Legislation · 90th Legislature prefiling · Source-checked

Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026

Every electricity bill among the 1,521 measures filed Nov 9 to Nov 14, 2026: what each would do, what the law says now, and how it would change it. Charts show how many bills, what they cover and how they would shift the status quo.

By Power Hopper Team · Research prepared November 15, 2026; validated and published November 16, 2026

Download CSV Download JSON

Audit outcome and overview

A full read of the bills filed in the first six days of prefiling for the 2027 Texas legislative session. Of 1,521 measures on the official rosters, 46 would change electricity policy, and the largest group is about data centers: who pays for the power lines and plants they need, whether they keep their tax exemptions, and where they can be built. Introduced bills only; none has passed.

Audit outcome: The six daily official filing rosters reconcile, including two genuine zero-filing days. All 49 shortlisted original/introduced bill-text PDFs were retrieved and inspected; 46 meet the report's broad electricity-impact threshold. This is a historical filing analysis, not a claim that any measure has passed. Legislative status is "Filed/prefiled" as indicated by date-specific TLO reports; use each official history link for subsequent action.

Power Hopper validation, Nov 16, 2026

Charts

Quantity · filings by date

1,521 measures were filed in six days; 1,262 came on the first

Official Texas Legislature Online filing-date rosters for the 90th Legislature, by type of measure. Nov 11 and Nov 14 had no filings. The label above each bar gives how many measures were electricity-related in the review.

Source: Texas Legislature Online, Bills By Filing Date reports for 90R, retrieved Nov 16, 2026; Texas Electricity Bill Watch review of 49 introduced bill texts. Other resolutions are HCR, HR and SCR.

Chart: Texas measures filed by date, Nov 9 to Nov 14, 2026, by type · Methodology for Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · Dataset: Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "Texas measures filed by date, Nov 9 to Nov 14, 2026, by type." Chart. Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 dataset. Power Hopper Media Data Room, published November 16, 2026. https://powerhopper.energy/media/data/texas-electricity-bill-watch-90th-legislature-filings-nov-9-to-14-2026#bw-texas-90r-prefiled-bills-by-filing-date-nov-9-to-14-2026. Accessed [date accessed].

Data table
Texas measures filed by date, Nov 9 to Nov 14, 2026, by type
FiledAllHouse billsSenate billsJoint resolutionsOther resolutionsElectricity-related
2026-11-091262900279582540
2026-11-1011671283141
2026-11-11000000
2026-11-12795617601
2026-11-13642241104
2026-11-14000000

Quantity · from the roster to the review

Of 1,521 filings, 46 were judged to change electricity policy in some way

Each stage keeps only part of the one above. Bar widths are on a log scale so the small counts stay visible.

Source: Texas Legislature Online rosters; Texas Electricity Bill Watch screen of 1,482 captions and full reading of 49 introduced PDFs. A caption screen is not a full-text search: Power Hopper's re-screen found 12 more near-topic bills (see the validation section).

Chart: From 1,521 filings to 46 electricity-related bills · Methodology for Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · Dataset: Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "From 1,521 filings to 46 electricity-related bills." Chart. Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 dataset. Power Hopper Media Data Room, published November 16, 2026. https://powerhopper.energy/media/data/texas-electricity-bill-watch-90th-legislature-filings-nov-9-to-14-2026#bw-texas-90r-from-1521-filings-to-46-electricity-bills. Accessed [date accessed].

Data table
From 1,521 filings to 46 electricity-related bills
StageCount
All filings on the six rosters1,521
House and Senate bills and joint resolutions1,482
Introduced texts read in full49
Met the electricity-impact threshold46

Scope · what the bills cover

Data centers and large loads are the biggest single subject: 14 of the 46 measures

Each measure is placed under one main topic. Bar colors show the report's priority rating. Topic labels are Power Hopper's grouping of the report's tags.

Source: Texas Electricity Bill Watch, 46 qualifying measures filed Nov 9 to Nov 13, 2026. Priority is the report's rating of how directly a bill changes rates, taxes, protections, generation eligibility or grid control.

Chart: Electricity bills by topic and priority, 90th Legislature filings · Methodology for Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · Dataset: Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "Electricity bills by topic and priority, 90th Legislature filings." Chart. Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 dataset. Power Hopper Media Data Room, published November 16, 2026. https://powerhopper.energy/media/data/texas-electricity-bill-watch-90th-legislature-filings-nov-9-to-14-2026#bw-texas-90r-electricity-bills-by-topic-and-priority. Accessed [date accessed].

Data table
Electricity bills by topic and priority, 90th Legislature filings
TopicHighMediumLowTotal
Data centers and large loads94114
Generation and fuels1258
Tax and incentive changes (other)3216
Electric vehicles and charging2125
Grid governance and market structure3104
Rates and cost recovery2103
Customer protections1203
Resilience studies0123

Shift · how they would change the status quo

More bills add limits or end incentives than create them, and nearly one in five is only a study

Each measure is placed under the main way it would change current law. Direction labels are Power Hopper's grouping of what each bill does, not a view on whether the change is good.

Source: Texas Electricity Bill Watch, 46 qualifying measures (introduced texts); direction labels by Power Hopper from the report's before-to-after summaries. A bill that does several things is counted once, under its main change.

Chart: How the 46 electricity bills would change current law · Methodology for Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · Dataset: Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "How the 46 electricity bills would change current law." Chart. Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 dataset. Power Hopper Media Data Room, published November 16, 2026. https://powerhopper.energy/media/data/texas-electricity-bill-watch-90th-legislature-filings-nov-9-to-14-2026#bw-texas-90r-how-electricity-bills-would-change-current-law. Accessed [date accessed].

Data table
How the 46 electricity bills would change current law
Main changeHighMediumLowTotal
Adds requirements, permits or limits5229
Study, council or workforce program only0279
Creates or expands incentives or relief4318
Ends or narrows incentives6118
Changes governance or program design1304
Reallocates or caps costs3003
Expands consumer protection1203
Enables new activity or rights1102

Shift · the data-center tax fight

Eight bills would end the data-center sales-tax exemption; they split on whether current certificates survive

Bills that repeal Tax Code sections 151.359 and 151.3595, grouped by what the introduced text does with exemptions already certified by the comptroller.

Source: Introduced bill texts (official TLO PDFs). HB167, HB408, HB681, SB293 and HB1139 are in the Bill Watch report; SB296, HB750 and HB851 were found by Power Hopper's validation re-screen.

