  "id": "US-01",
  "number": "U.S. new 345 kV+ line, 2013 (peak year)",
  "value": "4194.5",
  "unit": "miles",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://web.archive.org/web/20150209022700id_/http://www.ferc.gov:80/legal/staff-reports/2014/dec-infrastructure.pdf"
 },
 {
  "id": "US-02",
  "number": "U.S. new 345 kV+ line, 2023 (latest FERC edition)",
  "value": "59.5",
  "unit": "miles",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ferc.gov/sites/default/files/2025-04/DecemberMIR2024Revised-4-22-2025.pdf"
 },
 {
  "id": "US-03",
  "number": "U.S. new 345 kV+ line, 2024 (latest FERC edition)",
  "value": "906.1",
  "unit": "miles",
  "verification_status": "verified (primary document read 2026-11-17); may still be revised",
  "source_url": "https://www.ferc.gov/sites/default/files/2026-03/December%20MIR%202025.docx"
 },
 {
  "id": "US-04",
  "number": "U.S. new 345 kV+ line, 2024 (FERC first estimate)",
  "value": "275.5",
  "unit": "miles",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ferc.gov/sites/default/files/2025-02/December%20MIR%202024.pdf"
 },
 {
  "id": "US-05",
  "number": "U.S. new 345 kV+ line, 2024 (FERC Apr 2025 interim revision)",
  "value": "888.5",
  "unit": "miles",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ferc.gov/sites/default/files/2025-07/April%20MIR%202025.pdf"
 },
 {
  "id": "US-06",
  "number": "U.S. new 345 kV+ line, 2025 (FERC first estimate)",
  "value": "402.6",
  "unit": "miles",
  "verification_status": "verified (primary document read 2026-11-17); first estimate",
  "source_url": "https://www.ferc.gov/sites/default/files/2026-03/December%20MIR%202025.docx"
 },
 {
  "id": "US-07",
  "number": "U.S. average yearly 345 kV+ additions, 2019-2023",
  "value": "468.1",
  "unit": "miles/yr",
  "verification_status": "derived from verified inputs",
  "source_url": "data/us_345kv_plus_latest_ferc_2009_2025.csv"
 },
 {
  "id": "US-08",
  "number": "U.S. average yearly 345 kV+ additions, 2009-2016",
  "value": "1564.9",
  "unit": "miles/yr",
  "verification_status": "derived from verified inputs",
  "source_url": "data/us_345kv_plus_latest_ferc_2009_2025.csv"
 },
 {
  "id": "US-09",
  "number": "U.S. average yearly 345 kV+ additions, 2017-2025 (2017 Jan-Nov; 2025 first estimate)",
  "value": "547.7",
  "unit": "miles/yr",
  "verification_status": "derived from verified inputs",
  "source_url": "data/us_345kv_plus_latest_ferc_2009_2025.csv"
 },
 {
  "id": "US-10",
  "number": "Median ratio of latest to first FERC estimate, 13 years 2010-2024",
  "value": "1.35",
  "unit": "ratio",
  "verification_status": "derived (v3 said 1.4)",
  "source_url": "data/us_345kv_plus_latest_ferc_2009_2025.csv"
 },
 {
  "id": "US-11",
  "number": "U.S. 2023 per ACEG July 2025 addendum (~400 at 345 kV + ~50 at 500 kV)",
  "value": "450",
  "unit": "miles",
  "verification_status": "NOT FOUND in FERC tables: Apr 2025 EIU has no 2023 column; Dec 2024 edition and its Apr 2025 revision show 59.5",
  "source_url": "https://cleanenergygrid.org/new-report-reveals-u-s-transmission-buildout-lagging-far-behind-national-needs/"
 },
 {
  "id": "US-12",
  "number": "Grid Strategies (Nov 2026): 2023 data rose only about four miles across a year of FERC updates",
  "value": "4",
  "unit": "miles",
  "verification_status": "secondary; consistent with FERC 55.5 -> 59.5",
  "source_url": "https://gridstrategiesllc.com/wp-content/uploads/GS_US-Trails-the-World-in-High-Capacity-Transmission-Construction-1.pdf"
 },
 {
  "id": "US-13",
  "number": "FERC Form 1 p.424 345 kV+ lines added or altered, 2023 (investor-owned utilities)",
