Demand Response · Source-checked

Texas smart thermostat and residential demand response programs, 2025-2026: results, enrollment, incentives and efficiency charges

On the 34 days in 2025 when REPs deployed at least 1,000 homes, participating homes cut load by about 2.5% on average, about a tenth of the 20% goal in 16 TAC §25.186 (PUCT Staff, Project No. 56966). REP program enrollment grew from 55,125 to 145,323 homes during 2025, and 7,206 to 7,932 homes per quarter were also in an emergency program, which the rule prohibits. In CenterPoint Houston's area the $100 thermostat incentive is paid to the REP; Austin Energy and CPS Energy, municipal utilities outside the retail choice market, credit customers.

Download a table (CSV) Read the article

2.5%

Average load reduction by homes in REP thermostat programs on the 34 days in 2025 when REPs called at least 1,000 homes, about a tenth of the 20% goal (PUCT Staff)

Takeaway

  • On the 34 days in 2025 when REPs deployed at least 1,000 homes, participating homes cut load by about 2.5% on average, about a tenth of the 20% goal in 16 TAC §25.186 (PUCT Staff, Project No. 56966). REP program enrollment grew from 55,125 to 145,323 homes during 2025, and 7,206 to 7,932 homes per quarter were also in an emergency program, which the rule prohibits. In CenterPoint Houston's area the $100 thermostat incentive is paid to the REP; Austin Energy and CPS Energy, municipal utilities outside the retail choice market, credit customers.

Counterevidence. Oncor 2024: $405.5M modeled avoided costs vs $79.8M program costs (PUCT Docket 58182 order, findings 44-48).

Article: Texas REP thermostat programs averaged about a tenth of the state's residential load-reduction goal in 2025, PUCT Staff found

Data

11 CSV tables. Each row carries a status and a source URL. Status: Source-checked.

FileRowsNotes
texas-smart-thermostat-programs-2025-2026-centerpoint-rep-smart-thermostat-program-budget-2025-2027.csv32025 total = incentives + admin from EEPR Table 10 (Power Hopper sum). 2025 reported savings 24,332,916 kWh (EEPR Table 8, PDF p. 43). This is a deemed value: it equals 18,462 thermostats × 1,318 kWh (TRM Zone 3), not metered savings. CenterPoint narrative: "keep incentive spending at $1.8 million"; program "delivered over 24,000 MWh".
texas-smart-thermostat-programs-2025-2026-deployment-days-2025.csv4Counts as stated by PUCT Staff. The <100 share is "nearly 85%" in the report; no exact count is published.
texas-smart-thermostat-programs-2025-2026-eecrf-recovery-components-by-utility.csv3Energy Efficiency Cost Recovery Factor (all customer classes). "Other" = EM&V, prior-year over/under-recovery, interest and rate-case expenses (Power Hopper subtraction). Whole energy-efficiency portfolios, not thermostat programs alone.
texas-smart-thermostat-programs-2025-2026-ercot-average-real-time-energy-price-by-zone-2021-2025.csv5Average annual real-time energy market prices by zone. Wholesale prices, not retail rates.
texas-smart-thermostat-programs-2025-2026-nprr1296-proposed-seasonal-caps.csv4NPRR1296 as filed Aug 26, 2025 (sections 3.26.3, 3.26.4, 6.9.1). Rate ($/MWh) = lesser of $140,000/MW-year or the 3-year rolling Peaker Net Margin, divided by N, the 18 assessed hours per year (6+3+3+6); rate is scaled down if a season exceeds its cap. Payments go to QSEs representing REPs/NOIEs. Implied MW = cap MWh / hours assessed.
texas-smart-thermostat-programs-2025-2026-oncor-energy-efficiency-net-benefits-2024.csv4Whole Oncor energy-efficiency portfolio, 2024. Avoided costs are modeled values set by PUCT rules, not cash.
texas-smart-thermostat-programs-2025-2026-program-enrollment-and-prohibited-overlap-2025.csv4Unique residential ESI IDs enrolled at any point in the quarter. Overlap is prohibited under 16 TAC §25.186(c)(2)(D). Totals are sums of Table 3 cells and equal the Figure 2 counts.
texas-smart-thermostat-programs-2025-2026-rep-responsive-device-deployment-performance-2025.csv5PUCT Staff report Table 1. kW per deployed ESI ID = avg reduction MW x 1,000 / avg ESI IDs deployed (ratio of averages, Power Hopper calculation).
texas-smart-thermostat-programs-2025-2026-tdu-load-management-capacity-2024-2025.csv2PUCT Staff cite Project 38578 Item 168 for the MW. ERCOT may call TDU load management only at or near an EEA 2; no EEAs occurred Jan 1 - Nov 30, 2025.
texas-smart-thermostat-programs-2025-2026-trm-connected-thermostat-deemed-savings.csv5ENERGY STAR connected thermostat on unspecified existing HVAC (assumes 41.7% gas, 30.0% electric resistance, 28.3% heat pump heating). Deemed for utility program accounting; actual household savings vary. Values from Texas Technical Reference Manual 13.0, Vol. 2, Table 64 (p. 100); same values as v12.0, Table 65. Zone 5 (El Paso) is outside the ERCOT grid.
texas-smart-thermostat-programs-2025-2026-upfront-thermostat-payments-by-program-2026.csv3Program terms as published Nov. 11, 2026. Austin Energy and CPS Energy are municipal utilities outside the retail choice market; their customers cannot choose a REP, and Power Hopper does not serve or enroll them.

