{
  "title": "Texas residential delivery charges at 1,000 kWh, 2020\u20132026 official snapshots",
  "slug": "texas-residential-delivery-charges-history-2020-2026",
  "credit": "Power Hopper Team",
  "license": "CC BY 4.0 for Power Hopper-created compilation and analysis. Underlying data: Public Utility Commission of Texas, Lubbock Power & Light, ERCOT and the Texas Legislature, credited to the source.",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "pin_2020": "March 1, 2020 (PUCT Schedule Commission-7)",
  "pin_2026": "November 1, 2026 (PUCT monthly TDU rate reports; LP&L city tariff effective Nov. 1, 2026)",
  "sb1015_effective": "2023-06-18",
  "sb1015_note": "SB 1015 (88th Regular Session) took effect immediately on June 18, 2023. It amended Utilities Code \u00a736.210 (periodic / DCRF rate adjustments): strikes from \u00a736.210(d) the limit of 'not more than four times between comprehensive base rate proceedings' and repeals \u00a736.210(d-1), the related exception for utilities subject to \u00a736.157; adds (h) on filing timing while a base-rate case is pending. It did not itself set a delivery rate. SB 1015 applies only to PUCT proceedings that began on or after June 18, 2023, so the Sept. 1, 2023 totals can include rates from proceedings filed earlier. Published totals also include TCRF, base rates, EECRF and other riders.",
  "hb5247_note": "By November 2026, Oncor (PUCT Docket 59249, temporary rates) and AEP Texas (PUCT Docket 58315, final order July 30, 2026) were adjusting rates through a single annual proceeding under Utilities Code \u00a736.216, added by HB 5247 (89th Legislature, effective June 20, 2025), in lieu of SB 1015's \u00a736.210 DCRF process.",
  "oncor_temporary_note": "Oncor's November 2026 rates are temporary and subject to refund or credit with interest once the PUCT issues a final order (PUCT Docket 59249; PURA \u00a736.216(i)).",
  "centerpoint_dcrf_note": "CenterPoint's November 2026 total includes an interim distribution cost recovery factor (meters read on or after Sept. 30, 2026; PUCT Docket 59981). The Commission's final order, filed Nov. 5, 2026, approved the same rates.",
  "basis_note": "2020 figures are PUCT Schedule Commission-7 totals (fixed charges plus all listed per-kWh charges). 2026 figures are PUCT 'Average Residential Customer Bill (1,000 kWh)'; for Oncor, CenterPoint and TNMP these equal the listed charges, while AEP Texas's also include percent-of-revenue riders that are not itemized. Both are delivery charges only, before taxes and retail provider charges.",
  "not_affiliated": "Power Hopper is not affiliated with or endorsed by the PUCT, ERCOT, Oncor, CenterPoint Energy, AEP Texas, TNMP, Lubbock Power & Light or the City of Lubbock, or the Texas Legislature.",
  "gaps": [
    "March 1, 2023 official PUCT generic T&D summary is a 1-page Commission-1 file only; no Commission-7 totals.",
    "September 1, 2023 Commission-7 omits AEP Texas North.",
    "No official 2024 published total at 1,000 kWh was retrieved for this packet.",
    "LP&L is N/A for 2020 and is not on the PUCT TDU Commission-7 or monthly TDU report tables."