Chart: Data-center sales-tax repeal bills and what happens to existing certificates · Methodology for Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · Dataset: Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "Data-center sales-tax repeal bills and what happens to existing certificates." Chart. Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 dataset. Power Hopper Media Data Room, published November 16, 2026. https://powerhopper.energy/media/data/texas-electricity-bill-watch-90th-legislature-filings-nov-9-to-14-2026#bw-texas-90r-data-center-tax-repeal-bills-what-happens-to-existing-certificates. Accessed [date accessed].

Data table
Data-center sales-tax repeal bills and what happens to existing certificates
BillLead authorExisting certified exemptionsIn the report?
HB167Martinez FischerKeep until they expireYes
HB408IsaacKeep until they expireYes
HB681VasutKeep until they expireYes
SB293Huffman et al.End on the effective dateYes
HB1139González of DallasEnd on the effective dateYes
SB296GutierrezEnd on the effective dateNo (validation)
HB750JimenezNo provision in the textNo (validation)
HB851Perez of El PasoNo provision in the textNo (validation)

Shift · when the changes would start

Almost every bill would start Sept. 1, 2027, and 12 ask for immediate effect

Start date written in each introduced bill. Immediate effect needs a two-thirds vote of each house; otherwise the bill takes effect Sept. 1, 2027.

Source: Introduced bill texts (official TLO PDFs), 46 qualifying measures. Some bills add later deadlines for rules or reports; only the start date is counted.

Chart: When the 46 electricity bills would take effect · Methodology for Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · Dataset: Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "When the 46 electricity bills would take effect." Chart. Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 dataset. Power Hopper Media Data Room, published November 16, 2026. https://powerhopper.energy/media/data/texas-electricity-bill-watch-90th-legislature-filings-nov-9-to-14-2026#bw-texas-90r-when-electricity-bills-would-take-effect. Accessed [date accessed].

Data table
When the 46 electricity bills would take effect
Start dateMeasures
Sept. 1, 202730
Immediately with a two-thirds vote, otherwise Sept. 1, 202712
July 1, 2027 with a two-thirds vote, otherwise Oct. 1, 20271
Jan. 1, 20281
Jan. 1, 2028, only if voters approve HJR591
Statewide vote Nov. 2, 2027 (constitutional amendment)1

Scope · who filed them

Sen. Zaffirini filed five of the 46 measures, all on data centers and large loads

Lead author of each of the 46 measures: the 11 authors with two or more. Another 14 authors filed one each (25 in all).

Source: Texas Legislature Online rosters (first-listed author) and the Bill Watch review. Companion bills filed by different authors are counted for each author.

Chart: Electricity bills by lead author, 90th Legislature filings · Methodology for Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · Dataset: Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 · CC BY 4.0

Cite this chart

Power Hopper Team. "Electricity bills by lead author, 90th Legislature filings." Chart. Texas Electricity Bill Watch: 90th Legislature Filings, Nov 9 to 14, 2026 dataset. Power Hopper Media Data Room, published November 16, 2026. https://powerhopper.energy/media/data/texas-electricity-bill-watch-90th-legislature-filings-nov-9-to-14-2026#bw-texas-90r-electricity-bills-by-lead-author. Accessed [date accessed].

Data table
Electricity bills by lead author, 90th Legislature filings
Lead authorMeasures
Zaffirini5
Garcia (Bexar)4
Slawson3
González (El Paso)3
Lalani3
Landgraf3
Cook3
Hall2
Bhojani2
Harrison2
Salinas2

Official count reconciliation by filing date

Official count reconciliation by filing date
Official filed dateAll entriesHBSBHJRSJROther resolutionsQualified in this reviewRoster
November 9, 20261,26290027948102540TLO report for November 9, 2026
November 10, 2026116712830141TLO report for November 10, 2026
November 11, 20260000000TLO report for November 11, 2026
November 12, 20267956176001TLO report for November 12, 2026
November 13, 20266422411004TLO report for November 13, 2026
November 14, 20260000000TLO report for November 14, 2026
All six dates1,5211,04936558103946

Three issues to watch

  1. Who pays for data centers? SB33, HB730, SB32 and SB34 propose different cost allocation, permits and county powers. The first two have the clearest potential to shift electric costs away from households.
  2. Which energy projects receive tax support? SB287 withdraws certain solar/wind preferences; HB284 offers an on-site distributed-generation exemption; SB293 and HB1139 would end existing data-center tax exemptions, whereas HB167 and companions grandfather them. Validation note: SB296 also ends existing exemptions, and HB750 and HB851 repeal them without a provision for existing certificates.
  3. How will electricity rules be governed? HB191 changes PUCT selection, SB191 restricts external ERCOT interconnections, and SB366 broadens weather-related disconnect protection.

Individual daily reviews

Reviews are in order of filing date and then practical importance. Each links to the introduced bill text and the official status page.

November 9, 2026 — 1,262 official filings

40 qualifying measures, ordered by practical importance. All measures below are proposed as filed, not enacted law.

HB1005

High priorityRates · Transmission

Author: Slawson · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Requires full TDU-charge exemption or reimbursement for qualifying residential landowners adjoining newly built extra-high-voltage lines.
Current status quo
Ordinary residential TDU charges generally apply even when a line project acquires adjacent private property; no matching statewide rebate is identified.
Before → after (governing change)
Proposes 100% transmission-and-distribution charge exemption or semiannual reimbursement, transferable with land, until land-use conversion or Sept. 1, 2076. The draft labels the addition §309.2031 despite placing it in Chapter 39—an apparent citation error.
How, who, when, and expected bill/renewable effect
Immediate with 2/3 vote or Sept. 1, 2027. Benefits directly affected homeowners and could shift utility revenue requirements to other ratepayers or owners; funding source unspecified. No special renewable-generation incentive.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB139

High priorityRates · Utility structure

Author: González of El Paso · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Creates a statutory ceiling on the nonfuel portion of residential rates charged by utilities solely outside ERCOT.
Current status quo
Under Chapter 36, PUCT/base-rate regulation applies without the five-year summer-peak nonfuel rate formula proposed here.
Before → after (governing change)
Adds §36.218: in a base-rate case, maximum nonfuel residential rate equals the inflation-adjusted average from prior five years at weather-adjusted summer peaks; interim revisions only for inflation or an unreasonable rate, with 30-day notice.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027; PUCT must establish process. Limits nonfuel rate-setting discretion in eligible monopoly territories, not ERCOT retail REP charges or fuel charges. Direction of bills depends on historical levels and utility cost evidence; possible under-recovery or later corrections.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB167