  "value": "553.0",
  "unit": "miles",
  "verification_status": "partially verified (carried from v3; not re-pulled)",
  "source_url": "https://data.catalyst.coop/"
 },
 {
  "id": "CN-01",
  "number": "China new lines 330 kV+ AC plus all DC, average 2019-2023",
  "value": "15619",
  "unit": "km/yr",
  "verification_status": "verified (table read from page image)",
  "source_url": "https://pdf.dfcfw.com/pdf/H3_AP202512311811775347_1.pdf"
 },
 {
  "id": "CN-02",
  "number": "Same, in miles",
  "value": "9705",
  "unit": "miles/yr",
  "verification_status": "derived from verified inputs",
  "source_url": "https://pdf.dfcfw.com/pdf/H3_AP202512311811775347_1.pdf"
 },
 {
  "id": "CN-03",
  "number": "China new lines 500 kV+ AC plus all DC, average 2019-2023",
  "value": "8633",
  "unit": "miles/yr",
  "verification_status": "derived from verified inputs",
  "source_url": "https://pdf.dfcfw.com/pdf/H3_AP202512311811775347_1.pdf"
 },
 {
  "id": "CN-04",
  "number": "China AC 330 kV+ circuit-length stock increase 2019-2023 (Table 3-15) vs additions 2020-2023 (Table 4-24)",
  "value": "52282 vs 50374",
  "unit": "km",
  "verification_status": "derived; indicates additions are on a circuit-length basis (not proof)",
  "source_url": "https://pdf.dfcfw.com/pdf/H3_AP202512311811775347_1.pdf"
 },
 {
  "id": "R-01",
  "number": "China/U.S. ratio, published figures 2019-2023 (330 kV+ vs 345 kV+)",
  "value": "20.7",
  "unit": "ratio",
  "verification_status": "derived; not like-for-like",
  "source_url": "data/china_us_ratio_sensitivity_2019_2023.csv"
 },
 {
  "id": "R-02",
  "number": "China/U.S. ratio range across five definitions",
  "value": "10.4-20.7",
  "unit": "ratio",
  "verification_status": "derived; sensitivity",
  "source_url": "data/china_us_ratio_sensitivity_2019_2023.csv"
 },
 {
  "id": "T-01",
  "number": "China UHV DC: median years, NDRC approval to full service (n=13)",
  "value": "2.04",
  "unit": "years",
  "verification_status": "partially verified (3 of 13 rely on a search-excerpt source)",
  "source_url": "data/matched_approval_to_service_us_china.csv"
 },
 {
  "id": "T-02",
  "number": "U.S. ledger: median years, final approval to energization (n=12)",
  "value": "3.33",
  "unit": "years",
  "verification_status": "partially verified (8 of 12 rely on a low-confidence date)",
  "source_url": "data/matched_approval_to_service_us_china.csv"
 },
 {
  "id": "E-01",
  "number": "ERCOT 765-kV STEP Core Plan construction cost estimate",
  "value": "32.99",
  "unit": "USD billion",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"
 },
 {
  "id": "E-02",
  "number": "ERCOT 345-kV plan construction cost estimate",
  "value": "30.75",
  "unit": "USD billion",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ercot.com/files/docs/2025/01/28/ERCOT_Trending_Topic_345-kV_vs_765-kV_Transmission.pdf"
 },
 {
  "id": "E-03",
  "number": "Cost difference, 765 vs 345 (and after outage/upgrade adjustment)",
  "value": "2.24 (1.35)",
  "unit": "USD billion",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ercot.com/files/docs/2025/01/28/ERCOT_Trending_Topic_345-kV_vs_765-kV_Transmission.pdf"
 },
 {
  "id": "E-04",
  "number": "765 vs 345: added system-wide consumer energy cost reduction, study year 2039",
  "value": "229",
  "unit": "USD million/yr (2025$)",
  "verification_status": "verified (primary document read 2026-11-17); model result, not net savings vs no new lines",
  "source_url": "https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"
 },
 {
  "id": "E-05",
  "number": "765 vs 345: consumer energy cost savings, study year 2034",
