PUCT and bill-credit plans · Source-checked
What Texas Regulators Have Said About Bill-Credit Plans: PUCT Statements and Filings, 1999 to 2026
Every passage found in PUCT-written filings that names credit, minimum-usage or tiered plans, every recorded commissioner remark, and the search behind the count. No Power to Choose offer data is used.
By Power Hopper Team · November 14, 2026
What the data show
The Texas Public Utility Commission has dealt with bill-credit, minimum-usage and tiered electricity plans mostly through its Power to Choose website. A search of 20,463 readable PUCT-written filings from 2001 to 2026 found 15 distinct passages that name these plans, all dated 2015 to January 2019. Five of the 24 commissioners who served since 1999 are on record about them, between 2016 and 2018; none was found after August 9, 2018, and none of 38 sets of open-meeting minutes from 2024 to 2026 mentions them. Remarks come from news and trade coverage and are labeled by evidence tier. No Power to Choose offer data is used.
Read the story: What Texas regulators have said about bill-credit electricity plans, 1999 to 2026.
Charts
PUCT commissioners · 1999 to 2026
Of the 24 commissioners who have served since 1999, five are on record about credit or tiered plans
Tenure by calendar year as listed by the PUCT; a dot marks the year of the on-record remark found. Commissioners who left before 1999 are not shown.

Download PNG of PUCT commissioners and remarks on credit or tiered plans, 1999 to 2026 WEBP of PUCT commissioners and remarks on credit or tiered plans, 1999 to 2026 SVG of PUCT commissioners and remarks on credit or tiered plans, 1999 to 2026
Source: PUCT Past Commissioners and Commissioners pages (tenure); Power Hopper ledger of statements in Commission documents and press coverage. 'None found' is a limit of the sources searched, not proof that nothing was said.
Cite this chart
Power Hopper Team. "PUCT commissioners and remarks on credit or tiered plans, 1999 to 2026." Chart. What Texas Regulators Have Said About Bill-Credit Plans: PUCT Statements and Filings, 1999 to 2026 dataset. Power Hopper Media Data Room, published November 14, 2026. https://powerhopper.energy/media/data/texas-puct-bill-credit-plans-statements-and-filings-1999-2026#cv2-puct-commissioners-1999-2026-who-spoke-about-credit-and-tiered-plans. Accessed [date accessed].
Data table
| Commissioner | Tenure | Remark on credit or tiered plans |
|---|---|---|
| Pat Wood III | 1995 to 2001 | None found; signed the first customer protection rules (Dec 2000), which pre-date these plans |
| Judy Walsh | 1995 to 2001 | None found |
| Brett Perlman | 1999 to 2003 | None found |
| Max Yzaguirre | 2001 to 2002 | None found |
| Rebecca Klein | 2001 to 2004 | None found |
| Julie Caruthers Parsley | 2002 to 2008 | None found |
| Paul Hudson | 2003 to 2008 | None found |
| Barry Smitherman | 2004 to 2011 | None found (left before 2013; bill-credit plans not found in coverage of his tenure) |
| Donna Nelson | 2008 to 2017 | Statements found (2016) |
| Kenneth W. Anderson Jr. | 2008 to 2017 | Statements found (2016) |
| Rolando Pablos | 2011 to 2013 | None found |
| Brandy Marty Marquez | 2013 to 2018 | Statement found (2017) |
| DeAnn Walker | 2017 to 2021 | Statements found (2018) |
| Arthur D'Andrea | 2017 to 2021 | Statements found (2018) |
| Shelly Botkin | 2018 to 2021 | None quoted; received Aug 2018 staff memo |
| Will McAdams | 2021 to 2023 | None found |
| Peter Lake | 2021 to 2023 | None found |
| Lori Cobos | 2021 to 2024 | None found |
| Jimmy Glotfelty | 2021 to 2024 | None found |
| Kathleen Jackson | Aug 2022 to present | None found |
| Thomas Gleeson | Jan 2024 to present | None found |
| Courtney Hjaltman | Jun 2024 to present | None found |
| Morgan Johnson | Oct 2025 to present | None found |
| Patrick Rhode | Current member per PUCT page; start date not confirmed | None found |
On the record · 2016 to 2018
Chairman Nelson made 9 of the 22 recorded remarks by commissioners and senior staff; no commissioner remark was found after August 2018
Recorded remarks by official, split by how well each is supported. Counts are remarks in the research ledger, not mentions of a word.

