{"source":{"label":"ERCOT Regional Planning Group: ERCOT Independent Review documents","url":"https://www.ercot.com/committees/other/rpg","license":"ERCOT public documents"},"notes":["A review is linked to a project only by the review's own RPG number (its file name or title page); numbers it cites in passing are not links.","ERCOT reviews large transmission projects that utilities propose (Tier 1 and Tier 2) and publishes an Independent Review with the need, options studied, estimated cost and recommendation.","Quoted sentences are as ERCOT wrote them in that document; later changes are not reflected. Documents are joined to TPIT projects by RPG number only."],"tally":{"candidates":295,"fetched":{"cached":295},"docs":295,"docs_with_rpg":94,"rpg_numbers":37,"tpit_projects_linked":170},"docs":[{"url":"https://www.ercot.com/files/docs/2013/02/01/13._ercot_independent_review_kenedy_beevile_sinton_area_impr.pdf","file_date":"2013/02/01","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":"For the project scope recommended in this report AEP TCC and STEC are the designated providers of all transmission facilities."},{"url":"https://www.ercot.com/files/docs/2013/02/01/13._ercot_independent_review_lcra_kenedy_seguin_line_upgrade.pdf","file_date":"2013/02/01","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":"If different providers own the two ends of the recommended projects, ERCOT will designate them as co-providers and they can decide between themselves what parts of the recommended projects they will each provide."},{"url":"https://www.ercot.com/files/docs/2014/02/20/09._ercot_independent_review_houston_import_project_final_re.pdf","file_date":"2014/02/20","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":"double-circuit line) as the best solution for the area and recommends the project to be in-service by 2018."},{"url":"https://www.ercot.com/files/docs/2014/04/01/8_ercot_independent_review_of_the_houston_import_regional_pl.pdf","file_date":"2014/04/01","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":"The recommended set of improvements was found to be the most cost-effective solution for meeting the reliability criteria."},{"url":"https://www.ercot.com/files/docs/2014/04/21/cnp_katy_area_upgrade_project_eir_04_22_2014.pdf","file_date":"2014/04/21","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2014/05/19/ercot_independent_review_lcra_leander_roundrock_project_05_2.pdf","file_date":"2014/05/19","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2015/02/02/13_Jones_Creek_RPG_Project_Independent_Review.pdf","file_date":"2015/02/02","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":"The recommended set of improvements (known as Option B in the Independent Review) was found to be the most cost-effective solution for meeting the reliability criteria."},{"url":"https://www.ercot.com/files/docs/2015/02/26/CPS_LCRA_Transmission_Addition_Project_EIR_Update_RPG_Feb_2015.pdf","file_date":"2015/02/26","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2015/04/07/7_LCRA_TSC_and_CPS_Energy_Transmission_System_Addition_RPG_Project_Independent_Review.pdf","file_date":"2015/04/07","via":"cached","rpg":null,"mentions":null,"tier":4,"recommendation":"The recommended set of improvements was found to be the most cost-effective solution."},{"url":"https://www.ercot.com/files/docs/2015/09/14/AEP_Live_Oak_County_Transmission_Project_EIR_RPG_Sept_2015.pdf","file_date":"2015/09/14","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2015/11/13/10._ERCOT_Independent_Review_Panhandle_Upgrades_V1FINAL.pdf","file_date":"2015/11/13","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":"ERCOT recommends that the designated entity for the transmission upgrades consult with ERCOT if different specifications of the synchronous condensers are considered for implementation."},{"url":"https://www.ercot.com/files/docs/2016/03/21/AEPSC_Hidalgo_Starr_Transmission_Project____ERCOT_Independent_Review_Update.pdf","file_date":"2016/03/21","via":"cached","rpg":null,"mentions":null,"tier":4,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2016/03/21/RPG_Valley_Independent_Review_Update_03222016.pdf","file_date":"2016/03/21","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2016/05/12/AEPSC_Hidalgo_Starr_Transmission_Project_EIR_RPG_May_2016.pdf","file_date":"2016/05/12","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":"PUBLIC 6 ERCOT Recommendation ERCOT recommends Option D as the preferred option to address the reliability need in the study region \ufffd Expand the existing Stewart Road 138 kV substation to include new breakers and protection equipment for two new 345 kV transmission lines and two 345/138 kV transformers."},{"url":"https://www.ercot.com/files/docs/2016/05/12/ERCOT_Independent_Review_of_BEC_and_AEP_Katz_to_Tardis_RPG_Project.pdf","file_date":"2016/05/12","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2016/05/13/Valley_RPG_Independent_Review_0517_2016.pdf","file_date":"2016/05/13","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2016/06/17/AEPSC_and_Oncor_Barilla_Junction_Area_Improvement_Project__EIR_Update.pdf","file_date":"2016/06/17","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2016/06/17/ERCOT_Independent_Review_of_BEC_SaltCreek_RPG_Project_June_2016.pdf","file_date":"2016/06/17","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2016/08/15/TNMP_Line_69H_Rebuild_and_Conversion_Project__EIR_Update.pdf","file_date":"2016/08/15","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2016/09/13/ERCOT_Independent_Review_of_BEC_SaltCreek_RPG_Project_09_20_2016.pdf","file_date":"2016/09/13","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2017/01/20/ERCOT_Independent_Review_of_AEP_Maverick_County_Transmission_Project_-_Jan_2017.pdf","file_date":"2017/01/20","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2017/03/16/SU_South_Plains_Transmission_Project_ERCOT_Independent_Review_Scope.pdf","file_date":"2017/03/16","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2017/05/15/FWTP_EIR_Update_RPG_05162017.pdf","file_date":"2017/05/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"ast in the Culberson area has reached to 596 MW by 2022 The recommended Option 2 will be able to meet the 2022 Culberson area load projections Further improvements may be needed if the net load in the Culberson Loop area continues to grow beyond existing forecasts."},{"url":"https://www.ercot.com/files/docs/2017/08/18/ERCOT_Independent_Review_of_Northeast_Denton_County_and_Celina_Project_-_Aug_22_2017.pdf","file_date":"2017/08/18","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2017/10/18/CNPFP_EIR_StatusUpdate_RPG_10192017.pdf","file_date":"2017/10/18","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2017/11/13/SU_South_Plains_Transmission_Project_EIR_11_14_2017.pdf","file_date":"2017/11/13","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2018/05/21/FarWest_DRD_and_Project2_ERCOT_Independent_Review_May_22_2018-RPG.pdf","file_date":"2018/05/21","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"ollapse Voltage Collapse *The Far West Texas Project (FWTP) endorsed by ERCOT Board of Directors in June, 2017."},{"url":"https://www.ercot.com/files/docs/2020/01/16/EIR_AEPSC_Corpus_Christi_North_Shore_Study_StatusUpdate_01_21_2020.pdf","file_date":"2020/01/16","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2020/02/14/EIR_AEPSC_Corpus_Christi_North_Shore_Study_StatusUpdate_02_18_2020.pdf","file_date":"2020/02/14","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2020/03/06/EIR_AEPSC_Corpus_Christi_North_Shore_Study_StatusUpdate_03_10_2020.pdf","file_date":"2020/03/06","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2020/05/12/Frio_County_Project_EIR_05_19_2020_RPG.PDF","file_date":"2020/05/12","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"COT Recommendation \ufffd Based on the ERCOT Independent Review, ERCOT recommends Option 5 as the preferred option."},{"url":"https://www.ercot.com/files/docs/2020/05/14/GPL_Farmersville_Area_Reliability_Project_EIR_5_19_2020_RPG.pdf","file_date":"2020/05/14","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2020/07/17/BEC_Moffat_to_Hasse_Voltage_Conversion__EIR_Status_7_21_2020.pdf","file_date":"2020/07/17","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2020/12/10/ERCOT_EIR_Oncor_Nacogdoches_Lufkin_Scope.pdf","file_date":"2020/12/10","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2021/08/16/ERCOT_EIR_Oncor_Nacogdoches_Lufkin_081721_Status.pdf","file_date":"2021/08/16","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/03/11/Oncor_Roanoke_Area_Upgrades_EIR_Scope_03_15_2022.pdf","file_date":"2022/03/11","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/04/07/Oncor_Roanoke_Area_Upgrades_EIR_Status.pdf","file_date":"2022/04/07","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/04/11/ERCOT_EIR_Oncor_Nacogdoches_Lufkin.pdf","file_date":"2022/04/11","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"re identified for Option 1 Public 14 ERCOT Recommendation \ufffd ERCOT recommends Option 1 as the preferred option \ufffd Estimated Cost: $71."},{"url":"https://www.ercot.com/files/docs/2022/05/12/EIR-LCRA_TSC_Hays_Energy%E2%80%93Kendall_Corridor_Transmission_Line_Rehabilitation_Projects_Scope.pdf","file_date":"2022/05/12","via":"cached","rpg":null,"mentions":null,"tier":3,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/05/12/Oncor_Roanoke_Area_Upgrades_EIR_Status.pdf","file_date":"2022/05/12","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/06/10/Oncor_Roanoke_Area_Upgrades_EIR_Status_06_15_2022.pdf","file_date":"2022/06/10","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/07/15/EIR%20-%20LCRA%20TSC%20Hays%20Energy%20%E2%80%93%20Kendall%20Corridor%20Transmission%20Line%20Rehabilitation%20Projects%20FinalUpdate_July2022.pdf","file_date":"2022/07/15","via":"cached","rpg":null,"mentions":null,"tier":3,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/07/15/Oncor_Roanoke_Area_Upgrades_EIR_07_19_2022.pdf","file_date":"2022/07/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"ial impact on project need PUBLIC 14 ERCOT Recommendation \ufffd ERCOT recommends Option 2 as the preferred option \ufffd Estimated Cost: $286 Million \ufffd CCNs will be required \ufffd Oncor has requested ERCOT designate the recommended project \"critical\" to the reliability of the system per PUCT Substantive Rule 25."},{"url":"https://www.ercot.com/files/docs/2022/09/15/EIR%20-%20REC%20-%20Tawakoni%20Area%20Transmission%20Project%20-%20Status%20Update%20-%20RPG%20Sep%202022.pdf","file_date":"2022/09/15","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/09/15/EIR%20-%20STEC%20Hondo%20Creek%20to%20Pearson%2069-kV%20Transmission%20Line%20Rebuild%20Project%20Scope_Sept2022.pdf","file_date":"2022/09/15","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"essment o Congestion analysis may be performed based on the recommended transmission upgrades PUBLIC 9 Next Step \ufffd Tentative Timelines Status updates at the future RPG meetings Final recommendation \ufffd Q4 2022 PUBLIC 10 Comments? Stakeholder comments also welcomed through: Ying."},{"url":"https://www.ercot.com/files/docs/2022/10/14/EIR%20-%20PEC%20Wimberley%20Loop%20Transmission%20Scope%20and%20Status%20Update%20RPG%20Oct%202022.pdf","file_date":"2022/10/14","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"nalysis o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timelines \ufffd Final recommendation - Q4 2022 Public 18 Comments? Stakeholder comments also welcomed through: Caleb."},{"url":"https://www.ercot.com/files/docs/2022/10/14/EIR%20-%20REC%20-%20Tawakoni%20Area%20Transmission%20Project%20-%20Status%20Update%20-%20RPG%20Oct%202022.pdf","file_date":"2022/10/14","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/10/14/EIR%20-%20STEC%20Hondo%20Creek%20to%20Pearson%2069-kV%20Transmission%20Line%20Rebuild%20Project%20Status%20Update%20Oct2022.pdf","file_date":"2022/10/14","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2022/11/03/EIR%20-%20PEC%20Wimberley%20Loop%20Transmission%20Status%20Update%20RPG%20Nov%202022.pdf","file_date":"2022/11/03","via":"cached","rpg":null,"mentions":["22RPG033"],"tier":2,"recommendation":"nalysis \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timelines \ufffd Final recommendation - Q4 2022 Public 11 Comments? Stakeholder comments also welcomed through: Caleb."},{"url":"https://www.ercot.com/files/docs/2022/11/03/EIR%20-%20REC%20-%20Tawakoni%20Area%20Transmission%20Project%20-%20Status%20Update%20-%20RPG%20Nov%202022.pdf","file_date":"2022/11/03","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"tions within the study area PUBLIC 6 ERCOT Recommendation \ufffd ERCOT recommends Option 1 as the preferred solution \ufffd Estimated Cost: $42."},{"url":"https://www.ercot.com/files/docs/2022/11/03/EIR%20-%20STEC%20Hondo%20Creek%20to%20Pearson%2069-kV%20Transmission%20Line%20Rebuild%20Project%20Status%20Update%20Nov2022.pdf","file_date":"2022/11/03","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"ions within the study area PUBLIC 11 ERCOT Recommendation \ufffd ERCOT recommends Option 5 as the preferred option Rebuild the Hondo Creek to Castroville Sub to Bader to Pearson 69-kV line to 138-kV Remove the pole mounted switch of Castroville Switch Upgrade the 1."},{"url":"https://www.ercot.com/files/docs/2023/01/20/EIR%20-%20Oncor%20Peck%20to%20Driver%20138%20kV%20Line%20project%20Scope_Jan2023.pdf","file_date":"2023/01/20","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/01/23/EIR%20-%20PEC%20Wimberley%20Loop%20Transmission%20-%20Status%20Update%20-%20RPG%20Jan%202023.pdf","file_date":"2023/01/23","via":"cached","rpg":["22RPG033"],"mentions":null,"tier":2,"recommendation":"stion within the study area Public 9 ERCOT Recommendation \ufffd ERCOT recommends Option 3 \ufffd Estimated Cost: $61."},{"url":"https://www.ercot.com/files/docs/2023/02/13/EIR%20-%20CPS%20-%20San%20Antonio%20South%20Reliability%20Project%20-%20Scope%20-%20RPG%20Feb%202023.pdf","file_date":"2023/02/13","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/03/17/EIR%20-%20CPS%20-%20San%20Antonio%20South%20Reliability%20Project%20-%20Status%20Update%20-%20RPG%20Mar%202023.pdf","file_date":"2023/03/17","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"essment o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation addition sensitivity analysis (Planning Guide (PG) section 3."