  "value": "-136",
  "unit": "USD million/yr (2025$)",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"
 },
 {
  "id": "E-06",
  "number": "STEP Core Plan new right-of-way / existing line upgrades",
  "value": " 3441 / 2831",
  "unit": "miles",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"
 },
 {
  "id": "E-07",
  "number": "STEP Core Plan reduction in annual systemwide losses vs 345-kV plan",
  "value": "~5% (~560 GWh)",
  "unit": "share / GWh",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"
 },
 {
  "id": "E-08",
  "number": "West Texas Export stability limit, before/after STEP",
  "value": "12.7 -> 16.2",
  "unit": "GW",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"
 },
 {
  "id": "E-09",
  "number": "ERCOT 2030 summer peak forecast used in planning",
  "value": ">150",
  "unit": "GW",
  "verification_status": "verified (primary document read 2026-11-17); forecast",
  "source_url": "https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"
 },
 {
  "id": "E-10",
  "number": "Drill Hole-Sand Lake-Solstice 765-kV project cost / new ROW / in-service",
  "value": "742.2 / 104.4 / Summer 2030",
  "unit": "USD million / miles / date",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ercot.com/files/docs/2025/12/01/14.2-25RPG022-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project.pdf"
 },
 {
  "id": "E-11",
  "number": "Annual transmission investment needed under either plan (6-yr horizon)",
  "value": "5",
  "unit": "USD billion/yr",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.ercot.com/files/docs/2025/01/28/ERCOT_Trending_Topic_345-kV_vs_765-kV_Transmission.pdf"
 },
 {
  "id": "N-01",
  "number": "NERC prudent additions into ERCOT: Front Range / MISO-S / SPP-S",
  "value": "5700 / 4300 / 4100",
  "unit": "MW",
  "verification_status": "verified (primary document read 2026-11-17); study recommendation",
  "source_url": "https://www.nerc.com/pa/RAPA/Documents/ITCS_Final_Report.pdf"
 },
 {
  "id": "N-02",
  "number": "NERC prudent additions into ERCOT, total",
  "value": "14100",
  "unit": "MW",
  "verification_status": "verified (primary document read 2026-11-17); study recommendation",
  "source_url": "https://www.nerc.com/pa/RAPA/Documents/ITCS_Final_Report.pdf"
 },
 {
  "id": "N-03",
  "number": "NERC prudent additions, U.S. total",
  "value": "35000",
  "unit": "MW",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.nerc.com/pa/RAPA/Documents/ITCS_Final_Report.pdf"
 },
 {
  "id": "N-04",
  "number": "ERCOT current modeled import limit (ITCS)",
  "value": "820",
  "unit": "MW",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.nerc.com/pa/RAPA/Documents/ITCS_Final_Report.pdf"
 },
 {
  "id": "N-05",
  "number": "ERCOT energy-deficiency hours / max deficiency, 2033 case",
  "value": "135 / 18,926",
  "unit": "hours / MW",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.nerc.com/pa/RAPA/Documents/ITCS_Final_Report.pdf"
 },
 {
  "id": "N-06",
  "number": "ERCOT maximum DC-tie import capability during Winter Storm Uri",
  "value": "1220",
  "unit": "MW",
  "verification_status": "carried from v3; not re-opened in v4",
  "source_url": "https://www.nerc.com/pa/rrm/ea/Documents/February_2021_Cold_Weather_Report.pdf"
 },
 {
  "id": "N-07",
  "number": "ERCOT firm load shed at peak, Winter Storm Uri",
  "value": "20000",
  "unit": "MW",
  "verification_status": "carried from v3; not re-opened in v4",
  "source_url": "https://www.nerc.com/pa/rrm/ea/Documents/February_2021_Cold_Weather_Report.pdf"
 },
 {
  "id": "J-01",