  ],
  "comparison_2020_vs_2026": [
    {
      "delivery_utility": "Oncor",
      "pin_2020_date": "2020-03-01",
      "applicable_in_2020": "Y",
      "fixed_monthly_usd_2020": 3.42,
      "volumetric_usd_per_kwh_2020": 0.035271,
      "delivery_usd_1000_kwh_2020": 38.69,
      "fixed_monthly_usd_2026": 4.06,
      "volumetric_usd_per_kwh_2026": 0.068673,
      "delivery_usd_1000_kwh_2026": 72.73,
      "change_usd": 34.04,
      "change_pct": 88.0,
      "change_display": "+$34.04 (+88.0%)",
      "note": "2020 figures are PUCT Schedule Commission-7 totals (fixed charges plus all listed per-kWh charges). 2026 figures are PUCT 'Average Residential Customer Bill (1,000 kWh)'; for Oncor, CenterPoint and TNMP these equal the listed charges, while AEP Texas's also include percent-of-revenue riders that are not itemized. Both are delivery charges only, before taxes and retail provider charges. components (customer $1.48 + metering $2.58 + volumetric $0.068673). Oncor's November 2026 rates are temporary and subject to refund or credit with interest once the PUCT issues a final order (PUCT Docket 59249; PURA \u00a736.216(i)). Bills rendered on or after 2026-10-04; first appear in the Nov. 1, 2026 report. Adjusting under Utilities Code \u00a736.216, added by HB 5247 (89th Legislature, effective June 20, 2025).",
      "source_url_2020": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_url_2026": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/Oncor_Rate_Report.pdf"
    },
    {
      "delivery_utility": "CenterPoint",
      "pin_2020_date": "2020-03-01",
      "applicable_in_2020": "Y",
      "fixed_monthly_usd_2020": 5.47,
      "volumetric_usd_per_kwh_2020": 0.034485,
      "delivery_usd_1000_kwh_2020": 39.96,
      "fixed_monthly_usd_2026": 4.9,
      "volumetric_usd_per_kwh_2026": 0.065333,
      "delivery_usd_1000_kwh_2026": 70.23,
      "change_usd": 30.27,
      "change_pct": 75.8,
      "change_display": "+$30.27 (+75.8%)",
      "note": "2020 figures are PUCT Schedule Commission-7 totals (fixed charges plus all listed per-kWh charges). 2026 figures are PUCT 'Average Residential Customer Bill (1,000 kWh)'; for Oncor, CenterPoint and TNMP these equal the listed charges, while AEP Texas's also include percent-of-revenue riders that are not itemized. Both are delivery charges only, before taxes and retail provider charges. components (customer $2.11 + metering $2.79 + volumetric $0.065333). CenterPoint's November 2026 total includes an interim distribution cost recovery factor (meters read on or after Sept. 30, 2026; PUCT Docket 59981). The Commission's final order, filed Nov. 5, 2026, approved the same rates.",
      "source_url_2020": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_url_2026": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/CenterPoint_Rate_Report.pdf"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "pin_2020_date": "2020-03-01",
      "applicable_in_2020": "Y",
      "fixed_monthly_usd_2020": 4.79,
      "volumetric_usd_per_kwh_2020": 0.042286,
      "delivery_usd_1000_kwh_2020": 47.08,
      "fixed_monthly_usd_2026": 3.24,
      "volumetric_usd_per_kwh_2026": "",
      "delivery_usd_1000_kwh_2026": 60.15,
      "change_usd": 13.07,
      "change_pct": 27.8,
      "change_display": "+$13.07 (+27.8%)",
      "note": "2020 figures are PUCT Schedule Commission-7 totals (fixed charges plus all listed per-kWh charges). 2026 figures are PUCT 'Average Residential Customer Bill (1,000 kWh)'; for Oncor, CenterPoint and TNMP these equal the listed charges, while AEP Texas's also include percent-of-revenue riders that are not itemized. Both are delivery charges only, before taxes and retail provider charges. PUCT published average bill (volumetric shown as $0.057, rounded; average includes %-of-revenue riders). AEP Texas was adjusting rates through a single annual proceeding under Utilities Code \u00a736.216 (PUCT Docket 58315, final order July 30, 2026), added by HB 5247 (89th Legislature, effective June 20, 2025).",
      "source_url_2020": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_url_2026": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/AEP_Rate_Report.pdf"
    },
    {
      "delivery_utility": "AEP Texas North",
      "pin_2020_date": "2020-03-01",
      "applicable_in_2020": "Y",
      "fixed_monthly_usd_2020": 4.79,
      "volumetric_usd_per_kwh_2020": 0.035805,
      "delivery_usd_1000_kwh_2020": 40.6,
      "fixed_monthly_usd_2026": 3.24,
      "volumetric_usd_per_kwh_2026": "",
      "delivery_usd_1000_kwh_2026": 59.0,
      "change_usd": 18.4,
      "change_pct": 45.3,
      "change_display": "+$18.40 (+45.3%)",
      "note": "2020 figures are PUCT Schedule Commission-7 totals (fixed charges plus all listed per-kWh charges). 2026 figures are PUCT 'Average Residential Customer Bill (1,000 kWh)'; for Oncor, CenterPoint and TNMP these equal the listed charges, while AEP Texas's also include percent-of-revenue riders that are not itemized. Both are delivery charges only, before taxes and retail provider charges. PUCT published average bill (volumetric shown as $0.056, rounded; average includes %-of-revenue riders). AEP Texas was adjusting rates through a single annual proceeding under Utilities Code \u00a736.216 (PUCT Docket 58315, final order July 30, 2026), added by HB 5247 (89th Legislature, effective June 20, 2025).",
      "source_url_2020": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_url_2026": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/AEP_Rate_Report.pdf"
    },
    {
      "delivery_utility": "TNMP",