High priorityLarge loads · Electricity taxes

Author: Martinez Fischer · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Ends future data-center sales/use-tax exemptions, including qualified-center electricity-purchase relief, while protecting already certified exemptions.
Current status quo
Tax Code §§151.359/.3595 and §151.317(a)(9) currently exempt qualifying data-center tangible property and certain purchased electricity.
Before → after (governing change)
Repeals §§151.359/.3595 and removes data-center electricity from §151.317; existing certificates remain valid until their original exemption terms expire, pending applications denied.
How, who, when, and expected bill/renewable effect
Effective immediately with 2/3 vote or Sept. 1, 2027. Newer data centers face higher procurement/electricity tax burden; public tax revenue may rise, but household electric rates do not automatically fall. Same substantive language as HB408/HB681; unlike SB293/HB1139, grandfathering continues.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB184

High priorityTransmission · Rates

Author: Slawson · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Pauses PUCT approval of 765-kV lines until a grid-economics study receives independent review.
Current status quo
PUCT considers transmission approvals under existing certification and ERCOT planning processes; the mandatory special 765-kV study gate does not currently exist.
Before → after (governing change)
Adds §39.1671: examine dispatch scenarios, residential ratepayer costs, overruns, workforce/supply chain; independent reviewer cannot be an entity that recently studied extra-high-voltage lines for ERCOT or a market participant.
How, who, when, and expected bill/renewable effect
Immediate with 2/3 vote or Sept. 1, 2027; section expires Sept. 1, 2029. Could delay high-voltage projects and defer delivery charges, but also delay new wind/solar interconnections and reliability benefits. Net bill impact uncertain.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB191

High priorityUtility structure · PUCT governance

Author: Slawson · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Changes appointment and service terms of Texas utility commissioners and lengthens their lobbying restrictions.
Current status quo
§12.051 provides gubernatorial appointments with senate advice/consent and six-year staggered terms; §12.060 limits post-service lobbying.
Before → after (governing change)
Amends §§12.051/.060, adds §12.061: three-member governor/lieutenant-governor/speaker committee would select commissioners and leaders, set five-year terms, and increase former-commissioner lobbying restriction from one to three years.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Alters who governs all PUCT electric-rate and market decisions; rate and renewable outcomes depend on appointments and subsequent rulings, not specified in the bill.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB284

High priorityDistributed generation · Tax incentives

Author: Money · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Exempts certain behind-the-meter on-site distributed generation equipment, installations, use and leases from sales/use taxes.
Current status quo
Tax Code Chapter 151 imposes sales/use tax unless another exemption applies; there is not a general exemption in the form of proposed §151.3183 for qualifying exclusively on-site generation systems.
Before → after (governing change)
Adds §151.3183 covering necessary initial equipment for systems whose electricity is consumed solely at a nearby structure; excludes unrelated construction, repairs and maintenance.
How, who, when, and expected bill/renewable effect
Comptroller rules; July 1, 2027 with 2/3 vote, else Oct. 1, 2027. May reduce costs of self-supply solar or other distributed generators; exported power likely fails the “solely” consumed test. Public revenue falls; no guaranteed grid-rate change.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB408

High priorityLarge loads · Electricity taxes

Author: Isaac · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Removes future qualifying data-center sales/use-tax relief with grandfather protection.
Current status quo
Certified data centers presently qualify for exemption programs under Tax Code §§151.359/.3595, including electricity-use provisions in §151.317.
Before → after (governing change)
Repeals specified exemptions, preserves previously certified facilities until their remaining authorized terms expire and denies pending applications; text parallels HB167/HB681.
How, who, when, and expected bill/renewable effect
Immediate with 2/3 vote or Sept. 1, 2027. Raises costs for newly qualifying large loads without retroactively cancelling extant certificates; relative ratepayer effect indirect, renewable impact not specified.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB589

High priorityGeneration incentives · ERCOT

Author: Lalani · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Expressly treats geothermal, hydro, nuclear, gas, petroleum and coal generators as dispatchable for Texas Energy Fund financing.
Current status quo
Utilities Code §§34.0104/.0105 currently use a general controllable-output definition; electric energy storage remains disqualified from these loans and completion bonuses.
Before → after (governing change)
Adds §34.01015 and conforming edits to §§34.0104/.0105: enumerates eligible fuel/technology classes without changing the ≥100 MW loan threshold; storage remains excluded.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Could expand or clarify eligibility for geothermal/hydro and conventional generation; may shift subsidized generation mix, not promise lower retail rates. Wind/solar without dispatchability and batteries alone do not obtain these loans.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB681

High priorityLarge loads · Electricity taxes

Author: Vasut · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
A third House filing proposing prospective repeal of data-center tax advantages.
Current status quo
The current §§151.359/.3595 exemption framework and §151.317(a)(9) lower certain certified data-center equipment and electricity taxes.
Before → after (governing change)
Repeals the exemptions but grandfathers existing certificates and denies applications still pending when effective; mirrors HB167/HB408.
How, who, when, and expected bill/renewable effect
Immediate with 2/3 vote or Sept. 1, 2027. New data-center customers can face higher tax-inclusive energy/plant bills, with no proven corresponding decrease in residential electricity rates.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB730

High priorityRates · Large loads · Utility structure

Author: Perez of El Paso · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Protects customers of non-ERCOT monopoly utilities from paying for generation built primarily for a single large load.
Current status quo
Under §36.053 ordinary prudent, used-and-useful generation investment can enter utility rate base; there is no proposal-specific prohibition on charging other customers for dedicated >75-MW generation.
Before → after (governing change)
Adds §36.053(e)-(g), §37.056(j) and §39.411: such investment cannot be recovered from others without prior PUCT findings of net benefit and cost-causation; qualifying interconnections face ≥$100,000 study fee, site-control proof and financial security.
How, who, when, and expected bill/renewable effect
Applies only to electric utilities solely outside ERCOT; PUCT interconnection rules due June 1, 2028; effective Sept. 1, 2027. Likely shifts speculative generation costs toward large-load sponsors and protects household rates, though safeguards may raise data-center development costs. Renewable connection is technology-neutral.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB867

High priorityDistributed generation · EVs · ERCOT

Author: Anchía · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Lets PUCT develop vehicle-to-grid standards and permit aggregators to sell energy from EV batteries into ERCOT.
Current status quo
Existing §39.916 distributed-generation framework does not establish the explicit vehicle-to-grid aggregation authorization in proposed §39.9161.
Before → after (governing change)
Adds §39.9161: PUCT may, not must, adopt technical interconnection standards and allow EV owners through aggregators/load-serving entities to participate in wholesale, ancillary and virtual-power-plant markets.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. If implemented, EV owners could earn grid value, lower peak costs and support variable solar/wind; hardware, market rules and compensation are uncertain. Does not mandate a buyback rate.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