  "number": "U.S. power and communication line construction employment (NAICS 237130, private), 2025",
  "value": "251549",
  "unit": "jobs",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://data.bls.gov/cew/data/api/2025/a/industry/237130.csv"
 },
 {
  "id": "J-02",
  "number": "Texas, same industry, 2025",
  "value": "36957",
  "unit": "jobs",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://data.bls.gov/cew/data/api/2025/a/industry/237130.csv"
 },
 {
  "id": "J-03",
  "number": "\"over 100,000 jobs\" as share of J-01",
  "value": "39.8",
  "unit": "percent",
  "verification_status": "derived; the claim's unit (jobs vs job-years, direct vs total) is not stated",
  "source_url": ""
 },
 {
  "id": "J-04",
  "number": "Floor statement: bill \"is estimated to create over 100,000 jobs\"",
  "value": "quote",
  "unit": "",
  "verification_status": "verified (primary document read 2026-11-17) (quote); underlying estimate not cited",
  "source_url": "https://www.govinfo.gov/content/pkg/CREC-2026-11-09/pdf/CREC-2026-11-09-senate.pdf"
 },
 {
  "id": "L-01",
  "number": "S.Amdt. 6883 (BAAJA substitute) proposed to H.R. 2347",
  "value": "2026-11-10",
  "unit": "date",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://api.congress.gov/v3/amendment/119/samdt/6883/actions"
 },
 {
  "id": "L-02",
  "number": "Senate vote 257: cloture on motion to proceed to H.R. 2347",
  "value": "73-25",
  "unit": "votes",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.senate.gov/legislative/LIS/roll_call_votes/vote1192/vote_119_2_00257.xml"
 },
 {
  "id": "L-03",
  "number": "Senate vote 258: motion to proceed",
  "value": "62-21",
  "unit": "votes",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.senate.gov/legislative/LIS/roll_call_votes/vote1192/vote_119_2_00258.xml"
 },
 {
  "id": "L-04",
  "number": "Senate vote 264: cloture on S.Amdt. 6883 (Nov 16 2026, 5:27 PM CT)",
  "value": "70-27",
  "unit": "votes",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://www.senate.gov/legislative/LIS/roll_call_votes/vote1192/vote_119_2_00264.xml"
 },
 {
  "id": "L-05",
  "number": "Latest official action as of 2026-11-17 06:40 CT",
  "value": "2026-11-16 Considered by Senate",
  "unit": "status",
  "verification_status": "verified (primary document read 2026-11-17); no adoption or passage vote recorded yet",
  "source_url": "https://api.congress.gov/v3/amendment/119/samdt/6883/actions"
 },
 {
  "id": "L-06",
  "number": "CBO/JCT preliminary estimate: deficit increase, 2027-2036",
  "value": "<1",
  "unit": "USD billion",
  "verification_status": "partially verified: letter existence/date verified via congress.gov API; wording via Benton.org republication (cbo.gov blocked automated access)",
  "source_url": "https://www.cbo.gov/publication/62908"
 },
 {
  "id": "L-07",
  "number": "SA 6883 Sec. 2101(i): new FPA 216(k)(1) \"This section shall not apply within the area referred to in section 212(k)(2)(A)\" (ERCOT)",
  "value": "text",
  "unit": "",
  "verification_status": "verified (primary document read 2026-11-17); legal effect needs counsel",
  "source_url": "https://www.govinfo.gov/content/pkg/CREC-2026-11-10/pdf/CREC-2026-11-10-senate.pdf"
 },
 {
  "id": "L-08",
  "number": "SA 6883 Sec. 2103: new FPA 225(b)(1) ERCOT exclusion and planning-region exclusion",
  "value": "text",
  "unit": "",
  "verification_status": "verified (primary document read 2026-11-17); legal effect needs counsel",
  "source_url": "https://www.govinfo.gov/content/pkg/CREC-2026-11-10/pdf/CREC-2026-11-10-senate.pdf"
 },
 {
  "id": "L-09",