Charts

Chart · Demand Response · OBSERVED DATA

In CenterPoint's area, the $100 thermostat incentive goes to the retail provider, not the homeowner

Source: CenterPoint Houston, REP Smart Thermostat Program Manual 2026; Program pages: Austin Energy Power Partner Thermostat and CPS Energy WiFi Thermostat Rewards (accessed Nov. 11, 2026). Analysis: Power Hopper Team.

OBSERVED DATA · Chart: In CenterPoint's area, the $100 thermostat incentive goes to the retail provider, not the homeowner · Methodology for In CenterPoint's area, the $100 thermostat incentive goes to the retail provider, not the homeowner · CC BY 4.0

Cite this chart

Power Hopper Team. "In CenterPoint's area, the $100 thermostat incentive goes to the retail provider, not the homeowner." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-texas-smart-thermostat-incentive-who-gets-paid-centerpoint-austin-cps-2026. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA + POWER HOPPER CALCULATION

Deployed homes cut about 0.2 to 0.4 kW each on average during REP thermostat events in 2025, by Power Hopper's calculation

Source: PUCT Staff, Report on Residential Load Reduction Goal, Project No. 56966, Item 25 (June 30, 2026); The Brattle Group, prepared for NRG and Google, filed in NPRR1296 (Item 14b, Jan. 16, 2026), modeling assumption. Analysis: Power Hopper Team.

OBSERVED DATA + POWER HOPPER CALCULATION · Chart: Deployed homes cut about 0.2 to 0.4 kW each on average during REP thermostat events in 2025, by Power Hopper's calculation · Methodology for Deployed homes cut about 0.2 to 0.4 kW each on average during REP thermostat events in 2025, by Power Hopper's calculation · CC BY 4.0

Cite this chart

Power Hopper Team. "Deployed homes cut about 0.2 to 0.4 kW each on average during REP thermostat events in 2025, by Power Hopper's calculation." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-texas-rep-thermostat-demand-response-kw-per-home-by-season-2025. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA

REP thermostat programs reached about a tenth of the state's residential demand-response goal in 2025

Source: PUCT Staff, Report on Residential Load Reduction Goal, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

OBSERVED DATA · Chart: REP thermostat programs reached about a tenth of the state's residential demand-response goal in 2025 · Methodology for REP thermostat programs reached about a tenth of the state's residential demand-response goal in 2025 · CC BY 4.0

Cite this chart

Power Hopper Team. "REP thermostat programs reached about a tenth of the state's residential demand-response goal in 2025." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-texas-residential-load-reduction-ratio-vs-goal-by-season-2025. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA

REPs called at least 1,000 homes on just 34 of 334 peak days in 2025

Source: PUCT Staff, Report on Residential Load Reduction Goal, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