},{"url":"https://www.ercot.com/files/docs/2023/03/17/EIR%20-%20Oncor%20Peck%20to%20Driver%20138%20kV%20Line%20Project_Status_March2023.pdf","file_date":"2023/03/17","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/04/06/EIR%20-%20CPS%20-%20San%20Antonio%20South%20Reliability%20Project%20-%20Status%20Update%20-%20RPG%20Apr%202023.pdf","file_date":"2023/04/06","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"ings \ufffd ERCOT may perform a congestion analysis based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation addition sensitivity analysis (Planning Guide (PG) section 3."},{"url":"https://www.ercot.com/files/docs/2023/04/07/EIR---Oncor-Peck-to-Driver-138-kV-Line-Project-Status-Update-April2023.pdf","file_date":"2023/04/07","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"stion within the study area PUBLIC 9 ERCOT Recommendation \ufffd ERCOT recommends Option 1a as the preferred option \ufffd Construct the new 138-kV Peck Tap Switch \ufffd Convert the existing 25."},{"url":"https://www.ercot.com/files/docs/2023/05/16/EIR%20-%20CPS%20-%20San%20Antonio%20South%20Reliability%20Project%20-%20Status%20Update%20-%20RPG%20May%202023.pdf","file_date":"2023/05/16","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/06/13/EIR%20-%20CPS%20-%20San%20Antonio%20South%20Reliability%20Project%20-%20Status%20Update%20-%20RPG%20June%202023.pdf","file_date":"2023/06/13","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"id not yield any economic benefit and therefore will not be recommended for upgrade as part of this project Upgrade Mileage Passed Generator Passed Production Cagnon to Vlsi 138-kV line upgrade (mi) Revenue Reduction Test Cost Savings Test 8."},{"url":"https://www.ercot.com/files/docs/2023/07/14/EIR%20-%20TNMP%20-%20Silverleaf%20and%20Cowpen%20345138-kV%20Stations%20Project%20-%20Scope%20-%20RPG%20July2023.pdf","file_date":"2023/07/14","via":"cached","rpg":null,"mentions":["23RPG008"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/09/15/EIR%20-%20TNMP%20-%20Silverleaf%20and%20Cowpen%20345138-kV%20Stations%20Project%20-%20Status%20Update%20-%20RPG%20Sep%202023.pdf","file_date":"2023/09/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"nalysis o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation addition sensitivity analysis (Planning Guide (PG) section 3."},{"url":"https://www.ercot.com/files/docs/2023/10/13/EIR%20-%20TNMP%20-%20Pecos%20County%20Transmission%20Improvement%20Project%20-%20Scope%20-%20Pre-RPG%20Oct2023.pdf","file_date":"2023/10/13","via":"cached","rpg":null,"mentions":["23RPG008"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/10/13/EIR%20-%20TNMP%20-%20Silverleaf%20and%20Cowpen%20345138-kV%20Stations%20Project%20-%20Status%20Update%20-%20RPG%20Oct%202023.pdf","file_date":"2023/10/13","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/11/10/EIR%20-%20STEC%20-%20Rio%20Medina%20Project%20-%20Scope%20-%20RPG%20Nov%202023.pdf","file_date":"2023/11/10","via":"cached","rpg":null,"mentions":["22RPG022","22RPG048"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/11/10/EIR%20-%20TNMP%20-%20Silverleaf%20and%20Cowpen%20345138-kV%20Stations%20Project%20-%20Status%20Update%20-%20RPG%20Nov%202023.pdf","file_date":"2023/11/10","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"rial impact on project need PUBLIC 5 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: $273."},{"url":"https://www.ercot.com/files/docs/2023/11/13/EIR%20-%20BEC%20-%20San%20Miguel%20to%20Marion%20345%20kV%20Project%20Scope.pdf","file_date":"2023/11/13","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/11/13/EIR%20-%20Oncor%20-%20Arlington%20Reliability%20Enhancement%20Project%20-%20Scope%20and%20Status%20Update.pdf","file_date":"2023/11/13","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2023/11/13/EIR%20-%20TNMP%20-%20Pecos%20County%20Transmission%20Improvement%20Project%20-%20Status%20Update%20-%20RPG%20Nov%202023.pdf","file_date":"2023/11/13","via":"cached","rpg":null,"mentions":["23RPG008"],"tier":1,"recommendation":"nalysis o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation addition and load scaling sensitivity analyses o Planning Guide (PG) section 3."},{"url":"https://www.ercot.com/files/docs/2023/12/12/EIR%20-%20Oncor%20-%20Arlington%20Reliability%20Enhancement%20Project%20-%20Status%20Update%20-%20Dec%202023.pdf","file_date":"2023/12/12","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"tion within the study area PUBLIC 11 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: $73 Million \ufffd Estimated In-Service Date: May 2026 \ufffd Construct new 138-kV load-serving station (Division) between Sherry Switch and Great Southwest \ufffd Construct new 0."},{"url":"https://www.ercot.com/files/docs/2023/12/12/EIR%20-%20TNMP%20-%20Pecos%20County%20Transmission%20Improvement%20Project%20-%20Status%20Update%20-%20RPG%20Dec%202023.pdf","file_date":"2023/12/12","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/01/11/EIR%20-%20TNMP%20-%20Pecos%20County%20Transmission%20Improvement%20Project%20-%20Status%20Update%20-%20RPG%20Jan%202024.pdf","file_date":"2024/01/11","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"ial impact on project need PUBLIC 11 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: ~$114."},{"url":"https://www.ercot.com/files/docs/2024/01/12/EIR%20-%20BEC%20-%20San%20Miguel%20to%20Marion%20345%20kV%20Project%20Status%20Update_Jan%202024.pdf","file_date":"2024/01/12","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"essment o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation and Load Scaling Sensitivity Analyses o Planning Guide Section 3."},{"url":"https://www.ercot.com/files/docs/2024/01/12/EIR%20-%20STEC%20-%20Rio%20Medina%20-%20RPG%20Jan2024.pdf","file_date":"2024/01/12","via":"cached","rpg":null,"mentions":["22RPG022","22RPG048","23RPG024"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/02/08/EIR%20-%20Oncor%20-%20Temple%20Area%20Project%20-%20Scope%20-%20RPG%20February%202024.pdf","file_date":"2024/02/08","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/02/08/EIR%20-%20STEC%20-%20Rio%20Medina%20-%20RPG%20Feb2024.pdf","file_date":"2024/02/08","via":"cached","rpg":null,"mentions":["22RPG022","22RPG048","23RPG024"],"tier":2,"recommendation":"id not yield any economic benefit and therefore will not be recommended for upgrade as part of this project Upgrade Tested Mileage Passed Production Cost Passed Generation Revenue Medina Lake to Pipe Creek 138-kV (mi) Savings Test Line Upgrade Reduction Test 7."},{"url":"https://www.ercot.com/files/docs/2024/02/09/EIR%20-%20BEC%20-%20San%20Miguel%20to%20Marion%20345%20kV%20Project%20Status%20Update_Feb%202024.pdf","file_date":"2024/02/09","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"nalysis o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation and Load Scaling Sensitivity Analyses o Planning Guide Section 3."},{"url":"https://www.ercot.com/files/docs/2024/03/14/EIR%20-%20CPS%20-%20Eastside%20345_138-kV%20Switching%20Station%20Project_SCOPE_March_RPG_.pdf","file_date":"2024/03/14","via":"cached","rpg":null,"mentions":["22RPG026","23RPG003","23RPG004","23RPG015","23RPG028"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/03/14/EIR_CPS_Omicron_Reliability_Project_Scope_RPG_March2024.pdf","file_date":"2024/03/14","via":"cached","rpg":null,"mentions":["22RPG026","23RPG003","23RPG004","23RPG015","23RPG028"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/03/15/EIR%20-%20Oncor%20-%20Temple%20Area%20Project%20-%20Status%20Update%20-%20RPG%20March%202024_.pdf","file_date":"2024/03/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"Option \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation addition and load scaling sensitivity analyses o Planning Guide (PG) section 3."},{"url":"https://www.ercot.com/files/docs/2024/03/15/EIR%20-%20San%20Miguel%20to%20Marion%20345%20kV%20Project%20Status%20Update_March%202024.pdf","file_date":"2024/03/15","via":"cached","rpg":null,"mentions":null,"tier":3,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/03/15/EIR_Oncor_West%20Texas%20345-kV%20Infrastructure%20Rebuild%20Project%20-%20Status%20Update%20RPG%20March%202024_.pdf","file_date":"2024/03/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/04/08/EIR%20-%20San%20Antonio%20South%20Reliability%20II%20Project%20Status%20Update_April%202024.pdf","file_date":"2024/04/08","via":"cached","rpg":null,"mentions":null,"tier":3,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/04/09/EIR_Oncor_West%20Texas%20345-kV%20Infrastructure%20Rebuild%20Project%20-%20Status%20Update%20RPG%20April%202024.pdf","file_date":"2024/04/09","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"orse Tier 1 or Tier 2 RPG projects if transmission upgrades recommended in the Permian Basin Load Integration Study are submitted for RPG review \ufffd West Texas 345-kV Infrastructure Rebuild Project is ERCOT preferred Option."},{"url":"https://www.ercot.com/files/docs/2024/05/10/EIR%20-%20CPS%20-%20Eastside%20345_138-kV%20Switching%20Station%20Project_May_RPG.pdf","file_date":"2024/05/10","via":"cached","rpg":null,"mentions":["22RPG026","23RPG003","23RPG004","23RPG015","23RPG028"],"tier":1,"recommendation":"essment o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation and Load Scaling Sensitivity Analyses o Planning Guide Section 3."},{"url":"https://www.ercot.com/files/docs/2024/05/10/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stages%203%20and%204%20Project%20-%20Scope%20-%20RPG%20May%202024.pdf","file_date":"2024/05/10","via":"cached","rpg":null,"mentions":["22RPG045","23RPG013","23RPG023","23RPG027"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/05/10/EIR%20Oncor%20-%20Temple%20Area%20Projct%20-%20Status%20Update%20-%20RPG%20May%202024.pdf","file_date":"2024/05/10","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/05/10/EIR_Oncor_West%20Texas%20345-kV%20Infrastructure%20Rebuild%20Project%20-%20Status%20Update%20RPG%20May%202024.pdf","file_date":"2024/05/10","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"orse Tier 1 or Tier 2 RPG projects if transmission upgrades recommended in the Permian Basin Load Integration Study are submitted for RPG review \ufffd West Texas 345-kV Infrastructure Rebuild Project is ERCOT preferred Option."},{"url":"https://www.ercot.com/files/docs/2024/05/13/EIR_CPS_Omicron_Reliability_Project_Status_Update_RPG_May2024_update.pdf","file_date":"2024/05/13","via":"cached","rpg":null,"mentions":["22RPG026","23RPG003","23RPG004","23RPG015","23RPG028","23RPG032"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/06/05/EIR%20-%20Brownsville%20Area%20Improvement_Scope_June%202024.pdf","file_date":"2024/06/05","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/06/07/EIR%20-%20CPS%20-%20Eastside%20345_138-kV%20Switching%20Station%20Project%20-%20RPG%20Jun%202024.pdf","file_date":"2024/06/07","via":"cached","rpg":null,"mentions":["22RPG026","23RPG003","23RPG004","23RPG015","23RPG028"],"tier":1,"recommendation":"studies o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation and Load Scaling Sensitivity Analyses o Planning Guide Section 3."},{"url":"https://www.ercot.com/files/docs/2024/06/07/EIR%20-%20REC%20-%20Rand%20Area%20Loop%20Project%20-%20Scope%20-%20RPG%20Jun%202024.pdf","file_date":"2024/06/07","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/06/07/EIR%20REC%20-%20Rayburn%20Electric%20Cooperative%20Canton%20Loop%20-%20Status%20Update%20RPG%20June%202024.pdf","file_date":"2024/06/07","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/06/10/EIR%20Oncor%20-%20Temple%20Area%20Projct%20-%20Status%20Update%20-%20RPG%20June%202024.pdf","file_date":"2024/06/10","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/06/10/EIR_CPS_Omicron_Reliability_Project_Status_Update_RPG_June2024.pdf","file_date":"2024/06/10","via":"cached","rpg":null,"mentions":["22RPG026","23RPG003","23RPG004","23RPG015","23RPG028","23RPG032"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/07/11/EIR%20-%20Brownsville%20Area%20Improvement_Status%20Update_July%202024.pdf","file_date":"2024/07/11","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"nalysis o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation and Load Scaling Sensitivity Analyses o Planning Guide Section 3."},{"url":"https://www.ercot.com/files/docs/2024/07/12/EIR-CPS-Eastside-345_138-kV-Switching-Station-Project-RPG-Jul-2024.pdf","file_date":"2024/07/12","via":"cached","rpg":null,"mentions":["22RPG026","23RPG003","23RPG004","23RPG015","23RPG028","23RPG032","24RPG004"],"tier":1,"recommendation":"at the time of this study PUBLIC 15 ERCOT Recommendation \ufffd ERCOT recommends Option 1A \ufffd Estimated Cost: approximately $47."},{"url":"https://www.ercot.com/files/docs/2024/07/12/EIR-Oncor-Temple-Area-Projct-Status-Update-RPG-July-2024.pdf","file_date":"2024/07/12","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"at the time of this study PUBLIC 11 ERCOT Recommendation \ufffd ERCOT recommends Option 5A \ufffd Estimated Cost: approximately $272."},{"url":"https://www.ercot.com/files/docs/2024/07/15/EIR_CPS_Omicron_Reliability_Project_Status_Update_RPG_July2024.pdf","file_date":"2024/07/15","via":"cached","rpg":null,"mentions":["22RPG026","23RPG003","23RPG004","23RPG015","23RPG028","23RPG032"],"tier":2,"recommendation":"ested line did yield economic benefit and therefore will be recommended for upgrade as part of this project Upgrade Tested Mileage Passed Production Passed Generation Omicron to Rafter 138-kV (mi) Cost Revenue 1."},{"url":"https://www.ercot.com/files/docs/2024/08/09/EIR%20REC%20-%20Rayburn%20Electric%20Cooperative%20Canton%20Loop%20-%20Status%20Update%20RPG%20August%202024.pdf","file_date":"2024/08/09","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"thin the study area PUBLIC 18 ERCOT Recommendation Option \ufffd ERCOT recommends Option 3 \ufffd Estimated Cost: approximately $26."