SB191

High priorityTransmission · Utility structure

Author: Hall · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Makes ERCOT-to-outside-region electric interconnection approvals more restrictive and procedural.
Current status quo
§37.051 already has a PUCT certificate/public-interest process for lines enabling imports or exports, with specific legacy exemptions.
Before → after (governing change)
Revises §37.051(c)-(c-4): forbids additional federal jurisdiction; PUCT public-interest findings after technical, cost and ERCOT reliability assessment; application at least 180 days before a FERC request, and separate post-FERC certificate.
How, who, when, and expected bill/renewable effect
Applies prospectively; immediate with 2/3 vote or Sept. 1, 2027. Could constrain regional power trading and cross-border renewable imports/exports while limiting federal-jurisdiction exposure; rate/reliability effect depends on foregone projects.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

SB192

High priorityEVs · Renewable power

Author: Hall · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Mandates on-site renewable electricity or renewable-priced electricity for regulated public EV charging equipment.
Current status quo
Occupations Code §2311.0301 currently requires equipment inspection and maintenance, without the proposed renewable-power source/pricing condition.
Before → after (governing change)
Adds §2311.0301(3), limits agency exemption authority, routes violation penalties to the highway fund and repeals Chapter 2311A.
How, who, when, and expected bill/renewable effect
Effective immediately with 2/3 vote or Sept. 1, 2027; charging providers must comply by Jan. 1, 2028. Could boost demand for green-priced supply/onsite generation and chargers’ procurement costs; wording does not clearly require matched renewable electrons.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

SB287

High prioritySolar · Wind · Tax incentives

Author: Perry, Campbell · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Repeals specified solar/wind and solar-industry franchise/property-tax preferences while preserving different protections.
Current status quo
Tax Code §11.27(a-1) exempts the appraised value of qualifying equipment even when the equipment owner does not own underlying real estate; §§171.056/171.107 give a solar-business franchise-tax exemption and solar-device cost deduction.
Before → after (governing change)
Repeals §11.27(a-1) and §§171.056/171.107 with transition protections; rewrites solar definitions in Local Government Code §229.101 and Property Code §202.010. It does not repeal the separate §11.27(a) property-value exemption.
How, who, when, and expected bill/renewable effect
Effective Jan. 1, 2028. Would increase tax exposure for certain third-party-owned solar/wind equipment and solar businesses; could weaken distributed renewable economics. Exact net costs depend on ownership and other exemptions.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

SB293

High priorityLarge loads · Electricity taxes

Author: Huffman, et al. · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Repeals qualifying data-center tax exemptions, including for electricity, without grandfathering already certified facilities.
Current status quo
Currently certified data centers can receive sales/use-tax exclusions for eligible property and electric power during specified certification periods.
Before → after (governing change)
Repeals §§151.359/.3595 and removes §151.317 data-center exemption; existing exemptions end on effective date and pending certification applications are rejected.
How, who, when, and expected bill/renewable effect
Immediate with 2/3 vote or Sept. 1, 2027. Higher tax exposure for both current and future qualifying data centers; material difference from HB167/HB408/HB681. Revenue shift may affect taxes but not ERCOT’s wholesale price mechanism.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

SB32

High priorityLarge loads · Utility governance

Author: Zaffirini · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Creates a PUCT/TCEQ preconstruction permitting program for computational loads drawing at least 75 MW.
Current status quo
Large loads are already subject to specified electric interconnection planning/standards under Utilities Code §37.0561, but the new cross-agency site construction permit in proposed Title 7 does not yet exist.
Before → after (governing change)
Adds Utilities Code Title 7, Chapter 401: prior PUCT permit, disclosure of demand/energization and water impacts, reliability and environmental review, fees, possible denial/revocation and administrative penalties; applications confidential.
How, who, when, and expected bill/renewable effect
PUCT and TCEQ jointly adopt rules and memorandum of understanding; applies to construction beginning Sept. 1, 2027 or later. Could delay or condition high-demand projects and reduce poorly planned grid additions; effect on retail bills uncertain. No renewable-specific preference.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

SB33

High priorityRates · Large loads

Author: Zaffirini · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Separates the transmission costs attributable to data centers, AI and crypto computation from ordinary electric customers.
Current status quo
Utilities Code §35.004(c-1)/(c-2) requires qualifying large loads to contribute to interconnection costs, but does not establish the dedicated computational-site transmission rate class this bill proposes.
Before → after (governing change)
Redesignates those duties as §35.0041(a)-(b) and adds (c)-(f): PUCT must allocate otherwise unrecovered computational-load transmission costs to their own class and may require demand charges and contractual commitments.
How, who, when, and expected bill/renewable effect
PUCT rules by Sept. 1, 2028; customers at computational sites pay more cost-caused charges, reducing the risk that households and other businesses subsidize dedicated upgrades. Actual retail bill savings depend on tariff design and approved projects; renewable effect indirect through transmission cost allocation. Effective immediately with 2/3 vote, otherwise Sept. 1, 2027.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

SB34

High priorityLarge loads · Utility governance

Author: Zaffirini · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Gives counties new zoning and special-use authority over large computational sites in unincorporated territory.
Current status quo
Texas counties generally lack the broad purpose-specific computational-load zoning and permitting power described in this proposed Local Government Code chapter.
Before → after (governing change)
Adds §§231.301-.310: county zoning districts, location/noise/water/road conditions, financial assurances, electric-demand documentation, permits, stop-work orders and penalties; expressly disallows regulating electric rates, ERCOT or transmission siting.
How, who, when, and expected bill/renewable effect
County commissioners administer it from Sept. 1, 2027. May reduce local infrastructure burdens but lengthen data-center approval and affect when new electric demand appears; not a direct rate cap. Draft text contains inconsistent subsection lettering; implementation would need care.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB108

Medium priorityUtility structure · Customer choice

Author: González of El Paso · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Directs PUCT to study a large vertically integrated monopoly electric-service territory outside ERCOT and potential retail customer choice.
Current status quo
Eligible non-ERCOT territory retains generation/transmission/distribution monopoly service; §31.002 defines customer choice but the bill does not itself authorize retail competition there.
Before → after (governing change)
Requires ratepayer/market study and recommendations for introducing customer choice; report due Dec. 31, 2028; study expires Jan. 1, 2029.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. This is a study, not deregulation; possible future effects on monopoly rates, supplier entry and renewable procurement only if later enacted. Customers would see no immediate retail-choice change.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