      "pin_2020_date": "2020-03-01",
      "applicable_in_2020": "Y",
      "fixed_monthly_usd_2020": 7.85,
      "volumetric_usd_per_kwh_2020": 0.041194,
      "delivery_usd_1000_kwh_2020": 49.04,
      "fixed_monthly_usd_2026": 7.56,
      "volumetric_usd_per_kwh_2026": 0.07771,
      "delivery_usd_1000_kwh_2026": 85.27,
      "change_usd": 36.23,
      "change_pct": 73.9,
      "change_display": "+$36.23 (+73.9%)",
      "note": "2020 figures are PUCT Schedule Commission-7 totals (fixed charges plus all listed per-kWh charges). 2026 figures are PUCT 'Average Residential Customer Bill (1,000 kWh)'; for Oncor, CenterPoint and TNMP these equal the listed charges, while AEP Texas's also include percent-of-revenue riders that are not itemized. Both are delivery charges only, before taxes and retail provider charges. components (customer $1.70 + metering $5.86 + volumetric $0.077710)",
      "source_url_2020": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_url_2026": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/TNMP_Rate_Report.pdf"
    },
    {
      "delivery_utility": "Lubbock Power & Light",
      "pin_2020_date": "2020-03-01",
      "applicable_in_2020": "N",
      "fixed_monthly_usd_2020": "",
      "volumetric_usd_per_kwh_2020": "",
      "delivery_usd_1000_kwh_2020": "",
      "fixed_monthly_usd_2026": 2.5,
      "volumetric_usd_per_kwh_2026": 0.06008,
      "delivery_usd_1000_kwh_2026": 62.58,
      "change_usd": "",
      "change_pct": "",
      "change_display": "",
      "note": "Not applicable for 2020. LP&L was a bundled municipal utility. Competitive retail service in the LP&L service area began March 4, 2024 (customers moved to retail electric providers through April 1, 2024). LP&L delivery rates are set by the City of Lubbock, not the PUCT. The November 2026 figure is a Power Hopper sum of LP&L tariff components ($2.50 + 6.008\u00a2/kWh), not a published average bill, effective Nov. 1, 2026. SB 1015's DCRF process under Utilities Code \u00a736.210 applies to PUCT-regulated electric utilities.",
      "source_url_2020": "https://www.ercot.com/services/comm/mkt_notices/M-A022724-01",
      "source_url_2026": "https://public.destinyhosted.com/lubbodocs/2026/REGCCM/20260908_1280/14523_Delivery%20Service%20Tariff%20-%20Rate%202026-27%20Clean%20Version%20v2.pdf"
    }
  ],
  "snapshots": [
    {
      "delivery_utility": "Oncor",
      "as_of": "2020-03-01",
      "as_of_label": "March 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 38.69,
      "fixed_monthly_usd": 3.42,
      "volumetric_usd_per_kwh": 0.035271,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2020, page 8 of 8 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_page": "8 of 8"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2020-09-01",
      "as_of_label": "September 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 42.06,
      "fixed_monthly_usd": 3.42,
      "volumetric_usd_per_kwh": 0.038641,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2020, page 9 of 9 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323144859/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090120.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2021-03-01",
      "as_of_label": "March 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 37.68,
      "fixed_monthly_usd": 3.42,
      "volumetric_usd_per_kwh": 0.034256,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301171112/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2021-09-01",
      "as_of_label": "September 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 44.31,
      "fixed_monthly_usd": 3.42,
      "volumetric_usd_per_kwh": 0.040894,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301184208/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2022-03-01",
      "as_of_label": "March 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 41.52,
      "fixed_monthly_usd": 3.42,
      "volumetric_usd_per_kwh": 0.038101,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2022, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301175600/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030122.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2022-09-01",
      "as_of_label": "September 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 46.97,
      "fixed_monthly_usd": 3.42,
      "volumetric_usd_per_kwh": 0.043546,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2022 (official FTP archive copy, Wayback 2023-06-26). Column order on this sheet is CenterPoint, Oncor, AEP Central, AEP North, TNMP.",
      "source_url": "https://web.archive.org/web/20230626013352/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090122.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2023-03-01",
      "as_of_label": "March 1, 2023",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": "",
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "N",
      "record_type": "PUCT generic T&D summary (incomplete)",
      "note": "The official PUCT file titled Updated March 1, 2023 contains only Schedule Commission-1 (base T&D charges, 1 page). It does not include Schedule Commission-7 or other rider schedules, so a total residential delivery charge at 1,000 kWh cannot be source-checked from this document. The same 1-page file was posted as the current summary on June 22, 2023 (Wayback). Value cut, not estimated.",
      "source_url": "https://web.archive.org/web/20240301183314/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030123.pdf",
      "source_page": "page 1 of 1 (Commission-1 only)"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2023-09-01",