},{"url":"https://www.ercot.com/files/docs/2024/08/09/EIR_ONCOR_Venus_Switch_to_Sam_Switch_Project_Scope.pdf","file_date":"2024/08/09","via":"cached","rpg":null,"mentions":["23RPG006","23RPG018","23RPG020","23RPG033","24RPG019"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/08/12/EIR%20-%20REC%20-%20Rand%20Area%20Loop%20Project%20-%20RPG%20Aug%202024.pdf","file_date":"2024/08/12","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/08/12/eir-brownsville-area-improvement_status-update_august-2024.pdf","file_date":"2024/08/12","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"oviders \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation and Load Scaling Sensitivity Analyses o Planning Guide Section 3."},{"url":"https://www.ercot.com/files/docs/2024/09/20/eir-aepsc-brownsville-area-improvement_status-update_sept-2024.pdf","file_date":"2024/09/20","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"yield sufficient economic benefit and therefore will not be recommended for upgrade as part of this project PUBLIC 13 Sub-Synchronous Resonance (SSR) Assessment \ufffd Sub-Synchronous Resonance (SSR) Assessment was conducted for the preferred Option 2A per Nodal Protocol Section 3."},{"url":"https://www.ercot.com/files/docs/2024/09/23/EIR%20-%20Oncor%20-%20Connell%20to%20Rockhound%20RPG%20Project_SCOPE_September_RPG.pdf","file_date":"2024/09/23","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/09/23/EIR%20-%20Oncor%20-%20Forney%20345_138-kV%20Switch%20Rebuild%20Project_SCOPE_September_RPG.pdf","file_date":"2024/09/23","via":"cached","rpg":null,"mentions":["22RPG021","23RPG006","23RPG017","23RPG020","23RPG033","24RPG005"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/09/23/EIR%20-%20Oncor%20-%20Wilmer%20345138-kV%20Switch%20Project%20-%20Scope%20-%20RPG%20Sept2024.pdf","file_date":"2024/09/23","via":"cached","rpg":null,"mentions":["23RPG017","23RPG018","23RPG033"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/09/23/EIR_ONCOR_Venus_Switch_to_Sam_Switch_Project_Update.pdf","file_date":"2024/09/23","via":"cached","rpg":null,"mentions":["23RPG006","23RPG018","23RPG020","23RPG033","24RPG001","24RPG018","24RPG019"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stage%205%20Project%20-%20Scope%20-%20RPG%20September%202024.pdf","file_date":"2024/09/24","via":"cached","rpg":["24RPG015","24RPG023"],"mentions":["22RPG045","23RPG013","23RPG023","23RPG027","23RPG034","24RPG002","24RPG010"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stages%203%20and%204%20Project%20-%20Status%20Update%20-%20RPG%20September%202024.pdf","file_date":"2024/09/24","via":"cached","rpg":null,"mentions":["23RPG013","23RPG023","23RPG027","24RPG002"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20REC%20-%20Rand%20Area%20Loop%20Project%20-%20RPG%20Sep%202024_.pdf","file_date":"2024/09/24","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"thin the study area PUBLIC 27 ERCOT Recommendation Option \ufffd ERCOT recommends Option 3 \ufffd Estimated Cost: approximately $32."},{"url":"https://www.ercot.com/files/docs/2024/10/14/EIR%20-%20Oncor%20-%20Wilmer%20345138-kV%20Switch%20Project%20-%20Status%20Update%20-%20RPG%20Oct2024.pdf","file_date":"2024/10/14","via":"cached","rpg":null,"mentions":["23RPG017","23RPG018","23RPG033","24RPG019"],"tier":1,"recommendation":"nalysis \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timeline \ufffd Final recommendation \ufffd Q4 2024 PUBLIC 14 Comments? Stakeholder comments also welcomed through: Ying."},{"url":"https://www.ercot.com/files/docs/2024/10/15/24RPG024%20Oncor%20and%20LCRATSC%20RPG%20Overview%20for%20ERCOT%2010162024.pdf","file_date":"2024/10/15","via":"cached","rpg":["24RPG024"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/10/15/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stages%203%20and%204%20Project%20-%20Status%20Update%20-%20RPG%20October%202024.pdf","file_date":"2024/10/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"stion within the study area PUBLIC 6 ERCOT Recommendation \ufffd ERCOT recommends Oncor Proposed Option \ufffd Estimated Cost: approximately $202."},{"url":"https://www.ercot.com/files/docs/2024/10/15/EIR_ONCOR_LCRA_Hartring_to_Upland_138kV_Line_and_Benedum_Autotransformer_Addition_Project_Scope_RPG_October_2024.pdf","file_date":"2024/10/15","via":"cached","rpg":["22RPG010"],"mentions":["23RPG019"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/10/15/EIR_ONCOR_Tredway_Scope_OCT.pdf","file_date":"2024/10/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/10/15/EIR_ONCOR_Venus_Switch_to_Sam_Switch_Project_OCT_Update.pdf","file_date":"2024/10/15","via":"cached","rpg":null,"mentions":["23RPG006","23RPG018","23RPG020","23RPG033","24RPG001","24RPG018","24RPG019","24RPG021","24RPG022","24RPG025"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/11/11/EIR%20-%20CNP%20-%20Baytown%20Area%20Load%20Addition%20RPG%20Project_SCOPE_November_RPG_Final.pdf","file_date":"2024/11/11","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/11/11/EIR%20-%20Oncor%20-%20Forney%20345_138-kV%20Switch%20Rebuild%20Project_November_RPG.pdf","file_date":"2024/11/11","via":"cached","rpg":null,"mentions":["22RPG021","23RPG006","23RPG017","23RPG020","23RPG033","24RPG005"],"tier":1,"recommendation":"essment o Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Generation and Load Scaling Sensitivity Analyses o Planning Guide Section 3."},{"url":"https://www.ercot.com/files/docs/2024/11/11/EIR%20-%20Oncor%20-%20Wilmer%20345138-kV%20Switch%20Project%20-%20Status%20Update%20-%20RPG%20Nov2024.pdf","file_date":"2024/11/11","via":"cached","rpg":null,"mentions":["23RPG017","23RPG018","23RPG033","24RPG019"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/11/11/EIR_ONCOR_Venus_Switch_to_Sam_Switch_Project_NOV.pdf","file_date":"2024/11/11","via":"cached","rpg":null,"mentions":["23RPG006","23RPG018","23RPG020","23RPG033","24RPG001","24RPG018","24RPG019","24RPG021","24RPG022","24RPG025"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/12/12/24rpg032-_cnp_southwest_houston_345kv_reliability_project_ercot_rpg_presentation.pdf","file_date":"2024/12/12","via":"cached","rpg":["24RPG032"],"mentions":null,"tier":null,"recommendation":"rview for ERCOT RPG Meeting 5 Study Background The circuits recommended in 2023 RTP analysis were seen to have thermal overload concerns on multiple planning events as shown below."},{"url":"https://www.ercot.com/files/docs/2024/12/13/eir-cnp-southwest-houston-345-kv-reliability-project_scope_december_rpg.pdf","file_date":"2024/12/13","via":"cached","rpg":null,"mentions":["22RPG037","22RPG038","23RPG012","23RPG021","23RPG025","23RPG031","24RPG012","24RPG026","24RPG030"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2024/12/13/eir-oncor-forney-345_138-kv-switch-rebuild-project_december_rpg.pdf","file_date":"2024/12/13","via":"cached","rpg":null,"mentions":["22RPG021","23RPG006","23RPG017","23RPG020","23RPG033","24RPG005"],"tier":1,"recommendation":"at the time of this study PUBLIC 25 ERCOT Recommendation \ufffd ERCOT recommends Option 1A \ufffd Estimated Cost: approximately $100."},{"url":"https://www.ercot.com/files/docs/2024/12/13/eir-oncor-wilmer-345138-kv-switch-project-status-update-rpg-dec2024.pdf","file_date":"2024/12/13","via":"cached","rpg":null,"mentions":["23RPG017","23RPG018","23RPG033","24RPG019"],"tier":1,"recommendation":"at the time of this study PUBLIC 13 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $158."},{"url":"https://www.ercot.com/files/docs/2024/12/13/eir_oncor_venus_switch_to_sam_switch_project_dec.pdf","file_date":"2024/12/13","via":"cached","rpg":null,"mentions":["23RPG006","23RPG018","23RPG020","23RPG033","24RPG001","24RPG018","24RPG019","24RPG021","24RPG022","24RPG025"],"tier":1,"recommendation":"ne did not yield economic benefit and therefore will not be recommended for upgrade as part of this project."},{"url":"https://www.ercot.com/files/docs/2025/01/24/EIR_AEPSC_Aransas_Pass_to_Rincon_Project_Scope_RPG_January_2025.pdf","file_date":"2025/01/24","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/01/27/EIR%20-%20Oncor%20and%20WETT%20-%20Combined%20Dalaware%20Basin%20Stage%205%20Project%20%20and%20Alterntive%20-%20Status%20Update%20-%20RPG%20January%202025.pdf","file_date":"2025/01/27","via":"cached","rpg":["24RPG015","24RPG023"],"mentions":["22RPG045","23RPG013","23RPG023","23RPG027","23RPG034","24RPG002","24RPG010","24RPG027"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/01/27/EIR_ONCOR_Tredway_Project_JAN2025_2.pdf","file_date":"2025/01/27","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/02/21/EIR%20-%20CNP%20-%20Southwest%20Houston%20345-kV%20Reliability%20Project_February_RPG.pdf","file_date":"2025/02/21","via":"cached","rpg":null,"mentions":["22RPG037","22RPG038","23RPG012","23RPG021","23RPG025","23RPG031","24RPG012","24RPG026","24RPG030"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/02/21/EIR%20-%20Oncor%20-Roscoe%20Area%20Upgrades%20Project_SCOPE_February_RPG.pdf","file_date":"2025/02/21","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/02/21/EIR%20-%20TNMP%20-%20Galveston%20Region%20Project%20-%20Scope%20-%20RPG%20Feb%202025.pdf","file_date":"2025/02/21","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/02/21/EIR%20-CNP%20-%20Baytown_Area_Load_Addition_Project_February_RPG.pdf","file_date":"2025/02/21","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/02/21/TNMP%20Galveston%20Region%20Transmission%20Improvement%20Project%20-%20EIR.pdf","file_date":"2025/02/21","via":"cached","rpg":null,"mentions":null,"tier":null,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/03/14/EIR-BTU-Texas-A-M-University-System-RELLIS-Campus-Reliability-Project-Scope-RPG-Mar-2025.pdf","file_date":"2025/03/14","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/03/14/EIR-CNP-Southwest-Houston-345-kV-Reliability-Project_March_RPG.pdf","file_date":"2025/03/14","via":"cached","rpg":null,"mentions":["22RPG037","22RPG038","23RPG012","23RPG021","23RPG025","23RPG031","24RPG012","24RPG026","24RPG030"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/03/14/EIR_AEPSC_Aransas_Pass_to_Rincon_Project_Update_RPG_March_2025.pdf","file_date":"2025/03/14","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdat_Hartring_to_Upland_and_BenedumAuto_Project_RPG_Mar_2025.pdf","file_date":"2025/03/14","via":"cached","rpg":["22RPG010"],"mentions":["23RPG019"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_Mar_2025.pdf","file_date":"2025/03/14","via":"cached","rpg":["24RPG015","24RPG023"],"mentions":["22RPG045","23RPG013","23RPG023","23RPG027","23RPG034","24RPG002","24RPG010","24RPG027"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/03/17/EIR-CNP-Baytown_Area_Load_Addition_Project_March_RPG.pdf","file_date":"2025/03/17","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/03/18/EIR_ONCOR_Tredway_Project_Update_MARCH_v2.pdf","file_date":"2025/03/18","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"at the time of this study PUBLIC 23 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $119."},{"url":"https://www.ercot.com/files/docs/2025/04/28/EIR-BTU-Texas-A-M-University-System-RELLIS-Campus-Reliability-Project-Status-Update-RPG-Apr-2025.pdf","file_date":"2025/04/28","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"nalysis \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timeline \ufffd Final recommendation \ufffd Q3 2025 PUBLIC 17 Comments? Stakeholder comments also welcomed through: Ying."},{"url":"https://www.ercot.com/files/docs/2025/04/28/EIR-CNP-Baytown_Area_Load_Addition_Project_April_RPG.pdf","file_date":"2025/04/28","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/04/28/EIR-Oncor-Roscoe-Area-Upgrades-Project-StatusUpdate-April_2025_RPG.pdf","file_date":"2025/04/28","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/04/28/EIR_AEPSC_Aransas_Pass_to_Rincon_Project_Final_Update_RPG_April_2025.pdf","file_date":"2025/04/28","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"tion within the study area PUBLIC 19 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $34."},{"url":"https://www.ercot.com/files/docs/2025/04/28/EIR_BEC_Hamilton_County_Conversion_Project_SCOPE_APRIL.pdf","file_date":"2025/04/28","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/04/28/EIR_Scope_Oncor_Southern_DFW_Load_Interconnection_Project_-_RPG_April_2025.pdf","file_date":"2025/04/28","via":"cached","rpg":null,"mentions":["24RPG007","24RPG016","24RPG017","24RPG021","24RPG022","24RPG038"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_April_2025.pdf","file_date":"2025/04/28","via":"cached","rpg":["24RPG015","24RPG023"],"mentions":null,"tier":1,"recommendation":"at the time of this study Public 16 ERCOT Recommendation \ufffd ERCOT recommends Oncor's Proposed Option \ufffd Estimated Cost: approximately $855."},{"url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Hartring_to_Upland_and_BenedumAuto_Project_RPG_April_2025-.pdf","file_date":"2025/04/28","via":"cached","rpg":["22RPG010"],"mentions":null,"tier":2,"recommendation":"tion within the study area Public 21 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $97."},{"url":"https://www.ercot.com/files/docs/2025/05/19/EIR-Oncor-Roscoe-Area-Upgrades-Project-StatusUpdate-May_2025_RPG.pdf","file_date":"2025/05/19","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"tion within the study area PUBLIC 16 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $84."},{"url":"https://www.ercot.com/files/docs/2025/05/19/EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_SCOPE_May2025_RPG.pdf","file_date":"2025/05/19","via":"cached","rpg":null,"mentions":["24RPG001","24RPG013","24RPG014","24RPG018"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/05/20/EIR-CNP-Baytown_Area_Load_Addition_Project_May_RPG.pdf","file_date":"2025/05/20","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/06/16/EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_Jun2025_RPG.pdf","file_date":"2025/06/16","via":"cached","rpg":null,"mentions":["24RPG001","24RPG013","24RPG014","24RPG018"],"tier":1,"recommendation":"nalysis \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timeline \ufffd Final recommendation \ufffd Q3 2025 PUBLIC 11 Comments? Stakeholder comments also welcomed through: Abishek."},{"url":"https://www.ercot.com/files/docs/2025/06/16/EIR_BEC_Hamilton_County_Project_Status_Update_June_RPG_Meeting.pdf","file_date":"2025/06/16","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/07/25/EIR-AEP-Childress-Area-Transmission-Improvement-Project-Scope-RPG-July-2025.pdf","file_date":"2025/07/25","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/07/25/EIR-BTU-Texas-A-M-University-System-RELLIS-Campus-Reliability-Project-Status-Update-RPG-July-2025.pdf","file_date":"2025/07/25","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"at the time of this study PUBLIC 25 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $281."