdf",
"kv": [
345,
765
],
"date_text": "The Proposed Transmission Line Project is currently planned for completion in summer 2030.",
"date": "summer 2030",
"dockets": null,
"chars": 15875
},
{
"utility": "Oncor",
"project": "big hill switch to sand lake switch 765 kv",
"archived_url": "https://web.archive.org/web/20260417191805/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/big-hill-switch-to-sand-lake-switch-765-kv-/updated-ppm/Big%20Hill%20-%20Sand%20Lake%20Public%20Meeting%20Material.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/big-hill-switch-to-sand-lake-switch-765-kv-/updated-ppm/Big%20Hill%20-%20Sand%20Lake%20Public%20Meeting%20Material.pdf",
"kv": [
345,
765
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 10357
},
{
"utility": "Oncor",
"project": "border switch to clearfork switch",
"archived_url": "https://web.archive.org/web/20260214022252/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/border-switch-to-clearfork-switch/Border-Clearfork%20QA%20Handout%20(Jan%2015-2025).docx_safe.pdf",
"captured": "2026-02-14",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/border-switch-to-clearfork-switch/Border-Clearfork%20QA%20Handout%20(Jan%2015-2025).docx_safe.pdf",
"kv": [
345
],
"date_text": "The Project is currently planned for completion in 2029.",
"date": "2029",
"dockets": null,
"chars": 11670
},
{
"utility": "Oncor",
"project": "cattleman gasconades retermination 345kv",
"archived_url": "https://web.archive.org/web/20260417200218/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/cattleman-gasconades-retermination-345kv/Cattleman_Retermination%20Constraints%20WATERMARKED.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/cattleman-gasconades-retermination-345kv/Cattleman_Retermination%20Constraints%20WATERMARKED.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 2530
},
{
"utility": "Oncor",
"project": "dinosaur \u2013 longshore 765 kv transmission line project",
"archived_url": "https://web.archive.org/web/20260420155821/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/dinosaur-%E2%80%93-longshore-765-kv-transmission-line-project/Dinosaur%20-%20Longshore%20meeting%20map_color%205.13.25.pdf",
"captured": "2026-04-20",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/dinosaur-%E2%80%93-longshore-765-kv-transmission-line-project/Dinosaur%20-%20Longshore%20meeting%20map_color%205.13.25.pdf",
"kv": [
765
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 3082
},
{
"utility": "Oncor",
"project": "division 138kv transmission line project",
"archived_url": "https://web.archive.org/web/20260417183724/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/division-138kv-transmission-line-project/Division_Fig3-1A_EnvConstMapWEST.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/division-138kv-transmission-line-project/Division_Fig3-1A_EnvConstMapWEST.pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 11775
},
{
"utility": "Oncor",
"project": "double creek to prime",
"archived_url": "https://web.archive.org/web/20260417213012/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/double-creek-to-prime/DC-SP%20138%20Public%20Meeting%20Material%20Website%20Packet.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/double-creek-to-prime/DC-SP%20138%20Public%20Meeting%20Material%20Website%20Packet.pdf",
"kv": [
138
],
"date_text": "The Project is currently planned for completion in Summer 2028.",
"date": "Summer 2028",
"dockets": null,
"chars": 12999
},
{
"utility": "Oncor",
"project": "drill hole to el capitan 345 kv",
"archived_url": "https://web.archive.org/web/20260213020647/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/drill-hole-to-el-capitan-345-kv/Drill%20Hole-El%20Capitan%20Env.%20Const.%20Map.pdf",
"captured": "2026-02-13",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/drill-hole-to-el-capitan-345-kv/Drill%20Hole-El%20Capitan%20Env.%20Const.%20Map.pdf",
"kv": [
138,
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 5469
},
{
"utility": "Oncor",
"project": "dry lake to faulkner 345kv",
"archived_url": "https://web.archive.org/web/20260417210010/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/dry-lake-to-faulkner-345kv/02%20-%20DL_F%20Public_Notice_Map%202025_0922.docx",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/dry-lake-to-faulkner-345kv/02%20-%20DL_F%20Public_Notice_Map%202025_0922.docx",
"kv": null,
"date_text": null,
"date": null,
"dockets": null,
"chars": 300187
},
{
"utility": "Oncor",
"project": "exchange  to keller magnolia",
"archived_url": "https://web.archive.org/web/20250214155619/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/exchange--to-keller-magnolia/OnePager%20-%20Keller%20Magnolia%20to%20Exchange.pdf",
"captured": "2025-02-14",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/exchange--to-keller-magnolia/OnePager%20-%20Keller%20Magnolia%20to%20Exchange.pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 3488