      "as_of_label": "September 1, 2023",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 54.89,
      "fixed_monthly_usd": 4.23,
      "volumetric_usd_per_kwh": 0.05066,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2023 (official FTP archive copy, Wayback 2024-03-01). Column order is CenterPoint, Oncor, AEP Central, TNMP. AEP North is not published on this table.",
      "source_url": "https://web.archive.org/web/20240301172516/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090123.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2025-10-01",
      "as_of_label": "October 1, 2025",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 60.26,
      "fixed_monthly_usd": 4.23,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of October 01, 2025 (Wayback 2025-10-17 06:22:50 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20251017062250/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2026-04-01",
      "as_of_label": "April 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 60.41,
      "fixed_monthly_usd": 4.23,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of April 01, 2026 (Wayback 2026-04-14 21:56:45 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20260414215645/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2026-09-01",
      "as_of_label": "September 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 64.36,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset texas-residential-delivery-charge-history v1.0.1, from the PUCT monthly TDU rate report as of Sept. 1, 2026. The live FTP file has since been replaced by the Nov. 1, 2026 report.",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2026-10-01",
      "as_of_label": "October 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 64.36,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset; Oct. 1, 2026 PUCT report still showed pre-temporary rates.",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "Oncor",
      "as_of": "2026-11-01",
      "as_of_label": "November 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 72.73,
      "fixed_monthly_usd": 4.06,
      "volumetric_usd_per_kwh": 0.068673,
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report as of Nov. 1, 2026, published average bill at 1,000 kWh",
      "note": "components (customer $1.48 + metering $2.58 + volumetric $0.068673). Oncor's November 2026 rates are temporary and subject to refund or credit with interest once the PUCT issues a final order (PUCT Docket 59249; PURA \u00a736.216(i)). Bills rendered on or after 2026-10-04; first appear in the Nov. 1, 2026 report. Adjusting under Utilities Code \u00a736.216, added by HB 5247 (89th Legislature, effective June 20, 2025).",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/Oncor_Rate_Report.pdf",
      "source_page": "As of November 1, 2026, Residential, Average Residential Customer Bill (1,000 kWh)"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2020-03-01",
      "as_of_label": "March 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 39.96,
      "fixed_monthly_usd": 5.47,
      "volumetric_usd_per_kwh": 0.034485,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2020, page 8 of 8 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_page": "8 of 8"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2020-09-01",
      "as_of_label": "September 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 44.94,
      "fixed_monthly_usd": 4.39,
      "volumetric_usd_per_kwh": 0.040552,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2020, page 9 of 9 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323144859/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090120.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2021-03-01",
      "as_of_label": "March 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 35.63,
      "fixed_monthly_usd": 4.39,
      "volumetric_usd_per_kwh": 0.031243,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301171112/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2021-09-01",
      "as_of_label": "September 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 49.29,
      "fixed_monthly_usd": 4.39,
      "volumetric_usd_per_kwh": 0.044902,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301184208/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2022-03-01",
      "as_of_label": "March 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 41.16,
      "fixed_monthly_usd": 4.39,
      "volumetric_usd_per_kwh": 0.036767,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2022, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301175600/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030122.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2022-09-01",
      "as_of_label": "September 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 52.09,
      "fixed_monthly_usd": 4.39,
      "volumetric_usd_per_kwh": 0.047698,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2022 (official FTP archive copy, Wayback 2023-06-26). Column order on this sheet is CenterPoint, Oncor, AEP Central, AEP North, TNMP.",
      "source_url": "https://web.archive.org/web/20230626013352/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090122.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2023-03-01",
      "as_of_label": "March 1, 2023",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": "",
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "N",
      "record_type": "PUCT generic T&D summary (incomplete)",