},{"url":"https://www.ercot.com/files/docs/2025/07/28/EIR-Oncor-Connell-to-Rockhound-RPG-Project_StatusUpdate_July_RPG_Final.pdf","file_date":"2025/07/28","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/07/28/EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_July2025_RPG.pdf","file_date":"2025/07/28","via":"cached","rpg":null,"mentions":["24RPG001","24RPG013","24RPG014","24RPG018"],"tier":1,"recommendation":"nalysis \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timeline \ufffd Final recommendation \ufffd Q3 2025 PUBLIC 12 Comments? Stakeholder comments also welcomed through: Abishek."},{"url":"https://www.ercot.com/files/docs/2025/07/28/EIR-STEC-Ammonia-Plant-Load-Project_SCOPE_July2025_RPG.pdf","file_date":"2025/07/28","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/07/28/EIR_BEC_Hamilton_County_Project_Status_Update_July_RPG_Meeting.pdf","file_date":"2025/07/28","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf","file_date":"2025/07/28","via":"cached","rpg":["25RPG013","25RPG017"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/07/28/EIR_STEC_Nueces_Green_Ammonia_Project_Scope_RPG_July_2025.pdf","file_date":"2025/07/28","via":"cached","rpg":null,"mentions":["24RPG035"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/07/28/EIR_Status_Update_Oncor_Southern_DFW_Load_Interconnection_Project_RPG_July_2025.pdf","file_date":"2025/07/28","via":"cached","rpg":null,"mentions":["24RPG016","24RPG017","24RPG022","24RPG025"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/07/29/EIR-CNP-Baytown_Area_Load_Addition_Project_July_RPG_Final.pdf","file_date":"2025/07/29","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/08/22/EIR-AEP-Childress-Area-Transmission-Improvement-Project-Status-Update-RPG-Aug-2025.pdf","file_date":"2025/08/22","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"nalysis \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timeline \ufffd Final recommendation \ufffd Q4 2025 PUBLIC 16 Comments? Stakeholder comments also welcomed through: Ying."},{"url":"https://www.ercot.com/files/docs/2025/08/25/EIR-CPS-Energy-Large-Load-Additions-Project_SCOPE_Aug2025_RPG.pdf","file_date":"2025/08/25","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/08/25/EIR-STEC-Ammonia-Plant-Load-Project_StatusUpdate_August2025_RPG.pdf","file_date":"2025/08/25","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"nalysis \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timeline \ufffd Final recommendation \ufffd Q4 2025 PUBLIC 9 Comments? Stakeholder comments also welcomed through: Abishek."},{"url":"https://www.ercot.com/files/docs/2025/08/25/EIR_BEC_Hamilton_County_Project_Status_Update_August_RPG_Meeting.pdf","file_date":"2025/08/25","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"tion within the study area PUBLIC 28 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $84."},{"url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf","file_date":"2025/08/25","via":"cached","rpg":["25RPG013","25RPG017"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/08/25/EIR_Oncor_Southern_DFW_Load_Interconnection_Project_StatusUpdate_RPG_Aug_2025.pdf","file_date":"2025/08/25","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf","file_date":"2025/09/23","via":"cached","rpg":["25RPG028"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/09/24/EIR-Joint_AEP_CPS_Oncor_CPS_Texas_765-kV_STEP_Eastern_Backbone-Scope-RPG-Sept-2025_Final.pdf","file_date":"2025/09/24","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/09/24/EIR-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Project_SCOPE_September2025_RPG.pdf","file_date":"2025/09/24","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/09/24/EIR-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project-Scope-RPG-Sept-2025.pdf","file_date":"2025/09/24","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/09/25/EIR-Oncor-Connell-to-Rockhound-RPG-Project_StatusUpdate_September_RPG_Final.pdf","file_date":"2025/09/25","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/10/24/EIR-AEP-Childress-Area-Transmission-Improvement-Project-Status-Update-RPG-Oct-2025.pdf","file_date":"2025/10/24","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":"be needed for this project PUBLIC 19 ERCOT Recommendation \ufffd ERCOT recommends Option 1A \ufffd Estimated Cost: approximately $77."},{"url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf","file_date":"2025/10/24","via":"cached","rpg":["25RPG028"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/10/24/EIR_Scope_Oncor_Skyview_345138kV_Switch_Project_-_RPG_Oct_2025_Final.pdf","file_date":"2025/10/24","via":"cached","rpg":null,"mentions":["24RPG007","24RPG016","24RPG017","24RPG021","24RPG022"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/10/27/EIR-Joint_AEP_CPS_Oncor_CEHE_Texas_765-kV_STEP_Eastern_Backbone-Status-Update-RPG-Oct_2025_Final.pdf","file_date":"2025/10/27","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/10/27/EIR-Oncor-Connell-to-Rockhound-RPG-Project_StatusUpdate_October_RPG_Final.pdf","file_date":"2025/10/27","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/10/27/EIR-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project-Status-Update-RPG-Oct-2025.pdf","file_date":"2025/10/27","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/10/27/EIR-STEC-Ammonia-Plant-Load-Project_StatusUpdate_October2025_RPG.pdf","file_date":"2025/10/27","via":"cached","rpg":null,"mentions":["25RPG021"],"tier":2,"recommendation":"nalysis \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timeline \ufffd Final recommendation \ufffd Q4 2025 PUBLIC 25 Comments? Stakeholder comments also welcomed through: Abishek."},{"url":"https://www.ercot.com/files/docs/2025/10/28/EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_October2025_RPG.pdf","file_date":"2025/10/28","via":"cached","rpg":null,"mentions":["24RPG001","24RPG013","24RPG014","24RPG018"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf","file_date":"2025/10/28","via":"cached","rpg":["25RPG013","25RPG017"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/10/28/EIR_STEC_Nueces_Green_Ammonia_Project_Status_Update_RPG_October_2025_FINAL.pdf","file_date":"2025/10/28","via":"cached","rpg":null,"mentions":["24RPG035"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/11/10/EIR-Joint_AEP_CPS_Oncor_CEHE_Texas_765-kV_STEP_Eastern_Backbone-Status-Update-RPG-Nov_2025_Final.pdf","file_date":"2025/11/10","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/11/10/EIR-Oncor-Connell-to-Rockhound-RPG-Project_StatusUpdate_November_RPG.pdf","file_date":"2025/11/10","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"at the time of this study PUBLIC 20 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $110."},{"url":"https://www.ercot.com/files/docs/2025/11/10/EIR-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project-Status-Update-RPG-Nov-2025.pdf","file_date":"2025/11/10","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"s at the time of this study PUBLIC 9 ERCOT Recommendation \ufffd ERCOT recommends the Drill Hole to Sand Lake to Solstice 765-kV Line Project \ufffd Estimated Cost: approximately $742."},{"url":"https://www.ercot.com/files/docs/2025/11/10/EIR-STEC-Ammonia-Plant-Load-Project_StatusUpdate_November2025_RPG.pdf","file_date":"2025/11/10","via":"cached","rpg":null,"mentions":["25RPG021"],"tier":2,"recommendation":"nalysis \ufffd Congestion analysis may be performed based on the recommended transmission upgrades to ensure that the identified transmission upgrades do not result in new congestion within the study area \ufffd Tentative timeline \ufffd Final recommendation \ufffd Q4 2025 PUBLIC 12 Comments? Stakeholder comments also welcomed through: Abishek."},{"url":"https://www.ercot.com/files/docs/2025/11/10/EIR-TNMP-Galveston-Region-Project-Status-Update-RPG-Nov-2025.pdf","file_date":"2025/11/10","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf","file_date":"2025/11/10","via":"cached","rpg":["25RPG028"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/11/10/EIR_STEC_Nueces_Green_Ammonia_Project_Status_Update_RPG_November_2025_FINAL_v1.pdf","file_date":"2025/11/10","via":"cached","rpg":null,"mentions":["24RPG035"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf","file_date":"2025/12/01","via":"cached","rpg":["25RPG025"],"mentions":null,"tier":1,"recommendation":"and received an independent assessment from ERCOT staff and endorsed by the Technical Advisory Committee (TAC) \ufffd The 2024 Regional Transmission Plan (RTP) performed a comprehensive evaluation for determining the 765-kV STEP Core Plan to satisfy the reliability need by 2030."},{"url":"https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf","file_date":"2025/12/01","via":"cached","rpg":["25RPG022"],"mentions":null,"tier":1,"recommendation":"ERCOT recommends the Oncor and AEPSC Drill Hole to Sand Lake to Solstice 765-kV Line Project, which is a subset of the 765-kV STEP Core Plan, a $742."},{"url":"https://www.ercot.com/files/docs/2025/12/01/14.3-24RPG020-Oncor-Connell-345138-kV-Switch-and-Connell-to-Rockhound-345-kV-Double-Circuit-Line-Project-Option-1.pdf","file_date":"2025/12/01","via":"cached","rpg":["24RPG020"],"mentions":null,"tier":1,"recommendation":"dvisory Committee (TAC) \ufffd ERCOT studied several options and recommends Option 1 as it addresses all project needs with no reliability violations and improves long-term load-serving capability PUBLIC Item 14."},{"url":"https://www.ercot.com/files/docs/2025/12/15/EIR-TNMP-Galveston-Region-Project-Status-Update-RPG-Dec-2025.pdf","file_date":"2025/12/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":"tion within the study area PUBLIC 28 ERCOT Recommendation \ufffd ERCOT recommends Option 6 \ufffd Estimated Cost: approximately $95."},{"url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf","file_date":"2025/12/15","via":"cached","rpg":["25RPG013","25RPG017"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/12/15/EIR_STEC_Nueces_Green_Ammonia_Project_Status_Update_RPG_December_2025_FINAL.pdf","file_date":"2025/12/15","via":"cached","rpg":null,"mentions":["24RPG035"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/12/16/EIR-STEC-Ammonia-Plant-Load-Project_StatusUpdate_December2025_RPG.pdf","file_date":"2025/12/16","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2025/12/16/EIR_Status_Update_Oncor_Skyview_345138kV_Switch_Project_-_RPG_Dec_2025.pdf","file_date":"2025/12/16","via":"cached","rpg":null,"mentions":["24RPG007","24RPG016","24RPG017","24RPG021","24RPG022"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/15/EIR-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Project_January2025_RPG.pdf","file_date":"2026/01/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/15/EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_January2026_RPG.pdf","file_date":"2026/01/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf","file_date":"2026/01/15","via":"cached","rpg":["25RPG028"],"mentions":null,"tier":1,"recommendation":"ne did not yield economic benefit and therefore will not be recommended for upgrade as part of this project Upgrade Tested Mileage Passed Production Passed Consumer Cost Oasis to Savana POI 345-kV Transmission Line (~mi) Cost Savings Test Benifit Test 15."},{"url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf","file_date":"2026/01/15","via":"cached","rpg":["25RPG013","25RPG017"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/15/EIR_LPL_West_Loop_Project_Scope_RPG_January_2026_FINAL.pdf","file_date":"2026/01/15","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/15/EIR_Oncor_Southern_DFW_Load_Interconnection_Project_StatusUpdate_RPG_Jan_2026_Final.pdf","file_date":"2026/01/15","via":"cached","rpg":null,"mentions":["24RPG016","24RPG017","24RPG022","24RPG025"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/15/EIR_STEC_Nueces_Green_Ammonia_Project_Status_Update_RPG_January_2026_FINAL.pdf","file_date":"2026/01/15","via":"cached","rpg":null,"mentions":["24RPG035"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/15/EIR_Status_Update_Oncor_Skyview_345138kV_Switch_Project_-_RPG_Jan_2026_Final.pdf","file_date":"2026/01/15","via":"cached","rpg":null,"mentions":["24RPG007","24RPG016","24RPG017","24RPG021","24RPG022"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/30/10_EIR-Oncor-Combined-Set-1-and-2-North-Central-South-Central-Texas-Reliability-Project-Scope-RPG-Feb-2026_Final.pdf","file_date":"2026/01/30","via":"cached","rpg":null,"mentions":["25RPG009"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/30/11_EIR_Oncor_Lone_Star_Navarro_and_Ellis_Area_Reliability_Project_Scope_RPG_February_2026.pdf","file_date":"2026/01/30","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/30/12_EIR_STEC_Brownsville_Project_Scope_RPG_February_2026_FINAL.pdf","file_date":"2026/01/30","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/30/3_EIR-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Project_February2026_RPG.pdf","file_date":"2026/01/30","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/30/4_EIR_STEC_Nueces_Green_Ammonia_Project_Status_Update_RPG_February_2026_FINAL.pdf","file_date":"2026/01/30","via":"cached","rpg":null,"mentions":["24RPG035"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf","file_date":"2026/01/30","via":"cached","rpg":["25RPG013","25RPG017"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/30/7_EIR-STEC-Medina-County-Large-Load-Project_SCOPE_Feb2026_RPG.pdf","file_date":"2026/01/30","via":"cached","rpg":["25RPG020"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/30/8_EIR-CPS-Energy-Large-Load-Additions-Project_Updated_SCOPF_Feb2026_RPG.pdf","file_date":"2026/01/30","via":"cached","rpg":["25RPG020","25RPG046"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/01/30/9_EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Project-Scope-RPG-Feb-2026.pdf","file_date":"2026/01/30","via":"cached","rpg":null,"mentions":["25RPG004"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/02/02/8-25RPG012-STEC-Ammonia-Plant-Load-Project-Option-1.pdf","file_date":"2026/02/02","via":"cached","rpg":["25RPG012"],"mentions":["25RPG021"],"tier":1,"recommendation":"Template Key Takeaway(s): ERCOT studied several options and recommends Option 1 as it addresses all project needs with no reliability violations, is the least cost option, improves long-term load-serving capability and requires the least amount of CCN miles."