HB116

Medium priorityRates · Municipal utilities

Author: González of El Paso · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Extends higher-education-style electric discounts to eligible school districts and taxing political subdivisions in a qualifying border county.
Current status quo
Utilities Code §36.351 requires specified higher-education electric-service discounts; the proposed additional border-county public-school/political-subdivision class is not generally included.
Before → after (governing change)
Adds §36.3511: matching discounts from electric and municipal utilities, exempt if the discount exceeds 1% of annual utility revenue; bars shifting designated costs to residential/other customer classes.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027, excluding preexisting contracts. Benefits covered public facilities and taxpayers; utilities must file tariffs, while cost recovery restriction may affect utility margins. No direct solar/wind preference.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

HB514

Medium priorityWind · Property rights

Author: Garcia of Bexar · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Clarifies the surface owner’s right to use wind and the procedures for clearing expired wind-project agreements from property records.
Current status quo
Wind leases operate under property/contract law; the comprehensive wind-specific Chapter 304 proposed here does not exist.
Before → after (governing change)
Adds Chapter 304: nonseverable surface-estate right to capture wind; developer must record release of expired/terminated agreements, with 90-day response process after owner request.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027; existing agreements remain valid. Could lower land-title barriers for new wind development, benefiting landowners/developers; no fixed electric-rate effect.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

HB547

Medium priorityLarge loads · Local permitting

Author: Bhojani · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Allows counties to enforce acoustic limits for qualifying large-load electric sites.
Current status quo
Existing large-load interconnection rules do not independently create the proposed county noise-study and site approval procedure.
Before → after (governing change)
Adds Utilities Code §37.0562 and Local Government Code §§233.171-.178: optional county siting approvals, pre/post-construction engineer noise studies and limits of 55–70 dB(A) by neighboring land use.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027 for new permit applications. Could raise project mitigation costs or delay data centers; does not let counties set electric rates or interconnection standards. Rate and renewable impacts secondary.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

HB821

Medium priorityGeneration · State governance

Author: Harrison · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Abolishes the Texas Advanced Nuclear Energy Office.
Current status quo
Government Code Chapter 483, created in 2025, organizes the state’s nuclear-energy development office.
Before → after (governing change)
Repeals Chapter 483 and directs appropriated office funding to the Texas Education Agency to reduce school tax-rate compression.
How, who, when, and expected bill/renewable effect
Immediate with 2/3 vote or Sept. 1, 2027. Could reduce organized state support for new nuclear capacity; property-tax and long-run power-price results indirect and uncertain. Nuclear is low-carbon but not wind/solar renewable.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

HB871

Medium priorityDistributed generation · Property tax

Author: Landgraf · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Establishes a property-value tax exemption for some fuel-powered on-site backup generators, conditional on a voter-approved constitutional amendment.
Current status quo
Property-tax code already exempts qualifying solar/wind devices under §11.27, but not all specified natural-gas, diesel, biodiesel, hydrogen or propane enclosed transfer-switch generators.
Before → after (governing change)
Adds Tax Code §11.39 and extends exemption procedure in §11.43 for the added value of eligible generators; only takes effect if companion HJR59 wins voters’ approval.
How, who, when, and expected bill/renewable effect
Potential effective Jan. 1, 2028. May encourage backup generation and resilience but reduce property-tax receipts; primarily favors fuel-based units rather than wind/solar, with no direct retail-rate reduction.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

HB928

Medium priorityLarge loads · Local permitting

Author: Mizani · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Requires affirmative city or county public-hearing approval before constructing any data center.
Current status quo
No statewide rule generally conditions construction of all data centers on a dedicated approval vote of this type.
Before → after (governing change)
Adds §250.015: municipality must approve facilities inside city limits; county commissioners must approve facilities in unincorporated territory.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027 for projects with new initial permit applications. Broad siting veto may slow new large electricity demand; no direct TDU rates or renewable policy changes.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

HJR59

Medium priorityDistributed generation · Constitution

Author: Landgraf · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Proposes the constitutional permission needed for HB871’s on-site generator tax exemption.
Current status quo
Article VIII §2(a) explicitly authorizes solar/wind-powered device exemptions; fuel-powered backup generator additions are not expressly listed there.
Before → after (governing change)
Amends Article VIII §2(a) to authorize the Legislature to exempt property value attributable to on-site electric generators; statewide vote Nov. 2, 2027.
How, who, when, and expected bill/renewable effect
Requires voter approval and separate implementing law such as HB871 to grant relief; could favor on-site backup power, modestly alter property taxes, but does not itself create a consumer electricity discount.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

SB224

Medium priorityCustomer protections · Rates

Author: West · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Requires landlords of submetered apartment properties to warn tenants about utility cutoff caused by the landlord’s unpaid bill.
Current status quo
Property Code §92.301 gives tenant remedies for loss of utilities; proposed §92.303 would add a specific five-day notice and prohibited-fee rule.
Before → after (governing change)
Adds §92.303: mail/hand-deliver notice within five days of provider disconnection notice, including prescribed English/Spanish language; landlord may not pass through late/disconnect/reconnect charges.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027 for future notices. Protects multifamily tenants (including electricity customers) from surprise loss and pass-through penalties; could shift such costs to landlords, not a statewide kWh rate change.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

SB240

Medium priorityCustomer protections · Reliability

Author: Cook of Harris, et al. · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Expands critical-care residential electric customer classification to people dependent on an elevator to enter/exit home.
Current status quo
§17.002(3-a) currently covers physician-diagnosed life-sustaining electrically powered medical devices only.
Before → after (governing change)
Adds physician-diagnosed dependence on a home-access elevator as an alternative qualification for critical-care residential designation.
How, who, when, and expected bill/renewable effect
Immediate with 2/3 vote or Sept. 1, 2027. Extends outage and disconnection accommodations to more households; no specified tariff or renewable change, potential administrative costs uncertain.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

SB35

Medium priorityLarge loads · ERCOT governance

Author: Zaffirini · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Requires ERCOT to provide large-electric-load information to the Texas Water Development Board.
Current status quo
ERCOT handles large-load interconnection data, but the specified statutory transmission of that information to TWDB for water planning is new.
Before → after (governing change)
Adds §39.920: PUCT directs ERCOT to share §37.0561 large-load customer information as necessary for water planning; shared data becomes confidential.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Helps water-grid planning for data centers, with no immediate tariff or renewable requirement; planning costs and benefits not quantifiable.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