Download PNG of Recorded remarks on credit and tiered plans by official, 2016 to 2018 WEBP of Recorded remarks on credit and tiered plans by official, 2016 to 2018 SVG of Recorded remarks on credit and tiered plans by official, 2016 to 2018
Source: Power Hopper ledger of 22 direct remarks. Confirmed means two or more outlets or a Commission document; single outlet means one news report. Remarks come from news and trade coverage; no meeting transcripts or video were available. Excludes one off-topic remark.
Cite this chart
Power Hopper Team. "Recorded remarks on credit and tiered plans by official, 2016 to 2018." Chart. What Texas Regulators Have Said About Bill-Credit Plans: PUCT Statements and Filings, 1999 to 2026 dataset. Power Hopper Media Data Room, published November 14, 2026. https://powerhopper.energy/media/data/texas-puct-bill-credit-plans-statements-and-filings-1999-2026#cv2-puct-on-record-remarks-on-credit-and-tiered-plans-by-official-2016-2018. Accessed [date accessed].
Data table
| Official | Confirmed | Single outlet | Total |
|---|---|---|---|
| Nelson (Chairman) | 5 | 4 | 9 |
| Walker (Chairman) | 4 | 0 | 4 |
| Anderson | 0 | 3 | 3 |
| D'Andrea | 2 | 0 | 2 |
| Lloyd (Executive Director) | 0 | 2 | 2 |
| Marquez | 0 | 1 | 1 |
| Corona (staff) | 1 | 0 | 1 |
| Botkin | 0 | 0 | 0 |
PUCT-written documents · 2001 to 2026
PUCT-written filings name credit or tiered plans in 15 passages, all between 2015 and January 2019
Distinct passages by year in documents written by the Commission or its staff, after reading every keyword match. Drafts and repeated copies are counted once.

Download PNG of PUCT-written passages naming credit or tiered plans by year, 2001 to 2026 WEBP of PUCT-written passages naming credit or tiered plans by year, 2001 to 2026 SVG of PUCT-written passages naming credit or tiered plans by year, 2001 to 2026
Source: Power Hopper sweep of 24,429 PUCT-authored filings on Interchange (20,463 readable) plus Scope and agency reports, minutes and memos. Image-only and paper filings (about 3,700, mostly 2001 and 2002) could not be searched, so earlier years are a floor.
Cite this chart
Power Hopper Team. "PUCT-written passages naming credit or tiered plans by year, 2001 to 2026." Chart. What Texas Regulators Have Said About Bill-Credit Plans: PUCT Statements and Filings, 1999 to 2026 dataset. Power Hopper Media Data Room, published November 14, 2026. https://powerhopper.energy/media/data/texas-puct-bill-credit-plans-statements-and-filings-1999-2026#cv2-puct-written-passages-naming-credit-or-tiered-plans-by-year-2001-2026. Accessed [date accessed].
Data table
| Year | Distinct passages |
|---|---|
| 2001 | 0 |
| 2002 | 0 |
| 2003 | 0 |
| 2004 | 0 |
| 2005 | 0 |
| 2006 | 0 |
| 2007 | 0 |
| 2008 | 0 |
| 2009 | 0 |
| 2010 | 0 |
| 2011 | 0 |
| 2012 | 0 |
| 2013 | 0 |
| 2014 | 0 |
| 2015 | 2 |
| 2016 | 4 |
| 2017 | 4 |
| 2018 | 4 |
| 2019 | 1 |
| 2020 | 0 |
| 2021 | 0 |
| 2022 | 0 |
| 2023 | 0 |
| 2024 | 0 |
| 2025 | 0 |
| 2026 | 0 |
Method · what a full sweep of PUCT filings found
Out of 20,463 readable PUCT filings, 15 distinct passages name credit or tiered plans
Interchange cannot search inside documents, so each PUCT-authored filing was downloaded and searched for phrases such as bill credit, usage credit, minimum usage and tiered. Bar widths are on a log scale.