},{"url":"https://www.ercot.com/files/docs/2026/03/16/12.-EIR-STEC-Brownsville-Project-Scope-RPG-March-2026-FINAL.pdf","file_date":"2026/03/16","via":"cached","rpg":null,"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/03/16/13.-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Project_final.pdf","file_date":"2026/03/16","via":"cached","rpg":["26RPG001"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/03/16/4.-EIR-STEC-Nueces-GreenvAmmonia-Project-Status-Update-RPG-March-2026-FINAL.pdf","file_date":"2026/03/16","via":"cached","rpg":null,"mentions":["24RPG035"],"tier":2,"recommendation":"ingency are provided below PUBLIC 24 ERCOT Recommendation \ufffd ERCOT recommends Option 3 \ufffd Estimated Cost: approximately $161."},{"url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf","file_date":"2026/03/16","via":"cached","rpg":["25RPG013","25RPG017"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/03/16/8.-EIR-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Project_March2026_RPG.pdf","file_date":"2026/03/16","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/03/16/9.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_March2026_RPG.pdf","file_date":"2026/03/16","via":"cached","rpg":null,"mentions":["24RPG001","24RPG013","24RPG014","24RPG018","25RPG006"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/03/16/EIR-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Scope-RPG-March_2026.pdf","file_date":"2026/03/16","via":"cached","rpg":null,"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/03/16/EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Project-Scope-Update-RPG-Mar-2026.pdf","file_date":"2026/03/16","via":"cached","rpg":null,"mentions":["25RPG004"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/03/17/EIR-Oncor-Combined-Set-1-and-2-North-Central-South-Central-Texas-Reliability-Project-Scope-RPG-Mar-2026.pdf","file_date":"2026/03/17","via":"cached","rpg":null,"mentions":["25RPG009"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/03/17/EIR_Oncor_Southern_DFW_Load_Interconnection_Project_StatusUpdate_RPG_Mar_2026.pdf","file_date":"2026/03/17","via":"cached","rpg":null,"mentions":["24RPG016","24RPG017","24RPG022","24RPG025","25RPG038","25RPG040","25RPG042"],"tier":1,"recommendation":"(ERCOT's preferred option) PUBLIC 19 ERCOT Recommendation \ufffd ERCOT recommends Option 3 \ufffd Estimated Cost: approximately $2."},{"url":"https://www.ercot.com/files/docs/2026/03/17/EIR_Status_Update_Oncor_Skyview_345138kV_Switch_Project_-_RPG_Mar_2026.pdf","file_date":"2026/03/17","via":"cached","rpg":null,"mentions":["24RPG007","24RPG016","24RPG017","24RPG021","24RPG022"],"tier":2,"recommendation":"tion within the study area PUBLIC 19 ERCOT Recommendation \ufffd ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $56."},{"url":"https://www.ercot.com/files/docs/2026/04/09/12.-EIR-AEPSC-Laredo-Area-Upgrade-Project-Scope_RPG-Apr-2026-Final.pdf","file_date":"2026/04/09","via":"cached","rpg":["26RPG004"],"mentions":["23RPG007","25RPG045"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/09/13.-26RPG005-DME-Denton-Area-Transmission-Improvements-Final.pdf","file_date":"2026/04/09","via":"cached","rpg":["26RPG005"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf","file_date":"2026/04/09","via":"cached","rpg":["25RPG013","25RPG017"],"mentions":null,"tier":1,"recommendation":"21 PUBLIC ERCOT Recommendation ERCOT recommends Option 3A \ufffd Estimated Cost: approximately $477."},{"url":"https://www.ercot.com/files/docs/2026/04/09/4.-EIR-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Project_Recommendation_April2026.pdf","file_date":"2026/04/09","via":"cached","rpg":["25RPG026"],"mentions":null,"tier":1,"recommendation":"to have one Summer Peak Case 23 PUBLIC ERCOT Recommendation ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $233."},{"url":"https://www.ercot.com/files/docs/2026/04/09/7.-EIR-Status-Update-STEC-Southeast-Brownsville-Large-Load-Project-RPG_April_2026_Final.pdf","file_date":"2026/04/09","via":"cached","rpg":["25RPG039"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf","file_date":"2026/04/09","via":"cached","rpg":["25RPG040","25RPG042"],"mentions":["25RPG004"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf","file_date":"2026/04/09","via":"cached","rpg":["25RPG041","25RPG043"],"mentions":["25RPG009"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/10/14.-EIR-DME-Denton-Area-Transmission-Improvement-Scope.pdf","file_date":"2026/04/10","via":"cached","rpg":["26RPG005"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf","file_date":"2026/04/10","via":"cached","rpg":["25RPG009"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/10/6_EIR-CPS-Energy-Large-Load-Additions-Project-and-STEC-Medina-County-Large-Load-Project_StatusUpdate_April2026_RPG.pdf","file_date":"2026/04/10","via":"cached","rpg":["25RPG020","25RPG046"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/10/EIR-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Status-Update-RPG-April_2026.pdf","file_date":"2026/04/10","via":"cached","rpg":["26RPG001"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/10/EIR_BEC_Cooke_County_Resiliency_Project_Scope_RPG_April_2026_FINAL_v1.pdf","file_date":"2026/04/10","via":"cached","rpg":["26RPG007"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf","file_date":"2026/04/13","via":"cached","rpg":["25RPG004"],"mentions":["24RPG016","24RPG017","24RPG025","25RPG038","25RPG040","25RPG042"],"tier":1,"recommendation":"\ufffd ERCOT studied several options and recommends Option 3 as it addresses all project needs, meets ERCOT and NERC Reliability Standard, improves long-term load-serving capability for future load growth in the area, and improves operational flexibility."},{"url":"https://www.ercot.com/files/docs/2026/04/13/5.2-25RPG016-STEC-Nueces-Green-Ammonia-Load-Interconnection-Project.pdf","file_date":"2026/04/13","via":"cached","rpg":["25RPG016"],"mentions":["24RPG035"],"tier":1,"recommendation":"\ufffd ERCOT studied several options and recommends Option 3 as it addresses all project needs with no reliability violations, is the least cost option, improves long-term load-serving capability and requires the least amount of CCN miles."},{"url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf","file_date":"2026/04/15","via":"cached","rpg":["25RPG004"],"mentions":null,"tier":1,"recommendation":"ee (TAC) for review and comment, and on March 25, 2026, TAC endorsed the project, unopposed with two abstentions, as recommended by ERCOT."},{"url":"https://www.ercot.com/files/docs/2026/04/15/5.2-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG016-STEC-Revised-04.15.26.pdf","file_date":"2026/04/15","via":"cached","rpg":["25RPG016"],"mentions":null,"tier":1,"recommendation":"review and comment, and on March 25, 2026, TAC unanimously endorsed the project as recommended by ERCOT."},{"url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf","file_date":"2026/05/07","via":"cached","rpg":["25RPG040","25RPG042"],"mentions":["25RPG004"],"tier":1,"recommendation":"new CCN 26 PUBLIC Group 2 and Group 3 ERCOT Recommendation ERCOT recommends Oncor's proposed upgrades from Group 2 and Group 3 \ufffd Estimated Cost: approximately $2."},{"url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf","file_date":"2026/05/07","via":"cached","rpg":["25RPG041","25RPG043"],"mentions":["25RPG009"],"tier":1,"recommendation":"e time of this study 13 PUBLIC Group 2 ERCOT Recommendation ERCOT recommends Oncor's proposed upgrades from Group 2 \ufffd Estimated Cost: approximately $381."},{"url":"https://www.ercot.com/files/docs/2026/05/07/7.-EIR_Recommendation_-Euclid-765-kV-Substation-and-Transmission-Line-Addition-RPG-May-2026.pdf","file_date":"2026/05/07","via":"cached","rpg":["26RPG001"],"mentions":null,"tier":1,"recommendation":"e results of the analysis indicate that the addition of the recommended Euclid \ufffd Hillje area 765-kV and 345-kV upgrades does not impact the West Texas Export stability limit of 16."},{"url":"https://www.ercot.com/files/docs/2026/05/07/8.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_May_2026_FINAL.pdf","file_date":"2026/05/07","via":"cached","rpg":["26RPG007"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/05/08/3.-EIR_STEC_Southeast_Brownsville_Large_Load_Project_Recommendation_RPG_May_2026_FINAL.pdf","file_date":"2026/05/08","via":"cached","rpg":["25RPG039"],"mentions":null,"tier":2,"recommendation":"estion within the study area 17 PUBLIC ERCOT Recommendation ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $96."},{"url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf","file_date":"2026/05/08","via":"cached","rpg":["25RPG009"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/05/08/9.-EIR_Status_Update_-AEPSC-Laredo-Area-Upgrade-Project_StatusUpdate_RPG_May_2026_Final.pdf","file_date":"2026/05/08","via":"cached","rpg":["26RPG004"],"mentions":["23RPG007","25RPG045"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf","file_date":"2026/05/22","via":"cached","rpg":["25RPG013","25RPG017"],"mentions":null,"tier":1,"recommendation":"\ufffd ERCOT studied several options and recommends Option 3A as it addresses all project needs in the study area, meets ERCOT and NERC reliability criteria, improves long-term load-serving capability, and is feasible for construction."},{"url":"https://www.ercot.com/files/docs/2026/05/22/5.2-25RPG026-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Regional-Planning-Group-RPG-Project.pdf","file_date":"2026/05/22","via":"cached","rpg":["25RPG026"],"mentions":null,"tier":1,"recommendation":"\ufffd ERCOT studied several options and recommends Option 1 as it addresses all project needs in the study area, meets ERCOT and NERC reliability criteria, is the least cost option and is feasible for construction."},{"url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf","file_date":"2026/05/22","via":"cached","rpg":["25RPG009"],"mentions":["24RPG001","24RPG013","24RPG014","24RPG018","25RPG006","25RPG041"],"tier":1,"recommendation":"\ufffd ERCOT studied several options and recommends Option 7A as it addresses all project needs in the study area, meets ERCOT and NERC reliability criteria, improves long-term load-serving capability, supports future load growth in the area and is feasible for construction."},{"url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf","file_date":"2026/05/22","via":"cached","rpg":["25RPG040","25RPG042"],"mentions":["25RPG004","25RPG022","25RPG025"],"tier":1,"recommendation":") and the Set 2 North and Central Texas Reliability Project endorsed Oncor Southern DFW Load (25RPG042) for Reginal Planning Group (RPG) review in November 2025."},{"url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf","file_date":"2026/05/22","via":"cached","rpg":["25RPG041","25RPG043"],"mentions":["25RPG009","25RPG022","25RPG025"],"tier":1,"recommendation":"or Board Vote ERCOT Recommendation ERCOT staff requests and recommends that the Board endorse the need 5 for the Oncor Combined Set 1 North Central & South Central Texas Reliability Project & Set 2 North Central & South Central Texas Reliability Project (Group 2 upgrades) based on NERC and ERCOT reliability planning criteria."},{"url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf","file_date":"2026/05/22","via":"cached","rpg":["26RPG001"],"mentions":null,"tier":1,"recommendation":"or Board Vote ERCOT Recommendation ERCOT staff requests and recommends that the Board endorse the need for the LCRA TSC and CEHE Euclid 765-kV Substation and Transmission Line Addition RPG Project based on NERC and ERCOT reliability planning criteria."},{"url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf","file_date":"2026/06/02","via":"cached","rpg":["25RPG009"],"mentions":["25RPG041"],"tier":1,"recommendation":"\ufffd ERCOT studied several options and recommends Option 7A as it addresses all project needs in the study area, meets ERCOT and NERC reliability criteria, improves long-term load-serving capability, supports future load growth in the area and is feasible for construction."},{"url":"https://www.ercot.com/files/docs/2026/06/19/11.-EIR_Scope_TNMP-Climax-to-Bells-Area-Transmission-System-Improvements-Project_June-2026_RPG.pdf","file_date":"2026/06/19","via":"cached","rpg":["26RPG017"],"mentions":["25RPG030"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/06/19/13.-EIR_PEC_Liberty-Hill_GeorgeTown_Expansion_Project_Scope_RPG_June_2026_Final.pdf","file_date":"2026/06/19","via":"cached","rpg":["26RPG018"],"mentions":["25RPG009","26RPG002"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/06/19/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_June_2026_FINAL.pdf","file_date":"2026/06/19","via":"cached","rpg":["26RPG007"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/06/19/4.-EIR_Status_Update_-AEPSC-Laredo-Area-Upgrade-Project_StatusUpdate_RPG_June_2026_Final.pdf","file_date":"2026/06/19","via":"cached","rpg":["26RPG004"],"mentions":["23RPG007","25RPG045"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf","file_date":"2026/06/19","via":"cached","rpg":["25RPG009"],"mentions":["24RPG009","26RPG001"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/06/19/7.-EIR_LPL_West_Loop_Project_Status_Update_RPG_June_2026_FINAL.pdf","file_date":"2026/06/19","via":"cached","rpg":["25RPG037"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/06/19/9.-EIR_Scope_Oncor_Rockhound_to_Longshore_345_kV_Double_Circuit_Line_June2026_RPG_FinalUpdate.pdf","file_date":"2026/06/19","via":"cached","rpg":["26RPG015"],"mentions":["25RPG007","25RPG035"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/16/10.-EIR_PEC_Liberty-Hill_GeorgeTown_Expansion_Project_Status_Update_July_2026_RPG_Final.pdf","file_date":"2026/07/16","via":"cached","rpg":["26RPG018"],"mentions":["25RPG009","26RPG002"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/17/13.-EIR_Scope_Combined-AEPSC-Panhandle-Project-and-CTT-Panhandle-Reliability-Transmission-Plan-Project_RPG-July-2026.pdf","file_date":"2026/07/17","via":"cached","rpg":["26RPG008","26RPG016"],"mentions":["25RPG036"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/17/15.