SB36

Medium priorityRates · Large-load incentives

Author: Zaffirini · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Restricts data-center use of overlapping state and local tax incentives.
Current status quo
Qualifying data centers may have sales-tax exemptions under Tax Code §§151.359/.3595 and separate local economic-development or property-tax incentives subject to current eligibility rules.
Before → after (governing change)
Adds Local Government Code §§380.005/381.006, Tax Code §312.0022; bans new/renewed municipal or county development agreements and new property-tax abatements for registered centers; tightens concurrent state sales-tax exemption eligibility.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027; new agreements/applications only. May increase data-center taxes and local government revenue while reducing development subsidies; it does not directly impose new TDU rate classes or guarantee ratepayer savings.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

HB166

Low priorityEVs · Alternative-fuel grants

Author: Cortez · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Adjusts priority in an alternative-fueling-facility grant program, potentially including electric charging.
Current status quo
Health and Safety Code §393.004(b) prioritizes publicly accessible eligible stations when awarding grants.
Before → after (governing change)
Exempts qualifying transit-authority facilities in populous nonattainment/affected counties from the public-access priority restriction.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027 for later grant rounds. Could improve grant access for transit fueling/charging sites, but effects on private renewable generation or residential rates are minimal; note HB1144 separately proposes replacing Chapter 393.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

HB329

Low priorityGeothermal · Generation policy

Author: Garcia of Bexar · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Creates a state geothermal-development policy council in the Railroad Commission.
Current status quo
Natural Resources Code Chapter 81 does not provide the new council with this specific membership and planning remit.
Before → after (governing change)
Adds §81.076: Railroad Commission-led council studies industry development, tax incentives and geothermal oversight and recommends legislation; expires Jan. 1, 2034.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Could support future geothermal-electricity projects, but creates no direct permit reform, incentive payment or customer rate change. Substantively duplicated by HB994.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

HB349

Low priorityGeothermal · Workforce

Author: Garcia of Bexar · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Creates statewide geothermal workforce education and training work.
Current status quo
Labor Code §302.0085 geothermal-specific Texas Workforce Commission initiative does not presently exist.
Before → after (governing change)
Adds §302.0085 directing curriculum, funding opportunities, education-industry partnerships and annual legislative reports.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Could ease future geothermal labor constraints, with indirect and uncertain effects on renewable power costs and electric bills. Same substantive proposal as HB993.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

HB502

Low priorityGeothermal · Generation study

Author: Garcia of Bexar · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Studies using abandoned and inactive Bexar County oil/gas wells for geothermal production, including electricity.
Current status quo
Railroad Commission regulates wells and abandonment; this one-time site-specific conversion study is not currently mandated.
Before → after (governing change)
Requires well inventory, geologic/cost analysis, electrical and heat applications, barriers and possible pilot-program recommendations; report due Dec. 1, 2028; expires Jan. 1, 2029.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. No direct well conversion required or rates altered; could identify new small geothermal generation options later.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

HB595

Low priorityDistribution · Resilience study

Author: Lalani · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Requires an economics and resilience study of undergrounding power lines within 150 miles of the Gulf Coast.
Current status quo
PUCT oversees electric reliability but has no mandate for the exact temporary Gulf Coast study proposed here.
Before → after (governing change)
Requires cost, maintenance, outage-savings, technology and environmental feasibility assessments; report by Sept. 1, 2028, sunset Oct. 31, 2028.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. No immediate underground construction or delivery-charge increase; future investment could improve storm resilience but entail large capital recovery. Similar, not identical, to HB601.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

HB601

Low priorityDistribution · Resilience study

Author: Lalani · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Companion-like Gulf Coast buried-power-line cost study with a narrower scope than HB595.
Current status quo
There is no targeted statewide PUCT report requirement for this Gulf Coast region.
Before → after (governing change)
Requires cost, maintenance, outage-savings and federal technology analysis; omits HB595’s separate environmental feasibility assessment.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027; report by Sept. 1, 2028, sunset Oct. 31, 2028. Informational only; bill effects and renewable-interconnection implications await future construction decisions.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

HB706

Low priorityLarge loads · Local incentives

Author: Ochoa · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Requires elections and extensive public hearings before certain municipal data-center development incentives.
Current status quo
Local Government Code Chapter 380 authorizes qualifying municipal economic-development agreements without this data-center-specific ballot requirement.
Before → after (governing change)
Adds §380.005: five public hearings and voter approval before a covered data-center development agreement, including inviting utility departments and REPs to hearings.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027 for new agreements. Could slow subsidized data-center growth and electricity demand but leaves grid tariffs, rate recovery and renewable rules untouched.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

HB829

Low priorityGeneration · Industrial incentives

Author: Harrison · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Repeals the Texas Jobs, Energy, Technology, and Innovation Act tax-value limitation program.
Current status quo
Government Code Chapter 403 Subchapter T provides school district taxable-value limitations for qualifying large investments, with prior agreements protected.
Before → after (governing change)
Repeals the program for new projects, retains existing agreements and makes conforming Education/Tax/Government Code edits.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Could increase property-tax burden for future qualifying industrial/energy investments and alter the generation investment pipeline; not a direct consumer electricity rate rule. Renewable project eligibility must be assessed separately, not assumed.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

HB993

Low priorityGeothermal · Workforce

Author: Salinas · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Companion-like second filing for a geothermal workforce program.
Current status quo
General workforce-development tools exist, but not the geothermal-specific initiative in new §302.0085.
Before → after (governing change)
Creates Texas Workforce Commission geothermal curriculum, partnership and annual-report duties; mirrors HB349.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Potential long-term labor benefit to renewable geothermal developers, no immediate household tariff effect.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

HB994

Low priorityGeothermal · Generation policy

Author: Salinas · Filed: 2026-11-09 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Separately files the same geothermal policy-council proposal as HB329.
Current status quo
No Chapter 81 council currently has this exact statutory geothermal industry development and regulator-planning mission.
Before → after (governing change)
Adds §81.076 with Railroad Commission council, analysis of tax incentives, oversight plan and reports; sunsets Jan. 1, 2034.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Only future indirect possibilities for dispatchable renewable development and rates; grouped with HB329, not silently dropped.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

November 10, 2026 — 116 official filings

1 qualifying measure, ordered by practical importance. All measures below are proposed as filed, not enacted law.