Download PNG of Sweep of PUCT filings for credit and tiered plans: from 24,429 filings to 15 passages WEBP of Sweep of PUCT filings for credit and tiered plans: from 24,429 filings to 15 passages SVG of Sweep of PUCT filings for credit and tiered plans: from 24,429 filings to 15 passages
Source: Power Hopper search of the PUCT Interchange filing system (176,628 filings listed in 4,611 electric projects; 24,429 PUCT-authored, 2001 to 2026, routine items removed). 2,319 image-only filings, 1,410 paper filings and 179 spreadsheets were not searchable; 58 downloads failed.
Cite this chart
Power Hopper Team. "Sweep of PUCT filings for credit and tiered plans: from 24,429 filings to 15 passages." Chart. What Texas Regulators Have Said About Bill-Credit Plans: PUCT Statements and Filings, 1999 to 2026 dataset. Power Hopper Media Data Room, published November 14, 2026. https://powerhopper.energy/media/data/texas-puct-bill-credit-plans-statements-and-filings-1999-2026#cv2-how-many-puct-filings-name-credit-or-tiered-plans-sweep-of-24429-filings. Accessed [date accessed].
Data table
| Stage | Count |
|---|---|
| PUCT-authored filings, 2001 on (4,611 electric projects) | 24,429 |
| Text could be read | 20,463 |
| Contained a keyword match | 181 |
| Distinct passages left after reading every match | 15 |
Yardstick · lowest 1,000 kWh offer
The Commission's price yardstick fell from about 8 cents to about 5 cents between 2014 and 2016
Lowest 12-month fixed offer per 1,000 kWh in each utility area, in cents per kWh, from the Commission's 2015 and 2017 Scope reports, with the last regulated 2001 rate. A headline price, not what a typical household paid.

Download PNG of Lowest 1,000 kWh fixed offer by Texas utility area, 2001, 2014 and 2016 WEBP of Lowest 1,000 kWh fixed offer by Texas utility area, 2001, 2014 and 2016 SVG of Lowest 1,000 kWh fixed offer by Texas utility area, 2001, 2014 and 2016
Source: PUCT Scope of Competition reports (Jan 2015 Table 2, as of Dec 2014; Jan 2017 Table 2, as of Sep 2016). The 2017 report defines its price as for a plan without time-of-use, prepaid or minimum-usage-fee features; the 2015 table does not say so, so the two years are not strictly like for like.
Cite this chart
Power Hopper Team. "Lowest 1,000 kWh fixed offer by Texas utility area, 2001, 2014 and 2016." Chart. What Texas Regulators Have Said About Bill-Credit Plans: PUCT Statements and Filings, 1999 to 2026 dataset. Power Hopper Media Data Room, published November 14, 2026. https://powerhopper.energy/media/data/texas-puct-bill-credit-plans-statements-and-filings-1999-2026#cv2-lowest-1000-kwh-fixed-offer-by-texas-utility-area-2001-2014-2016. Accessed [date accessed].
Data table
| Utility area | Last regulated 2001 (¢/kWh) | Dec 2014 (¢/kWh) | Sep 2016 (¢/kWh) |
|---|---|---|---|
| Oncor | 9.7 | 7.73 | 4.5 |
| CenterPoint | 10.4 | 8.6 | 5.4 |
| AEP Texas Central | 9.6 | 8.75 | 5.6 |
| AEP Texas North | 10.0 | 8.75 | 5.0 |
| TNMP | 10.6 | 8.3 | 5.0 |
Project 45730 · Power to Choose review, 2016 to 2022
In the Power to Choose project, 90 of 195 filings by others mention these plans; PUCT staff and commissioners wrote 5 items
Items in the Commission's 200-item project by who filed them, and how many mention these plans. Filings by others show how heavily the topic was raised, not what the Commission said.

Download PNG of Project 45730 filings that mention credit, minimum-usage or tiered plans, by filer WEBP of Project 45730 filings that mention credit, minimum-usage or tiered plans, by filer SVG of Project 45730 filings that mention credit, minimum-usage or tiered plans, by filer
Source: PUCT Interchange, Project 45730 (200 items, Mar 2016 to Jan 2022), every item downloaded and phrase-searched by Power Hopper. One item had no document link. Counts are items, not individual mentions.