-EIR_SCOPE_AEPSC-Rio_Grand_Valley_System_Improvement_Project_July_2026_RPG_Final.pdf","file_date":"2026/07/17","via":"cached","rpg":["26RPG009"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/17/16.-26RPG022-AEN-Dunlap-to-Decker-138-kV-Line-Project-Overview.pdf","file_date":"2026/07/17","via":"cached","rpg":["26RPG022"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/17/17.-EIR_Scope_26RPG022-AEN-Dunlap-to-Decker-138-kV-Line-Project_Final.pdf","file_date":"2026/07/17","via":"cached","rpg":["26RPG022"],"mentions":["24RPG014","25RPG006"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/17/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_July_2026_FINAL_v2.pdf","file_date":"2026/07/17","via":"cached","rpg":["26RPG007"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/17/4.-EIR_Status_Update_-AEPSC-Laredo-Area-Upgrade-Project_StatusUpdate_RPG_July_2026_Final.pdf","file_date":"2026/07/17","via":"cached","rpg":["26RPG004"],"mentions":["23RPG007","25RPG045"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf","file_date":"2026/07/17","via":"cached","rpg":["25RPG009"],"mentions":["24RPG009","26RPG001"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/17/7.-EIR_LPL_West_Loop_Project_Status_Update_RPG_July_2026_FINAL.pdf","file_date":"2026/07/17","via":"cached","rpg":["25RPG037"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/17/9.-EIR_Status_Update_TNMP-Climax-to-Bells-Area-Transmission-System-Improvements-Project_RPG-July-2026.pdf","file_date":"2026/07/17","via":"cached","rpg":["26RPG017"],"mentions":["25RPG030"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/07/20/14.-AEPSC-RGV-System-Improvements-26RPG009-OVERVIEW.pdf","file_date":"2026/07/20","via":"cached","rpg":["26RPG009"],"mentions":null,"tier":1,"recommendation":"AEPSC recommends two options to mitigate the potential thermal overload of Hillje 765/345 kV autos under the maintenance of one of the Hillje autos and loss of a second auto under contingency: 1."},{"url":"https://www.ercot.com/files/docs/2026/07/21/8.-EIR_DME_Denton-Area_Transmission_Improvement_Status_Update.pdf","file_date":"2026/07/21","via":"cached","rpg":["26RPG005"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/08/14/3.-EIR_BEC_Cooke_County_Resiliency_Project_Recommendation_RPG_August_2026_FINAL.pdf","file_date":"2026/08/14","via":"cached","rpg":["26RPG007"],"mentions":null,"tier":2,"recommendation":"estion within the study area 21 PUBLIC ERCOT Recommendation ERCOT recommends Option 1A \ufffd Estimated Cost: approximately $169."},{"url":"https://www.ercot.com/files/docs/2026/08/14/4.-EIR_LPL_West_Loop_Project_Status_Update_RPG_August_2026_FINAL.pdf","file_date":"2026/08/14","via":"cached","rpg":["25RPG037"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/08/14/8.-EIR_BEC_San-Miguel-to-Marion-345-kV-Line-Rebuild-Project_Scope_RPG_August_2026_Final.pdf","file_date":"2026/08/14","via":"cached","rpg":["26RPG026"],"mentions":["25RPG013","25RPG017"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/08/17/5.-EIR_DME_Denton-Area_Transmission_Improvement_Status_Update_Aug18_Final.pdf","file_date":"2026/08/17","via":"cached","rpg":["26RPG005"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/08/17/7.-EIR_Status-update_26RPG022-AEN-Dunlap-to-Decker-138-kV-Line-Project_RGP_August.pdf","file_date":"2026/08/17","via":"cached","rpg":["26RPG022"],"mentions":["24RPG014","25RPG006"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/08/17/EIR_BEC_San-Miguel-to-Marion-345-kV-Line-Rebuild-Project_Scope_RPG_August_2026_Final.pdf","file_date":"2026/08/17","via":"cached","rpg":["26RPG026"],"mentions":["25RPG013","25RPG017"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/08/17/EIR_PEC_Liberty-Hill_GeorgeTown_Expansion_Project_Status_Update_Aug_2026_RPG_Final.pdf","file_date":"2026/08/17","via":"cached","rpg":["26RPG018"],"mentions":["25RPG009","26RPG002"],"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/09/18/3.-EIR_LPL_West_Loop_Project_Status_Update_RPG_September_2026_FINAL.pdf","file_date":"2026/09/18","via":"cached","rpg":["25RPG037"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/09/18/5.-EIR_Status_Update_TNMP-Climax-to-Bells-Area-Transmission-System-Improvements-Project_RPG-Sep-2026.pdf","file_date":"2026/09/18","via":"cached","rpg":["26RPG017"],"mentions":["25RPG030"],"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/09/18/6.-EIR_PEC_Liberty-Hill_GeorgeTown_Expansion_Project_Status_Update_Sep_2026_RPG_FINAL.pdf","file_date":"2026/09/18","via":"cached","rpg":["26RPG018"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/09/21/EIR-Status-Update-26RPG004-AEPSC-Laredo-Area-Upgrade-Project_uploaded.pdf","file_date":"2026/09/21","via":"cached","rpg":["26RPG004"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/09/22/EIR_DME_Denton-Area_Transmission_Improvement_Status_Update_Sep_22.pdf","file_date":"2026/09/22","via":"cached","rpg":["26RPG005"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/10/16/3.-EIR_Recommendation_TNMP-Climax-to-Bells-Area-Transmission-System-Improvements-Project_RPG-Oct-2026.pdf","file_date":"2026/10/16","via":"cached","rpg":["26RPG017"],"mentions":["25RPG030"],"tier":1,"recommendation":"to have one Summer Peak Case 26 PUBLIC ERCOT Recommendation ERCOT recommends Option 1 \ufffd Estimated Cost: approximately $249."},{"url":"https://www.ercot.com/files/docs/2026/10/16/4.-EIR_PEC_Liberty-Hill_GeorgeTown_Expansion_Project_Recommendation_RPG_October_2026_Final.pdf","file_date":"2026/10/16","via":"cached","rpg":["26RPG018"],"mentions":null,"tier":2,"recommendation":"estion within the study area 28 PUBLIC ERCOT Recommendation ERCOT recommends Option 4A \ufffd Estimated Cost: approximately $188."},{"url":"https://www.ercot.com/files/docs/2026/10/16/8.-EIR-Status-Update-26RPG004-AEPSC-Laredo-Area-Upgrade-Project_OctRPG_uploaded.pdf","file_date":"2026/10/16","via":"cached","rpg":["26RPG004"],"mentions":null,"tier":2,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/10/19/5.-EIR-LPL-West-Loop-Project-Recommendation-RPG_October_2026_FINAL.pdf","file_date":"2026/10/19","via":"cached","rpg":["25RPG037"],"mentions":null,"tier":1,"recommendation":null},{"url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf","file_date":"2026/10/19","via":"cached","rpg":["25RPG009"],"mentions":["24RPG009","26RPG001"],"tier":1,"recommendation":null}],"by_tpit":{"ercot-tpit:105316":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:73436B":[{"date":"2025/12/01","rpg":"24RPG020","url":"https://www.ercot.com/files/docs/2025/12/01/14.3-24RPG020-Oncor-Connell-345138-kV-Switch-and-Connell-to-Rockhound-345-kV-Double-Circuit-Line-Project-Option-1.pdf"}],"ercot-tpit:92852A":[{"date":"2026/04/09","rpg":"25RPG026","url":"https://www.ercot.com/files/docs/2026/04/09/4.-EIR-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Project_Recommendation_April2026.pdf"},{"date":"2026/05/22","rpg":"25RPG026","url":"https://www.ercot.com/files/docs/2026/05/22/5.2-25RPG026-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Regional-Planning-Group-RPG-Project.pdf"}],"ercot-tpit:99622":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:76654":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:104824":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105332":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105320":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105334":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105324":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105314":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:110447":[{"date":"2026/02/02","rpg":"25RPG012","url":"https://www.ercot.com/files/docs/2026/02/02/8-25RPG012-STEC-Ammonia-Plant-Load-Project-Option-1.pdf"}],"ercot-tpit:105312":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:110026":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110263":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:92734":[{"date":"2024/09/24","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stage%205%20Project%20-%20Scope%20-%20RPG%20September%202024.pdf"},{"date":"2025/01/27","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/01/27/EIR%20-%20Oncor%20and%20WETT%20-%20Combined%20Dalaware%20Basin%20Stage%205%20Project%20%20and%20Alterntive%20-%20Status%20Update%20-%20RPG%20January%202025.pdf"},{"date":"2025/04/28","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_April_2025.pdf"},{"date":"2025/03/14","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_Mar_2025.pdf"}],"ercot-tpit:110240":[{"date":"2026/04/09","rpg":"25RPG039","url":"https://www.ercot.com/files/docs/2026/04/09/7.-EIR-Status-Update-STEC-Southeast-Brownsville-Large-Load-Project-RPG_April_2026_Final.pdf"},{"date":"2026/05/08","rpg":"25RPG039","url":"https://www.ercot.com/files/docs/2026/05/08/3.-EIR_STEC_Southeast_Brownsville_Large_Load_Project_Recommendation_RPG_May_2026_FINAL.pdf"}],"ercot-tpit:111376":[{"date":"2026/04/09","rpg":"25RPG039","url":"https://www.ercot.com/files/docs/2026/04/09/7.-EIR-Status-Update-STEC-Southeast-Brownsville-Large-Load-Project-RPG_April_2026_Final.pdf"},{"date":"2026/05/08","rpg":"25RPG039","url":"https://www.ercot.com/files/docs/2026/05/08/3.-EIR_STEC_Southeast_Brownsville_Large_Load_Project_Recommendation_RPG_May_2026_FINAL.pdf"}],"ercot-tpit:111361":[{"date":"2026/04/09","rpg":"25RPG039","url":"https://www.ercot.com/files/docs/2026/04/09/7.-EIR-Status-Update-STEC-Southeast-Brownsville-Large-Load-Project-RPG_April_2026_Final.pdf"},{"date":"2026/05/08","rpg":"25RPG039","url":"https://www.ercot.com/files/docs/2026/05/08/3.-EIR_STEC_Southeast_Brownsville_Large_Load_Project_Recommendation_RPG_May_2026_FINAL.pdf"}],"ercot-tpit:111370":[{"date":"2026/04/09","rpg":"25RPG039","url":"https://www.ercot.com/files/docs/2026/04/09/7.-EIR-Status-Update-STEC-Southeast-Brownsville-Large-Load-Project-RPG_April_2026_Final.pdf"},{"date":"2026/05/08","rpg":"25RPG039","url":"https://www.ercot.com/files/docs/2026/05/08/3.-EIR_STEC_Southeast_Brownsville_Large_Load_Project_Recommendation_RPG_May_2026_FINAL.pdf"}],"ercot-tpit:109808":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:109845":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:110377":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:110268":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:99620":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:99626":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:92852B":[{"date":"2026/04/09","rpg":"25RPG026","url":"https://www.ercot.com/files/docs/2026/04/09/4.-EIR-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Project_Recommendation_April2026.pdf"},{"date":"2026/05/22","rpg":"25RPG026","url":"https://www.ercot.com/files/docs/2026/05/22/5.2-25RPG026-Oncor-Paris-Switch-to-Monticello-Switch-345-kV-Line-Rebuild-Regional-Planning-Group-RPG-Project.pdf"}],"ercot-tpit:105322":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105318":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105326":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105328":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:99066":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:99239A":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:99239C":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:103344G":[{"date":"2026/01/15","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf"},{"date":"2025/09/23","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf"},{"date":"2025/11/10","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf"},{"date":"2025/10/24","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf"}],"ercot-tpit:103344E":[{"date":"2026/01/15","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf"},{"date":"2025/09/23","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf"},{"date":"2025/11/10","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf"},{"date":"2025/10/24","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf"}],"ercot-tpit:103344C":[{"date":"2026/01/15","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf"},{"date":"2025/09/23","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf"},{"date":"2025/11/10","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf"},{"date":"2025/10/24","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf"}],"ercot-tpit:103344A":[{"date":"2026/01/15","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf"},{"date":"2025/09/23","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf"},{"date":"2025/11/10","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf"},{"date":"2025/10/24","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf"}],"ercot-tpit:103472":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:103344I":[{"date":"2026/01/15","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf"},{"date":"2025/09/23","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf"},{"date":"2025/11/10","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf"},{"date":"2025/10/24","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf"}],"ercot-tpit:103344B":[{"date":"2026/01/15","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf"},{"date":"2025/09/23","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf"},{"date":"2025/11/10","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf"},{"date":"2025/10/24","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf"}],"ercot-tpit:103344D":[{"date":"2026/01/15","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf"},{"date":"2025/09/23","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf"},{"date":"2025/11/10","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf"},{"date":"2025/10/24","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf"}],"ercot-tpit:103344F":[{"date":"2026/01/15","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf"},{"date":"2025/09/23","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf"},{"date":"2025/11/10","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf"},{"date":"2025/10/24","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf"}],"ercot-tpit:100281":[{"date":"2024/10/15","rpg":"24RPG024","url":"https://www.ercot.com/files/docs/2024/10/15/24RPG024%20Oncor%20and%20LCRATSC%20RPG%20Overview%20for%20ERCOT%2010162024.pdf"}],"ercot-tpit:103344H":[{"date":"2026/01/15","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Jan_2026_Final.pdf"},{"date":"2025/09/23","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/09/23/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_Scope_RPG_Sep_2025_Final.pdf"},{"date":"2025/11/10","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/11/10/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Nov_2025.pdf"},{"date":"2025/10/24","rpg":"25RPG028","url":"https://www.ercot.com/files/docs/2025/10/24/EIR_CNP_PHRobinson_to_WAParish_345kV_Hardening_Project_StatusUpdate_RPG_Oct_2025_Final.pdf"}],"ercot-tpit:110449":[{"date":"2026/02/02","rpg":"25RPG012","url":"https://www.ercot.com/files/docs/2026/02/02/8-25RPG012-STEC-Ammonia-Plant-Load-Project-Option-1.pdf"}],"ercot-tpit:99207":[{"date":"2026/01/30","rpg":"25RPG020","url":"https://www.ercot.com/files/docs/2026/01/30/7_EIR-STEC-Medina-County-Large-Load-Project_SCOPE_Feb2026_RPG.pdf"},{"date":"2026/01/30","rpg":"25RPG020","url":"https://www.ercot.com/files/docs/2026/01/30/8_EIR-CPS-Energy-Large-Load-Additions-Project_Updated_SCOPF_Feb2026_RPG.pdf"},{"date":"2026/04/10","rpg":"25RPG020","url":"https://www.ercot.com/files/docs/2026/04/10/6_EIR-CPS-Energy-Large-Load-Additions-Project-and-STEC-Medina-County-Large-Load-Project_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110943B":[{"date":"2026/08/14","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/08/14/3.