HB1064

High priorityRates · Electricity taxes

Author: Barry · Filed: 2026-11-10 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Expands gross-receipts-tax exemption on sold electricity from public schools to all qualifying political subdivisions.
Current status quo
Tax Code §182.022(d) presently exempts electric gross receipts from sales to public-school-district customers.
Before → after (governing change)
Amends §182.022(d) to include all political subdivisions and instructs PUCT-regulated utilities and REPs to adjust eligible customer bills to pass through reduced tax liability.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Lowers tax component of qualifying city/county/other local government electricity bills; decreases tax receipts and does not automatically lower residential or commercial electricity rates. No direct renewable effect.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

November 11, 2026 — 0 official filings

No measures filed. The official date-specific report explicitly reports zero bills, rather than a failed retrieval. There are therefore no candidate bill texts or policy changes to review.

November 12, 2026 — 79 official filings

1 qualifying measure, ordered by practical importance. All measures below are proposed as filed, not enacted law.

HB1125

Low priorityEVs · Public infrastructure

Author: Bhojani · Filed: 2026-11-12 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Requires EV charging facilities in newly designed state parking lots and garages.
Current status quo
Government Code Chapter 2165 does not currently impose the proposed EV-station minimum design duty for new state-owned parking.
Before → after (governing change)
Adds §2165.059: Texas Facilities Commission, consulting State Energy Conservation Office, must set guidelines and ensure sufficient EV charging capacity in new facilities.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027 for projects whose design starts afterward. Expands charging access and state construction/electric service costs; renewable energy source not prescribed.

Priority rationale: Low because the measure primarily funds studies, planning, workforce, or localized charging/incentive changes.

November 13, 2026 — 64 official filings

4 qualifying measures, ordered by practical importance. All measures below are proposed as filed, not enacted law.

HB1139

High priorityLarge loads · Electricity taxes

Author: González of Dallas · Filed: 2026-11-13 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Ends qualified data-center sales/use-tax relief, including the electricity exemption, even for existing certifications.
Current status quo
Tax Code §§151.359/.3595 and §151.317(a)(9) currently cover qualifying data-center property and purchases of electricity.
Before → after (governing change)
Repeals the exemptions and terminates certified exemptions on effective date; pending applications denied, substantially following SB293 rather than HB167/HB408/HB681.
How, who, when, and expected bill/renewable effect
Immediate with 2/3 vote or Sept. 1, 2027. Immediate tax increases for incumbents are possible, whereas grandfathering House versions would affect future applicants only. Original HB1139 PDF carries mixed HB1139/SB293 page headers; verify enrolled drafting later.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

SB366

High priorityCustomer protections · Rates

Author: Cook of Harris · Filed: 2026-11-13 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Expands the prohibition against retail electricity disconnection during weather emergencies.
Current status quo
Utilities Code §39.101(h) prohibits residential disconnection on weekends and during its current extreme-weather conditions (specified freeze or NWS heat advisory).
Before → after (governing change)
Amends §39.101(h) to count any service-area county subject to a governor-issued weather-related disaster declaration as an extreme-weather emergency, adding a third trigger.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Reduces cutoff exposure for households in declared disasters and may extend payment deferrals; provider cash-flow risk could change, but actual average retail-rate effect is not established. No renewable power requirement.

Priority rationale: High because the measure directly changes rate recovery, tax incentives, customer protections, generation eligibility, or control of grid decisions.

HB1144

Medium priorityEVs · Renewable storage grants

Author: Landgraf · Filed: 2026-11-13 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Reorganizes the Texas emissions reduction plan (TERP) and creates a consolidated clean-fleet grant structure including electric vehicles and fueling sites.
Current status quo
Health and Safety Code Chapters 392–395 currently run separate fleet, alternative fueling, gas and related incentive programs; §386.252 allocates program funds and includes at least $1 million for renewable-related electricity storage projects.
Before → after (governing change)
Creates Chapter 392A; raises clean-fleet allocation from 5% to 21%, revises other TERP allocations and alternatives, repeals Chapters 392–395, and retains at least $1 million for renewables-related storage in the new-technology grant category.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027; TCEQ administers. Could change grant competition for charging, hydrogen, natural gas fleets and renewables-related storage, but no automatic ERCOT wholesale or household tariff change. The introduced bill is 32 pages; this overview summarizes principal electricity-relevant provisions only.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

SB370

Medium priorityDistribution · Rates · Reliability

Author: Cook of Harris · Filed: 2026-11-13 · Status: filed/prefiled · Original full text, official PDF · Official status/history

What it does
Orders a metropolitan buried-distribution-line cost/benefit study across all utility ownership types.
Current status quo
No specific PUCT mandate exists to study undergrounding in Austin, Dallas-Fort Worth, Houston and San Antonio for cooperatives, IOUs and municipally owned utilities together.
Before → after (governing change)
Requires PUCT to model burial costs passed to ratepayers, maintenance, outage benefits and environmental/public-safety effects; report due Dec. 31, 2028, sunset Jan. 31, 2029.
How, who, when, and expected bill/renewable effect
Effective Sept. 1, 2027. Study only—not authorization to charge for or build underground lines. May inform future resilience vs. delivery-rate tradeoffs; negligible direct wind/solar effect.

Priority rationale: Medium because the measure affects a material electric-market segment or project approval but has uncertain statewide consumer-bill consequences.

November 14, 2026 — 0 official filings

No measures filed. The official date-specific report explicitly reports zero bills, rather than a failed retrieval. There are therefore no candidate bill texts or policy changes to review.

Companion groups and significant differences

Completeness audit and interpretive boundaries

  1. Official roster input: Each Nov 9–14 official date-specific report was accessed individually in Texas Legislature Online. All recorded rows reconciled to "Number of Bills," including HCR/SCR/HR. The 1,482 relevant HB/SB/HJR/SJR captions were screened. Filing dates, not later legislative actions, determine inclusion.
  2. Candidate text coverage: 49 original/introduced full PDF texts retrieved and examined; zero inaccessible PDFs remain. 46 qualify under electricity/renewables/utility-governance/large-load criteria; three near-topic but indirect bills were deliberately excluded below. The two zero-filing days do not represent access failures.
  3. Status quo discipline: "Current" descriptions are grounded in the Texas statutory sections linked on each bill and, where applicable, the old text shown bracketed in the introduced bills. New-section descriptions identify new authority, not a change falsely attributed to a current regulation. The direct text links provide the decisive legal language. As with all introduced bills, drafting errors and later amendments are possible.
  4. Impact estimates: Qualitative and conditional. No dollar savings, higher bills, renewable capacity additions, vote outcomes or enactment likelihood are asserted without evidence. A study bill is never treated as authority to build or charge for a project.
  5. Potential limits: Broad caption-based screening cannot guarantee that a measure with wholly misleading caption contains a concealed electricity clause. The 49 bill-text reviews were complete, but the other 1,433 measures were screened by their official captions, not full text. Source-law pages may update after this report's date. There is no claim that every unrelated measure's full text was read.