      "note": "The official PUCT file titled Updated March 1, 2023 contains only Schedule Commission-1 (base T&D charges, 1 page). It does not include Schedule Commission-7 or other rider schedules, so a total residential delivery charge at 1,000 kWh cannot be source-checked from this document. The same 1-page file was posted as the current summary on June 22, 2023 (Wayback). Value cut, not estimated.",
      "source_url": "https://web.archive.org/web/20240301183314/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030123.pdf",
      "source_page": "page 1 of 1 (Commission-1 only)"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2023-09-01",
      "as_of_label": "September 1, 2023",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 56.13,
      "fixed_monthly_usd": 4.39,
      "volumetric_usd_per_kwh": 0.051741,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2023 (official FTP archive copy, Wayback 2024-03-01). Column order is CenterPoint, Oncor, AEP Central, TNMP. AEP North is not published on this table.",
      "source_url": "https://web.archive.org/web/20240301172516/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090123.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2025-10-01",
      "as_of_label": "October 1, 2025",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 63.93,
      "fixed_monthly_usd": 4.9,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of October 01, 2025 (Wayback 2025-10-17 06:22:50 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20251017062250/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2026-04-01",
      "as_of_label": "April 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 54.89,
      "fixed_monthly_usd": 4.9,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of April 01, 2026 (Wayback 2026-04-14 21:56:45 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20260414215645/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2026-09-01",
      "as_of_label": "September 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 69.03,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset, PUCT monthly TDU rate report as of Sept. 1, 2026.",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2026-10-01",
      "as_of_label": "October 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 70.23,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset, PUCT monthly TDU rate report as of Oct. 1, 2026 (interim DCRF for meters read on or after 2026-09-30; PUCT Docket 59981).",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "CenterPoint",
      "as_of": "2026-11-01",
      "as_of_label": "November 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 70.23,
      "fixed_monthly_usd": 4.9,
      "volumetric_usd_per_kwh": 0.065333,
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report as of Nov. 1, 2026, published average bill at 1,000 kWh",
      "note": "components (customer $2.11 + metering $2.79 + volumetric $0.065333). CenterPoint's November 2026 total includes an interim distribution cost recovery factor (meters read on or after Sept. 30, 2026; PUCT Docket 59981). The Commission's final order, filed Nov. 5, 2026, approved the same rates.",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/CenterPoint_Rate_Report.pdf",
      "source_page": "CenterPoint Energy Houston Electric Rates Report 11/1/2026, Average Residential Customer Bill (1,000 kWh)"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2020-03-01",
      "as_of_label": "March 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 47.08,
      "fixed_monthly_usd": 4.79,
      "volumetric_usd_per_kwh": 0.042286,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2020, page 8 of 8 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_page": "8 of 8"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2020-09-01",
      "as_of_label": "September 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 49.61,
      "fixed_monthly_usd": 4.26,
      "volumetric_usd_per_kwh": 0.045345,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2020, page 9 of 9 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323144859/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090120.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2021-03-01",
      "as_of_label": "March 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 42.31,
      "fixed_monthly_usd": 4.26,
      "volumetric_usd_per_kwh": 0.038045,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301171112/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2021-09-01",
      "as_of_label": "September 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 50.13,
      "fixed_monthly_usd": 4.79,
      "volumetric_usd_per_kwh": 0.045338,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301184208/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2022-03-01",
      "as_of_label": "March 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 50.01,
      "fixed_monthly_usd": 4.79,
      "volumetric_usd_per_kwh": 0.045224,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2022, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301175600/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030122.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2022-09-01",
      "as_of_label": "September 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 55.9,
      "fixed_monthly_usd": 4.79,
      "volumetric_usd_per_kwh": 0.051107,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2022 (official FTP archive copy, Wayback 2023-06-26). Column order on this sheet is CenterPoint, Oncor, AEP Central, AEP North, TNMP.",