},
{
"utility": "Oncor",
"project": "exchange to roanoke",
"archived_url": "https://web.archive.org/web/20260213155351/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/exchange-to-roanoke/Questionnaire.pdf",
"captured": "2026-02-13",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/exchange-to-roanoke/Questionnaire.pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 5043
},
{
"utility": "Oncor",
"project": "fryers creek   hartrick   salado",
"archived_url": "https://web.archive.org/web/20260417205537/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/fryers-creek---hartrick---salado/T2F2S_OpenHouse_Notice_vr3_Exhibit1%20(1).pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/fryers-creek---hartrick---salado/T2F2S_OpenHouse_Notice_vr3_Exhibit1%20(1).pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 954
},
{
"utility": "Oncor",
"project": "ivy league 138 kv transmission line",
"archived_url": "https://web.archive.org/web/20220713201307/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/ivy-league-138-kv-transmission-line/Figure2_IvyLeague_Intervenor_Map_v2%20(1).pdf.coredownload.pdf",
"captured": "2022-07-13",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/ivy-league-138-kv-transmission-line/Figure2_IvyLeague_Intervenor_Map_v2%20(1).pdf.coredownload.pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 3849
},
{
"utility": "Oncor",
"project": "lamesa   faraday 345kv transmission line project",
"archived_url": "https://web.archive.org/web/20260417195930/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/lamesa---faraday-345kv-transmission-line-project/Lamesa-Faraday%20One%20Page%20Public%20Meeting%20Notice.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/lamesa---faraday-345kv-transmission-line-project/Lamesa-Faraday%20One%20Page%20Public%20Meeting%20Notice.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 3639
},
{
"utility": "Oncor",
"project": "longshore switch \u2013 drill hole switch 765 kv transmission line project",
"archived_url": "https://web.archive.org/web/20260417204527/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/longshore-switch-%E2%80%93-drill-hole-switch-765-kv-transmission-line-project/update-map/Longshore%20-%20Drill%20Hole%20Filing%20Appendix%20G%20Constraints%20Map%2011.26.25.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/longshore-switch-%E2%80%93-drill-hole-switch-765-kv-transmission-line-project/update-map/Longshore%20-%20Drill%20Hole%20Filing%20Appendix%20G%20Constraints%20Map%2011.26.25.pdf",
"kv": [
765
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 31252
},
{
"utility": "Oncor",
"project": "mascho lamesa",
"archived_url": "https://web.archive.org/web/20260418143123/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/mascho-lamesa/constraints-maps/Mascho-Lamesa_Board%203_PRELIMINARY.pdf",
"captured": "2026-04-18",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/mascho-lamesa/constraints-maps/Mascho-Lamesa_Board%203_PRELIMINARY.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 3104
},
{
"utility": "Oncor",
"project": "old country 345 kv tap transmission line",
"archived_url": "https://web.archive.org/web/20220713201233/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/old-country-345-kv-tap-transmission-line/Old%20Country%20345kV%20One%20Pager.pdf",
"captured": "2022-07-13",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/old-country-345-kv-tap-transmission-line/Old%20Country%20345kV%20One%20Pager.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 3657
},
{
"utility": "Oncor",
"project": "plowboy to oak spring 138kv",
"archived_url": "https://web.archive.org/web/20260417214457/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/plowboy-to-oak-spring-138kv-/Plowboy%20Sub%20-%20Oak%20Spring%20Switch%20-%20PPM%20Packet.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/plowboy-to-oak-spring-138kv-/Plowboy%20Sub%20-%20Oak%20Spring%20Switch%20-%20PPM%20Packet.pdf",
"kv": [
138
],
"date_text": "The Proposed Transmission Line Project is currently planned for completion in 2028.",
"date": "2028",
"dockets": null,
"chars": 11612
},
{
"utility": "Oncor",
"project": "porterville to shifting sands 138kv",
"archived_url": "https://web.archive.org/web/20260417235343/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/porterville-to-shifting-sands-138kv-/Porterville%20-%20Shifting%20Sands%20meeting%20handout.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/porterville-to-shifting-sands-138kv-/Porterville%20-%20Shifting%20Sands%20meeting%20handout.pdf",
"kv": [
138
],
"date_text": "The Proposed Transmission Line Project is currently planned for completion at the end of 2028.",
"date": "end of 2028",
"dockets": null,
"chars": 14300
},
{
"utility": "Oncor",