Cite this chart
Power Hopper Team. "Project 45730 filings that mention credit, minimum-usage or tiered plans, by filer." Chart. What Texas Regulators Have Said About Bill-Credit Plans: PUCT Statements and Filings, 1999 to 2026 dataset. Power Hopper Media Data Room, published November 14, 2026. https://powerhopper.energy/media/data/texas-puct-bill-credit-plans-statements-and-filings-1999-2026#cv2-power-to-choose-project-45730-filings-that-mention-credit-or-tiered-plans. Accessed [date accessed].
Data table
| Filed by | Items | Items that mention |
|---|---|---|
| Retailers, trade groups, advocates and individuals (formal comments) | 184 | 80 |
| Consumer emails compiled by PUCT staff into 9 items | 9 | 9 |
| Public comments logged as PC or MISC | 2 | 1 |
| PUCT staff or a commissioner | 5 | 2 |
Downloads
Statement ledger (CSV) · Commissioner roster (CSV) · Passages in PUCT documents (CSV) · Sweep passages (CSV) · Sweep coverage (CSV) · Records searched (CSV) · Project 45730 filings (CSV) · Open-meeting discussions (CSV) · Lowest price, Scope reports (CSV) · Regulation milestones (CSV) · Source register (CSV) · Key numbers (JSON) · SHA-256 checksums
Notes and limits
Scope. The package covers what the PUCT and its commissioners have said, in documents and in news and trade coverage, about usage-credit (bill-credit), minimum-usage and tiered electricity plans, from SB 7 in 1999 to 2026. It does not use Power to Choose offer data and does not count or rate any retailer's plans.
Evidence tiers. AGENCY means a PUCT document was read. CONFIRMED means two or more outlets report the same remark. SINGLE means one outlet. FILING means a retailer filing. Commissioner remarks rest on news and trade coverage because no meeting transcripts or video were available. Statements about what a remark meant are limited to what the sources say.
Counting rule. A passage is a place in a PUCT-written document that names credit, minimum-usage or tiered plans. Drafts and repeated copies of the same text are counted once. Passages about utility refund credits, deposit refunds, wholesale charges and credits, or energy-efficiency incentives were read and excluded. Adjacent passages (wording about credits that does not concern retail plans) are listed separately and not counted.
Sweep method. The PUCT Interchange filing system cannot search inside documents. Power Hopper listed every filing in 4,611 electric projects whose titles or filers pointed to retail topics (176,628 filings), downloaded the 24,429 written by the PUCT from 2001 on, extracted text from PDFs, ZIP packages and Word files, and searched for phrases. Every match was read.
Gaps. 2,319 scanned-image filings (mostly 2001 and 2002), 1,410 paper filings with no electronic file, and 179 spreadsheets could not be searched, and 58 downloads failed. Filings written by others were searched only in Project 45730. A project with an unrelated title could hold a mention that was missed. Minutes before 2024, the 2016 to 2018 agendas, and transcripts or video were not available.
Commissioner list. Tenure comes from the PUCT's past-commissioners list; Johnson's and Rhode's start dates are approximate. 'None found' means no remark was found in the sources searched, not that none exists.
Project 45730. Items were classified by filer. Nine items are consumer emails compiled by PUCT staff and are counted as filings by others, not Commission statements.
Yardstick. The 2015 and 2017 Scope reports print the lowest 12-month fixed offer per 1,000 kWh by utility area. The 2017 report defines it as a plan without time-of-use, prepaid or minimum-usage-fee features; the 2015 report does not say so.
Power Hopper is not affiliated with or endorsed by the PUCT, ERCOT, or any retail electric provider or news outlet named here.
Power Hopper (BJW Ventures LLC d/b/a Power Hopper) is a PUCT-registered electricity broker, BR260201; registration is not a PUCT endorsement. Electricity providers may pay us a commission if you sign up through us. Power Hopper is not a retail electric provider, utility or transmission and distribution utility. This brief was prepared with AI assistance.