OBSERVED DATA · Chart: REPs called at least 1,000 homes on just 34 of 334 peak days in 2025 · Methodology for REPs called at least 1,000 homes on just 34 of 334 peak days in 2025 · CC BY 4.0

Cite this chart

Power Hopper Team. "REPs called at least 1,000 homes on just 34 of 334 peak days in 2025." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-texas-rep-smart-thermostat-deployment-days-2025. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA

Enrollment in REP thermostat programs grew from 55,125 to 145,323 homes during 2025

Source: PUCT Staff, Report on Residential Load Reduction Goal, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

OBSERVED DATA · Chart: Enrollment in REP thermostat programs grew from 55,125 to 145,323 homes during 2025 · Methodology for Enrollment in REP thermostat programs grew from 55,125 to 145,323 homes during 2025 · CC BY 4.0

Cite this chart

Power Hopper Team. "Enrollment in REP thermostat programs grew from 55,125 to 145,323 homes during 2025." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-texas-residential-demand-response-enrollment-by-program-2025. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA + POWER HOPPER CALCULATION

About 7,200 to 7,900 homes per quarter were enrolled in programs that cannot be combined

Source: PUCT Staff, Report on Residential Load Reduction Goal, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

OBSERVED DATA + POWER HOPPER CALCULATION · Chart: About 7,200 to 7,900 homes per quarter were enrolled in programs that cannot be combined · Methodology for About 7,200 to 7,900 homes per quarter were enrolled in programs that cannot be combined · CC BY 4.0

Cite this chart

Power Hopper Team. "About 7,200 to 7,900 homes per quarter were enrolled in programs that cannot be combined." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-texas-smart-thermostat-prohibited-dual-enrollment-by-quarter-2025. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA

Performance bonuses made up 31% to 42% of approved 2026 efficiency charges at CenterPoint and Oncor

Source: CenterPoint Energy Houston Electric, 2026 Energy Efficiency Plan and Report, PUCT Project No. 59166, Item 35; PUCT Docket No. 58182, Order (Dec. 12, 2025); PUCT Docket No. 59791, Unopposed Stipulation (Sept. 9, 2026; no final order as of Nov. 11, 2026). Analysis: Power Hopper Team.

OBSERVED DATA · Chart: Performance bonuses made up 31% to 42% of approved 2026 efficiency charges at CenterPoint and Oncor · Methodology for Performance bonuses made up 31% to 42% of approved 2026 efficiency charges at CenterPoint and Oncor · CC BY 4.0

Cite this chart

Power Hopper Team. "Performance bonuses made up 31% to 42% of approved 2026 efficiency charges at CenterPoint and Oncor." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-texas-utility-energy-efficiency-charge-eecrf-components-2026. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA

Average wholesale prices in 2024-2025 were about a fifth of 2021 levels; PUCT Staff said lower prices "may diminish demand response incentives"

Source: Independent Market Monitor, 2025 State of the ERCOT Market Report, as reproduced in PUCT Project No. 56966, Item 25, Table 2. Analysis: Power Hopper Team.

OBSERVED DATA · Chart: Average wholesale prices in 2024-2025 were about a fifth of 2021 levels; PUCT Staff said lower prices "may diminish demand response incentives" · Methodology for Average wholesale prices in 2024-2025 were about a fifth of 2021 levels; PUCT Staff said lower prices "may diminish demand response incentives" · CC BY 4.0

Cite this chart

Power Hopper Team. "Average wholesale prices in 2024-2025 were about a fifth of 2021 levels; PUCT Staff said lower prices "may diminish demand response incentives"." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-ercot-average-real-time-wholesale-price-by-zone-2021-2025. Accessed [date accessed].

Chart · Demand Response · PROPOSED RULE (PENDING)

ERCOT's pending residential demand-response proposal sets seasonal caps equal to about 500 MW, by Power Hopper's calculation

Source: ERCOT NPRR1296, Residential Demand Response Program (as filed Aug. 26, 2025; pending). Analysis: Power Hopper Team.