"project": "quarry field to kyle ranch 138 kv",
"archived_url": "https://web.archive.org/web/20220713201243/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/quarry-field-to-kyle-ranch-138-kv/KR-QF%20Modified%2051737%20One%20Pager.pdf",
"captured": "2022-07-13",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/quarry-field-to-kyle-ranch-138-kv/KR-QF%20Modified%2051737%20One%20Pager.pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": [
"49302"
],
"chars": 4585
},
{
"utility": "Oncor",
"project": "ramhorn hill to duham",
"archived_url": "https://web.archive.org/web/20230718221811/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/Ramhorn-hill-to-duham/maps/Appendix%20H%20Figure%203-1c%20(oversize).pdf",
"captured": "2023-07-18",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/Ramhorn-hill-to-duham/maps/Appendix%20H%20Figure%203-1c%20(oversize).pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 5359
},
{
"utility": "Oncor",
"project": "ranger camp to tonkawa 345 kv transmission line project",
"archived_url": "https://web.archive.org/web/20260417195022/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/ranger-camp-to-tonkawa-345-kv-transmission-line-project/Ranger%20Camp-Tonkawa%20Pub%20Meeting%20Notice%20Map.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/ranger-camp-to-tonkawa-345-kv-transmission-line-project/Ranger%20Camp-Tonkawa%20Pub%20Meeting%20Notice%20Map.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 649
},
{
"utility": "Oncor",
"project": "rangercamp345kv",
"archived_url": "https://web.archive.org/web/20250725023825/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/rangercamp345kv/Ranger%20Camp%20345%20kV%20Tap%20Line_Route%20Description%20Map_3-25-24.pdf",
"captured": "2025-07-25",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/rangercamp345kv/Ranger%20Camp%20345%20kV%20Tap%20Line_Route%20Description%20Map_3-25-24.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 697
},
{
"utility": "Oncor",
"project": "redland longleaf 345 kv",
"archived_url": "https://web.archive.org/web/20260417212321/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/redland-longleaf-345-kv/Att%20No%2010-12_Notice_Map_Color.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/redland-longleaf-345-kv/Att%20No%2010-12_Notice_Map_Color.pdf",
"kv": [
138,
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 746
},
{
"utility": "Oncor",
"project": "reiter switch tesoro switch",
"archived_url": "https://web.archive.org/web/20260214092642/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/reiter-switch-tesoro-switch/Reiter%20Switch-Tesoro%20Switch%20Map.pdf",
"captured": "2026-02-14",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/reiter-switch-tesoro-switch/Reiter%20Switch-Tesoro%20Switch%20Map.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 2893
},
{
"utility": "Oncor",
"project": "rockhound switch   connell switch 345 kv transmission line project",
"archived_url": "https://web.archive.org/web/20260417180023/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/rockhound-switch---connell-switch-345-kv-transmission-line-project/Rockhound_Connell%20PublicMeetingMaterial.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/rockhound-switch---connell-switch-345-kv-transmission-line-project/Rockhound_Connell%20PublicMeetingMaterial.pdf",
"kv": null,
"date_text": null,
"date": null,
"dockets": null,
"chars": 17462
},
{
"utility": "Oncor",
"project": "sandlake \u2013 north mccamey 345 kv transmission line project",
"archived_url": "https://web.archive.org/web/20231026203155/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/sandlake-%E2%80%93-north-mccamey-345-kv-transmission-line-project-/PublicMeeting%20Oversize%20Map%201.pdf",
"captured": "2023-10-26",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/sandlake-%E2%80%93-north-mccamey-345-kv-transmission-line-project-/PublicMeeting%20Oversize%20Map%201.pdf",
"kv": [
345
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 5004
},
{
"utility": "Oncor",
"project": "wofford poi to berryville pod 138kv",
"archived_url": "https://web.archive.org/web/20260417184305/https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/wofford-poi-to-berryville-pod-138kv-/Wofford%20Map.pdf",
"captured": "2026-04-17",
"original_url": "https://www.oncor.com/content/dam/oncorwww/documents/about-us/transmission-system/current-trasmission-line-projects/wofford-poi-to-berryville-pod-138kv-/Wofford%20Map.pdf",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 457
},
{
"utility": "TNMP",
"project": "transmission line projects",
"archived_url": "https://web.archive.org/web/20250422101500/https://tnmp.com/transmission-line-projects",
"captured": "2025-04-22",
"original_url": "https://tnmp.com/transmission-line-projects",
"kv": [
138
],
"date_text": null,
"date": null,
"dockets": null,
"chars": 2575
}
]
}