Read and excluded after full-text review

Official reference sources

Power Hopper validation and additional bills

This section was added by Power Hopper on Nov 16, 2026. It is separate from the research report above.

What was checked

One correction

The report's text for HB867's author was garbled. The TLO roster spells the name Anchía.

A gap: bills the report did not include

The report screened captions and read 49 texts. Power Hopper screened all 1,482 captions again with a broad word list (electric, utility, power, energy, data center and similar) and read the introduced text of every bill that was not already in the report and looked related. The 12 below are near-topic. Seven are data-center bills, of which HB750, HB851 and SB296 repeal the same tax exemptions as the report's HB167 group, HB732 and SB338 limit data-center incentives, and HB529 and HB734 deal with data-center water use and disclosure. Five concern backup power during outages or EV fees. They are shown for completeness; the report's own count of 46 and its priority ratings are unchanged, and every chart uses the 46 except the data-center tax chart, which adds SB296, HB750 and HB851. This re-screen is a word search of captions, so it can also miss bills.

Additional bills found by the validation re-screen
BillLead authorFiledGroupWhat the introduced text does
HB750Jimenez2026-11-09Data-center tax repealRepeals Tax Code §§151.359 and 151.3595 and the data-center item in §151.317; tax liability accruing before the effective date continues. The introduced text has no provision keeping already certified data-center exemptions alive (unlike HB167, HB408, HB681). Effective Sept. 1, 2027. Introduced text of HB750
HB851Perez, Vincent2026-11-09Data-center tax repealRepeals §§151.359 and 151.3595 and the §151.317 data-center item, bars enterprise-project tax refunds and enterprise-zone benefits for data centers; saves only tax liability accruing before the effective date. No provision keeping certified exemptions alive. Effective Sept. 1, 2027. Introduced text of HB851
HB732Perez, Vincent2026-11-09Data-center incentive limitsBars data centers from tax abatements (Ch. 312), municipal and county Chapter 380/381 programs, tax increment financing (Ch. 311) and Texas Enterprise Fund grants; applies to agreements entered, renewed or enlarged on or after the effective date. Effective Sept. 1, 2027. Overlaps SB36. Introduced text of HB732
HB734Perez, Vincent2026-11-09Data-center transparencyAdds public-disclosure duties for local economic-development agreements involving data centers (Gov't Code §403.0246). A transparency measure like HB374/HB696, which the report excluded. Introduced text of HB734
SB296Gutierrez2026-11-09Data-center sitingCreates a TCEQ permit program for data centers of 20 MW or more or 50,000 square feet or more: local option elections, a temporary moratorium on approvals, annual payments to county residents, and repeal of the data-center sales-tax exemptions. Effective immediately with a 2/3 vote or Sept. 1, 2027. Introduced text of SB296
SB338Perry, Campbell et al.2026-11-12Data-center incentive limitsAmends the Jobs, Energy, Technology, and Innovation Act (Gov't Code ch. 403) and Chapters 312, 380 and 381 to cap school-district taxable value at 50% of market value for data-center projects, add termination rights and other data-center conditions. Effective Sept. 1, 2027. Introduced text of SB338
HB529Bhojani2026-11-09Data-center waterWater-conservation plans and water-use reporting for covered data centers (75 MW or more of electric demand, or 300,000 gallons in 30 days). A water bill with an electric-demand threshold. Introduced text of HB529
HB812Reynolds2026-11-09Backup powerRequires nursing facilities to have an emergency generator or comparable power source with 72 hours of fuel by Sept. 1, 2028 (extensions possible). Backup power, not grid policy. Introduced text of HB812
SB317Miles2026-11-10Backup powerRequires generators or other power sources at housing tax-credit developments for residents 55 and older, able to run elevators and keep one area at 68 to 82 degrees during an outage. Backup power. Introduced text of SB317
SB320Miles2026-11-10Backup powerRaises the on-site fuel or battery duration for dialysis-facility emergency generators from 24 to 72 hours. Backup power. Introduced text of SB320
SB315Miles2026-11-10Backup powerRequires senior independent living communities to contract a vendor to keep elevators operable within 72 hours of a power outage, with administrative penalties up to $1,000 and then $5,000 a day. Outage resilience. Introduced text of SB315
HB1072Spencer2026-11-10Electric vehiclesAllocates one-twentieth of electric-vehicle registration fees ($400 new, $200 renewal) to the county and road district highway fund and the rest to the state highway fund. Effective Sept. 1, 2027. Introduced text of HB1072

Downloads

Bill reviews (46) (CSV) · Full filing roster (1,521) (CSV) · Reconciliation by date (CSV) · Excluded bills (CSV) · Citations checked (CSV) · Additional bills found (CSV) · Key numbers (JSON) · SHA-256 checksums

Notes and limits

Scope. Measures filed on the six official Texas Legislature Online (TLO) filing-date rosters, Nov 9 to Nov 14, 2026, for the 90th Legislature, Regular Session. Filing dates, not later legislative actions, determine inclusion. Introduced bills only; none has passed.

How the review was done. Each daily roster was read, the 1,482 HB, SB, HJR and SJR captions were screened, 49 plausible or ambiguous introduced texts were read in full, 46 met the review's broad electricity-impact threshold and 3 were excluded. Priority (High, Medium, Low) is the report's own rating.

Power Hopper labels. The topic and direction-of-change labels used in the charts, the effective-date groups, and the validation sections were added by Power Hopper. Each bill is placed under one main topic and one main change; many bills do several things.

Impact estimates. Qualitative and conditional. No dollar savings, higher bills, renewable capacity additions, vote outcomes or enactment likelihood are asserted. A study bill is never treated as authority to build or charge for a project.

Limits. Caption-based screening cannot guarantee that a measure with a misleading caption contains no electricity clause. The 49 bill-text reviews were complete, but the other 1,433 measures were screened by caption, not full text. Power Hopper's re-screen found 12 more near-topic bills. Source-law pages and bill status may change after Nov 16, 2026.

Power Hopper is not affiliated with or endorsed by the Texas Legislature, the Texas Legislative Council, the PUCT, ERCOT, or any legislator, retail electric provider or news outlet named here.

Power Hopper (BJW Ventures LLC d/b/a Power Hopper) is a PUCT-registered electricity broker, BR260201; registration is not a PUCT endorsement. Electricity providers may pay us a commission if you sign up through us. Power Hopper is not a retail electric provider, utility or transmission and distribution utility. This brief was prepared with AI assistance.