PROPOSED RULE (PENDING) · Chart: ERCOT's pending residential demand-response proposal sets seasonal caps equal to about 500 MW, by Power Hopper's calculation · Methodology for ERCOT's pending residential demand-response proposal sets seasonal caps equal to about 500 MW, by Power Hopper's calculation · CC BY 4.0

Cite this chart

Power Hopper Team. "ERCOT's pending residential demand-response proposal sets seasonal caps equal to about 500 MW, by Power Hopper's calculation." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-ercot-nprr1296-residential-demand-response-proposed-seasonal-caps. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA

Texas's efficiency manual assigns a connected thermostat about 1,270 to 1,430 kWh of deemed savings a year

Source: Texas Technical Reference Manual 13.0, Vol. 2, Table 64 (p. 100); same values as v12.0, Table 65. Analysis: Power Hopper Team.

OBSERVED DATA · Chart: Texas's efficiency manual assigns a connected thermostat about 1,270 to 1,430 kWh of deemed savings a year · Methodology for Texas's efficiency manual assigns a connected thermostat about 1,270 to 1,430 kWh of deemed savings a year · CC BY 4.0

Cite this chart

Power Hopper Team. "Texas's efficiency manual assigns a connected thermostat about 1,270 to 1,430 kWh of deemed savings a year." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-texas-trm-connected-smart-thermostat-deemed-kwh-savings-by-climate-zone. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA

Oncor's 2024 efficiency programs: $405.5 million in modeled avoided costs vs. $79.8 million in costs

Source: PUCT Docket No. 58182, Order (Dec. 12, 2025). Analysis: Power Hopper Team.

OBSERVED DATA · Chart: Oncor's 2024 efficiency programs: $405.5 million in modeled avoided costs vs. $79.8 million in costs · Methodology for Oncor's 2024 efficiency programs: $405.5 million in modeled avoided costs vs. $79.8 million in costs · CC BY 4.0

Cite this chart

Power Hopper Team. "Oncor's 2024 efficiency programs: $405.5 million in modeled avoided costs vs. $79.8 million in costs." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-oncor-energy-efficiency-avoided-costs-vs-program-costs-2024. Accessed [date accessed].

Chart · Demand Response · OBSERVED DATA + POWER HOPPER CALCULATION

CenterPoint budgets $2 million a year in REP thermostat incentives for 2026 and 2027

Source: CenterPoint Energy Houston Electric, 2026 Energy Efficiency Plan and Report, PUCT Project No. 59166, Item 35; CenterPoint response to RFI, PUCT Docket No. 59826, Item 27. Analysis: Power Hopper Team.

OBSERVED DATA + POWER HOPPER CALCULATION · Chart: CenterPoint budgets $2 million a year in REP thermostat incentives for 2026 and 2027 · Methodology for CenterPoint budgets $2 million a year in REP thermostat incentives for 2026 and 2027 · CC BY 4.0

Cite this chart

Power Hopper Team. "CenterPoint budgets $2 million a year in REP thermostat incentives for 2026 and 2027." Chart. Texas smart thermostat and residential demand response programs, 2025-2026 dataset. Power Hopper Media Data Room, published November 11, 2026. https://powerhopper.energy/media/data/texas-smart-thermostat-programs-data#chart-centerpoint-rep-smart-thermostat-program-incentives-budget-2025-2027. Accessed [date accessed].

Share cards

Stat card: 2.5%. average load reduction by homes in REP thermostat programs on 2025 deployment days. About 10% of the 20% reduction (0.25 ratio) set as the goal in 16 TAC §25.186. 34 deployment days, Jan. 1 - Nov. 30, 2025.

Key-number card · 1200 × 675 px

2.5%: average load reduction by homes in REP thermostat programs on 2025 deployment days

Source: PUCT Staff report, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

Download PNG of 2.5%: average load reduction by homes in REP thermostat programs on 2025 deployment days WebP of 2.5%: average load reduction by homes in REP thermostat programs on 2025 deployment days JPG of 2.5%: average load reduction by homes in REP thermostat programs on 2025 deployment days

Stat card: 2.5%. average load reduction by homes in REP thermostat programs on 2025 deployment days. About 10% of the 20% reduction (0.25 ratio) set as the goal in 16 TAC §25.186. 34 deployment days, Jan. 1 - Nov. 30, 2025.