-EIR_BEC_Cooke_County_Resiliency_Project_Recommendation_RPG_August_2026_FINAL.pdf"},{"date":"2026/07/17","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/07/17/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_July_2026_FINAL_v2.pdf"},{"date":"2026/05/07","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/05/07/8.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_May_2026_FINAL.pdf"},{"date":"2026/04/10","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/04/10/EIR_BEC_Cooke_County_Resiliency_Project_Scope_RPG_April_2026_FINAL_v1.pdf"},{"date":"2026/06/19","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/06/19/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_June_2026_FINAL.pdf"}],"ercot-tpit:99417":[{"date":"2024/09/24","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stage%205%20Project%20-%20Scope%20-%20RPG%20September%202024.pdf"},{"date":"2025/01/27","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/01/27/EIR%20-%20Oncor%20and%20WETT%20-%20Combined%20Dalaware%20Basin%20Stage%205%20Project%20%20and%20Alterntive%20-%20Status%20Update%20-%20RPG%20January%202025.pdf"},{"date":"2025/04/28","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_April_2025.pdf"},{"date":"2025/03/14","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_Mar_2025.pdf"}],"ercot-tpit:99419":[{"date":"2024/09/24","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stage%205%20Project%20-%20Scope%20-%20RPG%20September%202024.pdf"},{"date":"2025/01/27","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/01/27/EIR%20-%20Oncor%20and%20WETT%20-%20Combined%20Dalaware%20Basin%20Stage%205%20Project%20%20and%20Alterntive%20-%20Status%20Update%20-%20RPG%20January%202025.pdf"},{"date":"2025/04/28","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_April_2025.pdf"},{"date":"2025/03/14","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_Mar_2025.pdf"}],"ercot-tpit:105749":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105833":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105836":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:99318":[{"date":"2024/09/24","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stage%205%20Project%20-%20Scope%20-%20RPG%20September%202024.pdf"},{"date":"2025/01/27","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/01/27/EIR%20-%20Oncor%20and%20WETT%20-%20Combined%20Dalaware%20Basin%20Stage%205%20Project%20%20and%20Alterntive%20-%20Status%20Update%20-%20RPG%20January%202025.pdf"},{"date":"2025/04/28","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_April_2025.pdf"},{"date":"2025/03/14","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_Mar_2025.pdf"}],"ercot-tpit:109790":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110010":[{"date":"2026/04/09","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/22","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"},{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"}],"ercot-tpit:110018A":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110018B":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:100136":[{"date":"2024/09/24","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stage%205%20Project%20-%20Scope%20-%20RPG%20September%202024.pdf"},{"date":"2025/01/27","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/01/27/EIR%20-%20Oncor%20and%20WETT%20-%20Combined%20Dalaware%20Basin%20Stage%205%20Project%20%20and%20Alterntive%20-%20Status%20Update%20-%20RPG%20January%202025.pdf"},{"date":"2025/04/28","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_April_2025.pdf"},{"date":"2025/03/14","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_Mar_2025.pdf"}],"ercot-tpit:110397":[{"date":"2026/04/13","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/13/5.2-25RPG016-STEC-Nueces-Green-Ammonia-Load-Interconnection-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/15/5.2-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG016-STEC-Revised-04.15.26.pdf"}],"ercot-tpit:110587":[{"date":"2026/06/19","rpg":"26RPG015","url":"https://www.ercot.com/files/docs/2026/06/19/9.-EIR_Scope_Oncor_Rockhound_to_Longshore_345_kV_Double_Circuit_Line_June2026_RPG_FinalUpdate.pdf"}],"ercot-tpit:109952":[{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"}],"ercot-tpit:110389":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:110523":[{"date":"2026/01/30","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/01/30/8_EIR-CPS-Energy-Large-Load-Additions-Project_Updated_SCOPF_Feb2026_RPG.pdf"},{"date":"2026/04/10","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/04/10/6_EIR-CPS-Energy-Large-Load-Additions-Project-and-STEC-Medina-County-Large-Load-Project_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110461":[{"date":"2026/01/30","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/01/30/8_EIR-CPS-Energy-Large-Load-Additions-Project_Updated_SCOPF_Feb2026_RPG.pdf"},{"date":"2026/04/10","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/04/10/6_EIR-CPS-Energy-Large-Load-Additions-Project-and-STEC-Medina-County-Large-Load-Project_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110362":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:110342":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:109812":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:112560":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105626":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:110004":[{"date":"2026/04/09","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/22","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"},{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"}],"ercot-tpit:99239B":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:105838":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:110022":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110012":[{"date":"2026/04/09","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/22","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"},{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"}],"ercot-tpit:110126":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:109792":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110943A":[{"date":"2026/08/14","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/08/14/3.-EIR_BEC_Cooke_County_Resiliency_Project_Recommendation_RPG_August_2026_FINAL.pdf"},{"date":"2026/07/17","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/07/17/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_July_2026_FINAL_v2.pdf"},{"date":"2026/05/07","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/05/07/8.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_May_2026_FINAL.pdf"},{"date":"2026/04/10","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/04/10/EIR_BEC_Cooke_County_Resiliency_Project_Scope_RPG_April_2026_FINAL_v1.pdf"},{"date":"2026/06/19","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/06/19/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_June_2026_FINAL.pdf"}],"ercot-tpit:109818":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:110296":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:110008":[{"date":"2026/04/09","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/22","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG041","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"},{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"}],"ercot-tpit:110020":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110154":[{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"}],"ercot-tpit:110274":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:103782":[{"date":"2025/12/01","rpg":"25RPG022","url":"https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"}],"ercot-tpit:109822":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:110379":[{"date":"2026/04/13","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/13/5.2-25RPG016-STEC-Nueces-Green-Ammonia-Load-Interconnection-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/15/5.2-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG016-STEC-Revised-04.15.26.pdf"}],"ercot-tpit:110391":[{"date":"2026/04/13","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/13/5.2-25RPG016-STEC-Nueces-Green-Ammonia-Load-Interconnection-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/15/5.2-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG016-STEC-Revised-04.15.26.pdf"}],"ercot-tpit:110515":[{"date":"2026/01/30","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/01/30/8_EIR-CPS-Energy-Large-Load-Additions-Project_Updated_SCOPF_Feb2026_RPG.pdf"},{"date":"2026/04/10","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/04/10/6_EIR-CPS-Energy-Large-Load-Additions-Project-and-STEC-Medina-County-Large-Load-Project_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110525":[{"date":"2026/01/30","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/01/30/8_EIR-CPS-Energy-Large-Load-Additions-Project_Updated_SCOPF_Feb2026_RPG.pdf"},{"date":"2026/04/10","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/04/10/6_EIR-CPS-Energy-Large-Load-Additions-Project-and-STEC-Medina-County-Large-Load-Project_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110529":[{"date":"2026/01/30","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/01/30/8_EIR-CPS-Energy-Large-Load-Additions-Project_Updated_SCOPF_Feb2026_RPG.pdf"},{"date":"2026/04/10","rpg":"25RPG046","url":"https://www.ercot.com/files/docs/2026/04/10/6_EIR-CPS-Energy-Large-Load-Additions-Project-and-STEC-Medina-County-Large-Load-Project_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:105886":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:105888":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:112326":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:112324":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:110387":[{"date":"2026/04/13","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/13/5.2-25RPG016-STEC-Nueces-Green-Ammonia-Load-Interconnection-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/15/5.2-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG016-STEC-Revised-04.15.26.pdf"}],"ercot-tpit:102955":[{"date":"2025/12/01","rpg":"25RPG022","url":"https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"}],"ercot-tpit:110519":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:110943C":[{"date":"2026/08/14","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/08/14/3.-EIR_BEC_Cooke_County_Resiliency_Project_Recommendation_RPG_August_2026_FINAL.pdf"},{"date":"2026/07/17","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/07/17/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_July_2026_FINAL_v2.pdf"},{"date":"2026/05/07","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/05/07/8.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_May_2026_FINAL.pdf"},{"date":"2026/04/10","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/04/10/EIR_BEC_Cooke_County_Resiliency_Project_Scope_RPG_April_2026_FINAL_v1.pdf"},{"date":"2026/06/19","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/06/19/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_June_2026_FINAL.pdf"}],"ercot-tpit:110485":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:110254":[{"date":"2026/08/14","rpg":"26RPG026","url":"https://www.ercot.com/files/docs/2026/08/14/8.-EIR_BEC_San-Miguel-to-Marion-345-kV-Line-Rebuild-Project_Scope_RPG_August_2026_Final.pdf"},{"date":"2026/08/17","rpg":"26RPG026","url":"https://www.ercot.com/files/docs/2026/08/17/EIR_BEC_San-Miguel-to-Marion-345-kV-Line-Rebuild-Project_Scope_RPG_August_2026_Final.pdf"}],"ercot-tpit:112229":[{"date":"2026/04/13","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/13/5.2-25RPG016-STEC-Nueces-Green-Ammonia-Load-Interconnection-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/15/5.2-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG016-STEC-Revised-04.15.26.pdf"}],"ercot-tpit:110443":[{"date":"2026/04/13","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/13/5.2-25RPG016-STEC-Nueces-Green-Ammonia-Load-Interconnection-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG016","url":"https://www.ercot.com/files/docs/2026/04/15/5.2-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG016-STEC-Revised-04.15.26.pdf"}],"ercot-tpit:110170":[{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"}],"ercot-tpit:110160":[{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"}],"ercot-tpit:109870":[{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"}],"ercot-tpit:109864":[{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"}],"ercot-tpit:109868":[{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"}],"ercot-tpit:105648":[{"date":"2026/05/07","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/05/07/7.-EIR_Recommendation_-Euclid-765-kV-Substation-and-Transmission-Line-Addition-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf"},{"date":"2026/03/16","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/03/16/13.