      "source_url": "https://web.archive.org/web/20230626013352/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090122.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2023-03-01",
      "as_of_label": "March 1, 2023",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": "",
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "N",
      "record_type": "PUCT generic T&D summary (incomplete)",
      "note": "The official PUCT file titled Updated March 1, 2023 contains only Schedule Commission-1 (base T&D charges, 1 page). It does not include Schedule Commission-7 or other rider schedules, so a total residential delivery charge at 1,000 kWh cannot be source-checked from this document. The same 1-page file was posted as the current summary on June 22, 2023 (Wayback). Value cut, not estimated.",
      "source_url": "https://web.archive.org/web/20240301183314/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030123.pdf",
      "source_page": "page 1 of 1 (Commission-1 only)"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2023-09-01",
      "as_of_label": "September 1, 2023",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 60.04,
      "fixed_monthly_usd": 4.79,
      "volumetric_usd_per_kwh": 0.055254,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2023 (official FTP archive copy, Wayback 2024-03-01). Column order is CenterPoint, Oncor, AEP Central, TNMP. AEP North is not published on this table.",
      "source_url": "https://web.archive.org/web/20240301172516/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090123.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2025-10-01",
      "as_of_label": "October 1, 2025",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 64.24,
      "fixed_monthly_usd": 3.24,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of October 01, 2025 (Wayback 2025-10-17 06:22:50 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20251017062250/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2026-04-01",
      "as_of_label": "April 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 59.25,
      "fixed_monthly_usd": 3.24,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of April 01, 2026 (Wayback 2026-04-14 21:56:45 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20260414215645/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2026-09-01",
      "as_of_label": "September 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 61.07,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset, PUCT monthly TDU rate report as of Sept. 1, 2026.",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2026-10-01",
      "as_of_label": "October 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 60.42,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset, PUCT monthly TDU rate report as of Oct. 1, 2026.",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "AEP Texas Central",
      "as_of": "2026-11-01",
      "as_of_label": "November 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 60.15,
      "fixed_monthly_usd": 3.24,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report as of Nov. 1, 2026, published average bill at 1,000 kWh",
      "note": "PUCT published average bill (volumetric shown as $0.057, rounded; average includes %-of-revenue riders). AEP Texas was adjusting rates through a single annual proceeding under Utilities Code \u00a736.216 (PUCT Docket 58315, final order July 30, 2026), added by HB 5247 (89th Legislature, effective June 20, 2025).",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/AEP_Rate_Report.pdf",
      "source_page": "PUCT Monthly Report (As of November 1, 2026), Central column, Average Residential Customer Bill (1,000 kWh)"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2020-03-01",
      "as_of_label": "March 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 40.6,
      "fixed_monthly_usd": 4.79,
      "volumetric_usd_per_kwh": 0.035805,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2020, page 8 of 8 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_page": "8 of 8"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2020-09-01",
      "as_of_label": "September 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 44.43,
      "fixed_monthly_usd": 3.57,
      "volumetric_usd_per_kwh": 0.040869,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2020, page 9 of 9 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323144859/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090120.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2021-03-01",
      "as_of_label": "March 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 39.19,
      "fixed_monthly_usd": 3.57,
      "volumetric_usd_per_kwh": 0.035622,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301171112/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2021-09-01",
      "as_of_label": "September 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 45.89,
      "fixed_monthly_usd": 4.79,
      "volumetric_usd_per_kwh": 0.041096,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301184208/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2022-03-01",
      "as_of_label": "March 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 45.85,
      "fixed_monthly_usd": 4.79,
      "volumetric_usd_per_kwh": 0.041058,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2022, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301175600/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030122.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2022-09-01",
      "as_of_label": "September 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 51.78,