Social square · 1080 × 1080 px

2.5%: average load reduction by homes in REP thermostat programs on 2025 deployment days

Source: PUCT Staff report, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

Download PNG of 2.5%: average load reduction by homes in REP thermostat programs on 2025 deployment days WebP of 2.5%: average load reduction by homes in REP thermostat programs on 2025 deployment days JPG of 2.5%: average load reduction by homes in REP thermostat programs on 2025 deployment days

Stat card: 410 MW. of utility load management offered in 2025 has never been deployed by ERCOT. Combined residential and commercial TDU load management programs (380.4 MW in 2024). ERCOT may call them only at or near an Energy Emergency Alert level 2.

Key-number card · 1200 × 675 px

410 MW: of utility load management offered in 2025 has never been deployed by ERCOT

Source: PUCT Staff report, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

Download PNG of 410 MW: of utility load management offered in 2025 has never been deployed by ERCOT WebP of 410 MW: of utility load management offered in 2025 has never been deployed by ERCOT JPG of 410 MW: of utility load management offered in 2025 has never been deployed by ERCOT

Stat card: 410 MW. of utility load management offered in 2025 has never been deployed by ERCOT. Combined residential and commercial TDU load management programs (380.4 MW in 2024). ERCOT may call them only at or near an Energy Emergency Alert level 2.

Social square · 1080 × 1080 px

410 MW: of utility load management offered in 2025 has never been deployed by ERCOT

Source: PUCT Staff report, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

Download PNG of 410 MW: of utility load management offered in 2025 has never been deployed by ERCOT WebP of 410 MW: of utility load management offered in 2025 has never been deployed by ERCOT JPG of 410 MW: of utility load management offered in 2025 has never been deployed by ERCOT

Stat card: $100. per thermostat, paid by CenterPoint Houston to the retail provider, not the customer. 2026 program: up to 2 per ESI ID, $2 million budget. In 2025, $1,846,200 covered 18,462 thermostats.

Key-number card · 1200 × 675 px

$100: per thermostat, paid by CenterPoint Houston to the retail provider, not the customer

Source: CenterPoint Houston REP Smart Thermostat Program Manual 2026; PUCT Project No. 59166, Item 35; Docket No. 59826, Item 27.

Download PNG of $100: per thermostat, paid by CenterPoint Houston to the retail provider, not the customer WebP of $100: per thermostat, paid by CenterPoint Houston to the retail provider, not the customer JPG of $100: per thermostat, paid by CenterPoint Houston to the retail provider, not the customer

Stat card: $100. per thermostat, paid by CenterPoint Houston to the retail provider, not the customer. 2026 program: up to 2 per ESI ID, $2 million budget. In 2025, $1,846,200 covered 18,462 thermostats.

Social square · 1080 × 1080 px

$100: per thermostat, paid by CenterPoint Houston to the retail provider, not the customer

Source: CenterPoint Houston REP Smart Thermostat Program Manual 2026; PUCT Project No. 59166, Item 35; Docket No. 59826, Item 27.

Download PNG of $100: per thermostat, paid by CenterPoint Houston to the retail provider, not the customer WebP of $100: per thermostat, paid by CenterPoint Houston to the retail provider, not the customer JPG of $100: per thermostat, paid by CenterPoint Houston to the retail provider, not the customer

Stat card: 7,932. homes in Q1 2025 were in a REP thermostat program and an emergency program at once. Dual enrollment is prohibited under 16 TAC §25.186. Counts ranged from 7,206 to 7,932 per quarter in 2025; customers may not know, for example when a prior owner enrolled.

Key-number card · 1200 × 675 px

7,932: homes in Q1 2025 were in a REP thermostat program and an emergency program at once

Source: PUCT Staff report, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

Download PNG of 7,932: homes in Q1 2025 were in a REP thermostat program and an emergency program at once WebP of 7,932: homes in Q1 2025 were in a REP thermostat program and an emergency program at once JPG of 7,932: homes in Q1 2025 were in a REP thermostat program and an emergency program at once

Stat card: 7,932. homes in Q1 2025 were in a REP thermostat program and an emergency program at once. Dual enrollment is prohibited under 16 TAC §25.186. Counts ranged from 7,206 to 7,932 per quarter in 2025; customers may not know, for example when a prior owner enrolled.