  "number": "SA 6883 Sec. 2101(b): FERC backstop eligibility includes facilities of not less than 230 kV; state 1-year clock runs from state filing date",
  "value": "text",
  "unit": "",
  "verification_status": "verified (primary document read 2026-11-17); legal effect needs counsel",
  "source_url": "https://www.govinfo.gov/content/pkg/CREC-2026-11-10/pdf/CREC-2026-11-10-senate.pdf"
 },
 {
  "id": "B-01",
  "number": "ERCOT total TCOS (2026 matrix)",
  "value": "6055.6",
  "unit": "USD million/yr",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://interchange.puc.texas.gov/Documents/59080_50_1603607.ZIP"
 },
 {
  "id": "B-02",
  "number": "ERCOT average 4CP, 2025",
  "value": "80874",
  "unit": "MW",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://interchange.puc.texas.gov/Documents/59080_50_1603607.ZIP"
 },
 {
  "id": "B-03",
  "number": "Oncor / CenterPoint average 4CP, 2025",
  "value": "28677 / 20180",
  "unit": "MW",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://interchange.puc.texas.gov/Documents/59080_50_1603607.ZIP"
 },
 {
  "id": "B-04",
  "number": "Oncor Rider TCRF residential allocation factor",
  "value": "42.407",
  "unit": "percent",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://interchange.puc.texas.gov/Documents/59249_105_1676040.PDF"
 },
 {
  "id": "B-05",
  "number": "CenterPoint Rider TCRF residential allocation factor",
  "value": "48.9238",
  "unit": "percent",
  "verification_status": "verified (primary document read 2026-11-17)",
  "source_url": "https://interchange.puc.texas.gov/Documents/59825_10_1665606.PDF"
 },
 {
  "id": "B-06",
  "number": "Oncor / CenterPoint residential customers, 2024",
  "value": "3477215 / 2485470",
  "unit": "customers",
  "verification_status": "carried from v3; not re-downloaded in v4",
  "source_url": "https://www.eia.gov/electricity/data/eia861/zip/f8612024.zip"
 },
 {
  "id": "B-07",
  "number": "Annual carrying-charge rate (levelized revenue requirement / capital)",
  "value": "8-14 (central 11)",
  "unit": "percent",
  "verification_status": "ASSUMPTION; needs utility-specific check",
  "source_url": ""
 },
 {
  "id": "B-08",
  "number": "Estimated added monthly transmission charge, Oncor home, full STEP in rates, today's load",
  "value": "9.51-16.64 (central 13.08)",
  "unit": "USD/month",
  "verification_status": "Power Hopper ESTIMATE, not ERCOT",
  "source_url": "data/household_transmission_charge_estimate.csv"
 },
 {
  "id": "B-09",
  "number": "Same, CenterPoint home",
  "value": "10.80-18.90 (central 14.85)",
  "unit": "USD/month",
  "verification_status": "Power Hopper ESTIMATE",
  "source_url": "data/household_transmission_charge_estimate.csv"
 },
 {
  "id": "B-10",
  "number": "Same, Oncor home, if ERCOT 4CP grows to 111.3 GW and new load absorbs the added share",
  "value": "6.91-12.09 (central 9.50)",
  "unit": "USD/month",
  "verification_status": "Power Hopper ESTIMATE; 111.3 GW forecast carried from v3 (ERCOT CEO update Apr 2026)",
  "source_url": "data/household_transmission_charge_estimate.csv"
 },
 {
  "id": "B-11",
  "number": "Incremental cost of 765 plan vs 345 plan, Oncor home (central)",
  "value": "0.89",
  "unit": "USD/month",
  "verification_status": "Power Hopper ESTIMATE",
  "source_url": "data/household_transmission_charge_estimate.csv"
 },
 {
  "id": "C-01",
  "number": "Median filed cost per mile, 345 kV+ lines >=20 mi, 2001-08 / 2009-16 / 2017-25 (2025$)",
  "value": "1.54 / 2.04 / 2.01",
  "unit": "USD million/mile",
  "verification_status": "partially verified (PUDL republication; not re-pulled in v4)",
  "source_url": "https://data.catalyst.coop/"
 }
]