      "fixed_monthly_usd": 4.79,
      "volumetric_usd_per_kwh": 0.046985,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2022 (official FTP archive copy, Wayback 2023-06-26). Column order on this sheet is CenterPoint, Oncor, AEP Central, AEP North, TNMP.",
      "source_url": "https://web.archive.org/web/20230626013352/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090122.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2023-03-01",
      "as_of_label": "March 1, 2023",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": "",
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "N",
      "record_type": "PUCT generic T&D summary (incomplete)",
      "note": "The official PUCT file titled Updated March 1, 2023 contains only Schedule Commission-1 (base T&D charges, 1 page). It does not include Schedule Commission-7 or other rider schedules, so a total residential delivery charge at 1,000 kWh cannot be source-checked from this document. The same 1-page file was posted as the current summary on June 22, 2023 (Wayback). Value cut, not estimated.",
      "source_url": "https://web.archive.org/web/20240301183314/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030123.pdf",
      "source_page": "page 1 of 1 (Commission-1 only)"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2023-09-01",
      "as_of_label": "September 1, 2023",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": "",
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "N",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "AEP North is not published on the September 1, 2023 Commission-7 table. Value cut, not estimated.",
      "source_url": "https://web.archive.org/web/20240301172516/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090123.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2025-10-01",
      "as_of_label": "October 1, 2025",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 62.56,
      "fixed_monthly_usd": 3.24,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of October 01, 2025 (Wayback 2025-10-17 06:22:50 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20251017062250/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2026-04-01",
      "as_of_label": "April 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 59.72,
      "fixed_monthly_usd": 3.24,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of April 01, 2026 (Wayback 2026-04-14 21:56:45 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20260414215645/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2026-09-01",
      "as_of_label": "September 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 59.93,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset, PUCT monthly TDU rate report as of Sept. 1, 2026.",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2026-10-01",
      "as_of_label": "October 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 59.27,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset, PUCT monthly TDU rate report as of Oct. 1, 2026.",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "AEP Texas North",
      "as_of": "2026-11-01",
      "as_of_label": "November 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 59.0,
      "fixed_monthly_usd": 3.24,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report as of Nov. 1, 2026, published average bill at 1,000 kWh",
      "note": "PUCT published average bill (volumetric shown as $0.056, rounded; average includes %-of-revenue riders). AEP Texas was adjusting rates through a single annual proceeding under Utilities Code \u00a736.216 (PUCT Docket 58315, final order July 30, 2026), added by HB 5247 (89th Legislature, effective June 20, 2025).",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/AEP_Rate_Report.pdf",
      "source_page": "PUCT Monthly Report (As of November 1, 2026), North column, Average Residential Customer Bill (1,000 kWh)"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2020-03-01",
      "as_of_label": "March 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 49.04,
      "fixed_monthly_usd": 7.85,
      "volumetric_usd_per_kwh": 0.041194,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2020, page 8 of 8 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323132836/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030120.pdf",
      "source_page": "8 of 8"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2020-09-01",
      "as_of_label": "September 1, 2020",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 56.94,
      "fixed_monthly_usd": 7.85,
      "volumetric_usd_per_kwh": 0.049093,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2020, page 9 of 9 (official FTP archive copy, Wayback 2023-03-23)",
      "source_url": "https://web.archive.org/web/20230323144859/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090120.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2021-03-01",
      "as_of_label": "March 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 48.25,
      "fixed_monthly_usd": 7.85,
      "volumetric_usd_per_kwh": 0.040403,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301171112/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2021-09-01",
      "as_of_label": "September 1, 2021",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 57.22,
      "fixed_monthly_usd": 7.85,
      "volumetric_usd_per_kwh": 0.049368,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2021, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301184208/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090121.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2022-03-01",