Social square · 1080 × 1080 px

7,932: homes in Q1 2025 were in a REP thermostat program and an emergency program at once

Source: PUCT Staff report, Project No. 56966, Item 25 (June 30, 2026). Analysis: Power Hopper Team.

Download PNG of 7,932: homes in Q1 2025 were in a REP thermostat program and an emergency program at once WebP of 7,932: homes in Q1 2025 were in a REP thermostat program and an emergency program at once JPG of 7,932: homes in Q1 2025 were in a REP thermostat program and an emergency program at once

Social card: Texas REP thermostat programs averaged about a tenth of the state's residential load-reduction goal in 2025, PUCT Staff found. On the 34 days in 2025 when REPs called at least 1,000 homes, homes in REP thermostat programs cut load about 2.5% on average, about a tenth of the state's goal (PUCT Staff). In CenterPoint Houston's area the utility pays its $100 incentive to the retail provider.

Link-preview card · 1200 × 630 px

Texas REP thermostat programs averaged about a tenth of the state's residential load-reduction goal in 2025, PUCT Staff found

Source: PUCT Project No. 56966 Item 25; CenterPoint 2026 program manual. Analysis: Power Hopper Team.

Download PNG of Texas REP thermostat programs averaged about a tenth of the state's residential load-reduction goal in 2025, PUCT Staff found WebP of Texas REP thermostat programs averaged about a tenth of the state's residential load-reduction goal in 2025, PUCT Staff found JPG of Texas REP thermostat programs averaged about a tenth of the state's residential load-reduction goal in 2025, PUCT Staff found

Methodology

  1. Figures come from PUCT Staff Project No. 56966 Item 25, the rule adoption order (Item 24), CenterPoint's 2026 Energy Efficiency Plan and Report (Project No. 59166, Item 35) and data responses (Docket No. 59826, Item 27), the Oncor EECRF order (Docket No. 58182), the TNMP settlement (Docket No. 59791, pending), ERCOT NPRR1296 filings, and the Texas Technical Reference Manual 13.0, Vol. 2, Table 64 (p. 100).
  2. Austin Energy and CPS Energy terms come from their program pages as of Nov. 11, 2026. Those are municipal utilities outside the retail choice market; Power Hopper does not serve them or enroll anyone in their programs.
  3. Power Hopper calculations (kW per deployed home, overlap share of enrollment, implied MW from NPRR1296 caps, CenterPoint incentive per thermostat) are labeled as such.
  4. CenterPoint's reported 24,332,916 kWh for 2025 is a deemed value: it equals 18,462 thermostats × 1,318 kWh (TRM Zone 3), not metered savings.

Full methodology

Limitations

  • Deemed kWh values in the Technical Reference Manual are averages used for program accounting, not a measurement or estimate for any home. The TRM says summer and winter demand savings shall not be claimed for the connected-thermostat measure. Zone 5 (El Paso) is outside the ERCOT grid.
  • The 2.5% average load-reduction ratio is PUCT Staff's figure for the 34 days in 2025 when REPs called at least 1,000 homes, not a year-round average.
  • NPRR1296 is pending (tabled at PRS on Sept. 17, 2025); no payments have been made. Seasonal caps are Power Hopper's calculation from the filed megawatt-hour caps and assessed hours.
  • Oncor avoided-cost figures are modeled values under PUCT rules, not cash returned to customers.

Files

Power Hopper is not affiliated with or endorsed by the PUCT, ERCOT, the Independent Market Monitor (Potomac Economics), CenterPoint Energy Houston Electric, Oncor Electric Delivery, Texas-New Mexico Power, Austin Energy, CPS Energy, The Brattle Group, NRG, Google, ENERGY STAR or the U.S. Environmental Protection Agency, or any thermostat manufacturer or retail electric provider.

Power Hopper (BJW Ventures LLC d/b/a Power Hopper) is a PUCT-registered electricity broker, BR260201; registration is not a PUCT endorsement. Electricity providers may pay us a commission if you sign up through us. Power Hopper is not a retail electric provider, utility or transmission and distribution utility, and is not affiliated with or endorsed by the PUCT, ERCOT or any utility, supplier or data provider named above. This brief was prepared with AI assistance.