-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Project_final.pdf"},{"date":"2026/04/10","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/04/10/EIR-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Status-Update-RPG-April_2026.pdf"}],"ercot-tpit:104732":[{"date":"2026/05/07","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/05/07/7.-EIR_Recommendation_-Euclid-765-kV-Substation-and-Transmission-Line-Addition-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf"},{"date":"2026/03/16","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/03/16/13.-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Project_final.pdf"},{"date":"2026/04/10","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/04/10/EIR-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Status-Update-RPG-April_2026.pdf"}],"ercot-tpit:104118":[{"date":"2026/05/07","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/05/07/7.-EIR_Recommendation_-Euclid-765-kV-Substation-and-Transmission-Line-Addition-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/05/22/5.6-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Planning-Group-RPG-Project.pdf"},{"date":"2026/03/16","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/03/16/13.-26RPG001-LCRA-TSC-and-CEHE-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Project_final.pdf"},{"date":"2026/04/10","rpg":"26RPG001","url":"https://www.ercot.com/files/docs/2026/04/10/EIR-Euclid-765-kV-Substation-and-Transmission-Line-Addition-Status-Update-RPG-April_2026.pdf"}],"ercot-tpit:110943E":[{"date":"2026/08/14","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/08/14/3.-EIR_BEC_Cooke_County_Resiliency_Project_Recommendation_RPG_August_2026_FINAL.pdf"},{"date":"2026/07/17","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/07/17/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_July_2026_FINAL_v2.pdf"},{"date":"2026/05/07","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/05/07/8.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_May_2026_FINAL.pdf"},{"date":"2026/04/10","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/04/10/EIR_BEC_Cooke_County_Resiliency_Project_Scope_RPG_April_2026_FINAL_v1.pdf"},{"date":"2026/06/19","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/06/19/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_June_2026_FINAL.pdf"}],"ercot-tpit:110943D":[{"date":"2026/08/14","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/08/14/3.-EIR_BEC_Cooke_County_Resiliency_Project_Recommendation_RPG_August_2026_FINAL.pdf"},{"date":"2026/07/17","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/07/17/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_July_2026_FINAL_v2.pdf"},{"date":"2026/05/07","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/05/07/8.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_May_2026_FINAL.pdf"},{"date":"2026/04/10","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/04/10/EIR_BEC_Cooke_County_Resiliency_Project_Scope_RPG_April_2026_FINAL_v1.pdf"},{"date":"2026/06/19","rpg":"26RPG007","url":"https://www.ercot.com/files/docs/2026/06/19/3.-EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_June_2026_FINAL.pdf"}],"ercot-tpit:109805":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:110395":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:109741":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"}],"ercot-tpit:109843":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:110838":[{"date":"2026/07/20","rpg":"26RPG009","url":"https://www.ercot.com/files/docs/2026/07/20/14.-AEPSC-RGV-System-Improvements-26RPG009-OVERVIEW.pdf"},{"date":"2026/07/17","rpg":"26RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/15.-EIR_SCOPE_AEPSC-Rio_Grand_Valley_System_Improvement_Project_July_2026_RPG_Final.pdf"}],"ercot-tpit:110053":[{"date":"2026/04/09","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/04/09/9.-EIR-Status-Update-Oncor-Combined-Set-1-Set-2-North-Central-South-Central-TX-Reliability-Project_RPG-Apr_2026_Final.pdf"},{"date":"2026/05/22","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/22/5.5-25RPG041_25RPG043-Combined-Oncor-Set-1-North-Central-and-South-Central.pdf"},{"date":"2026/05/07","rpg":"25RPG043","url":"https://www.ercot.com/files/docs/2026/05/07/6.-EIR_Recommendation_Oncor_Combined-Set_1_Set_2_North_Central_South_Central_TX_Reliability_Project_Group2_RPG-May_2026.pdf"}],"ercot-tpit:110122":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:110120":[{"date":"2026/05/08","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/08/4.-EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-Lake-Project_May2026_RPG_Option7A_ERCOT_Recommendation_Final.pdf"},{"date":"2026/06/02","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/02/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project-REVISED.pdf"},{"date":"2026/06/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/06/19/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Scope_June2026_RPG.pdf"},{"date":"2026/07/17","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/07/17/5.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_July2026_RPG.pdf"},{"date":"2026/10/19","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/10/19/7.-EIR_StatusUpdate_Oncor-and-LCRA-TSC-Muscovy-VossLake_Phase2_Oct2026_RPG.pdf"},{"date":"2026/05/22","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/05/22/5.3-25RPG009-Oncor-and-LCRA-TSC-Muscovy-and-Voss-Lake-345_138-kV-Regional-Planning-Group-RPG-Project.pdf"},{"date":"2026/04/10","rpg":"25RPG009","url":"https://www.ercot.com/files/docs/2026/04/10/5_EIR-Oncor-and-LCRA-TSC-Muscovy-Voss-_StatusUpdate_April2026_RPG.pdf"}],"ercot-tpit:103797A":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103797C":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103797B":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103797D":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103797E":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103797F":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103797G":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103797I":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103809":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:102901":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:102885":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:109994":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:110478":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:109992":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:109986":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:109984":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:109982":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:109974":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:109956":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:109940":[{"date":"2026/05/22","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2026/05/22","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/05/22/5.1-25RPG013-_-25RPG017-CPS-Combined-Reactive-Power-Planning-Project-_-Helotes.pdf"},{"date":"2025/07/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/07/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/07/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Scope_RPG_July_2025.pdf"},{"date":"2026/03/16","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/03/16/5.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Status-Update-RPG-March-2026-FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/10/28","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/10/28/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_October_2025_FINAL.pdf"},{"date":"2025/12/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/12/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_December_2025_FINAL.pdf"},{"date":"2025/08/25","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2025/08/25/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_August_2025.pdf"},{"date":"2026/04/09","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/04/09/3.-EIR-CPS-Energy-Helotes-Reactive-Power-Planning-Project-Recommendation-RPG_April_2026_FINAL.pdf"},{"date":"2026/01/30","rpg":"25RPG017","url":"https://www.ercot.com/files/docs/2026/01/30/5_EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_February_2026_FINAL.pdf"},{"date":"2026/01/15","rpg":"25RPG013","url":"https://www.ercot.com/files/docs/2026/01/15/EIR_CPS_Energy_Helotes_Reactive_Power_Planning_Project_Status_Update_RPG_January_2026_FINAL.pdf"}],"ercot-tpit:110306":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:110290":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:110278":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:105759":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105829A":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:105744":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105747":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105753":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105755":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105757":[{"date":"2026/04/13","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/13/5.1-25RPG004-Oncor-Southern-DFW-Load-Interconnection-and-General-Grid-Strengthening-Project.pdf"},{"date":"2026/04/15","rpg":"25RPG004","url":"https://www.ercot.com/files/docs/2026/04/15/5.1-Issue-for-the-ERCOT-Board-of-Directors-April_2026_25RPG004-Oncor-REVISED.pdf"}],"ercot-tpit:105829B":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103797H":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:103797J":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:112322":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:110248":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:112226":[{"date":"2025/12/01","rpg":"25RPG025","url":"https://www.ercot.com/files/docs/2025/12/01/14.1-25RPG025-AEP-Texas-CPS-Energy-Oncor-and-CNP-Texas-765-kV-STEP-Eastern-Backbone-Project.pdf"}],"ercot-tpit:110284":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:109824":[{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"}],"ercot-tpit:110381":[{"date":"2026/04/09","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"},{"date":"2026/05/22","rpg":"25RPG042","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"}],"ercot-tpit:110647":[{"date":"2026/05/22","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/22/5.4-25RPG040-and-25RPG042-Combined-Oncor-Set.pdf"},{"date":"2026/04/09","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/04/09/8.-EIR-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-Status-Update-RPG-Apr-2026_Final.pdf"},{"date":"2026/05/07","rpg":"25RPG040","url":"https://www.ercot.com/files/docs/2026/05/07/5.-EIR_Recommendation-Oncor-Combined-Set-1-and-Set-2-North-and-Central-Texas-Reliability-Projects-RPG-May-2026.pdf"}],"ercot-tpit:72579A":[{"date":"2023/01/23","rpg":"22RPG033","url":"https://www.ercot.com/files/docs/2023/01/23/EIR%20-%20PEC%20Wimberley%20Loop%20Transmission%20-%20Status%20Update%20-%20RPG%20Jan%202023.pdf"}],"ercot-tpit:102815":[{"date":"2025/03/14","rpg":"22RPG010","url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdat_Hartring_to_Upland_and_BenedumAuto_Project_RPG_Mar_2025.pdf"},{"date":"2024/10/15","rpg":"22RPG010","url":"https://www.ercot.com/files/docs/2024/10/15/EIR_ONCOR_LCRA_Hartring_to_Upland_138kV_Line_and_Benedum_Autotransformer_Addition_Project_Scope_RPG_October_2024.pdf"},{"date":"2025/04/28","rpg":"22RPG010","url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Hartring_to_Upland_and_BenedumAuto_Project_RPG_April_2025-.pdf"}],"ercot-tpit:69709":[{"date":"2025/03/14","rpg":"22RPG010","url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdat_Hartring_to_Upland_and_BenedumAuto_Project_RPG_Mar_2025.pdf"},{"date":"2024/10/15","rpg":"22RPG010","url":"https://www.ercot.com/files/docs/2024/10/15/EIR_ONCOR_LCRA_Hartring_to_Upland_138kV_Line_and_Benedum_Autotransformer_Addition_Project_Scope_RPG_October_2024.pdf"},{"date":"2025/04/28","rpg":"22RPG010","url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Hartring_to_Upland_and_BenedumAuto_Project_RPG_April_2025-.pdf"}],"ercot-tpit:72579B":[{"date":"2023/01/23","rpg":"22RPG033","url":"https://www.ercot.com/files/docs/2023/01/23/EIR%20-%20PEC%20Wimberley%20Loop%20Transmission%20-%20Status%20Update%20-%20RPG%20Jan%202023.pdf"}],"ercot-tpit:99287":[{"date":"2024/09/24","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stage%205%20Project%20-%20Scope%20-%20RPG%20September%202024.pdf"},{"date":"2025/01/27","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/01/27/EIR%20-%20Oncor%20and%20WETT%20-%20Combined%20Dalaware%20Basin%20Stage%205%20Project%20%20and%20Alterntive%20-%20Status%20Update%20-%20RPG%20January%202025.pdf"},{"date":"2025/04/28","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_April_2025.pdf"},{"date":"2025/03/14","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_Mar_2025.pdf"}],"ercot-tpit:73436A":[{"date":"2025/12/01","rpg":"24RPG020","url":"https://www.ercot.com/files/docs/2025/12/01/14.3-24RPG020-Oncor-Connell-345138-kV-Switch-and-Connell-to-Rockhound-345-kV-Double-Circuit-Line-Project-Option-1.pdf"}],"ercot-tpit:99413":[{"date":"2024/09/24","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2024/09/24/EIR%20-%20Oncor%20-%20Dalaware%20Basin%20Stage%205%20Project%20-%20Scope%20-%20RPG%20September%202024.pdf"},{"date":"2025/01/27","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/01/27/EIR%20-%20Oncor%20and%20WETT%20-%20Combined%20Dalaware%20Basin%20Stage%205%20Project%20%20and%20Alterntive%20-%20Status%20Update%20-%20RPG%20January%202025.pdf"},{"date":"2025/04/28","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/04/28/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_April_2025.pdf"},{"date":"2025/03/14","rpg":"24RPG015","url":"https://www.ercot.com/files/docs/2025/03/14/EIR_StatusUpdate_Combined_Dalaware_Basin_Stage_5_Project_and_Alterntive_RPG_Mar_2025.pdf"}],"ercot-tpit:110445":[{"date":"2026/02/02","rpg":"25RPG012","url":"https://www.ercot.com/files/docs/2026/02/02/8-25RPG012-STEC-Ammonia-Plant-Load-Project-Option-1.pdf"}],"ercot-tpit:87905":[{"date":"2024/10/15","rpg":"24RPG024","url":"https://www.ercot.com/files/docs/2024/10/15/24RPG024%20Oncor%20and%20LCRATSC%20RPG%20Overview%20for%20ERCOT%2010162024.pdf"}]}}