      "as_of_label": "March 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 55.12,
      "fixed_monthly_usd": 7.85,
      "volumetric_usd_per_kwh": 0.047274,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated March 1, 2022, page 9 of 9 (official FTP archive copy, Wayback 2024-03-01)",
      "source_url": "https://web.archive.org/web/20240301175600/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030122.pdf",
      "source_page": "9 of 9"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2022-09-01",
      "as_of_label": "September 1, 2022",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": 62.43,
      "fixed_monthly_usd": 7.85,
      "volumetric_usd_per_kwh": 0.054581,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2022 (official FTP archive copy, Wayback 2023-06-26). Column order on this sheet is CenterPoint, Oncor, AEP Central, AEP North, TNMP.",
      "source_url": "https://web.archive.org/web/20230626013352/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090122.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2023-03-01",
      "as_of_label": "March 1, 2023",
      "period": "before_sb1015",
      "delivery_usd_1000_kwh": "",
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "N",
      "record_type": "PUCT generic T&D summary (incomplete)",
      "note": "The official PUCT file titled Updated March 1, 2023 contains only Schedule Commission-1 (base T&D charges, 1 page). It does not include Schedule Commission-7 or other rider schedules, so a total residential delivery charge at 1,000 kWh cannot be source-checked from this document. The same 1-page file was posted as the current summary on June 22, 2023 (Wayback). Value cut, not estimated.",
      "source_url": "https://web.archive.org/web/20240301183314/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_030123.pdf",
      "source_page": "page 1 of 1 (Commission-1 only)"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2023-09-01",
      "as_of_label": "September 1, 2023",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 68.32,
      "fixed_monthly_usd": 7.85,
      "volumetric_usd_per_kwh": 0.060465,
      "published": "Y",
      "record_type": "PUCT Schedule Commission-7 total monthly bill at 1,000 kWh",
      "note": "PUCT Comparison of Utilities' Generic T&D Rates, Schedule Commission-7, Updated September 1, 2023 (official FTP archive copy, Wayback 2024-03-01). Column order is CenterPoint, Oncor, AEP Central, TNMP. AEP North is not published on this table.",
      "source_url": "https://web.archive.org/web/20240301172516/https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/Trans/TDArchive/TDGenericRateSummary_090123.pdf",
      "source_page": "Commission-7 (last page)"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2025-10-01",
      "as_of_label": "October 1, 2025",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 79.91,
      "fixed_monthly_usd": 7.85,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of October 01, 2025 (Wayback 2025-10-17 06:22:50 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20251017062250/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2026-04-01",
      "as_of_label": "April 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 80.59,
      "fixed_monthly_usd": 7.85,
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT TDR webpage, published average residential bill at 1,000 kWh",
      "note": "PUCT Transmission and Distribution Utility Rates page, Residential table, As of April 01, 2026 (Wayback 2026-04-14 21:56:45 UTC). Customer plus metering as published: AEP $1.27+$1.97; CenterPoint $2.11+$2.79; Oncor $1.43+$2.80; TNMP $1.13+$6.72. Volumetric line on the page is rounded for some utilities; the 1,000 kWh average bill is the figure used.",
      "source_url": "https://web.archive.org/web/20260414215645/https://www.puc.texas.gov/industry/electric/rates/tdr/",
      "source_page": "Residential TDU Delivery Charges table"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2026-09-01",
      "as_of_label": "September 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 81.87,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset, PUCT monthly TDU rate report as of Sept. 1, 2026.",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2026-10-01",
      "as_of_label": "October 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 85.27,
      "fixed_monthly_usd": "",
      "volumetric_usd_per_kwh": "",
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report (as-of date), from existing source-checked Power Hopper history dataset",
      "note": "Existing source-checked dataset, PUCT monthly TDU rate report as of Oct. 1, 2026 (rates effective 2026-09-13).",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/",
      "source_page": "as recorded in texas-residential-delivery-charge-history v1.0.1 (live FTP file now shows Nov. 1, 2026)"
    },
    {
      "delivery_utility": "TNMP",
      "as_of": "2026-11-01",
      "as_of_label": "November 1, 2026",
      "period": "after_sb1015",
      "delivery_usd_1000_kwh": 85.27,
      "fixed_monthly_usd": 7.56,
      "volumetric_usd_per_kwh": 0.07771,
      "published": "Y",
      "record_type": "PUCT monthly TDU rate report as of Nov. 1, 2026, published average bill at 1,000 kWh",
      "note": "components (customer $1.70 + metering $5.86 + volumetric $0.077710)",
      "source_url": "https://ftp.puc.texas.gov/public/puct-info/industry/electric/rates/tdr/tdu/TNMP_Rate_Report.pdf",
      "source_page": "As of November 1, 2026, Average Residential Customer Bill (1,000 kWh)"
    }
  ]
}